> cypress-extracker-webapp@1.0.0 scripts-regression > set DEBUG=cypress:* && cypress run --browser chrome --spec "./cypress/e2e/regression/** ==================================================================================================== (Run Starting) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Cypress: 12.13.0 │ │ Browser: Chrome 114 (headless) │ │ Node Version: v18.14.1 (C:\Program Files\nodejs\node.exe) │ │ Specs: 96 found (01_LoginPage/ex-3313-invalid-credentials.spec.ts, 01_LoginPage/ex-33 │ │ 16-email-input-validation.spec.ts, 01_LoginPage/ex-5751-create-new-account-wit │ │ h-already-used-email.spec.ts, 09_Analytics/ex-5428-verify-sent-export--tm-tag- │ │ detailed-report-xlsx-af...) │ │ Searched: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\e2e\regression\** │ │ Experiments: experimentalMemoryManagement=true,experimentalStudio=true │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 01_LoginPage/ex-3313-invalid-credentials.spec.ts (1 of 96) Login with invalid credentialsTue Jun 06 2023 00:46:30 GMT+0000 (Greenwich Mean Time) Login with invalid credentialsTue Jun 06 2023 00:46:30 GMT+0000 (Greenwich Mean Time) √ EX-3313 - Login with invalid credentials.Tue Jun 06 2023 00:46:30 GMT+0000 (Greenwich Mean Time) (9939ms) √ EX-3313 - Login with invalid credentials.Tue Jun 06 2023 00:46:30 GMT+0000 (Greenwich Mean Time) (9939ms) 1 passing (10s) 1 passing (10s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 9 seconds │ │ Spec Ran: 01_LoginPage/ex-3313-invalid-credentials.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 01_LoginPage/ex-3316-email-input-validation.spec.ts (2 of 96) 3316 | Verify data input validation for emailTue Jun 06 2023 00:46:45 GMT+0000 (Greenwich Mean Time) 3316 | Verify data input validation for emailTue Jun 06 2023 00:46:45 GMT+0000 (Greenwich Mean Time) √ 3316 - Verify data input validation for emailTue Jun 06 2023 00:46:45 GMT+0000 (Greenwich Mean Time) (8172ms) √ 3316 - Verify data input validation for emailTue Jun 06 2023 00:46:45 GMT+0000 (Greenwich Mean Time) (8172ms) 1 passing (8s) 1 passing (8s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_001.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 8 seconds │ │ Spec Ran: 01_LoginPage/ex-3316-email-input-validation.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 01_LoginPage/ex-5751-create-new-account-with-already-used-email.spec (3 of 96) .ts Account Creation | Prevent users from creating separate accounts with same email domainTue Jun 06 2023 00:46:56 GMT+0000 (Greenwich Mean Time) Account Creation | Prevent users from creating separate accounts with same email domainTue Jun 06 2023 00:46:56 GMT+0000 (Greenwich Mean Time) √ EX-5751 - Create account with email that is already associated with existing Extracker account.Tue Jun 06 2023 00:46:56 GMT+0000 (Greenwich Mean Time) (10179ms) √ EX-5751 - Create account with email that is already associated with existing Extracker account.Tue Jun 06 2023 00:46:56 GMT+0000 (Greenwich Mean Time) (10179ms) 1 passing (10s) 1 passing (10s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_002.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 10 seconds │ │ Spec Ran: 01_LoginPage/ex-5751-create-new-account-with-already-used-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 09_Analytics/ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx (4 of 96) -after-filtering-by-project.spec.ts Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Tue Jun 06 2023 00:47:10 GMT+0000 (Greenwich Mean Time) Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Tue Jun 06 2023 00:47:10 GMT+0000 (Greenwich Mean Time) 1) EX-5428 - Verify the SENT, Detailed TM Tags Report (Excel).Tue Jun 06 2023 00:47:10 GMT+0000 (Greenwich Mean Time) 1) EX-5428 - Verify the SENT, Detailed TM Tags Report (Excel).Tue Jun 06 2023 00:47:10 GMT+0000 (Greenwich Mean Time) 0 passing (1m) 1 failing 1) Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Tue Jun 06 2023 00:47:10 GMT+0000 (Greenwich Mean Time) EX-5428 - Verify the SENT, Detailed TM Tags Report (Excel).Tue Jun 06 2023 00:47:10 GMT+0000 (Greenwich Mean Time): AssertionError: expected ' Tag Number,Title,Date Of Work Performed,Date signed,Date Submitted,COR Number,Project Name,Customer Reference Number,My Job Number,Status,Labor: \n Straight Time \n hours,Labor: \n Overtime \n hours,Labor: Double \n Time hours,Labor: OT \n Premium \n hours,Labor: DT \n Premium \n hours' to deeply equal ' Tag Number,Title,Date Of Work Performed,Date signed,COR Number,Project Name,Customer Reference Number,My Job Number,Status,Labor: \n Straight Time \n hours,Labor: \n Overtime \n hours,Labor: Double \n Time hours,Labor: OT \n Premium \n hours,Labor: DT \n Premium \n hours' + expected - actual -' Tag Number,Title,Date Of Work Performed,Date signed,Date Submitted,COR Number,Project Name,Customer Reference Number,My Job Number,Status,Labor: \n Straight Time \n hours,Labor: \n Overtime \n hours,Labor: Double \n Time hours,Labor: OT \n Premium \n hours,Labor: DT \n Premium \n hours' +' Tag Number,Title,Date Of Work Performed,Date signed,COR Number,Project Name,Customer Reference Number,My Job Number,Status,Labor: \n Straight Time \n hours,Labor: \n Overtime \n hours,Labor: Double \n Time hours,Labor: OT \n Premium \n hours,Labor: DT \n Premium \n hours' at Context.eval (webpack:///./cypress/e2e/regression/09_Analytics/ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx-after-filtering-by-project.spec.ts:46:62) 0 passing (1m) 1 failing 1) Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Tue Jun 06 2023 00:47:10 GMT+0000 (Greenwich Mean Time) EX-5428 - Verify the SENT, Detailed TM Tags Report (Excel).Tue Jun 06 2023 00:47:10 GMT+0000 (Greenwich Mean Time): AssertionError: expected ' Tag Number,Title,Date Of Work Performed,Date signed,Date Submitted,COR Number,Project Name,Customer Reference Number,My Job Number,Status,Labor: \n Straight Time \n hours,Labor: \n Overtime \n hours,Labor: Double \n Time hours,Labor: OT \n Premium \n hours,Labor: DT \n Premium \n hours' to deeply equal ' Tag Number,Title,Date Of Work Performed,Date signed,COR Number,Project Name,Customer Reference Number,My Job Number,Status,Labor: \n Straight Time \n hours,Labor: \n Overtime \n hours,Labor: Double \n Time hours,Labor: OT \n Premium \n hours,Labor: DT \n Premium \n hours' + expected - actual -' Tag Number,Title,Date Of Work Performed,Date signed,Date Submitted,COR Number,Project Name,Customer Reference Number,My Job Number,Status,Labor: \n Straight Time \n hours,Labor: \n Overtime \n hours,Labor: Double \n Time hours,Labor: OT \n Premium \n hours,Labor: DT \n Premium \n hours' +' Tag Number,Title,Date Of Work Performed,Date signed,COR Number,Project Name,Customer Reference Number,My Job Number,Status,Labor: \n Straight Time \n hours,Labor: \n Overtime \n hours,Labor: Double \n Time hours,Labor: OT \n Premium \n hours,Labor: DT \n Premium \n hours' at Context.eval (webpack:///./cypress/e2e/regression/09_Analytics/ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx-after-filtering-by-project.spec.ts:46:62) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_003.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 0 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 2 │ │ Video: false │ │ Duration: 1 minute, 15 seconds │ │ Spec Ran: 09_Analytics/ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx-after-filte │ │ ring-by-project.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\09_Anal (1280x720) ytics\ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx-after-filtering-by -project.spec.ts\Analytics Verify the SENT, Detailed TM Tags Report (Excel)Tue Jun 06 2023 004710 GMT+0000 (Greenwich Mean Time) -- EX-5428 - Verify the SENT, Detailed TM Tags Report (Excel).Tue Jun 06 2023 004710 GMT+0000 (Greenwich Mean Time) (failed).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\09_Anal (1280x720) ytics\ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx-after-filtering-by -project.spec.ts\Analytics Verify the SENT, Detailed TM Tags Report (Excel)Tue Jun 06 2023 004710 GMT+0000 (Greenwich Mean Time) -- EX-5428 - Verify the SENT, Detailed TM Tags Report (Excel).Tue Jun 06 2023 004710 GMT+0000 (Greenwich Mean Time) (failed) (attempt 2).png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 09_Analytics/ex-8799-verify-received-export--tm-tag-detailed-report- (5 of 96) xlsx-after-filtering-by-project.spec.ts Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Tue Jun 06 2023 00:48:29 GMT+0000 (Greenwich Mean Time) Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Tue Jun 06 2023 00:48:29 GMT+0000 (Greenwich Mean Time) √ EX-8799 - Verify the Received, Detailed TM Tags Report (Excel).Tue Jun 06 2023 00:48:29 GMT+0000 (Greenwich Mean Time) (37945ms) √ EX-8799 - Verify the Received, Detailed TM Tags Report (Excel).Tue Jun 06 2023 00:48:29 GMT+0000 (Greenwich Mean Time) (37945ms) 1 passing (38s) 1 passing (38s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_004.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 38 seconds │ │ Spec Ran: 09_Analytics/ex-8799-verify-received-export--tm-tag-detailed-report-xlsx-after-f │ │ iltering-by-project.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 12_Tag_Activity/ex-7214-tag-activity-create-sign-send-reject-from-we (6 of 96) b.spec.ts Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification)Tue Jun 06 2023 00:49:11 GMT+0000 (Greenwich Mean Time) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification)Tue Jun 06 2023 00:49:11 GMT+0000 (Greenwich Mean Time) √ EX-7214 - Part 1: Clean the tags (49914ms) √ EX-7214 - Part 1: Clean the tags (49914ms) √ EX-7214 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagTue Jun 06 2023 00:49:11 GMT+0000 (Greenwich Mean Time) (86756ms) √ EX-7214 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagTue Jun 06 2023 00:49:11 GMT+0000 (Greenwich Mean Time) (86756ms) √ EX-7214 - Part 3: Verify activity feed. Tue Jun 06 2023 00:49:11 GMT+0000 (Greenwich Mean Time) (63235ms) √ EX-7214 - Part 3: Verify activity feed. Tue Jun 06 2023 00:49:11 GMT+0000 (Greenwich Mean Time) (63235ms) √ EX-7214 - Part 4: Verify the GC Admin received Bell Notification and use it to reject the tag.Tue Jun 06 2023 00:49:11 GMT+0000 (Greenwich Mean Time) (24208ms) √ EX-7214 - Part 4: Verify the GC Admin received Bell Notification and use it to reject the tag.Tue Jun 06 2023 00:49:11 GMT+0000 (Greenwich Mean Time) (24208ms) √ EX-7214 - Part 5: Verify the tag activity in the SC Admin T&M Log pageTue Jun 06 2023 00:49:11 GMT+0000 (Greenwich Mean Time) (53488ms) √ EX-7214 - Part 5: Verify the tag activity in the SC Admin T&M Log pageTue Jun 06 2023 00:49:11 GMT+0000 (Greenwich Mean Time) (53488ms) √ EX-7214 - Part 6: Verify the tag activity in the GC Admin T&M Log page in Receiver tabTue Jun 06 2023 00:49:11 GMT+0000 (Greenwich Mean Time) (49198ms) √ EX-7214 - Part 6: Verify the tag activity in the GC Admin T&M Log page in Receiver tabTue Jun 06 2023 00:49:11 GMT+0000 (Greenwich Mean Time) (49198ms) √ EX-7214 - Part 7: Cleanup SC Tag ... Tue Jun 06 2023 00:49:11 GMT+0000 (Greenwich Mean Time) (36891ms) √ EX-7214 - Part 7: Cleanup SC Tag ... Tue Jun 06 2023 00:49:11 GMT+0000 (Greenwich Mean Time) (36891ms) 7 passing (6m) 7 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_005.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 4 seconds │ │ Spec Ran: 12_Tag_Activity/ex-7214-tag-activity-create-sign-send-reject-from-web.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 12_Tag_Activity/ex-7215-tag-activity-create-sign-send-revise-resubmi (7 of 96) t-from-web.spec.ts Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Revise and Resubmit the tag from the web(Bell notification)Tue Jun 06 2023 00:55:20 GMT+0000 (Greenwich Mean Time) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Revise and Resubmit the tag from the web(Bell notification)Tue Jun 06 2023 00:55:20 GMT+0000 (Greenwich Mean Time) √ EX-7215 - Part 1: Clean the tags (55793ms) √ EX-7215 - Part 1: Clean the tags (55793ms) √ EX-7215 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagTue Jun 06 2023 00:55:20 GMT+0000 (Greenwich Mean Time) (107900ms) √ EX-7215 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagTue Jun 06 2023 00:55:20 GMT+0000 (Greenwich Mean Time) (107900ms) √ EX-7215 - Part 3: Verify the GC Admin received Bell Notification and use it to revise and resubmit the tag.Tue Jun 06 2023 00:55:20 GMT+0000 (Greenwich Mean Time) (23945ms) √ EX-7215 - Part 3: Verify the GC Admin received Bell Notification and use it to revise and resubmit the tag.Tue Jun 06 2023 00:55:20 GMT+0000 (Greenwich Mean Time) (23945ms) √ EX-7215 - Part 4: Verify the tag activity in the SC Admin T&M Log pageTue Jun 06 2023 00:55:20 GMT+0000 (Greenwich Mean Time) (48984ms) √ EX-7215 - Part 4: Verify the tag activity in the SC Admin T&M Log pageTue Jun 06 2023 00:55:20 GMT+0000 (Greenwich Mean Time) (48984ms) √ EX-7215 - Part 5: Verify the tag activity in the GC Admin T&M Log page in Receiver tabTue Jun 06 2023 00:55:20 GMT+0000 (Greenwich Mean Time) (51566ms) √ EX-7215 - Part 5: Verify the tag activity in the GC Admin T&M Log page in Receiver tabTue Jun 06 2023 00:55:20 GMT+0000 (Greenwich Mean Time) (51566ms) √ EX-7215 - Part 6: Cleanup SC Tag ... Tue Jun 06 2023 00:55:20 GMT+0000 (Greenwich Mean Time) (45022ms) √ EX-7215 - Part 6: Cleanup SC Tag ... Tue Jun 06 2023 00:55:20 GMT+0000 (Greenwich Mean Time) (45022ms) 6 passing (6m) 6 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_006.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: false │ │ Duration: 6 minutes, 23 seconds │ │ Spec Ran: 12_Tag_Activity/ex-7215-tag-activity-create-sign-send-revise-resubmit-from-web.s │ │ pec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\12_Tag_ (1280x720) Activity\ex-7215-tag-activity-create-sign-send-revise-resubmit-from-web.spec.ts\ Activity Log T&M Tag Create the tag, Send the tag, View the tag, Revise and Re submit the tag from the web(Bell notification)Tue Jun 06 2023 005520 GMT+0000 (G reenwich Mean Time) -- EX-7215 - Part 4 Verify the tag activity in the SC Admin T&M Log pa.png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 12_Tag_Activity/ex-7353-tag-activity-create-tag-opened-status.spec.t (8 of 96) s Activity Log | T&M Tag | Create a Tag with status Open and verify its Activity Feed messages. Tue Jun 06 2023 01:01:48 GMT+0000 (Greenwich Mean Time) Activity Log | T&M Tag | Create a Tag with status Open and verify its Activity Feed messages. Tue Jun 06 2023 01:01:48 GMT+0000 (Greenwich Mean Time) √ EX-7353 - Part 1: GC PM creates a projectTue Jun 06 2023 01:01:48 GMT+0000 (Greenwich Mean Time) (49918ms) √ EX-7353 - Part 1: GC PM creates a projectTue Jun 06 2023 01:01:48 GMT+0000 (Greenwich Mean Time) (49918ms) √ EX-7353 - Part 2: GC PM adds a contract with SC PM.Tue Jun 06 2023 01:01:48 GMT+0000 (Greenwich Mean Time) (38565ms) √ EX-7353 - Part 2: GC PM adds a contract with SC PM.Tue Jun 06 2023 01:01:48 GMT+0000 (Greenwich Mean Time) (38565ms) √ EX-7353 - Part 3: Sub Contractor accepts invite from the bell notification.Tue Jun 06 2023 01:01:48 GMT+0000 (Greenwich Mean Time) (25517ms) √ EX-7353 - Part 3: Sub Contractor accepts invite from the bell notification.Tue Jun 06 2023 01:01:48 GMT+0000 (Greenwich Mean Time) (25517ms) √ EX-7353 - Part 4: Gen Contractor creates a Authorize T&M Work Change Notification.Tue Jun 06 2023 01:01:48 GMT+0000 (Greenwich Mean Time) (46501ms) √ EX-7353 - Part 4: Gen Contractor creates a Authorize T&M Work Change Notification.Tue Jun 06 2023 01:01:48 GMT+0000 (Greenwich Mean Time) (46501ms) √ EX-7353 - Part 5: Verify the tag activity in the GC Admin T&M Log page at the receiver tabTue Jun 06 2023 01:01:48 GMT+0000 (Greenwich Mean Time) (33174ms) √ EX-7353 - Part 5: Verify the tag activity in the GC Admin T&M Log page at the receiver tabTue Jun 06 2023 01:01:48 GMT+0000 (Greenwich Mean Time) (33174ms) √ EX-7353 - Part 6: Cleanup SC. Tue Jun 06 2023 01:01:48 GMT+0000 (Greenwich Mean Time) (31954ms) √ EX-7353 - Part 6: Cleanup SC. Tue Jun 06 2023 01:01:48 GMT+0000 (Greenwich Mean Time) (31954ms) √ EX-7353 - Part 6: Cleanup GC. Tue Jun 06 2023 01:01:48 GMT+0000 (Greenwich Mean Time) (28009ms) √ EX-7353 - Part 6: Cleanup GC. Tue Jun 06 2023 01:01:48 GMT+0000 (Greenwich Mean Time) (28009ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_007.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 14 seconds │ │ Spec Ran: 12_Tag_Activity/ex-7353-tag-activity-create-tag-opened-status.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7673-cor-activity-create-cor-draft-view-cor.spec. (9 of 96) ts Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiverTue Jun 06 2023 01:06:06 GMT+0000 (Greenwich Mean Time) Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiverTue Jun 06 2023 01:06:06 GMT+0000 (Greenwich Mean Time) √ EX-7673 - Part 0: Clean existing COR's : Tue Jun 06 2023 01:06:06 GMT+0000 (Greenwich Mean Time) (54084ms) √ EX-7673 - Part 0: Clean existing COR's : Tue Jun 06 2023 01:06:06 GMT+0000 (Greenwich Mean Time) (54084ms) √ EX-7673 - Part 1: Create COR as draft: Tue Jun 06 2023 01:06:06 GMT+0000 (Greenwich Mean Time) (52123ms) √ EX-7673 - Part 1: Create COR as draft: Tue Jun 06 2023 01:06:06 GMT+0000 (Greenwich Mean Time) (52123ms) √ EX-7673 - Part 2: Verify the COR Draft Log has the new COR draft and send the COR for email distribution : Tue Jun 06 2023 01:06:06 GMT+0000 (Greenwich Mean Time) (65318ms) √ EX-7673 - Part 2: Verify the COR Draft Log has the new COR draft and send the COR for email distribution : Tue Jun 06 2023 01:06:06 GMT+0000 (Greenwich Mean Time) (65318ms) √ EX-7673 - Part 3: Verify the Activity Feed in the Sent Log : Tue Jun 06 2023 01:06:06 GMT+0000 (Greenwich Mean Time) (63283ms) √ EX-7673 - Part 3: Verify the Activity Feed in the Sent Log : Tue Jun 06 2023 01:06:06 GMT+0000 (Greenwich Mean Time) (63283ms) √ EX-7673 - Part 4: Verify the activity at the Received Log for the Customer: Tue Jun 06 2023 01:06:06 GMT+0000 (Greenwich Mean Time) (47570ms) √ EX-7673 - Part 4: Verify the activity at the Received Log for the Customer: Tue Jun 06 2023 01:06:06 GMT+0000 (Greenwich Mean Time) (47570ms) √ EX-7673 - Part 5: Clean the COR Tue Jun 06 2023 01:06:06 GMT+0000 (Greenwich Mean Time) (58493ms) √ EX-7673 - Part 5: Clean the COR Tue Jun 06 2023 01:06:06 GMT+0000 (Greenwich Mean Time) (58493ms) 6 passing (7m) 6 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_008.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: false │ │ Duration: 6 minutes, 56 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7673-cor-activity-create-cor-draft-view-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_ (1280x720) Activity\ex-7673-cor-activity-create-cor-draft-view-cor.spec.ts\Activity Log CO R Create a COR as Draft and send out for distribution and view the COR at the r eceiverTue Jun 06 2023 010606 GMT+0000 (Greenwich Mean Time) -- EX-7673 - Part 4 Verify the activity at the Received Log for the Customer Tue Jun 06 2023 .png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7674-cor-activity-create-cor-resend-cor-resend-co (10 of 96) r-with-email-message-view-cor.spec.ts COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageTue Jun 06 2023 01:13:05 GMT+0000 (Greenwich Mean Time) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageTue Jun 06 2023 01:13:05 GMT+0000 (Greenwich Mean Time) √ EX-7674 - Part 0: Clean existing COR's : Tue Jun 06 2023 01:13:05 GMT+0000 (Greenwich Mean Time) (55416ms) √ EX-7674 - Part 0: Clean existing COR's : Tue Jun 06 2023 01:13:05 GMT+0000 (Greenwich Mean Time) (55416ms) √ EX-7674 - Part 1: Create COR. Tue Jun 06 2023 01:13:05 GMT+0000 (Greenwich Mean Time) (60121ms) √ EX-7674 - Part 1: Create COR. Tue Jun 06 2023 01:13:05 GMT+0000 (Greenwich Mean Time) (60121ms) √ EX-7674 - Part 2: Verify the COR is in the Sent Log : Tue Jun 06 2023 01:13:05 GMT+0000 (Greenwich Mean Time) (56125ms) √ EX-7674 - Part 2: Verify the COR is in the Sent Log : Tue Jun 06 2023 01:13:05 GMT+0000 (Greenwich Mean Time) (56125ms) √ EX-7674 - Part 3: Resend the COR and resend the cor with email message and verify activity in sent log : Tue Jun 06 2023 01:13:05 GMT+0000 (Greenwich Mean Time) (82501ms) √ EX-7674 - Part 3: Resend the COR and resend the cor with email message and verify activity in sent log : Tue Jun 06 2023 01:13:05 GMT+0000 (Greenwich Mean Time) (82501ms) √ EX-7674 - Part 4: Verify the activity at the reciver side : Tue Jun 06 2023 01:13:05 GMT+0000 (Greenwich Mean Time) (40425ms) √ EX-7674 - Part 4: Verify the activity at the reciver side : Tue Jun 06 2023 01:13:05 GMT+0000 (Greenwich Mean Time) (40425ms) √ EX-7674 - Part 5: Clean the COR: Tue Jun 06 2023 01:13:05 GMT+0000 (Greenwich Mean Time) (63432ms) √ EX-7674 - Part 5: Clean the COR: Tue Jun 06 2023 01:13:05 GMT+0000 (Greenwich Mean Time) (63432ms) 6 passing (6m) 6 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_009.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 58 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7674-cor-activity-create-cor-resend-cor-resend-cor-with-email │ │ -message-view-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7678-cor-activity-create-cor-change-status-state- (11 of 96) at-receiver.spec.ts Create a COR and send the COR and change the status and stage with email message at the receiver sideTue Jun 06 2023 01:19:08 GMT+0000 (Greenwich Mean Time) Create a COR and send the COR and change the status and stage with email message at the receiver sideTue Jun 06 2023 01:19:08 GMT+0000 (Greenwich Mean Time) √ EX-7678 - Part 1: Clean existing COR's : Tue Jun 06 2023 01:19:08 GMT+0000 (Greenwich Mean Time) (55135ms) √ EX-7678 - Part 1: Clean existing COR's : Tue Jun 06 2023 01:19:08 GMT+0000 (Greenwich Mean Time) (55135ms) √ EX-7678 - Part 2: Create COR : Tue Jun 06 2023 01:19:08 GMT+0000 (Greenwich Mean Time) (62140ms) √ EX-7678 - Part 2: Create COR : Tue Jun 06 2023 01:19:08 GMT+0000 (Greenwich Mean Time) (62140ms) √ EX-7678 - Part 3: Verify the COR is in the Sent Log : Tue Jun 06 2023 01:19:08 GMT+0000 (Greenwich Mean Time) (51500ms) √ EX-7678 - Part 3: Verify the COR is in the Sent Log : Tue Jun 06 2023 01:19:08 GMT+0000 (Greenwich Mean Time) (51500ms) √ EX-7678 - Part 4: Change status and state at sent side verify activity in received log : Tue Jun 06 2023 01:19:08 GMT+0000 (Greenwich Mean Time) (83700ms) √ EX-7678 - Part 4: Change status and state at sent side verify activity in received log : Tue Jun 06 2023 01:19:08 GMT+0000 (Greenwich Mean Time) (83700ms) √ EX-7678 - Part 5: Verify the activity at the sent side : Tue Jun 06 2023 01:19:08 GMT+0000 (Greenwich Mean Time) (47499ms) √ EX-7678 - Part 5: Verify the activity at the sent side : Tue Jun 06 2023 01:19:08 GMT+0000 (Greenwich Mean Time) (47499ms) √ EX-7678 - Part 6: Clean the COR:Tue Jun 06 2023 01:19:08 GMT+0000 (Greenwich Mean Time) (61262ms) √ EX-7678 - Part 6: Clean the COR:Tue Jun 06 2023 01:19:08 GMT+0000 (Greenwich Mean Time) (61262ms) 6 passing (6m) 6 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_010.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 2 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7678-cor-activity-create-cor-change-status-state-at-receiver. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts (12 of 96) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageTue Jun 06 2023 01:25:14 GMT+0000 (Greenwich Mean Time) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageTue Jun 06 2023 01:25:14 GMT+0000 (Greenwich Mean Time) √ EX-7798 - Part 1: Clean existing COR's : Tue Jun 06 2023 01:25:14 GMT+0000 (Greenwich Mean Time) (52976ms) √ EX-7798 - Part 1: Clean existing COR's : Tue Jun 06 2023 01:25:14 GMT+0000 (Greenwich Mean Time) (52976ms) √ EX-7798 - Part 2: Upload COR : Tue Jun 06 2023 01:25:14 GMT+0000 (Greenwich Mean Time) (69281ms) √ EX-7798 - Part 2: Upload COR : Tue Jun 06 2023 01:25:14 GMT+0000 (Greenwich Mean Time) (69281ms) √ EX-7798 - Part 3: View the COR at receiver side : Tue Jun 06 2023 01:25:14 GMT+0000 (Greenwich Mean Time) (66894ms) √ EX-7798 - Part 3: View the COR at receiver side : Tue Jun 06 2023 01:25:14 GMT+0000 (Greenwich Mean Time) (66894ms) √ EX-7798 - Part 4: Verify the COR is in the Sent Log : Tue Jun 06 2023 01:25:14 GMT+0000 (Greenwich Mean Time) (51321ms) √ EX-7798 - Part 4: Verify the COR is in the Sent Log : Tue Jun 06 2023 01:25:14 GMT+0000 (Greenwich Mean Time) (51321ms) √ EX-7798 - Part 5: Verify the activity at the reciver side : Tue Jun 06 2023 01:25:14 GMT+0000 (Greenwich Mean Time) (41930ms) √ EX-7798 - Part 5: Verify the activity at the reciver side : Tue Jun 06 2023 01:25:14 GMT+0000 (Greenwich Mean Time) (41930ms) √ EX-7798 - Part 6: Clean the COR:Tue Jun 06 2023 01:25:14 GMT+0000 (Greenwich Mean Time) (57844ms) √ EX-7798 - Part 6: Clean the COR:Tue Jun 06 2023 01:25:14 GMT+0000 (Greenwich Mean Time) (57844ms) 6 passing (6m) 6 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_011.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: false │ │ Duration: 6 minutes, 16 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_ (1280x720) Activity\ex-7798-cor-activity-upload-cor-view-cor.spec.ts\COR Log Create a COR and send out for distribution and resend the cor and resend again with email mes sageTue Jun 06 2023 012514 GMT+0000 (Greenwich Mean Time) -- EX-7798 - Part 2 Up load COR Tue Jun 06 2023 012514 GMT+0000 (Greenwich Mean Time) (fai.png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Add_users_to_Project/EX-9394-GC-creates-project- (13 of 96) adds-new-customer-user.spec.ts Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fieldsTue Jun 06 2023 01:31:34 GMT+0000 (Greenwich Mean Time) Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fieldsTue Jun 06 2023 01:31:34 GMT+0000 (Greenwich Mean Time) √ EX-9394 - Part 1: Create a project and add customers : Tue Jun 06 2023 01:31:34 GMT+0000 (Greenwich Mean Time) (49776ms) √ EX-9394 - Part 1: Create a project and add customers : Tue Jun 06 2023 01:31:34 GMT+0000 (Greenwich Mean Time) (49776ms) 1) EX-9394 - Part 2: Add new Customer to the project.Tue Jun 06 2023 01:31:34 GMT+0000 (Greenwich Mean Time) 1) EX-9394 - Part 2: Add new Customer to the project.Tue Jun 06 2023 01:31:34 GMT+0000 (Greenwich Mean Time) √ EX-9394 - Part 3: Cleanup GC... Tue Jun 06 2023 01:31:34 GMT+0000 (Greenwich Mean Time) (32204ms) √ EX-9394 - Part 3: Cleanup GC... Tue Jun 06 2023 01:31:34 GMT+0000 (Greenwich Mean Time) (32204ms) 2 passing (3m) 1 failing 1) Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fieldsTue Jun 06 2023 01:31:34 GMT+0000 (Greenwich Mean Time) EX-9394 - Part 2: Add new Customer to the project.Tue Jun 06 2023 01:31:34 GMT+0000 (Greenwich Mean Time): CypressError: Timed out retrying after 30000ms: `cy.contains()` failed because it requires a DOM element, window or document. No elements in the current DOM matched your query: > cy.get(div[role='alert']) at isElement (https://staging.extracker.co/__cypress/runner/cypress_runner.js:161429:70) at validateType (https://staging.extracker.co/__cypress/runner/cypress_runner.js:161287:14) at Object.isType (https://staging.extracker.co/__cypress/runner/cypress_runner.js:161318:7) at (https://staging.extracker.co/__cypress/runner/cypress_runner.js:148566:22) at Object.subjectFn (https://staging.extracker.co/__cypress/runner/cypress_runner.js:159292:16) at $Cy.verifyUpcomingAssertions (https://staging.extracker.co/__cypress/runner/cypress_runner.js:140514:31) at onRetry (https://staging.extracker.co/__cypress/runner/cypress_runner.js:159283:15) at tryCatcher (https://staging.extracker.co/__cypress/runner/cypress_runner.js:18744:23) at Promise.attempt.Promise.try (https://staging.extracker.co/__cypress/runner/cypress_runner.js:16018:29) at whenStable (https://staging.extracker.co/__cypress/runner/cypress_runner.js:156168:65) at (https://staging.extracker.co/__cypress/runner/cypress_runner.js:155609:14) at tryCatcher (https://staging.extracker.co/__cypress/runner/cypress_runner.js:18744:23) at Promise._settlePromiseFromHandler (https://staging.extracker.co/__cypress/runner/cypress_runner.js:16679:31) at Promise._settlePromise (https://staging.extracker.co/__cypress/runner/cypress_runner.js:16736:18) at Promise._settlePromise0 (https://staging.extracker.co/__cypress/runner/cypress_runner.js:16781:10) at Promise._settlePromises (https://staging.extracker.co/__cypress/runner/cypress_runner.js:16861:18) at Promise._fulfill (https://staging.extracker.co/__cypress/runner/cypress_runner.js:16805:18) at (https://staging.extracker.co/__cypress/runner/cypress_runner.js:18419:46) From Your Spec Code: at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:256:36) 2 passing (3m) 1 failing 1) Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fieldsTue Jun 06 2023 01:31:34 GMT+0000 (Greenwich Mean Time) EX-9394 - Part 2: Add new Customer to the project.Tue Jun 06 2023 01:31:34 GMT+0000 (Greenwich Mean Time): CypressError: Timed out retrying after 30000ms: `cy.contains()` failed because it requires a DOM element, window or document. No elements in the current DOM matched your query: > cy.get(div[role='alert']) at isElement (https://staging.extracker.co/__cypress/runner/cypress_runner.js:161429:70) at validateType (https://staging.extracker.co/__cypress/runner/cypress_runner.js:161287:14) at Object.isType (https://staging.extracker.co/__cypress/runner/cypress_runner.js:161318:7) at (https://staging.extracker.co/__cypress/runner/cypress_runner.js:148566:22) at Object.subjectFn (https://staging.extracker.co/__cypress/runner/cypress_runner.js:159292:16) at $Cy.verifyUpcomingAssertions (https://staging.extracker.co/__cypress/runner/cypress_runner.js:140514:31) at onRetry (https://staging.extracker.co/__cypress/runner/cypress_runner.js:159283:15) at tryCatcher (https://staging.extracker.co/__cypress/runner/cypress_runner.js:18744:23) at Promise.attempt.Promise.try (https://staging.extracker.co/__cypress/runner/cypress_runner.js:16018:29) at whenStable (https://staging.extracker.co/__cypress/runner/cypress_runner.js:156168:65) at (https://staging.extracker.co/__cypress/runner/cypress_runner.js:155609:14) at tryCatcher (https://staging.extracker.co/__cypress/runner/cypress_runner.js:18744:23) at Promise._settlePromiseFromHandler (https://staging.extracker.co/__cypress/runner/cypress_runner.js:16679:31) at Promise._settlePromise (https://staging.extracker.co/__cypress/runner/cypress_runner.js:16736:18) at Promise._settlePromise0 (https://staging.extracker.co/__cypress/runner/cypress_runner.js:16781:10) at Promise._settlePromises (https://staging.extracker.co/__cypress/runner/cypress_runner.js:16861:18) at Promise._fulfill (https://staging.extracker.co/__cypress/runner/cypress_runner.js:16805:18) at (https://staging.extracker.co/__cypress/runner/cypress_runner.js:18419:46) From Your Spec Code: at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:256:36) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_012.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 3 │ │ Passing: 2 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 2 │ │ Video: false │ │ Duration: 3 minutes, 26 seconds │ │ Spec Ran: 02_PermissionLevels/Add_users_to_Project/EX-9394-GC-creates-project-adds-new-cus │ │ tomer-user.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\Add_users_to_Project\EX-9394-GC-creates-project-adds-new-customer-u ser.spec.ts\Add Customer Add a new user as customer to the project with all man datory and non mandatory fieldsTue Jun 06 2023 013134 GMT+0000 (Greenwich Mean T ime) -- EX-9394 - Part 2 Add new Customer to the project.Tue Jun 06 2023 013134 GMT+0000 (Greenwich Me.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\Add_users_to_Project\EX-9394-GC-creates-project-adds-new-customer-u ser.spec.ts\Add Customer Add a new user as customer to the project with all man datory and non mandatory fieldsTue Jun 06 2023 013134 GMT+0000 (Greenwich Mean T ime) -- EX-9394 - Part 2 Add new Customer to the project.Tue Jun 06 2023 013134 GMT+0000 (Greenwic (1).png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3323-create-new-project-as-own (14 of 96) er-in-owner-company.spec.ts Create New Project in Owner Company as Account Owner, using only mandatory data.Tue Jun 06 2023 01:35:04 GMT+0000 (Greenwich Mean Time) Create New Project in Owner Company as Account Owner, using only mandatory data.Tue Jun 06 2023 01:35:04 GMT+0000 (Greenwich Mean Time) √ EX-3323 - Create a project in Owner Company as Account Owner.Tue Jun 06 2023 01:35:04 GMT+0000 (Greenwich Mean Time) (48256ms) √ EX-3323 - Create a project in Owner Company as Account Owner.Tue Jun 06 2023 01:35:04 GMT+0000 (Greenwich Mean Time) (48256ms) √ EX-3323 - Cleanup...Tue Jun 06 2023 01:35:04 GMT+0000 (Greenwich Mean Time) (27269ms) √ EX-3323 - Cleanup...Tue Jun 06 2023 01:35:04 GMT+0000 (Greenwich Mean Time) (27269ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_013.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 15 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3323-create-new-project-as-owner-in-owner- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3328-create-new-project-as-own (15 of 96) er-in-sc-company.spec.ts Create New Project in SC Company as Account Owner, using only mandatory data.Tue Jun 06 2023 01:36:24 GMT+0000 (Greenwich Mean Time) Create New Project in SC Company as Account Owner, using only mandatory data.Tue Jun 06 2023 01:36:24 GMT+0000 (Greenwich Mean Time) √ EX-3328 - Create a project in SC Company as Account Owner.Tue Jun 06 2023 01:36:24 GMT+0000 (Greenwich Mean Time) (50614ms) √ EX-3328 - Create a project in SC Company as Account Owner.Tue Jun 06 2023 01:36:24 GMT+0000 (Greenwich Mean Time) (50614ms) √ EX-3328 - Cleanup...Tue Jun 06 2023 01:36:24 GMT+0000 (Greenwich Mean Time) (29708ms) √ EX-3328 - Cleanup...Tue Jun 06 2023 01:36:24 GMT+0000 (Greenwich Mean Time) (29708ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_014.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 20 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3328-create-new-project-as-owner-in-sc-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3329-create-new-project-as-own (16 of 96) er-in-other-company.spec.ts Create New Project in Other Company as Account Owner, using only mandatory data.Tue Jun 06 2023 01:37:48 GMT+0000 (Greenwich Mean Time) Create New Project in Other Company as Account Owner, using only mandatory data.Tue Jun 06 2023 01:37:48 GMT+0000 (Greenwich Mean Time) √ EX-3329 - Create a project in Other Company as Account Owner.Tue Jun 06 2023 01:37:48 GMT+0000 (Greenwich Mean Time) (50817ms) √ EX-3329 - Create a project in Other Company as Account Owner.Tue Jun 06 2023 01:37:48 GMT+0000 (Greenwich Mean Time) (50817ms) √ EX-3329 - Cleanup...Tue Jun 06 2023 01:37:48 GMT+0000 (Greenwich Mean Time) (27727ms) √ EX-3329 - Cleanup...Tue Jun 06 2023 01:37:48 GMT+0000 (Greenwich Mean Time) (27727ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_015.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 18 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3329-create-new-project-as-owner-in-other- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3330-create-new-project-as-adm (17 of 96) in-in-owner-company.spec.ts Create New Project in Owner Company as Admin, using only mandatory data.Tue Jun 06 2023 01:39:10 GMT+0000 (Greenwich Mean Time) Create New Project in Owner Company as Admin, using only mandatory data.Tue Jun 06 2023 01:39:10 GMT+0000 (Greenwich Mean Time) √ EX-3330 - Create a project in Owner Company as Admin.Tue Jun 06 2023 01:39:10 GMT+0000 (Greenwich Mean Time) (53410ms) √ EX-3330 - Create a project in Owner Company as Admin.Tue Jun 06 2023 01:39:10 GMT+0000 (Greenwich Mean Time) (53410ms) √ EX-3330 - Cleanup...Tue Jun 06 2023 01:39:10 GMT+0000 (Greenwich Mean Time) (27916ms) √ EX-3330 - Cleanup...Tue Jun 06 2023 01:39:10 GMT+0000 (Greenwich Mean Time) (27916ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_016.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 21 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3330-create-new-project-as-admin-in-owner- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3331-create-new-project-as-adm (18 of 96) in-in-gc-company.spec.ts EX-3331 | Create New Project in General Contractor Company as Admin, using only mandatory data. Tue Jun 06 2023 01:40:35 GMT+0000 (Greenwich Mean Time) EX-3331 | Create New Project in General Contractor Company as Admin, using only mandatory data. Tue Jun 06 2023 01:40:35 GMT+0000 (Greenwich Mean Time) √ EX-3331 - Tue Jun 06 2023 01:40:35 GMT+0000 (Greenwich Mean Time) (60140ms) √ EX-3331 - Tue Jun 06 2023 01:40:35 GMT+0000 (Greenwich Mean Time) (60140ms) √ EX-3331 - Cleanup...Tue Jun 06 2023 01:40:35 GMT+0000 (Greenwich Mean Time) (24633ms) √ EX-3331 - Cleanup...Tue Jun 06 2023 01:40:35 GMT+0000 (Greenwich Mean Time) (24633ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_017.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 25 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3331-create-new-project-as-admin-in-gc-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3332-create-new-project-as-pm- (19 of 96) in-gc-company.spec.ts Create New Project in General Contractor Company as Project Manageer, using only mandatory data.Tue Jun 06 2023 01:42:03 GMT+0000 (Greenwich Mean Time) Create New Project in General Contractor Company as Project Manageer, using only mandatory data.Tue Jun 06 2023 01:42:03 GMT+0000 (Greenwich Mean Time) √ EX-3332 - Create a projct in General Contractor Company as Project Manageer.Tue Jun 06 2023 01:42:03 GMT+0000 (Greenwich Mean Time) (49402ms) √ EX-3332 - Create a projct in General Contractor Company as Project Manageer.Tue Jun 06 2023 01:42:03 GMT+0000 (Greenwich Mean Time) (49402ms) √ EX-3332 - Cleanup...Tue Jun 06 2023 01:42:03 GMT+0000 (Greenwich Mean Time) (25899ms) √ EX-3332 - Cleanup...Tue Jun 06 2023 01:42:03 GMT+0000 (Greenwich Mean Time) (25899ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_018.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 15 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3332-create-new-project-as-pm-in-gc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3333-create-new-project-as-fu- (20 of 96) in-gc-company.spec.ts Create New Project in General Contractor Company as Field User, using only mandatory data.Tue Jun 06 2023 01:43:22 GMT+0000 (Greenwich Mean Time) Create New Project in General Contractor Company as Field User, using only mandatory data.Tue Jun 06 2023 01:43:22 GMT+0000 (Greenwich Mean Time) √ EX-3333 - Create a project in General Contractor Company as Field UserTue Jun 06 2023 01:43:22 GMT+0000 (Greenwich Mean Time) (50441ms) √ EX-3333 - Create a project in General Contractor Company as Field UserTue Jun 06 2023 01:43:22 GMT+0000 (Greenwich Mean Time) (50441ms) √ EX-3333 - Cleanup...Tue Jun 06 2023 01:43:22 GMT+0000 (Greenwich Mean Time) (24790ms) √ EX-3333 - Cleanup...Tue Jun 06 2023 01:43:22 GMT+0000 (Greenwich Mean Time) (24790ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_019.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 15 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3333-create-new-project-as-fu-in-gc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3334-create-new-project-as-pm- (21 of 96) in-owner-company.spec.ts Create New Project in Owner Company as Project Manager, using only mandatory data.Tue Jun 06 2023 01:44:41 GMT+0000 (Greenwich Mean Time) Create New Project in Owner Company as Project Manager, using only mandatory data.Tue Jun 06 2023 01:44:41 GMT+0000 (Greenwich Mean Time) √ EX-3334 - Creaet a project in Owner Company as Project Manager. Tue Jun 06 2023 01:44:41 GMT+0000 (Greenwich Mean Time) (49132ms) √ EX-3334 - Creaet a project in Owner Company as Project Manager. Tue Jun 06 2023 01:44:41 GMT+0000 (Greenwich Mean Time) (49132ms) √ EX-3334 - Cleanup...Tue Jun 06 2023 01:44:41 GMT+0000 (Greenwich Mean Time) (26783ms) √ EX-3334 - Cleanup...Tue Jun 06 2023 01:44:41 GMT+0000 (Greenwich Mean Time) (26783ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_020.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 16 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3334-create-new-project-as-pm-in-owner-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3335-create-new-project-as-fu- (22 of 96) in-owner-company.spec.ts Create New Project in Owner Company as Field User, using only mandatory data.Tue Jun 06 2023 01:46:00 GMT+0000 (Greenwich Mean Time) Create New Project in Owner Company as Field User, using only mandatory data.Tue Jun 06 2023 01:46:00 GMT+0000 (Greenwich Mean Time) √ EX-3335 - Create a project in Owner Company as Field User.Tue Jun 06 2023 01:46:00 GMT+0000 (Greenwich Mean Time) (47958ms) √ EX-3335 - Create a project in Owner Company as Field User.Tue Jun 06 2023 01:46:00 GMT+0000 (Greenwich Mean Time) (47958ms) √ EX-3335 - Cleanup...Tue Jun 06 2023 01:46:01 GMT+0000 (Greenwich Mean Time) (27435ms) √ EX-3335 - Cleanup...Tue Jun 06 2023 01:46:01 GMT+0000 (Greenwich Mean Time) (27435ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_021.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 15 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3335-create-new-project-as-fu-in-owner-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3336-create-new-project-as-adm (23 of 96) in-in-sc-company.spec.ts Create New Project in SC Company as Admin, using only mandatory data.Tue Jun 06 2023 01:47:20 GMT+0000 (Greenwich Mean Time) Create New Project in SC Company as Admin, using only mandatory data.Tue Jun 06 2023 01:47:20 GMT+0000 (Greenwich Mean Time) √ EX-3336 - Create project in SC Company as Admin.Tue Jun 06 2023 01:47:20 GMT+0000 (Greenwich Mean Time) (52846ms) √ EX-3336 - Create project in SC Company as Admin.Tue Jun 06 2023 01:47:20 GMT+0000 (Greenwich Mean Time) (52846ms) 1) EX-3336 - Cleanup...Tue Jun 06 2023 01:47:20 GMT+0000 (Greenwich Mean Time) 1) EX-3336 - Cleanup...Tue Jun 06 2023 01:47:20 GMT+0000 (Greenwich Mean Time) 1 passing (4m) 1 failing 1) Create New Project in SC Company as Admin, using only mandatory data.Tue Jun 06 2023 01:47:20 GMT+0000 (Greenwich Mean Time) EX-3336 - Cleanup...Tue Jun 06 2023 01:47:20 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected not to find content: 'Test Project TC3336 1686016040019' within the element: but continuously found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:38:38) 1 passing (4m) 1 failing 1) Create New Project in SC Company as Admin, using only mandatory data.Tue Jun 06 2023 01:47:20 GMT+0000 (Greenwich Mean Time) EX-3336 - Cleanup...Tue Jun 06 2023 01:47:20 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected not to find content: 'Test Project TC3336 1686016040019' within the element: but continuously found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:38:38) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_022.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 1 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 3 │ │ Video: false │ │ Duration: 4 minutes, 3 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3336-create-new-project-as-admin-in-sc-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\Create_Project\ex-3336-create-new-project-as-admin-in-sc-company.sp ec.ts\Create New Project in SC Company as Admin, using only mandatory data.Tue J un 06 2023 014720 GMT+0000 (Greenwich Mean Time) -- EX-3336 - Create project in SC Company as Admin.Tue Jun 06 2023 014720 GMT+0000 (Greenwich Mean Time) (faile d).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\Create_Project\ex-3336-create-new-project-as-admin-in-sc-company.sp ec.ts\Create New Project in SC Company as Admin, using only mandatory data.Tue J un 06 2023 014720 GMT+0000 (Greenwich Mean Time) -- EX-3336 - Cleanup...Tue Jun 06 2023 014720 GMT+0000 (Greenwich Mean Time) (failed).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\Create_Project\ex-3336-create-new-project-as-admin-in-sc-company.sp ec.ts\Create New Project in SC Company as Admin, using only mandatory data.Tue J un 06 2023 014720 GMT+0000 (Greenwich Mean Time) -- EX-3336 - Cleanup...Tue Jun 06 2023 014720 GMT+0000 (Greenwich Mean Time) (failed) (attempt 2).png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3337-create-new-project-as-pm- (24 of 96) in-sc-company.spec.ts Create New Project in SC Company as Project Manager, using only mandatory data.Tue Jun 06 2023 01:51:27 GMT+0000 (Greenwich Mean Time) Create New Project in SC Company as Project Manager, using only mandatory data.Tue Jun 06 2023 01:51:27 GMT+0000 (Greenwich Mean Time) √ EX-3337Tue Jun 06 2023 01:51:27 GMT+0000 (Greenwich Mean Time) (52034ms) √ EX-3337Tue Jun 06 2023 01:51:27 GMT+0000 (Greenwich Mean Time) (52034ms) √ EX-3337 - Cleanup...Tue Jun 06 2023 01:51:27 GMT+0000 (Greenwich Mean Time) (29736ms) √ EX-3337 - Cleanup...Tue Jun 06 2023 01:51:27 GMT+0000 (Greenwich Mean Time) (29736ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_023.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 21 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3337-create-new-project-as-pm-in-sc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3338-create-new-project-as-fu- (25 of 96) in-sc-company.spec.ts Create New Project in SC Company as Field User, using only mandatory data.Tue Jun 06 2023 01:52:52 GMT+0000 (Greenwich Mean Time) Create New Project in SC Company as Field User, using only mandatory data.Tue Jun 06 2023 01:52:52 GMT+0000 (Greenwich Mean Time) √ EX-3338 - Create a project in SC Company as Field User. Tue Jun 06 2023 01:52:52 GMT+0000 (Greenwich Mean Time) (51157ms) √ EX-3338 - Create a project in SC Company as Field User. Tue Jun 06 2023 01:52:52 GMT+0000 (Greenwich Mean Time) (51157ms) √ EX-3338 - Cleanup...Tue Jun 06 2023 01:52:52 GMT+0000 (Greenwich Mean Time) (29582ms) √ EX-3338 - Cleanup...Tue Jun 06 2023 01:52:52 GMT+0000 (Greenwich Mean Time) (29582ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_024.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 20 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3338-create-new-project-as-fu-in-sc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3342-create-new-project-as-adm (26 of 96) in-in-other-company.spec.ts Create New Project in Other Company as Admin, using only mandatory data.Tue Jun 06 2023 01:54:17 GMT+0000 (Greenwich Mean Time) Create New Project in Other Company as Admin, using only mandatory data.Tue Jun 06 2023 01:54:17 GMT+0000 (Greenwich Mean Time) √ EX-3342 - Create a project in Other Company as Admin. Tue Jun 06 2023 01:54:17 GMT+0000 (Greenwich Mean Time) (51329ms) √ EX-3342 - Create a project in Other Company as Admin. Tue Jun 06 2023 01:54:17 GMT+0000 (Greenwich Mean Time) (51329ms) √ EX-3342 - Cleanup...Tue Jun 06 2023 01:54:17 GMT+0000 (Greenwich Mean Time) (29100ms) √ EX-3342 - Cleanup...Tue Jun 06 2023 01:54:17 GMT+0000 (Greenwich Mean Time) (29100ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_025.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 20 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3342-create-new-project-as-admin-in-other- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3343-create-new-project-as-pm- (27 of 96) in-other-company.spec.ts Create New Project in Other Company as Project Manager, using only mandatory data.Tue Jun 06 2023 01:55:41 GMT+0000 (Greenwich Mean Time) Create New Project in Other Company as Project Manager, using only mandatory data.Tue Jun 06 2023 01:55:41 GMT+0000 (Greenwich Mean Time) √ EX-3343 - Create a project in Other Company as Project Manager.Tue Jun 06 2023 01:55:41 GMT+0000 (Greenwich Mean Time) (50335ms) √ EX-3343 - Create a project in Other Company as Project Manager.Tue Jun 06 2023 01:55:41 GMT+0000 (Greenwich Mean Time) (50335ms) √ EX-3343 - Cleanup...Tue Jun 06 2023 01:55:41 GMT+0000 (Greenwich Mean Time) (28914ms) √ EX-3343 - Cleanup...Tue Jun 06 2023 01:55:41 GMT+0000 (Greenwich Mean Time) (28914ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_026.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 19 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3343-create-new-project-as-pm-in-other-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3344-create-new-project-as-fu- (28 of 96) in-other-company.spec.ts Create New Project in Other Company as Field User, using only mandatory data.Tue Jun 06 2023 01:57:04 GMT+0000 (Greenwich Mean Time) Create New Project in Other Company as Field User, using only mandatory data.Tue Jun 06 2023 01:57:04 GMT+0000 (Greenwich Mean Time) √ EX-3344 - Create a project in Other Company as Field User. Tue Jun 06 2023 01:57:04 GMT+0000 (Greenwich Mean Time) (50770ms) √ EX-3344 - Create a project in Other Company as Field User. Tue Jun 06 2023 01:57:04 GMT+0000 (Greenwich Mean Time) (50770ms) √ EX-3344 - Cleanup...Tue Jun 06 2023 01:57:04 GMT+0000 (Greenwich Mean Time) (28928ms) √ EX-3344 - Cleanup...Tue Jun 06 2023 01:57:04 GMT+0000 (Greenwich Mean Time) (28928ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_027.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 19 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3344-create-new-project-as-fu-in-other-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9792-GC-account-owner-user-previll (29 of 96) eges.spec.ts User Role permissions| GC Account Owner | Login and verify users access privilegesTue Jun 06 2023 01:58:28 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Account Owner | Login and verify users access privilegesTue Jun 06 2023 01:58:28 GMT+0000 (Greenwich Mean Time) √ EX-9792 - Part 1: SignUp. Tue Jun 06 2023 01:58:28 GMT+0000 (Greenwich Mean Time) (14582ms) √ EX-9792 - Part 1: SignUp. Tue Jun 06 2023 01:58:28 GMT+0000 (Greenwich Mean Time) (14582ms) √ EX-9792 - Part 2: Verify the confirmation email. Tue Jun 06 2023 01:58:47 GMT+0000 (Greenwich Mean Time) √ EX-9792 - Part 2: Verify the confirmation email. Tue Jun 06 2023 01:58:47 GMT+0000 (Greenwich Mean Time) √ EX-9792 - Part 3: Create your account | Select, This is my company. Tue Jun 06 2023 01:58:53 GMT+0000 (Greenwich Mean Time) (16788ms) √ EX-9792 - Part 3: Create your account | Select, This is my company. Tue Jun 06 2023 01:58:53 GMT+0000 (Greenwich Mean Time) (16788ms) √ EX-9792 - Part 4: Change the role to Account owner Tue Jun 06 2023 01:58:53 GMT+0000 (Greenwich Mean Time) (20807ms) √ EX-9792 - Part 4: Change the role to Account owner Tue Jun 06 2023 01:58:53 GMT+0000 (Greenwich Mean Time) (20807ms) √ EX-9792-Part 5: Login as GC Account Owner and verify user privilegesTue Jun 06 2023 01:58:53 GMT+0000 (Greenwich Mean Time) (41312ms) √ EX-9792-Part 5: Login as GC Account Owner and verify user privilegesTue Jun 06 2023 01:58:53 GMT+0000 (Greenwich Mean Time) (41312ms) √ EX-9792 - Part 6: Delete the account from the company. Tue Jun 06 2023 01:58:53 GMT+0000 (Greenwich Mean Time) (11905ms) √ EX-9792 - Part 6: Delete the account from the company. Tue Jun 06 2023 01:58:53 GMT+0000 (Greenwich Mean Time) (11905ms) 6 passing (2m) 6 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_028.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 56 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9792-GC-account-owner-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9828-GC-admin-user-previlleges.spe (30 of 96) c.ts User Role permissions| GC Admin | Login and verify users access privilegesTue Jun 06 2023 02:00:29 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Admin | Login and verify users access privilegesTue Jun 06 2023 02:00:29 GMT+0000 (Greenwich Mean Time) √ EX-9828 - Part 1: SignUp. Tue Jun 06 2023 02:00:29 GMT+0000 (Greenwich Mean Time) (15580ms) √ EX-9828 - Part 1: SignUp. Tue Jun 06 2023 02:00:29 GMT+0000 (Greenwich Mean Time) (15580ms) √ EX-9828 - Part 2: Verify the confirmation email. Tue Jun 06 2023 02:00:49 GMT+0000 (Greenwich Mean Time) √ EX-9828 - Part 2: Verify the confirmation email. Tue Jun 06 2023 02:00:49 GMT+0000 (Greenwich Mean Time) √ EX-9828 - Part 3: Create your account | Select, This is my company. Tue Jun 06 2023 02:00:54 GMT+0000 (Greenwich Mean Time) (20136ms) √ EX-9828 - Part 3: Create your account | Select, This is my company. Tue Jun 06 2023 02:00:54 GMT+0000 (Greenwich Mean Time) (20136ms) √ EX-9828 - Part 4: Change the role to Account Admin Tue Jun 06 2023 02:00:54 GMT+0000 (Greenwich Mean Time) (19684ms) √ EX-9828 - Part 4: Change the role to Account Admin Tue Jun 06 2023 02:00:54 GMT+0000 (Greenwich Mean Time) (19684ms) √ EX-9828-Part 5: Login as GC Account Admin and verify user privilegesTue Jun 06 2023 02:00:54 GMT+0000 (Greenwich Mean Time) (40128ms) √ EX-9828-Part 5: Login as GC Account Admin and verify user privilegesTue Jun 06 2023 02:00:54 GMT+0000 (Greenwich Mean Time) (40128ms) √ EX-9828 - Part 6: Delete the account from the company. Tue Jun 06 2023 02:00:54 GMT+0000 (Greenwich Mean Time) (11945ms) √ EX-9828 - Part 6: Delete the account from the company. Tue Jun 06 2023 02:00:54 GMT+0000 (Greenwich Mean Time) (11945ms) 6 passing (2m) 6 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_029.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 57 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9828-GC-admin-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9829-GC-PM-user-previlleges.spec.t (31 of 96) s User Role permissions| GC PM | Login and verify users access privilegesTue Jun 06 2023 02:02:31 GMT+0000 (Greenwich Mean Time) User Role permissions| GC PM | Login and verify users access privilegesTue Jun 06 2023 02:02:31 GMT+0000 (Greenwich Mean Time) √ EX-9829 - Part 1: SignUp. Tue Jun 06 2023 02:02:31 GMT+0000 (Greenwich Mean Time) (15102ms) √ EX-9829 - Part 1: SignUp. Tue Jun 06 2023 02:02:31 GMT+0000 (Greenwich Mean Time) (15102ms) √ EX-9829 - Part 2: Verify the confirmation email. Tue Jun 06 2023 02:02:51 GMT+0000 (Greenwich Mean Time) √ EX-9829 - Part 2: Verify the confirmation email. Tue Jun 06 2023 02:02:51 GMT+0000 (Greenwich Mean Time) √ EX-9829 - Part 3: Create your account | Select, This is my company. Tue Jun 06 2023 02:02:55 GMT+0000 (Greenwich Mean Time) (16424ms) √ EX-9829 - Part 3: Create your account | Select, This is my company. Tue Jun 06 2023 02:02:55 GMT+0000 (Greenwich Mean Time) (16424ms) √ EX-9829 - Part 4: Change the role to Project Manager Tue Jun 06 2023 02:02:55 GMT+0000 (Greenwich Mean Time) (20422ms) √ EX-9829 - Part 4: Change the role to Project Manager Tue Jun 06 2023 02:02:55 GMT+0000 (Greenwich Mean Time) (20422ms) √ EX-9829-Part 5: Login as GC PM and verify user privilegesTue Jun 06 2023 02:02:55 GMT+0000 (Greenwich Mean Time) (36913ms) √ EX-9829-Part 5: Login as GC PM and verify user privilegesTue Jun 06 2023 02:02:55 GMT+0000 (Greenwich Mean Time) (36913ms) √ EX-9829 - Part 6: Delete the account from the company. Tue Jun 06 2023 02:02:55 GMT+0000 (Greenwich Mean Time) (10986ms) √ EX-9829 - Part 6: Delete the account from the company. Tue Jun 06 2023 02:02:55 GMT+0000 (Greenwich Mean Time) (10986ms) 6 passing (2m) 6 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_030.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 50 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9829-GC-PM-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9830-GC-Field-user-previlleges.spe (32 of 96) c.ts User Role permissions| GC FieldUser | Login and verify users access privilegesTue Jun 06 2023 02:04:26 GMT+0000 (Greenwich Mean Time) User Role permissions| GC FieldUser | Login and verify users access privilegesTue Jun 06 2023 02:04:26 GMT+0000 (Greenwich Mean Time) √ EX-9830 - Part 1: SignUp. Tue Jun 06 2023 02:04:26 GMT+0000 (Greenwich Mean Time) (15367ms) √ EX-9830 - Part 1: SignUp. Tue Jun 06 2023 02:04:26 GMT+0000 (Greenwich Mean Time) (15367ms) √ EX-9830 - Part 2: Verify the confirmation email. Tue Jun 06 2023 02:04:46 GMT+0000 (Greenwich Mean Time) √ EX-9830 - Part 2: Verify the confirmation email. Tue Jun 06 2023 02:04:46 GMT+0000 (Greenwich Mean Time) √ EX-9830 - Part 3: Create your account | Select, This is my company. Tue Jun 06 2023 02:04:51 GMT+0000 (Greenwich Mean Time) (16187ms) √ EX-9830 - Part 3: Create your account | Select, This is my company. Tue Jun 06 2023 02:04:51 GMT+0000 (Greenwich Mean Time) (16187ms) √ EX-9830-Part 4: Login as GC FU and verify user privilegesTue Jun 06 2023 02:04:51 GMT+0000 (Greenwich Mean Time) (21090ms) √ EX-9830-Part 4: Login as GC FU and verify user privilegesTue Jun 06 2023 02:04:51 GMT+0000 (Greenwich Mean Time) (21090ms) √ EX-9830 - Part 5: Delete the account from the company. Tue Jun 06 2023 02:04:51 GMT+0000 (Greenwich Mean Time) (11649ms) √ EX-9830 - Part 5: Delete the account from the company. Tue Jun 06 2023 02:04:51 GMT+0000 (Greenwich Mean Time) (11649ms) 5 passing (1m) 5 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_031.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 14 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9830-GC-Field-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9832-SC-Field-users-user-previlleg (33 of 96) es.spec.ts User Role permissions| SC FU | Login and verify users access privilegesTue Jun 06 2023 02:05:45 GMT+0000 (Greenwich Mean Time) User Role permissions| SC FU | Login and verify users access privilegesTue Jun 06 2023 02:05:45 GMT+0000 (Greenwich Mean Time) √ EX-9832 - Part 1: Add Contractor with SC Field User to existing project. Tue Jun 06 2023 02:05:45 GMT+0000 (Greenwich Mean Time) (31159ms) √ EX-9832 - Part 1: Add Contractor with SC Field User to existing project. Tue Jun 06 2023 02:05:45 GMT+0000 (Greenwich Mean Time) (31159ms) √ EX-9832 - Part 2: SignUp. Tue Jun 06 2023 02:05:45 GMT+0000 (Greenwich Mean Time) (10857ms) √ EX-9832 - Part 2: SignUp. Tue Jun 06 2023 02:05:45 GMT+0000 (Greenwich Mean Time) (10857ms) √ EX-9832 - Part 3: Verify the confirmation email. Tue Jun 06 2023 02:06:32 GMT+0000 (Greenwich Mean Time) √ EX-9832 - Part 3: Verify the confirmation email. Tue Jun 06 2023 02:06:32 GMT+0000 (Greenwich Mean Time) √ EX-9832 - Part 4: Create your account | Select, This is my company. Tue Jun 06 2023 02:06:37 GMT+0000 (Greenwich Mean Time) (16710ms) √ EX-9832 - Part 4: Create your account | Select, This is my company. Tue Jun 06 2023 02:06:37 GMT+0000 (Greenwich Mean Time) (16710ms) √ EX-9832 - Part 5: Change the role to Field User Tue Jun 06 2023 02:06:37 GMT+0000 (Greenwich Mean Time) (21841ms) √ EX-9832 - Part 5: Change the role to Field User Tue Jun 06 2023 02:06:37 GMT+0000 (Greenwich Mean Time) (21841ms) √ EX-9832-Part 6: Login as SC FU and verify user privilegesTue Jun 06 2023 02:06:37 GMT+0000 (Greenwich Mean Time) (21397ms) √ EX-9832-Part 6: Login as SC FU and verify user privilegesTue Jun 06 2023 02:06:37 GMT+0000 (Greenwich Mean Time) (21397ms) √ EX-9832 - Part 7: Delete the account from the company. Tue Jun 06 2023 02:06:37 GMT+0000 (Greenwich Mean Time) (11678ms) √ EX-9832 - Part 7: Delete the account from the company. Tue Jun 06 2023 02:06:37 GMT+0000 (Greenwich Mean Time) (11678ms) √ EX-9832 - Part 8: Delete the contracts of existing Project Tue Jun 06 2023 02:06:37 GMT+0000 (Greenwich Mean Time) (28275ms) √ EX-9832 - Part 8: Delete the contracts of existing Project Tue Jun 06 2023 02:06:37 GMT+0000 (Greenwich Mean Time) (28275ms) 8 passing (3m) 8 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_032.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 32 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9832-SC-Field-users-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9833-SC-PM-user-previlleges.spec.t (34 of 96) s User Role permissions| SC PM | Login and verify users access privilegesTue Jun 06 2023 02:08:22 GMT+0000 (Greenwich Mean Time) User Role permissions| SC PM | Login and verify users access privilegesTue Jun 06 2023 02:08:22 GMT+0000 (Greenwich Mean Time) √ EX-9833 - Part 1: Add Contractor with SC PM to existing project. Tue Jun 06 2023 02:08:22 GMT+0000 (Greenwich Mean Time) (31296ms) √ EX-9833 - Part 1: Add Contractor with SC PM to existing project. Tue Jun 06 2023 02:08:22 GMT+0000 (Greenwich Mean Time) (31296ms) √ EX-9833 - Part 2: SignUp. Tue Jun 06 2023 02:08:22 GMT+0000 (Greenwich Mean Time) (11927ms) √ EX-9833 - Part 2: SignUp. Tue Jun 06 2023 02:08:22 GMT+0000 (Greenwich Mean Time) (11927ms) √ EX-9833 - Part 3: Verify the confirmation email. Tue Jun 06 2023 02:09:10 GMT+0000 (Greenwich Mean Time) √ EX-9833 - Part 3: Verify the confirmation email. Tue Jun 06 2023 02:09:10 GMT+0000 (Greenwich Mean Time) √ EX-9833 - Part 4: Create your account | Select, This is my company. Tue Jun 06 2023 02:09:15 GMT+0000 (Greenwich Mean Time) (17158ms) √ EX-9833 - Part 4: Create your account | Select, This is my company. Tue Jun 06 2023 02:09:15 GMT+0000 (Greenwich Mean Time) (17158ms) √ EX-9833 - Part 5: Change the role to PM Tue Jun 06 2023 02:09:15 GMT+0000 (Greenwich Mean Time) (20039ms) √ EX-9833 - Part 5: Change the role to PM Tue Jun 06 2023 02:09:15 GMT+0000 (Greenwich Mean Time) (20039ms) √ EX-9833-Part 6: Login as SC PM and verify user privilegesTue Jun 06 2023 02:09:15 GMT+0000 (Greenwich Mean Time) (33038ms) √ EX-9833-Part 6: Login as SC PM and verify user privilegesTue Jun 06 2023 02:09:15 GMT+0000 (Greenwich Mean Time) (33038ms) √ EX-9833 - Part 7: Delete the account from the company. Tue Jun 06 2023 02:09:15 GMT+0000 (Greenwich Mean Time) (12230ms) √ EX-9833 - Part 7: Delete the account from the company. Tue Jun 06 2023 02:09:15 GMT+0000 (Greenwich Mean Time) (12230ms) √ EX-9833 - Part 8: Delete the contracts of existing Project Tue Jun 06 2023 02:09:15 GMT+0000 (Greenwich Mean Time) (28179ms) √ EX-9833 - Part 8: Delete the contracts of existing Project Tue Jun 06 2023 02:09:15 GMT+0000 (Greenwich Mean Time) (28179ms) 8 passing (3m) 8 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_033.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 44 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9833-SC-PM-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9834-SC-Admin-user-previlleges.spe (35 of 96) c.ts User Role permissions| SC Admin | Login and verify users access privilegesTue Jun 06 2023 02:11:11 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Admin | Login and verify users access privilegesTue Jun 06 2023 02:11:11 GMT+0000 (Greenwich Mean Time) √ EX-9834 - Part 1: Add Contractor with SC Admin to existing project. Tue Jun 06 2023 02:11:11 GMT+0000 (Greenwich Mean Time) (30849ms) √ EX-9834 - Part 1: Add Contractor with SC Admin to existing project. Tue Jun 06 2023 02:11:11 GMT+0000 (Greenwich Mean Time) (30849ms) √ EX-9834 - Part 2: SignUp. Tue Jun 06 2023 02:11:11 GMT+0000 (Greenwich Mean Time) (10908ms) √ EX-9834 - Part 2: SignUp. Tue Jun 06 2023 02:11:11 GMT+0000 (Greenwich Mean Time) (10908ms) √ EX-9834 - Part 3: Verify the confirmation email. Tue Jun 06 2023 02:11:57 GMT+0000 (Greenwich Mean Time) √ EX-9834 - Part 3: Verify the confirmation email. Tue Jun 06 2023 02:11:57 GMT+0000 (Greenwich Mean Time) √ EX-9834 - Part 4: Create your account | Select, This is my company. Tue Jun 06 2023 02:12:02 GMT+0000 (Greenwich Mean Time) (16322ms) √ EX-9834 - Part 4: Create your account | Select, This is my company. Tue Jun 06 2023 02:12:02 GMT+0000 (Greenwich Mean Time) (16322ms) √ EX-9834 - Part 5: Change the role to Admin Tue Jun 06 2023 02:12:02 GMT+0000 (Greenwich Mean Time) (19213ms) √ EX-9834 - Part 5: Change the role to Admin Tue Jun 06 2023 02:12:02 GMT+0000 (Greenwich Mean Time) (19213ms) √ EX-9834-Part 6: Login as SC Admin and verify user privilegesTue Jun 06 2023 02:12:02 GMT+0000 (Greenwich Mean Time) (36801ms) √ EX-9834-Part 6: Login as SC Admin and verify user privilegesTue Jun 06 2023 02:12:02 GMT+0000 (Greenwich Mean Time) (36801ms) √ EX-9834 - Part 7: Delete the account from the company. Tue Jun 06 2023 02:12:02 GMT+0000 (Greenwich Mean Time) (13518ms) √ EX-9834 - Part 7: Delete the account from the company. Tue Jun 06 2023 02:12:02 GMT+0000 (Greenwich Mean Time) (13518ms) √ EX-9834 - Part 8: Delete the contracts of existing Project Tue Jun 06 2023 02:12:02 GMT+0000 (Greenwich Mean Time) (28596ms) √ EX-9834 - Part 8: Delete the contracts of existing Project Tue Jun 06 2023 02:12:02 GMT+0000 (Greenwich Mean Time) (28596ms) 8 passing (3m) 8 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_034.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 46 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9834-SC-Admin-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9835-SC-account-owner-user-previll (36 of 96) eges.spec.ts User Role permissions| SC Account Owner | Login and verify users access privilegesTue Jun 06 2023 02:14:02 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Account Owner | Login and verify users access privilegesTue Jun 06 2023 02:14:02 GMT+0000 (Greenwich Mean Time) √ EX-9835 - Part 1: Add Contractor with SC Account owner to existing project. Tue Jun 06 2023 02:14:02 GMT+0000 (Greenwich Mean Time) (31329ms) √ EX-9835 - Part 1: Add Contractor with SC Account owner to existing project. Tue Jun 06 2023 02:14:02 GMT+0000 (Greenwich Mean Time) (31329ms) √ EX-9835 - Part 2: SignUp. Tue Jun 06 2023 02:14:02 GMT+0000 (Greenwich Mean Time) (11439ms) √ EX-9835 - Part 2: SignUp. Tue Jun 06 2023 02:14:02 GMT+0000 (Greenwich Mean Time) (11439ms) √ EX-9835 - Part 3: Verify the confirmation email. Tue Jun 06 2023 02:14:50 GMT+0000 (Greenwich Mean Time) √ EX-9835 - Part 3: Verify the confirmation email. Tue Jun 06 2023 02:14:50 GMT+0000 (Greenwich Mean Time) √ EX-9835 - Part 4: Create your account | Select, This is my company. Tue Jun 06 2023 02:14:55 GMT+0000 (Greenwich Mean Time) (15977ms) √ EX-9835 - Part 4: Create your account | Select, This is my company. Tue Jun 06 2023 02:14:55 GMT+0000 (Greenwich Mean Time) (15977ms) √ EX-9835 - Part 5: Change the role to Account owner Tue Jun 06 2023 02:14:55 GMT+0000 (Greenwich Mean Time) (19579ms) √ EX-9835 - Part 5: Change the role to Account owner Tue Jun 06 2023 02:14:55 GMT+0000 (Greenwich Mean Time) (19579ms) √ EX-9835-Part 6: Login as SC Account Owner and verify user privilegesTue Jun 06 2023 02:14:55 GMT+0000 (Greenwich Mean Time) (38385ms) √ EX-9835-Part 6: Login as SC Account Owner and verify user privilegesTue Jun 06 2023 02:14:55 GMT+0000 (Greenwich Mean Time) (38385ms) √ EX-9835 - Part 7: Delete the account from the company. Tue Jun 06 2023 02:14:55 GMT+0000 (Greenwich Mean Time) (12851ms) √ EX-9835 - Part 7: Delete the account from the company. Tue Jun 06 2023 02:14:55 GMT+0000 (Greenwich Mean Time) (12851ms) √ EX-9835 - Part 8: Delete the contracts of existing Project Tue Jun 06 2023 02:14:55 GMT+0000 (Greenwich Mean Time) (29793ms) √ EX-9835 - Part 8: Delete the contracts of existing Project Tue Jun 06 2023 02:14:55 GMT+0000 (Greenwich Mean Time) (29793ms) 8 passing (3m) 8 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_035.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 50 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9835-SC-account-owner-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-3673-verify-contractor-is-able-to-upload-cor-with (37 of 96) -only-mandatory-data.spec.ts Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Tue Jun 06 2023 02:16:57 GMT+0000 (Greenwich Mean Time) Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Tue Jun 06 2023 02:16:57 GMT+0000 (Greenwich Mean Time) √ EX-7674 - Part 0: Clean existing COR's : Tue Jun 06 2023 02:16:57 GMT+0000 (Greenwich Mean Time) (55595ms) √ EX-7674 - Part 0: Clean existing COR's : Tue Jun 06 2023 02:16:57 GMT+0000 (Greenwich Mean Time) (55595ms) √ EX-3673 - Upload COR with only mandatory data.Tue Jun 06 2023 02:16:57 GMT+0000 (Greenwich Mean Time) (51272ms) √ EX-3673 - Upload COR with only mandatory data.Tue Jun 06 2023 02:16:57 GMT+0000 (Greenwich Mean Time) (51272ms) √ EX-3673 - Verify the COR data in the COR Log.Tue Jun 06 2023 02:16:57 GMT+0000 (Greenwich Mean Time) (48479ms) √ EX-3673 - Verify the COR data in the COR Log.Tue Jun 06 2023 02:16:57 GMT+0000 (Greenwich Mean Time) (48479ms) √ EX-3673 - Cleanup - Delete COR.Tue Jun 06 2023 02:16:57 GMT+0000 (Greenwich Mean Time) (49626ms) √ EX-3673 - Cleanup - Delete COR.Tue Jun 06 2023 02:16:57 GMT+0000 (Greenwich Mean Time) (49626ms) 4 passing (3m) 4 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_036.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 4 │ │ Passing: 4 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 25 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandat │ │ ory-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-3683-GC-creates-project-adds-contract-SC-creates- (38 of 96) cor.spec.ts COR Log | GC PM creats a project. Adds Contract with SC Company. SC PM is able to create a COR by using Create a Change Order RequestTue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) COR Log | GC PM creats a project. Adds Contract with SC Company. SC PM is able to create a COR by using Create a Change Order RequestTue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) √ EX-3683 - Part 1: Create a projcet and add customers : Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (47714ms) √ EX-3683 - Part 1: Create a projcet and add customers : Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (47714ms) √ EX-3683 - Part 2: Add My Company users to the project.Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (60147ms) √ EX-3683 - Part 2: Add My Company users to the project.Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (60147ms) √ EX-3683 - Part 3: Add Contract to the project.Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (33517ms) √ EX-3683 - Part 3: Add Contract to the project.Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (33517ms) √ EX-3683 - Part 4: PM Contractor accept the project Invites : Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (23160ms) √ EX-3683 - Part 4: PM Contractor accept the project Invites : Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (23160ms) √ EX-3683 - Part 5: Owner Contractor accept the project Invites : Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (25991ms) √ EX-3683 - Part 5: Owner Contractor accept the project Invites : Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (25991ms) √ EX-3683 - Part 6: Admin Contractor accept the project Invites : Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (22278ms) √ EX-3683 - Part 6: Admin Contractor accept the project Invites : Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (22278ms) √ EX-3683 - Part 7: Field User Contractor accept the project Invites : Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (25106ms) √ EX-3683 - Part 7: Field User Contractor accept the project Invites : Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (25106ms) √ EX-3683 - Part 8: Create COR : Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (49826ms) √ EX-3683 - Part 8: Create COR : Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (49826ms) √ EX-3683 - Part 9: Verify the COR is in the Sent Log : Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (34242ms) √ EX-3683 - Part 9: Verify the COR is in the Sent Log : Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (34242ms) √ EX-3683 - Part 10: Cleanup GC... Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (29285ms) √ EX-3683 - Part 10: Cleanup GC... Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (29285ms) √ EX-3683 - Part 11: Cleanup SC... Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (29055ms) √ EX-3683 - Part 11: Cleanup SC... Tue Jun 06 2023 02:20:26 GMT+0000 (Greenwich Mean Time) (29055ms) 11 passing (6m) 11 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_037.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 11 │ │ Passing: 11 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 21 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-3683-GC-creates-project-adds-contract-SC-creates-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-3686-verify-there-are-two-tabs-on-cor-log-page-se (39 of 96) nt-received.spec.ts COR Log | To verify that on COR Log page there are separate tabs for Sent and Received CORsTue Jun 06 2023 02:26:51 GMT+0000 (Greenwich Mean Time) COR Log | To verify that on COR Log page there are separate tabs for Sent and Received CORsTue Jun 06 2023 02:26:51 GMT+0000 (Greenwich Mean Time) √ EX-3686: Verify there are separate tabs for Sent and Received CORsTue Jun 06 2023 02:26:51 GMT+0000 (Greenwich Mean Time) (26372ms) √ EX-3686: Verify there are separate tabs for Sent and Received CORsTue Jun 06 2023 02:26:51 GMT+0000 (Greenwich Mean Time) (26372ms) 1 passing (27s) 1 passing (27s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_038.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 26 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-3686-verify-there-are-two-tabs-on-cor-log-page-sent-received. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-4366-SC-creates-project-adds-gc-customer-sc-creat (40 of 96) es-cor.spec.ts Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) √ EX-4366 - Create a projcet and add customers : Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (54954ms) √ EX-4366 - Create a projcet and add customers : Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (54954ms) √ EX-4366 - Add My Company users to the project.Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (63286ms) √ EX-4366 - Add My Company users to the project.Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (63286ms) √ EX-4366 - Add Customer to the project.Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (67076ms) √ EX-4366 - Add Customer to the project.Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (67076ms) √ EX-4366 - PM Customer accept the project Invites : Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (18657ms) √ EX-4366 - PM Customer accept the project Invites : Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (18657ms) √ EX-4366 - Owner Customer accept the project Invites : Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (16311ms) √ EX-4366 - Owner Customer accept the project Invites : Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (16311ms) √ EX-4366 - Admin Customer accept the project Invites : Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (36939ms) √ EX-4366 - Admin Customer accept the project Invites : Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (36939ms) 1) EX-4366 - Field User Customer accept the project Invites : Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) 1) EX-4366 - Field User Customer accept the project Invites : Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) √ EX-4366 - Create COR : Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (52809ms) √ EX-4366 - Create COR : Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (52809ms) √ EX-4366 - Verify COR is created : Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (32655ms) √ EX-4366 - Verify COR is created : Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (32655ms) √ EX-4366 - Cleanup GC... Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (29155ms) √ EX-4366 - Cleanup GC... Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (29155ms) √ EX-4366 - Cleanup SC... Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (32470ms) √ EX-4366 - Cleanup SC... Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) (32470ms) 10 passing (9m) 1 failing 1) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) EX-4366 - Field User Customer accept the project Invites : Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:256:5) 10 passing (9m) 1 failing 1) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time) EX-4366 - Field User Customer accept the project Invites : Tue Jun 06 2023 02:27:22 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:256:5) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_039.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 11 │ │ Passing: 10 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 3 │ │ Video: false │ │ Duration: 8 minutes, 49 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec. │ │ ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1280x720) Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Crea te COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Jun 06 2023 022722 GMT +0000 (Greenwich Mean Time) -- EX-4366 - PM Customer accept the project Invites Tue J.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1280x720) Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Crea te COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Jun 06 2023 022722 GMT +0000 (Greenwich Mean Time) -- EX-4366 - Field User Customer accept the project Invite.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1280x720) Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Crea te COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Jun 06 2023 022722 GMT +0000 (Greenwich Mean Time) -- EX-4366 - Field User Customer accept the project In (1).png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft. (41 of 96) spec.ts Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestTue Jun 06 2023 02:36:15 GMT+0000 (Greenwich Mean Time) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestTue Jun 06 2023 02:36:15 GMT+0000 (Greenwich Mean Time) √ EX-4432 - Create project and add customer.Tue Jun 06 2023 02:36:15 GMT+0000 (Greenwich Mean Time) (52063ms) √ EX-4432 - Create project and add customer.Tue Jun 06 2023 02:36:15 GMT+0000 (Greenwich Mean Time) (52063ms) √ EX-4432 - Add Customers.Tue Jun 06 2023 02:36:15 GMT+0000 (Greenwich Mean Time) (30809ms) √ EX-4432 - Add Customers.Tue Jun 06 2023 02:36:15 GMT+0000 (Greenwich Mean Time) (30809ms) √ EX-4432 - Customer Accept invite.Tue Jun 06 2023 02:36:15 GMT+0000 (Greenwich Mean Time) (26124ms) √ EX-4432 - Customer Accept invite.Tue Jun 06 2023 02:36:15 GMT+0000 (Greenwich Mean Time) (26124ms) √ EX-4432 - Contractor creates COR Draft. : Tue Jun 06 2023 02:36:15 GMT+0000 (Greenwich Mean Time) (36894ms) √ EX-4432 - Contractor creates COR Draft. : Tue Jun 06 2023 02:36:15 GMT+0000 (Greenwich Mean Time) (36894ms) √ EX-4432 - Verify the COR Draft Log has the new COR draft. : Tue Jun 06 2023 02:36:15 GMT+0000 (Greenwich Mean Time) (39474ms) √ EX-4432 - Verify the COR Draft Log has the new COR draft. : Tue Jun 06 2023 02:36:15 GMT+0000 (Greenwich Mean Time) (39474ms) √ EX-4432 - Cleanup GC... Tue Jun 06 2023 02:36:15 GMT+0000 (Greenwich Mean Time) (25813ms) √ EX-4432 - Cleanup GC... Tue Jun 06 2023 02:36:15 GMT+0000 (Greenwich Mean Time) (25813ms) √ EX-4432 - Cleanup SC... Tue Jun 06 2023 02:36:15 GMT+0000 (Greenwich Mean Time) (29809ms) √ EX-4432 - Cleanup SC... Tue Jun 06 2023 02:36:15 GMT+0000 (Greenwich Mean Time) (29809ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_040.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 1 second │ │ Spec Ran: 04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5244-verify-shareable-link-contains-just-the-sele (42 of 96) cted-project.spec.ts COR | Verify sharable link contains CORs from just the selected project.Tue Jun 06 2023 02:40:20 GMT+0000 (Greenwich Mean Time) COR | Verify sharable link contains CORs from just the selected project.Tue Jun 06 2023 02:40:20 GMT+0000 (Greenwich Mean Time) √ EX-5244 Tue Jun 06 2023 02:40:20 GMT+0000 (Greenwich Mean Time) (51381ms) √ EX-5244 Tue Jun 06 2023 02:40:20 GMT+0000 (Greenwich Mean Time) (51381ms) 1 passing (52s) 1 passing (52s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_041.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 51 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5244-verify-shareable-link-contains-just-the-selected-project │ │ .spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5333-SC-creates-cor-with-full-data.spec.ts (43 of 96) Tue Jun 06 2023 02:41:17 GMT+0000 (Greenwich Mean Time) Tue Jun 06 2023 02:41:17 GMT+0000 (Greenwich Mean Time) - EX-5333 - Part 1: Create COR with full set of data: Tue Jun 06 2023 02:41:17 GMT+0000 (Greenwich Mean Time) - EX-5333 - Part 1: Create COR with full set of data: Tue Jun 06 2023 02:41:17 GMT+0000 (Greenwich Mean Time) 0 passing (22ms) 1 pending 0 passing (22ms) 1 pending [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_042.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 0 │ │ Failing: 0 │ │ Pending: 1 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 0 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5333-SC-creates-cor-with-full-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5396-verify-contractor-is-able-to-upload-cor-with (44 of 96) -mandatory-and-optional-data.spec.ts Upload COR | To verify that the contractor is able to Upload a Change Order Request with full set of data. Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) Upload COR | To verify that the contractor is able to Upload a Change Order Request with full set of data. Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) √ EX-5396 - Create new project. Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (49061ms) √ EX-5396 - Create new project. Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (49061ms) √ EX-5396 - Add My Company users to the project.Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (66106ms) √ EX-5396 - Add My Company users to the project.Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (66106ms) √ EX-5396 - Add Contract to the project.Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (31489ms) √ EX-5396 - Add Contract to the project.Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (31489ms) √ EX-5396 - PM Customer accept the project Invites : Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (22386ms) √ EX-5396 - PM Customer accept the project Invites : Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (22386ms) √ EX-5396 - Owner Customer accept the project Invites : Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (29169ms) √ EX-5396 - Owner Customer accept the project Invites : Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (29169ms) √ EX-5396 - Admin Customer accept the project Invites : Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (22079ms) √ EX-5396 - Admin Customer accept the project Invites : Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (22079ms) √ EX-5396 - Field User Customer accept the project Invites : Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (21771ms) √ EX-5396 - Field User Customer accept the project Invites : Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (21771ms) √ EX-5396 - Upload COR with full data set, mandatory and optional data.Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (64550ms) √ EX-5396 - Upload COR with full data set, mandatory and optional data.Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (64550ms) √ EX-5396 - Verify the COR data in the COR Log.Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (52566ms) √ EX-5396 - Verify the COR data in the COR Log.Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (52566ms) √ EX-5396 - Cleanup GC... Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (25708ms) √ EX-5396 - Cleanup GC... Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (25708ms) √ EX-5396 - Cleanup SC... Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (29587ms) √ EX-5396 - Cleanup SC... Tue Jun 06 2023 02:41:21 GMT+0000 (Greenwich Mean Time) (29587ms) 11 passing (7m) 11 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_043.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 11 │ │ Passing: 11 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 55 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5396-verify-contractor-is-able-to-upload-cor-with-mandatory-a │ │ nd-optional-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5435-create-new-project-add-contrac-verify-origin (45 of 96) al-contract-value.spec.ts Create New Project with full set of data, as GC PM add contractor and verify the Original Contract Value.Tue Jun 06 2023 02:48:20 GMT+0000 (Greenwich Mean Time) Create New Project with full set of data, as GC PM add contractor and verify the Original Contract Value.Tue Jun 06 2023 02:48:20 GMT+0000 (Greenwich Mean Time) √ EX-5435 - Create a project.Tue Jun 06 2023 02:48:20 GMT+0000 (Greenwich Mean Time) (50488ms) √ EX-5435 - Create a project.Tue Jun 06 2023 02:48:20 GMT+0000 (Greenwich Mean Time) (50488ms) √ EX-5435 - Add contract.Tue Jun 06 2023 02:48:20 GMT+0000 (Greenwich Mean Time) (34571ms) √ EX-5435 - Add contract.Tue Jun 06 2023 02:48:20 GMT+0000 (Greenwich Mean Time) (34571ms) √ EX-5435 - Sub Contractor accepts the project/contract invite.Tue Jun 06 2023 02:48:20 GMT+0000 (Greenwich Mean Time) (21293ms) √ EX-5435 - Sub Contractor accepts the project/contract invite.Tue Jun 06 2023 02:48:20 GMT+0000 (Greenwich Mean Time) (21293ms) √ EX-5435 - Verify Original Contract Value.Tue Jun 06 2023 02:48:20 GMT+0000 (Greenwich Mean Time) (25321ms) √ EX-5435 - Verify Original Contract Value.Tue Jun 06 2023 02:48:20 GMT+0000 (Greenwich Mean Time) (25321ms) √ EX-5435 - Cleanup GC... Tue Jun 06 2023 02:48:20 GMT+0000 (Greenwich Mean Time) (25059ms) √ EX-5435 - Cleanup GC... Tue Jun 06 2023 02:48:20 GMT+0000 (Greenwich Mean Time) (25059ms) √ EX-5435 - Cleanup SC... Tue Jun 06 2023 02:48:20 GMT+0000 (Greenwich Mean Time) (33976ms) √ EX-5435 - Cleanup SC... Tue Jun 06 2023 02:48:20 GMT+0000 (Greenwich Mean Time) (33976ms) 6 passing (3m) 6 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_044.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 11 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5435-create-new-project-add-contrac-verify-original-contract- │ │ value.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-5827-to-verify-multiple-cors-to-same-tag-when-cre (46 of 96) ating-cor.spec.ts COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Jun 06 2023 02:51:35 GMT+0000 (Greenwich Mean Time) COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Jun 06 2023 02:51:35 GMT+0000 (Greenwich Mean Time) √ EX-5827 - Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Jun 06 2023 02:51:35 GMT+0000 (Greenwich Mean Time) (25705ms) √ EX-5827 - Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Jun 06 2023 02:51:35 GMT+0000 (Greenwich Mean Time) (25705ms) 1 passing (26s) 1 passing (26s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_045.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 25 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-5827-to-verify-multiple-cors-to-same-tag-when-creating-cor.sp │ │ ec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-5894-to-verify-multiple-cors-to-same-tag-when-upl (47 of 96) oading-cor.spec.ts COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Jun 06 2023 02:52:04 GMT+0000 (Greenwich Mean Time) COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Jun 06 2023 02:52:04 GMT+0000 (Greenwich Mean Time) √ EX-5894 - Verify Multiple CORs should not be associated with the same T&M Tag when uploading a New CORTue Jun 06 2023 02:52:04 GMT+0000 (Greenwich Mean Time) (39306ms) √ EX-5894 - Verify Multiple CORs should not be associated with the same T&M Tag when uploading a New CORTue Jun 06 2023 02:52:04 GMT+0000 (Greenwich Mean Time) (39306ms) 1 passing (40s) 1 passing (40s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_046.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 39 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-5894-to-verify-multiple-cors-to-same-tag-when-uploading-cor.s │ │ pec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-6681-verify-sent-summary-data-after-filtering-by- (48 of 96) project.spec.ts As Sub Contractor go to COR Log / Sent and verify the Summary data when fitered for one and multiple projects.Tue Jun 06 2023 02:52:47 GMT+0000 (Greenwich Mean Time) As Sub Contractor go to COR Log / Sent and verify the Summary data when fitered for one and multiple projects.Tue Jun 06 2023 02:52:47 GMT+0000 (Greenwich Mean Time) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by single Project.Tue Jun 06 2023 02:52:47 GMT+0000 (Greenwich Mean Time) (49233ms) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by single Project.Tue Jun 06 2023 02:52:47 GMT+0000 (Greenwich Mean Time) (49233ms) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by multiple Projects.Tue Jun 06 2023 02:52:47 GMT+0000 (Greenwich Mean Time) (59037ms) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by multiple Projects.Tue Jun 06 2023 02:52:47 GMT+0000 (Greenwich Mean Time) (59037ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_047.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 49 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-6681-verify-sent-summary-data-after-filtering-by-project.spec │ │ .ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5425-verify-received-summary-data-after-filte (49 of 96) ring-by-project.spec.ts T&M | Verify the RECEIVED Labor Hours Summary and T&M Log Summary shows correct values before and after filtering.Tue Jun 06 2023 02:54:40 GMT+0000 (Greenwich Mean Time) T&M | Verify the RECEIVED Labor Hours Summary and T&M Log Summary shows correct values before and after filtering.Tue Jun 06 2023 02:54:40 GMT+0000 (Greenwich Mean Time) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by single project.Tue Jun 06 2023 02:54:40 GMT+0000 (Greenwich Mean Time) (63118ms) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by single project.Tue Jun 06 2023 02:54:40 GMT+0000 (Greenwich Mean Time) (63118ms) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by multiple projects.Tue Jun 06 2023 02:54:40 GMT+0000 (Greenwich Mean Time) (45141ms) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by multiple projects.Tue Jun 06 2023 02:54:40 GMT+0000 (Greenwich Mean Time) (45141ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_048.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 50 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5425-verify-received-summary-data-after-filtering-by-proj │ │ ect.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5429-verify-received-export-csv-after-filteri (50 of 96) ng-by-project.spec.ts T&M | Verify the T&M Log / RECEIVED CSV exports.Tue Jun 06 2023 02:56:34 GMT+0000 (Greenwich Mean Time) T&M | Verify the T&M Log / RECEIVED CSV exports.Tue Jun 06 2023 02:56:34 GMT+0000 (Greenwich Mean Time) √ EX-5429 - Verify the T&M Log / RECEIVED CSV export.Tue Jun 06 2023 02:56:34 GMT+0000 (Greenwich Mean Time) (56593ms) √ EX-5429 - Verify the T&M Log / RECEIVED CSV export.Tue Jun 06 2023 02:56:34 GMT+0000 (Greenwich Mean Time) (56593ms) 1 passing (57s) 1 passing (57s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_049.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 56 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5429-verify-received-export-csv-after-filtering-by-projec │ │ t.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5431-verify-received-export-sharelog-after-fi (51 of 96) ltering-by-project.spec.ts T&M | Verify the T&M Log / RECEIVED ShareLog exports.Tue Jun 06 2023 02:57:35 GMT+0000 (Greenwich Mean Time) T&M | Verify the T&M Log / RECEIVED ShareLog exports.Tue Jun 06 2023 02:57:35 GMT+0000 (Greenwich Mean Time) √ EX-5431 - Verify the T&M Log / RECEIVED ShareLog export.Tue Jun 06 2023 02:57:35 GMT+0000 (Greenwich Mean Time) (59661ms) √ EX-5431 - Verify the T&M Log / RECEIVED ShareLog export.Tue Jun 06 2023 02:57:35 GMT+0000 (Greenwich Mean Time) (59661ms) 1 passing (60s) 1 passing (60s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_050.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 59 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5431-verify-received-export-sharelog-after-filtering-by-p │ │ roject.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5641-verify-tnm-log-received-summary-data-aft (52 of 96) er-filtering-by-tag-status.spec.ts T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Jun 06 2023 02:58:38 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Jun 06 2023 02:58:38 GMT+0000 (Greenwich Mean Time) √ EX-5641 - Filter by status Awaiting Signature and verify the Summary data for the test project.Tue Jun 06 2023 02:58:39 GMT+0000 (Greenwich Mean Time) (61630ms) √ EX-5641 - Filter by status Awaiting Signature and verify the Summary data for the test project.Tue Jun 06 2023 02:58:39 GMT+0000 (Greenwich Mean Time) (61630ms) √ EX-5641 - Filter by status Open and verify the Summary data for the test project.Tue Jun 06 2023 02:58:39 GMT+0000 (Greenwich Mean Time) (57163ms) √ EX-5641 - Filter by status Open and verify the Summary data for the test project.Tue Jun 06 2023 02:58:39 GMT+0000 (Greenwich Mean Time) (57163ms) √ EX-5641 - Filter by status Rejected and verify the Summary data for the test project.Tue Jun 06 2023 02:58:39 GMT+0000 (Greenwich Mean Time) (58288ms) √ EX-5641 - Filter by status Rejected and verify the Summary data for the test project.Tue Jun 06 2023 02:58:39 GMT+0000 (Greenwich Mean Time) (58288ms) √ EX-5641 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Tue Jun 06 2023 02:58:39 GMT+0000 (Greenwich Mean Time) (60792ms) √ EX-5641 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Tue Jun 06 2023 02:58:39 GMT+0000 (Greenwich Mean Time) (60792ms) √ EX-5641 - Filter by status Signed and verify the Summary data for the test project.Tue Jun 06 2023 02:58:39 GMT+0000 (Greenwich Mean Time) (57700ms) √ EX-5641 - Filter by status Signed and verify the Summary data for the test project.Tue Jun 06 2023 02:58:39 GMT+0000 (Greenwich Mean Time) (57700ms) 5 passing (5m) 5 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_051.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 0 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5641-verify-tnm-log-received-summary-data-after-filtering │ │ -by-tag-status.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-1-gc-creates-project-and-contract-sc-creates (53 of 96) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:03:43 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:03:43 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 1: GC PM creates a projectTue Jun 06 2023 03:03:43 GMT+0000 (Greenwich Mean Time) (54595ms) √ EX-4415 - Part 1: GC PM creates a projectTue Jun 06 2023 03:03:43 GMT+0000 (Greenwich Mean Time) (54595ms) √ EX-4415 - Part 2: GC PM adds a contract with SC PM.Tue Jun 06 2023 03:03:43 GMT+0000 (Greenwich Mean Time) (39618ms) √ EX-4415 - Part 2: GC PM adds a contract with SC PM.Tue Jun 06 2023 03:03:43 GMT+0000 (Greenwich Mean Time) (39618ms) √ EX-4415 - Part 3.1: Sub Contractor accepts invite from the bell notification.Tue Jun 06 2023 03:03:43 GMT+0000 (Greenwich Mean Time) (23970ms) √ EX-4415 - Part 3.1: Sub Contractor accepts invite from the bell notification.Tue Jun 06 2023 03:03:43 GMT+0000 (Greenwich Mean Time) (23970ms) √ EX-4415 - Part 3.2: Sub Contractor adds users to the project.Tue Jun 06 2023 03:03:43 GMT+0000 (Greenwich Mean Time) (69852ms) √ EX-4415 - Part 3.2: Sub Contractor adds users to the project.Tue Jun 06 2023 03:03:43 GMT+0000 (Greenwich Mean Time) (69852ms) √ EX-4415 - Part 4: Sub Contractor creates a Tag and sends signature request.Tue Jun 06 2023 03:03:43 GMT+0000 (Greenwich Mean Time) (68543ms) √ EX-4415 - Part 4: Sub Contractor creates a Tag and sends signature request.Tue Jun 06 2023 03:03:43 GMT+0000 (Greenwich Mean Time) (68543ms) 5 passing (4m) 5 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_052.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 17 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-1-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-2-gc-creates-project-and-contract-sc-creates (54 of 96) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:08:04 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:08:04 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 5: Sub Contractor ADD Labor valuesTue Jun 06 2023 03:08:04 GMT+0000 (Greenwich Mean Time) (177897ms) √ EX-4415 - Part 5: Sub Contractor ADD Labor valuesTue Jun 06 2023 03:08:04 GMT+0000 (Greenwich Mean Time) (177897ms) √ EX-4415 - Part 6: Sub Contractor Add Material valuesTue Jun 06 2023 03:08:04 GMT+0000 (Greenwich Mean Time) (140627ms) √ EX-4415 - Part 6: Sub Contractor Add Material valuesTue Jun 06 2023 03:08:04 GMT+0000 (Greenwich Mean Time) (140627ms) 2 passing (5m) 2 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_053.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 19 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-2-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-3-gc-creates-project-and-contract-sc-creates (55 of 96) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:13:28 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:13:28 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 7: Sub Contractor Adds Equipment. Tue Jun 06 2023 03:13:28 GMT+0000 (Greenwich Mean Time) (161058ms) √ EX-4415 - Part 7: Sub Contractor Adds Equipment. Tue Jun 06 2023 03:13:28 GMT+0000 (Greenwich Mean Time) (161058ms) 1 passing (3m) 1 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_054.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 41 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-3-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-4-gc-creates-project-and-contract-sc-creates (56 of 96) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:16:14 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:16:14 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 8: Sub Contractor Adds Other. Tue Jun 06 2023 03:16:14 GMT+0000 (Greenwich Mean Time) (179213ms) √ EX-4415 - Part 8: Sub Contractor Adds Other. Tue Jun 06 2023 03:16:14 GMT+0000 (Greenwich Mean Time) (179213ms) 1 passing (3m) 1 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_055.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 59 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-4-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-5-gc-creates-project-and-contract-sc-creates (57 of 96) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:19:19 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:19:19 GMT+0000 (Greenwich Mean Time) 1) EX-4415 - Part 9 : Sub Contractor uploads files.Tue Jun 06 2023 03:19:19 GMT+0000 (Greenwich Mean Time) 1) EX-4415 - Part 9 : Sub Contractor uploads files.Tue Jun 06 2023 03:19:19 GMT+0000 (Greenwich Mean Time) 2) EX-4415 - Part 10 : Sub Contractor signs the Tag.Tue Jun 06 2023 03:19:19 GMT+0000 (Greenwich Mean Time) 2) EX-4415 - Part 10 : Sub Contractor signs the Tag.Tue Jun 06 2023 03:19:19 GMT+0000 (Greenwich Mean Time) 0 passing (7m) 2 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:19:19 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 9 : Sub Contractor uploads files.Tue Jun 06 2023 03:19:19 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected not to find content: 'Generating T&M Tag' within the selector: 'div[role="dialog"] h5' but continuously found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:258:32) 2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:19:19 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 10 : Sub Contractor signs the Tag.Tue Jun 06 2023 03:19:19 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `ul[class='MuiList-root MuiList-padding'] li[class='MuiListItem-root MuiListItem-gutters'] div[class='MuiListItemText-root'] span`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:82:7) 0 passing (7m) 2 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:19:19 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 9 : Sub Contractor uploads files.Tue Jun 06 2023 03:19:19 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected not to find content: 'Generating T&M Tag' within the selector: 'div[role="dialog"] h5' but continuously found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:258:32) 2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:19:19 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 10 : Sub Contractor signs the Tag.Tue Jun 06 2023 03:19:19 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `ul[class='MuiList-root MuiList-padding'] li[class='MuiListItem-root MuiListItem-gutters'] div[class='MuiListItemText-root'] span`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:82:7) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_056.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 0 │ │ Failing: 2 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 4 │ │ Video: false │ │ Duration: 6 minutes, 50 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 031919 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 9 Sub Contractor uploads files.Tue Jun 06 2023 031919 G.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 031919 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 9 Sub Contractor uploads files.Tue Jun 06 2023 0319 (1).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 031919 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 10 Sub Contractor signs the Tag.Tue Jun 06 2023 031919 .png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 031919 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 10 Sub Contractor signs the Tag.Tue Jun 06 2023 031 (1).png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates (58 of 96) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:26:14 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:26:14 GMT+0000 (Greenwich Mean Time) 1) EX-4415 - Part 11 : Sub Contractor sends signature request.Tue Jun 06 2023 03:26:14 GMT+0000 (Greenwich Mean Time) 1) EX-4415 - Part 11 : Sub Contractor sends signature request.Tue Jun 06 2023 03:26:14 GMT+0000 (Greenwich Mean Time) 2) EX-4415 - Part 12: Verify the tag was created.Tue Jun 06 2023 03:26:14 GMT+0000 (Greenwich Mean Time) 2) EX-4415 - Part 12: Verify the tag was created.Tue Jun 06 2023 03:26:14 GMT+0000 (Greenwich Mean Time) 3) EX-4415 - Part 13: Verify the GC sees the tag.Tue Jun 06 2023 03:26:14 GMT+0000 (Greenwich Mean Time) 3) EX-4415 - Part 13: Verify the GC sees the tag.Tue Jun 06 2023 03:26:14 GMT+0000 (Greenwich Mean Time) 4) EX-4415 - Part 14: Verify GC PM User recived emailsTue Jun 06 2023 03:35:39 GMT+0000 (Greenwich Mean Time) 4) EX-4415 - Part 14: Verify GC PM User recived emailsTue Jun 06 2023 03:35:39 GMT+0000 (Greenwich Mean Time) 5) EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) 5) EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) 6) EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) 6) EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) 7) EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) 7) EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 18: Cleanup...Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) (43186ms) √ EX-4415 - Part 18: Cleanup...Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) (43186ms) 1 passing (17m) 7 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 11 : Sub Contractor sends signature request.Tue Jun 06 2023 03:26:14 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `[data-cy="sign-field"] img`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 12: Verify the tag was created.Tue Jun 06 2023 03:26:14 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='awaitingSignatureStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 3) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 13: Verify the GC sees the tag.Tue Jun 06 2023 03:26:14 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Create T&M Tag for Test Project TC4415 1686020623825' within the selector: 'td' but never did. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:45:26) 4) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 14: Verify GC PM User recived emailsTue Jun 06 2023 03:35:39 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC4415 1686020623825' within the selector: 'td' but never did. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34) 5) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC4415 1686020623825' within the element: but never did. at Context.eval (webpack:///./cypress/support/commands.ts:721:5) 6) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 7) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 1 passing (17m) 7 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 11 : Sub Contractor sends signature request.Tue Jun 06 2023 03:26:14 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `[data-cy="sign-field"] img`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 12: Verify the tag was created.Tue Jun 06 2023 03:26:14 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='awaitingSignatureStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 3) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 13: Verify the GC sees the tag.Tue Jun 06 2023 03:26:14 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Create T&M Tag for Test Project TC4415 1686020623825' within the selector: 'td' but never did. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:45:26) 4) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 14: Verify GC PM User recived emailsTue Jun 06 2023 03:35:39 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC4415 1686020623825' within the selector: 'td' but never did. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34) 5) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC4415 1686020623825' within the element: but never did. at Context.eval (webpack:///./cypress/support/commands.ts:721:5) 6) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 7) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Tue Jun 06 2023 03:36:45 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_057.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 1 │ │ Failing: 7 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 14 │ │ Video: false │ │ Duration: 16 minutes, 55 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 032614 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 11 Sub Contractor sends signature r equest.Tue Jun 06 20.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 032614 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 11 Sub Contractor sends signature r equest.Tue Jun 0 (1).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 032614 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 12 Verify the tag was created.Tue Ju n 06 2023 032614 GMT.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 032614 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 12 Verify the tag was created.Tue Ju n 06 2023 032614 (1).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 032614 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 13 Verify the GC sees the tag.Tue Ju n 06 2023 032614 GMT.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 032614 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 13 Verify the GC sees the tag.Tue Ju n 06 2023 032614 (1).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 033539 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 14 Verify GC PM User recived emailsT ue Jun 06 2023 03353.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 033539 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 14 Verify GC PM User recived emailsT ue Jun 06 2023 0 (1).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 033645 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 15 Verify the GC received Bell Notif ication and use it t.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 033645 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 15 Verify the GC received Bell Notif ication and use (1).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 033645 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 16 Verify the tag status in the GC T &M Log.Tue Jun 06 20.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 033645 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 16 Verify the tag status in the GC T &M Log.Tue Jun 0 (1).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 033645 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 17 Verify the tag status in the SC T &MM Log.Tue Jun 06 2.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 033645 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 17 Verify the tag status in the SC T &MM Log.Tue Jun (1).png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5424-verify-sent-summary-data-after-filtering-by- (59 of 96) project.spec.ts As Sub Contractor go to T&M Log / Sent and verify the Summary data for the test project.Tue Jun 06 2023 03:43:13 GMT+0000 (Greenwich Mean Time) As Sub Contractor go to T&M Log / Sent and verify the Summary data for the test project.Tue Jun 06 2023 03:43:13 GMT+0000 (Greenwich Mean Time) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log Overview Summary shows correct values when filtered by single Project.Tue Jun 06 2023 03:43:13 GMT+0000 (Greenwich Mean Time) (50032ms) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log Overview Summary shows correct values when filtered by single Project.Tue Jun 06 2023 03:43:13 GMT+0000 (Greenwich Mean Time) (50032ms) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log OVerview Summary shows correct values when filtered by multiple Projects.Tue Jun 06 2023 03:43:13 GMT+0000 (Greenwich Mean Time) (84690ms) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log OVerview Summary shows correct values when filtered by multiple Projects.Tue Jun 06 2023 03:43:13 GMT+0000 (Greenwich Mean Time) (84690ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_058.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 16 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5424-verify-sent-summary-data-after-filtering-by-project.spec │ │ .ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5430-verify-sent-export-csv-after-filtering-by-pr (60 of 96) oject.spec.ts T&M | Verify the T&M Log / Sent CSV export.Tue Jun 06 2023 03:45:34 GMT+0000 (Greenwich Mean Time) T&M | Verify the T&M Log / Sent CSV export.Tue Jun 06 2023 03:45:34 GMT+0000 (Greenwich Mean Time) √ EX-5430 - Verify the T&M Log / Sent CSV export.Tue Jun 06 2023 03:45:34 GMT+0000 (Greenwich Mean Time) (43207ms) √ EX-5430 - Verify the T&M Log / Sent CSV export.Tue Jun 06 2023 03:45:34 GMT+0000 (Greenwich Mean Time) (43207ms) 1 passing (43s) 1 passing (43s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_059.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 43 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5430-verify-sent-export-csv-after-filtering-by-project.spec.t │ │ s │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5505-verify-tnm-log-sent-summary-data-after-filte (61 of 96) ring-by-customer.spec.ts T&M | Verify filtering the T&M Log / SENT, by Customer, returns correct values for Labor Hours Summary.Tue Jun 06 2023 03:46:21 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Customer, returns correct values for Labor Hours Summary.Tue Jun 06 2023 03:46:21 GMT+0000 (Greenwich Mean Time) √ EX-5505 - Filter by Customer and verify the Summary Labour Hours and T&M Log Overview Summary data for the test project.Tue Jun 06 2023 03:46:21 GMT+0000 (Greenwich Mean Time) (90258ms) √ EX-5505 - Filter by Customer and verify the Summary Labour Hours and T&M Log Overview Summary data for the test project.Tue Jun 06 2023 03:46:21 GMT+0000 (Greenwich Mean Time) (90258ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_060.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 31 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5505-verify-tnm-log-sent-summary-data-after-filtering-by-cust │ │ omer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5506-verify-tnm-log-sent-summary-data-after-filte (62 of 96) ring-by-job-number.spec.ts T&M | Verify filtering the T&M Log / SENT, by Job Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Jun 06 2023 03:47:57 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Job Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Jun 06 2023 03:47:57 GMT+0000 (Greenwich Mean Time) √ EX-5506 - Filter by JobNumber and verify the Summary data for the test project.Tue Jun 06 2023 03:47:57 GMT+0000 (Greenwich Mean Time) (90759ms) √ EX-5506 - Filter by JobNumber and verify the Summary data for the test project.Tue Jun 06 2023 03:47:57 GMT+0000 (Greenwich Mean Time) (90759ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_061.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 30 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5506-verify-tnm-log-sent-summary-data-after-filtering-by-job- │ │ number.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5507-verify-tnm-log-sent-summary-data-after-filte (63 of 96) ring-by-cust-ref-num.spec.ts T&M | Verify filtering the T&M Log / SENT, by Custmer Reference Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Jun 06 2023 03:49:32 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Custmer Reference Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Jun 06 2023 03:49:32 GMT+0000 (Greenwich Mean Time) √ EX-5507 - Filter by CustRefNum and verify the Summary data for the test project.Tue Jun 06 2023 03:49:32 GMT+0000 (Greenwich Mean Time) (86718ms) √ EX-5507 - Filter by CustRefNum and verify the Summary data for the test project.Tue Jun 06 2023 03:49:32 GMT+0000 (Greenwich Mean Time) (86718ms) 1 passing (1m) 1 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_062.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 27 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5507-verify-tnm-log-sent-summary-data-after-filtering-by-cust │ │ -ref-num.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5508-verify-tnm-log-sent-summary-data-after-filte (64 of 96) ring-by-tag-status.spec.ts T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Jun 06 2023 03:51:03 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Jun 06 2023 03:51:03 GMT+0000 (Greenwich Mean Time) √ EX-5508 - Filter by status Awaiting Signature and verify the Summary data for the test project.Tue Jun 06 2023 03:51:03 GMT+0000 (Greenwich Mean Time) (93696ms) √ EX-5508 - Filter by status Awaiting Signature and verify the Summary data for the test project.Tue Jun 06 2023 03:51:03 GMT+0000 (Greenwich Mean Time) (93696ms) √ EX-5508 - Filter by status Draft and verify the Summary data for the test project.Tue Jun 06 2023 03:51:03 GMT+0000 (Greenwich Mean Time) (79429ms) √ EX-5508 - Filter by status Draft and verify the Summary data for the test project.Tue Jun 06 2023 03:51:03 GMT+0000 (Greenwich Mean Time) (79429ms) √ EX-5508 - Filter by status Open and verify the Summary data for the test project.Tue Jun 06 2023 03:51:03 GMT+0000 (Greenwich Mean Time) (87452ms) √ EX-5508 - Filter by status Open and verify the Summary data for the test project.Tue Jun 06 2023 03:51:03 GMT+0000 (Greenwich Mean Time) (87452ms) √ EX-5508 - Filter by status Rejected and verify the Summary data for the test project.Tue Jun 06 2023 03:51:03 GMT+0000 (Greenwich Mean Time) (81350ms) √ EX-5508 - Filter by status Rejected and verify the Summary data for the test project.Tue Jun 06 2023 03:51:03 GMT+0000 (Greenwich Mean Time) (81350ms) √ EX-5508 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Tue Jun 06 2023 03:51:03 GMT+0000 (Greenwich Mean Time) (84815ms) √ EX-5508 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Tue Jun 06 2023 03:51:03 GMT+0000 (Greenwich Mean Time) (84815ms) √ EX-5508 - Filter by status Signed and verify the Summary data for the test project.Tue Jun 06 2023 03:51:03 GMT+0000 (Greenwich Mean Time) (97410ms) √ EX-5508 - Filter by status Signed and verify the Summary data for the test project.Tue Jun 06 2023 03:51:03 GMT+0000 (Greenwich Mean Time) (97410ms) √ EX-5508 - Filter by status Signed Not Sent and verify the Summary data for the test project.Tue Jun 06 2023 03:51:03 GMT+0000 (Greenwich Mean Time) (90926ms) √ EX-5508 - Filter by status Signed Not Sent and verify the Summary data for the test project.Tue Jun 06 2023 03:51:03 GMT+0000 (Greenwich Mean Time) (90926ms) 7 passing (10m) 7 passing (10m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_063.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 10 minutes, 20 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5508-verify-tnm-log-sent-summary-data-after-filtering-by-tag- │ │ status.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5509-verify-tnm-log-sent-summary-data-after-filte (65 of 96) ring-by-cust-label.spec.ts T&M | Verify filtering the T&M Log/SENT, by Label, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Jun 06 2023 04:01:28 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log/SENT, by Label, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Jun 06 2023 04:01:28 GMT+0000 (Greenwich Mean Time) √ EX-5509 - Filter by Label and verify the Summary data for the test project.Tue Jun 06 2023 04:01:28 GMT+0000 (Greenwich Mean Time) (86105ms) √ EX-5509 - Filter by Label and verify the Summary data for the test project.Tue Jun 06 2023 04:01:28 GMT+0000 (Greenwich Mean Time) (86105ms) 1 passing (1m) 1 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_064.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 26 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5509-verify-tnm-log-sent-summary-data-after-filtering-by-cust │ │ -label.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5510-verify-tnm-log-sent-summary-data-after-filte (66 of 96) ring-by-cor-availability.spec.ts T&M | Verify filtering the T&M Log/SENT, by COR availability, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Jun 06 2023 04:02:59 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log/SENT, by COR availability, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Jun 06 2023 04:02:59 GMT+0000 (Greenwich Mean Time) √ EX-5510 - Filter by 'Display Pending CORs only' and verify the Summary data for the test project.Tue Jun 06 2023 04:02:59 GMT+0000 (Greenwich Mean Time) (80677ms) √ EX-5510 - Filter by 'Display Pending CORs only' and verify the Summary data for the test project.Tue Jun 06 2023 04:02:59 GMT+0000 (Greenwich Mean Time) (80677ms) √ EX-5510 - Filter by 'Display Tags with CORs only' and verify the Summary data for the test project.Tue Jun 06 2023 04:02:59 GMT+0000 (Greenwich Mean Time) (75336ms) √ EX-5510 - Filter by 'Display Tags with CORs only' and verify the Summary data for the test project.Tue Jun 06 2023 04:02:59 GMT+0000 (Greenwich Mean Time) (75336ms) 2 passing (3m) 2 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_065.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 38 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5510-verify-tnm-log-sent-summary-data-after-filtering-by-cor- │ │ availability.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6191-sc-creates-tag-required-signer-gc-signs-tag. (67 of 96) spec.ts T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Jun 06 2023 04:05:41 GMT+0000 (Greenwich Mean Time) T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Jun 06 2023 04:05:41 GMT+0000 (Greenwich Mean Time) 1) EX-6191 - Part 0: Clean the tags 1) EX-6191 - Part 0: Clean the tags √ EX-6191 - Part 1: Sub Contractor Admin creates tag and save it as draft.Tue Jun 06 2023 04:05:41 GMT+0000 (Greenwich Mean Time) (103699ms) √ EX-6191 - Part 1: Sub Contractor Admin creates tag and save it as draft.Tue Jun 06 2023 04:05:41 GMT+0000 (Greenwich Mean Time) (103699ms) √ EX-6191 - Part 2: Sub Contractor Admin adds LMEO to the draft. Tue Jun 06 2023 04:05:41 GMT+0000 (Greenwich Mean Time) (146945ms) √ EX-6191 - Part 2: Sub Contractor Admin adds LMEO to the draft. Tue Jun 06 2023 04:05:41 GMT+0000 (Greenwich Mean Time) (146945ms) √ EX-6191 - Part 3: Sub Contractor admin adds files. Tue Jun 06 2023 04:05:41 GMT+0000 (Greenwich Mean Time) (101109ms) √ EX-6191 - Part 3: Sub Contractor admin adds files. Tue Jun 06 2023 04:05:41 GMT+0000 (Greenwich Mean Time) (101109ms) √ EX-6191 - Part 4: Sub Contractor admin signs the tag.Tue Jun 06 2023 04:05:41 GMT+0000 (Greenwich Mean Time) (93628ms) √ EX-6191 - Part 4: Sub Contractor admin signs the tag.Tue Jun 06 2023 04:05:41 GMT+0000 (Greenwich Mean Time) (93628ms) √ EX-6191 - Part 5: Sub Contractor admin sends tag for signature.Tue Jun 06 2023 04:05:41 GMT+0000 (Greenwich Mean Time) (77904ms) √ EX-6191 - Part 5: Sub Contractor admin sends tag for signature.Tue Jun 06 2023 04:05:41 GMT+0000 (Greenwich Mean Time) (77904ms) √ EX-6191 - Part 6: Verify the tag was created.Tue Jun 06 2023 04:05:41 GMT+0000 (Greenwich Mean Time) (46102ms) √ EX-6191 - Part 6: Verify the tag was created.Tue Jun 06 2023 04:05:41 GMT+0000 (Greenwich Mean Time) (46102ms) √ EX-6191 - Part 7: Verify the GC Admin sees the tag.Tue Jun 06 2023 04:05:41 GMT+0000 (Greenwich Mean Time) (42356ms) √ EX-6191 - Part 7: Verify the GC Admin sees the tag.Tue Jun 06 2023 04:05:41 GMT+0000 (Greenwich Mean Time) (42356ms) √ EX-6191 - Part 8: Verify GC Admin recived emailsTue Jun 06 2023 04:17:57 GMT+0000 (Greenwich Mean Time) √ EX-6191 - Part 8: Verify GC Admin recived emailsTue Jun 06 2023 04:17:57 GMT+0000 (Greenwich Mean Time) √ EX-6191 - Part 9: Verify the GC Admin received Bell Notification and use it to sign the tag.Tue Jun 06 2023 04:18:02 GMT+0000 (Greenwich Mean Time) (35953ms) √ EX-6191 - Part 9: Verify the GC Admin received Bell Notification and use it to sign the tag.Tue Jun 06 2023 04:18:02 GMT+0000 (Greenwich Mean Time) (35953ms) √ EX-6191 - Part 10: Verify the tag status in the GC Admin T&M Log.Tue Jun 06 2023 04:18:02 GMT+0000 (Greenwich Mean Time) (55398ms) √ EX-6191 - Part 10: Verify the tag status in the GC Admin T&M Log.Tue Jun 06 2023 04:18:02 GMT+0000 (Greenwich Mean Time) (55398ms) √ EX-6191 - Part 11: Verify the tag status in the SC Admin T&M Log.Tue Jun 06 2023 04:18:02 GMT+0000 (Greenwich Mean Time) (40588ms) √ EX-6191 - Part 11: Verify the tag status in the SC Admin T&M Log.Tue Jun 06 2023 04:18:02 GMT+0000 (Greenwich Mean Time) (40588ms) 2) EX-6191 - Part 12: Cleanup SC Tag ... Tue Jun 06 2023 04:18:02 GMT+0000 (Greenwich Mean Time) 2) EX-6191 - Part 12: Cleanup SC Tag ... Tue Jun 06 2023 04:18:02 GMT+0000 (Greenwich Mean Time) 11 passing (17m) 2 failing 1) T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Jun 06 2023 04:18:02 GMT+0000 (Greenwich Mean Time) EX-6191 - Part 0: Clean the tags: AssertionError: Timed out retrying after 30000ms: Expected to find element: `li[data-option-index='1']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:319:19) 2) T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Jun 06 2023 04:18:02 GMT+0000 (Greenwich Mean Time) EX-6191 - Part 12: Cleanup SC Tag ... Tue Jun 06 2023 04:18:02 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `li[data-option-index='1']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:319:19) 11 passing (17m) 2 failing 1) T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Jun 06 2023 04:18:02 GMT+0000 (Greenwich Mean Time) EX-6191 - Part 0: Clean the tags: AssertionError: Timed out retrying after 30000ms: Expected to find element: `li[data-option-index='1']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:319:19) 2) T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Jun 06 2023 04:18:02 GMT+0000 (Greenwich Mean Time) EX-6191 - Part 12: Cleanup SC Tag ... Tue Jun 06 2023 04:18:02 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `li[data-option-index='1']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:319:19) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_066.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 13 │ │ Passing: 11 │ │ Failing: 2 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 5 │ │ Video: false │ │ Duration: 16 minutes, 57 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6191-sc-creates-tag-required-signer-gc-signs-tag.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-6191-sc-creates-tag-required-signer-gc-signs-tag.spec.ts\T&M Workfl ow Existing project and contract, SC Admin send a tag. GC Admin signs the tag a s single Required Signer. Save As Draft On Each Step.Tue Jun 06 2023 040541 GMT+ 0000 (Greenwich Mean Time) -- EX-6191 - Part 0 Clean the tags (failed).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-6191-sc-creates-tag-required-signer-gc-signs-tag.spec.ts\T&M Workfl ow Existing project and contract, SC Admin send a tag. GC Admin signs the tag a s single Required Signer. Save As Draft On Each Step.Tue Jun 06 2023 040541 GMT+ 0000 (Greenwich Mean Time) -- EX-6191 - Part 0 Clean the tags (failed) (attempt. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-6191-sc-creates-tag-required-signer-gc-signs-tag.spec.ts\T&M Workfl ow Existing project and contract, SC Admin send a tag. GC Admin signs the tag a s single Required Signer. Save As Draft On Each Step.Tue Jun 06 2023 041802 GMT+ 0000 (Greenwich Mean Time) -- EX-6191 - Part 10 Verify the tag status in the GC. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-6191-sc-creates-tag-required-signer-gc-signs-tag.spec.ts\T&M Workfl ow Existing project and contract, SC Admin send a tag. GC Admin signs the tag a s single Required Signer. Save As Draft On Each Step.Tue Jun 06 2023 041802 GMT+ 0000 (Greenwich Mean Time) -- EX-6191 - Part 12 Cleanup SC Tag ... Tue Jun 06 2. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-6191-sc-creates-tag-required-signer-gc-signs-tag.spec.ts\T&M Workfl ow Existing project and contract, SC Admin send a tag. GC Admin signs the tag a s single Required Signer. Save As Draft On Each Step.Tue Jun 06 2023 041802 GMT+ 0000 (Greenwich Mean Time) -- EX-6191 - Part 12 Cleanup SC Tag ... Tue Jun (1). png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6193-sc-fu-creates-tag-required-signer-gc-fu-sign (68 of 96) s-tag.spec.ts T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Tue Jun 06 2023 04:22:43 GMT+0000 (Greenwich Mean Time) T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Tue Jun 06 2023 04:22:43 GMT+0000 (Greenwich Mean Time) √ EX-6193 - Sub Contractor FU creates a Tag and sends signature request.Tue Jun 06 2023 04:22:43 GMT+0000 (Greenwich Mean Time) (206204ms) √ EX-6193 - Sub Contractor FU creates a Tag and sends signature request.Tue Jun 06 2023 04:22:43 GMT+0000 (Greenwich Mean Time) (206204ms) √ EX-6193 - Verify the tag was created.Tue Jun 06 2023 04:22:43 GMT+0000 (Greenwich Mean Time) (26484ms) √ EX-6193 - Verify the tag was created.Tue Jun 06 2023 04:22:43 GMT+0000 (Greenwich Mean Time) (26484ms) √ EX-6193 - Verify the GC FU sees the tag.Tue Jun 06 2023 04:22:43 GMT+0000 (Greenwich Mean Time) (28308ms) √ EX-6193 - Verify the GC FU sees the tag.Tue Jun 06 2023 04:22:43 GMT+0000 (Greenwich Mean Time) (28308ms) √ EX-6193 - Verify GC FU recived emailsTue Jun 06 2023 04:27:51 GMT+0000 (Greenwich Mean Time) √ EX-6193 - Verify GC FU recived emailsTue Jun 06 2023 04:27:51 GMT+0000 (Greenwich Mean Time) √ EX-6193 - Verify the GC FU received Bell Notification and use it to sign the tag.Tue Jun 06 2023 04:27:56 GMT+0000 (Greenwich Mean Time) (30128ms) √ EX-6193 - Verify the GC FU received Bell Notification and use it to sign the tag.Tue Jun 06 2023 04:27:56 GMT+0000 (Greenwich Mean Time) (30128ms) √ EX-6193 - Verify the tag status in the GC FU T&M Log.Tue Jun 06 2023 04:27:56 GMT+0000 (Greenwich Mean Time) (28209ms) √ EX-6193 - Verify the tag status in the GC FU T&M Log.Tue Jun 06 2023 04:27:56 GMT+0000 (Greenwich Mean Time) (28209ms) √ EX-6193 - Verify the tag status in the SC FU T&MM Log.Tue Jun 06 2023 04:27:56 GMT+0000 (Greenwich Mean Time) (25229ms) √ EX-6193 - Verify the tag status in the SC FU T&MM Log.Tue Jun 06 2023 04:27:56 GMT+0000 (Greenwich Mean Time) (25229ms) √ EX-6193 - Cleanup SC Tag ... Tue Jun 06 2023 04:27:56 GMT+0000 (Greenwich Mean Time) (29570ms) √ EX-6193 - Cleanup SC Tag ... Tue Jun 06 2023 04:27:56 GMT+0000 (Greenwich Mean Time) (29570ms) 8 passing (7m) 8 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_067.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: false │ │ Duration: 7 minutes, 6 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6193-sc-fu-creates-tag-required-signer-gc-fu-signs-tag.spec.t │ │ s │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-6193-sc-fu-creates-tag-required-signer-gc-fu-signs-tag.spec.ts\T&M Workflow Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Tue Jun 06 2023 042243 GMT+0000 (Greenw ich Mean Time) -- EX-6193 - Sub Contractor FU creates a Tag and sends signature reque.png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-1-sc-pm-creates-project-and-contract-gc-pm-c (69 of 96) reates-tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 04:29:53 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 04:29:53 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 0: Clean existing tags. Tue Jun 06 2023 04:29:53 GMT+0000 (Greenwich Mean Time) (43692ms) √ EX-6324 - Part 0: Clean existing tags. Tue Jun 06 2023 04:29:53 GMT+0000 (Greenwich Mean Time) (43692ms) √ EX-6324 - Part 1: Sub Contractor creates a Tag and saves it as draft.Tue Jun 06 2023 04:29:53 GMT+0000 (Greenwich Mean Time) (73897ms) √ EX-6324 - Part 1: Sub Contractor creates a Tag and saves it as draft.Tue Jun 06 2023 04:29:53 GMT+0000 (Greenwich Mean Time) (73897ms) √ EX-6324 - Part 2: Sub Contractor ADD Labor values to the draft.Tue Jun 06 2023 04:29:53 GMT+0000 (Greenwich Mean Time) (181571ms) √ EX-6324 - Part 2: Sub Contractor ADD Labor values to the draft.Tue Jun 06 2023 04:29:53 GMT+0000 (Greenwich Mean Time) (181571ms) √ EX-6324 - Part 3: Sub Contractor Add Material values to the draft.Tue Jun 06 2023 04:29:53 GMT+0000 (Greenwich Mean Time) (149992ms) √ EX-6324 - Part 3: Sub Contractor Add Material values to the draft.Tue Jun 06 2023 04:29:53 GMT+0000 (Greenwich Mean Time) (149992ms) √ EX-6324 - Part 4: Sub Contractor Adds Equipment to the draft. Tue Jun 06 2023 04:29:53 GMT+0000 (Greenwich Mean Time) (168808ms) √ EX-6324 - Part 4: Sub Contractor Adds Equipment to the draft. Tue Jun 06 2023 04:29:53 GMT+0000 (Greenwich Mean Time) (168808ms) 5 passing (10m) 5 passing (10m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_068.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 10 minutes, 20 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-1-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-2-sc-pm-creates-project-and-contract-gc-pm-c (70 of 96) reates-tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 04:40:18 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 04:40:18 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 5: Sub Contractor Adds Other to the draft. Tue Jun 06 2023 04:40:18 GMT+0000 (Greenwich Mean Time) (181653ms) √ EX-6324 - Part 5: Sub Contractor Adds Other to the draft. Tue Jun 06 2023 04:40:18 GMT+0000 (Greenwich Mean Time) (181653ms) √ EX-6324 - Part 6 : Sub Contractor upload files to the draft.Tue Jun 06 2023 04:40:18 GMT+0000 (Greenwich Mean Time) (94110ms) √ EX-6324 - Part 6 : Sub Contractor upload files to the draft.Tue Jun 06 2023 04:40:18 GMT+0000 (Greenwich Mean Time) (94110ms) √ EX-6324 - Part 7 : Sub Contractor removes one file from the draft.Tue Jun 06 2023 04:40:18 GMT+0000 (Greenwich Mean Time) (81490ms) √ EX-6324 - Part 7 : Sub Contractor removes one file from the draft.Tue Jun 06 2023 04:40:18 GMT+0000 (Greenwich Mean Time) (81490ms) √ EX-6324 - Part 8 : Sub Contractor signs the tag.Tue Jun 06 2023 04:40:18 GMT+0000 (Greenwich Mean Time) (95785ms) √ EX-6324 - Part 8 : Sub Contractor signs the tag.Tue Jun 06 2023 04:40:18 GMT+0000 (Greenwich Mean Time) (95785ms) 4 passing (8m) 4 passing (8m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_069.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 4 │ │ Passing: 4 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 34 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-2-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-c (71 of 96) reates-tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 04:47:57 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 04:47:57 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 9 : Sub Contractor removes his signature and re-adds it.Tue Jun 06 2023 04:47:57 GMT+0000 (Greenwich Mean Time) (92472ms) √ EX-6324 - Part 9 : Sub Contractor removes his signature and re-adds it.Tue Jun 06 2023 04:47:57 GMT+0000 (Greenwich Mean Time) (92472ms) √ EX-6324 - Part 10 : Sub Contractor removes a user from the TO list and adds another signerTue Jun 06 2023 04:47:57 GMT+0000 (Greenwich Mean Time) (103908ms) √ EX-6324 - Part 10 : Sub Contractor removes a user from the TO list and adds another signerTue Jun 06 2023 04:47:57 GMT+0000 (Greenwich Mean Time) (103908ms) √ EX-6324 - Part 11 : Sub Contractor sends signature request.Tue Jun 06 2023 04:47:57 GMT+0000 (Greenwich Mean Time) (86789ms) √ EX-6324 - Part 11 : Sub Contractor sends signature request.Tue Jun 06 2023 04:47:57 GMT+0000 (Greenwich Mean Time) (86789ms) √ EX-6324 - Part 12: Verify the tag status is Awaiting Signatures.Tue Jun 06 2023 04:47:57 GMT+0000 (Greenwich Mean Time) (33367ms) √ EX-6324 - Part 12: Verify the tag status is Awaiting Signatures.Tue Jun 06 2023 04:47:57 GMT+0000 (Greenwich Mean Time) (33367ms) 4 passing (5m) 4 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_070.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 4 │ │ Passing: 4 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 18 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-c (72 of 96) reates-tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 04:53:20 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 04:53:20 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 13: Verify the GC sees the tag.Tue Jun 06 2023 04:53:20 GMT+0000 (Greenwich Mean Time) (35832ms) √ EX-6324 - Part 13: Verify the GC sees the tag.Tue Jun 06 2023 04:53:20 GMT+0000 (Greenwich Mean Time) (35832ms) √ EX-6324 - Part 14: Verify GC PM User recived emailsTue Jun 06 2023 04:54:01 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 14: Verify GC PM User recived emailsTue Jun 06 2023 04:54:01 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 15: Verify GC Owner User recived emails and sign the tagTue Jun 06 2023 04:54:01 GMT+0000 (Greenwich Mean Time) (10654ms) √ EX-6324 - Part 15: Verify GC Owner User recived emails and sign the tagTue Jun 06 2023 04:54:01 GMT+0000 (Greenwich Mean Time) (10654ms) 3 passing (52s) 3 passing (52s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_071.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 3 │ │ Passing: 3 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 52 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-c (73 of 96) reates-tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 04:54:16 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Jun 06 2023 04:54:16 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 16: Verify the tag status in the GC T&M Log.Tue Jun 06 2023 04:54:16 GMT+0000 (Greenwich Mean Time) (33029ms) √ EX-6324 - Part 16: Verify the tag status in the GC T&M Log.Tue Jun 06 2023 04:54:16 GMT+0000 (Greenwich Mean Time) (33029ms) √ EX-6324 - Part 17: Verify the tag status in the SC PM T&MM Log.Tue Jun 06 2023 04:54:16 GMT+0000 (Greenwich Mean Time) (27895ms) √ EX-6324 - Part 17: Verify the tag status in the SC PM T&MM Log.Tue Jun 06 2023 04:54:16 GMT+0000 (Greenwich Mean Time) (27895ms) √ EX-6324 - Part 18: Verify the tag status in the SC Owner T&MM Log.Tue Jun 06 2023 04:54:16 GMT+0000 (Greenwich Mean Time) (27401ms) √ EX-6324 - Part 18: Verify the tag status in the SC Owner T&MM Log.Tue Jun 06 2023 04:54:16 GMT+0000 (Greenwich Mean Time) (27401ms) √ EX-6324 - Part 19: Verify the tag status in the SC Admin T&MM Log.Tue Jun 06 2023 04:54:16 GMT+0000 (Greenwich Mean Time) (36232ms) √ EX-6324 - Part 19: Verify the tag status in the SC Admin T&MM Log.Tue Jun 06 2023 04:54:16 GMT+0000 (Greenwich Mean Time) (36232ms) √ EX-6324 - Part 20: Verify the tag status in the SC PM T&MM Log.Tue Jun 06 2023 04:54:16 GMT+0000 (Greenwich Mean Time) (22852ms) √ EX-6324 - Part 20: Verify the tag status in the SC PM T&MM Log.Tue Jun 06 2023 04:54:16 GMT+0000 (Greenwich Mean Time) (22852ms) √ EX-6324 - Part 21: Cleanup...Tue Jun 06 2023 04:54:16 GMT+0000 (Greenwich Mean Time) (45314ms) √ EX-6324 - Part 21: Cleanup...Tue Jun 06 2023 04:54:16 GMT+0000 (Greenwich Mean Time) (45314ms) 6 passing (3m) 6 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_072.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 13 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6335-sc-sends-tag-gc-signs-tag-as-optional-not-sa (74 of 96) ved-drafts.spec.ts EX-6335 | T&M | Workflow | Existing project and contract, SC PM send a tag. GC Owner signs the tag as one of four Optional Signers. Do not save as draft.Tue Jun 06 2023 04:57:34 GMT+0000 (Greenwich Mean Time) EX-6335 | T&M | Workflow | Existing project and contract, SC PM send a tag. GC Owner signs the tag as one of four Optional Signers. Do not save as draft.Tue Jun 06 2023 04:57:34 GMT+0000 (Greenwich Mean Time) √ EX-6335 - Part 1: Sub Contractor creates a Tag and sends signature request. Tue Jun 06 2023 04:57:34 GMT+0000 (Greenwich Mean Time) (192138ms) √ EX-6335 - Part 1: Sub Contractor creates a Tag and sends signature request. Tue Jun 06 2023 04:57:34 GMT+0000 (Greenwich Mean Time) (192138ms) √ EX-6335 - Part 2: Verify the tag was created. Tue Jun 06 2023 04:57:34 GMT+0000 (Greenwich Mean Time) (38556ms) √ EX-6335 - Part 2: Verify the tag was created. Tue Jun 06 2023 04:57:34 GMT+0000 (Greenwich Mean Time) (38556ms) √ EX-6335 - Part 3: Verify GC User and GC Feild user recived emails. Tue Jun 06 2023 05:01:30 GMT+0000 (Greenwich Mean Time) √ EX-6335 - Part 3: Verify GC User and GC Feild user recived emails. Tue Jun 06 2023 05:01:30 GMT+0000 (Greenwich Mean Time) √ EX-6335 - Part 4: Sign the Tag from Email. Tue Jun 06 2023 05:01:30 GMT+0000 (Greenwich Mean Time) (10453ms) √ EX-6335 - Part 4: Sign the Tag from Email. Tue Jun 06 2023 05:01:30 GMT+0000 (Greenwich Mean Time) (10453ms) √ EX-6335 - Part 5: Verify the tag status in the GC T&M Log. Tue Jun 06 2023 05:01:48 GMT+0000 (Greenwich Mean Time) (39241ms) √ EX-6335 - Part 5: Verify the tag status in the GC T&M Log. Tue Jun 06 2023 05:01:48 GMT+0000 (Greenwich Mean Time) (39241ms) √ EX-6335 - Part 6: Verify the tag status in the SC Admin T&M Log. Tue Jun 06 2023 05:01:48 GMT+0000 (Greenwich Mean Time) (53433ms) √ EX-6335 - Part 6: Verify the tag status in the SC Admin T&M Log. Tue Jun 06 2023 05:01:48 GMT+0000 (Greenwich Mean Time) (53433ms) √ EX-6335 - Part 7: Verify the tag status in the SC PM T&M Log. Tue Jun 06 2023 05:01:48 GMT+0000 (Greenwich Mean Time) (31147ms) √ EX-6335 - Part 7: Verify the tag status in the SC PM T&M Log. Tue Jun 06 2023 05:01:48 GMT+0000 (Greenwich Mean Time) (31147ms) √ EX-6335 - Part 8: Verify the tag status in the SC Owner T&MM Log. Tue Jun 06 2023 05:01:48 GMT+0000 (Greenwich Mean Time) (32213ms) √ EX-6335 - Part 8: Verify the tag status in the SC Owner T&MM Log. Tue Jun 06 2023 05:01:48 GMT+0000 (Greenwich Mean Time) (32213ms) √ EX-6335 - Part 9: Verify the tag status in the SC FieldUser T&MM Log. Tue Jun 06 2023 05:01:48 GMT+0000 (Greenwich Mean Time) (26355ms) √ EX-6335 - Part 9: Verify the tag status in the SC FieldUser T&MM Log. Tue Jun 06 2023 05:01:48 GMT+0000 (Greenwich Mean Time) (26355ms) √ EX-6335 - Part 10: Cleanup SC Tag ... Tue Jun 06 2023 05:01:48 GMT+0000 (Greenwich Mean Time) (30668ms) √ EX-6335 - Part 10: Cleanup SC Tag ... Tue Jun 06 2023 05:01:48 GMT+0000 (Greenwich Mean Time) (30668ms) 10 passing (9m) 10 passing (9m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_073.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 10 │ │ Passing: 10 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: false │ │ Duration: 8 minutes, 44 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6335-sc-sends-tag-gc-signs-tag-as-optional-not-saved-drafts.s │ │ pec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-6335-sc-sends-tag-gc-signs-tag-as-optional-not-saved-drafts.spec.ts\ EX-6335 T&M Workflow Existing project and contract, SC PM send a tag. GC Owne r signs the tag as one of four Optional Signers. Do not save as draft.Tue Jun 06 2023 050148 GMT+0000 (Greenwich Mean Time) -- EX-6335 - Part 6 Verify the tag s tatus in t.png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-7224-switch-project-workflow.spec.ts (75 of 96) T&M | SC PM creates a project, creates a tag for it, creates another project, moves the tag to the new project.Tue Jun 06 2023 05:06:22 GMT+0000 (Greenwich Mean Time) T&M | SC PM creates a project, creates a tag for it, creates another project, moves the tag to the new project.Tue Jun 06 2023 05:06:22 GMT+0000 (Greenwich Mean Time) √ EX-7224 - Part 1: SC PM creates a Project A.Tue Jun 06 2023 05:06:22 GMT+0000 (Greenwich Mean Time) (48910ms) √ EX-7224 - Part 1: SC PM creates a Project A.Tue Jun 06 2023 05:06:22 GMT+0000 (Greenwich Mean Time) (48910ms) √ EX-7224 - Part 2: SC adds customer to Project A.Tue Jun 06 2023 05:06:22 GMT+0000 (Greenwich Mean Time) (31007ms) √ EX-7224 - Part 2: SC adds customer to Project A.Tue Jun 06 2023 05:06:22 GMT+0000 (Greenwich Mean Time) (31007ms) √ EX-7224 - Part 3: Sub Contractor creates a tag.Tue Jun 06 2023 05:06:22 GMT+0000 (Greenwich Mean Time) (62080ms) √ EX-7224 - Part 3: Sub Contractor creates a tag.Tue Jun 06 2023 05:06:22 GMT+0000 (Greenwich Mean Time) (62080ms) √ EX-7224 - Part 4: Sub Contractor creates Project B.Tue Jun 06 2023 05:06:22 GMT+0000 (Greenwich Mean Time) (44801ms) √ EX-7224 - Part 4: Sub Contractor creates Project B.Tue Jun 06 2023 05:06:22 GMT+0000 (Greenwich Mean Time) (44801ms) √ EX-7224 - Part 5: Sub Contractor switches the tag to Project B.Tue Jun 06 2023 05:06:22 GMT+0000 (Greenwich Mean Time) (66989ms) √ EX-7224 - Part 5: Sub Contractor switches the tag to Project B.Tue Jun 06 2023 05:06:22 GMT+0000 (Greenwich Mean Time) (66989ms) √ EX-7224 - Part 7: Clean up Project A.Tue Jun 06 2023 05:06:22 GMT+0000 (Greenwich Mean Time) (29681ms) √ EX-7224 - Part 7: Clean up Project A.Tue Jun 06 2023 05:06:22 GMT+0000 (Greenwich Mean Time) (29681ms) √ EX-7224 - Part 8: Cleanup Proejct B.Tue Jun 06 2023 05:06:22 GMT+0000 (Greenwich Mean Time) (29296ms) √ EX-7224 - Part 8: Cleanup Proejct B.Tue Jun 06 2023 05:06:22 GMT+0000 (Greenwich Mean Time) (29296ms) 7 passing (5m) 7 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_074.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 13 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-7224-switch-project-workflow.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-6030-create-cn-respond-with-upload- (76 of 96) cor-verify-all-data.spec.ts Change Notifications | Create CN, respond to it with Upload COR and verify the data in the CN Log. Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) Change Notifications | Create CN, respond to it with Upload COR and verify the data in the CN Log. Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) √ EX-6030 Part 1: Create a project and send invite.Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) (48253ms) √ EX-6030 Part 1: Create a project and send invite.Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) (48253ms) √ EX-6030 Part 2: Add contractor.Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) (38001ms) √ EX-6030 Part 2: Add contractor.Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) (38001ms) √ EX-6030 Part 3: Sub Contractor accepts the invite.Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) (21204ms) √ EX-6030 Part 3: Sub Contractor accepts the invite.Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) (21204ms) √ EX-6030 Part 4: Gen Contractor creates a Pricing Request Change Notification.Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) (41993ms) √ EX-6030 Part 4: Gen Contractor creates a Pricing Request Change Notification.Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) (41993ms) √ EX-6030 Part 5: Sub Contractor responds to the Change Notification with Upload COR.Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) (67451ms) √ EX-6030 Part 5: Sub Contractor responds to the Change Notification with Upload COR.Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) (67451ms) √ EX-6030 Part 6: GC verifies CN data and status.Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) (22742ms) √ EX-6030 Part 6: GC verifies CN data and status.Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) (22742ms) √ EX-6030 Part 7: Cleanup GC...Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) (25243ms) √ EX-6030 Part 7: Cleanup GC...Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) (25243ms) √ EX-6030 Part 7: Cleanup SC...Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) (31819ms) √ EX-6030 Part 7: Cleanup SC...Tue Jun 06 2023 05:11:39 GMT+0000 (Greenwich Mean Time) (31819ms) 8 passing (5m) 8 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_075.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 57 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-6030-create-cn-respond-with-upload-cor-verify-a │ │ ll-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8597-respond-to-cn-as-SC-and-GC-cle (77 of 96) ar-response.spec.ts Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseTue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseTue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) √ EX-8597 Part 1: Delete existing CORs. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (38107ms) √ EX-8597 Part 1: Delete existing CORs. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (38107ms) √ EX-8597 Part 2: Delete existing CNs. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (22608ms) √ EX-8597 Part 2: Delete existing CNs. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (22608ms) √ EX-8597 Part 3: Create a CN with type as Authorize T&M Work and send it to Contractor. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (41944ms) √ EX-8597 Part 3: Create a CN with type as Authorize T&M Work and send it to Contractor. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (41944ms) √ EX-8597 Part 4: Respond to CN with No Cost Impact as SC PM. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (46049ms) √ EX-8597 Part 4: Respond to CN with No Cost Impact as SC PM. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (46049ms) √ EX-8597 Part 5: Verify the reponse and clear the response. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (41200ms) √ EX-8597 Part 5: Verify the reponse and clear the response. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (41200ms) √ EX-8597 Part 6: Respond to CN by creating a COR. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (67008ms) √ EX-8597 Part 6: Respond to CN by creating a COR. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (67008ms) √ EX-8597 Part 7: Verify the reponse and clear the response. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (39204ms) √ EX-8597 Part 7: Verify the reponse and clear the response. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (39204ms) √ EX-8597 Part 8: Respond to CN as SC PM by uploading a COR. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (66984ms) √ EX-8597 Part 8: Respond to CN as SC PM by uploading a COR. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (66984ms) √ EX-8597 Part 9: Verify the reponse and clear the response. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (64629ms) √ EX-8597 Part 9: Verify the reponse and clear the response. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (64629ms) √ EX-8597 Part 10: Respond to CN with No Cost Impact as GC PM and verify the reponse and clear the response. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (63345ms) √ EX-8597 Part 10: Respond to CN with No Cost Impact as GC PM and verify the reponse and clear the response. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (63345ms) √ EX-8597 Part 11: Respond to CN by linking received COR as GC PM and verify the reponse and clear the response. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (52380ms) √ EX-8597 Part 11: Respond to CN by linking received COR as GC PM and verify the reponse and clear the response. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (52380ms) √ EX-8597 Part 12: Clean the CORs. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (67207ms) √ EX-8597 Part 12: Clean the CORs. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (67207ms) √ EX-8597 Part 13: Clean the CNs. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (50394ms) √ EX-8597 Part 13: Clean the CNs. Tue Jun 06 2023 05:16:41 GMT+0000 (Greenwich Mean Time) (50394ms) 13 passing (12m) 13 passing (12m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_076.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 13 │ │ Passing: 13 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: false │ │ Duration: 11 minutes, 30 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8597-respond-to-cn-as-SC-and-GC-clear-response. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1280x720) geNotificationLog\Sent\ex-8597-respond-to-cn-as-SC-and-GC-clear-response.spec.ts \Change Notifications Clear Response Respond to CN as GC and SC with all optio ns and clear the responseTue Jun 06 2023 051641 GMT+0000 (Greenwich Mean Time) - - EX-8597 Part 9 Verify the reponse and clear the response. Tue Jun 06 2023 0516 41 GMT+0000.png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8599-create-cn-authorize-t&mwork-re (78 of 96) spond-as-SC-PM-with-no-cost-impact.spec.ts Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor. ) Tue Jun 06 2023 05:28:15 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor. ) Tue Jun 06 2023 05:28:15 GMT+0000 (Greenwich Mean Time) √ EX-8599 Part 1: Delete existing CN (24173ms) √ EX-8599 Part 1: Delete existing CN (24173ms) √ EX-8599 Part 2: Create a CN with type as Authorize T&M Work and send it to Contractor. Tue Jun 06 2023 05:28:16 GMT+0000 (Greenwich Mean Time) (43680ms) √ EX-8599 Part 2: Create a CN with type as Authorize T&M Work and send it to Contractor. Tue Jun 06 2023 05:28:16 GMT+0000 (Greenwich Mean Time) (43680ms) √ EX-8599 Part 3: Respond to CN with No Cost Impact. Tue Jun 06 2023 05:28:16 GMT+0000 (Greenwich Mean Time) (53985ms) √ EX-8599 Part 3: Respond to CN with No Cost Impact. Tue Jun 06 2023 05:28:16 GMT+0000 (Greenwich Mean Time) (53985ms) √ EX-8599 Part 4: Verify the data as Gc. Tue Jun 06 2023 05:28:16 GMT+0000 (Greenwich Mean Time) (30616ms) √ EX-8599 Part 4: Verify the data as Gc. Tue Jun 06 2023 05:28:16 GMT+0000 (Greenwich Mean Time) (30616ms) √ EX-8599 Part 5: Delete the CN. Tue Jun 06 2023 05:28:16 GMT+0000 (Greenwich Mean Time) (29740ms) √ EX-8599 Part 5: Delete the CN. Tue Jun 06 2023 05:28:16 GMT+0000 (Greenwich Mean Time) (29740ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_077.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 3 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8599-create-cn-authorize-t&mwork-respond-as-SC- │ │ PM-with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8942-create-cn-pricing-request-resp (79 of 96) ond-as-SC-PM-with-no-cost-impact.spec.ts Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 05:31:22 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 05:31:22 GMT+0000 (Greenwich Mean Time) √ EX-8942 Part 1: Delete existing CN (26072ms) √ EX-8942 Part 1: Delete existing CN (26072ms) √ EX-8942 Part 2: Create a CN with type as Pricing Request and send it to ContractorTue Jun 06 2023 05:31:22 GMT+0000 (Greenwich Mean Time) (39181ms) √ EX-8942 Part 2: Create a CN with type as Pricing Request and send it to ContractorTue Jun 06 2023 05:31:22 GMT+0000 (Greenwich Mean Time) (39181ms) √ EX-8942 Part 3: Respond to CN with No Cost ImpactTue Jun 06 2023 05:31:22 GMT+0000 (Greenwich Mean Time) (53098ms) √ EX-8942 Part 3: Respond to CN with No Cost ImpactTue Jun 06 2023 05:31:22 GMT+0000 (Greenwich Mean Time) (53098ms) √ EX-8942 Part 4: Verify the data as GcTue Jun 06 2023 05:31:22 GMT+0000 (Greenwich Mean Time) (28844ms) √ EX-8942 Part 4: Verify the data as GcTue Jun 06 2023 05:31:22 GMT+0000 (Greenwich Mean Time) (28844ms) √ EX-8942 Part 5: Delete the CNTue Jun 06 2023 05:31:22 GMT+0000 (Greenwich Mean Time) (30326ms) √ EX-8942 Part 5: Delete the CNTue Jun 06 2023 05:31:22 GMT+0000 (Greenwich Mean Time) (30326ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_078.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 58 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8942-create-cn-pricing-request-respond-as-SC-PM │ │ -with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8943-create-cn-pricing-request-resp (80 of 96) ond-as-SC-PM-with-create-cor.spec.ts Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 05:34:25 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 05:34:25 GMT+0000 (Greenwich Mean Time) √ EX-8943 Part 1: Delete existing CN (24998ms) √ EX-8943 Part 1: Delete existing CN (24998ms) √ EX-8943 Part 2: Delete existing CORsTue Jun 06 2023 05:34:25 GMT+0000 (Greenwich Mean Time) (34523ms) √ EX-8943 Part 2: Delete existing CORsTue Jun 06 2023 05:34:25 GMT+0000 (Greenwich Mean Time) (34523ms) √ EX-8943 Part 3: Create a CN with type as Pricing Request and send it to ContractorTue Jun 06 2023 05:34:25 GMT+0000 (Greenwich Mean Time) (41386ms) √ EX-8943 Part 3: Create a CN with type as Pricing Request and send it to ContractorTue Jun 06 2023 05:34:25 GMT+0000 (Greenwich Mean Time) (41386ms) √ EX-8943 Part 4: Respond to CN with create corTue Jun 06 2023 05:34:25 GMT+0000 (Greenwich Mean Time) (71456ms) √ EX-8943 Part 4: Respond to CN with create corTue Jun 06 2023 05:34:25 GMT+0000 (Greenwich Mean Time) (71456ms) √ EX-8943 Part 5: Verify the data as GcTue Jun 06 2023 05:34:25 GMT+0000 (Greenwich Mean Time) (30663ms) √ EX-8943 Part 5: Verify the data as GcTue Jun 06 2023 05:34:25 GMT+0000 (Greenwich Mean Time) (30663ms) √ EX-8943 Part 6: Delete all CORsTue Jun 06 2023 05:34:25 GMT+0000 (Greenwich Mean Time) (48639ms) √ EX-8943 Part 6: Delete all CORsTue Jun 06 2023 05:34:25 GMT+0000 (Greenwich Mean Time) (48639ms) √ EX-8943 Part 7: Delete the CNTue Jun 06 2023 05:34:25 GMT+0000 (Greenwich Mean Time) (30030ms) √ EX-8943 Part 7: Delete the CNTue Jun 06 2023 05:34:25 GMT+0000 (Greenwich Mean Time) (30030ms) 7 passing (5m) 7 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_079.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 42 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8943-create-cn-pricing-request-respond-as-SC-PM │ │ -with-create-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8944-create-cn-pricing-request-resp (81 of 96) ond-as-SC-PM-with-upload-cor.spec.ts Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 05:39:11 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 05:39:11 GMT+0000 (Greenwich Mean Time) √ EX-8944 Part 1: Delete existing CN (26143ms) √ EX-8944 Part 1: Delete existing CN (26143ms) √ EX-8944 Part 2: Delete existing CORsTue Jun 06 2023 05:39:11 GMT+0000 (Greenwich Mean Time) (29877ms) √ EX-8944 Part 2: Delete existing CORsTue Jun 06 2023 05:39:11 GMT+0000 (Greenwich Mean Time) (29877ms) √ EX-8944 Part 3: Create a CN with type as Pricing Request and send it to ContractorTue Jun 06 2023 05:39:11 GMT+0000 (Greenwich Mean Time) (41982ms) √ EX-8944 Part 3: Create a CN with type as Pricing Request and send it to ContractorTue Jun 06 2023 05:39:11 GMT+0000 (Greenwich Mean Time) (41982ms) √ EX-8944 Part 4: Respond to CN with upload corTue Jun 06 2023 05:39:11 GMT+0000 (Greenwich Mean Time) (80166ms) √ EX-8944 Part 4: Respond to CN with upload corTue Jun 06 2023 05:39:11 GMT+0000 (Greenwich Mean Time) (80166ms) √ EX-8944 Part 5: Verify the data as GcTue Jun 06 2023 05:39:11 GMT+0000 (Greenwich Mean Time) (32193ms) √ EX-8944 Part 5: Verify the data as GcTue Jun 06 2023 05:39:11 GMT+0000 (Greenwich Mean Time) (32193ms) √ EX-8944 Part 6: Delete all CORsTue Jun 06 2023 05:39:11 GMT+0000 (Greenwich Mean Time) (47234ms) √ EX-8944 Part 6: Delete all CORsTue Jun 06 2023 05:39:11 GMT+0000 (Greenwich Mean Time) (47234ms) √ EX-8944 Part 7: Delete the CNTue Jun 06 2023 05:39:11 GMT+0000 (Greenwich Mean Time) (30480ms) √ EX-8944 Part 7: Delete the CNTue Jun 06 2023 05:39:11 GMT+0000 (Greenwich Mean Time) (30480ms) 7 passing (5m) 7 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_080.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 49 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8944-create-cn-pricing-request-respond-as-SC-PM │ │ -with-upload-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8945-create-cn-pricing-request-resp (82 of 96) ond-as-GC-PM-with-no-cost-impact.spec.ts Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 05:44:05 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 05:44:05 GMT+0000 (Greenwich Mean Time) √ EX-8945 Part 1: Delete existing CN (26755ms) √ EX-8945 Part 1: Delete existing CN (26755ms) √ EX-8945 Part 2: Create a CN with type as Pricing Request and send it to ContractorTue Jun 06 2023 05:44:05 GMT+0000 (Greenwich Mean Time) (42184ms) √ EX-8945 Part 2: Create a CN with type as Pricing Request and send it to ContractorTue Jun 06 2023 05:44:05 GMT+0000 (Greenwich Mean Time) (42184ms) √ EX-8945 Part 3: Respond to CN with No Cost Impact as GC PMTue Jun 06 2023 05:44:05 GMT+0000 (Greenwich Mean Time) (53955ms) √ EX-8945 Part 3: Respond to CN with No Cost Impact as GC PMTue Jun 06 2023 05:44:05 GMT+0000 (Greenwich Mean Time) (53955ms) √ EX-8945 Part 4: Verify the data as ScTue Jun 06 2023 05:44:05 GMT+0000 (Greenwich Mean Time) (35414ms) √ EX-8945 Part 4: Verify the data as ScTue Jun 06 2023 05:44:05 GMT+0000 (Greenwich Mean Time) (35414ms) √ EX-8945 Part 5: Delete the CNTue Jun 06 2023 05:44:05 GMT+0000 (Greenwich Mean Time) (32524ms) √ EX-8945 Part 5: Delete the CNTue Jun 06 2023 05:44:05 GMT+0000 (Greenwich Mean Time) (32524ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_081.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 11 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8945-create-cn-pricing-request-respond-as-GC-PM │ │ -with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8946-create-cn-pricing-request-resp (83 of 96) ond-as-GC-PM-by-linking-existing-cor.spec.ts Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 05:47:20 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 05:47:20 GMT+0000 (Greenwich Mean Time) √ EX-8946 Part 1: Delete existing CN (23071ms) √ EX-8946 Part 1: Delete existing CN (23071ms) √ EX-8946 Part 2: Create a CN with type as Pricing Request and send it to ContractorTue Jun 06 2023 05:47:20 GMT+0000 (Greenwich Mean Time) (42763ms) √ EX-8946 Part 2: Create a CN with type as Pricing Request and send it to ContractorTue Jun 06 2023 05:47:20 GMT+0000 (Greenwich Mean Time) (42763ms) √ EX-8946 Part 3: Respond to CN by linking received COR as GC PMTue Jun 06 2023 05:47:20 GMT+0000 (Greenwich Mean Time) (50890ms) √ EX-8946 Part 3: Respond to CN by linking received COR as GC PMTue Jun 06 2023 05:47:20 GMT+0000 (Greenwich Mean Time) (50890ms) √ EX-8946 Part 4: Verify the data as ScTue Jun 06 2023 05:47:20 GMT+0000 (Greenwich Mean Time) (35948ms) √ EX-8946 Part 4: Verify the data as ScTue Jun 06 2023 05:47:20 GMT+0000 (Greenwich Mean Time) (35948ms) √ EX-8946 Part 5: Delete the CNTue Jun 06 2023 05:47:20 GMT+0000 (Greenwich Mean Time) (33756ms) √ EX-8946 Part 5: Delete the CNTue Jun 06 2023 05:47:20 GMT+0000 (Greenwich Mean Time) (33756ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_082.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 7 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8946-create-cn-pricing-request-respond-as-GC-PM │ │ -by-linking-existing-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8947-create-cn-authorize-t&mwork-re (84 of 96) spond-as-SC-PM-with-create-cor.spec.ts Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 05:50:31 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 05:50:31 GMT+0000 (Greenwich Mean Time) √ EX-8947 Part 1: Delete existing CN (26750ms) √ EX-8947 Part 1: Delete existing CN (26750ms) √ EX-8947 Part 2: Delete existing CORsTue Jun 06 2023 05:50:31 GMT+0000 (Greenwich Mean Time) (32186ms) √ EX-8947 Part 2: Delete existing CORsTue Jun 06 2023 05:50:31 GMT+0000 (Greenwich Mean Time) (32186ms) √ EX-8947 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorTue Jun 06 2023 05:50:31 GMT+0000 (Greenwich Mean Time) (45898ms) √ EX-8947 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorTue Jun 06 2023 05:50:31 GMT+0000 (Greenwich Mean Time) (45898ms) √ EX-8947 Part 4: Respond to CN with create corTue Jun 06 2023 05:50:31 GMT+0000 (Greenwich Mean Time) (65890ms) √ EX-8947 Part 4: Respond to CN with create corTue Jun 06 2023 05:50:31 GMT+0000 (Greenwich Mean Time) (65890ms) √ EX-8947 Part 5: Verify the data as GcTue Jun 06 2023 05:50:31 GMT+0000 (Greenwich Mean Time) (31612ms) √ EX-8947 Part 5: Verify the data as GcTue Jun 06 2023 05:50:31 GMT+0000 (Greenwich Mean Time) (31612ms) √ EX-8947 Part 6: Delete all CORsTue Jun 06 2023 05:50:31 GMT+0000 (Greenwich Mean Time) (46966ms) √ EX-8947 Part 6: Delete all CORsTue Jun 06 2023 05:50:31 GMT+0000 (Greenwich Mean Time) (46966ms) √ EX-8947 Part 7: Delete the CNTue Jun 06 2023 05:50:31 GMT+0000 (Greenwich Mean Time) (27321ms) √ EX-8947 Part 7: Delete the CNTue Jun 06 2023 05:50:31 GMT+0000 (Greenwich Mean Time) (27321ms) 7 passing (5m) 7 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_083.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 37 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8947-create-cn-authorize-t&mwork-respond-as-SC- │ │ PM-with-create-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8948-create-cn-authorize-t&mwork-re (85 of 96) spond-as-SC-PM-with-upload-cor.spec.ts Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 05:55:12 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 05:55:12 GMT+0000 (Greenwich Mean Time) √ EX-8948 Part 1.1: Delete existing CN (26681ms) √ EX-8948 Part 1.1: Delete existing CN (26681ms) √ EX-8948 Part 1.2: Delete all CORs. Tue Jun 06 2023 05:55:12 GMT+0000 (Greenwich Mean Time) (30362ms) √ EX-8948 Part 1.2: Delete all CORs. Tue Jun 06 2023 05:55:12 GMT+0000 (Greenwich Mean Time) (30362ms) √ EX-8948 Part 2: Delete existing CORsTue Jun 06 2023 05:55:12 GMT+0000 (Greenwich Mean Time) (32863ms) √ EX-8948 Part 2: Delete existing CORsTue Jun 06 2023 05:55:12 GMT+0000 (Greenwich Mean Time) (32863ms) √ EX-8948 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorTue Jun 06 2023 05:55:12 GMT+0000 (Greenwich Mean Time) (43088ms) √ EX-8948 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorTue Jun 06 2023 05:55:12 GMT+0000 (Greenwich Mean Time) (43088ms) √ EX-8948 Part 4: Respond to CN with upload corTue Jun 06 2023 05:55:12 GMT+0000 (Greenwich Mean Time) (65111ms) √ EX-8948 Part 4: Respond to CN with upload corTue Jun 06 2023 05:55:12 GMT+0000 (Greenwich Mean Time) (65111ms) √ EX-8948 Part 5: Verify the data as Gc. Tue Jun 06 2023 05:55:12 GMT+0000 (Greenwich Mean Time) (29745ms) √ EX-8948 Part 5: Verify the data as Gc. Tue Jun 06 2023 05:55:12 GMT+0000 (Greenwich Mean Time) (29745ms) √ EX-8948 Part 6: Delete all CORs. Tue Jun 06 2023 05:55:12 GMT+0000 (Greenwich Mean Time) (43557ms) √ EX-8948 Part 6: Delete all CORs. Tue Jun 06 2023 05:55:12 GMT+0000 (Greenwich Mean Time) (43557ms) √ EX-8948 Part 7: Delete the CN. Tue Jun 06 2023 05:55:12 GMT+0000 (Greenwich Mean Time) (30815ms) √ EX-8948 Part 7: Delete the CN. Tue Jun 06 2023 05:55:12 GMT+0000 (Greenwich Mean Time) (30815ms) 8 passing (5m) 8 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_084.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 3 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8948-create-cn-authorize-t&mwork-respond-as-SC- │ │ PM-with-upload-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8949-create-cn-authorize-t&mwork-re (86 of 96) spond-as-GC-PM-with-no-cost-impact.spec.ts Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 06:00:20 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 06:00:20 GMT+0000 (Greenwich Mean Time) √ EX-8949 Part 1: Delete existing CN (25414ms) √ EX-8949 Part 1: Delete existing CN (25414ms) √ EX-8949 Part 2: Create a CN with type as Authorize T&M Work and send it to ContractorTue Jun 06 2023 06:00:20 GMT+0000 (Greenwich Mean Time) (45979ms) √ EX-8949 Part 2: Create a CN with type as Authorize T&M Work and send it to ContractorTue Jun 06 2023 06:00:20 GMT+0000 (Greenwich Mean Time) (45979ms) √ EX-8949 Part 3: Respond to CN with No Cost Impact as GC PMTue Jun 06 2023 06:00:20 GMT+0000 (Greenwich Mean Time) (52319ms) √ EX-8949 Part 3: Respond to CN with No Cost Impact as GC PMTue Jun 06 2023 06:00:20 GMT+0000 (Greenwich Mean Time) (52319ms) √ EX-8949 Part 4: Verify the data as ScTue Jun 06 2023 06:00:20 GMT+0000 (Greenwich Mean Time) (34852ms) √ EX-8949 Part 4: Verify the data as ScTue Jun 06 2023 06:00:20 GMT+0000 (Greenwich Mean Time) (34852ms) √ EX-8949 Part 5: Delete the CNTue Jun 06 2023 06:00:20 GMT+0000 (Greenwich Mean Time) (30486ms) √ EX-8949 Part 5: Delete the CNTue Jun 06 2023 06:00:20 GMT+0000 (Greenwich Mean Time) (30486ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_085.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 9 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8949-create-cn-authorize-t&mwork-respond-as-GC- │ │ PM-with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8950-create-cn-authorize-t&mwork-re (87 of 96) spond-as-GC-PM-by-linking-existing-cor.spec.ts Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 06:03:33 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Jun 06 2023 06:03:33 GMT+0000 (Greenwich Mean Time) √ EX-8950 Part 1: Delete existing CN (24541ms) √ EX-8950 Part 1: Delete existing CN (24541ms) √ EX-8950 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorTue Jun 06 2023 06:03:33 GMT+0000 (Greenwich Mean Time) (42814ms) √ EX-8950 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorTue Jun 06 2023 06:03:33 GMT+0000 (Greenwich Mean Time) (42814ms) √ EX-8950 Part 4: Respond to CN by linking received COR as GC PMTue Jun 06 2023 06:03:33 GMT+0000 (Greenwich Mean Time) (42658ms) √ EX-8950 Part 4: Respond to CN by linking received COR as GC PMTue Jun 06 2023 06:03:33 GMT+0000 (Greenwich Mean Time) (42658ms) √ EX-8950 Part 5: Verify the data as ScTue Jun 06 2023 06:03:33 GMT+0000 (Greenwich Mean Time) (30499ms) √ EX-8950 Part 5: Verify the data as ScTue Jun 06 2023 06:03:33 GMT+0000 (Greenwich Mean Time) (30499ms) √ EX-8950 Part 6: Delete the CNTue Jun 06 2023 06:03:33 GMT+0000 (Greenwich Mean Time) (28408ms) √ EX-8950 Part 6: Delete the CNTue Jun 06 2023 06:03:33 GMT+0000 (Greenwich Mean Time) (28408ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_086.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 49 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8950-create-cn-authorize-t&mwork-respond-as-GC- │ │ PM-by-linking-existing-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 08_Projects/Active Projects/ex-5467-verify-job-number-propagation-be (88 of 96) tween-project.spec.ts Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) √ EX-5467 - Create project as GC.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (34688ms) √ EX-5467 - Create project as GC.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (34688ms) √ EX-5467 - Add contract.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (33370ms) √ EX-5467 - Add contract.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (33370ms) √ EX-5467 - Verify the contract is added.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (18389ms) √ EX-5467 - Verify the contract is added.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (18389ms) √ EX-5467 - Add Customer.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (27542ms) √ EX-5467 - Add Customer.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (27542ms) √ EX-5467 - Verify Project Details at GC side.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (27024ms) √ EX-5467 - Verify Project Details at GC side.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (27024ms) √ EX-5467 - Accept the project invite at the SC side.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (39014ms) √ EX-5467 - Accept the project invite at the SC side.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (39014ms) √ EX-5467 - Verify Project Details at SC side.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (21937ms) √ EX-5467 - Verify Project Details at SC side.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (21937ms) √ EX-5467 - Accept project invite at the Customer side.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (25655ms) √ EX-5467 - Accept project invite at the Customer side.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (25655ms) √ EX-5467 - Verify Project Details at the Customer side.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (16555ms) √ EX-5467 - Verify Project Details at the Customer side.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (16555ms) √ EX-5467 - Cleanup GC... Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (23765ms) √ EX-5467 - Cleanup GC... Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (23765ms) √ EX-5467 - Cleanup SC... Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (32413ms) √ EX-5467 - Cleanup SC... Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (32413ms) √ EX-5467 - Cleanup for Owner.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (26405ms) √ EX-5467 - Cleanup for Owner.Tue Jun 06 2023 06:06:27 GMT+0000 (Greenwich Mean Time) (26405ms) 12 passing (5m) 12 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_087.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 28 seconds │ │ Spec Ran: 08_Projects/Active Projects/ex-5467-verify-job-number-propagation-between-projec │ │ t.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 08_Projects/Active Projects/ex-7362-verify-job-number-propagation-to (89 of 96) -draft-cors.spec.ts Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Tue Jun 06 2023 06:11:58 GMT+0000 (Greenwich Mean Time) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Tue Jun 06 2023 06:11:58 GMT+0000 (Greenwich Mean Time) √ EX-7362 - Part 1: Create project as SC.Tue Jun 06 2023 06:11:58 GMT+0000 (Greenwich Mean Time) (36931ms) √ EX-7362 - Part 1: Create project as SC.Tue Jun 06 2023 06:11:58 GMT+0000 (Greenwich Mean Time) (36931ms) √ EX-7362 - Part 2: Add Customer.Tue Jun 06 2023 06:11:58 GMT+0000 (Greenwich Mean Time) (26604ms) √ EX-7362 - Part 2: Add Customer.Tue Jun 06 2023 06:11:58 GMT+0000 (Greenwich Mean Time) (26604ms) √ EX-7362 - Part 3: Accept the project invite at the GC side.Tue Jun 06 2023 06:11:58 GMT+0000 (Greenwich Mean Time) (32527ms) √ EX-7362 - Part 3: Accept the project invite at the GC side.Tue Jun 06 2023 06:11:58 GMT+0000 (Greenwich Mean Time) (32527ms) √ EX-7362 - Part 4: Create COR and Save it as Draft.Tue Jun 06 2023 06:11:58 GMT+0000 (Greenwich Mean Time) (36167ms) √ EX-7362 - Part 4: Create COR and Save it as Draft.Tue Jun 06 2023 06:11:58 GMT+0000 (Greenwich Mean Time) (36167ms) √ EX-7362 - Part 5: Verify Draft COR data in the Draft COR Log.Tue Jun 06 2023 06:11:58 GMT+0000 (Greenwich Mean Time) (24045ms) √ EX-7362 - Part 5: Verify Draft COR data in the Draft COR Log.Tue Jun 06 2023 06:11:58 GMT+0000 (Greenwich Mean Time) (24045ms) √ EX-7362 - Cleanup GC... Tue Jun 06 2023 06:11:58 GMT+0000 (Greenwich Mean Time) (26607ms) √ EX-7362 - Cleanup GC... Tue Jun 06 2023 06:11:58 GMT+0000 (Greenwich Mean Time) (26607ms) √ EX-7362 - Cleanup SC... Tue Jun 06 2023 06:11:58 GMT+0000 (Greenwich Mean Time) (32362ms) √ EX-7362 - Cleanup SC... Tue Jun 06 2023 06:11:58 GMT+0000 (Greenwich Mean Time) (32362ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_088.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 37 seconds │ │ Spec Ran: 08_Projects/Active Projects/ex-7362-verify-job-number-propagation-to-draft-cors. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/ChangeNotifications/ex-3723-verify-all-links-in-pricing-re (90 of 96) quest-cn-response-needed-email.spec.ts Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Tue Jun 06 2023 06:15:39 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Tue Jun 06 2023 06:15:39 GMT+0000 (Greenwich Mean Time) √ EX-3723 Part 1: Create a project and send invite.Tue Jun 06 2023 06:15:39 GMT+0000 (Greenwich Mean Time) (48675ms) √ EX-3723 Part 1: Create a project and send invite.Tue Jun 06 2023 06:15:39 GMT+0000 (Greenwich Mean Time) (48675ms) √ EX-3723 Part 2: Add Sub-Contractor.Tue Jun 06 2023 06:15:39 GMT+0000 (Greenwich Mean Time) (35598ms) √ EX-3723 Part 2: Add Sub-Contractor.Tue Jun 06 2023 06:15:39 GMT+0000 (Greenwich Mean Time) (35598ms) √ EX-3723 Part 3: Login to the Sub Contractor account and Accept the invite.Tue Jun 06 2023 06:15:39 GMT+0000 (Greenwich Mean Time) (23295ms) √ EX-3723 Part 3: Login to the Sub Contractor account and Accept the invite.Tue Jun 06 2023 06:15:39 GMT+0000 (Greenwich Mean Time) (23295ms) √ EX-3723 Part 4: Log in back to the Gen Contractor account and create a Pricing Request Change Notification.Tue Jun 06 2023 06:15:39 GMT+0000 (Greenwich Mean Time) (37187ms) √ EX-3723 Part 4: Log in back to the Gen Contractor account and create a Pricing Request Change Notification.Tue Jun 06 2023 06:15:39 GMT+0000 (Greenwich Mean Time) (37187ms) √ EX-3723 Part 5: Verify the Response Needed CN email.Tue Jun 06 2023 06:18:09 GMT+0000 (Greenwich Mean Time) (7618ms) √ EX-3723 Part 5: Verify the Response Needed CN email.Tue Jun 06 2023 06:18:09 GMT+0000 (Greenwich Mean Time) (7618ms) √ EX-3723 Part 6: Verify LinksTue Jun 06 2023 06:18:20 GMT+0000 (Greenwich Mean Time) (15178ms) √ EX-3723 Part 6: Verify LinksTue Jun 06 2023 06:18:20 GMT+0000 (Greenwich Mean Time) (15178ms) √ EX-3723 Part 7: Cleanup GC...Tue Jun 06 2023 06:18:20 GMT+0000 (Greenwich Mean Time) (25174ms) √ EX-3723 Part 7: Cleanup GC...Tue Jun 06 2023 06:18:20 GMT+0000 (Greenwich Mean Time) (25174ms) √ EX-3723 Part 7: Cleanup SC...Tue Jun 06 2023 06:18:20 GMT+0000 (Greenwich Mean Time) (28212ms) √ EX-3723 Part 7: Cleanup SC...Tue Jun 06 2023 06:18:20 GMT+0000 (Greenwich Mean Time) (28212ms) 8 passing (4m) 8 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_089.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 50 seconds │ │ Spec Ran: 11_Emails/ChangeNotifications/ex-3723-verify-all-links-in-pricing-request-cn-res │ │ ponse-needed-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/ChangeNotifications/ex-5287-verify-all-links-in-authorize- (91 of 96) work-cn-response-needed-email.spec.ts Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Authorize Work CN.Tue Jun 06 2023 06:19:33 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Authorize Work CN.Tue Jun 06 2023 06:19:33 GMT+0000 (Greenwich Mean Time) √ EX-5287 Part 1: Create a project.Tue Jun 06 2023 06:19:33 GMT+0000 (Greenwich Mean Time) (49001ms) √ EX-5287 Part 1: Create a project.Tue Jun 06 2023 06:19:33 GMT+0000 (Greenwich Mean Time) (49001ms) √ EX-5287 Part 2: Send invite.Tue Jun 06 2023 06:19:33 GMT+0000 (Greenwich Mean Time) (35061ms) √ EX-5287 Part 2: Send invite.Tue Jun 06 2023 06:19:33 GMT+0000 (Greenwich Mean Time) (35061ms) √ EX-5287 Part 3: Login to the Sub Contractor account and Accept the invite.Tue Jun 06 2023 06:19:33 GMT+0000 (Greenwich Mean Time) (21447ms) √ EX-5287 Part 3: Login to the Sub Contractor account and Accept the invite.Tue Jun 06 2023 06:19:33 GMT+0000 (Greenwich Mean Time) (21447ms) √ EX-5287 Part 4: Log in back to the Gen Contractor account and create a Authorize T&M Work Change Notification.Tue Jun 06 2023 06:19:33 GMT+0000 (Greenwich Mean Time) (38510ms) √ EX-5287 Part 4: Log in back to the Gen Contractor account and create a Authorize T&M Work Change Notification.Tue Jun 06 2023 06:19:33 GMT+0000 (Greenwich Mean Time) (38510ms) √ EX-5287 Part 5: Verify the Response Needed CN email.Tue Jun 06 2023 06:22:02 GMT+0000 (Greenwich Mean Time) (6403ms) √ EX-5287 Part 5: Verify the Response Needed CN email.Tue Jun 06 2023 06:22:02 GMT+0000 (Greenwich Mean Time) (6403ms) √ EX-5287 Part 6: Verify LinksTue Jun 06 2023 06:22:13 GMT+0000 (Greenwich Mean Time) (11348ms) √ EX-5287 Part 6: Verify LinksTue Jun 06 2023 06:22:13 GMT+0000 (Greenwich Mean Time) (11348ms) √ EX-5287 Part 7: Cleanup GC...Tue Jun 06 2023 06:22:13 GMT+0000 (Greenwich Mean Time) (24668ms) √ EX-5287 Part 7: Cleanup GC...Tue Jun 06 2023 06:22:13 GMT+0000 (Greenwich Mean Time) (24668ms) 7 passing (3m) 7 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_090.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 16 seconds │ │ Spec Ran: 11_Emails/ChangeNotifications/ex-5287-verify-all-links-in-authorize-work-cn-resp │ │ onse-needed-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/CORs/ex-3720-verify-all-links-in-cor-recieved-email.spec.t (92 of 96) s Email Hyperlinks | To verify that all links on COR received email works fineTue Jun 06 2023 06:22:52 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on COR received email works fineTue Jun 06 2023 06:22:52 GMT+0000 (Greenwich Mean Time) √ EX-3720 Part 1: Create a project. Tue Jun 06 2023 06:22:52 GMT+0000 (Greenwich Mean Time) (48919ms) √ EX-3720 Part 1: Create a project. Tue Jun 06 2023 06:22:52 GMT+0000 (Greenwich Mean Time) (48919ms) √ EX-3720 Part 2: Add contract. Tue Jun 06 2023 06:22:52 GMT+0000 (Greenwich Mean Time) (33908ms) √ EX-3720 Part 2: Add contract. Tue Jun 06 2023 06:22:52 GMT+0000 (Greenwich Mean Time) (33908ms) √ EX-3720 Part 3: Sub Contractor accepts the project invite.Tue Jun 06 2023 06:22:52 GMT+0000 (Greenwich Mean Time) (21508ms) √ EX-3720 Part 3: Sub Contractor accepts the project invite.Tue Jun 06 2023 06:22:52 GMT+0000 (Greenwich Mean Time) (21508ms) √ EX-3720 Part 4: Sub Contractor creates COR.Tue Jun 06 2023 06:22:52 GMT+0000 (Greenwich Mean Time) (69232ms) √ EX-3720 Part 4: Sub Contractor creates COR.Tue Jun 06 2023 06:22:52 GMT+0000 (Greenwich Mean Time) (69232ms) √ EX-3720 Part 5: Verify the new COR email links to Extracker.com.Tue Jun 06 2023 06:25:51 GMT+0000 (Greenwich Mean Time) (11682ms) √ EX-3720 Part 5: Verify the new COR email links to Extracker.com.Tue Jun 06 2023 06:25:51 GMT+0000 (Greenwich Mean Time) (11682ms) √ EX-3720 Part 6: Verify the VIEW/COMMENT/DOWNLOAD button link.Tue Jun 06 2023 06:26:06 GMT+0000 (Greenwich Mean Time) (12019ms) √ EX-3720 Part 6: Verify the VIEW/COMMENT/DOWNLOAD button link.Tue Jun 06 2023 06:26:06 GMT+0000 (Greenwich Mean Time) (12019ms) √ EX-3720 Part 7: Cleanup GC...Tue Jun 06 2023 06:26:06 GMT+0000 (Greenwich Mean Time) (25198ms) √ EX-3720 Part 7: Cleanup GC...Tue Jun 06 2023 06:26:06 GMT+0000 (Greenwich Mean Time) (25198ms) √ EX-3720 Part 8: Cleanup SC...Tue Jun 06 2023 06:26:06 GMT+0000 (Greenwich Mean Time) (30614ms) √ EX-3720 Part 8: Cleanup SC...Tue Jun 06 2023 06:26:06 GMT+0000 (Greenwich Mean Time) (30614ms) 8 passing (4m) 8 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_091.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 21 seconds │ │ Spec Ran: 11_Emails/CORs/ex-3720-verify-all-links-in-cor-recieved-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/Projects/ex-3717-verify-all-links-in-add-my-company-email. (93 of 96) spec.ts Email Hyperlinks | To verify that all links on Add My Company email work fineTue Jun 06 2023 06:27:17 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Add My Company email work fineTue Jun 06 2023 06:27:17 GMT+0000 (Greenwich Mean Time) √ EX-3717 Part 1: Create project and send invite.Tue Jun 06 2023 06:27:17 GMT+0000 (Greenwich Mean Time) (47453ms) √ EX-3717 Part 1: Create project and send invite.Tue Jun 06 2023 06:27:17 GMT+0000 (Greenwich Mean Time) (47453ms) √ EX-3717 Part 2: Add My Comapny Users. Tue Jun 06 2023 06:27:17 GMT+0000 (Greenwich Mean Time) (32836ms) √ EX-3717 Part 2: Add My Comapny Users. Tue Jun 06 2023 06:27:17 GMT+0000 (Greenwich Mean Time) (32836ms) √ EX-3717 Part 3: Verify the email links to Extracker.com.Tue Jun 06 2023 06:28:42 GMT+0000 (Greenwich Mean Time) (8020ms) √ EX-3717 Part 3: Verify the email links to Extracker.com.Tue Jun 06 2023 06:28:42 GMT+0000 (Greenwich Mean Time) (8020ms) √ EX-3717 Part 4: Verify the JOIN PROJECT button link.Tue Jun 06 2023 06:28:54 GMT+0000 (Greenwich Mean Time) (12954ms) √ EX-3717 Part 4: Verify the JOIN PROJECT button link.Tue Jun 06 2023 06:28:54 GMT+0000 (Greenwich Mean Time) (12954ms) √ EX-3717 Part 5: Cleanup...Tue Jun 06 2023 06:28:54 GMT+0000 (Greenwich Mean Time) (27900ms) √ EX-3717 Part 5: Cleanup...Tue Jun 06 2023 06:28:54 GMT+0000 (Greenwich Mean Time) (27900ms) 5 passing (2m) 5 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_092.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 18 seconds │ │ Spec Ran: 11_Emails/Projects/ex-3717-verify-all-links-in-add-my-company-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/Projects/ex-3718-verify-all-links-in-add-my-customer-email (94 of 96) .spec.ts Email Hyperlinks | To verify that all the links on Add My Customer worksTue Jun 06 2023 06:29:39 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all the links on Add My Customer worksTue Jun 06 2023 06:29:39 GMT+0000 (Greenwich Mean Time) √ EX-3718 Part 1: Create project and send invite.Tue Jun 06 2023 06:29:39 GMT+0000 (Greenwich Mean Time) (48797ms) √ EX-3718 Part 1: Create project and send invite.Tue Jun 06 2023 06:29:39 GMT+0000 (Greenwich Mean Time) (48797ms) √ EX-3718 Part 2: Add Customers.Tue Jun 06 2023 06:29:39 GMT+0000 (Greenwich Mean Time) (36040ms) √ EX-3718 Part 2: Add Customers.Tue Jun 06 2023 06:29:39 GMT+0000 (Greenwich Mean Time) (36040ms) √ EX-3718 Part 3: Login to the Owner PM account and Accept the invite.Tue Jun 06 2023 06:29:39 GMT+0000 (Greenwich Mean Time) (16255ms) √ EX-3718 Part 3: Login to the Owner PM account and Accept the invite.Tue Jun 06 2023 06:29:39 GMT+0000 (Greenwich Mean Time) (16255ms) √ EX-3718 Part 4: Verify the email links to Extracker.com.Tue Jun 06 2023 06:31:24 GMT+0000 (Greenwich Mean Time) (13764ms) √ EX-3718 Part 4: Verify the email links to Extracker.com.Tue Jun 06 2023 06:31:24 GMT+0000 (Greenwich Mean Time) (13764ms) √ EX-3718 Part 5: Verify the JOIN PROJECT button link.Tue Jun 06 2023 06:31:43 GMT+0000 (Greenwich Mean Time) (13540ms) √ EX-3718 Part 5: Verify the JOIN PROJECT button link.Tue Jun 06 2023 06:31:43 GMT+0000 (Greenwich Mean Time) (13540ms) √ EX-3718 Part 6: Cleanup Ow...Tue Jun 06 2023 06:31:43 GMT+0000 (Greenwich Mean Time) (28384ms) √ EX-3718 Part 6: Cleanup Ow...Tue Jun 06 2023 06:31:43 GMT+0000 (Greenwich Mean Time) (28384ms) √ EX-3718 Part 7: Cleanup GC...Tue Jun 06 2023 06:31:43 GMT+0000 (Greenwich Mean Time) (24773ms) √ EX-3718 Part 7: Cleanup GC...Tue Jun 06 2023 06:31:43 GMT+0000 (Greenwich Mean Time) (24773ms) 7 passing (3m) 7 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_093.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 10 seconds │ │ Spec Ran: 11_Emails/Projects/ex-3718-verify-all-links-in-add-my-customer-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/Projects/ex-3719-verify-all-links-in-add-contrctor-email.s (95 of 96) pec.ts Email Hyperlinks | To verify that all the links on Add Contractors email workTue Jun 06 2023 06:32:53 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all the links on Add Contractors email workTue Jun 06 2023 06:32:53 GMT+0000 (Greenwich Mean Time) √ EX-3719 Part 1: Create a project Tue Jun 06 2023 06:32:53 GMT+0000 (Greenwich Mean Time) (48353ms) √ EX-3719 Part 1: Create a project Tue Jun 06 2023 06:32:53 GMT+0000 (Greenwich Mean Time) (48353ms) √ EX-3719 Part 2: Send invite.Tue Jun 06 2023 06:32:53 GMT+0000 (Greenwich Mean Time) (34743ms) √ EX-3719 Part 2: Send invite.Tue Jun 06 2023 06:32:53 GMT+0000 (Greenwich Mean Time) (34743ms) √ EX-3719 Part 3: Accept invite. Tue Jun 06 2023 06:32:53 GMT+0000 (Greenwich Mean Time) (20928ms) √ EX-3719 Part 3: Accept invite. Tue Jun 06 2023 06:32:53 GMT+0000 (Greenwich Mean Time) (20928ms) √ EX-3719 Part 4: Verify the email links to Extracker.com.Tue Jun 06 2023 06:34:42 GMT+0000 (Greenwich Mean Time) (10813ms) √ EX-3719 Part 4: Verify the email links to Extracker.com.Tue Jun 06 2023 06:34:42 GMT+0000 (Greenwich Mean Time) (10813ms) √ EX-3719 Part 5: Verify JOIN PROJECT button link.Tue Jun 06 2023 06:34:57 GMT+0000 (Greenwich Mean Time) (12751ms) √ EX-3719 Part 5: Verify JOIN PROJECT button link.Tue Jun 06 2023 06:34:57 GMT+0000 (Greenwich Mean Time) (12751ms) √ EX-3719 Part 6: Cleanup GC...Tue Jun 06 2023 06:34:57 GMT+0000 (Greenwich Mean Time) (25962ms) √ EX-3719 Part 6: Cleanup GC...Tue Jun 06 2023 06:34:57 GMT+0000 (Greenwich Mean Time) (25962ms) √ EX-3719 Part 7: Cleanup SC...Tue Jun 06 2023 06:34:57 GMT+0000 (Greenwich Mean Time) (30887ms) √ EX-3719 Part 7: Cleanup SC...Tue Jun 06 2023 06:34:57 GMT+0000 (Greenwich Mean Time) (30887ms) 7 passing (3m) 7 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_094.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 14 seconds │ │ Spec Ran: 11_Emails/Projects/ex-3719-verify-all-links-in-add-contrctor-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/T&M_Tags/ex-3721-verify-all-links-in-please-sign-tm-tag-em (96 of 96) ail.spec.ts Email Hyperlinks | To verify that all links on Please sign T&M tag email works fineTue Jun 06 2023 06:36:11 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Please sign T&M tag email works fineTue Jun 06 2023 06:36:11 GMT+0000 (Greenwich Mean Time) √ EX-3721 Part 1: Create a project and send invite.Tue Jun 06 2023 06:36:11 GMT+0000 (Greenwich Mean Time) (50213ms) √ EX-3721 Part 1: Create a project and send invite.Tue Jun 06 2023 06:36:11 GMT+0000 (Greenwich Mean Time) (50213ms) √ EX-3721 Part 2: Send invite.Tue Jun 06 2023 06:36:11 GMT+0000 (Greenwich Mean Time) (35573ms) √ EX-3721 Part 2: Send invite.Tue Jun 06 2023 06:36:11 GMT+0000 (Greenwich Mean Time) (35573ms) √ EX-3721 Part 3: Sub Contractor Accepts the invite.Tue Jun 06 2023 06:36:11 GMT+0000 (Greenwich Mean Time) (21763ms) √ EX-3721 Part 3: Sub Contractor Accepts the invite.Tue Jun 06 2023 06:36:11 GMT+0000 (Greenwich Mean Time) (21763ms) √ EX-3721 Part 4: Sub Contractor creates a Tag.Tue Jun 06 2023 06:36:11 GMT+0000 (Greenwich Mean Time) (43875ms) √ EX-3721 Part 4: Sub Contractor creates a Tag.Tue Jun 06 2023 06:36:11 GMT+0000 (Greenwich Mean Time) (43875ms) √ EX-3721 Part 5: Verify the tag was created.Tue Jun 06 2023 06:36:11 GMT+0000 (Greenwich Mean Time) (26937ms) √ EX-3721 Part 5: Verify the tag was created.Tue Jun 06 2023 06:36:11 GMT+0000 (Greenwich Mean Time) (26937ms) √ EX-3721 Part 6: Verify the please sign T&M email.Tue Jun 06 2023 06:39:15 GMT+0000 (Greenwich Mean Time) (11924ms) √ EX-3721 Part 6: Verify the please sign T&M email.Tue Jun 06 2023 06:39:15 GMT+0000 (Greenwich Mean Time) (11924ms) √ EX-3721 Part 7: Cleanup GC...Tue Jun 06 2023 06:39:31 GMT+0000 (Greenwich Mean Time) (26893ms) √ EX-3721 Part 7: Cleanup GC...Tue Jun 06 2023 06:39:31 GMT+0000 (Greenwich Mean Time) (26893ms) √ EX-3721 Part 7: Cleanup SC...Tue Jun 06 2023 06:39:31 GMT+0000 (Greenwich Mean Time) (31000ms) √ EX-3721 Part 7: Cleanup SC...Tue Jun 06 2023 06:39:31 GMT+0000 (Greenwich Mean Time) (31000ms) 8 passing (4m) 8 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_095.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 17 seconds │ │ Spec Ran: 11_Emails/T&M_Tags/ex-3721-verify-all-links-in-please-sign-tm-tag-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ==================================================================================================== (Run Finished) Spec Tests Passing Failing Pending Skipped ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ √ 01_LoginPage/ex-3313-invalid-creden 00:09 1 1 - - - │ │ tials.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 01_LoginPage/ex-3316-email-input-va 00:08 1 1 - - - │ │ lidation.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 01_LoginPage/ex-5751-create-new-acc 00:10 1 1 - - - │ │ ount-with-already-used-email.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 09_Analytics/ex-5428-verify-sent-ex 01:15 1 - 1 - - │ │ port--tm-tag-detailed-report-xlsx-a │ │ fter-filtering-by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 09_Analytics/ex-8799-verify-receive 00:38 1 1 - - - │ │ d-export--tm-tag-detailed-report-xl │ │ sx-after-filtering-by-project.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 12_Tag_Activity/ex-7214-tag-activit 06:04 7 7 - - - │ │ y-create-sign-send-reject-from-web. │ │ spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 12_Tag_Activity/ex-7215-tag-activit 06:23 6 6 - - - │ │ y-create-sign-send-revise-resubmit- │ │ from-web.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 12_Tag_Activity/ex-7353-tag-activit 04:14 7 7 - - - │ │ y-create-tag-opened-status.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-7673-cor-activit 06:56 6 6 - - - │ │ y-create-cor-draft-view-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-7674-cor-activit 05:58 6 6 - - - │ │ y-create-cor-resend-cor-resend-cor- │ │ with-email-message-view-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-7678-cor-activit 06:02 6 6 - - - │ │ y-create-cor-change-status-state-at │ │ -receiver.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-7798-cor-activit 06:16 6 6 - - - │ │ y-upload-cor-view-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 02_PermissionLevels/Add_users_to_Pr 03:26 3 2 1 - - │ │ oject/EX-9394-GC-creates-project-ad │ │ ds-new-customer-user.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:15 2 2 - - - │ │ ex-3323-create-new-project-as-owner │ │ -in-owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:20 2 2 - - - │ │ ex-3328-create-new-project-as-owner │ │ -in-sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:18 2 2 - - - │ │ ex-3329-create-new-project-as-owner │ │ -in-other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:21 2 2 - - - │ │ ex-3330-create-new-project-as-admin │ │ -in-owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:25 2 2 - - - │ │ ex-3331-create-new-project-as-admin │ │ -in-gc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:15 2 2 - - - │ │ ex-3332-create-new-project-as-pm-in │ │ -gc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:15 2 2 - - - │ │ ex-3333-create-new-project-as-fu-in │ │ -gc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:16 2 2 - - - │ │ ex-3334-create-new-project-as-pm-in │ │ -owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:15 2 2 - - - │ │ ex-3335-create-new-project-as-fu-in │ │ -owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 02_PermissionLevels/Create_Project/ 04:03 2 1 1 - - │ │ ex-3336-create-new-project-as-admin │ │ -in-sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:21 2 2 - - - │ │ ex-3337-create-new-project-as-pm-in │ │ -sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:20 2 2 - - - │ │ ex-3338-create-new-project-as-fu-in │ │ -sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:20 2 2 - - - │ │ ex-3342-create-new-project-as-admin │ │ -in-other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:19 2 2 - - - │ │ ex-3343-create-new-project-as-pm-in │ │ -other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:19 2 2 - - - │ │ ex-3344-create-new-project-as-fu-in │ │ -other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 01:56 6 6 - - - │ │ 792-GC-account-owner-user-previlleg │ │ es.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 01:57 6 6 - - - │ │ 828-GC-admin-user-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 01:50 6 6 - - - │ │ 829-GC-PM-user-previlleges.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 01:14 5 5 - - - │ │ 830-GC-Field-user-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 02:32 8 8 - - - │ │ 832-SC-Field-users-user-previlleges │ │ .spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 02:44 8 8 - - - │ │ 833-SC-PM-user-previlleges.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 02:46 8 8 - - - │ │ 834-SC-Admin-user-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 02:50 8 8 - - - │ │ 835-SC-account-owner-user-previlleg │ │ es.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-3673-verify-cont 03:25 4 4 - - - │ │ ractor-is-able-to-upload-cor-with-o │ │ nly-mandatory-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-3683-GC-creates- 06:21 11 11 - - - │ │ project-adds-contract-SC-creates-co │ │ r.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-3686-verify-ther 00:26 1 1 - - - │ │ e-are-two-tabs-on-cor-log-page-sent │ │ -received.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 04_COR_Log/Sent/EX-4366-SC-creates- 08:49 11 10 1 - - │ │ project-adds-gc-customer-sc-creates │ │ -cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/EX-4432-to-verify-P 04:01 7 7 - - - │ │ M-is-able-to-create-cor-as-draft.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5244-verify-shar 00:51 1 1 - - - │ │ eable-link-contains-just-the-select │ │ ed-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5333-SC-creates- 27ms 1 - - 1 - │ │ cor-with-full-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5396-verify-cont 06:55 11 11 - - - │ │ ractor-is-able-to-upload-cor-with-m │ │ andatory-and-optional-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5435-create-new- 03:11 6 6 - - - │ │ project-add-contrac-verify-original │ │ -contract-value.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/EX-5827-to-verify-m 00:25 1 1 - - - │ │ ultiple-cors-to-same-tag-when-creat │ │ ing-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/EX-5894-to-verify-m 00:39 1 1 - - - │ │ ultiple-cors-to-same-tag-when-uploa │ │ ding-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-6681-verify-sent 01:49 2 2 - - - │ │ -summary-data-after-filtering-by-pr │ │ oject.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5425-verify- 01:50 2 2 - - - │ │ received-summary-data-after-filteri │ │ ng-by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5429-verify- 00:56 1 1 - - - │ │ received-export-csv-after-filtering │ │ -by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5431-verify- 00:59 1 1 - - - │ │ received-export-sharelog-after-filt │ │ ering-by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5641-verify- 05:00 5 5 - - - │ │ tnm-log-received-summary-data-after │ │ -filtering-by-tag-status.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-1-gc-create 04:17 5 5 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-2-gc-create 05:19 2 2 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-3-gc-create 02:41 1 1 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-4-gc-create 02:59 1 1 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 05_T&M_Log/Sent/ex-4415-5-gc-create 06:50 2 - 2 - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 05_T&M_Log/Sent/ex-4415-6-gc-create 16:55 8 1 7 - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5424-verify-sent 02:16 2 2 - - - │ │ -summary-data-after-filtering-by-pr │ │ oject.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5430-verify-sent 00:43 1 1 - - - │ │ -export-csv-after-filtering-by-proj │ │ ect.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5505-verify-tnm- 01:31 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-customer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5506-verify-tnm- 01:30 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-job-number.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5507-verify-tnm- 01:27 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-cust-ref-num.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5508-verify-tnm- 10:20 7 7 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-tag-status.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5509-verify-tnm- 01:26 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-cust-label.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5510-verify-tnm- 02:38 2 2 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-cor-availability.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 05_T&M_Log/Sent/ex-6191-sc-creates- 16:57 13 11 2 - - │ │ tag-required-signer-gc-signs-tag.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6193-sc-fu-creat 07:06 8 8 - - - │ │ es-tag-required-signer-gc-fu-signs- │ │ tag.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-1-sc-pm-cre 10:20 5 5 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-2-sc-pm-cre 07:34 4 4 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-3-sc-pm-cre 05:18 4 4 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-4-sc-pm-cre 00:52 3 3 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-5-sc-pm-cre 03:13 6 6 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6335-sc-sends-ta 08:44 10 10 - - - │ │ g-gc-signs-tag-as-optional-not-save │ │ d-drafts.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-7224-switch-proj 05:13 7 7 - - - │ │ ect-workflow.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-60 04:57 8 8 - - - │ │ 30-create-cn-respond-with-upload-co │ │ r-verify-all-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-85 11:30 13 13 - - - │ │ 97-respond-to-cn-as-SC-and-GC-clear │ │ -response.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-85 03:03 5 5 - - - │ │ 99-create-cn-authorize-t&mwork-resp │ │ ond-as-SC-PM-with-no-cost-impact.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 02:58 5 5 - - - │ │ 42-create-cn-pricing-request-respon │ │ d-as-SC-PM-with-no-cost-impact.spec │ │ .ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 04:42 7 7 - - - │ │ 43-create-cn-pricing-request-respon │ │ d-as-SC-PM-with-create-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 04:49 7 7 - - - │ │ 44-create-cn-pricing-request-respon │ │ d-as-SC-PM-with-upload-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 03:11 5 5 - - - │ │ 45-create-cn-pricing-request-respon │ │ d-as-GC-PM-with-no-cost-impact.spec │ │ .ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 03:07 5 5 - - - │ │ 46-create-cn-pricing-request-respon │ │ d-as-GC-PM-by-linking-existing-cor. │ │ spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 04:37 7 7 - - - │ │ 47-create-cn-authorize-t&mwork-resp │ │ ond-as-SC-PM-with-create-cor.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 05:03 8 8 - - - │ │ 48-create-cn-authorize-t&mwork-resp │ │ ond-as-SC-PM-with-upload-cor.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 03:09 5 5 - - - │ │ 49-create-cn-authorize-t&mwork-resp │ │ ond-as-GC-PM-with-no-cost-impact.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 02:49 5 5 - - - │ │ 50-create-cn-authorize-t&mwork-resp │ │ ond-as-GC-PM-by-linking-existing-co │ │ r.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 08_Projects/Active Projects/ex-5467 05:28 12 12 - - - │ │ -verify-job-number-propagation-betw │ │ een-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 08_Projects/Active Projects/ex-7362 03:37 7 7 - - - │ │ -verify-job-number-propagation-to-d │ │ raft-cors.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/ChangeNotifications/ex-37 03:50 8 8 - - - │ │ 23-verify-all-links-in-pricing-requ │ │ est-cn-response-needed-email.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/ChangeNotifications/ex-52 03:16 7 7 - - - │ │ 87-verify-all-links-in-authorize-wo │ │ rk-cn-response-needed-email.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/CORs/ex-3720-verify-all-l 04:21 8 8 - - - │ │ inks-in-cor-recieved-email.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/Projects/ex-3717-verify-a 02:18 5 5 - - - │ │ ll-links-in-add-my-company-email.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/Projects/ex-3718-verify-a 03:10 7 7 - - - │ │ ll-links-in-add-my-customer-email.s │ │ pec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/Projects/ex-3719-verify-a 03:14 7 7 - - - │ │ ll-links-in-add-contrctor-email.spe │ │ c.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/T&M_Tags/ex-3721-verify-a 04:17 8 8 - - - │ │ ll-links-in-please-sign-tm-tag-emai │ │ l.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ × 7 of 96 failed (7%) 5:47:48 447 431 15 1 -