> cypress-extracker-webapp@1.0.0 scripts-regression > set DEBUG=cypress:* && cypress run --browser chrome --spec "./cypress/e2e/regression/** ==================================================================================================== (Run Starting) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Cypress: 12.13.0 │ │ Browser: Chrome 114 (headless) │ │ Node Version: v18.14.1 (C:\Program Files\nodejs\node.exe) │ │ Specs: 104 found (01_LoginPage/ex-3313-invalid-credentials.spec.ts, 01_LoginPage/ex-3 │ │ 316-email-input-validation.spec.ts, 01_LoginPage/ex-5751-create-new-account-wi │ │ th-already-used-email.spec.ts, 09_Analytics/ex-5428-verify-sent-export--tm-tag │ │ -detailed-report-xlsx-af...) │ │ Searched: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\e2e\regression\** │ │ Experiments: experimentalMemoryManagement=true,experimentalStudio=true │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 01_LoginPage/ex-3313-invalid-credentials.spec.ts (1 of 104) Login with invalid credentialsWed Jun 28 2023 00:46:23 GMT+0000 (Greenwich Mean Time) Login with invalid credentialsWed Jun 28 2023 00:46:23 GMT+0000 (Greenwich Mean Time) √ EX-3313 - Login with invalid credentials.Wed Jun 28 2023 00:46:23 GMT+0000 (Greenwich Mean Time) (9656ms) √ EX-3313 - Login with invalid credentials.Wed Jun 28 2023 00:46:23 GMT+0000 (Greenwich Mean Time) (9656ms) 1 passing (10s) 1 passing (10s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 9 seconds │ │ Spec Ran: 01_LoginPage/ex-3313-invalid-credentials.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 01_LoginPage/ex-3316-email-input-validation.spec.ts (2 of 104) 3316 | Verify data input validation for emailWed Jun 28 2023 00:46:37 GMT+0000 (Greenwich Mean Time) 3316 | Verify data input validation for emailWed Jun 28 2023 00:46:37 GMT+0000 (Greenwich Mean Time) √ 3316 - Verify data input validation for emailWed Jun 28 2023 00:46:37 GMT+0000 (Greenwich Mean Time) (7648ms) √ 3316 - Verify data input validation for emailWed Jun 28 2023 00:46:37 GMT+0000 (Greenwich Mean Time) (7648ms) 1 passing (8s) 1 passing (8s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_001.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 seconds │ │ Spec Ran: 01_LoginPage/ex-3316-email-input-validation.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 01_LoginPage/ex-5751-create-new-account-with-already-used-email.spec (3 of 104) .ts Account Creation | Prevent users from creating separate accounts with same email domainWed Jun 28 2023 00:46:48 GMT+0000 (Greenwich Mean Time) Account Creation | Prevent users from creating separate accounts with same email domainWed Jun 28 2023 00:46:48 GMT+0000 (Greenwich Mean Time) √ EX-5751 - Create account with email that is already associated with existing Extracker account.Wed Jun 28 2023 00:46:48 GMT+0000 (Greenwich Mean Time) (10634ms) √ EX-5751 - Create account with email that is already associated with existing Extracker account.Wed Jun 28 2023 00:46:48 GMT+0000 (Greenwich Mean Time) (10634ms) 1 passing (11s) 1 passing (11s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_002.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 10 seconds │ │ Spec Ran: 01_LoginPage/ex-5751-create-new-account-with-already-used-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 09_Analytics/ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx (4 of 104) -after-filtering-by-project.spec.ts Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Wed Jun 28 2023 00:47:02 GMT+0000 (Greenwich Mean Time) Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Wed Jun 28 2023 00:47:02 GMT+0000 (Greenwich Mean Time) √ EX-5428 - Verify the SENT, Detailed TM Tags Report (Excel).Wed Jun 28 2023 00:47:02 GMT+0000 (Greenwich Mean Time) (39706ms) √ EX-5428 - Verify the SENT, Detailed TM Tags Report (Excel).Wed Jun 28 2023 00:47:02 GMT+0000 (Greenwich Mean Time) (39706ms) 1 passing (40s) 1 passing (40s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_003.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 39 seconds │ │ Spec Ran: 09_Analytics/ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx-after-filte │ │ ring-by-project.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 09_Analytics/ex-8799-verify-received-export--tm-tag-detailed-report- (5 of 104) xlsx-after-filtering-by-project.spec.ts Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Wed Jun 28 2023 00:47:45 GMT+0000 (Greenwich Mean Time) Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Wed Jun 28 2023 00:47:45 GMT+0000 (Greenwich Mean Time) √ EX-8799 - Verify the Received, Detailed TM Tags Report (Excel).Wed Jun 28 2023 00:47:45 GMT+0000 (Greenwich Mean Time) (38033ms) √ EX-8799 - Verify the Received, Detailed TM Tags Report (Excel).Wed Jun 28 2023 00:47:45 GMT+0000 (Greenwich Mean Time) (38033ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_004.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: false │ │ Duration: 1 minute, 47 seconds │ │ Spec Ran: 09_Analytics/ex-8799-verify-received-export--tm-tag-detailed-report-xlsx-after-f │ │ iltering-by-project.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\09_Anal (1280x720) ytics\ex-8799-verify-received-export--tm-tag-detailed-report-xlsx-after-filterin g-by-project.spec.ts\Analytics Verify the SENT, Detailed TM Tags Report (Excel) Wed Jun 28 2023 004745 GMT+0000 (Greenwich Mean Time) -- EX-8799 - Verify the Re ceived, Detailed TM Tags Report (Excel).Wed Jun 28 2023 004745 GMT+0000 (Greenwi ch Mean Time) (failed).png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 12_Tag_Activity/ex-7214-tag-activity-create-sign-send-reject-from-we (6 of 104) b.spec.ts Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification)Wed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification)Wed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) √ EX-7214 - Part 1: Clean the tags (48828ms) √ EX-7214 - Part 1: Clean the tags (48828ms) √ EX-7214 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagWed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) (101807ms) √ EX-7214 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagWed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) (101807ms) 1) EX-7214 - Part 3: Verify activity feed. Wed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) 1) EX-7214 - Part 3: Verify activity feed. Wed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) √ EX-7214 - Part 4: Verify the GC Admin received Bell Notification and use it to reject the tag.Wed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) (24035ms) √ EX-7214 - Part 4: Verify the GC Admin received Bell Notification and use it to reject the tag.Wed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) (24035ms) 2) EX-7214 - Part 5: Verify the tag activity in the SC Admin T&M Log pageWed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) 2) EX-7214 - Part 5: Verify the tag activity in the SC Admin T&M Log pageWed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) 3) EX-7214 - Part 6: Verify the tag activity in the GC Admin T&M Log page in Receiver tabWed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) 3) EX-7214 - Part 6: Verify the tag activity in the GC Admin T&M Log page in Receiver tabWed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) √ EX-7214 - Part 7: Cleanup SC Tag ... Wed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) (60737ms) √ EX-7214 - Part 7: Cleanup SC Tag ... Wed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) (60737ms) 4 passing (11m) 3 failing 1) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification)Wed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) EX-7214 - Part 3: Verify activity feed. Wed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `li[data-option-index='1']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:319:19) 2) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification)Wed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) EX-7214 - Part 5: Verify the tag activity in the SC Admin T&M Log pageWed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `li[data-option-index='1']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:319:19) 3) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification)Wed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) EX-7214 - Part 6: Verify the tag activity in the GC Admin T&M Log page in Receiver tabWed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time): Timed out retrying after 30000ms + expected - actual -'SC_Admin Account signed T&M Tag EX07360' +'SC_Admin Account created T&M Tag EX07360 as draft' at Context.eval (webpack:///./cypress/support/PageObjects/T&M_Activity.ts:14:120) 4 passing (11m) 3 failing 1) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification)Wed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) EX-7214 - Part 3: Verify activity feed. Wed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `li[data-option-index='1']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:319:19) 2) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification)Wed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) EX-7214 - Part 5: Verify the tag activity in the SC Admin T&M Log pageWed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `li[data-option-index='1']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:319:19) 3) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification)Wed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time) EX-7214 - Part 6: Verify the tag activity in the GC Admin T&M Log page in Receiver tabWed Jun 28 2023 00:49:36 GMT+0000 (Greenwich Mean Time): Timed out retrying after 30000ms + expected - actual -'SC_Admin Account signed T&M Tag EX07360' +'SC_Admin Account created T&M Tag EX07360 as draft' at Context.eval (webpack:///./cypress/support/PageObjects/T&M_Activity.ts:14:120) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_005.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 4 │ │ Failing: 3 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 6 │ │ Video: false │ │ Duration: 10 minutes, 59 seconds │ │ Spec Ran: 12_Tag_Activity/ex-7214-tag-activity-create-sign-send-reject-from-web.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\12_Tag_ (1280x720) Activity\ex-7214-tag-activity-create-sign-send-reject-from-web.spec.ts\Activity Log T&M Tag Create the tag, Send the tag, View the tag, Reject the tag from th e web(Bell notification)Wed Jun 28 2023 004936 GMT+0000 (Greenwich Mean Time) -- EX-7214 - Part 3 Verify activity feed. Wed Jun 28 2023 004936 GMT+0000 (Greenwi c.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\12_Tag_ (1280x720) Activity\ex-7214-tag-activity-create-sign-send-reject-from-web.spec.ts\Activity Log T&M Tag Create the tag, Send the tag, View the tag, Reject the tag from th e web(Bell notification)Wed Jun 28 2023 004936 GMT+0000 (Greenwich Mean Time) -- EX-7214 - Part 3 Verify activity feed. Wed Jun 28 2023 004936 GMT+0000 (Gree (1 ).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\12_Tag_ (1280x720) Activity\ex-7214-tag-activity-create-sign-send-reject-from-web.spec.ts\Activity Log T&M Tag Create the tag, Send the tag, View the tag, Reject the tag from th e web(Bell notification)Wed Jun 28 2023 004936 GMT+0000 (Greenwich Mean Time) -- EX-7214 - Part 5 Verify the tag activity in the SC Admin T&M Log pageWed Jun 28 .png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\12_Tag_ (1280x720) Activity\ex-7214-tag-activity-create-sign-send-reject-from-web.spec.ts\Activity Log T&M Tag Create the tag, Send the tag, View the tag, Reject the tag from th e web(Bell notification)Wed Jun 28 2023 004936 GMT+0000 (Greenwich Mean Time) -- EX-7214 - Part 5 Verify the tag activity in the SC Admin T&M Log pageWed Jun (1 ).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\12_Tag_ (1280x720) Activity\ex-7214-tag-activity-create-sign-send-reject-from-web.spec.ts\Activity Log T&M Tag Create the tag, Send the tag, View the tag, Reject the tag from th e web(Bell notification)Wed Jun 28 2023 004936 GMT+0000 (Greenwich Mean Time) -- EX-7214 - Part 6 Verify the tag activity in the GC Admin T&M Log page in Receiv e.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\12_Tag_ (1280x720) Activity\ex-7214-tag-activity-create-sign-send-reject-from-web.spec.ts\Activity Log T&M Tag Create the tag, Send the tag, View the tag, Reject the tag from th e web(Bell notification)Wed Jun 28 2023 004936 GMT+0000 (Greenwich Mean Time) -- EX-7214 - Part 6 Verify the tag activity in the GC Admin T&M Log page in Rec (1 ).png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 12_Tag_Activity/ex-7215-tag-activity-create-sign-send-revise-resubmi (7 of 104) t-from-web.spec.ts Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Revise and Resubmit the tag from the web(Bell notification)Wed Jun 28 2023 01:00:40 GMT+0000 (Greenwich Mean Time) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Revise and Resubmit the tag from the web(Bell notification)Wed Jun 28 2023 01:00:40 GMT+0000 (Greenwich Mean Time) √ EX-7215 - Part 1: Clean the tags (48660ms) √ EX-7215 - Part 1: Clean the tags (48660ms) √ EX-7215 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagWed Jun 28 2023 01:00:40 GMT+0000 (Greenwich Mean Time) (130118ms) √ EX-7215 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagWed Jun 28 2023 01:00:40 GMT+0000 (Greenwich Mean Time) (130118ms) √ EX-7215 - Part 3: Verify the GC Admin received Bell Notification and use it to revise and resubmit the tag.Wed Jun 28 2023 01:00:40 GMT+0000 (Greenwich Mean Time) (24120ms) √ EX-7215 - Part 3: Verify the GC Admin received Bell Notification and use it to revise and resubmit the tag.Wed Jun 28 2023 01:00:40 GMT+0000 (Greenwich Mean Time) (24120ms) √ EX-7215 - Part 4: Verify the tag activity in the SC Admin T&M Log pageWed Jun 28 2023 01:00:40 GMT+0000 (Greenwich Mean Time) (60085ms) √ EX-7215 - Part 4: Verify the tag activity in the SC Admin T&M Log pageWed Jun 28 2023 01:00:40 GMT+0000 (Greenwich Mean Time) (60085ms) √ EX-7215 - Part 5: Verify the tag activity in the GC Admin T&M Log page in Receiver tabWed Jun 28 2023 01:00:40 GMT+0000 (Greenwich Mean Time) (76827ms) √ EX-7215 - Part 5: Verify the tag activity in the GC Admin T&M Log page in Receiver tabWed Jun 28 2023 01:00:40 GMT+0000 (Greenwich Mean Time) (76827ms) √ EX-7215 - Part 6: Cleanup SC Tag ... Wed Jun 28 2023 01:00:40 GMT+0000 (Greenwich Mean Time) (38023ms) √ EX-7215 - Part 6: Cleanup SC Tag ... Wed Jun 28 2023 01:00:40 GMT+0000 (Greenwich Mean Time) (38023ms) 6 passing (7m) 6 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_006.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: false │ │ Duration: 7 minutes, 7 seconds │ │ Spec Ran: 12_Tag_Activity/ex-7215-tag-activity-create-sign-send-revise-resubmit-from-web.s │ │ pec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\12_Tag_ (1280x720) Activity\ex-7215-tag-activity-create-sign-send-revise-resubmit-from-web.spec.ts\ Activity Log T&M Tag Create the tag, Send the tag, View the tag, Revise and Re submit the tag from the web(Bell notification)Wed Jun 28 2023 010040 GMT+0000 (G reenwich Mean Time) -- EX-7215 - Part 4 Verify the tag activity in the SC Admin T&M Log pa.png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 12_Tag_Activity/ex-7353-tag-activity-create-tag-opened-status.spec.t (8 of 104) s Activity Log | T&M Tag | Create a Tag with status Open and verify its Activity Feed messages. Wed Jun 28 2023 01:07:51 GMT+0000 (Greenwich Mean Time) Activity Log | T&M Tag | Create a Tag with status Open and verify its Activity Feed messages. Wed Jun 28 2023 01:07:51 GMT+0000 (Greenwich Mean Time) √ EX-7353 - Part 1: GC PM creates a projectWed Jun 28 2023 01:07:51 GMT+0000 (Greenwich Mean Time) (47461ms) √ EX-7353 - Part 1: GC PM creates a projectWed Jun 28 2023 01:07:51 GMT+0000 (Greenwich Mean Time) (47461ms) √ EX-7353 - Part 2: GC PM adds a contract with SC PM.Wed Jun 28 2023 01:07:51 GMT+0000 (Greenwich Mean Time) (36417ms) √ EX-7353 - Part 2: GC PM adds a contract with SC PM.Wed Jun 28 2023 01:07:51 GMT+0000 (Greenwich Mean Time) (36417ms) √ EX-7353 - Part 3: Sub Contractor accepts invite from the bell notification.Wed Jun 28 2023 01:07:51 GMT+0000 (Greenwich Mean Time) (32605ms) √ EX-7353 - Part 3: Sub Contractor accepts invite from the bell notification.Wed Jun 28 2023 01:07:51 GMT+0000 (Greenwich Mean Time) (32605ms) √ EX-7353 - Part 4: Gen Contractor creates a Authorize T&M Work Change Notification.Wed Jun 28 2023 01:07:51 GMT+0000 (Greenwich Mean Time) (40734ms) √ EX-7353 - Part 4: Gen Contractor creates a Authorize T&M Work Change Notification.Wed Jun 28 2023 01:07:51 GMT+0000 (Greenwich Mean Time) (40734ms) √ EX-7353 - Part 5: Verify the tag activity in the GC Admin T&M Log page at the receiver tabWed Jun 28 2023 01:07:51 GMT+0000 (Greenwich Mean Time) (31088ms) √ EX-7353 - Part 5: Verify the tag activity in the GC Admin T&M Log page at the receiver tabWed Jun 28 2023 01:07:51 GMT+0000 (Greenwich Mean Time) (31088ms) √ EX-7353 - Part 6: Cleanup SC. Wed Jun 28 2023 01:07:51 GMT+0000 (Greenwich Mean Time) (30159ms) √ EX-7353 - Part 6: Cleanup SC. Wed Jun 28 2023 01:07:51 GMT+0000 (Greenwich Mean Time) (30159ms) √ EX-7353 - Part 6: Cleanup GC. Wed Jun 28 2023 01:07:51 GMT+0000 (Greenwich Mean Time) (27419ms) √ EX-7353 - Part 6: Cleanup GC. Wed Jun 28 2023 01:07:51 GMT+0000 (Greenwich Mean Time) (27419ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_007.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 6 seconds │ │ Spec Ran: 12_Tag_Activity/ex-7353-tag-activity-create-tag-opened-status.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7673-cor-activity-create-cor-draft-view-cor.spec. (9 of 104) ts Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiverWed Jun 28 2023 01:12:01 GMT+0000 (Greenwich Mean Time) Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiverWed Jun 28 2023 01:12:01 GMT+0000 (Greenwich Mean Time) √ EX-7673 - Part 0: Clean existing COR's : Wed Jun 28 2023 01:12:01 GMT+0000 (Greenwich Mean Time) (65722ms) √ EX-7673 - Part 0: Clean existing COR's : Wed Jun 28 2023 01:12:01 GMT+0000 (Greenwich Mean Time) (65722ms) √ EX-7673 - Part 1: Create COR as draft: Wed Jun 28 2023 01:12:01 GMT+0000 (Greenwich Mean Time) (56167ms) √ EX-7673 - Part 1: Create COR as draft: Wed Jun 28 2023 01:12:01 GMT+0000 (Greenwich Mean Time) (56167ms) √ EX-7673 - Part 2: Verify the COR Draft Log has the new COR draft and send the COR for email distribution : Wed Jun 28 2023 01:12:01 GMT+0000 (Greenwich Mean Time) (78930ms) √ EX-7673 - Part 2: Verify the COR Draft Log has the new COR draft and send the COR for email distribution : Wed Jun 28 2023 01:12:01 GMT+0000 (Greenwich Mean Time) (78930ms) √ EX-7673 - Part 3: Verify the Activity Feed in the Sent Log : Wed Jun 28 2023 01:12:01 GMT+0000 (Greenwich Mean Time) (62205ms) √ EX-7673 - Part 3: Verify the Activity Feed in the Sent Log : Wed Jun 28 2023 01:12:01 GMT+0000 (Greenwich Mean Time) (62205ms) √ EX-7673 - Part 4: Verify the activity at the Received Log for the Customer: Wed Jun 28 2023 01:12:01 GMT+0000 (Greenwich Mean Time) (54804ms) √ EX-7673 - Part 4: Verify the activity at the Received Log for the Customer: Wed Jun 28 2023 01:12:01 GMT+0000 (Greenwich Mean Time) (54804ms) √ EX-7673 - Part 5: Clean the COR Wed Jun 28 2023 01:12:01 GMT+0000 (Greenwich Mean Time) (75382ms) √ EX-7673 - Part 5: Clean the COR Wed Jun 28 2023 01:12:01 GMT+0000 (Greenwich Mean Time) (75382ms) 6 passing (7m) 6 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_008.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 33 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7673-cor-activity-create-cor-draft-view-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7674-cor-activity-create-cor-resend-cor-resend-co (10 of 104) r-with-email-message-view-cor.spec.ts COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageWed Jun 28 2023 01:18:39 GMT+0000 (Greenwich Mean Time) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageWed Jun 28 2023 01:18:39 GMT+0000 (Greenwich Mean Time) √ EX-7674 - Part 0: Clean existing COR's : Wed Jun 28 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (60933ms) √ EX-7674 - Part 0: Clean existing COR's : Wed Jun 28 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (60933ms) √ EX-7674 - Part 1: Create COR. Wed Jun 28 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (69635ms) √ EX-7674 - Part 1: Create COR. Wed Jun 28 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (69635ms) √ EX-7674 - Part 2: Verify the COR is in the Sent Log : Wed Jun 28 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (57030ms) √ EX-7674 - Part 2: Verify the COR is in the Sent Log : Wed Jun 28 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (57030ms) √ EX-7674 - Part 3: Resend the COR and resend the cor with email message and verify activity in sent log : Wed Jun 28 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (81115ms) √ EX-7674 - Part 3: Resend the COR and resend the cor with email message and verify activity in sent log : Wed Jun 28 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (81115ms) √ EX-7674 - Part 4: Verify the activity at the reciver side : Wed Jun 28 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (64559ms) √ EX-7674 - Part 4: Verify the activity at the reciver side : Wed Jun 28 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (64559ms) √ EX-7674 - Part 5: Clean the COR: Wed Jun 28 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (53761ms) √ EX-7674 - Part 5: Clean the COR: Wed Jun 28 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (53761ms) 6 passing (6m) 6 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_009.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 27 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7674-cor-activity-create-cor-resend-cor-resend-cor-with-email │ │ -message-view-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7678-cor-activity-create-cor-change-status-state- (11 of 104) at-receiver.spec.ts Create a COR and send the COR and change the status and stage with email message at the receiver sideWed Jun 28 2023 01:25:10 GMT+0000 (Greenwich Mean Time) Create a COR and send the COR and change the status and stage with email message at the receiver sideWed Jun 28 2023 01:25:10 GMT+0000 (Greenwich Mean Time) √ EX-7678 - Part 1: Clean existing COR's : Wed Jun 28 2023 01:25:10 GMT+0000 (Greenwich Mean Time) (50697ms) √ EX-7678 - Part 1: Clean existing COR's : Wed Jun 28 2023 01:25:10 GMT+0000 (Greenwich Mean Time) (50697ms) √ EX-7678 - Part 2: Create COR : Wed Jun 28 2023 01:25:10 GMT+0000 (Greenwich Mean Time) (80138ms) √ EX-7678 - Part 2: Create COR : Wed Jun 28 2023 01:25:10 GMT+0000 (Greenwich Mean Time) (80138ms) √ EX-7678 - Part 3: Verify the COR is in the Sent Log : Wed Jun 28 2023 01:25:10 GMT+0000 (Greenwich Mean Time) (50549ms) √ EX-7678 - Part 3: Verify the COR is in the Sent Log : Wed Jun 28 2023 01:25:10 GMT+0000 (Greenwich Mean Time) (50549ms) √ EX-7678 - Part 4: Change status and state at sent side verify activity in received log : Wed Jun 28 2023 01:25:10 GMT+0000 (Greenwich Mean Time) (100482ms) √ EX-7678 - Part 4: Change status and state at sent side verify activity in received log : Wed Jun 28 2023 01:25:10 GMT+0000 (Greenwich Mean Time) (100482ms) √ EX-7678 - Part 5: Verify the activity at the sent side : Wed Jun 28 2023 01:25:10 GMT+0000 (Greenwich Mean Time) (50282ms) √ EX-7678 - Part 5: Verify the activity at the sent side : Wed Jun 28 2023 01:25:10 GMT+0000 (Greenwich Mean Time) (50282ms) √ EX-7678 - Part 6: Clean the COR:Wed Jun 28 2023 01:25:10 GMT+0000 (Greenwich Mean Time) (73657ms) √ EX-7678 - Part 6: Clean the COR:Wed Jun 28 2023 01:25:10 GMT+0000 (Greenwich Mean Time) (73657ms) 6 passing (8m) 6 passing (8m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_010.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: false │ │ Duration: 8 minutes, 12 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7678-cor-activity-create-cor-change-status-state-at-receiver. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_ (1280x720) Activity\ex-7678-cor-activity-create-cor-change-status-state-at-receiver.spec.ts \Create a COR and send the COR and change the status and stage with email messag e at the receiver sideWed Jun 28 2023 012510 GMT+0000 (Greenwich Mean Time) -- E X-7678 - Part 2 Create COR Wed Jun 28 2023 012510 GMT+0000 (Greenwich Mean Time ) (failed).png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts (12 of 104) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageWed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageWed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) √ EX-7798 - Part 1: Clean existing COR's : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) (66344ms) √ EX-7798 - Part 1: Clean existing COR's : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) (66344ms) 1) EX-7798 - Part 2: Upload COR : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) 1) EX-7798 - Part 2: Upload COR : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) 2) EX-7798 - Part 3: View the COR at receiver side : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) 2) EX-7798 - Part 3: View the COR at receiver side : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) 3) EX-7798 - Part 4: Verify the COR is in the Sent Log : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) 3) EX-7798 - Part 4: Verify the COR is in the Sent Log : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) 4) EX-7798 - Part 5: Verify the activity at the reciver side : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) 4) EX-7798 - Part 5: Verify the activity at the reciver side : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) √ EX-7798 - Part 6: Clean the COR:Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) (63367ms) √ EX-7798 - Part 6: Clean the COR:Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) (63367ms) 2 passing (12m) 4 failing 1) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageWed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) EX-7798 - Part 2: Upload COR : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `li[data-option-index='0']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:319:19) 2) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageWed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) EX-7798 - Part 3: View the COR at receiver side : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: '1' within the selector: 'td' but never did. at corLogPage.verifyCorNumberForCorInTable (webpack:///./cypress/support/PageObjects/COR_Log_.ts:195:37) at Context.eval (webpack:///./cypress/e2e/regression/13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts:52:13) 3) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageWed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) EX-7798 - Part 4: Verify the COR is in the Sent Log : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: '1' within the selector: 'td' but never did. at corLogPage.verifyCorNumberForCorInTable (webpack:///./cypress/support/PageObjects/COR_Log_.ts:195:37) at Context.eval (webpack:///./cypress/e2e/regression/13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts:70:13) 4) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageWed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) EX-7798 - Part 5: Verify the activity at the reciver side : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: '1' within the selector: 'td' but never did. at corLogPage.verifyCorNumberForCorInTable (webpack:///./cypress/support/PageObjects/COR_Log_.ts:195:37) at Context.eval (webpack:///./cypress/e2e/regression/13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts:85:13) 2 passing (12m) 4 failing 1) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageWed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) EX-7798 - Part 2: Upload COR : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `li[data-option-index='0']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:319:19) 2) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageWed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) EX-7798 - Part 3: View the COR at receiver side : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: '1' within the selector: 'td' but never did. at corLogPage.verifyCorNumberForCorInTable (webpack:///./cypress/support/PageObjects/COR_Log_.ts:195:37) at Context.eval (webpack:///./cypress/e2e/regression/13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts:52:13) 3) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageWed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) EX-7798 - Part 4: Verify the COR is in the Sent Log : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: '1' within the selector: 'td' but never did. at corLogPage.verifyCorNumberForCorInTable (webpack:///./cypress/support/PageObjects/COR_Log_.ts:195:37) at Context.eval (webpack:///./cypress/e2e/regression/13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts:70:13) 4) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageWed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time) EX-7798 - Part 5: Verify the activity at the reciver side : Wed Jun 28 2023 01:33:28 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: '1' within the selector: 'td' but never did. at corLogPage.verifyCorNumberForCorInTable (webpack:///./cypress/support/PageObjects/COR_Log_.ts:195:37) at Context.eval (webpack:///./cypress/e2e/regression/13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts:85:13) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_011.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 2 │ │ Failing: 4 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 8 │ │ Video: false │ │ Duration: 12 minutes, 3 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_ (1280x720) Activity\ex-7798-cor-activity-upload-cor-view-cor.spec.ts\COR Log Create a COR and send out for distribution and resend the cor and resend again with email mes sageWed Jun 28 2023 013328 GMT+0000 (Greenwich Mean Time) -- EX-7798 - Part 2 Up load COR Wed Jun 28 2023 013328 GMT+0000 (Greenwich Mean Time) (fai.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_ (1280x720) Activity\ex-7798-cor-activity-upload-cor-view-cor.spec.ts\COR Log Create a COR and send out for distribution and resend the cor and resend again with email mes sageWed Jun 28 2023 013328 GMT+0000 (Greenwich Mean Time) -- EX-7798 - Part 2 Up load COR Wed Jun 28 2023 013328 GMT+0000 (Greenwich Mean Time) (1).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_ (1280x720) Activity\ex-7798-cor-activity-upload-cor-view-cor.spec.ts\COR Log Create a COR and send out for distribution and resend the cor and resend again with email mes sageWed Jun 28 2023 013328 GMT+0000 (Greenwich Mean Time) -- EX-7798 - Part 3 Vi ew the COR at receiver side Wed Jun 28 2023 013328 GMT+0000 (Greenw.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_ (1280x720) Activity\ex-7798-cor-activity-upload-cor-view-cor.spec.ts\COR Log Create a COR and send out for distribution and resend the cor and resend again with email mes sageWed Jun 28 2023 013328 GMT+0000 (Greenwich Mean Time) -- EX-7798 - Part 3 Vi ew the COR at receiver side Wed Jun 28 2023 013328 GMT+0000 (Gr (1).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_ (1280x720) Activity\ex-7798-cor-activity-upload-cor-view-cor.spec.ts\COR Log Create a COR and send out for distribution and resend the cor and resend again with email mes sageWed Jun 28 2023 013328 GMT+0000 (Greenwich Mean Time) -- EX-7798 - Part 4 Ve rify the COR is in the Sent Log Wed Jun 28 2023 013328 GMT+0000 (Gr.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_ (1280x720) Activity\ex-7798-cor-activity-upload-cor-view-cor.spec.ts\COR Log Create a COR and send out for distribution and resend the cor and resend again with email mes sageWed Jun 28 2023 013328 GMT+0000 (Greenwich Mean Time) -- EX-7798 - Part 4 Ve rify the COR is in the Sent Log Wed Jun 28 2023 013328 GMT+0000 (1).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_ (1280x720) Activity\ex-7798-cor-activity-upload-cor-view-cor.spec.ts\COR Log Create a COR and send out for distribution and resend the cor and resend again with email mes sageWed Jun 28 2023 013328 GMT+0000 (Greenwich Mean Time) -- EX-7798 - Part 5 Ve rify the activity at the reciver side Wed Jun 28 2023 013328 GMT+00.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_ (1280x720) Activity\ex-7798-cor-activity-upload-cor-view-cor.spec.ts\COR Log Create a COR and send out for distribution and resend the cor and resend again with email mes sageWed Jun 28 2023 013328 GMT+0000 (Greenwich Mean Time) -- EX-7798 - Part 5 Ve rify the activity at the reciver side Wed Jun 28 2023 013328 GM (1).png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Add_users_to_Project/EX-9394-GC-creates-project- (13 of 104) adds-new-customer-user.spec.ts Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fields. Wed Jun 28 2023 01:45:35 GMT+0000 (Greenwich Mean Time) Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fields. Wed Jun 28 2023 01:45:35 GMT+0000 (Greenwich Mean Time) √ EX-9394 - Part 1: Create a project. : Wed Jun 28 2023 01:45:35 GMT+0000 (Greenwich Mean Time) (49868ms) √ EX-9394 - Part 1: Create a project. : Wed Jun 28 2023 01:45:35 GMT+0000 (Greenwich Mean Time) (49868ms) 1) EX-9394 - Part 2: Add new Customer to the project.Wed Jun 28 2023 01:45:35 GMT+0000 (Greenwich Mean Time) 1) EX-9394 - Part 2: Add new Customer to the project.Wed Jun 28 2023 01:45:35 GMT+0000 (Greenwich Mean Time) √ EX-9394 - Part 3: Cleanup GC... Wed Jun 28 2023 01:45:35 GMT+0000 (Greenwich Mean Time) (28582ms) √ EX-9394 - Part 3: Cleanup GC... Wed Jun 28 2023 01:45:35 GMT+0000 (Greenwich Mean Time) (28582ms) 2 passing (3m) 1 failing 1) Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fields. Wed Jun 28 2023 01:45:35 GMT+0000 (Greenwich Mean Time) EX-9394 - Part 2: Add new Customer to the project.Wed Jun 28 2023 01:45:35 GMT+0000 (Greenwich Mean Time): CypressError: Timed out retrying after 30000ms: `cy.contains()` failed because it requires a DOM element, window or document. No elements in the current DOM matched your query: > cy.get(div[role='alert']) at isElement (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161429:70) at validateType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161287:14) at Object.isType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161318:7) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:148566:22) at Object.subjectFn (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:159292:16) at $Cy.verifyUpcomingAssertions (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:140514:31) at onRetry (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:159283:15) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23) at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16018:29) at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:156168:65) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:155609:14) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16861:18) at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16805:18) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18419:46) From Your Spec Code: at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:256:36) 2 passing (3m) 1 failing 1) Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fields. Wed Jun 28 2023 01:45:35 GMT+0000 (Greenwich Mean Time) EX-9394 - Part 2: Add new Customer to the project.Wed Jun 28 2023 01:45:35 GMT+0000 (Greenwich Mean Time): CypressError: Timed out retrying after 30000ms: `cy.contains()` failed because it requires a DOM element, window or document. No elements in the current DOM matched your query: > cy.get(div[role='alert']) at isElement (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161429:70) at validateType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161287:14) at Object.isType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161318:7) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:148566:22) at Object.subjectFn (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:159292:16) at $Cy.verifyUpcomingAssertions (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:140514:31) at onRetry (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:159283:15) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23) at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16018:29) at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:156168:65) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:155609:14) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16861:18) at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16805:18) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18419:46) From Your Spec Code: at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:256:36) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_012.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 3 │ │ Passing: 2 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 2 │ │ Video: false │ │ Duration: 3 minutes, 16 seconds │ │ Spec Ran: 02_PermissionLevels/Add_users_to_Project/EX-9394-GC-creates-project-adds-new-cus │ │ tomer-user.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\Add_users_to_Project\EX-9394-GC-creates-project-adds-new-customer-u ser.spec.ts\Add Customer Add a new user as customer to the project with all man datory and non mandatory fields. Wed Jun 28 2023 014535 GMT+0000 (Greenwich Mean Time) -- EX-9394 - Part 2 Add new Customer to the project.Wed Jun 28 2023 01453 5 GMT+0000 (Greenwich .png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\Add_users_to_Project\EX-9394-GC-creates-project-adds-new-customer-u ser.spec.ts\Add Customer Add a new user as customer to the project with all man datory and non mandatory fields. Wed Jun 28 2023 014535 GMT+0000 (Greenwich Mean Time) -- EX-9394 - Part 2 Add new Customer to the project.Wed Jun 28 2023 01453 5 GMT+0000 (Greenw (1).png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3323-create-new-project-as-own (14 of 104) er-in-owner-company.spec.ts Create New Project in Owner Company as Account Owner, using only mandatory data.Wed Jun 28 2023 01:48:55 GMT+0000 (Greenwich Mean Time) Create New Project in Owner Company as Account Owner, using only mandatory data.Wed Jun 28 2023 01:48:55 GMT+0000 (Greenwich Mean Time) √ EX-3323 - Create a project in Owner Company as Account Owner.Wed Jun 28 2023 01:48:55 GMT+0000 (Greenwich Mean Time) (47161ms) √ EX-3323 - Create a project in Owner Company as Account Owner.Wed Jun 28 2023 01:48:55 GMT+0000 (Greenwich Mean Time) (47161ms) √ EX-3323 - Cleanup...Wed Jun 28 2023 01:48:55 GMT+0000 (Greenwich Mean Time) (29644ms) √ EX-3323 - Cleanup...Wed Jun 28 2023 01:48:55 GMT+0000 (Greenwich Mean Time) (29644ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_013.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 17 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3323-create-new-project-as-owner-in-owner- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3328-create-new-project-as-own (15 of 104) er-in-sc-company.spec.ts Create New Project in SC Company as Account Owner, using only mandatory data.Wed Jun 28 2023 01:50:15 GMT+0000 (Greenwich Mean Time) Create New Project in SC Company as Account Owner, using only mandatory data.Wed Jun 28 2023 01:50:15 GMT+0000 (Greenwich Mean Time) √ EX-3328 - Create a project in SC Company as Account Owner.Wed Jun 28 2023 01:50:15 GMT+0000 (Greenwich Mean Time) (47306ms) √ EX-3328 - Create a project in SC Company as Account Owner.Wed Jun 28 2023 01:50:15 GMT+0000 (Greenwich Mean Time) (47306ms) √ EX-3328 - Cleanup...Wed Jun 28 2023 01:50:15 GMT+0000 (Greenwich Mean Time) (26011ms) √ EX-3328 - Cleanup...Wed Jun 28 2023 01:50:15 GMT+0000 (Greenwich Mean Time) (26011ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_014.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 13 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3328-create-new-project-as-owner-in-sc-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3329-create-new-project-as-own (16 of 104) er-in-other-company.spec.ts Create New Project in Other Company as Account Owner, using only mandatory data.Wed Jun 28 2023 01:51:32 GMT+0000 (Greenwich Mean Time) Create New Project in Other Company as Account Owner, using only mandatory data.Wed Jun 28 2023 01:51:32 GMT+0000 (Greenwich Mean Time) √ EX-3329 - Create a project in Other Company as Account Owner.Wed Jun 28 2023 01:51:32 GMT+0000 (Greenwich Mean Time) (48593ms) √ EX-3329 - Create a project in Other Company as Account Owner.Wed Jun 28 2023 01:51:32 GMT+0000 (Greenwich Mean Time) (48593ms) √ EX-3329 - Cleanup...Wed Jun 28 2023 01:51:32 GMT+0000 (Greenwich Mean Time) (27822ms) √ EX-3329 - Cleanup...Wed Jun 28 2023 01:51:32 GMT+0000 (Greenwich Mean Time) (27822ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_015.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 16 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3329-create-new-project-as-owner-in-other- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3330-create-new-project-as-adm (17 of 104) in-in-owner-company.spec.ts Create New Project in Owner Company as Admin, using only mandatory data.Wed Jun 28 2023 01:52:51 GMT+0000 (Greenwich Mean Time) Create New Project in Owner Company as Admin, using only mandatory data.Wed Jun 28 2023 01:52:51 GMT+0000 (Greenwich Mean Time) √ EX-3330 - Create a project in Owner Company as Admin.Wed Jun 28 2023 01:52:51 GMT+0000 (Greenwich Mean Time) (48210ms) √ EX-3330 - Create a project in Owner Company as Admin.Wed Jun 28 2023 01:52:51 GMT+0000 (Greenwich Mean Time) (48210ms) √ EX-3330 - Cleanup...Wed Jun 28 2023 01:52:51 GMT+0000 (Greenwich Mean Time) (26397ms) √ EX-3330 - Cleanup...Wed Jun 28 2023 01:52:51 GMT+0000 (Greenwich Mean Time) (26397ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_016.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 14 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3330-create-new-project-as-admin-in-owner- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3331-create-new-project-as-adm (18 of 104) in-in-gc-company.spec.ts EX-3331 | Create New Project in General Contractor Company as Admin, using only mandatory data. Wed Jun 28 2023 01:54:09 GMT+0000 (Greenwich Mean Time) EX-3331 | Create New Project in General Contractor Company as Admin, using only mandatory data. Wed Jun 28 2023 01:54:09 GMT+0000 (Greenwich Mean Time) √ EX-3331 - Wed Jun 28 2023 01:54:09 GMT+0000 (Greenwich Mean Time) (63823ms) √ EX-3331 - Wed Jun 28 2023 01:54:09 GMT+0000 (Greenwich Mean Time) (63823ms) √ EX-3331 - Cleanup...Wed Jun 28 2023 01:54:09 GMT+0000 (Greenwich Mean Time) (24298ms) √ EX-3331 - Cleanup...Wed Jun 28 2023 01:54:09 GMT+0000 (Greenwich Mean Time) (24298ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_017.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 28 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3331-create-new-project-as-admin-in-gc-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3332-create-new-project-as-pm- (19 of 104) in-gc-company.spec.ts Create New Project in General Contractor Company as Project Manageer, using only mandatory data.Wed Jun 28 2023 01:55:41 GMT+0000 (Greenwich Mean Time) Create New Project in General Contractor Company as Project Manageer, using only mandatory data.Wed Jun 28 2023 01:55:41 GMT+0000 (Greenwich Mean Time) √ EX-3332 - Create a projct in General Contractor Company as Project Manageer.Wed Jun 28 2023 01:55:41 GMT+0000 (Greenwich Mean Time) (48685ms) √ EX-3332 - Create a projct in General Contractor Company as Project Manageer.Wed Jun 28 2023 01:55:41 GMT+0000 (Greenwich Mean Time) (48685ms) √ EX-3332 - Cleanup...Wed Jun 28 2023 01:55:41 GMT+0000 (Greenwich Mean Time) (23976ms) √ EX-3332 - Cleanup...Wed Jun 28 2023 01:55:41 GMT+0000 (Greenwich Mean Time) (23976ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_018.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 12 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3332-create-new-project-as-pm-in-gc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3333-create-new-project-as-fu- (20 of 104) in-gc-company.spec.ts Create New Project in General Contractor Company as Field User, using only mandatory data.Wed Jun 28 2023 01:56:57 GMT+0000 (Greenwich Mean Time) Create New Project in General Contractor Company as Field User, using only mandatory data.Wed Jun 28 2023 01:56:57 GMT+0000 (Greenwich Mean Time) √ EX-3333 - Create a project in General Contractor Company as Field UserWed Jun 28 2023 01:56:57 GMT+0000 (Greenwich Mean Time) (47739ms) √ EX-3333 - Create a project in General Contractor Company as Field UserWed Jun 28 2023 01:56:57 GMT+0000 (Greenwich Mean Time) (47739ms) √ EX-3333 - Cleanup...Wed Jun 28 2023 01:56:57 GMT+0000 (Greenwich Mean Time) (24229ms) √ EX-3333 - Cleanup...Wed Jun 28 2023 01:56:57 GMT+0000 (Greenwich Mean Time) (24229ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_019.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 12 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3333-create-new-project-as-fu-in-gc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3334-create-new-project-as-pm- (21 of 104) in-owner-company.spec.ts Create New Project in Owner Company as Project Manager, using only mandatory data.Wed Jun 28 2023 01:58:12 GMT+0000 (Greenwich Mean Time) Create New Project in Owner Company as Project Manager, using only mandatory data.Wed Jun 28 2023 01:58:12 GMT+0000 (Greenwich Mean Time) √ EX-3334 - Creaet a project in Owner Company as Project Manager. Wed Jun 28 2023 01:58:12 GMT+0000 (Greenwich Mean Time) (47724ms) √ EX-3334 - Creaet a project in Owner Company as Project Manager. Wed Jun 28 2023 01:58:12 GMT+0000 (Greenwich Mean Time) (47724ms) √ EX-3334 - Cleanup...Wed Jun 28 2023 01:58:12 GMT+0000 (Greenwich Mean Time) (26993ms) √ EX-3334 - Cleanup...Wed Jun 28 2023 01:58:12 GMT+0000 (Greenwich Mean Time) (26993ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_020.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 14 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3334-create-new-project-as-pm-in-owner-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3335-create-new-project-as-fu- (22 of 104) in-owner-company.spec.ts Create New Project in Owner Company as Field User, using only mandatory data.Wed Jun 28 2023 01:59:30 GMT+0000 (Greenwich Mean Time) Create New Project in Owner Company as Field User, using only mandatory data.Wed Jun 28 2023 01:59:30 GMT+0000 (Greenwich Mean Time) √ EX-3335 - Create a project in Owner Company as Field User.Wed Jun 28 2023 01:59:30 GMT+0000 (Greenwich Mean Time) (47626ms) √ EX-3335 - Create a project in Owner Company as Field User.Wed Jun 28 2023 01:59:30 GMT+0000 (Greenwich Mean Time) (47626ms) √ EX-3335 - Cleanup...Wed Jun 28 2023 01:59:30 GMT+0000 (Greenwich Mean Time) (26315ms) √ EX-3335 - Cleanup...Wed Jun 28 2023 01:59:30 GMT+0000 (Greenwich Mean Time) (26315ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_021.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 14 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3335-create-new-project-as-fu-in-owner-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3336-create-new-project-as-adm (23 of 104) in-in-sc-company.spec.ts Create New Project in SC Company as Admin, using only mandatory data.Wed Jun 28 2023 02:00:48 GMT+0000 (Greenwich Mean Time) Create New Project in SC Company as Admin, using only mandatory data.Wed Jun 28 2023 02:00:48 GMT+0000 (Greenwich Mean Time) √ EX-3336 - Create project in SC Company as Admin.Wed Jun 28 2023 02:00:48 GMT+0000 (Greenwich Mean Time) (60910ms) √ EX-3336 - Create project in SC Company as Admin.Wed Jun 28 2023 02:00:48 GMT+0000 (Greenwich Mean Time) (60910ms) 1) EX-3336 - Cleanup...Wed Jun 28 2023 02:00:48 GMT+0000 (Greenwich Mean Time) 1) EX-3336 - Cleanup...Wed Jun 28 2023 02:00:48 GMT+0000 (Greenwich Mean Time) 1 passing (4m) 1 failing 1) Create New Project in SC Company as Admin, using only mandatory data.Wed Jun 28 2023 02:00:48 GMT+0000 (Greenwich Mean Time) EX-3336 - Cleanup...Wed Jun 28 2023 02:00:48 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected not to find content: 'Test Project TC3336 1687917648013' within the element: but continuously found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:38:38) 1 passing (4m) 1 failing 1) Create New Project in SC Company as Admin, using only mandatory data.Wed Jun 28 2023 02:00:48 GMT+0000 (Greenwich Mean Time) EX-3336 - Cleanup...Wed Jun 28 2023 02:00:48 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected not to find content: 'Test Project TC3336 1687917648013' within the element: but continuously found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:38:38) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_022.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 1 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 3 │ │ Video: false │ │ Duration: 3 minutes, 56 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3336-create-new-project-as-admin-in-sc-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\Create_Project\ex-3336-create-new-project-as-admin-in-sc-company.sp ec.ts\Create New Project in SC Company as Admin, using only mandatory data.Wed J un 28 2023 020048 GMT+0000 (Greenwich Mean Time) -- EX-3336 - Create project in SC Company as Admin.Wed Jun 28 2023 020048 GMT+0000 (Greenwich Mean Time) (faile d).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\Create_Project\ex-3336-create-new-project-as-admin-in-sc-company.sp ec.ts\Create New Project in SC Company as Admin, using only mandatory data.Wed J un 28 2023 020048 GMT+0000 (Greenwich Mean Time) -- EX-3336 - Cleanup...Wed Jun 28 2023 020048 GMT+0000 (Greenwich Mean Time) (failed).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\Create_Project\ex-3336-create-new-project-as-admin-in-sc-company.sp ec.ts\Create New Project in SC Company as Admin, using only mandatory data.Wed J un 28 2023 020048 GMT+0000 (Greenwich Mean Time) -- EX-3336 - Cleanup...Wed Jun 28 2023 020048 GMT+0000 (Greenwich Mean Time) (failed) (attempt 2).png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3337-create-new-project-as-pm- (24 of 104) in-sc-company.spec.ts Create New Project in SC Company as Project Manager, using only mandatory data.Wed Jun 28 2023 02:04:48 GMT+0000 (Greenwich Mean Time) Create New Project in SC Company as Project Manager, using only mandatory data.Wed Jun 28 2023 02:04:48 GMT+0000 (Greenwich Mean Time) √ EX-3337Wed Jun 28 2023 02:04:48 GMT+0000 (Greenwich Mean Time) (48584ms) √ EX-3337Wed Jun 28 2023 02:04:48 GMT+0000 (Greenwich Mean Time) (48584ms) √ EX-3337 - Cleanup...Wed Jun 28 2023 02:04:48 GMT+0000 (Greenwich Mean Time) (28309ms) √ EX-3337 - Cleanup...Wed Jun 28 2023 02:04:48 GMT+0000 (Greenwich Mean Time) (28309ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_023.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 17 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3337-create-new-project-as-pm-in-sc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3338-create-new-project-as-fu- (25 of 104) in-sc-company.spec.ts Create New Project in SC Company as Field User, using only mandatory data.Wed Jun 28 2023 02:06:08 GMT+0000 (Greenwich Mean Time) Create New Project in SC Company as Field User, using only mandatory data.Wed Jun 28 2023 02:06:08 GMT+0000 (Greenwich Mean Time) √ EX-3338 - Create a project in SC Company as Field User. Wed Jun 28 2023 02:06:08 GMT+0000 (Greenwich Mean Time) (48132ms) √ EX-3338 - Create a project in SC Company as Field User. Wed Jun 28 2023 02:06:08 GMT+0000 (Greenwich Mean Time) (48132ms) √ EX-3338 - Cleanup...Wed Jun 28 2023 02:06:08 GMT+0000 (Greenwich Mean Time) (28177ms) √ EX-3338 - Cleanup...Wed Jun 28 2023 02:06:08 GMT+0000 (Greenwich Mean Time) (28177ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_024.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 16 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3338-create-new-project-as-fu-in-sc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3342-create-new-project-as-adm (26 of 104) in-in-other-company.spec.ts Create New Project in Other Company as Admin, using only mandatory data.Wed Jun 28 2023 02:07:28 GMT+0000 (Greenwich Mean Time) Create New Project in Other Company as Admin, using only mandatory data.Wed Jun 28 2023 02:07:28 GMT+0000 (Greenwich Mean Time) √ EX-3342 - Create a project in Other Company as Admin. Wed Jun 28 2023 02:07:28 GMT+0000 (Greenwich Mean Time) (55698ms) √ EX-3342 - Create a project in Other Company as Admin. Wed Jun 28 2023 02:07:28 GMT+0000 (Greenwich Mean Time) (55698ms) √ EX-3342 - Cleanup...Wed Jun 28 2023 02:07:28 GMT+0000 (Greenwich Mean Time) (28705ms) √ EX-3342 - Cleanup...Wed Jun 28 2023 02:07:28 GMT+0000 (Greenwich Mean Time) (28705ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_025.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 24 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3342-create-new-project-as-admin-in-other- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3343-create-new-project-as-pm- (27 of 104) in-other-company.spec.ts Create New Project in Other Company as Project Manager, using only mandatory data.Wed Jun 28 2023 02:08:56 GMT+0000 (Greenwich Mean Time) Create New Project in Other Company as Project Manager, using only mandatory data.Wed Jun 28 2023 02:08:56 GMT+0000 (Greenwich Mean Time) √ EX-3343 - Create a project in Other Company as Project Manager.Wed Jun 28 2023 02:08:56 GMT+0000 (Greenwich Mean Time) (47209ms) √ EX-3343 - Create a project in Other Company as Project Manager.Wed Jun 28 2023 02:08:56 GMT+0000 (Greenwich Mean Time) (47209ms) √ EX-3343 - Cleanup...Wed Jun 28 2023 02:08:56 GMT+0000 (Greenwich Mean Time) (30711ms) √ EX-3343 - Cleanup...Wed Jun 28 2023 02:08:56 GMT+0000 (Greenwich Mean Time) (30711ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_026.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 18 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3343-create-new-project-as-pm-in-other-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3344-create-new-project-as-fu- (28 of 104) in-other-company.spec.ts Create New Project in Other Company as Field User, using only mandatory data.Wed Jun 28 2023 02:10:17 GMT+0000 (Greenwich Mean Time) Create New Project in Other Company as Field User, using only mandatory data.Wed Jun 28 2023 02:10:17 GMT+0000 (Greenwich Mean Time) √ EX-3344 - Create a project in Other Company as Field User. Wed Jun 28 2023 02:10:17 GMT+0000 (Greenwich Mean Time) (47344ms) √ EX-3344 - Create a project in Other Company as Field User. Wed Jun 28 2023 02:10:17 GMT+0000 (Greenwich Mean Time) (47344ms) √ EX-3344 - Cleanup...Wed Jun 28 2023 02:10:17 GMT+0000 (Greenwich Mean Time) (28895ms) √ EX-3344 - Cleanup...Wed Jun 28 2023 02:10:17 GMT+0000 (Greenwich Mean Time) (28895ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_027.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 16 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3344-create-new-project-as-fu-in-other-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9792-GC-account-owner-user-previll (29 of 104) eges.spec.ts User Role permissions| GC Account Owner | Login and verify users access privileges. Wed Jun 28 2023 02:11:37 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Account Owner | Login and verify users access privileges. Wed Jun 28 2023 02:11:37 GMT+0000 (Greenwich Mean Time) √ EX-9792 - Part 1: SignUp. Wed Jun 28 2023 02:11:37 GMT+0000 (Greenwich Mean Time) (15521ms) √ EX-9792 - Part 1: SignUp. Wed Jun 28 2023 02:11:37 GMT+0000 (Greenwich Mean Time) (15521ms) √ EX-9792 - Part 2: Verify the confirmation email. Wed Jun 28 2023 02:11:57 GMT+0000 (Greenwich Mean Time) √ EX-9792 - Part 2: Verify the confirmation email. Wed Jun 28 2023 02:11:57 GMT+0000 (Greenwich Mean Time) √ EX-9792 - Part 3: Create your account | Select, This is my company. Wed Jun 28 2023 02:12:02 GMT+0000 (Greenwich Mean Time) (18794ms) √ EX-9792 - Part 3: Create your account | Select, This is my company. Wed Jun 28 2023 02:12:02 GMT+0000 (Greenwich Mean Time) (18794ms) √ EX-9792 - Part 4: Change the role to Account owner Wed Jun 28 2023 02:12:25 GMT+0000 (Greenwich Mean Time) (21914ms) √ EX-9792 - Part 4: Change the role to Account owner Wed Jun 28 2023 02:12:25 GMT+0000 (Greenwich Mean Time) (21914ms) √ EX-9792 - Part 5: Login as GC Account Owner and verify user privilegesWed Jun 28 2023 02:12:25 GMT+0000 (Greenwich Mean Time) (36426ms) √ EX-9792 - Part 5: Login as GC Account Owner and verify user privilegesWed Jun 28 2023 02:12:25 GMT+0000 (Greenwich Mean Time) (36426ms) √ EX-9792 - Part 6: Delete the account from the company. Wed Jun 28 2023 02:12:25 GMT+0000 (Greenwich Mean Time) (10527ms) √ EX-9792 - Part 6: Delete the account from the company. Wed Jun 28 2023 02:12:25 GMT+0000 (Greenwich Mean Time) (10527ms) 6 passing (2m) 6 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_028.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 56 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9792-GC-account-owner-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9793-GC-Owner-project-previlleges. (30 of 104) spec.ts User Role permissions| GC Account owner | Login as GC Account owner and create project and verify user privilegesWed Jun 28 2023 02:13:38 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Account owner | Login as GC Account owner and create project and verify user privilegesWed Jun 28 2023 02:13:38 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 1: Create a project Wed Jun 28 2023 02:13:38 GMT+0000 (Greenwich Mean Time) (45539ms) √ EX-9793 - Part 1: Create a project Wed Jun 28 2023 02:13:38 GMT+0000 (Greenwich Mean Time) (45539ms) √ EX-9793 - Part 2: Edit the project details and change the nameWed Jun 28 2023 02:13:38 GMT+0000 (Greenwich Mean Time) (29218ms) √ EX-9793 - Part 2: Edit the project details and change the nameWed Jun 28 2023 02:13:38 GMT+0000 (Greenwich Mean Time) (29218ms) √ EX-9793 - Part 3: Add customer to the Project. Wed Jun 28 2023 02:13:38 GMT+0000 (Greenwich Mean Time) (34892ms) √ EX-9793 - Part 3: Add customer to the Project. Wed Jun 28 2023 02:13:38 GMT+0000 (Greenwich Mean Time) (34892ms) √ EX-9793 - Part 4: Verify the invitation email for customerWed Jun 28 2023 02:15:33 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 4: Verify the invitation email for customerWed Jun 28 2023 02:15:33 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 5: Add company user to the Project. Wed Jun 28 2023 02:15:37 GMT+0000 (Greenwich Mean Time) (38927ms) √ EX-9793 - Part 5: Add company user to the Project. Wed Jun 28 2023 02:15:37 GMT+0000 (Greenwich Mean Time) (38927ms) √ EX-9793 - Part 6: Verify company user can access project. Wed Jun 28 2023 02:15:37 GMT+0000 (Greenwich Mean Time) (23183ms) √ EX-9793 - Part 6: Verify company user can access project. Wed Jun 28 2023 02:15:37 GMT+0000 (Greenwich Mean Time) (23183ms) √ EX-9793 - Part 7: Add Contract with a user to the project. Wed Jun 28 2023 02:15:37 GMT+0000 (Greenwich Mean Time) (25730ms) √ EX-9793 - Part 7: Add Contract with a user to the project. Wed Jun 28 2023 02:15:37 GMT+0000 (Greenwich Mean Time) (25730ms) √ EX-9793 - Part 8: Verify email invitation for contractor user Wed Jun 28 2023 02:17:09 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 8: Verify email invitation for contractor user Wed Jun 28 2023 02:17:09 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 9: Add additional user to existing contract of the project. Wed Jun 28 2023 02:17:13 GMT+0000 (Greenwich Mean Time) (35805ms) √ EX-9793 - Part 9: Add additional user to existing contract of the project. Wed Jun 28 2023 02:17:13 GMT+0000 (Greenwich Mean Time) (35805ms) √ EX-9793 - Part 10: Verify email invitation for additional contract user Wed Jun 28 2023 02:17:51 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 10: Verify email invitation for additional contract user Wed Jun 28 2023 02:17:51 GMT+0000 (Greenwich Mean Time) √ Ex-9793 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesWed Jun 28 2023 02:17:55 GMT+0000 (Greenwich Mean Time) (29374ms) √ Ex-9793 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesWed Jun 28 2023 02:17:55 GMT+0000 (Greenwich Mean Time) (29374ms) √ EX-9793 - Part12: Clean up Project Wed Jun 28 2023 02:17:55 GMT+0000 (Greenwich Mean Time) (24248ms) √ EX-9793 - Part12: Clean up Project Wed Jun 28 2023 02:17:55 GMT+0000 (Greenwich Mean Time) (24248ms) 12 passing (5m) 12 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_029.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 10 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9793-GC-Owner-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9828-GC-admin-user-previlleges.spe (31 of 104) c.ts User Role permissions| GC Admin | Login and verify users access privilegesWed Jun 28 2023 02:18:53 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Admin | Login and verify users access privilegesWed Jun 28 2023 02:18:53 GMT+0000 (Greenwich Mean Time) √ EX-9828 - Part 1: SignUp. Wed Jun 28 2023 02:18:53 GMT+0000 (Greenwich Mean Time) (15021ms) √ EX-9828 - Part 1: SignUp. Wed Jun 28 2023 02:18:53 GMT+0000 (Greenwich Mean Time) (15021ms) √ EX-9828 - Part 2: Verify the confirmation email. Wed Jun 28 2023 02:19:12 GMT+0000 (Greenwich Mean Time) √ EX-9828 - Part 2: Verify the confirmation email. Wed Jun 28 2023 02:19:12 GMT+0000 (Greenwich Mean Time) √ EX-9828 - Part 3: Create your account | Select, This is my company. Wed Jun 28 2023 02:19:17 GMT+0000 (Greenwich Mean Time) (16168ms) √ EX-9828 - Part 3: Create your account | Select, This is my company. Wed Jun 28 2023 02:19:17 GMT+0000 (Greenwich Mean Time) (16168ms) √ EX-9828 - Part 4: Change the role to Account Admin Wed Jun 28 2023 02:19:37 GMT+0000 (Greenwich Mean Time) (19022ms) √ EX-9828 - Part 4: Change the role to Account Admin Wed Jun 28 2023 02:19:37 GMT+0000 (Greenwich Mean Time) (19022ms) √ EX-9828 - Part 5: Login as GC Account Admin and verify user privilegesWed Jun 28 2023 02:19:37 GMT+0000 (Greenwich Mean Time) (33538ms) √ EX-9828 - Part 5: Login as GC Account Admin and verify user privilegesWed Jun 28 2023 02:19:37 GMT+0000 (Greenwich Mean Time) (33538ms) √ EX-9828 - Part 6: Delete the account from the company. Wed Jun 28 2023 02:19:37 GMT+0000 (Greenwich Mean Time) (11039ms) √ EX-9828 - Part 6: Delete the account from the company. Wed Jun 28 2023 02:19:37 GMT+0000 (Greenwich Mean Time) (11039ms) 6 passing (2m) 6 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_030.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 48 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9828-GC-admin-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9829-GC-PM-user-previlleges.spec.t (32 of 104) s User Role permissions| GC PM | Login and verify users access privilegesWed Jun 28 2023 02:20:46 GMT+0000 (Greenwich Mean Time) User Role permissions| GC PM | Login and verify users access privilegesWed Jun 28 2023 02:20:46 GMT+0000 (Greenwich Mean Time) √ EX-9829 - Part 1: SignUp. Wed Jun 28 2023 02:20:46 GMT+0000 (Greenwich Mean Time) (14663ms) √ EX-9829 - Part 1: SignUp. Wed Jun 28 2023 02:20:46 GMT+0000 (Greenwich Mean Time) (14663ms) √ EX-9829 - Part 2: Verify the confirmation email. Wed Jun 28 2023 02:21:05 GMT+0000 (Greenwich Mean Time) √ EX-9829 - Part 2: Verify the confirmation email. Wed Jun 28 2023 02:21:05 GMT+0000 (Greenwich Mean Time) √ EX-9829 - Part 3: Create your account | Select, This is my company. Wed Jun 28 2023 02:21:09 GMT+0000 (Greenwich Mean Time) (17256ms) √ EX-9829 - Part 3: Create your account | Select, This is my company. Wed Jun 28 2023 02:21:09 GMT+0000 (Greenwich Mean Time) (17256ms) √ EX-9829 - Part 4: Change the role to Project Manager Wed Jun 28 2023 02:21:31 GMT+0000 (Greenwich Mean Time) (18820ms) √ EX-9829 - Part 4: Change the role to Project Manager Wed Jun 28 2023 02:21:31 GMT+0000 (Greenwich Mean Time) (18820ms) √ EX-9829 - Part 5: Login as GC PM and verify user privilegesWed Jun 28 2023 02:21:31 GMT+0000 (Greenwich Mean Time) (34101ms) √ EX-9829 - Part 5: Login as GC PM and verify user privilegesWed Jun 28 2023 02:21:31 GMT+0000 (Greenwich Mean Time) (34101ms) √ EX-9829 - Part 6: Delete the account from the company. Wed Jun 28 2023 02:21:31 GMT+0000 (Greenwich Mean Time) (12482ms) √ EX-9829 - Part 6: Delete the account from the company. Wed Jun 28 2023 02:21:31 GMT+0000 (Greenwich Mean Time) (12482ms) 6 passing (2m) 6 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_031.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 50 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9829-GC-PM-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9830-GC-Field-user-previlleges.spe (33 of 104) c.ts User Role permissions| GC FieldUser | Login and verify users access privilegesWed Jun 28 2023 02:22:40 GMT+0000 (Greenwich Mean Time) User Role permissions| GC FieldUser | Login and verify users access privilegesWed Jun 28 2023 02:22:40 GMT+0000 (Greenwich Mean Time) √ EX-9830 - Part 1: SignUp. Wed Jun 28 2023 02:22:40 GMT+0000 (Greenwich Mean Time) (13570ms) √ EX-9830 - Part 1: SignUp. Wed Jun 28 2023 02:22:40 GMT+0000 (Greenwich Mean Time) (13570ms) √ EX-9830 - Part 2: Verify the confirmation email. Wed Jun 28 2023 02:22:58 GMT+0000 (Greenwich Mean Time) √ EX-9830 - Part 2: Verify the confirmation email. Wed Jun 28 2023 02:22:58 GMT+0000 (Greenwich Mean Time) √ EX-9830 - Part 3: Create your account | Select, This is my company. Wed Jun 28 2023 02:23:03 GMT+0000 (Greenwich Mean Time) (12364ms) √ EX-9830 - Part 3: Create your account | Select, This is my company. Wed Jun 28 2023 02:23:03 GMT+0000 (Greenwich Mean Time) (12364ms) √ EX-9830 - Part 4: Login as GC FU and verify user privilegesWed Jun 28 2023 02:23:19 GMT+0000 (Greenwich Mean Time) (18635ms) √ EX-9830 - Part 4: Login as GC FU and verify user privilegesWed Jun 28 2023 02:23:19 GMT+0000 (Greenwich Mean Time) (18635ms) √ EX-9830 - Part 5: Delete the account from the company. Wed Jun 28 2023 02:23:19 GMT+0000 (Greenwich Mean Time) (11360ms) √ EX-9830 - Part 5: Delete the account from the company. Wed Jun 28 2023 02:23:19 GMT+0000 (Greenwich Mean Time) (11360ms) 5 passing (1m) 5 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_032.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 8 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9830-GC-Field-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9832-SC-Field-users-user-previlleg (34 of 104) es.spec.ts User Role permissions| SC FU | Login and verify users access privilegesWed Jun 28 2023 02:23:54 GMT+0000 (Greenwich Mean Time) User Role permissions| SC FU | Login and verify users access privilegesWed Jun 28 2023 02:23:54 GMT+0000 (Greenwich Mean Time) √ EX-9832 - Part 1: Add Contractor with SC Field User to existing project. Wed Jun 28 2023 02:23:54 GMT+0000 (Greenwich Mean Time) (30662ms) √ EX-9832 - Part 1: Add Contractor with SC Field User to existing project. Wed Jun 28 2023 02:23:54 GMT+0000 (Greenwich Mean Time) (30662ms) √ EX-9832 - Part 2: SignUp. Wed Jun 28 2023 02:23:54 GMT+0000 (Greenwich Mean Time) (9902ms) √ EX-9832 - Part 2: SignUp. Wed Jun 28 2023 02:23:54 GMT+0000 (Greenwich Mean Time) (9902ms) √ EX-9832 - Part 3: Verify the confirmation email. Wed Jun 28 2023 02:24:39 GMT+0000 (Greenwich Mean Time) √ EX-9832 - Part 3: Verify the confirmation email. Wed Jun 28 2023 02:24:39 GMT+0000 (Greenwich Mean Time) √ EX-9832 - Part 4: Create your account | Select, This is my company. Wed Jun 28 2023 02:24:44 GMT+0000 (Greenwich Mean Time) (16653ms) √ EX-9832 - Part 4: Create your account | Select, This is my company. Wed Jun 28 2023 02:24:44 GMT+0000 (Greenwich Mean Time) (16653ms) √ EX-9832 - Part 5: Change the role to Field User Wed Jun 28 2023 02:25:04 GMT+0000 (Greenwich Mean Time) (19556ms) √ EX-9832 - Part 5: Change the role to Field User Wed Jun 28 2023 02:25:04 GMT+0000 (Greenwich Mean Time) (19556ms) √ EX-9832 - Part 6: Login as SC FU and verify user privilegesWed Jun 28 2023 02:25:04 GMT+0000 (Greenwich Mean Time) (19231ms) √ EX-9832 - Part 6: Login as SC FU and verify user privilegesWed Jun 28 2023 02:25:04 GMT+0000 (Greenwich Mean Time) (19231ms) √ EX-9832 - Part 7: Delete the account from the company. Wed Jun 28 2023 02:25:04 GMT+0000 (Greenwich Mean Time) (12001ms) √ EX-9832 - Part 7: Delete the account from the company. Wed Jun 28 2023 02:25:04 GMT+0000 (Greenwich Mean Time) (12001ms) √ EX-9832 - Part 8: Delete the contracts of existing Project Wed Jun 28 2023 02:25:04 GMT+0000 (Greenwich Mean Time) (27250ms) √ EX-9832 - Part 8: Delete the contracts of existing Project Wed Jun 28 2023 02:25:04 GMT+0000 (Greenwich Mean Time) (27250ms) 8 passing (2m) 8 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_033.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 28 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9832-SC-Field-users-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9833-SC-PM-user-previlleges.spec.t (35 of 104) s User Role permissions| SC PM | Login and verify users access privilegesWed Jun 28 2023 02:26:27 GMT+0000 (Greenwich Mean Time) User Role permissions| SC PM | Login and verify users access privilegesWed Jun 28 2023 02:26:27 GMT+0000 (Greenwich Mean Time) √ EX-9833 - Part 1: Add Contractor with SC PM to existing project. Wed Jun 28 2023 02:26:27 GMT+0000 (Greenwich Mean Time) (30601ms) √ EX-9833 - Part 1: Add Contractor with SC PM to existing project. Wed Jun 28 2023 02:26:27 GMT+0000 (Greenwich Mean Time) (30601ms) √ EX-9833 - Part 2: SignUp. Wed Jun 28 2023 02:26:27 GMT+0000 (Greenwich Mean Time) (9314ms) √ EX-9833 - Part 2: SignUp. Wed Jun 28 2023 02:26:27 GMT+0000 (Greenwich Mean Time) (9314ms) √ EX-9833 - Part 3: Verify the confirmation email. Wed Jun 28 2023 02:27:12 GMT+0000 (Greenwich Mean Time) √ EX-9833 - Part 3: Verify the confirmation email. Wed Jun 28 2023 02:27:12 GMT+0000 (Greenwich Mean Time) √ EX-9833 - Part 4: Create your account | Select, This is my company. Wed Jun 28 2023 02:27:16 GMT+0000 (Greenwich Mean Time) (17104ms) √ EX-9833 - Part 4: Create your account | Select, This is my company. Wed Jun 28 2023 02:27:16 GMT+0000 (Greenwich Mean Time) (17104ms) √ EX-9833 - Part 5: Change the role to PM Wed Jun 28 2023 02:27:37 GMT+0000 (Greenwich Mean Time) (22420ms) √ EX-9833 - Part 5: Change the role to PM Wed Jun 28 2023 02:27:37 GMT+0000 (Greenwich Mean Time) (22420ms) √ EX-9833 - Part 6: Login as SC PM and verify user privilegesWed Jun 28 2023 02:27:37 GMT+0000 (Greenwich Mean Time) (30675ms) √ EX-9833 - Part 6: Login as SC PM and verify user privilegesWed Jun 28 2023 02:27:37 GMT+0000 (Greenwich Mean Time) (30675ms) √ EX-9833 - Part 7: Delete the account from the company. Wed Jun 28 2023 02:27:37 GMT+0000 (Greenwich Mean Time) (11949ms) √ EX-9833 - Part 7: Delete the account from the company. Wed Jun 28 2023 02:27:37 GMT+0000 (Greenwich Mean Time) (11949ms) √ EX-9833 - Part 8: Delete the contracts of existing Project Wed Jun 28 2023 02:27:37 GMT+0000 (Greenwich Mean Time) (27767ms) √ EX-9833 - Part 8: Delete the contracts of existing Project Wed Jun 28 2023 02:27:37 GMT+0000 (Greenwich Mean Time) (27767ms) 8 passing (3m) 8 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_034.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 43 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9833-SC-PM-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9834-SC-Admin-user-previlleges.spe (36 of 104) c.ts User Role permissions| SC Admin | Login and verify users access privilegesWed Jun 28 2023 02:29:15 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Admin | Login and verify users access privilegesWed Jun 28 2023 02:29:15 GMT+0000 (Greenwich Mean Time) √ EX-9834 - Part 1: Add Contractor with SC Admin to existing project. Wed Jun 28 2023 02:29:15 GMT+0000 (Greenwich Mean Time) (32049ms) √ EX-9834 - Part 1: Add Contractor with SC Admin to existing project. Wed Jun 28 2023 02:29:15 GMT+0000 (Greenwich Mean Time) (32049ms) √ EX-9834 - Part 2: SignUp. Wed Jun 28 2023 02:29:15 GMT+0000 (Greenwich Mean Time) (10556ms) √ EX-9834 - Part 2: SignUp. Wed Jun 28 2023 02:29:15 GMT+0000 (Greenwich Mean Time) (10556ms) √ EX-9834 - Part 3: Verify the confirmation email. Wed Jun 28 2023 02:30:02 GMT+0000 (Greenwich Mean Time) √ EX-9834 - Part 3: Verify the confirmation email. Wed Jun 28 2023 02:30:02 GMT+0000 (Greenwich Mean Time) √ EX-9834 - Part 4: Create your account | Select, This is my company. Wed Jun 28 2023 02:30:07 GMT+0000 (Greenwich Mean Time) (20195ms) √ EX-9834 - Part 4: Create your account | Select, This is my company. Wed Jun 28 2023 02:30:07 GMT+0000 (Greenwich Mean Time) (20195ms) √ EX-9834 - Part 5: Change the role to Admin Wed Jun 28 2023 02:30:31 GMT+0000 (Greenwich Mean Time) (20590ms) √ EX-9834 - Part 5: Change the role to Admin Wed Jun 28 2023 02:30:31 GMT+0000 (Greenwich Mean Time) (20590ms) √ EX-9834 - Part 6: Login as SC Admin and verify user privilegesWed Jun 28 2023 02:30:31 GMT+0000 (Greenwich Mean Time) (33429ms) √ EX-9834 - Part 6: Login as SC Admin and verify user privilegesWed Jun 28 2023 02:30:31 GMT+0000 (Greenwich Mean Time) (33429ms) √ EX-9834 - Part 7: Delete the account from the company. Wed Jun 28 2023 02:30:31 GMT+0000 (Greenwich Mean Time) (11185ms) √ EX-9834 - Part 7: Delete the account from the company. Wed Jun 28 2023 02:30:31 GMT+0000 (Greenwich Mean Time) (11185ms) √ EX-9834 - Part 8: Delete the contracts of existing Project Wed Jun 28 2023 02:30:31 GMT+0000 (Greenwich Mean Time) (29003ms) √ EX-9834 - Part 8: Delete the contracts of existing Project Wed Jun 28 2023 02:30:31 GMT+0000 (Greenwich Mean Time) (29003ms) 8 passing (3m) 8 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_035.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 50 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9834-SC-Admin-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9835-SC-account-owner-user-previll (37 of 104) eges.spec.ts User Role permissions| SC Account Owner | Login and verify users access privilegesWed Jun 28 2023 02:32:09 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Account Owner | Login and verify users access privilegesWed Jun 28 2023 02:32:09 GMT+0000 (Greenwich Mean Time) √ EX-9835 - Part 1: Add Contractor with SC Account owner to existing project. Wed Jun 28 2023 02:32:09 GMT+0000 (Greenwich Mean Time) (31509ms) √ EX-9835 - Part 1: Add Contractor with SC Account owner to existing project. Wed Jun 28 2023 02:32:09 GMT+0000 (Greenwich Mean Time) (31509ms) √ EX-9835 - Part 2: SignUp. Wed Jun 28 2023 02:32:09 GMT+0000 (Greenwich Mean Time) (10184ms) √ EX-9835 - Part 2: SignUp. Wed Jun 28 2023 02:32:09 GMT+0000 (Greenwich Mean Time) (10184ms) √ EX-9835 - Part 3: Verify the confirmation email. Wed Jun 28 2023 02:32:56 GMT+0000 (Greenwich Mean Time) √ EX-9835 - Part 3: Verify the confirmation email. Wed Jun 28 2023 02:32:56 GMT+0000 (Greenwich Mean Time) √ EX-9835 - Part 4: Create your account | Select, This is my company. Wed Jun 28 2023 02:33:00 GMT+0000 (Greenwich Mean Time) (18427ms) √ EX-9835 - Part 4: Create your account | Select, This is my company. Wed Jun 28 2023 02:33:00 GMT+0000 (Greenwich Mean Time) (18427ms) √ EX-9835 - Part 5: Change the role to Account owner Wed Jun 28 2023 02:33:22 GMT+0000 (Greenwich Mean Time) (19439ms) √ EX-9835 - Part 5: Change the role to Account owner Wed Jun 28 2023 02:33:22 GMT+0000 (Greenwich Mean Time) (19439ms) √ EX-9835 - Part 6: Login as SC Account Owner and verify user privilegesWed Jun 28 2023 02:33:22 GMT+0000 (Greenwich Mean Time) (34038ms) √ EX-9835 - Part 6: Login as SC Account Owner and verify user privilegesWed Jun 28 2023 02:33:22 GMT+0000 (Greenwich Mean Time) (34038ms) √ EX-9835 - Part 7: Delete the account from the company. Wed Jun 28 2023 02:33:22 GMT+0000 (Greenwich Mean Time) (10746ms) √ EX-9835 - Part 7: Delete the account from the company. Wed Jun 28 2023 02:33:22 GMT+0000 (Greenwich Mean Time) (10746ms) √ EX-9835 - Part 8: Delete the contracts of existing Project Wed Jun 28 2023 02:33:22 GMT+0000 (Greenwich Mean Time) (28099ms) √ EX-9835 - Part 8: Delete the contracts of existing Project Wed Jun 28 2023 02:33:22 GMT+0000 (Greenwich Mean Time) (28099ms) 8 passing (3m) 8 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_036.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 45 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9835-SC-account-owner-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges. (38 of 104) spec.ts User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesWed Jun 28 2023 02:34:59 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesWed Jun 28 2023 02:34:59 GMT+0000 (Greenwich Mean Time) √ EX-9885 - Part 1: Create a project Wed Jun 28 2023 02:34:59 GMT+0000 (Greenwich Mean Time) (60805ms) √ EX-9885 - Part 1: Create a project Wed Jun 28 2023 02:34:59 GMT+0000 (Greenwich Mean Time) (60805ms) √ EX-9885 - Part 2: Edit the project details and change the nameWed Jun 28 2023 02:34:59 GMT+0000 (Greenwich Mean Time) (56814ms) √ EX-9885 - Part 2: Edit the project details and change the nameWed Jun 28 2023 02:34:59 GMT+0000 (Greenwich Mean Time) (56814ms) √ EX-9885 - Part 3: Add customer to the Project. Wed Jun 28 2023 02:34:59 GMT+0000 (Greenwich Mean Time) (60021ms) √ EX-9885 - Part 3: Add customer to the Project. Wed Jun 28 2023 02:34:59 GMT+0000 (Greenwich Mean Time) (60021ms) √ EX-9885 - Part 4: Verify the invitation email for customerWed Jun 28 2023 02:38:02 GMT+0000 (Greenwich Mean Time) √ EX-9885 - Part 4: Verify the invitation email for customerWed Jun 28 2023 02:38:02 GMT+0000 (Greenwich Mean Time) √ EX-9885 - Part 5: Add company user to the Project. Wed Jun 28 2023 02:38:06 GMT+0000 (Greenwich Mean Time) (73471ms) √ EX-9885 - Part 5: Add company user to the Project. Wed Jun 28 2023 02:38:06 GMT+0000 (Greenwich Mean Time) (73471ms) √ EX-9885 - Part 6: Verify company user can access project. Wed Jun 28 2023 02:38:06 GMT+0000 (Greenwich Mean Time) (23506ms) √ EX-9885 - Part 6: Verify company user can access project. Wed Jun 28 2023 02:38:06 GMT+0000 (Greenwich Mean Time) (23506ms) 1) EX-9885 - Part 7: Add Contract with a user to the project. Wed Jun 28 2023 02:38:06 GMT+0000 (Greenwich Mean Time) 1) EX-9885 - Part 7: Add Contract with a user to the project. Wed Jun 28 2023 02:38:06 GMT+0000 (Greenwich Mean Time) 2) EX-9885 - Part 8: Verify email invitation for contractor user Wed Jun 28 2023 02:42:22 GMT+0000 (Greenwich Mean Time) 2) EX-9885 - Part 8: Verify email invitation for contractor user Wed Jun 28 2023 02:42:22 GMT+0000 (Greenwich Mean Time) 3) EX-9885 - Part 9: Add additiona user to existing contract of the project. Wed Jun 28 2023 02:43:28 GMT+0000 (Greenwich Mean Time) 3) EX-9885 - Part 9: Add additiona user to existing contract of the project. Wed Jun 28 2023 02:43:28 GMT+0000 (Greenwich Mean Time) 4) EX-9885 - Part 10: Verify email invitation for additional contract user Wed Jun 28 2023 02:45:56 GMT+0000 (Greenwich Mean Time) 4) EX-9885 - Part 10: Verify email invitation for additional contract user Wed Jun 28 2023 02:45:56 GMT+0000 (Greenwich Mean Time) √ Ex-9885 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesWed Jun 28 2023 02:47:02 GMT+0000 (Greenwich Mean Time) (51067ms) √ Ex-9885 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesWed Jun 28 2023 02:47:02 GMT+0000 (Greenwich Mean Time) (51067ms) √ EX-9885 - Part12: Clean up Project Wed Jun 28 2023 02:47:02 GMT+0000 (Greenwich Mean Time) (27523ms) √ EX-9885 - Part12: Clean up Project Wed Jun 28 2023 02:47:02 GMT+0000 (Greenwich Mean Time) (27523ms) 8 passing (13m) 4 failing 1) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesWed Jun 28 2023 02:47:02 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 7: Add Contract with a user to the project. Wed Jun 28 2023 02:38:06 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Contract' within the selector: 'tbody tr td' but never did. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34) 2) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesWed Jun 28 2023 02:47:02 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 8: Verify email invitation for contractor user Wed Jun 28 2023 02:42:22 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1687919699352' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack:///./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack:///./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts:126:28) 3) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesWed Jun 28 2023 02:47:02 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 9: Add additiona user to existing contract of the project. Wed Jun 28 2023 02:43:28 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `[data-cy="stickyTable"] tbody tr[data-cy]`, but never found it. at projectsOpenProjectAddContractors.verifyContractsCount (webpack:///./cypress/support/PageObjects/Projects_OpenProject_AddContractors.ts:137:35) at Context.eval (webpack:///./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts:140:23) 4) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesWed Jun 28 2023 02:47:02 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 10: Verify email invitation for additional contract user Wed Jun 28 2023 02:45:56 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1687919699352' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack:///./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack:///./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts:154:28) 8 passing (13m) 4 failing 1) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesWed Jun 28 2023 02:47:02 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 7: Add Contract with a user to the project. Wed Jun 28 2023 02:38:06 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Contract' within the selector: 'tbody tr td' but never did. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34) 2) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesWed Jun 28 2023 02:47:02 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 8: Verify email invitation for contractor user Wed Jun 28 2023 02:42:22 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1687919699352' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack:///./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack:///./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts:126:28) 3) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesWed Jun 28 2023 02:47:02 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 9: Add additiona user to existing contract of the project. Wed Jun 28 2023 02:43:28 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `[data-cy="stickyTable"] tbody tr[data-cy]`, but never found it. at projectsOpenProjectAddContractors.verifyContractsCount (webpack:///./cypress/support/PageObjects/Projects_OpenProject_AddContractors.ts:137:35) at Context.eval (webpack:///./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts:140:23) 4) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesWed Jun 28 2023 02:47:02 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 10: Verify email invitation for additional contract user Wed Jun 28 2023 02:45:56 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1687919699352' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack:///./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack:///./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts:154:28) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_037.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 8 │ │ Failing: 4 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 8 │ │ Video: false │ │ Duration: 13 minutes, 21 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesWed Jun 28 2023 023806 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 7 Ad d Contract with a user to the project. Wed Jun 28 2023 023806 GMT+0000 (Greenwi. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesWed Jun 28 2023 023806 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 7 Ad d Contract with a user to the project. Wed Jun 28 2023 023806 GMT+0000 (Gre (1). png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesWed Jun 28 2023 024222 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 8 Ve rify email invitation for contractor user Wed Jun 28 2023 024222 GMT+0000 (Gree. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesWed Jun 28 2023 024222 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 8 Ve rify email invitation for contractor user Wed Jun 28 2023 024222 GMT+0000 ( (1). png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesWed Jun 28 2023 024328 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 9 Ad d additiona user to existing contract of the project. Wed Jun 28 2023 024328 GM. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesWed Jun 28 2023 024328 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 9 Ad d additiona user to existing contract of the project. Wed Jun 28 2023 02432 (1). png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesWed Jun 28 2023 024556 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 10 V erify email invitation for additional contract user Wed Jun 28 2023 024556 GMT+. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesWed Jun 28 2023 024556 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 10 V erify email invitation for additional contract user Wed Jun 28 2023 024556 (1). png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9886-GC-PM-project-previlleges.spe (39 of 104) c.ts User Role permissions| GC PM | Login as GC PM and create project and verify user privilegesWed Jun 28 2023 02:48:24 GMT+0000 (Greenwich Mean Time) User Role permissions| GC PM | Login as GC PM and create project and verify user privilegesWed Jun 28 2023 02:48:24 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 1: Create a project Wed Jun 28 2023 02:48:24 GMT+0000 (Greenwich Mean Time) (46818ms) √ EX-9886 - Part 1: Create a project Wed Jun 28 2023 02:48:24 GMT+0000 (Greenwich Mean Time) (46818ms) √ EX-9886 - Part 2: Edit the project details and change the nameWed Jun 28 2023 02:48:24 GMT+0000 (Greenwich Mean Time) (28324ms) √ EX-9886 - Part 2: Edit the project details and change the nameWed Jun 28 2023 02:48:24 GMT+0000 (Greenwich Mean Time) (28324ms) √ EX-9886 - Part 3: Add customer to the Project. Wed Jun 28 2023 02:48:24 GMT+0000 (Greenwich Mean Time) (30334ms) √ EX-9886 - Part 3: Add customer to the Project. Wed Jun 28 2023 02:48:24 GMT+0000 (Greenwich Mean Time) (30334ms) √ EX-9886 - Part 4: Verify the invitation email for customerWed Jun 28 2023 02:50:14 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 4: Verify the invitation email for customerWed Jun 28 2023 02:50:14 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 5: Add company user to the Project. Wed Jun 28 2023 02:50:19 GMT+0000 (Greenwich Mean Time) (43659ms) √ EX-9886 - Part 5: Add company user to the Project. Wed Jun 28 2023 02:50:19 GMT+0000 (Greenwich Mean Time) (43659ms) √ EX-9886 - Part 6: Verify company user can access project. Wed Jun 28 2023 02:50:19 GMT+0000 (Greenwich Mean Time) (24420ms) √ EX-9886 - Part 6: Verify company user can access project. Wed Jun 28 2023 02:50:19 GMT+0000 (Greenwich Mean Time) (24420ms) √ EX-9886 - Part 7: Add Contract with a user to the project. Wed Jun 28 2023 02:50:19 GMT+0000 (Greenwich Mean Time) (26155ms) √ EX-9886 - Part 7: Add Contract with a user to the project. Wed Jun 28 2023 02:50:19 GMT+0000 (Greenwich Mean Time) (26155ms) √ EX-9886 - Part 8: Verify email invitation for contractor user Wed Jun 28 2023 02:51:57 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 8: Verify email invitation for contractor user Wed Jun 28 2023 02:51:57 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 9: Add additional user to existing contract of the project. Wed Jun 28 2023 02:52:01 GMT+0000 (Greenwich Mean Time) (35635ms) √ EX-9886 - Part 9: Add additional user to existing contract of the project. Wed Jun 28 2023 02:52:01 GMT+0000 (Greenwich Mean Time) (35635ms) √ EX-9886 - Part 10: Verify email invitation for additional contract user Wed Jun 28 2023 02:52:40 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 10: Verify email invitation for additional contract user Wed Jun 28 2023 02:52:40 GMT+0000 (Greenwich Mean Time) √ Ex-9886 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesWed Jun 28 2023 02:52:43 GMT+0000 (Greenwich Mean Time) (28794ms) √ Ex-9886 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesWed Jun 28 2023 02:52:43 GMT+0000 (Greenwich Mean Time) (28794ms) √ EX-9886 - Part 12: Clean up Project Wed Jun 28 2023 02:52:43 GMT+0000 (Greenwich Mean Time) (25529ms) √ EX-9886 - Part 12: Clean up Project Wed Jun 28 2023 02:52:43 GMT+0000 (Greenwich Mean Time) (25529ms) 12 passing (5m) 12 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_038.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 14 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9886-GC-PM-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges. (40 of 104) spec.ts User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesWed Jun 28 2023 02:53:41 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesWed Jun 28 2023 02:53:41 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 1: Create a project Wed Jun 28 2023 02:53:41 GMT+0000 (Greenwich Mean Time) (60646ms) √ EX-9887 - Part 1: Create a project Wed Jun 28 2023 02:53:41 GMT+0000 (Greenwich Mean Time) (60646ms) √ EX-9887 - Part 2: Edit the project details and change the nameWed Jun 28 2023 02:53:41 GMT+0000 (Greenwich Mean Time) (63645ms) √ EX-9887 - Part 2: Edit the project details and change the nameWed Jun 28 2023 02:53:41 GMT+0000 (Greenwich Mean Time) (63645ms) √ EX-9887 - Part 3: Add customer to the Project. Wed Jun 28 2023 02:53:41 GMT+0000 (Greenwich Mean Time) (49428ms) √ EX-9887 - Part 3: Add customer to the Project. Wed Jun 28 2023 02:53:41 GMT+0000 (Greenwich Mean Time) (49428ms) √ EX-9887 - Part 4: Verify the invitation email for customerWed Jun 28 2023 02:57:21 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 4: Verify the invitation email for customerWed Jun 28 2023 02:57:21 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 5: Add company user to the Project. Wed Jun 28 2023 02:57:26 GMT+0000 (Greenwich Mean Time) (51944ms) √ EX-9887 - Part 5: Add company user to the Project. Wed Jun 28 2023 02:57:26 GMT+0000 (Greenwich Mean Time) (51944ms) √ EX-9887 - Part 6: Verify company user can access project. Wed Jun 28 2023 02:57:26 GMT+0000 (Greenwich Mean Time) (24911ms) √ EX-9887 - Part 6: Verify company user can access project. Wed Jun 28 2023 02:57:26 GMT+0000 (Greenwich Mean Time) (24911ms) √ EX-9887 - Part 7: Add Contract with a user to the project. Wed Jun 28 2023 02:57:26 GMT+0000 (Greenwich Mean Time) (53974ms) √ EX-9887 - Part 7: Add Contract with a user to the project. Wed Jun 28 2023 02:57:26 GMT+0000 (Greenwich Mean Time) (53974ms) √ EX-9887 - Part 8: Verify email invitation for contractor user Wed Jun 28 2023 03:00:34 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 8: Verify email invitation for contractor user Wed Jun 28 2023 03:00:34 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 9: Add additiona user to existing contract of the project. Wed Jun 28 2023 03:00:38 GMT+0000 (Greenwich Mean Time) (68450ms) √ EX-9887 - Part 9: Add additiona user to existing contract of the project. Wed Jun 28 2023 03:00:38 GMT+0000 (Greenwich Mean Time) (68450ms) √ EX-9887 - Part 10: Verify email invitation for additional contract user Wed Jun 28 2023 03:01:50 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 10: Verify email invitation for additional contract user Wed Jun 28 2023 03:01:50 GMT+0000 (Greenwich Mean Time) √ Ex-9887 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesWed Jun 28 2023 03:01:54 GMT+0000 (Greenwich Mean Time) (47904ms) √ Ex-9887 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesWed Jun 28 2023 03:01:54 GMT+0000 (Greenwich Mean Time) (47904ms) √ EX-9887 - Part 12: Clean up Project Wed Jun 28 2023 03:01:54 GMT+0000 (Greenwich Mean Time) (27981ms) √ EX-9887 - Part 12: Clean up Project Wed Jun 28 2023 03:01:54 GMT+0000 (Greenwich Mean Time) (27981ms) 12 passing (9m) 12 passing (9m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_039.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 2 │ │ Video: false │ │ Duration: 9 minutes, 28 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\User_roles\ex-9887-SC-Admin-project-previlleges.spec.ts\User Role p ermissions SC Admin Login as SC admin and create project and verify user privil egesWed Jun 28 2023 025341 GMT+0000 (Greenwich Mean Time) -- EX-9887 - Part 3 Ad d customer to the Project. Wed Jun 28 2023 025341 GMT+0000 (Greenwich Mean Time. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1280x720) issionLevels\User_roles\ex-9887-SC-Admin-project-previlleges.spec.ts\User Role p ermissions SC Admin Login as SC admin and create project and verify user privil egesWed Jun 28 2023 025726 GMT+0000 (Greenwich Mean Time) -- EX-9887 - Part 5 Ad d company user to the Project. Wed Jun 28 2023 025726 GMT+0000 (Greenwich Mean . png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9888-GC-FU-project-previlleges.spe (41 of 104) c.ts User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesWed Jun 28 2023 03:03:14 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesWed Jun 28 2023 03:03:14 GMT+0000 (Greenwich Mean Time) √ EX-9888 - Part 1: Create a project Wed Jun 28 2023 03:03:14 GMT+0000 (Greenwich Mean Time) (45849ms) √ EX-9888 - Part 1: Create a project Wed Jun 28 2023 03:03:14 GMT+0000 (Greenwich Mean Time) (45849ms) √ EX-9888 - Part 2: Edit the project details and change the nameWed Jun 28 2023 03:03:14 GMT+0000 (Greenwich Mean Time) (27965ms) √ EX-9888 - Part 2: Edit the project details and change the nameWed Jun 28 2023 03:03:14 GMT+0000 (Greenwich Mean Time) (27965ms) √ EX-9888 - Part 3: Add customer to the Project. Wed Jun 28 2023 03:03:14 GMT+0000 (Greenwich Mean Time) (30760ms) √ EX-9888 - Part 3: Add customer to the Project. Wed Jun 28 2023 03:03:14 GMT+0000 (Greenwich Mean Time) (30760ms) √ EX-9888 - Part 4: Verify the invitation email for customerWed Jun 28 2023 03:05:03 GMT+0000 (Greenwich Mean Time) √ EX-9888 - Part 4: Verify the invitation email for customerWed Jun 28 2023 03:05:03 GMT+0000 (Greenwich Mean Time) √ EX-9888 - Part 5: Add company user to the Project. Wed Jun 28 2023 03:05:08 GMT+0000 (Greenwich Mean Time) (37284ms) √ EX-9888 - Part 5: Add company user to the Project. Wed Jun 28 2023 03:05:08 GMT+0000 (Greenwich Mean Time) (37284ms) √ EX-9888 - Part 6: Verify company user can access project. Wed Jun 28 2023 03:05:08 GMT+0000 (Greenwich Mean Time) (24862ms) √ EX-9888 - Part 6: Verify company user can access project. Wed Jun 28 2023 03:05:08 GMT+0000 (Greenwich Mean Time) (24862ms) √ EX-9888 - Part 7: Add Contract should be in disabled state Wed Jun 28 2023 03:05:08 GMT+0000 (Greenwich Mean Time) (18581ms) √ EX-9888 - Part 7: Add Contract should be in disabled state Wed Jun 28 2023 03:05:08 GMT+0000 (Greenwich Mean Time) (18581ms) √ Ex-9888 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesWed Jun 28 2023 03:05:08 GMT+0000 (Greenwich Mean Time) (16104ms) √ Ex-9888 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesWed Jun 28 2023 03:05:08 GMT+0000 (Greenwich Mean Time) (16104ms) √ EX-9888 - Part 9: Clean up Project Wed Jun 28 2023 03:05:08 GMT+0000 (Greenwich Mean Time) (25446ms) √ EX-9888 - Part 9: Clean up Project Wed Jun 28 2023 03:05:08 GMT+0000 (Greenwich Mean Time) (25446ms) 9 passing (4m) 9 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_040.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 9 │ │ Passing: 9 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 56 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9888-GC-FU-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9889-SC-Owner-project-previlleges. (42 of 104) spec.ts User Role permissions| SC Account Owner | Login as SC account owner and create project and verify user privilegesWed Jun 28 2023 03:07:14 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Account Owner | Login as SC account owner and create project and verify user privilegesWed Jun 28 2023 03:07:14 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 1: Create a project Wed Jun 28 2023 03:07:14 GMT+0000 (Greenwich Mean Time) (50211ms) √ EX-9889 - Part 1: Create a project Wed Jun 28 2023 03:07:14 GMT+0000 (Greenwich Mean Time) (50211ms) √ EX-9889 - Part 2: Edit the project details and change the nameWed Jun 28 2023 03:07:14 GMT+0000 (Greenwich Mean Time) (29304ms) √ EX-9889 - Part 2: Edit the project details and change the nameWed Jun 28 2023 03:07:14 GMT+0000 (Greenwich Mean Time) (29304ms) √ EX-9889 - Part 3: Add customer to the Project. Wed Jun 28 2023 03:07:14 GMT+0000 (Greenwich Mean Time) (37972ms) √ EX-9889 - Part 3: Add customer to the Project. Wed Jun 28 2023 03:07:14 GMT+0000 (Greenwich Mean Time) (37972ms) √ EX-9889 - Part 4: Verify the invitation email for customerWed Jun 28 2023 03:09:17 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 4: Verify the invitation email for customerWed Jun 28 2023 03:09:17 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 5: Add company user to the Project. Wed Jun 28 2023 03:09:21 GMT+0000 (Greenwich Mean Time) (38825ms) √ EX-9889 - Part 5: Add company user to the Project. Wed Jun 28 2023 03:09:21 GMT+0000 (Greenwich Mean Time) (38825ms) √ EX-9889 - Part 6: Verify company user can access project. Wed Jun 28 2023 03:09:21 GMT+0000 (Greenwich Mean Time) (23872ms) √ EX-9889 - Part 6: Verify company user can access project. Wed Jun 28 2023 03:09:21 GMT+0000 (Greenwich Mean Time) (23872ms) √ EX-9889 - Part 7: Add Contract with a user to the project. Wed Jun 28 2023 03:09:21 GMT+0000 (Greenwich Mean Time) (28648ms) √ EX-9889 - Part 7: Add Contract with a user to the project. Wed Jun 28 2023 03:09:21 GMT+0000 (Greenwich Mean Time) (28648ms) √ EX-9889 - Part 8: Verify email invitation for contractor user Wed Jun 28 2023 03:10:57 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 8: Verify email invitation for contractor user Wed Jun 28 2023 03:10:57 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 9: Add additional user to existing contract of the project. Wed Jun 28 2023 03:11:00 GMT+0000 (Greenwich Mean Time) (37014ms) √ EX-9889 - Part 9: Add additional user to existing contract of the project. Wed Jun 28 2023 03:11:00 GMT+0000 (Greenwich Mean Time) (37014ms) √ EX-9889 - Part 10: Verify email invitation for additional contract user Wed Jun 28 2023 03:11:40 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 10: Verify email invitation for additional contract user Wed Jun 28 2023 03:11:40 GMT+0000 (Greenwich Mean Time) √ Ex-9889 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesWed Jun 28 2023 03:11:44 GMT+0000 (Greenwich Mean Time) (30350ms) √ Ex-9889 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesWed Jun 28 2023 03:11:44 GMT+0000 (Greenwich Mean Time) (30350ms) √ EX-9889 - Part 12: Clean up Project Wed Jun 28 2023 03:11:44 GMT+0000 (Greenwich Mean Time) (28065ms) √ EX-9889 - Part 12: Clean up Project Wed Jun 28 2023 03:11:44 GMT+0000 (Greenwich Mean Time) (28065ms) 12 passing (5m) 12 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_041.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 28 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9889-SC-Owner-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9890-SC-PM-project-previlleges.spe (43 of 104) c.ts User Role permissions| SC PM | Login as SC PM and create project and verify user privilegesWed Jun 28 2023 03:12:46 GMT+0000 (Greenwich Mean Time) User Role permissions| SC PM | Login as SC PM and create project and verify user privilegesWed Jun 28 2023 03:12:46 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 1: Create a project Wed Jun 28 2023 03:12:46 GMT+0000 (Greenwich Mean Time) (46824ms) √ EX-9890 - Part 1: Create a project Wed Jun 28 2023 03:12:46 GMT+0000 (Greenwich Mean Time) (46824ms) √ EX-9890 - Part 2: Edit the project details and change the nameWed Jun 28 2023 03:12:46 GMT+0000 (Greenwich Mean Time) (29364ms) √ EX-9890 - Part 2: Edit the project details and change the nameWed Jun 28 2023 03:12:46 GMT+0000 (Greenwich Mean Time) (29364ms) √ EX-9890 - Part 3: Add customer to the Project. Wed Jun 28 2023 03:12:46 GMT+0000 (Greenwich Mean Time) (31977ms) √ EX-9890 - Part 3: Add customer to the Project. Wed Jun 28 2023 03:12:46 GMT+0000 (Greenwich Mean Time) (31977ms) √ EX-9890 - Part 4: Verify the invitation email for customerWed Jun 28 2023 03:14:39 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 4: Verify the invitation email for customerWed Jun 28 2023 03:14:39 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 5: Add company user to the Project. Wed Jun 28 2023 03:14:44 GMT+0000 (Greenwich Mean Time) (41114ms) √ EX-9890 - Part 5: Add company user to the Project. Wed Jun 28 2023 03:14:44 GMT+0000 (Greenwich Mean Time) (41114ms) √ EX-9890 - Part 6: Verify company user can access project. Wed Jun 28 2023 03:14:44 GMT+0000 (Greenwich Mean Time) (23475ms) √ EX-9890 - Part 6: Verify company user can access project. Wed Jun 28 2023 03:14:44 GMT+0000 (Greenwich Mean Time) (23475ms) √ EX-9890 - Part 7: Add Contract with a user to the project. Wed Jun 28 2023 03:14:44 GMT+0000 (Greenwich Mean Time) (29601ms) √ EX-9890 - Part 7: Add Contract with a user to the project. Wed Jun 28 2023 03:14:44 GMT+0000 (Greenwich Mean Time) (29601ms) √ EX-9890 - Part 8: Verify email invitation for contractor user Wed Jun 28 2023 03:16:22 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 8: Verify email invitation for contractor user Wed Jun 28 2023 03:16:22 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 9: Add additiona user to existing contract of the project. Wed Jun 28 2023 03:16:26 GMT+0000 (Greenwich Mean Time) (32858ms) √ EX-9890 - Part 9: Add additiona user to existing contract of the project. Wed Jun 28 2023 03:16:26 GMT+0000 (Greenwich Mean Time) (32858ms) √ EX-9890 - Part 10: Verify email invitation for additional contract user Wed Jun 28 2023 03:17:02 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 10: Verify email invitation for additional contract user Wed Jun 28 2023 03:17:02 GMT+0000 (Greenwich Mean Time) √ Ex-9890 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesWed Jun 28 2023 03:17:05 GMT+0000 (Greenwich Mean Time) (31238ms) √ Ex-9890 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesWed Jun 28 2023 03:17:05 GMT+0000 (Greenwich Mean Time) (31238ms) √ EX-9890 - Part 12: Clean up Project Wed Jun 28 2023 03:17:05 GMT+0000 (Greenwich Mean Time) (29130ms) √ EX-9890 - Part 12: Clean up Project Wed Jun 28 2023 03:17:05 GMT+0000 (Greenwich Mean Time) (29130ms) 12 passing (5m) 12 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_042.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 19 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9890-SC-PM-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9891-SC-FU-project-previlleges.spe (44 of 104) c.ts User Role permissions| SC Field User | Login as SC Field User and create project and verify user privilegesWed Jun 28 2023 03:18:10 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Field User | Login as SC Field User and create project and verify user privilegesWed Jun 28 2023 03:18:10 GMT+0000 (Greenwich Mean Time) √ EX-9891 - Part 1: Create a project Wed Jun 28 2023 03:18:10 GMT+0000 (Greenwich Mean Time) (44818ms) √ EX-9891 - Part 1: Create a project Wed Jun 28 2023 03:18:10 GMT+0000 (Greenwich Mean Time) (44818ms) √ EX-9891 - Part 2: Edit the project details and change the nameWed Jun 28 2023 03:18:10 GMT+0000 (Greenwich Mean Time) (28917ms) √ EX-9891 - Part 2: Edit the project details and change the nameWed Jun 28 2023 03:18:10 GMT+0000 (Greenwich Mean Time) (28917ms) √ EX-9891 - Part 3: Add customer to the Project. Wed Jun 28 2023 03:18:10 GMT+0000 (Greenwich Mean Time) (32059ms) √ EX-9891 - Part 3: Add customer to the Project. Wed Jun 28 2023 03:18:10 GMT+0000 (Greenwich Mean Time) (32059ms) √ EX-9891 - Part 4: Verify the invitation email for customerWed Jun 28 2023 03:20:00 GMT+0000 (Greenwich Mean Time) √ EX-9891 - Part 4: Verify the invitation email for customerWed Jun 28 2023 03:20:00 GMT+0000 (Greenwich Mean Time) √ EX-9891 - Part 5: Add company user to the Project. Wed Jun 28 2023 03:20:04 GMT+0000 (Greenwich Mean Time) (40558ms) √ EX-9891 - Part 5: Add company user to the Project. Wed Jun 28 2023 03:20:04 GMT+0000 (Greenwich Mean Time) (40558ms) √ EX-9891 - Part 6: Verify company user can access project. Wed Jun 28 2023 03:20:04 GMT+0000 (Greenwich Mean Time) (23183ms) √ EX-9891 - Part 6: Verify company user can access project. Wed Jun 28 2023 03:20:04 GMT+0000 (Greenwich Mean Time) (23183ms) √ EX-9891 - Part 7: Add Contract should be in disabled state Wed Jun 28 2023 03:20:04 GMT+0000 (Greenwich Mean Time) (18505ms) √ EX-9891 - Part 7: Add Contract should be in disabled state Wed Jun 28 2023 03:20:04 GMT+0000 (Greenwich Mean Time) (18505ms) √ Ex-9891 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesWed Jun 28 2023 03:20:04 GMT+0000 (Greenwich Mean Time) (15706ms) √ Ex-9891 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesWed Jun 28 2023 03:20:04 GMT+0000 (Greenwich Mean Time) (15706ms) √ EX-9891 - Part 9: Clean up Project Wed Jun 28 2023 03:20:04 GMT+0000 (Greenwich Mean Time) (28602ms) √ EX-9891 - Part 9: Clean up Project Wed Jun 28 2023 03:20:04 GMT+0000 (Greenwich Mean Time) (28602ms) 9 passing (4m) 9 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_043.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 9 │ │ Passing: 9 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 1 second │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9891-SC-FU-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-3673-verify-contractor-is-able-to-upload-cor-with (45 of 104) -only-mandatory-data.spec.ts Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Wed Jun 28 2023 03:22:15 GMT+0000 (Greenwich Mean Time) Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Wed Jun 28 2023 03:22:15 GMT+0000 (Greenwich Mean Time) √ EX-7674 - Part 0: Clean existing COR's : Wed Jun 28 2023 03:22:15 GMT+0000 (Greenwich Mean Time) (54131ms) √ EX-7674 - Part 0: Clean existing COR's : Wed Jun 28 2023 03:22:15 GMT+0000 (Greenwich Mean Time) (54131ms) √ EX-3673 - Upload COR with only mandatory data.Wed Jun 28 2023 03:22:15 GMT+0000 (Greenwich Mean Time) (51025ms) √ EX-3673 - Upload COR with only mandatory data.Wed Jun 28 2023 03:22:15 GMT+0000 (Greenwich Mean Time) (51025ms) √ EX-3673 - Verify the COR data in the COR Log.Wed Jun 28 2023 03:22:15 GMT+0000 (Greenwich Mean Time) (52368ms) √ EX-3673 - Verify the COR data in the COR Log.Wed Jun 28 2023 03:22:15 GMT+0000 (Greenwich Mean Time) (52368ms) √ EX-3673 - Cleanup - Delete COR.Wed Jun 28 2023 03:22:15 GMT+0000 (Greenwich Mean Time) (51598ms) √ EX-3673 - Cleanup - Delete COR.Wed Jun 28 2023 03:22:15 GMT+0000 (Greenwich Mean Time) (51598ms) 4 passing (3m) 4 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_044.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 4 │ │ Passing: 4 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 29 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandat │ │ ory-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-3683-GC-creates-project-adds-contract-SC-creates- (46 of 104) cor.spec.ts COR Log | GC PM creats a project. Adds Contract with SC Company. SC PM is able to create a COR by using Create a Change Order RequestWed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) COR Log | GC PM creats a project. Adds Contract with SC Company. SC PM is able to create a COR by using Create a Change Order RequestWed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) √ EX-3683 - Part 1: Create a projcet and add customers : Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (47481ms) √ EX-3683 - Part 1: Create a projcet and add customers : Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (47481ms) √ EX-3683 - Part 2: Add My Company users to the project.Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (57566ms) √ EX-3683 - Part 2: Add My Company users to the project.Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (57566ms) √ EX-3683 - Part 3: Add Contract to the project.Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (30500ms) √ EX-3683 - Part 3: Add Contract to the project.Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (30500ms) √ EX-3683 - Part 4: PM Contractor accept the project Invites : Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (22934ms) √ EX-3683 - Part 4: PM Contractor accept the project Invites : Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (22934ms) √ EX-3683 - Part 5: Owner Contractor accept the project Invites : Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (32174ms) √ EX-3683 - Part 5: Owner Contractor accept the project Invites : Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (32174ms) √ EX-3683 - Part 6: Admin Contractor accept the project Invites : Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (20287ms) √ EX-3683 - Part 6: Admin Contractor accept the project Invites : Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (20287ms) √ EX-3683 - Part 7: Field User Contractor accept the project Invites : Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (20649ms) √ EX-3683 - Part 7: Field User Contractor accept the project Invites : Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (20649ms) √ EX-3683 - Part 8: Create COR : Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (46562ms) √ EX-3683 - Part 8: Create COR : Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (46562ms) √ EX-3683 - Part 9: Verify the COR is in the Sent Log : Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (43552ms) √ EX-3683 - Part 9: Verify the COR is in the Sent Log : Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (43552ms) √ EX-3683 - Part 10: Cleanup GC... Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (27465ms) √ EX-3683 - Part 10: Cleanup GC... Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (27465ms) √ EX-3683 - Part 11: Cleanup SC... Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (28295ms) √ EX-3683 - Part 11: Cleanup SC... Wed Jun 28 2023 03:25:48 GMT+0000 (Greenwich Mean Time) (28295ms) 11 passing (6m) 11 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_045.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 11 │ │ Passing: 11 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 18 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-3683-GC-creates-project-adds-contract-SC-creates-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-3686-verify-there-are-two-tabs-on-cor-log-page-se (47 of 104) nt-received.spec.ts COR Log | To verify that on COR Log page there are separate tabs for Sent and Received CORsWed Jun 28 2023 03:32:10 GMT+0000 (Greenwich Mean Time) COR Log | To verify that on COR Log page there are separate tabs for Sent and Received CORsWed Jun 28 2023 03:32:10 GMT+0000 (Greenwich Mean Time) √ EX-3686: Verify there are separate tabs for Sent and Received CORsWed Jun 28 2023 03:32:10 GMT+0000 (Greenwich Mean Time) (27166ms) √ EX-3686: Verify there are separate tabs for Sent and Received CORsWed Jun 28 2023 03:32:10 GMT+0000 (Greenwich Mean Time) (27166ms) 1 passing (28s) 1 passing (28s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_046.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 27 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-3686-verify-there-are-two-tabs-on-cor-log-page-sent-received. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-4366-SC-creates-project-adds-gc-customer-sc-creat (48 of 104) es-cor.spec.ts Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestWed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestWed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) √ EX-4366 - Create a projcet and add customers : Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (48850ms) √ EX-4366 - Create a projcet and add customers : Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (48850ms) √ EX-4366 - Add My Company users to the project.Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (63153ms) √ EX-4366 - Add My Company users to the project.Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (63153ms) √ EX-4366 - Add Customer to the project.Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (64546ms) √ EX-4366 - Add Customer to the project.Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (64546ms) √ EX-4366 - PM Customer accept the project Invites : Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (18465ms) √ EX-4366 - PM Customer accept the project Invites : Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (18465ms) 1) EX-4366 - Owner Customer accept the project Invites : Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) 1) EX-4366 - Owner Customer accept the project Invites : Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) √ EX-4366 - Admin Customer accept the project Invites : Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (46094ms) √ EX-4366 - Admin Customer accept the project Invites : Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (46094ms) √ EX-4366 - Field User Customer accept the project Invites : Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (21785ms) √ EX-4366 - Field User Customer accept the project Invites : Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (21785ms) √ EX-4366 - Create COR : Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (49888ms) √ EX-4366 - Create COR : Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (49888ms) √ EX-4366 - Verify COR is created : Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (46918ms) √ EX-4366 - Verify COR is created : Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (46918ms) √ EX-4366 - Cleanup GC... Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (26780ms) √ EX-4366 - Cleanup GC... Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (26780ms) √ EX-4366 - Cleanup SC... Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (30955ms) √ EX-4366 - Cleanup SC... Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) (30955ms) 10 passing (9m) 1 failing 1) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestWed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) EX-4366 - Owner Customer accept the project Invites : Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:256:5) 10 passing (9m) 1 failing 1) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestWed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time) EX-4366 - Owner Customer accept the project Invites : Wed Jun 28 2023 03:32:42 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:256:5) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_047.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 11 │ │ Passing: 10 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 3 │ │ Video: false │ │ Duration: 9 minutes, 9 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec. │ │ ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1280x720) Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Crea te COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestWed Jun 28 2023 033242 GMT +0000 (Greenwich Mean Time) -- EX-4366 - Owner Customer accept the project Invit es We.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1280x720) Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Crea te COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestWed Jun 28 2023 033242 GMT +0000 (Greenwich Mean Time) -- EX-4366 - Owner Customer accept the project Invit es (1).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1280x720) Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Crea te COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestWed Jun 28 2023 033242 GMT +0000 (Greenwich Mean Time) -- EX-4366 - Admin Customer accept the project Invit es We.png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft. (49 of 104) spec.ts Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestWed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestWed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) √ EX-4432 - Create project Test Project TC4432 1687923715537. Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) (48780ms) √ EX-4432 - Create project Test Project TC4432 1687923715537. Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) (48780ms) √ EX-4432 - Add Customer.Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) (32142ms) √ EX-4432 - Add Customer.Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) (32142ms) 1) EX-4432 - Customer Accept invite.Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) 1) EX-4432 - Customer Accept invite.Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) √ EX-4432 - Contractor creates COR Draft. : Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) (36891ms) √ EX-4432 - Contractor creates COR Draft. : Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) (36891ms) √ EX-4432 - Verify the COR Draft Log has the new COR draft. : Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) (43178ms) √ EX-4432 - Verify the COR Draft Log has the new COR draft. : Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) (43178ms) 2) EX-4432 - Cleanup GC... Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) 2) EX-4432 - Cleanup GC... Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) √ EX-4432 - Cleanup SC... Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) (32028ms) √ EX-4432 - Cleanup SC... Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) (32028ms) 5 passing (6m) 2 failing 1) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestWed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) EX-4432 - Customer Accept invite.Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:256:5) 2) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestWed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) EX-4432 - Cleanup GC... Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC4432 1687923715537' but never did. at projectsPage.archivePoject (webpack:///./cypress/support/PageObjects/Projects_.ts:76:7) at Context.eval (webpack:///./cypress/support/commands.ts:845:11) 5 passing (6m) 2 failing 1) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestWed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) EX-4432 - Customer Accept invite.Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:256:5) 2) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestWed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time) EX-4432 - Cleanup GC... Wed Jun 28 2023 03:41:55 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC4432 1687923715537' but never did. at projectsPage.archivePoject (webpack:///./cypress/support/PageObjects/Projects_.ts:76:7) at Context.eval (webpack:///./cypress/support/commands.ts:845:11) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_048.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 5 │ │ Failing: 2 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 4 │ │ Video: false │ │ Duration: 6 minutes, 11 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1280x720) Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts\Create COR To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestWed Jun 28 2023 034155 GMT+0000 (Greenwich Mean Time) -- EX-4432 - Customer Accept invite.Wed Jun 28 2023 034155 GMT+0000 (Greenwich Mean Time) (. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1280x720) Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts\Create COR To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestWed Jun 28 2023 034155 GMT+0000 (Greenwich Mean Time) -- EX-4432 - Customer Accept invite.Wed Jun 28 2023 034155 GMT+0000 (Greenwich Mean Tim (1). png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1280x720) Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts\Create COR To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestWed Jun 28 2023 034155 GMT+0000 (Greenwich Mean Time) -- EX-4432 - Cleanup GC... Wed Jun 28 2023 034155 GMT+0000 (Greenwich Mean Time) (failed).pn g - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1280x720) Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts\Create COR To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestWed Jun 28 2023 034155 GMT+0000 (Greenwich Mean Time) -- EX-4432 - Cleanup GC... Wed Jun 28 2023 034155 GMT+0000 (Greenwich Mean Time) (failed) (. png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5244-verify-shareable-link-contains-just-the-sele (50 of 104) cted-project.spec.ts COR | Verify sharable link contains CORs from just the selected project.Wed Jun 28 2023 03:48:10 GMT+0000 (Greenwich Mean Time) COR | Verify sharable link contains CORs from just the selected project.Wed Jun 28 2023 03:48:10 GMT+0000 (Greenwich Mean Time) √ EX-5244 Wed Jun 28 2023 03:48:10 GMT+0000 (Greenwich Mean Time) (59877ms) √ EX-5244 Wed Jun 28 2023 03:48:10 GMT+0000 (Greenwich Mean Time) (59877ms) 1 passing (1m) 1 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_049.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 0 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5244-verify-shareable-link-contains-just-the-selected-project │ │ .spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5333-SC-creates-cor-with-full-data.spec.ts (51 of 104) Wed Jun 28 2023 03:49:13 GMT+0000 (Greenwich Mean Time) Wed Jun 28 2023 03:49:13 GMT+0000 (Greenwich Mean Time) - EX-5333 - Part 1: Create COR with full set of data: Wed Jun 28 2023 03:49:13 GMT+0000 (Greenwich Mean Time) - EX-5333 - Part 1: Create COR with full set of data: Wed Jun 28 2023 03:49:13 GMT+0000 (Greenwich Mean Time) 0 passing (59ms) 1 pending 0 passing (59ms) 1 pending [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_050.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 0 │ │ Failing: 0 │ │ Pending: 1 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 0 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5333-SC-creates-cor-with-full-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5396-verify-contractor-is-able-to-upload-cor-with (52 of 104) -mandatory-and-optional-data.spec.ts Upload COR | To verify that the contractor is able to Upload a Change Order Request with full set of data. Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) Upload COR | To verify that the contractor is able to Upload a Change Order Request with full set of data. Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) √ EX-5396 - Create new project. Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (47999ms) √ EX-5396 - Create new project. Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (47999ms) √ EX-5396 - Add My Company users to the project.Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (63527ms) √ EX-5396 - Add My Company users to the project.Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (63527ms) √ EX-5396 - Add Contract to the project.Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (32164ms) √ EX-5396 - Add Contract to the project.Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (32164ms) √ EX-5396 - PM Customer accept the project Invites : Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (26407ms) √ EX-5396 - PM Customer accept the project Invites : Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (26407ms) √ EX-5396 - Owner Customer accept the project Invites : Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (30974ms) √ EX-5396 - Owner Customer accept the project Invites : Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (30974ms) √ EX-5396 - Admin Customer accept the project Invites : Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (20850ms) √ EX-5396 - Admin Customer accept the project Invites : Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (20850ms) √ EX-5396 - Field User Customer accept the project Invites : Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (20868ms) √ EX-5396 - Field User Customer accept the project Invites : Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (20868ms) √ EX-5396 - Upload COR with full data set, mandatory and optional data.Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (64778ms) √ EX-5396 - Upload COR with full data set, mandatory and optional data.Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (64778ms) √ EX-5396 - Verify the COR data in the COR Log.Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (62042ms) √ EX-5396 - Verify the COR data in the COR Log.Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (62042ms) √ EX-5396 - Cleanup GC... Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (25973ms) √ EX-5396 - Cleanup GC... Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (25973ms) √ EX-5396 - Cleanup SC... Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (29884ms) √ EX-5396 - Cleanup SC... Wed Jun 28 2023 03:49:17 GMT+0000 (Greenwich Mean Time) (29884ms) 11 passing (7m) 11 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_051.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 11 │ │ Passing: 11 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 6 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5396-verify-contractor-is-able-to-upload-cor-with-mandatory-a │ │ nd-optional-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5435-create-new-project-add-contrac-verify-origin (53 of 104) al-contract-value.spec.ts Create New Project with full set of data, as GC PM add contractor and verify the Original Contract Value.Wed Jun 28 2023 03:56:27 GMT+0000 (Greenwich Mean Time) Create New Project with full set of data, as GC PM add contractor and verify the Original Contract Value.Wed Jun 28 2023 03:56:27 GMT+0000 (Greenwich Mean Time) √ EX-5435 - Create a project.Wed Jun 28 2023 03:56:27 GMT+0000 (Greenwich Mean Time) (50801ms) √ EX-5435 - Create a project.Wed Jun 28 2023 03:56:27 GMT+0000 (Greenwich Mean Time) (50801ms) √ EX-5435 - Add contract.Wed Jun 28 2023 03:56:27 GMT+0000 (Greenwich Mean Time) (34245ms) √ EX-5435 - Add contract.Wed Jun 28 2023 03:56:27 GMT+0000 (Greenwich Mean Time) (34245ms) √ EX-5435 - Sub Contractor accepts the project/contract invite.Wed Jun 28 2023 03:56:27 GMT+0000 (Greenwich Mean Time) (21321ms) √ EX-5435 - Sub Contractor accepts the project/contract invite.Wed Jun 28 2023 03:56:27 GMT+0000 (Greenwich Mean Time) (21321ms) √ EX-5435 - Verify Original Contract Value.Wed Jun 28 2023 03:56:27 GMT+0000 (Greenwich Mean Time) (22710ms) √ EX-5435 - Verify Original Contract Value.Wed Jun 28 2023 03:56:27 GMT+0000 (Greenwich Mean Time) (22710ms) √ EX-5435 - Cleanup GC... Wed Jun 28 2023 03:56:27 GMT+0000 (Greenwich Mean Time) (32317ms) √ EX-5435 - Cleanup GC... Wed Jun 28 2023 03:56:27 GMT+0000 (Greenwich Mean Time) (32317ms) √ EX-5435 - Cleanup SC... Wed Jun 28 2023 03:56:27 GMT+0000 (Greenwich Mean Time) (30204ms) √ EX-5435 - Cleanup SC... Wed Jun 28 2023 03:56:27 GMT+0000 (Greenwich Mean Time) (30204ms) 6 passing (3m) 6 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_052.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 11 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5435-create-new-project-add-contrac-verify-original-contract- │ │ value.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-5827-to-verify-multiple-cors-to-same-tag-when-cre (54 of 104) ating-cor.spec.ts COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORWed Jun 28 2023 03:59:42 GMT+0000 (Greenwich Mean Time) COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORWed Jun 28 2023 03:59:42 GMT+0000 (Greenwich Mean Time) √ EX-5827 - Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORWed Jun 28 2023 03:59:42 GMT+0000 (Greenwich Mean Time) (23473ms) √ EX-5827 - Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORWed Jun 28 2023 03:59:42 GMT+0000 (Greenwich Mean Time) (23473ms) 1 passing (24s) 1 passing (24s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_053.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 23 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-5827-to-verify-multiple-cors-to-same-tag-when-creating-cor.sp │ │ ec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-5894-to-verify-multiple-cors-to-same-tag-when-upl (55 of 104) oading-cor.spec.ts COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORWed Jun 28 2023 04:00:09 GMT+0000 (Greenwich Mean Time) COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORWed Jun 28 2023 04:00:09 GMT+0000 (Greenwich Mean Time) √ EX-5894 - Verify Multiple CORs should not be associated with the same T&M Tag when uploading a New CORWed Jun 28 2023 04:00:09 GMT+0000 (Greenwich Mean Time) (38387ms) √ EX-5894 - Verify Multiple CORs should not be associated with the same T&M Tag when uploading a New CORWed Jun 28 2023 04:00:09 GMT+0000 (Greenwich Mean Time) (38387ms) 1 passing (39s) 1 passing (39s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_054.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 38 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-5894-to-verify-multiple-cors-to-same-tag-when-uploading-cor.s │ │ pec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-6681-verify-sent-summary-data-after-filtering-by- (56 of 104) project.spec.ts As Sub Contractor go to COR Log / Sent and verify the Summary data when fitered for one and multiple projects.Wed Jun 28 2023 04:00:51 GMT+0000 (Greenwich Mean Time) As Sub Contractor go to COR Log / Sent and verify the Summary data when fitered for one and multiple projects.Wed Jun 28 2023 04:00:51 GMT+0000 (Greenwich Mean Time) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by single Project.Wed Jun 28 2023 04:00:51 GMT+0000 (Greenwich Mean Time) (52890ms) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by single Project.Wed Jun 28 2023 04:00:51 GMT+0000 (Greenwich Mean Time) (52890ms) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by multiple Projects.Wed Jun 28 2023 04:00:51 GMT+0000 (Greenwich Mean Time) (66566ms) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by multiple Projects.Wed Jun 28 2023 04:00:51 GMT+0000 (Greenwich Mean Time) (66566ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_055.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 0 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-6681-verify-sent-summary-data-after-filtering-by-project.spec │ │ .ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5425-verify-received-summary-data-after-filte (57 of 104) ring-by-project.spec.ts T&M | Verify the RECEIVED Labor Hours Summary and T&M Log Summary shows correct values before and after filtering.Wed Jun 28 2023 04:02:55 GMT+0000 (Greenwich Mean Time) T&M | Verify the RECEIVED Labor Hours Summary and T&M Log Summary shows correct values before and after filtering.Wed Jun 28 2023 04:02:55 GMT+0000 (Greenwich Mean Time) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by single project.Wed Jun 28 2023 04:02:55 GMT+0000 (Greenwich Mean Time) (58821ms) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by single project.Wed Jun 28 2023 04:02:55 GMT+0000 (Greenwich Mean Time) (58821ms) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by multiple projects.Wed Jun 28 2023 04:02:55 GMT+0000 (Greenwich Mean Time) (48308ms) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by multiple projects.Wed Jun 28 2023 04:02:55 GMT+0000 (Greenwich Mean Time) (48308ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_056.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 49 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5425-verify-received-summary-data-after-filtering-by-proj │ │ ect.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5429-verify-received-export-csv-after-filteri (58 of 104) ng-by-project.spec.ts T&M | Verify the T&M Log / RECEIVED CSV exports.Wed Jun 28 2023 04:04:47 GMT+0000 (Greenwich Mean Time) T&M | Verify the T&M Log / RECEIVED CSV exports.Wed Jun 28 2023 04:04:47 GMT+0000 (Greenwich Mean Time) √ EX-5429 - Verify the T&M Log / RECEIVED CSV export.Wed Jun 28 2023 04:04:47 GMT+0000 (Greenwich Mean Time) (51305ms) √ EX-5429 - Verify the T&M Log / RECEIVED CSV export.Wed Jun 28 2023 04:04:47 GMT+0000 (Greenwich Mean Time) (51305ms) 1 passing (52s) 1 passing (52s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_057.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 51 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5429-verify-received-export-csv-after-filtering-by-projec │ │ t.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5431-verify-received-export-sharelog-after-fi (59 of 104) ltering-by-project.spec.ts T&M | Verify the T&M Log / RECEIVED ShareLog exports.Wed Jun 28 2023 04:05:42 GMT+0000 (Greenwich Mean Time) T&M | Verify the T&M Log / RECEIVED ShareLog exports.Wed Jun 28 2023 04:05:42 GMT+0000 (Greenwich Mean Time) √ EX-5431 - Verify the T&M Log / RECEIVED ShareLog export.Wed Jun 28 2023 04:05:42 GMT+0000 (Greenwich Mean Time) (56988ms) √ EX-5431 - Verify the T&M Log / RECEIVED ShareLog export.Wed Jun 28 2023 04:05:42 GMT+0000 (Greenwich Mean Time) (56988ms) 1 passing (57s) 1 passing (57s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_058.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 57 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5431-verify-received-export-sharelog-after-filtering-by-p │ │ roject.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5641-verify-tnm-log-received-summary-data-aft (60 of 104) er-filtering-by-tag-status.spec.ts T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Wed Jun 28 2023 04:06:43 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Wed Jun 28 2023 04:06:43 GMT+0000 (Greenwich Mean Time) √ EX-5641 - Filter by status Awaiting Signature and verify the Summary data for the test project.Wed Jun 28 2023 04:06:43 GMT+0000 (Greenwich Mean Time) (60608ms) √ EX-5641 - Filter by status Awaiting Signature and verify the Summary data for the test project.Wed Jun 28 2023 04:06:43 GMT+0000 (Greenwich Mean Time) (60608ms) √ EX-5641 - Filter by status Open and verify the Summary data for the test project.Wed Jun 28 2023 04:06:43 GMT+0000 (Greenwich Mean Time) (55378ms) √ EX-5641 - Filter by status Open and verify the Summary data for the test project.Wed Jun 28 2023 04:06:43 GMT+0000 (Greenwich Mean Time) (55378ms) √ EX-5641 - Filter by status Rejected and verify the Summary data for the test project.Wed Jun 28 2023 04:06:43 GMT+0000 (Greenwich Mean Time) (58393ms) √ EX-5641 - Filter by status Rejected and verify the Summary data for the test project.Wed Jun 28 2023 04:06:43 GMT+0000 (Greenwich Mean Time) (58393ms) √ EX-5641 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Wed Jun 28 2023 04:06:43 GMT+0000 (Greenwich Mean Time) (55538ms) √ EX-5641 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Wed Jun 28 2023 04:06:43 GMT+0000 (Greenwich Mean Time) (55538ms) √ EX-5641 - Filter by status Signed and verify the Summary data for the test project.Wed Jun 28 2023 04:06:43 GMT+0000 (Greenwich Mean Time) (55127ms) √ EX-5641 - Filter by status Signed and verify the Summary data for the test project.Wed Jun 28 2023 04:06:43 GMT+0000 (Greenwich Mean Time) (55127ms) 5 passing (5m) 5 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_059.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 49 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5641-verify-tnm-log-received-summary-data-after-filtering │ │ -by-tag-status.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-1-gc-creates-project-and-contract-sc-creates (61 of 104) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 04:11:36 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 04:11:36 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 1: GC PM creates a projectWed Jun 28 2023 04:11:36 GMT+0000 (Greenwich Mean Time) (46028ms) √ EX-4415 - Part 1: GC PM creates a projectWed Jun 28 2023 04:11:36 GMT+0000 (Greenwich Mean Time) (46028ms) √ EX-4415 - Part 2: GC PM adds a contract with SC PM.Wed Jun 28 2023 04:11:36 GMT+0000 (Greenwich Mean Time) (34719ms) √ EX-4415 - Part 2: GC PM adds a contract with SC PM.Wed Jun 28 2023 04:11:36 GMT+0000 (Greenwich Mean Time) (34719ms) √ EX-4415 - Part 3.1: Sub Contractor accepts invite from the bell notification.Wed Jun 28 2023 04:11:36 GMT+0000 (Greenwich Mean Time) (30886ms) √ EX-4415 - Part 3.1: Sub Contractor accepts invite from the bell notification.Wed Jun 28 2023 04:11:36 GMT+0000 (Greenwich Mean Time) (30886ms) √ EX-4415 - Part 3.2: Sub Contractor adds users to the project.Wed Jun 28 2023 04:11:36 GMT+0000 (Greenwich Mean Time) (71045ms) √ EX-4415 - Part 3.2: Sub Contractor adds users to the project.Wed Jun 28 2023 04:11:36 GMT+0000 (Greenwich Mean Time) (71045ms) √ EX-4415 - Part 4: Sub Contractor creates a Tag and sends signature request.Wed Jun 28 2023 04:11:36 GMT+0000 (Greenwich Mean Time) (67904ms) √ EX-4415 - Part 4: Sub Contractor creates a Tag and sends signature request.Wed Jun 28 2023 04:11:36 GMT+0000 (Greenwich Mean Time) (67904ms) 5 passing (4m) 5 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_060.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 11 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-1-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-2-gc-creates-project-and-contract-sc-creates (62 of 104) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 04:15:51 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 04:15:51 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 5: Sub Contractor ADD Labor valuesWed Jun 28 2023 04:15:51 GMT+0000 (Greenwich Mean Time) (171058ms) √ EX-4415 - Part 5: Sub Contractor ADD Labor valuesWed Jun 28 2023 04:15:51 GMT+0000 (Greenwich Mean Time) (171058ms) √ EX-4415 - Part 6: Sub Contractor Add Material valuesWed Jun 28 2023 04:15:51 GMT+0000 (Greenwich Mean Time) (126318ms) √ EX-4415 - Part 6: Sub Contractor Add Material valuesWed Jun 28 2023 04:15:51 GMT+0000 (Greenwich Mean Time) (126318ms) 2 passing (5m) 2 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_061.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 58 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-2-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-3-gc-creates-project-and-contract-sc-creates (63 of 104) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 04:20:53 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 04:20:53 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 7: Sub Contractor Adds Equipment. Wed Jun 28 2023 04:20:53 GMT+0000 (Greenwich Mean Time) (171132ms) √ EX-4415 - Part 7: Sub Contractor Adds Equipment. Wed Jun 28 2023 04:20:53 GMT+0000 (Greenwich Mean Time) (171132ms) 1 passing (3m) 1 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_062.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 51 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-3-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-4-gc-creates-project-and-contract-sc-creates (64 of 104) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 04:23:50 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 04:23:50 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 8: Sub Contractor Adds Other. Wed Jun 28 2023 04:23:50 GMT+0000 (Greenwich Mean Time) (166078ms) √ EX-4415 - Part 8: Sub Contractor Adds Other. Wed Jun 28 2023 04:23:50 GMT+0000 (Greenwich Mean Time) (166078ms) 1 passing (3m) 1 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_063.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 46 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-4-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-5-gc-creates-project-and-contract-sc-creates (65 of 104) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 04:26:42 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 04:26:42 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 9 : Sub Contractor uploads files.Wed Jun 28 2023 04:26:42 GMT+0000 (Greenwich Mean Time) (90061ms) √ EX-4415 - Part 9 : Sub Contractor uploads files.Wed Jun 28 2023 04:26:42 GMT+0000 (Greenwich Mean Time) (90061ms) √ EX-4415 - Part 10 : Sub Contractor signs the Tag.Wed Jun 28 2023 04:26:42 GMT+0000 (Greenwich Mean Time) (60511ms) √ EX-4415 - Part 10 : Sub Contractor signs the Tag.Wed Jun 28 2023 04:26:42 GMT+0000 (Greenwich Mean Time) (60511ms) 2 passing (3m) 2 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_064.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 31 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates (66 of 104) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 04:29:16 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 04:29:16 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 11 : Sub Contractor sends signature request.Wed Jun 28 2023 04:29:16 GMT+0000 (Greenwich Mean Time) (73633ms) √ EX-4415 - Part 11 : Sub Contractor sends signature request.Wed Jun 28 2023 04:29:16 GMT+0000 (Greenwich Mean Time) (73633ms) √ EX-4415 - Part 12: Verify the tag was created.Wed Jun 28 2023 04:29:16 GMT+0000 (Greenwich Mean Time) (26627ms) √ EX-4415 - Part 12: Verify the tag was created.Wed Jun 28 2023 04:29:16 GMT+0000 (Greenwich Mean Time) (26627ms) √ EX-4415 - Part 13: Verify the GC sees the tag.Wed Jun 28 2023 04:29:16 GMT+0000 (Greenwich Mean Time) (34096ms) √ EX-4415 - Part 13: Verify the GC sees the tag.Wed Jun 28 2023 04:29:16 GMT+0000 (Greenwich Mean Time) (34096ms) √ EX-4415 - Part 14: Verify GC PM User recived emailsWed Jun 28 2023 04:31:37 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 14: Verify GC PM User recived emailsWed Jun 28 2023 04:31:37 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Wed Jun 28 2023 04:31:42 GMT+0000 (Greenwich Mean Time) (29207ms) √ EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Wed Jun 28 2023 04:31:42 GMT+0000 (Greenwich Mean Time) (29207ms) √ EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Wed Jun 28 2023 04:31:42 GMT+0000 (Greenwich Mean Time) (28935ms) √ EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Wed Jun 28 2023 04:31:42 GMT+0000 (Greenwich Mean Time) (28935ms) √ EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Wed Jun 28 2023 04:31:42 GMT+0000 (Greenwich Mean Time) (22988ms) √ EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Wed Jun 28 2023 04:31:42 GMT+0000 (Greenwich Mean Time) (22988ms) √ EX-4415 - Part 18: Cleanup...Wed Jun 28 2023 04:31:42 GMT+0000 (Greenwich Mean Time) (36307ms) √ EX-4415 - Part 18: Cleanup...Wed Jun 28 2023 04:31:42 GMT+0000 (Greenwich Mean Time) (36307ms) 8 passing (4m) 8 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_065.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 22 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5424-verify-sent-summary-data-after-filtering-by- (67 of 104) project.spec.ts As Sub Contractor go to T&M Log / Sent and verify the Summary data for the test project.Wed Jun 28 2023 04:33:43 GMT+0000 (Greenwich Mean Time) As Sub Contractor go to T&M Log / Sent and verify the Summary data for the test project.Wed Jun 28 2023 04:33:43 GMT+0000 (Greenwich Mean Time) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log Overview Summary shows correct values when filtered by single Project.Wed Jun 28 2023 04:33:43 GMT+0000 (Greenwich Mean Time) (46035ms) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log Overview Summary shows correct values when filtered by single Project.Wed Jun 28 2023 04:33:43 GMT+0000 (Greenwich Mean Time) (46035ms) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log OVerview Summary shows correct values when filtered by multiple Projects.Wed Jun 28 2023 04:33:43 GMT+0000 (Greenwich Mean Time) (72212ms) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log OVerview Summary shows correct values when filtered by multiple Projects.Wed Jun 28 2023 04:33:43 GMT+0000 (Greenwich Mean Time) (72212ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_066.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 0 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5424-verify-sent-summary-data-after-filtering-by-project.spec │ │ .ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5430-verify-sent-export-csv-after-filtering-by-pr (68 of 104) oject.spec.ts T&M | Verify the T&M Log / Sent CSV export.Wed Jun 28 2023 04:35:47 GMT+0000 (Greenwich Mean Time) T&M | Verify the T&M Log / Sent CSV export.Wed Jun 28 2023 04:35:47 GMT+0000 (Greenwich Mean Time) √ EX-5430 - Verify the T&M Log / Sent CSV export.Wed Jun 28 2023 04:35:47 GMT+0000 (Greenwich Mean Time) (37920ms) √ EX-5430 - Verify the T&M Log / Sent CSV export.Wed Jun 28 2023 04:35:47 GMT+0000 (Greenwich Mean Time) (37920ms) 1 passing (38s) 1 passing (38s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_067.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 38 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5430-verify-sent-export-csv-after-filtering-by-project.spec.t │ │ s │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5505-verify-tnm-log-sent-summary-data-after-filte (69 of 104) ring-by-customer.spec.ts T&M | Verify filtering the T&M Log / SENT, by Customer, returns correct values for Labor Hours Summary.Wed Jun 28 2023 04:36:29 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Customer, returns correct values for Labor Hours Summary.Wed Jun 28 2023 04:36:29 GMT+0000 (Greenwich Mean Time) √ EX-5505 - Filter by Customer and verify the Summary Labour Hours and T&M Log Overview Summary data for the test project.Wed Jun 28 2023 04:36:29 GMT+0000 (Greenwich Mean Time) (80601ms) √ EX-5505 - Filter by Customer and verify the Summary Labour Hours and T&M Log Overview Summary data for the test project.Wed Jun 28 2023 04:36:29 GMT+0000 (Greenwich Mean Time) (80601ms) 1 passing (1m) 1 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_068.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 21 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5505-verify-tnm-log-sent-summary-data-after-filtering-by-cust │ │ omer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5506-verify-tnm-log-sent-summary-data-after-filte (70 of 104) ring-by-job-number.spec.ts T&M | Verify filtering the T&M Log / SENT, by Job Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Wed Jun 28 2023 04:37:54 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Job Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Wed Jun 28 2023 04:37:54 GMT+0000 (Greenwich Mean Time) √ EX-5506 - Filter by JobNumber and verify the Summary data for the test project.Wed Jun 28 2023 04:37:54 GMT+0000 (Greenwich Mean Time) (81028ms) √ EX-5506 - Filter by JobNumber and verify the Summary data for the test project.Wed Jun 28 2023 04:37:54 GMT+0000 (Greenwich Mean Time) (81028ms) 1 passing (1m) 1 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_069.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 21 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5506-verify-tnm-log-sent-summary-data-after-filtering-by-job- │ │ number.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5507-verify-tnm-log-sent-summary-data-after-filte (71 of 104) ring-by-cust-ref-num.spec.ts T&M | Verify filtering the T&M Log / SENT, by Custmer Reference Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Wed Jun 28 2023 04:39:20 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Custmer Reference Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Wed Jun 28 2023 04:39:20 GMT+0000 (Greenwich Mean Time) √ EX-5507 - Filter by CustRefNum and verify the Summary data for the test project.Wed Jun 28 2023 04:39:20 GMT+0000 (Greenwich Mean Time) (76815ms) √ EX-5507 - Filter by CustRefNum and verify the Summary data for the test project.Wed Jun 28 2023 04:39:20 GMT+0000 (Greenwich Mean Time) (76815ms) 1 passing (1m) 1 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_070.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 17 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5507-verify-tnm-log-sent-summary-data-after-filtering-by-cust │ │ -ref-num.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5508-verify-tnm-log-sent-summary-data-after-filte (72 of 104) ring-by-tag-status.spec.ts T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Wed Jun 28 2023 04:40:42 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Wed Jun 28 2023 04:40:42 GMT+0000 (Greenwich Mean Time) √ EX-5508 - Filter by status Awaiting Signature and verify the Summary data for the test project.Wed Jun 28 2023 04:40:42 GMT+0000 (Greenwich Mean Time) (80989ms) √ EX-5508 - Filter by status Awaiting Signature and verify the Summary data for the test project.Wed Jun 28 2023 04:40:42 GMT+0000 (Greenwich Mean Time) (80989ms) √ EX-5508 - Filter by status Draft and verify the Summary data for the test project.Wed Jun 28 2023 04:40:42 GMT+0000 (Greenwich Mean Time) (70588ms) √ EX-5508 - Filter by status Draft and verify the Summary data for the test project.Wed Jun 28 2023 04:40:42 GMT+0000 (Greenwich Mean Time) (70588ms) √ EX-5508 - Filter by status Open and verify the Summary data for the test project.Wed Jun 28 2023 04:40:42 GMT+0000 (Greenwich Mean Time) (73768ms) √ EX-5508 - Filter by status Open and verify the Summary data for the test project.Wed Jun 28 2023 04:40:42 GMT+0000 (Greenwich Mean Time) (73768ms) √ EX-5508 - Filter by status Rejected and verify the Summary data for the test project.Wed Jun 28 2023 04:40:42 GMT+0000 (Greenwich Mean Time) (76961ms) √ EX-5508 - Filter by status Rejected and verify the Summary data for the test project.Wed Jun 28 2023 04:40:42 GMT+0000 (Greenwich Mean Time) (76961ms) √ EX-5508 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Wed Jun 28 2023 04:40:42 GMT+0000 (Greenwich Mean Time) (71280ms) √ EX-5508 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Wed Jun 28 2023 04:40:42 GMT+0000 (Greenwich Mean Time) (71280ms) √ EX-5508 - Filter by status Signed and verify the Summary data for the test project.Wed Jun 28 2023 04:40:42 GMT+0000 (Greenwich Mean Time) (68537ms) √ EX-5508 - Filter by status Signed and verify the Summary data for the test project.Wed Jun 28 2023 04:40:42 GMT+0000 (Greenwich Mean Time) (68537ms) √ EX-5508 - Filter by status Signed Not Sent and verify the Summary data for the test project.Wed Jun 28 2023 04:40:42 GMT+0000 (Greenwich Mean Time) (71177ms) √ EX-5508 - Filter by status Signed Not Sent and verify the Summary data for the test project.Wed Jun 28 2023 04:40:42 GMT+0000 (Greenwich Mean Time) (71177ms) 7 passing (9m) 7 passing (9m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_071.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 8 minutes, 39 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5508-verify-tnm-log-sent-summary-data-after-filtering-by-tag- │ │ status.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5509-verify-tnm-log-sent-summary-data-after-filte (73 of 104) ring-by-cust-label.spec.ts T&M | Verify filtering the T&M Log/SENT, by Label, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Wed Jun 28 2023 04:49:25 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log/SENT, by Label, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Wed Jun 28 2023 04:49:25 GMT+0000 (Greenwich Mean Time) √ EX-5509 - Filter by Label and verify the Summary data for the test project.Wed Jun 28 2023 04:49:25 GMT+0000 (Greenwich Mean Time) (77939ms) √ EX-5509 - Filter by Label and verify the Summary data for the test project.Wed Jun 28 2023 04:49:25 GMT+0000 (Greenwich Mean Time) (77939ms) 1 passing (1m) 1 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_072.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 18 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5509-verify-tnm-log-sent-summary-data-after-filtering-by-cust │ │ -label.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5510-verify-tnm-log-sent-summary-data-after-filte (74 of 104) ring-by-cor-availability.spec.ts T&M | Verify filtering the T&M Log/SENT, by COR availability, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Wed Jun 28 2023 04:50:47 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log/SENT, by COR availability, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Wed Jun 28 2023 04:50:47 GMT+0000 (Greenwich Mean Time) √ EX-5510 - Filter by 'Display Pending CORs only' and verify the Summary data for the test project.Wed Jun 28 2023 04:50:47 GMT+0000 (Greenwich Mean Time) (73539ms) √ EX-5510 - Filter by 'Display Pending CORs only' and verify the Summary data for the test project.Wed Jun 28 2023 04:50:47 GMT+0000 (Greenwich Mean Time) (73539ms) √ EX-5510 - Filter by 'Display Tags with CORs only' and verify the Summary data for the test project.Wed Jun 28 2023 04:50:47 GMT+0000 (Greenwich Mean Time) (64139ms) √ EX-5510 - Filter by 'Display Tags with CORs only' and verify the Summary data for the test project.Wed Jun 28 2023 04:50:47 GMT+0000 (Greenwich Mean Time) (64139ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_073.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 19 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5510-verify-tnm-log-sent-summary-data-after-filtering-by-cor- │ │ availability.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6191-sc-creates-tag-required-signer-gc-signs-tag. (75 of 104) spec.ts T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Wed Jun 28 2023 04:53:11 GMT+0000 (Greenwich Mean Time) T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Wed Jun 28 2023 04:53:11 GMT+0000 (Greenwich Mean Time) √ EX-6191 - Part 0: Clean the tags (41250ms) √ EX-6191 - Part 0: Clean the tags (41250ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_074.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: false │ │ Duration: 1 minute, 34 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6191-sc-creates-tag-required-signer-gc-signs-tag.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1280x720) Log\Sent\ex-6191-sc-creates-tag-required-signer-gc-signs-tag.spec.ts\T&M Workfl ow Existing project and contract, SC Admin send a tag. GC Admin signs the tag a s single Required Signer. Save As Draft On Each Step.Wed Jun 28 2023 045311 GMT+ 0000 (Greenwich Mean Time) -- EX-6191 - Part 0 Clean the tags (failed).png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6193-sc-fu-creates-tag-required-signer-gc-fu-sign (76 of 104) s-tag.spec.ts T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Wed Jun 28 2023 04:54:50 GMT+0000 (Greenwich Mean Time) T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Wed Jun 28 2023 04:54:50 GMT+0000 (Greenwich Mean Time) √ EX-6193 - Part 1: Sub Contractor FU creates a Tag and sends signature request.Wed Jun 28 2023 04:54:50 GMT+0000 (Greenwich Mean Time) (167336ms) √ EX-6193 - Part 1: Sub Contractor FU creates a Tag and sends signature request.Wed Jun 28 2023 04:54:50 GMT+0000 (Greenwich Mean Time) (167336ms) √ EX-6193 - Part 2: Verify the tag was created.Wed Jun 28 2023 04:54:50 GMT+0000 (Greenwich Mean Time) (25352ms) √ EX-6193 - Part 2: Verify the tag was created.Wed Jun 28 2023 04:54:50 GMT+0000 (Greenwich Mean Time) (25352ms) √ EX-6193 - Part 3: Verify the GC FU sees the tag.Wed Jun 28 2023 04:54:50 GMT+0000 (Greenwich Mean Time) (31535ms) √ EX-6193 - Part 3: Verify the GC FU sees the tag.Wed Jun 28 2023 04:54:50 GMT+0000 (Greenwich Mean Time) (31535ms) √ EX-6193 - Part 4: Verify GC FU recived emailsWed Jun 28 2023 04:58:39 GMT+0000 (Greenwich Mean Time) √ EX-6193 - Part 4: Verify GC FU recived emailsWed Jun 28 2023 04:58:39 GMT+0000 (Greenwich Mean Time) √ EX-6193 - Part 5: Verify the GC FU received Bell Notification and use it to sign the tag.Wed Jun 28 2023 04:58:44 GMT+0000 (Greenwich Mean Time) (29145ms) √ EX-6193 - Part 5: Verify the GC FU received Bell Notification and use it to sign the tag.Wed Jun 28 2023 04:58:44 GMT+0000 (Greenwich Mean Time) (29145ms) √ EX-6193 - Part 6: Verify the tag status in the GC FU T&M Log.Wed Jun 28 2023 04:58:44 GMT+0000 (Greenwich Mean Time) (27810ms) √ EX-6193 - Part 6: Verify the tag status in the GC FU T&M Log.Wed Jun 28 2023 04:58:44 GMT+0000 (Greenwich Mean Time) (27810ms) √ EX-6193 - Part 7: Verify the tag status in the SC FU T&MM Log.Wed Jun 28 2023 04:58:44 GMT+0000 (Greenwich Mean Time) (22429ms) √ EX-6193 - Part 7: Verify the tag status in the SC FU T&MM Log.Wed Jun 28 2023 04:58:44 GMT+0000 (Greenwich Mean Time) (22429ms) √ EX-6193 - Part 8: Cleanup SC Tag ... Wed Jun 28 2023 04:58:44 GMT+0000 (Greenwich Mean Time) (29057ms) √ EX-6193 - Part 8: Cleanup SC Tag ... Wed Jun 28 2023 04:58:44 GMT+0000 (Greenwich Mean Time) (29057ms) 8 passing (6m) 8 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_075.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 42 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6193-sc-fu-creates-tag-required-signer-gc-fu-signs-tag.spec.t │ │ s │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-1-sc-pm-creates-project-and-contract-gc-pm-c (77 of 104) reates-tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 05:00:37 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 05:00:37 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 0: Clean existing tags. Wed Jun 28 2023 05:00:37 GMT+0000 (Greenwich Mean Time) (38737ms) √ EX-6324 - Part 0: Clean existing tags. Wed Jun 28 2023 05:00:37 GMT+0000 (Greenwich Mean Time) (38737ms) √ EX-6324 - Part 1: Sub Contractor creates a Tag and saves it as draft.Wed Jun 28 2023 05:00:37 GMT+0000 (Greenwich Mean Time) (72130ms) √ EX-6324 - Part 1: Sub Contractor creates a Tag and saves it as draft.Wed Jun 28 2023 05:00:37 GMT+0000 (Greenwich Mean Time) (72130ms) √ EX-6324 - Part 2: Sub Contractor ADD Labor values to the draft.Wed Jun 28 2023 05:00:37 GMT+0000 (Greenwich Mean Time) (166859ms) √ EX-6324 - Part 2: Sub Contractor ADD Labor values to the draft.Wed Jun 28 2023 05:00:37 GMT+0000 (Greenwich Mean Time) (166859ms) √ EX-6324 - Part 3: Sub Contractor Add Material values to the draft.Wed Jun 28 2023 05:00:37 GMT+0000 (Greenwich Mean Time) (151091ms) √ EX-6324 - Part 3: Sub Contractor Add Material values to the draft.Wed Jun 28 2023 05:00:37 GMT+0000 (Greenwich Mean Time) (151091ms) √ EX-6324 - Part 4: Sub Contractor Adds Equipment to the draft. Wed Jun 28 2023 05:00:37 GMT+0000 (Greenwich Mean Time) (162594ms) √ EX-6324 - Part 4: Sub Contractor Adds Equipment to the draft. Wed Jun 28 2023 05:00:37 GMT+0000 (Greenwich Mean Time) (162594ms) 5 passing (10m) 5 passing (10m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_076.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 9 minutes, 53 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-1-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-2-sc-pm-creates-project-and-contract-gc-pm-c (78 of 104) reates-tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 05:10:35 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 05:10:35 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 5: Sub Contractor Adds Other to the draft. Wed Jun 28 2023 05:10:35 GMT+0000 (Greenwich Mean Time) (165019ms) √ EX-6324 - Part 5: Sub Contractor Adds Other to the draft. Wed Jun 28 2023 05:10:35 GMT+0000 (Greenwich Mean Time) (165019ms) √ EX-6324 - Part 6 : Sub Contractor upload files to the draft.Wed Jun 28 2023 05:10:35 GMT+0000 (Greenwich Mean Time) (88406ms) √ EX-6324 - Part 6 : Sub Contractor upload files to the draft.Wed Jun 28 2023 05:10:35 GMT+0000 (Greenwich Mean Time) (88406ms) √ EX-6324 - Part 7 : Sub Contractor removes one file from the draft.Wed Jun 28 2023 05:10:35 GMT+0000 (Greenwich Mean Time) (79750ms) √ EX-6324 - Part 7 : Sub Contractor removes one file from the draft.Wed Jun 28 2023 05:10:35 GMT+0000 (Greenwich Mean Time) (79750ms) √ EX-6324 - Part 8 : Sub Contractor signs the tag.Wed Jun 28 2023 05:10:35 GMT+0000 (Greenwich Mean Time) (83385ms) √ EX-6324 - Part 8 : Sub Contractor signs the tag.Wed Jun 28 2023 05:10:35 GMT+0000 (Greenwich Mean Time) (83385ms) 4 passing (7m) 4 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_077.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 4 │ │ Passing: 4 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 58 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-2-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-c (79 of 104) reates-tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 05:17:37 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 05:17:37 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 9 : Sub Contractor removes his signature and re-adds it.Wed Jun 28 2023 05:17:38 GMT+0000 (Greenwich Mean Time) (87714ms) √ EX-6324 - Part 9 : Sub Contractor removes his signature and re-adds it.Wed Jun 28 2023 05:17:38 GMT+0000 (Greenwich Mean Time) (87714ms) √ EX-6324 - Part 10 : Sub Contractor removes a user from the TO list and adds another signerWed Jun 28 2023 05:17:38 GMT+0000 (Greenwich Mean Time) (94044ms) √ EX-6324 - Part 10 : Sub Contractor removes a user from the TO list and adds another signerWed Jun 28 2023 05:17:38 GMT+0000 (Greenwich Mean Time) (94044ms) √ EX-6324 - Part 11 : Sub Contractor sends signature request.Wed Jun 28 2023 05:17:38 GMT+0000 (Greenwich Mean Time) (81071ms) √ EX-6324 - Part 11 : Sub Contractor sends signature request.Wed Jun 28 2023 05:17:38 GMT+0000 (Greenwich Mean Time) (81071ms) √ EX-6324 - Part 12: Verify the tag status is Awaiting Signatures.Wed Jun 28 2023 05:17:38 GMT+0000 (Greenwich Mean Time) (24372ms) √ EX-6324 - Part 12: Verify the tag status is Awaiting Signatures.Wed Jun 28 2023 05:17:38 GMT+0000 (Greenwich Mean Time) (24372ms) 4 passing (5m) 4 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_078.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 4 │ │ Passing: 4 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 48 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-c (80 of 104) reates-tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 05:22:30 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 05:22:30 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 13: Verify the GC sees the tag.Wed Jun 28 2023 05:22:30 GMT+0000 (Greenwich Mean Time) (38439ms) √ EX-6324 - Part 13: Verify the GC sees the tag.Wed Jun 28 2023 05:22:30 GMT+0000 (Greenwich Mean Time) (38439ms) √ EX-6324 - Part 14: Verify GC PM User recived emailsWed Jun 28 2023 05:23:13 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 14: Verify GC PM User recived emailsWed Jun 28 2023 05:23:13 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 15: Verify GC Owner User recived emails and sign the tagWed Jun 28 2023 05:23:13 GMT+0000 (Greenwich Mean Time) (9104ms) √ EX-6324 - Part 15: Verify GC Owner User recived emails and sign the tagWed Jun 28 2023 05:23:13 GMT+0000 (Greenwich Mean Time) (9104ms) 3 passing (53s) 3 passing (53s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_079.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 3 │ │ Passing: 3 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 53 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-c (81 of 104) reates-tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 05:23:27 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Wed Jun 28 2023 05:23:27 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 16: Verify the tag status in the GC T&M Log.Wed Jun 28 2023 05:23:27 GMT+0000 (Greenwich Mean Time) (31293ms) √ EX-6324 - Part 16: Verify the tag status in the GC T&M Log.Wed Jun 28 2023 05:23:27 GMT+0000 (Greenwich Mean Time) (31293ms) √ EX-6324 - Part 17: Verify the tag status in the SC PM T&MM Log.Wed Jun 28 2023 05:23:27 GMT+0000 (Greenwich Mean Time) (24922ms) √ EX-6324 - Part 17: Verify the tag status in the SC PM T&MM Log.Wed Jun 28 2023 05:23:27 GMT+0000 (Greenwich Mean Time) (24922ms) √ EX-6324 - Part 18: Verify the tag status in the SC Owner T&MM Log.Wed Jun 28 2023 05:23:27 GMT+0000 (Greenwich Mean Time) (24466ms) √ EX-6324 - Part 18: Verify the tag status in the SC Owner T&MM Log.Wed Jun 28 2023 05:23:27 GMT+0000 (Greenwich Mean Time) (24466ms) √ EX-6324 - Part 19: Verify the tag status in the SC Admin T&MM Log.Wed Jun 28 2023 05:23:27 GMT+0000 (Greenwich Mean Time) (53863ms) √ EX-6324 - Part 19: Verify the tag status in the SC Admin T&MM Log.Wed Jun 28 2023 05:23:27 GMT+0000 (Greenwich Mean Time) (53863ms) √ EX-6324 - Part 20: Verify the tag status in the SC PM T&MM Log.Wed Jun 28 2023 05:23:27 GMT+0000 (Greenwich Mean Time) (22817ms) √ EX-6324 - Part 20: Verify the tag status in the SC PM T&MM Log.Wed Jun 28 2023 05:23:27 GMT+0000 (Greenwich Mean Time) (22817ms) √ EX-6324 - Part 21: Cleanup...Wed Jun 28 2023 05:23:27 GMT+0000 (Greenwich Mean Time) (45751ms) √ EX-6324 - Part 21: Cleanup...Wed Jun 28 2023 05:23:27 GMT+0000 (Greenwich Mean Time) (45751ms) 6 passing (3m) 6 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_080.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 23 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6335-sc-sends-tag-gc-signs-tag-as-optional-not-sa (82 of 104) ved-drafts.spec.ts EX-6335 | T&M | Workflow | Existing project and contract, SC PM send a tag. GC Owner signs the tag as one of four Optional Signers. Do not save as draft.Wed Jun 28 2023 05:26:55 GMT+0000 (Greenwich Mean Time) EX-6335 | T&M | Workflow | Existing project and contract, SC PM send a tag. GC Owner signs the tag as one of four Optional Signers. Do not save as draft.Wed Jun 28 2023 05:26:55 GMT+0000 (Greenwich Mean Time) √ EX-6335 - Part 1: Sub Contractor creates a Tag and sends signature request. Wed Jun 28 2023 05:26:55 GMT+0000 (Greenwich Mean Time) (174921ms) √ EX-6335 - Part 1: Sub Contractor creates a Tag and sends signature request. Wed Jun 28 2023 05:26:55 GMT+0000 (Greenwich Mean Time) (174921ms) √ EX-6335 - Part 2: Verify the tag was created. Wed Jun 28 2023 05:26:55 GMT+0000 (Greenwich Mean Time) (32522ms) √ EX-6335 - Part 2: Verify the tag was created. Wed Jun 28 2023 05:26:55 GMT+0000 (Greenwich Mean Time) (32522ms) √ EX-6335 - Part 3: Verify GC User and GC Feild user recived emails. Wed Jun 28 2023 05:30:28 GMT+0000 (Greenwich Mean Time) √ EX-6335 - Part 3: Verify GC User and GC Feild user recived emails. Wed Jun 28 2023 05:30:28 GMT+0000 (Greenwich Mean Time) √ EX-6335 - Part 4: Sign the Tag from Email. Wed Jun 28 2023 05:30:28 GMT+0000 (Greenwich Mean Time) (8275ms) √ EX-6335 - Part 4: Sign the Tag from Email. Wed Jun 28 2023 05:30:28 GMT+0000 (Greenwich Mean Time) (8275ms) √ EX-6335 - Part 5: Verify the tag status in the GC T&M Log. Wed Jun 28 2023 05:30:41 GMT+0000 (Greenwich Mean Time) (34580ms) √ EX-6335 - Part 5: Verify the tag status in the GC T&M Log. Wed Jun 28 2023 05:30:41 GMT+0000 (Greenwich Mean Time) (34580ms) √ EX-6335 - Part 6: Verify the tag status in the SC Admin T&M Log. Wed Jun 28 2023 05:30:41 GMT+0000 (Greenwich Mean Time) (71010ms) √ EX-6335 - Part 6: Verify the tag status in the SC Admin T&M Log. Wed Jun 28 2023 05:30:41 GMT+0000 (Greenwich Mean Time) (71010ms) √ EX-6335 - Part 7: Verify the tag status in the SC PM T&M Log. Wed Jun 28 2023 05:30:41 GMT+0000 (Greenwich Mean Time) (30135ms) √ EX-6335 - Part 7: Verify the tag status in the SC PM T&M Log. Wed Jun 28 2023 05:30:41 GMT+0000 (Greenwich Mean Time) (30135ms) √ EX-6335 - Part 8: Verify the tag status in the SC Owner T&MM Log. Wed Jun 28 2023 05:30:41 GMT+0000 (Greenwich Mean Time) (28620ms) √ EX-6335 - Part 8: Verify the tag status in the SC Owner T&MM Log. Wed Jun 28 2023 05:30:41 GMT+0000 (Greenwich Mean Time) (28620ms) √ EX-6335 - Part 9: Verify the tag status in the SC FieldUser T&MM Log. Wed Jun 28 2023 05:30:41 GMT+0000 (Greenwich Mean Time) (26784ms) √ EX-6335 - Part 9: Verify the tag status in the SC FieldUser T&MM Log. Wed Jun 28 2023 05:30:41 GMT+0000 (Greenwich Mean Time) (26784ms) √ EX-6335 - Part 10: Cleanup SC Tag ... Wed Jun 28 2023 05:30:41 GMT+0000 (Greenwich Mean Time) (28201ms) √ EX-6335 - Part 10: Cleanup SC Tag ... Wed Jun 28 2023 05:30:41 GMT+0000 (Greenwich Mean Time) (28201ms) 10 passing (7m) 10 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_081.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 10 │ │ Passing: 10 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 26 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6335-sc-sends-tag-gc-signs-tag-as-optional-not-saved-drafts.s │ │ pec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-7224-switch-project-workflow.spec.ts (83 of 104) T&M | SC PM creates a project, creates a tag for it, creates another project, moves the tag to the new project.Wed Jun 28 2023 05:34:29 GMT+0000 (Greenwich Mean Time) T&M | SC PM creates a project, creates a tag for it, creates another project, moves the tag to the new project.Wed Jun 28 2023 05:34:29 GMT+0000 (Greenwich Mean Time) √ EX-7224 - Part 1: SC PM creates a Project A.Wed Jun 28 2023 05:34:29 GMT+0000 (Greenwich Mean Time) (48279ms) √ EX-7224 - Part 1: SC PM creates a Project A.Wed Jun 28 2023 05:34:29 GMT+0000 (Greenwich Mean Time) (48279ms) √ EX-7224 - Part 2: SC adds customer to Project A.Wed Jun 28 2023 05:34:29 GMT+0000 (Greenwich Mean Time) (29443ms) √ EX-7224 - Part 2: SC adds customer to Project A.Wed Jun 28 2023 05:34:29 GMT+0000 (Greenwich Mean Time) (29443ms) √ EX-7224 - Part 3: Sub Contractor creates a tag.Wed Jun 28 2023 05:34:29 GMT+0000 (Greenwich Mean Time) (58776ms) √ EX-7224 - Part 3: Sub Contractor creates a tag.Wed Jun 28 2023 05:34:29 GMT+0000 (Greenwich Mean Time) (58776ms) √ EX-7224 - Part 4: Sub Contractor creates Project B.Wed Jun 28 2023 05:34:29 GMT+0000 (Greenwich Mean Time) (40319ms) √ EX-7224 - Part 4: Sub Contractor creates Project B.Wed Jun 28 2023 05:34:29 GMT+0000 (Greenwich Mean Time) (40319ms) √ EX-7224 - Part 5: Sub Contractor switches the tag to Project B.Wed Jun 28 2023 05:34:29 GMT+0000 (Greenwich Mean Time) (67820ms) √ EX-7224 - Part 5: Sub Contractor switches the tag to Project B.Wed Jun 28 2023 05:34:29 GMT+0000 (Greenwich Mean Time) (67820ms) √ EX-7224 - Part 7: Clean up Project A.Wed Jun 28 2023 05:34:29 GMT+0000 (Greenwich Mean Time) (29705ms) √ EX-7224 - Part 7: Clean up Project A.Wed Jun 28 2023 05:34:29 GMT+0000 (Greenwich Mean Time) (29705ms) √ EX-7224 - Part 8: Cleanup Proejct B.Wed Jun 28 2023 05:34:29 GMT+0000 (Greenwich Mean Time) (26690ms) √ EX-7224 - Part 8: Cleanup Proejct B.Wed Jun 28 2023 05:34:29 GMT+0000 (Greenwich Mean Time) (26690ms) 7 passing (5m) 7 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_082.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 1 second │ │ Spec Ran: 05_T&M_Log/Sent/ex-7224-switch-project-workflow.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-6030-create-cn-respond-with-upload- (84 of 104) cor-verify-all-data.spec.ts Change Notifications | Create CN, respond to it with Upload COR and verify the data in the CN Log. Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) Change Notifications | Create CN, respond to it with Upload COR and verify the data in the CN Log. Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) √ EX-6030 Part 1: Create a project and send invite.Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) (46378ms) √ EX-6030 Part 1: Create a project and send invite.Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) (46378ms) √ EX-6030 Part 2: Add contractor.Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) (35622ms) √ EX-6030 Part 2: Add contractor.Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) (35622ms) √ EX-6030 Part 3: Sub Contractor accepts the invite.Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) (21495ms) √ EX-6030 Part 3: Sub Contractor accepts the invite.Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) (21495ms) √ EX-6030 Part 4: Gen Contractor creates a Pricing Request Change Notification.Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) (41803ms) √ EX-6030 Part 4: Gen Contractor creates a Pricing Request Change Notification.Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) (41803ms) √ EX-6030 Part 5: Sub Contractor responds to the Change Notification with Upload COR.Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) (57183ms) √ EX-6030 Part 5: Sub Contractor responds to the Change Notification with Upload COR.Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) (57183ms) √ EX-6030 Part 6: GC verifies CN data and status.Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) (24099ms) √ EX-6030 Part 6: GC verifies CN data and status.Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) (24099ms) √ EX-6030 Part 7: Cleanup GC...Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) (25051ms) √ EX-6030 Part 7: Cleanup GC...Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) (25051ms) √ EX-6030 Part 7: Cleanup SC...Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) (32304ms) √ EX-6030 Part 7: Cleanup SC...Wed Jun 28 2023 05:39:34 GMT+0000 (Greenwich Mean Time) (32304ms) 8 passing (5m) 8 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_083.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 44 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-6030-create-cn-respond-with-upload-cor-verify-a │ │ ll-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8597-respond-to-cn-as-SC-and-GC-cle (85 of 104) ar-response.spec.ts Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseWed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseWed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) √ EX-8597 Part 1: Delete existing CORs. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (39567ms) √ EX-8597 Part 1: Delete existing CORs. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (39567ms) √ EX-8597 Part 2: Delete existing CNs. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (20956ms) √ EX-8597 Part 2: Delete existing CNs. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (20956ms) √ EX-8597 Part 3: Create a CN with type as Authorize T&M Work and send it to Contractor. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (39942ms) √ EX-8597 Part 3: Create a CN with type as Authorize T&M Work and send it to Contractor. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (39942ms) √ EX-8597 Part 4: Respond to CN with No Cost Impact as SC PM. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (37111ms) √ EX-8597 Part 4: Respond to CN with No Cost Impact as SC PM. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (37111ms) √ EX-8597 Part 5: Verify the reponse and clear the response. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (41094ms) √ EX-8597 Part 5: Verify the reponse and clear the response. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (41094ms) √ EX-8597 Part 6: Respond to CN by creating a COR. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (52167ms) √ EX-8597 Part 6: Respond to CN by creating a COR. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (52167ms) √ EX-8597 Part 7: Verify the reponse and clear the response. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (45333ms) √ EX-8597 Part 7: Verify the reponse and clear the response. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (45333ms) √ EX-8597 Part 8: Respond to CN as SC PM by uploading a COR. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (56775ms) √ EX-8597 Part 8: Respond to CN as SC PM by uploading a COR. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (56775ms) √ EX-8597 Part 9: Verify the reponse and clear the response. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (40529ms) √ EX-8597 Part 9: Verify the reponse and clear the response. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (40529ms) √ EX-8597 Part 10: Respond to CN with No Cost Impact as GC PM and verify the reponse and clear the response. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (58324ms) √ EX-8597 Part 10: Respond to CN with No Cost Impact as GC PM and verify the reponse and clear the response. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (58324ms) √ EX-8597 Part 11: Respond to CN by linking received COR as GC PM and verify the reponse and clear the response. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (51070ms) √ EX-8597 Part 11: Respond to CN by linking received COR as GC PM and verify the reponse and clear the response. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (51070ms) √ EX-8597 Part 12: Clean the CORs. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (67400ms) √ EX-8597 Part 12: Clean the CORs. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (67400ms) √ EX-8597 Part 13: Clean the CNs. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (41450ms) √ EX-8597 Part 13: Clean the CNs. Wed Jun 28 2023 05:44:22 GMT+0000 (Greenwich Mean Time) (41450ms) 13 passing (10m) 13 passing (10m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_084.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 13 │ │ Passing: 13 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 9 minutes, 52 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8597-respond-to-cn-as-SC-and-GC-clear-response. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8599-create-cn-authorize-t&mwork-re (86 of 104) spond-as-SC-PM-with-no-cost-impact.spec.ts Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor. ) Wed Jun 28 2023 05:54:19 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor. ) Wed Jun 28 2023 05:54:19 GMT+0000 (Greenwich Mean Time) √ EX-8599 Part 1: Delete existing CN (24023ms) √ EX-8599 Part 1: Delete existing CN (24023ms) √ EX-8599 Part 2: Create a CN with type as Authorize T&M Work and send it to Contractor. Wed Jun 28 2023 05:54:19 GMT+0000 (Greenwich Mean Time) (46096ms) √ EX-8599 Part 2: Create a CN with type as Authorize T&M Work and send it to Contractor. Wed Jun 28 2023 05:54:19 GMT+0000 (Greenwich Mean Time) (46096ms) √ EX-8599 Part 3: Respond to CN with No Cost Impact. Wed Jun 28 2023 05:54:19 GMT+0000 (Greenwich Mean Time) (43327ms) √ EX-8599 Part 3: Respond to CN with No Cost Impact. Wed Jun 28 2023 05:54:19 GMT+0000 (Greenwich Mean Time) (43327ms) √ EX-8599 Part 4: Verify the data as Gc. Wed Jun 28 2023 05:54:19 GMT+0000 (Greenwich Mean Time) (25519ms) √ EX-8599 Part 4: Verify the data as Gc. Wed Jun 28 2023 05:54:19 GMT+0000 (Greenwich Mean Time) (25519ms) √ EX-8599 Part 5: Delete the CN. Wed Jun 28 2023 05:54:19 GMT+0000 (Greenwich Mean Time) (27628ms) √ EX-8599 Part 5: Delete the CN. Wed Jun 28 2023 05:54:19 GMT+0000 (Greenwich Mean Time) (27628ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_085.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 47 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8599-create-cn-authorize-t&mwork-respond-as-SC- │ │ PM-with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8942-create-cn-pricing-request-resp (87 of 104) ond-as-SC-PM-with-no-cost-impact.spec.ts Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 05:57:10 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 05:57:10 GMT+0000 (Greenwich Mean Time) √ EX-8942 Part 1: Delete existing CN (27094ms) √ EX-8942 Part 1: Delete existing CN (27094ms) √ EX-8942 Part 2: Create a CN with type as Pricing Request and send it to ContractorWed Jun 28 2023 05:57:10 GMT+0000 (Greenwich Mean Time) (39598ms) √ EX-8942 Part 2: Create a CN with type as Pricing Request and send it to ContractorWed Jun 28 2023 05:57:10 GMT+0000 (Greenwich Mean Time) (39598ms) √ EX-8942 Part 3: Respond to CN with No Cost ImpactWed Jun 28 2023 05:57:10 GMT+0000 (Greenwich Mean Time) (43723ms) √ EX-8942 Part 3: Respond to CN with No Cost ImpactWed Jun 28 2023 05:57:10 GMT+0000 (Greenwich Mean Time) (43723ms) √ EX-8942 Part 4: Verify the data as GcWed Jun 28 2023 05:57:10 GMT+0000 (Greenwich Mean Time) (26556ms) √ EX-8942 Part 4: Verify the data as GcWed Jun 28 2023 05:57:10 GMT+0000 (Greenwich Mean Time) (26556ms) √ EX-8942 Part 5: Delete the CNWed Jun 28 2023 05:57:10 GMT+0000 (Greenwich Mean Time) (28342ms) √ EX-8942 Part 5: Delete the CNWed Jun 28 2023 05:57:10 GMT+0000 (Greenwich Mean Time) (28342ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_086.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 46 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8942-create-cn-pricing-request-respond-as-SC-PM │ │ -with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8943-create-cn-pricing-request-resp (88 of 104) ond-as-SC-PM-with-create-cor.spec.ts Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 06:00:00 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 06:00:00 GMT+0000 (Greenwich Mean Time) √ EX-8943 Part 1: Delete existing CN (24914ms) √ EX-8943 Part 1: Delete existing CN (24914ms) √ EX-8943 Part 2: Delete existing CORsWed Jun 28 2023 06:00:00 GMT+0000 (Greenwich Mean Time) (33510ms) √ EX-8943 Part 2: Delete existing CORsWed Jun 28 2023 06:00:00 GMT+0000 (Greenwich Mean Time) (33510ms) √ EX-8943 Part 3: Create a CN with type as Pricing Request and send it to ContractorWed Jun 28 2023 06:00:00 GMT+0000 (Greenwich Mean Time) (38267ms) √ EX-8943 Part 3: Create a CN with type as Pricing Request and send it to ContractorWed Jun 28 2023 06:00:00 GMT+0000 (Greenwich Mean Time) (38267ms) √ EX-8943 Part 4: Respond to CN with create corWed Jun 28 2023 06:00:00 GMT+0000 (Greenwich Mean Time) (61118ms) √ EX-8943 Part 4: Respond to CN with create corWed Jun 28 2023 06:00:00 GMT+0000 (Greenwich Mean Time) (61118ms) √ EX-8943 Part 5: Verify the data as GcWed Jun 28 2023 06:00:00 GMT+0000 (Greenwich Mean Time) (27121ms) √ EX-8943 Part 5: Verify the data as GcWed Jun 28 2023 06:00:00 GMT+0000 (Greenwich Mean Time) (27121ms) √ EX-8943 Part 6: Delete all CORsWed Jun 28 2023 06:00:00 GMT+0000 (Greenwich Mean Time) (47394ms) √ EX-8943 Part 6: Delete all CORsWed Jun 28 2023 06:00:00 GMT+0000 (Greenwich Mean Time) (47394ms) √ EX-8943 Part 7: Delete the CNWed Jun 28 2023 06:00:00 GMT+0000 (Greenwich Mean Time) (28639ms) √ EX-8943 Part 7: Delete the CNWed Jun 28 2023 06:00:00 GMT+0000 (Greenwich Mean Time) (28639ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_087.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 21 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8943-create-cn-pricing-request-respond-as-SC-PM │ │ -with-create-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8944-create-cn-pricing-request-resp (89 of 104) ond-as-SC-PM-with-upload-cor.spec.ts Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 06:04:25 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 06:04:25 GMT+0000 (Greenwich Mean Time) √ EX-8944 Part 1: Delete existing CN (24396ms) √ EX-8944 Part 1: Delete existing CN (24396ms) √ EX-8944 Part 2: Delete existing CORsWed Jun 28 2023 06:04:25 GMT+0000 (Greenwich Mean Time) (32163ms) √ EX-8944 Part 2: Delete existing CORsWed Jun 28 2023 06:04:25 GMT+0000 (Greenwich Mean Time) (32163ms) √ EX-8944 Part 3: Create a CN with type as Pricing Request and send it to ContractorWed Jun 28 2023 06:04:25 GMT+0000 (Greenwich Mean Time) (38817ms) √ EX-8944 Part 3: Create a CN with type as Pricing Request and send it to ContractorWed Jun 28 2023 06:04:25 GMT+0000 (Greenwich Mean Time) (38817ms) √ EX-8944 Part 4: Respond to CN with upload corWed Jun 28 2023 06:04:25 GMT+0000 (Greenwich Mean Time) (66710ms) √ EX-8944 Part 4: Respond to CN with upload corWed Jun 28 2023 06:04:25 GMT+0000 (Greenwich Mean Time) (66710ms) √ EX-8944 Part 5: Verify the data as GcWed Jun 28 2023 06:04:25 GMT+0000 (Greenwich Mean Time) (27131ms) √ EX-8944 Part 5: Verify the data as GcWed Jun 28 2023 06:04:25 GMT+0000 (Greenwich Mean Time) (27131ms) √ EX-8944 Part 6: Delete all CORsWed Jun 28 2023 06:04:25 GMT+0000 (Greenwich Mean Time) (54114ms) √ EX-8944 Part 6: Delete all CORsWed Jun 28 2023 06:04:25 GMT+0000 (Greenwich Mean Time) (54114ms) √ EX-8944 Part 7: Delete the CNWed Jun 28 2023 06:04:25 GMT+0000 (Greenwich Mean Time) (28124ms) √ EX-8944 Part 7: Delete the CNWed Jun 28 2023 06:04:25 GMT+0000 (Greenwich Mean Time) (28124ms) 7 passing (5m) 7 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_088.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 32 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8944-create-cn-pricing-request-respond-as-SC-PM │ │ -with-upload-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8945-create-cn-pricing-request-resp (90 of 104) ond-as-GC-PM-with-no-cost-impact.spec.ts Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 06:09:01 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 06:09:01 GMT+0000 (Greenwich Mean Time) √ EX-8945 Part 1: Delete existing CN (24878ms) √ EX-8945 Part 1: Delete existing CN (24878ms) √ EX-8945 Part 2: Create a CN with type as Pricing Request and send it to ContractorWed Jun 28 2023 06:09:01 GMT+0000 (Greenwich Mean Time) (40424ms) √ EX-8945 Part 2: Create a CN with type as Pricing Request and send it to ContractorWed Jun 28 2023 06:09:01 GMT+0000 (Greenwich Mean Time) (40424ms) √ EX-8945 Part 3: Respond to CN with No Cost Impact as GC PMWed Jun 28 2023 06:09:01 GMT+0000 (Greenwich Mean Time) (48532ms) √ EX-8945 Part 3: Respond to CN with No Cost Impact as GC PMWed Jun 28 2023 06:09:01 GMT+0000 (Greenwich Mean Time) (48532ms) √ EX-8945 Part 4: Verify the data as ScWed Jun 28 2023 06:09:01 GMT+0000 (Greenwich Mean Time) (24532ms) √ EX-8945 Part 4: Verify the data as ScWed Jun 28 2023 06:09:01 GMT+0000 (Greenwich Mean Time) (24532ms) √ EX-8945 Part 5: Delete the CNWed Jun 28 2023 06:09:01 GMT+0000 (Greenwich Mean Time) (27050ms) √ EX-8945 Part 5: Delete the CNWed Jun 28 2023 06:09:01 GMT+0000 (Greenwich Mean Time) (27050ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_089.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 46 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8945-create-cn-pricing-request-respond-as-GC-PM │ │ -with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8946-create-cn-pricing-request-resp (91 of 104) ond-as-GC-PM-by-linking-existing-cor.spec.ts Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 06:11:50 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 06:11:50 GMT+0000 (Greenwich Mean Time) √ EX-8946 Part 1: Delete existing CN (23820ms) √ EX-8946 Part 1: Delete existing CN (23820ms) √ EX-8946 Part 2: Create a CN with type as Pricing Request and send it to ContractorWed Jun 28 2023 06:11:50 GMT+0000 (Greenwich Mean Time) (39220ms) √ EX-8946 Part 2: Create a CN with type as Pricing Request and send it to ContractorWed Jun 28 2023 06:11:50 GMT+0000 (Greenwich Mean Time) (39220ms) √ EX-8946 Part 3: Respond to CN by linking received COR as GC PMWed Jun 28 2023 06:11:50 GMT+0000 (Greenwich Mean Time) (45198ms) √ EX-8946 Part 3: Respond to CN by linking received COR as GC PMWed Jun 28 2023 06:11:50 GMT+0000 (Greenwich Mean Time) (45198ms) √ EX-8946 Part 4: Verify the data as ScWed Jun 28 2023 06:11:50 GMT+0000 (Greenwich Mean Time) (23775ms) √ EX-8946 Part 4: Verify the data as ScWed Jun 28 2023 06:11:50 GMT+0000 (Greenwich Mean Time) (23775ms) √ EX-8946 Part 5: Delete the CNWed Jun 28 2023 06:11:50 GMT+0000 (Greenwich Mean Time) (27977ms) √ EX-8946 Part 5: Delete the CNWed Jun 28 2023 06:11:50 GMT+0000 (Greenwich Mean Time) (27977ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_090.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 41 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8946-create-cn-pricing-request-respond-as-GC-PM │ │ -by-linking-existing-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8947-create-cn-authorize-t&mwork-re (92 of 104) spond-as-SC-PM-with-create-cor.spec.ts Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 06:14:35 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 06:14:35 GMT+0000 (Greenwich Mean Time) √ EX-8947 Part 1: Delete existing CN (24817ms) √ EX-8947 Part 1: Delete existing CN (24817ms) √ EX-8947 Part 2: Delete existing CORsWed Jun 28 2023 06:14:35 GMT+0000 (Greenwich Mean Time) (35754ms) √ EX-8947 Part 2: Delete existing CORsWed Jun 28 2023 06:14:35 GMT+0000 (Greenwich Mean Time) (35754ms) √ EX-8947 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorWed Jun 28 2023 06:14:35 GMT+0000 (Greenwich Mean Time) (44324ms) √ EX-8947 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorWed Jun 28 2023 06:14:35 GMT+0000 (Greenwich Mean Time) (44324ms) √ EX-8947 Part 4: Respond to CN with create corWed Jun 28 2023 06:14:35 GMT+0000 (Greenwich Mean Time) (56918ms) √ EX-8947 Part 4: Respond to CN with create corWed Jun 28 2023 06:14:35 GMT+0000 (Greenwich Mean Time) (56918ms) √ EX-8947 Part 5: Verify the data as GcWed Jun 28 2023 06:14:35 GMT+0000 (Greenwich Mean Time) (25779ms) √ EX-8947 Part 5: Verify the data as GcWed Jun 28 2023 06:14:35 GMT+0000 (Greenwich Mean Time) (25779ms) √ EX-8947 Part 6: Delete all CORsWed Jun 28 2023 06:14:35 GMT+0000 (Greenwich Mean Time) (48935ms) √ EX-8947 Part 6: Delete all CORsWed Jun 28 2023 06:14:35 GMT+0000 (Greenwich Mean Time) (48935ms) √ EX-8947 Part 7: Delete the CNWed Jun 28 2023 06:14:35 GMT+0000 (Greenwich Mean Time) (29546ms) √ EX-8947 Part 7: Delete the CNWed Jun 28 2023 06:14:35 GMT+0000 (Greenwich Mean Time) (29546ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_091.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 27 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8947-create-cn-authorize-t&mwork-respond-as-SC- │ │ PM-with-create-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8948-create-cn-authorize-t&mwork-re (93 of 104) spond-as-SC-PM-with-upload-cor.spec.ts Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 06:19:05 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 06:19:05 GMT+0000 (Greenwich Mean Time) √ EX-8948 Part 1.1: Delete existing CN (24442ms) √ EX-8948 Part 1.1: Delete existing CN (24442ms) √ EX-8948 Part 1.2: Delete all CORs. Wed Jun 28 2023 06:19:05 GMT+0000 (Greenwich Mean Time) (40477ms) √ EX-8948 Part 1.2: Delete all CORs. Wed Jun 28 2023 06:19:05 GMT+0000 (Greenwich Mean Time) (40477ms) √ EX-8948 Part 2: Delete existing CORsWed Jun 28 2023 06:19:06 GMT+0000 (Greenwich Mean Time) (30269ms) √ EX-8948 Part 2: Delete existing CORsWed Jun 28 2023 06:19:06 GMT+0000 (Greenwich Mean Time) (30269ms) √ EX-8948 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorWed Jun 28 2023 06:19:06 GMT+0000 (Greenwich Mean Time) (44270ms) √ EX-8948 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorWed Jun 28 2023 06:19:06 GMT+0000 (Greenwich Mean Time) (44270ms) √ EX-8948 Part 4: Respond to CN with upload corWed Jun 28 2023 06:19:06 GMT+0000 (Greenwich Mean Time) (54878ms) √ EX-8948 Part 4: Respond to CN with upload corWed Jun 28 2023 06:19:06 GMT+0000 (Greenwich Mean Time) (54878ms) √ EX-8948 Part 5: Verify the data as Gc. Wed Jun 28 2023 06:19:06 GMT+0000 (Greenwich Mean Time) (27853ms) √ EX-8948 Part 5: Verify the data as Gc. Wed Jun 28 2023 06:19:06 GMT+0000 (Greenwich Mean Time) (27853ms) √ EX-8948 Part 6: Delete all CORs. Wed Jun 28 2023 06:19:06 GMT+0000 (Greenwich Mean Time) (42405ms) √ EX-8948 Part 6: Delete all CORs. Wed Jun 28 2023 06:19:06 GMT+0000 (Greenwich Mean Time) (42405ms) √ EX-8948 Part 7: Delete the CN. Wed Jun 28 2023 06:19:06 GMT+0000 (Greenwich Mean Time) (32512ms) √ EX-8948 Part 7: Delete the CN. Wed Jun 28 2023 06:19:06 GMT+0000 (Greenwich Mean Time) (32512ms) 8 passing (5m) 8 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_092.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 57 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8948-create-cn-authorize-t&mwork-respond-as-SC- │ │ PM-with-upload-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8949-create-cn-authorize-t&mwork-re (94 of 104) spond-as-GC-PM-with-no-cost-impact.spec.ts Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 06:24:07 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 06:24:07 GMT+0000 (Greenwich Mean Time) √ EX-8949 Part 1: Delete existing CN (24156ms) √ EX-8949 Part 1: Delete existing CN (24156ms) √ EX-8949 Part 2: Create a CN with type as Authorize T&M Work and send it to ContractorWed Jun 28 2023 06:24:07 GMT+0000 (Greenwich Mean Time) (41419ms) √ EX-8949 Part 2: Create a CN with type as Authorize T&M Work and send it to ContractorWed Jun 28 2023 06:24:07 GMT+0000 (Greenwich Mean Time) (41419ms) √ EX-8949 Part 3: Respond to CN with No Cost Impact as GC PMWed Jun 28 2023 06:24:07 GMT+0000 (Greenwich Mean Time) (49512ms) √ EX-8949 Part 3: Respond to CN with No Cost Impact as GC PMWed Jun 28 2023 06:24:07 GMT+0000 (Greenwich Mean Time) (49512ms) √ EX-8949 Part 4: Verify the data as ScWed Jun 28 2023 06:24:07 GMT+0000 (Greenwich Mean Time) (24575ms) √ EX-8949 Part 4: Verify the data as ScWed Jun 28 2023 06:24:07 GMT+0000 (Greenwich Mean Time) (24575ms) √ EX-8949 Part 5: Delete the CNWed Jun 28 2023 06:24:07 GMT+0000 (Greenwich Mean Time) (28034ms) √ EX-8949 Part 5: Delete the CNWed Jun 28 2023 06:24:07 GMT+0000 (Greenwich Mean Time) (28034ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_093.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 48 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8949-create-cn-authorize-t&mwork-respond-as-GC- │ │ PM-with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8950-create-cn-authorize-t&mwork-re (95 of 104) spond-as-GC-PM-by-linking-existing-cor.spec.ts Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 06:26:59 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Wed Jun 28 2023 06:26:59 GMT+0000 (Greenwich Mean Time) √ EX-8950 Part 1: Delete existing CN (24535ms) √ EX-8950 Part 1: Delete existing CN (24535ms) √ EX-8950 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorWed Jun 28 2023 06:26:59 GMT+0000 (Greenwich Mean Time) (41665ms) √ EX-8950 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorWed Jun 28 2023 06:26:59 GMT+0000 (Greenwich Mean Time) (41665ms) √ EX-8950 Part 4: Respond to CN by linking received COR as GC PMWed Jun 28 2023 06:26:59 GMT+0000 (Greenwich Mean Time) (48578ms) √ EX-8950 Part 4: Respond to CN by linking received COR as GC PMWed Jun 28 2023 06:26:59 GMT+0000 (Greenwich Mean Time) (48578ms) √ EX-8950 Part 5: Verify the data as ScWed Jun 28 2023 06:26:59 GMT+0000 (Greenwich Mean Time) (23780ms) √ EX-8950 Part 5: Verify the data as ScWed Jun 28 2023 06:26:59 GMT+0000 (Greenwich Mean Time) (23780ms) √ EX-8950 Part 6: Delete the CNWed Jun 28 2023 06:26:59 GMT+0000 (Greenwich Mean Time) (27309ms) √ EX-8950 Part 6: Delete the CNWed Jun 28 2023 06:26:59 GMT+0000 (Greenwich Mean Time) (27309ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_094.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 46 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8950-create-cn-authorize-t&mwork-respond-as-GC- │ │ PM-by-linking-existing-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 08_Projects/Active Projects/ex-5467-verify-job-number-propagation-be (96 of 104) tween-project.spec.ts Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) √ EX-5467 - Create project as GC.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (33936ms) √ EX-5467 - Create project as GC.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (33936ms) √ EX-5467 - Add contract.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (33421ms) √ EX-5467 - Add contract.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (33421ms) √ EX-5467 - Verify the contract is added.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (20006ms) √ EX-5467 - Verify the contract is added.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (20006ms) √ EX-5467 - Add Customer.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (30805ms) √ EX-5467 - Add Customer.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (30805ms) √ EX-5467 - Verify Project Details at GC side.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (26875ms) √ EX-5467 - Verify Project Details at GC side.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (26875ms) √ EX-5467 - Accept the project invite at the SC side.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (37785ms) √ EX-5467 - Accept the project invite at the SC side.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (37785ms) √ EX-5467 - Verify Project Details at SC side.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (20403ms) √ EX-5467 - Verify Project Details at SC side.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (20403ms) √ EX-5467 - Accept project invite at the Customer side.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (25056ms) √ EX-5467 - Accept project invite at the Customer side.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (25056ms) √ EX-5467 - Verify Project Details at the Customer side.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (19080ms) √ EX-5467 - Verify Project Details at the Customer side.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (19080ms) √ EX-5467 - Cleanup GC... Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (24066ms) √ EX-5467 - Cleanup GC... Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (24066ms) √ EX-5467 - Cleanup SC... Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (27929ms) √ EX-5467 - Cleanup SC... Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (27929ms) √ EX-5467 - Cleanup for Owner.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (27568ms) √ EX-5467 - Cleanup for Owner.Wed Jun 28 2023 06:29:49 GMT+0000 (Greenwich Mean Time) (27568ms) 12 passing (5m) 12 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_095.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 28 seconds │ │ Spec Ran: 08_Projects/Active Projects/ex-5467-verify-job-number-propagation-between-projec │ │ t.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 08_Projects/Active Projects/ex-7362-verify-job-number-propagation-to (97 of 104) -draft-cors.spec.ts Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Wed Jun 28 2023 06:35:21 GMT+0000 (Greenwich Mean Time) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Wed Jun 28 2023 06:35:21 GMT+0000 (Greenwich Mean Time) √ EX-7362 - Part 1: Create project as SC.Wed Jun 28 2023 06:35:21 GMT+0000 (Greenwich Mean Time) (40993ms) √ EX-7362 - Part 1: Create project as SC.Wed Jun 28 2023 06:35:21 GMT+0000 (Greenwich Mean Time) (40993ms) √ EX-7362 - Part 2: Add Customer.Wed Jun 28 2023 06:35:21 GMT+0000 (Greenwich Mean Time) (27475ms) √ EX-7362 - Part 2: Add Customer.Wed Jun 28 2023 06:35:21 GMT+0000 (Greenwich Mean Time) (27475ms) √ EX-7362 - Part 3: Accept the project invite at the GC side.Wed Jun 28 2023 06:35:21 GMT+0000 (Greenwich Mean Time) (30100ms) √ EX-7362 - Part 3: Accept the project invite at the GC side.Wed Jun 28 2023 06:35:21 GMT+0000 (Greenwich Mean Time) (30100ms) √ EX-7362 - Part 4: Create COR and Save it as Draft.Wed Jun 28 2023 06:35:21 GMT+0000 (Greenwich Mean Time) (33782ms) √ EX-7362 - Part 4: Create COR and Save it as Draft.Wed Jun 28 2023 06:35:21 GMT+0000 (Greenwich Mean Time) (33782ms) √ EX-7362 - Part 5: Verify Draft COR data in the Draft COR Log.Wed Jun 28 2023 06:35:21 GMT+0000 (Greenwich Mean Time) (32995ms) √ EX-7362 - Part 5: Verify Draft COR data in the Draft COR Log.Wed Jun 28 2023 06:35:21 GMT+0000 (Greenwich Mean Time) (32995ms) √ EX-7362 - Cleanup GC... Wed Jun 28 2023 06:35:21 GMT+0000 (Greenwich Mean Time) (34119ms) √ EX-7362 - Cleanup GC... Wed Jun 28 2023 06:35:21 GMT+0000 (Greenwich Mean Time) (34119ms) √ EX-7362 - Cleanup SC... Wed Jun 28 2023 06:35:21 GMT+0000 (Greenwich Mean Time) (29651ms) √ EX-7362 - Cleanup SC... Wed Jun 28 2023 06:35:21 GMT+0000 (Greenwich Mean Time) (29651ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_096.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 51 seconds │ │ Spec Ran: 08_Projects/Active Projects/ex-7362-verify-job-number-propagation-to-draft-cors. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/ChangeNotifications/ex-3723-verify-all-links-in-pricing-re (98 of 104) quest-cn-response-needed-email.spec.ts Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Wed Jun 28 2023 06:39:17 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Wed Jun 28 2023 06:39:17 GMT+0000 (Greenwich Mean Time) √ EX-3723 Part 1: Create a project and send invite.Wed Jun 28 2023 06:39:17 GMT+0000 (Greenwich Mean Time) (48141ms) √ EX-3723 Part 1: Create a project and send invite.Wed Jun 28 2023 06:39:17 GMT+0000 (Greenwich Mean Time) (48141ms) √ EX-3723 Part 2: Add Sub-Contractor.Wed Jun 28 2023 06:39:17 GMT+0000 (Greenwich Mean Time) (32559ms) √ EX-3723 Part 2: Add Sub-Contractor.Wed Jun 28 2023 06:39:17 GMT+0000 (Greenwich Mean Time) (32559ms) √ EX-3723 Part 3: Login to the Sub Contractor account and Accept the invite.Wed Jun 28 2023 06:39:17 GMT+0000 (Greenwich Mean Time) (24464ms) √ EX-3723 Part 3: Login to the Sub Contractor account and Accept the invite.Wed Jun 28 2023 06:39:17 GMT+0000 (Greenwich Mean Time) (24464ms) √ EX-3723 Part 4: Log in back to the Gen Contractor account and create a Pricing Request Change Notification.Wed Jun 28 2023 06:39:17 GMT+0000 (Greenwich Mean Time) (36767ms) √ EX-3723 Part 4: Log in back to the Gen Contractor account and create a Pricing Request Change Notification.Wed Jun 28 2023 06:39:17 GMT+0000 (Greenwich Mean Time) (36767ms) √ EX-3723 Part 5: Verify the Response Needed CN email.Wed Jun 28 2023 06:41:44 GMT+0000 (Greenwich Mean Time) (6599ms) √ EX-3723 Part 5: Verify the Response Needed CN email.Wed Jun 28 2023 06:41:44 GMT+0000 (Greenwich Mean Time) (6599ms) √ EX-3723 Part 6: Verify LinksWed Jun 28 2023 06:41:54 GMT+0000 (Greenwich Mean Time) (18728ms) √ EX-3723 Part 6: Verify LinksWed Jun 28 2023 06:41:54 GMT+0000 (Greenwich Mean Time) (18728ms) √ EX-3723 Part 7: Cleanup GC...Wed Jun 28 2023 06:41:54 GMT+0000 (Greenwich Mean Time) (24910ms) √ EX-3723 Part 7: Cleanup GC...Wed Jun 28 2023 06:41:54 GMT+0000 (Greenwich Mean Time) (24910ms) √ EX-3723 Part 7: Cleanup SC...Wed Jun 28 2023 06:41:54 GMT+0000 (Greenwich Mean Time) (29159ms) √ EX-3723 Part 7: Cleanup SC...Wed Jun 28 2023 06:41:54 GMT+0000 (Greenwich Mean Time) (29159ms) 8 passing (4m) 8 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_097.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 50 seconds │ │ Spec Ran: 11_Emails/ChangeNotifications/ex-3723-verify-all-links-in-pricing-request-cn-res │ │ ponse-needed-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/ChangeNotifications/ex-5287-verify-all-links-in-authorize- (99 of 104) work-cn-response-needed-email.spec.ts Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Authorize Work CN.Wed Jun 28 2023 06:43:11 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Authorize Work CN.Wed Jun 28 2023 06:43:11 GMT+0000 (Greenwich Mean Time) √ EX-5287 Part 1: Create a project.Wed Jun 28 2023 06:43:11 GMT+0000 (Greenwich Mean Time) (47809ms) √ EX-5287 Part 1: Create a project.Wed Jun 28 2023 06:43:11 GMT+0000 (Greenwich Mean Time) (47809ms) √ EX-5287 Part 2: Send invite.Wed Jun 28 2023 06:43:11 GMT+0000 (Greenwich Mean Time) (33933ms) √ EX-5287 Part 2: Send invite.Wed Jun 28 2023 06:43:11 GMT+0000 (Greenwich Mean Time) (33933ms) √ EX-5287 Part 3: Login to the Sub Contractor account and Accept the invite.Wed Jun 28 2023 06:43:11 GMT+0000 (Greenwich Mean Time) (20859ms) √ EX-5287 Part 3: Login to the Sub Contractor account and Accept the invite.Wed Jun 28 2023 06:43:11 GMT+0000 (Greenwich Mean Time) (20859ms) √ EX-5287 Part 4: Log in back to the Gen Contractor account and create a Authorize T&M Work Change Notification.Wed Jun 28 2023 06:43:11 GMT+0000 (Greenwich Mean Time) (36701ms) √ EX-5287 Part 4: Log in back to the Gen Contractor account and create a Authorize T&M Work Change Notification.Wed Jun 28 2023 06:43:11 GMT+0000 (Greenwich Mean Time) (36701ms) √ EX-5287 Part 5: Verify the Response Needed CN email.Wed Jun 28 2023 06:45:35 GMT+0000 (Greenwich Mean Time) (6071ms) √ EX-5287 Part 5: Verify the Response Needed CN email.Wed Jun 28 2023 06:45:35 GMT+0000 (Greenwich Mean Time) (6071ms) √ EX-5287 Part 6: Verify LinksWed Jun 28 2023 06:45:45 GMT+0000 (Greenwich Mean Time) (10869ms) √ EX-5287 Part 6: Verify LinksWed Jun 28 2023 06:45:45 GMT+0000 (Greenwich Mean Time) (10869ms) √ EX-5287 Part 7: Cleanup GC...Wed Jun 28 2023 06:45:45 GMT+0000 (Greenwich Mean Time) (23658ms) √ EX-5287 Part 7: Cleanup GC...Wed Jun 28 2023 06:45:45 GMT+0000 (Greenwich Mean Time) (23658ms) 7 passing (3m) 7 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_098.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 8 seconds │ │ Spec Ran: 11_Emails/ChangeNotifications/ex-5287-verify-all-links-in-authorize-work-cn-resp │ │ onse-needed-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/CORs/ex-3720-verify-all-links-in-cor-recieved-email.spec.t (100 of 104) s Email Hyperlinks | To verify that all links on COR received email works fineWed Jun 28 2023 06:46:23 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on COR received email works fineWed Jun 28 2023 06:46:23 GMT+0000 (Greenwich Mean Time) √ EX-3720 Part 1: Create a project. Wed Jun 28 2023 06:46:23 GMT+0000 (Greenwich Mean Time) (47493ms) √ EX-3720 Part 1: Create a project. Wed Jun 28 2023 06:46:23 GMT+0000 (Greenwich Mean Time) (47493ms) √ EX-3720 Part 2: Add contract. Wed Jun 28 2023 06:46:23 GMT+0000 (Greenwich Mean Time) (33331ms) √ EX-3720 Part 2: Add contract. Wed Jun 28 2023 06:46:23 GMT+0000 (Greenwich Mean Time) (33331ms) √ EX-3720 Part 3: Sub Contractor accepts the project invite.Wed Jun 28 2023 06:46:23 GMT+0000 (Greenwich Mean Time) (21883ms) √ EX-3720 Part 3: Sub Contractor accepts the project invite.Wed Jun 28 2023 06:46:23 GMT+0000 (Greenwich Mean Time) (21883ms) √ EX-3720 Part 4: Sub Contractor creates COR.Wed Jun 28 2023 06:46:23 GMT+0000 (Greenwich Mean Time) (64576ms) √ EX-3720 Part 4: Sub Contractor creates COR.Wed Jun 28 2023 06:46:23 GMT+0000 (Greenwich Mean Time) (64576ms) √ EX-3720 Part 5: Verify the new COR email links to clearstory.build.Wed Jun 28 2023 06:49:16 GMT+0000 (Greenwich Mean Time) (11998ms) √ EX-3720 Part 5: Verify the new COR email links to clearstory.build.Wed Jun 28 2023 06:49:16 GMT+0000 (Greenwich Mean Time) (11998ms) √ EX-3720 Part 6: Verify the VIEW/COMMENT/DOWNLOAD button link.Wed Jun 28 2023 06:49:31 GMT+0000 (Greenwich Mean Time) (10705ms) √ EX-3720 Part 6: Verify the VIEW/COMMENT/DOWNLOAD button link.Wed Jun 28 2023 06:49:31 GMT+0000 (Greenwich Mean Time) (10705ms) √ EX-3720 Part 7: Cleanup GC...Wed Jun 28 2023 06:49:31 GMT+0000 (Greenwich Mean Time) (24859ms) √ EX-3720 Part 7: Cleanup GC...Wed Jun 28 2023 06:49:31 GMT+0000 (Greenwich Mean Time) (24859ms) √ EX-3720 Part 8: Cleanup SC...Wed Jun 28 2023 06:49:31 GMT+0000 (Greenwich Mean Time) (28346ms) √ EX-3720 Part 8: Cleanup SC...Wed Jun 28 2023 06:49:31 GMT+0000 (Greenwich Mean Time) (28346ms) 8 passing (4m) 8 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_099.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 12 seconds │ │ Spec Ran: 11_Emails/CORs/ex-3720-verify-all-links-in-cor-recieved-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/Projects/ex-3717-verify-all-links-in-add-my-company-email. (101 of 104) spec.ts Email Hyperlinks | To verify that all links on Add My Company email work fineWed Jun 28 2023 06:50:39 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Add My Company email work fineWed Jun 28 2023 06:50:39 GMT+0000 (Greenwich Mean Time) √ EX-3717 Part 1: Create project and send invite.Wed Jun 28 2023 06:50:39 GMT+0000 (Greenwich Mean Time) (46812ms) √ EX-3717 Part 1: Create project and send invite.Wed Jun 28 2023 06:50:39 GMT+0000 (Greenwich Mean Time) (46812ms) √ EX-3717 Part 2: Add My Comapny Users. Wed Jun 28 2023 06:50:39 GMT+0000 (Greenwich Mean Time) (34064ms) √ EX-3717 Part 2: Add My Comapny Users. Wed Jun 28 2023 06:50:39 GMT+0000 (Greenwich Mean Time) (34064ms) √ EX-3717 Part 3: Verify the email links to clearstory.build.Wed Jun 28 2023 06:52:04 GMT+0000 (Greenwich Mean Time) (9591ms) √ EX-3717 Part 3: Verify the email links to clearstory.build.Wed Jun 28 2023 06:52:04 GMT+0000 (Greenwich Mean Time) (9591ms) √ EX-3717 Part 4: Verify the JOIN PROJECT button link.Wed Jun 28 2023 06:52:19 GMT+0000 (Greenwich Mean Time) (11138ms) √ EX-3717 Part 4: Verify the JOIN PROJECT button link.Wed Jun 28 2023 06:52:19 GMT+0000 (Greenwich Mean Time) (11138ms) √ EX-3717 Part 5: Cleanup...Wed Jun 28 2023 06:52:19 GMT+0000 (Greenwich Mean Time) (24125ms) √ EX-3717 Part 5: Cleanup...Wed Jun 28 2023 06:52:19 GMT+0000 (Greenwich Mean Time) (24125ms) 5 passing (2m) 5 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_100.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 15 seconds │ │ Spec Ran: 11_Emails/Projects/ex-3717-verify-all-links-in-add-my-company-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/Projects/ex-3718-verify-all-links-in-add-my-customer-email (102 of 104) .spec.ts Email Hyperlinks | To verify that all the links on Add My Customer worksWed Jun 28 2023 06:52:57 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all the links on Add My Customer worksWed Jun 28 2023 06:52:57 GMT+0000 (Greenwich Mean Time) √ EX-3718 Part 1: Create project and send invite.Wed Jun 28 2023 06:52:57 GMT+0000 (Greenwich Mean Time) (47878ms) √ EX-3718 Part 1: Create project and send invite.Wed Jun 28 2023 06:52:57 GMT+0000 (Greenwich Mean Time) (47878ms) √ EX-3718 Part 2: Add Customers.Wed Jun 28 2023 06:52:57 GMT+0000 (Greenwich Mean Time) (30104ms) √ EX-3718 Part 2: Add Customers.Wed Jun 28 2023 06:52:57 GMT+0000 (Greenwich Mean Time) (30104ms) √ EX-3718 Part 3: Login to the Owner PM account and Accept the invite.Wed Jun 28 2023 06:52:57 GMT+0000 (Greenwich Mean Time) (15399ms) √ EX-3718 Part 3: Login to the Owner PM account and Accept the invite.Wed Jun 28 2023 06:52:57 GMT+0000 (Greenwich Mean Time) (15399ms) 1) EX-3718 Part 4: Verify the email links to clearstory.build.Wed Jun 28 2023 06:54:35 GMT+0000 (Greenwich Mean Time) 1) EX-3718 Part 4: Verify the email links to clearstory.build.Wed Jun 28 2023 06:54:35 GMT+0000 (Greenwich Mean Time) √ EX-3718 Part 5: Verify the JOIN PROJECT button link.Wed Jun 28 2023 06:55:44 GMT+0000 (Greenwich Mean Time) (12592ms) √ EX-3718 Part 5: Verify the JOIN PROJECT button link.Wed Jun 28 2023 06:55:44 GMT+0000 (Greenwich Mean Time) (12592ms) √ EX-3718 Part 6: Cleanup Ow...Wed Jun 28 2023 06:55:44 GMT+0000 (Greenwich Mean Time) (27278ms) √ EX-3718 Part 6: Cleanup Ow...Wed Jun 28 2023 06:55:44 GMT+0000 (Greenwich Mean Time) (27278ms) √ EX-3718 Part 7: Cleanup GC...Wed Jun 28 2023 06:55:44 GMT+0000 (Greenwich Mean Time) (23958ms) √ EX-3718 Part 7: Cleanup GC...Wed Jun 28 2023 06:55:44 GMT+0000 (Greenwich Mean Time) (23958ms) 6 passing (4m) 1 failing 1) Email Hyperlinks | To verify that all the links on Add My Customer worksWed Jun 28 2023 06:55:44 GMT+0000 (Greenwich Mean Time) EX-3718 Part 4: Verify the email links to clearstory.build.Wed Jun 28 2023 06:54:35 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[href="https://clearstory.build/"] img[title='Clearstory']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 6 passing (4m) 1 failing 1) Email Hyperlinks | To verify that all the links on Add My Customer worksWed Jun 28 2023 06:55:44 GMT+0000 (Greenwich Mean Time) EX-3718 Part 4: Verify the email links to clearstory.build.Wed Jun 28 2023 06:54:35 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[href="https://clearstory.build/"] img[title='Clearstory']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_101.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 6 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 2 │ │ Video: false │ │ Duration: 3 minutes, 50 seconds │ │ Spec Ran: 11_Emails/Projects/ex-3718-verify-all-links-in-add-my-customer-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\11_Emai (1280x720) ls\Projects\ex-3718-verify-all-links-in-add-my-customer-email.spec.ts\Email Hype rlinks To verify that all the links on Add My Customer worksWed Jun 28 2023 065 435 GMT+0000 (Greenwich Mean Time) -- EX-3718 Part 4 Verify the email links to c learstory.build.Wed Jun 28 2023 065435 GMT+0000 (Greenwich Mean Time) (failed).p ng - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\11_Emai (1280x720) ls\Projects\ex-3718-verify-all-links-in-add-my-customer-email.spec.ts\Email Hype rlinks To verify that all the links on Add My Customer worksWed Jun 28 2023 065 435 GMT+0000 (Greenwich Mean Time) -- EX-3718 Part 4 Verify the email links to c learstory.build.Wed Jun 28 2023 065435 GMT+0000 (Greenwich Mean Time) (failed) ( .png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/Projects/ex-3719-verify-all-links-in-add-contrctor-email.s (103 of 104) pec.ts Email Hyperlinks | To verify that all the links on Add Contractors email workWed Jun 28 2023 06:56:52 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all the links on Add Contractors email workWed Jun 28 2023 06:56:52 GMT+0000 (Greenwich Mean Time) √ EX-3719 Part 1: Create a project Wed Jun 28 2023 06:56:52 GMT+0000 (Greenwich Mean Time) (54512ms) √ EX-3719 Part 1: Create a project Wed Jun 28 2023 06:56:52 GMT+0000 (Greenwich Mean Time) (54512ms) √ EX-3719 Part 2: Send invite.Wed Jun 28 2023 06:56:52 GMT+0000 (Greenwich Mean Time) (34231ms) √ EX-3719 Part 2: Send invite.Wed Jun 28 2023 06:56:52 GMT+0000 (Greenwich Mean Time) (34231ms) √ EX-3719 Part 3: Accept invite. Wed Jun 28 2023 06:56:52 GMT+0000 (Greenwich Mean Time) (21876ms) √ EX-3719 Part 3: Accept invite. Wed Jun 28 2023 06:56:52 GMT+0000 (Greenwich Mean Time) (21876ms) √ EX-3719 Part 4: Verify the email links to Eclearstory.build.Wed Jun 28 2023 06:58:47 GMT+0000 (Greenwich Mean Time) (13563ms) √ EX-3719 Part 4: Verify the email links to Eclearstory.build.Wed Jun 28 2023 06:58:47 GMT+0000 (Greenwich Mean Time) (13563ms) √ EX-3719 Part 5: Verify JOIN PROJECT button link.Wed Jun 28 2023 06:59:06 GMT+0000 (Greenwich Mean Time) (14999ms) √ EX-3719 Part 5: Verify JOIN PROJECT button link.Wed Jun 28 2023 06:59:06 GMT+0000 (Greenwich Mean Time) (14999ms) √ EX-3719 Part 6: Cleanup GC...Wed Jun 28 2023 06:59:06 GMT+0000 (Greenwich Mean Time) (24300ms) √ EX-3719 Part 6: Cleanup GC...Wed Jun 28 2023 06:59:06 GMT+0000 (Greenwich Mean Time) (24300ms) √ EX-3719 Part 7: Cleanup SC...Wed Jun 28 2023 06:59:06 GMT+0000 (Greenwich Mean Time) (29381ms) √ EX-3719 Part 7: Cleanup SC...Wed Jun 28 2023 06:59:06 GMT+0000 (Greenwich Mean Time) (29381ms) 7 passing (3m) 7 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_102.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 22 seconds │ │ Spec Ran: 11_Emails/Projects/ex-3719-verify-all-links-in-add-contrctor-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/T&M_Tags/ex-3721-verify-all-links-in-please-sign-tm-tag-em (104 of 104) ail.spec.ts Email Hyperlinks | To verify that all links on Please sign T&M tag email works fineWed Jun 28 2023 07:00:18 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Please sign T&M tag email works fineWed Jun 28 2023 07:00:18 GMT+0000 (Greenwich Mean Time) √ EX-3721 Part 1: Create a project and send invite.Wed Jun 28 2023 07:00:18 GMT+0000 (Greenwich Mean Time) (47636ms) √ EX-3721 Part 1: Create a project and send invite.Wed Jun 28 2023 07:00:18 GMT+0000 (Greenwich Mean Time) (47636ms) √ EX-3721 Part 2: Send invite.Wed Jun 28 2023 07:00:18 GMT+0000 (Greenwich Mean Time) (35293ms) √ EX-3721 Part 2: Send invite.Wed Jun 28 2023 07:00:18 GMT+0000 (Greenwich Mean Time) (35293ms) √ EX-3721 Part 3: Sub Contractor Accepts the invite.Wed Jun 28 2023 07:00:18 GMT+0000 (Greenwich Mean Time) (21231ms) √ EX-3721 Part 3: Sub Contractor Accepts the invite.Wed Jun 28 2023 07:00:18 GMT+0000 (Greenwich Mean Time) (21231ms) √ EX-3721 Part 4: Sub Contractor creates a Tag.Wed Jun 28 2023 07:00:18 GMT+0000 (Greenwich Mean Time) (44977ms) √ EX-3721 Part 4: Sub Contractor creates a Tag.Wed Jun 28 2023 07:00:18 GMT+0000 (Greenwich Mean Time) (44977ms) √ EX-3721 Part 5: Verify the tag was created.Wed Jun 28 2023 07:00:18 GMT+0000 (Greenwich Mean Time) (26590ms) √ EX-3721 Part 5: Verify the tag was created.Wed Jun 28 2023 07:00:18 GMT+0000 (Greenwich Mean Time) (26590ms) √ EX-3721 Part 6: Verify the please sign T&M email.Wed Jun 28 2023 07:03:19 GMT+0000 (Greenwich Mean Time) (11182ms) √ EX-3721 Part 6: Verify the please sign T&M email.Wed Jun 28 2023 07:03:19 GMT+0000 (Greenwich Mean Time) (11182ms) √ EX-3721 Part 7: Cleanup GC...Wed Jun 28 2023 07:03:35 GMT+0000 (Greenwich Mean Time) (25375ms) √ EX-3721 Part 7: Cleanup GC...Wed Jun 28 2023 07:03:35 GMT+0000 (Greenwich Mean Time) (25375ms) √ EX-3721 Part 7: Cleanup SC...Wed Jun 28 2023 07:03:35 GMT+0000 (Greenwich Mean Time) (29175ms) √ EX-3721 Part 7: Cleanup SC...Wed Jun 28 2023 07:03:35 GMT+0000 (Greenwich Mean Time) (29175ms) 8 passing (4m) 8 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_103.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 10 seconds │ │ Spec Ran: 11_Emails/T&M_Tags/ex-3721-verify-all-links-in-please-sign-tm-tag-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ==================================================================================================== (Run Finished) Spec Tests Passing Failing Pending Skipped ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ √ 01_LoginPage/ex-3313-invalid-creden 00:09 1 1 - - - │ │ tials.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 01_LoginPage/ex-3316-email-input-va 00:07 1 1 - - - │ │ lidation.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 01_LoginPage/ex-5751-create-new-acc 00:10 1 1 - - - │ │ ount-with-already-used-email.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 09_Analytics/ex-5428-verify-sent-ex 00:39 1 1 - - - │ │ port--tm-tag-detailed-report-xlsx-a │ │ fter-filtering-by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 09_Analytics/ex-8799-verify-receive 01:47 1 1 - - - │ │ d-export--tm-tag-detailed-report-xl │ │ sx-after-filtering-by-project.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 12_Tag_Activity/ex-7214-tag-activit 10:59 7 4 3 - - │ │ y-create-sign-send-reject-from-web. │ │ spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 12_Tag_Activity/ex-7215-tag-activit 07:07 6 6 - - - │ │ y-create-sign-send-revise-resubmit- │ │ from-web.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 12_Tag_Activity/ex-7353-tag-activit 04:06 7 7 - - - │ │ y-create-tag-opened-status.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-7673-cor-activit 06:33 6 6 - - - │ │ y-create-cor-draft-view-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-7674-cor-activit 06:27 6 6 - - - │ │ y-create-cor-resend-cor-resend-cor- │ │ with-email-message-view-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-7678-cor-activit 08:12 6 6 - - - │ │ y-create-cor-change-status-state-at │ │ -receiver.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 13_Cor_Activity/ex-7798-cor-activit 12:03 6 2 4 - - │ │ y-upload-cor-view-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 02_PermissionLevels/Add_users_to_Pr 03:16 3 2 1 - - │ │ oject/EX-9394-GC-creates-project-ad │ │ ds-new-customer-user.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:17 2 2 - - - │ │ ex-3323-create-new-project-as-owner │ │ -in-owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:13 2 2 - - - │ │ ex-3328-create-new-project-as-owner │ │ -in-sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:16 2 2 - - - │ │ ex-3329-create-new-project-as-owner │ │ -in-other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:14 2 2 - - - │ │ ex-3330-create-new-project-as-admin │ │ -in-owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:28 2 2 - - - │ │ ex-3331-create-new-project-as-admin │ │ -in-gc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:12 2 2 - - - │ │ ex-3332-create-new-project-as-pm-in │ │ -gc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:12 2 2 - - - │ │ ex-3333-create-new-project-as-fu-in │ │ -gc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:14 2 2 - - - │ │ ex-3334-create-new-project-as-pm-in │ │ -owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:14 2 2 - - - │ │ ex-3335-create-new-project-as-fu-in │ │ -owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 02_PermissionLevels/Create_Project/ 03:56 2 1 1 - - │ │ ex-3336-create-new-project-as-admin │ │ -in-sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:17 2 2 - - - │ │ ex-3337-create-new-project-as-pm-in │ │ -sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:16 2 2 - - - │ │ ex-3338-create-new-project-as-fu-in │ │ -sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:24 2 2 - - - │ │ ex-3342-create-new-project-as-admin │ │ -in-other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:18 2 2 - - - │ │ ex-3343-create-new-project-as-pm-in │ │ -other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:16 2 2 - - - │ │ ex-3344-create-new-project-as-fu-in │ │ -other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 01:56 6 6 - - - │ │ 792-GC-account-owner-user-previlleg │ │ es.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 05:10 12 12 - - - │ │ 793-GC-Owner-project-previlleges.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 01:48 6 6 - - - │ │ 828-GC-admin-user-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 01:50 6 6 - - - │ │ 829-GC-PM-user-previlleges.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 01:08 5 5 - - - │ │ 830-GC-Field-user-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 02:28 8 8 - - - │ │ 832-SC-Field-users-user-previlleges │ │ .spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 02:43 8 8 - - - │ │ 833-SC-PM-user-previlleges.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 02:50 8 8 - - - │ │ 834-SC-Admin-user-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 02:45 8 8 - - - │ │ 835-SC-account-owner-user-previlleg │ │ es.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 02_PermissionLevels/User_roles/ex-9 13:21 12 8 4 - - │ │ 885-GC-Admin-project-previlleges.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 05:14 12 12 - - - │ │ 886-GC-PM-project-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 09:28 12 12 - - - │ │ 887-SC-Admin-project-previlleges.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 03:56 9 9 - - - │ │ 888-GC-FU-project-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 05:28 12 12 - - - │ │ 889-SC-Owner-project-previlleges.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 05:19 12 12 - - - │ │ 890-SC-PM-project-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 04:01 9 9 - - - │ │ 891-SC-FU-project-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-3673-verify-cont 03:29 4 4 - - - │ │ ractor-is-able-to-upload-cor-with-o │ │ nly-mandatory-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-3683-GC-creates- 06:18 11 11 - - - │ │ project-adds-contract-SC-creates-co │ │ r.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-3686-verify-ther 00:27 1 1 - - - │ │ e-are-two-tabs-on-cor-log-page-sent │ │ -received.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 04_COR_Log/Sent/EX-4366-SC-creates- 09:09 11 10 1 - - │ │ project-adds-gc-customer-sc-creates │ │ -cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 04_COR_Log/Sent/EX-4432-to-verify-P 06:11 7 5 2 - - │ │ M-is-able-to-create-cor-as-draft.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5244-verify-shar 01:00 1 1 - - - │ │ eable-link-contains-just-the-select │ │ ed-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5333-SC-creates- 22ms 1 - - 1 - │ │ cor-with-full-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5396-verify-cont 07:06 11 11 - - - │ │ ractor-is-able-to-upload-cor-with-m │ │ andatory-and-optional-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5435-create-new- 03:11 6 6 - - - │ │ project-add-contrac-verify-original │ │ -contract-value.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/EX-5827-to-verify-m 00:23 1 1 - - - │ │ ultiple-cors-to-same-tag-when-creat │ │ ing-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/EX-5894-to-verify-m 00:38 1 1 - - - │ │ ultiple-cors-to-same-tag-when-uploa │ │ ding-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-6681-verify-sent 02:00 2 2 - - - │ │ -summary-data-after-filtering-by-pr │ │ oject.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5425-verify- 01:49 2 2 - - - │ │ received-summary-data-after-filteri │ │ ng-by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5429-verify- 00:51 1 1 - - - │ │ received-export-csv-after-filtering │ │ -by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5431-verify- 00:57 1 1 - - - │ │ received-export-sharelog-after-filt │ │ ering-by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5641-verify- 04:49 5 5 - - - │ │ tnm-log-received-summary-data-after │ │ -filtering-by-tag-status.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-1-gc-create 04:11 5 5 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-2-gc-create 04:58 2 2 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-3-gc-create 02:51 1 1 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-4-gc-create 02:46 1 1 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-5-gc-create 02:31 2 2 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-6-gc-create 04:22 8 8 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5424-verify-sent 02:00 2 2 - - - │ │ -summary-data-after-filtering-by-pr │ │ oject.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5430-verify-sent 00:38 1 1 - - - │ │ -export-csv-after-filtering-by-proj │ │ ect.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5505-verify-tnm- 01:21 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-customer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5506-verify-tnm- 01:21 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-job-number.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5507-verify-tnm- 01:17 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-cust-ref-num.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5508-verify-tnm- 08:39 7 7 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-tag-status.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5509-verify-tnm- 01:18 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-cust-label.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5510-verify-tnm- 02:19 2 2 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-cor-availability.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6191-sc-creates- 01:34 1 1 - - - │ │ tag-required-signer-gc-signs-tag.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6193-sc-fu-creat 05:42 8 8 - - - │ │ es-tag-required-signer-gc-fu-signs- │ │ tag.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-1-sc-pm-cre 09:53 5 5 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-2-sc-pm-cre 06:58 4 4 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-3-sc-pm-cre 04:48 4 4 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-4-sc-pm-cre 00:53 3 3 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-5-sc-pm-cre 03:23 6 6 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6335-sc-sends-ta 07:26 10 10 - - - │ │ g-gc-signs-tag-as-optional-not-save │ │ d-drafts.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-7224-switch-proj 05:01 7 7 - - - │ │ ect-workflow.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-60 04:44 8 8 - - - │ │ 30-create-cn-respond-with-upload-co │ │ r-verify-all-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-85 09:52 13 13 - - - │ │ 97-respond-to-cn-as-SC-and-GC-clear │ │ -response.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-85 02:47 5 5 - - - │ │ 99-create-cn-authorize-t&mwork-resp │ │ ond-as-SC-PM-with-no-cost-impact.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 02:46 5 5 - - - │ │ 42-create-cn-pricing-request-respon │ │ d-as-SC-PM-with-no-cost-impact.spec │ │ .ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 04:21 7 7 - - - │ │ 43-create-cn-pricing-request-respon │ │ d-as-SC-PM-with-create-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 04:32 7 7 - - - │ │ 44-create-cn-pricing-request-respon │ │ d-as-SC-PM-with-upload-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 02:46 5 5 - - - │ │ 45-create-cn-pricing-request-respon │ │ d-as-GC-PM-with-no-cost-impact.spec │ │ .ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 02:41 5 5 - - - │ │ 46-create-cn-pricing-request-respon │ │ d-as-GC-PM-by-linking-existing-cor. │ │ spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 04:27 7 7 - - - │ │ 47-create-cn-authorize-t&mwork-resp │ │ ond-as-SC-PM-with-create-cor.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 04:57 8 8 - - - │ │ 48-create-cn-authorize-t&mwork-resp │ │ ond-as-SC-PM-with-upload-cor.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 02:48 5 5 - - - │ │ 49-create-cn-authorize-t&mwork-resp │ │ ond-as-GC-PM-with-no-cost-impact.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 02:46 5 5 - - - │ │ 50-create-cn-authorize-t&mwork-resp │ │ ond-as-GC-PM-by-linking-existing-co │ │ r.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 08_Projects/Active Projects/ex-5467 05:28 12 12 - - - │ │ -verify-job-number-propagation-betw │ │ een-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 08_Projects/Active Projects/ex-7362 03:51 7 7 - - - │ │ -verify-job-number-propagation-to-d │ │ raft-cors.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/ChangeNotifications/ex-37 03:50 8 8 - - - │ │ 23-verify-all-links-in-pricing-requ │ │ est-cn-response-needed-email.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/ChangeNotifications/ex-52 03:08 7 7 - - - │ │ 87-verify-all-links-in-authorize-wo │ │ rk-cn-response-needed-email.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/CORs/ex-3720-verify-all-l 04:12 8 8 - - - │ │ inks-in-cor-recieved-email.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/Projects/ex-3717-verify-a 02:15 5 5 - - - │ │ ll-links-in-add-my-company-email.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 11_Emails/Projects/ex-3718-verify-a 03:50 7 6 1 - - │ │ ll-links-in-add-my-customer-email.s │ │ pec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/Projects/ex-3719-verify-a 03:22 7 7 - - - │ │ ll-links-in-add-contrctor-email.spe │ │ c.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/T&M_Tags/ex-3721-verify-a 04:10 8 8 - - - │ │ ll-links-in-please-sign-tm-tag-emai │ │ l.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ × 8 of 104 failed (8%) 6:11:40 525 507 17 1 -