> cypress-extracker-webapp@1.0.0 scripts-regression > cypress run --browser chrome --spec "./cypress/e2e/regression/** ==================================================================================================== (Run Starting) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Cypress: 12.17.3 │ │ Browser: Chrome 115 (headless) │ │ Node Version: v18.14.1 (C:\Program Files\nodejs\node.exe) │ │ Specs: 110 found (01_LoginPage/ex-3313-invalid-credentials.spec.ts, 01_LoginPage/ex-3 │ │ 316-email-input-validation.spec.ts, 01_LoginPage/ex-5751-create-new-account-wi │ │ th-already-used-email.spec.ts, 09_Analytics/ex-5428-verify-sent-export--tm-tag │ │ -detailed-report-xlsx-af...) │ │ Searched: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\e2e\regression\** │ │ Experiments: experimentalMemoryManagement=true,experimentalStudio=true │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 01_LoginPage/ex-3313-invalid-credentials.spec.ts (1 of 110) Login with invalid credentialsTue Aug 08 2023 00:46:26 GMT+0000 (Greenwich Mean Time) Login with invalid credentialsTue Aug 08 2023 00:46:26 GMT+0000 (Greenwich Mean Time) √ EX-3313 - Login with invalid credentials.Tue Aug 08 2023 00:46:26 GMT+0000 (Greenwich Mean Time) (11854ms) √ EX-3313 - Login with invalid credentials.Tue Aug 08 2023 00:46:26 GMT+0000 (Greenwich Mean Time) (11854ms) 1 passing (12s) 1 passing (12s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 11 seconds │ │ Spec Ran: 01_LoginPage/ex-3313-invalid-credentials.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 01_LoginPage/ex-3316-email-input-validation.spec.ts (2 of 110) 3316 | Verify data input validation for emailTue Aug 08 2023 00:46:43 GMT+0000 (Greenwich Mean Time) 3316 | Verify data input validation for emailTue Aug 08 2023 00:46:43 GMT+0000 (Greenwich Mean Time) √ 3316 - Verify data input validation for emailTue Aug 08 2023 00:46:43 GMT+0000 (Greenwich Mean Time) (8963ms) √ 3316 - Verify data input validation for emailTue Aug 08 2023 00:46:43 GMT+0000 (Greenwich Mean Time) (8963ms) 1 passing (9s) 1 passing (9s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_001.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 9 seconds │ │ Spec Ran: 01_LoginPage/ex-3316-email-input-validation.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 01_LoginPage/ex-5751-create-new-account-with-already-used-email.spec (3 of 110) .ts Account Creation | Prevent users from creating separate accounts with same email domainTue Aug 08 2023 00:46:55 GMT+0000 (Greenwich Mean Time) Account Creation | Prevent users from creating separate accounts with same email domainTue Aug 08 2023 00:46:55 GMT+0000 (Greenwich Mean Time) √ EX-5751 - Create account with email that is already associated with existing Extracker account.Tue Aug 08 2023 00:46:55 GMT+0000 (Greenwich Mean Time) (12317ms) √ EX-5751 - Create account with email that is already associated with existing Extracker account.Tue Aug 08 2023 00:46:55 GMT+0000 (Greenwich Mean Time) (12317ms) 1 passing (12s) 1 passing (12s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_002.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 12 seconds │ │ Spec Ran: 01_LoginPage/ex-5751-create-new-account-with-already-used-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 09_Analytics/ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx (4 of 110) -after-filtering-by-project.spec.ts Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Tue Aug 08 2023 00:47:11 GMT+0000 (Greenwich Mean Time) Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Tue Aug 08 2023 00:47:11 GMT+0000 (Greenwich Mean Time) √ EX-5428 - Verify the SENT, Detailed TM Tags Report (Excel).Tue Aug 08 2023 00:47:11 GMT+0000 (Greenwich Mean Time) (38769ms) √ EX-5428 - Verify the SENT, Detailed TM Tags Report (Excel).Tue Aug 08 2023 00:47:11 GMT+0000 (Greenwich Mean Time) (38769ms) 1 passing (39s) 1 passing (39s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_003.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 38 seconds │ │ Spec Ran: 09_Analytics/ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx-after-filte │ │ ring-by-project.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 09_Analytics/ex-8799-verify-received-export--tm-tag-detailed-report- (5 of 110) xlsx-after-filtering-by-project.spec.ts Analytics | Verify the Received, Detailed TM Tags Report (Excel)Tue Aug 08 2023 00:47:54 GMT+0000 (Greenwich Mean Time) Analytics | Verify the Received, Detailed TM Tags Report (Excel)Tue Aug 08 2023 00:47:54 GMT+0000 (Greenwich Mean Time) √ EX-8799 - Verify the Received, Detailed TM Tags Report (Excel).Tue Aug 08 2023 00:47:54 GMT+0000 (Greenwich Mean Time) (38933ms) √ EX-8799 - Verify the Received, Detailed TM Tags Report (Excel).Tue Aug 08 2023 00:47:54 GMT+0000 (Greenwich Mean Time) (38933ms) 1 passing (39s) 1 passing (39s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_004.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 39 seconds │ │ Spec Ran: 09_Analytics/ex-8799-verify-received-export--tm-tag-detailed-report-xlsx-after-f │ │ iltering-by-project.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 12_Tag_Activity/ex-7214-tag-activity-create-sign-send-reject-from-we (6 of 110) b.spec.ts Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification)Tue Aug 08 2023 00:48:38 GMT+0000 (Greenwich Mean Time) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification)Tue Aug 08 2023 00:48:38 GMT+0000 (Greenwich Mean Time) √ EX-7214 - Part 1: Clean the tags (42131ms) √ EX-7214 - Part 1: Clean the tags (42131ms) √ EX-7214 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagTue Aug 08 2023 00:48:38 GMT+0000 (Greenwich Mean Time) (87036ms) √ EX-7214 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagTue Aug 08 2023 00:48:38 GMT+0000 (Greenwich Mean Time) (87036ms) √ EX-7214 - Part 3: Verify activity feed. Tue Aug 08 2023 00:48:38 GMT+0000 (Greenwich Mean Time) (41887ms) √ EX-7214 - Part 3: Verify activity feed. Tue Aug 08 2023 00:48:38 GMT+0000 (Greenwich Mean Time) (41887ms) √ EX-7214 - Part 4: Verify the GC Admin received Bell Notification and use it to reject the tag.Tue Aug 08 2023 00:48:38 GMT+0000 (Greenwich Mean Time) (24978ms) √ EX-7214 - Part 4: Verify the GC Admin received Bell Notification and use it to reject the tag.Tue Aug 08 2023 00:48:38 GMT+0000 (Greenwich Mean Time) (24978ms) √ EX-7214 - Part 5: Verify the tag activity in the SC Admin T&M Log pageTue Aug 08 2023 00:48:38 GMT+0000 (Greenwich Mean Time) (38446ms) √ EX-7214 - Part 5: Verify the tag activity in the SC Admin T&M Log pageTue Aug 08 2023 00:48:38 GMT+0000 (Greenwich Mean Time) (38446ms) √ EX-7214 - Part 6: Verify the tag activity in the GC Admin T&M Log page in Receiver tabTue Aug 08 2023 00:48:38 GMT+0000 (Greenwich Mean Time) (41102ms) √ EX-7214 - Part 6: Verify the tag activity in the GC Admin T&M Log page in Receiver tabTue Aug 08 2023 00:48:38 GMT+0000 (Greenwich Mean Time) (41102ms) √ EX-7214 - Part 7: Cleanup SC Tag ... Tue Aug 08 2023 00:48:38 GMT+0000 (Greenwich Mean Time) (38904ms) √ EX-7214 - Part 7: Cleanup SC Tag ... Tue Aug 08 2023 00:48:38 GMT+0000 (Greenwich Mean Time) (38904ms) 7 passing (5m) 7 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_005.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 15 seconds │ │ Spec Ran: 12_Tag_Activity/ex-7214-tag-activity-create-sign-send-reject-from-web.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 12_Tag_Activity/ex-7215-tag-activity-create-sign-send-revise-resubmi (7 of 110) t-from-web.spec.ts Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Revise and Resubmit the tag from the web(Bell notification)Tue Aug 08 2023 00:53:58 GMT+0000 (Greenwich Mean Time) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Revise and Resubmit the tag from the web(Bell notification)Tue Aug 08 2023 00:53:58 GMT+0000 (Greenwich Mean Time) √ EX-7215 - Part 1: Clean the tags (45561ms) √ EX-7215 - Part 1: Clean the tags (45561ms) √ EX-7215 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagTue Aug 08 2023 00:53:59 GMT+0000 (Greenwich Mean Time) (88135ms) √ EX-7215 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagTue Aug 08 2023 00:53:59 GMT+0000 (Greenwich Mean Time) (88135ms) √ EX-7215 - Part 3: Verify the GC Admin received Bell Notification and use it to revise and resubmit the tag.Tue Aug 08 2023 00:53:59 GMT+0000 (Greenwich Mean Time) (25881ms) √ EX-7215 - Part 3: Verify the GC Admin received Bell Notification and use it to revise and resubmit the tag.Tue Aug 08 2023 00:53:59 GMT+0000 (Greenwich Mean Time) (25881ms) √ EX-7215 - Part 4: Verify the tag activity in the SC Admin T&M Log pageTue Aug 08 2023 00:53:59 GMT+0000 (Greenwich Mean Time) (48591ms) √ EX-7215 - Part 4: Verify the tag activity in the SC Admin T&M Log pageTue Aug 08 2023 00:53:59 GMT+0000 (Greenwich Mean Time) (48591ms) √ EX-7215 - Part 5: Verify the tag activity in the GC Admin T&M Log page in Receiver tabTue Aug 08 2023 00:53:59 GMT+0000 (Greenwich Mean Time) (41281ms) √ EX-7215 - Part 5: Verify the tag activity in the GC Admin T&M Log page in Receiver tabTue Aug 08 2023 00:53:59 GMT+0000 (Greenwich Mean Time) (41281ms) √ EX-7215 - Part 6: Cleanup SC Tag ... Tue Aug 08 2023 00:53:59 GMT+0000 (Greenwich Mean Time) (34715ms) √ EX-7215 - Part 6: Cleanup SC Tag ... Tue Aug 08 2023 00:53:59 GMT+0000 (Greenwich Mean Time) (34715ms) 6 passing (5m) 6 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_006.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 44 seconds │ │ Spec Ran: 12_Tag_Activity/ex-7215-tag-activity-create-sign-send-revise-resubmit-from-web.s │ │ pec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 12_Tag_Activity/ex-7353-tag-activity-create-tag-opened-status.spec.t (8 of 110) s Activity Log | T&M Tag | Create a Tag with status Open and verify its Activity Feed messages. Tue Aug 08 2023 00:58:48 GMT+0000 (Greenwich Mean Time) Activity Log | T&M Tag | Create a Tag with status Open and verify its Activity Feed messages. Tue Aug 08 2023 00:58:48 GMT+0000 (Greenwich Mean Time) √ EX-7353 - Part 1: GC PM creates a projectTue Aug 08 2023 00:58:48 GMT+0000 (Greenwich Mean Time) (47737ms) √ EX-7353 - Part 1: GC PM creates a projectTue Aug 08 2023 00:58:48 GMT+0000 (Greenwich Mean Time) (47737ms) √ EX-7353 - Part 2: GC PM adds a contract with SC PM.Tue Aug 08 2023 00:58:48 GMT+0000 (Greenwich Mean Time) (41007ms) √ EX-7353 - Part 2: GC PM adds a contract with SC PM.Tue Aug 08 2023 00:58:48 GMT+0000 (Greenwich Mean Time) (41007ms) √ EX-7353 - Part 3: Sub Contractor accepts invite from the bell notification.Tue Aug 08 2023 00:58:48 GMT+0000 (Greenwich Mean Time) (25804ms) √ EX-7353 - Part 3: Sub Contractor accepts invite from the bell notification.Tue Aug 08 2023 00:58:48 GMT+0000 (Greenwich Mean Time) (25804ms) √ EX-7353 - Part 4: Gen Contractor creates a Authorize T&M Work Change Notification.Tue Aug 08 2023 00:58:48 GMT+0000 (Greenwich Mean Time) (48094ms) √ EX-7353 - Part 4: Gen Contractor creates a Authorize T&M Work Change Notification.Tue Aug 08 2023 00:58:48 GMT+0000 (Greenwich Mean Time) (48094ms) √ EX-7353 - Part 5: Verify the tag activity in the GC Admin T&M Log page at the receiver tabTue Aug 08 2023 00:58:48 GMT+0000 (Greenwich Mean Time) (35650ms) √ EX-7353 - Part 5: Verify the tag activity in the GC Admin T&M Log page at the receiver tabTue Aug 08 2023 00:58:48 GMT+0000 (Greenwich Mean Time) (35650ms) √ EX-7353 - Part 6: Cleanup SC. Tue Aug 08 2023 00:58:48 GMT+0000 (Greenwich Mean Time) (31621ms) √ EX-7353 - Part 6: Cleanup SC. Tue Aug 08 2023 00:58:48 GMT+0000 (Greenwich Mean Time) (31621ms) √ EX-7353 - Part 6: Cleanup GC. Tue Aug 08 2023 00:58:48 GMT+0000 (Greenwich Mean Time) (36584ms) √ EX-7353 - Part 6: Cleanup GC. Tue Aug 08 2023 00:58:48 GMT+0000 (Greenwich Mean Time) (36584ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_007.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 26 seconds │ │ Spec Ran: 12_Tag_Activity/ex-7353-tag-activity-create-tag-opened-status.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7673-cor-activity-create-cor-draft-view-cor.spec. (9 of 110) ts Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiverTue Aug 08 2023 01:03:20 GMT+0000 (Greenwich Mean Time) Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiverTue Aug 08 2023 01:03:20 GMT+0000 (Greenwich Mean Time) √ EX-7673 - Part 0: Clean existing COR's : Tue Aug 08 2023 01:03:20 GMT+0000 (Greenwich Mean Time) (50571ms) √ EX-7673 - Part 0: Clean existing COR's : Tue Aug 08 2023 01:03:20 GMT+0000 (Greenwich Mean Time) (50571ms) √ EX-7673 - Part 1: Create COR as draft: Tue Aug 08 2023 01:03:20 GMT+0000 (Greenwich Mean Time) (49744ms) √ EX-7673 - Part 1: Create COR as draft: Tue Aug 08 2023 01:03:20 GMT+0000 (Greenwich Mean Time) (49744ms) √ EX-7673 - Part 2: Verify the COR Draft Log has the new COR draft and send the COR for email distribution : Tue Aug 08 2023 01:03:20 GMT+0000 (Greenwich Mean Time) (53709ms) √ EX-7673 - Part 2: Verify the COR Draft Log has the new COR draft and send the COR for email distribution : Tue Aug 08 2023 01:03:20 GMT+0000 (Greenwich Mean Time) (53709ms) √ EX-7673 - Part 3: Verify the Activity Feed in the Sent Log : Tue Aug 08 2023 01:03:20 GMT+0000 (Greenwich Mean Time) (46038ms) √ EX-7673 - Part 3: Verify the Activity Feed in the Sent Log : Tue Aug 08 2023 01:03:20 GMT+0000 (Greenwich Mean Time) (46038ms) √ EX-7673 - Part 4: Verify the activity at the Received Log for the Customer: Tue Aug 08 2023 01:03:20 GMT+0000 (Greenwich Mean Time) (40874ms) √ EX-7673 - Part 4: Verify the activity at the Received Log for the Customer: Tue Aug 08 2023 01:03:20 GMT+0000 (Greenwich Mean Time) (40874ms) √ EX-7673 - Part 5: Clean the COR Tue Aug 08 2023 01:03:20 GMT+0000 (Greenwich Mean Time) (54987ms) √ EX-7673 - Part 5: Clean the COR Tue Aug 08 2023 01:03:20 GMT+0000 (Greenwich Mean Time) (54987ms) 6 passing (5m) 6 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_008.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 56 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7673-cor-activity-create-cor-draft-view-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7674-cor-activity-create-cor-resend-cor-resend-co (10 of 110) r-with-email-message-view-cor.spec.ts COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageTue Aug 08 2023 01:08:21 GMT+0000 (Greenwich Mean Time) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageTue Aug 08 2023 01:08:21 GMT+0000 (Greenwich Mean Time) √ EX-7674 - Part 0: Clean existing COR's : Tue Aug 08 2023 01:08:21 GMT+0000 (Greenwich Mean Time) (41883ms) √ EX-7674 - Part 0: Clean existing COR's : Tue Aug 08 2023 01:08:21 GMT+0000 (Greenwich Mean Time) (41883ms) √ EX-7674 - Part 1: Create COR. Tue Aug 08 2023 01:08:21 GMT+0000 (Greenwich Mean Time) (56559ms) √ EX-7674 - Part 1: Create COR. Tue Aug 08 2023 01:08:21 GMT+0000 (Greenwich Mean Time) (56559ms) √ EX-7674 - Part 2: Verify the COR is in the Sent Log : Tue Aug 08 2023 01:08:21 GMT+0000 (Greenwich Mean Time) (43421ms) √ EX-7674 - Part 2: Verify the COR is in the Sent Log : Tue Aug 08 2023 01:08:21 GMT+0000 (Greenwich Mean Time) (43421ms) √ EX-7674 - Part 3: Resend the COR and resend the cor with email message and verify activity in sent log : Tue Aug 08 2023 01:08:21 GMT+0000 (Greenwich Mean Time) (57281ms) √ EX-7674 - Part 3: Resend the COR and resend the cor with email message and verify activity in sent log : Tue Aug 08 2023 01:08:21 GMT+0000 (Greenwich Mean Time) (57281ms) √ EX-7674 - Part 4: Verify the activity at the reciver side : Tue Aug 08 2023 01:08:21 GMT+0000 (Greenwich Mean Time) (43086ms) √ EX-7674 - Part 4: Verify the activity at the reciver side : Tue Aug 08 2023 01:08:21 GMT+0000 (Greenwich Mean Time) (43086ms) √ EX-7674 - Part 5: Clean the COR: Tue Aug 08 2023 01:08:21 GMT+0000 (Greenwich Mean Time) (53930ms) √ EX-7674 - Part 5: Clean the COR: Tue Aug 08 2023 01:08:21 GMT+0000 (Greenwich Mean Time) (53930ms) 6 passing (5m) 6 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_009.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 57 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7674-cor-activity-create-cor-resend-cor-resend-cor-with-email │ │ -message-view-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7678-cor-activity-create-cor-change-status-state- (11 of 110) at-receiver.spec.ts Create a COR and send the COR and change the status and stage with email message at the receiver sideTue Aug 08 2023 01:13:23 GMT+0000 (Greenwich Mean Time) Create a COR and send the COR and change the status and stage with email message at the receiver sideTue Aug 08 2023 01:13:23 GMT+0000 (Greenwich Mean Time) √ EX-7678 - Part 1: Clean existing COR's : Tue Aug 08 2023 01:13:23 GMT+0000 (Greenwich Mean Time) (45832ms) √ EX-7678 - Part 1: Clean existing COR's : Tue Aug 08 2023 01:13:23 GMT+0000 (Greenwich Mean Time) (45832ms) √ EX-7678 - Part 2: Create COR : Tue Aug 08 2023 01:13:23 GMT+0000 (Greenwich Mean Time) (56658ms) √ EX-7678 - Part 2: Create COR : Tue Aug 08 2023 01:13:23 GMT+0000 (Greenwich Mean Time) (56658ms) √ EX-7678 - Part 3: Verify the COR is in the Sent Log : Tue Aug 08 2023 01:13:23 GMT+0000 (Greenwich Mean Time) (41415ms) √ EX-7678 - Part 3: Verify the COR is in the Sent Log : Tue Aug 08 2023 01:13:23 GMT+0000 (Greenwich Mean Time) (41415ms) √ EX-7678 - Part 4: Change status and state at sent side verify activity in received log : Tue Aug 08 2023 01:13:23 GMT+0000 (Greenwich Mean Time) (74505ms) √ EX-7678 - Part 4: Change status and state at sent side verify activity in received log : Tue Aug 08 2023 01:13:23 GMT+0000 (Greenwich Mean Time) (74505ms) √ EX-7678 - Part 5: Verify the activity at the sent side : Tue Aug 08 2023 01:13:23 GMT+0000 (Greenwich Mean Time) (40393ms) √ EX-7678 - Part 5: Verify the activity at the sent side : Tue Aug 08 2023 01:13:23 GMT+0000 (Greenwich Mean Time) (40393ms) √ EX-7678 - Part 6: Clean the COR:Tue Aug 08 2023 01:13:23 GMT+0000 (Greenwich Mean Time) (52224ms) √ EX-7678 - Part 6: Clean the COR:Tue Aug 08 2023 01:13:23 GMT+0000 (Greenwich Mean Time) (52224ms) 6 passing (5m) 6 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_010.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 11 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7678-cor-activity-create-cor-change-status-state-at-receiver. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts (12 of 110) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageTue Aug 08 2023 01:18:39 GMT+0000 (Greenwich Mean Time) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageTue Aug 08 2023 01:18:39 GMT+0000 (Greenwich Mean Time) √ EX-7798 - Part 1: Clean existing COR's : Tue Aug 08 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (43970ms) √ EX-7798 - Part 1: Clean existing COR's : Tue Aug 08 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (43970ms) √ EX-7798 - Part 2: Upload COR : Tue Aug 08 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (62661ms) √ EX-7798 - Part 2: Upload COR : Tue Aug 08 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (62661ms) √ EX-7798 - Part 3: View the COR at receiver side : Tue Aug 08 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (55728ms) √ EX-7798 - Part 3: View the COR at receiver side : Tue Aug 08 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (55728ms) √ EX-7798 - Part 4: Verify the COR is in the Sent Log : Tue Aug 08 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (43665ms) √ EX-7798 - Part 4: Verify the COR is in the Sent Log : Tue Aug 08 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (43665ms) √ EX-7798 - Part 5: Verify the activity at the reciver side : Tue Aug 08 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (38115ms) √ EX-7798 - Part 5: Verify the activity at the reciver side : Tue Aug 08 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (38115ms) √ EX-7798 - Part 6: Clean the COR:Tue Aug 08 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (58414ms) √ EX-7798 - Part 6: Clean the COR:Tue Aug 08 2023 01:18:39 GMT+0000 (Greenwich Mean Time) (58414ms) 6 passing (5m) 6 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_011.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 3 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Add_users_to_Project/EX-9394-GC-creates-project- (13 of 110) adds-new-customer-user.spec.ts Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fields. Tue Aug 08 2023 01:23:46 GMT+0000 (Greenwich Mean Time) Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fields. Tue Aug 08 2023 01:23:46 GMT+0000 (Greenwich Mean Time) √ EX-9394 - Part 1: Create a project. : Tue Aug 08 2023 01:23:46 GMT+0000 (Greenwich Mean Time) (49830ms) √ EX-9394 - Part 1: Create a project. : Tue Aug 08 2023 01:23:46 GMT+0000 (Greenwich Mean Time) (49830ms) 1) EX-9394 - Part 2: Add new Customer to the project.Tue Aug 08 2023 01:23:46 GMT+0000 (Greenwich Mean Time) 1) EX-9394 - Part 2: Add new Customer to the project.Tue Aug 08 2023 01:23:46 GMT+0000 (Greenwich Mean Time) √ EX-9394 - Part 3: Cleanup GC... Tue Aug 08 2023 01:23:46 GMT+0000 (Greenwich Mean Time) (42747ms) √ EX-9394 - Part 3: Cleanup GC... Tue Aug 08 2023 01:23:46 GMT+0000 (Greenwich Mean Time) (42747ms) 2 passing (3m) 1 failing 1) Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fields. Tue Aug 08 2023 01:23:46 GMT+0000 (Greenwich Mean Time) EX-9394 - Part 2: Add new Customer to the project.Tue Aug 08 2023 01:23:46 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test User' within the selector: 'td' but never did. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34) 2 passing (3m) 1 failing 1) Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fields. Tue Aug 08 2023 01:23:46 GMT+0000 (Greenwich Mean Time) EX-9394 - Part 2: Add new Customer to the project.Tue Aug 08 2023 01:23:46 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test User' within the selector: 'td' but never did. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_012.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 3 │ │ Passing: 2 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: false │ │ Duration: 2 minutes, 36 seconds │ │ Spec Ran: 02_PermissionLevels/Add_users_to_Project/EX-9394-GC-creates-project-adds-new-cus │ │ tomer-user.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x533) issionLevels\Add_users_to_Project\EX-9394-GC-creates-project-adds-new-customer-u ser.spec.ts\Add Customer Add a new user as customer to the project with all man datory and non mandatory fields. Tue Aug 08 2023 012346 GMT+0000 (Greenwich Mean Time) -- EX-9394 - Part 2 Add new Customer to the project.Tue Aug 08 2023 01234 6 GMT+0000 (Greenwich .png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3323-create-new-project-as-own (14 of 110) er-in-owner-company.spec.ts Create New Project in Owner Company as Account Owner, using only mandatory data.Tue Aug 08 2023 01:26:27 GMT+0000 (Greenwich Mean Time) Create New Project in Owner Company as Account Owner, using only mandatory data.Tue Aug 08 2023 01:26:27 GMT+0000 (Greenwich Mean Time) √ EX-3323 - Create a project in Owner Company as Account Owner.Tue Aug 08 2023 01:26:27 GMT+0000 (Greenwich Mean Time) (49319ms) √ EX-3323 - Create a project in Owner Company as Account Owner.Tue Aug 08 2023 01:26:27 GMT+0000 (Greenwich Mean Time) (49319ms) √ EX-3323 - Cleanup...Tue Aug 08 2023 01:26:27 GMT+0000 (Greenwich Mean Time) (29193ms) √ EX-3323 - Cleanup...Tue Aug 08 2023 01:26:27 GMT+0000 (Greenwich Mean Time) (29193ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_013.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 18 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3323-create-new-project-as-owner-in-owner- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3328-create-new-project-as-own (15 of 110) er-in-sc-company.spec.ts Create New Project in SC Company as Account Owner, using only mandatory data.Tue Aug 08 2023 01:27:49 GMT+0000 (Greenwich Mean Time) Create New Project in SC Company as Account Owner, using only mandatory data.Tue Aug 08 2023 01:27:49 GMT+0000 (Greenwich Mean Time) √ EX-3328 - Create a project in SC Company as Account Owner.Tue Aug 08 2023 01:27:49 GMT+0000 (Greenwich Mean Time) (51412ms) √ EX-3328 - Create a project in SC Company as Account Owner.Tue Aug 08 2023 01:27:49 GMT+0000 (Greenwich Mean Time) (51412ms) √ EX-3328 - Cleanup...Tue Aug 08 2023 01:27:49 GMT+0000 (Greenwich Mean Time) (29570ms) √ EX-3328 - Cleanup...Tue Aug 08 2023 01:27:49 GMT+0000 (Greenwich Mean Time) (29570ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_014.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 21 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3328-create-new-project-as-owner-in-sc-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3329-create-new-project-as-own (16 of 110) er-in-other-company.spec.ts Create New Project in Other Company as Account Owner, using only mandatory data.Tue Aug 08 2023 01:29:14 GMT+0000 (Greenwich Mean Time) Create New Project in Other Company as Account Owner, using only mandatory data.Tue Aug 08 2023 01:29:14 GMT+0000 (Greenwich Mean Time) √ EX-3329 - Create a project in Other Company as Account Owner.Tue Aug 08 2023 01:29:14 GMT+0000 (Greenwich Mean Time) (49506ms) √ EX-3329 - Create a project in Other Company as Account Owner.Tue Aug 08 2023 01:29:14 GMT+0000 (Greenwich Mean Time) (49506ms) √ EX-3329 - Cleanup...Tue Aug 08 2023 01:29:14 GMT+0000 (Greenwich Mean Time) (30880ms) √ EX-3329 - Cleanup...Tue Aug 08 2023 01:29:14 GMT+0000 (Greenwich Mean Time) (30880ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_015.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 20 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3329-create-new-project-as-owner-in-other- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3330-create-new-project-as-adm (17 of 110) in-in-owner-company.spec.ts Create New Project in Owner Company as Admin, using only mandatory data.Tue Aug 08 2023 01:30:39 GMT+0000 (Greenwich Mean Time) Create New Project in Owner Company as Admin, using only mandatory data.Tue Aug 08 2023 01:30:39 GMT+0000 (Greenwich Mean Time) √ EX-3330 - Create a project in Owner Company as Admin.Tue Aug 08 2023 01:30:39 GMT+0000 (Greenwich Mean Time) (51819ms) √ EX-3330 - Create a project in Owner Company as Admin.Tue Aug 08 2023 01:30:39 GMT+0000 (Greenwich Mean Time) (51819ms) √ EX-3330 - Cleanup...Tue Aug 08 2023 01:30:39 GMT+0000 (Greenwich Mean Time) (31452ms) √ EX-3330 - Cleanup...Tue Aug 08 2023 01:30:39 GMT+0000 (Greenwich Mean Time) (31452ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_016.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 23 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3330-create-new-project-as-admin-in-owner- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3331-create-new-project-as-adm (18 of 110) in-in-gc-company.spec.ts EX-3331 | Create New Project in General Contractor Company as Admin, using only mandatory data. Tue Aug 08 2023 01:32:06 GMT+0000 (Greenwich Mean Time) EX-3331 | Create New Project in General Contractor Company as Admin, using only mandatory data. Tue Aug 08 2023 01:32:06 GMT+0000 (Greenwich Mean Time) √ EX-3331 - Tue Aug 08 2023 01:32:06 GMT+0000 (Greenwich Mean Time) (54790ms) √ EX-3331 - Tue Aug 08 2023 01:32:06 GMT+0000 (Greenwich Mean Time) (54790ms) √ EX-3331 - Cleanup...Tue Aug 08 2023 01:32:06 GMT+0000 (Greenwich Mean Time) (42057ms) √ EX-3331 - Cleanup...Tue Aug 08 2023 01:32:06 GMT+0000 (Greenwich Mean Time) (42057ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_017.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 37 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3331-create-new-project-as-admin-in-gc-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3332-create-new-project-as-pm- (19 of 110) in-gc-company.spec.ts Create New Project in General Contractor Company as Project Manageer, using only mandatory data.Tue Aug 08 2023 01:33:47 GMT+0000 (Greenwich Mean Time) Create New Project in General Contractor Company as Project Manageer, using only mandatory data.Tue Aug 08 2023 01:33:47 GMT+0000 (Greenwich Mean Time) √ EX-3332 - Create a projct in General Contractor Company as Project Manageer.Tue Aug 08 2023 01:33:47 GMT+0000 (Greenwich Mean Time) (52107ms) √ EX-3332 - Create a projct in General Contractor Company as Project Manageer.Tue Aug 08 2023 01:33:47 GMT+0000 (Greenwich Mean Time) (52107ms) √ EX-3332 - Cleanup...Tue Aug 08 2023 01:33:47 GMT+0000 (Greenwich Mean Time) (35537ms) √ EX-3332 - Cleanup...Tue Aug 08 2023 01:33:47 GMT+0000 (Greenwich Mean Time) (35537ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_018.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 27 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3332-create-new-project-as-pm-in-gc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3333-create-new-project-as-fu- (20 of 110) in-gc-company.spec.ts Create New Project in General Contractor Company as Field User, using only mandatory data.Tue Aug 08 2023 01:35:19 GMT+0000 (Greenwich Mean Time) Create New Project in General Contractor Company as Field User, using only mandatory data.Tue Aug 08 2023 01:35:19 GMT+0000 (Greenwich Mean Time) √ EX-3333 - Create a project in General Contractor Company as Field UserTue Aug 08 2023 01:35:19 GMT+0000 (Greenwich Mean Time) (49587ms) √ EX-3333 - Create a project in General Contractor Company as Field UserTue Aug 08 2023 01:35:19 GMT+0000 (Greenwich Mean Time) (49587ms) √ EX-3333 - Cleanup...Tue Aug 08 2023 01:35:19 GMT+0000 (Greenwich Mean Time) (37684ms) √ EX-3333 - Cleanup...Tue Aug 08 2023 01:35:19 GMT+0000 (Greenwich Mean Time) (37684ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_019.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 27 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3333-create-new-project-as-fu-in-gc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3334-create-new-project-as-pm- (21 of 110) in-owner-company.spec.ts Create New Project in Owner Company as Project Manager, using only mandatory data.Tue Aug 08 2023 01:36:50 GMT+0000 (Greenwich Mean Time) Create New Project in Owner Company as Project Manager, using only mandatory data.Tue Aug 08 2023 01:36:50 GMT+0000 (Greenwich Mean Time) √ EX-3334 - Creaet a project in Owner Company as Project Manager. Tue Aug 08 2023 01:36:50 GMT+0000 (Greenwich Mean Time) (50715ms) √ EX-3334 - Creaet a project in Owner Company as Project Manager. Tue Aug 08 2023 01:36:50 GMT+0000 (Greenwich Mean Time) (50715ms) √ EX-3334 - Cleanup...Tue Aug 08 2023 01:36:50 GMT+0000 (Greenwich Mean Time) (30314ms) √ EX-3334 - Cleanup...Tue Aug 08 2023 01:36:50 GMT+0000 (Greenwich Mean Time) (30314ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_020.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 21 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3334-create-new-project-as-pm-in-owner-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3335-create-new-project-as-fu- (22 of 110) in-owner-company.spec.ts Create New Project in Owner Company as Field User, using only mandatory data.Tue Aug 08 2023 01:38:15 GMT+0000 (Greenwich Mean Time) Create New Project in Owner Company as Field User, using only mandatory data.Tue Aug 08 2023 01:38:15 GMT+0000 (Greenwich Mean Time) √ EX-3335 - Create a project in Owner Company as Field User.Tue Aug 08 2023 01:38:15 GMT+0000 (Greenwich Mean Time) (48114ms) √ EX-3335 - Create a project in Owner Company as Field User.Tue Aug 08 2023 01:38:15 GMT+0000 (Greenwich Mean Time) (48114ms) √ EX-3335 - Cleanup...Tue Aug 08 2023 01:38:15 GMT+0000 (Greenwich Mean Time) (29536ms) √ EX-3335 - Cleanup...Tue Aug 08 2023 01:38:15 GMT+0000 (Greenwich Mean Time) (29536ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_021.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 18 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3335-create-new-project-as-fu-in-owner-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3336-create-new-project-as-adm (23 of 110) in-in-sc-company.spec.ts Create New Project in SC Company as Admin, using only mandatory data.Tue Aug 08 2023 01:39:37 GMT+0000 (Greenwich Mean Time) Create New Project in SC Company as Admin, using only mandatory data.Tue Aug 08 2023 01:39:37 GMT+0000 (Greenwich Mean Time) √ EX-3336 - Create project in SC Company as Admin.Tue Aug 08 2023 01:39:37 GMT+0000 (Greenwich Mean Time) (51142ms) √ EX-3336 - Create project in SC Company as Admin.Tue Aug 08 2023 01:39:37 GMT+0000 (Greenwich Mean Time) (51142ms) √ EX-3336 - Cleanup...Tue Aug 08 2023 01:39:37 GMT+0000 (Greenwich Mean Time) (30721ms) √ EX-3336 - Cleanup...Tue Aug 08 2023 01:39:37 GMT+0000 (Greenwich Mean Time) (30721ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_022.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 22 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3336-create-new-project-as-admin-in-sc-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3337-create-new-project-as-pm- (24 of 110) in-sc-company.spec.ts Create New Project in SC Company as Project Manager, using only mandatory data.Tue Aug 08 2023 01:41:03 GMT+0000 (Greenwich Mean Time) Create New Project in SC Company as Project Manager, using only mandatory data.Tue Aug 08 2023 01:41:03 GMT+0000 (Greenwich Mean Time) √ EX-3337Tue Aug 08 2023 01:41:03 GMT+0000 (Greenwich Mean Time) (50939ms) √ EX-3337Tue Aug 08 2023 01:41:03 GMT+0000 (Greenwich Mean Time) (50939ms) √ EX-3337 - Cleanup...Tue Aug 08 2023 01:41:03 GMT+0000 (Greenwich Mean Time) (31033ms) √ EX-3337 - Cleanup...Tue Aug 08 2023 01:41:03 GMT+0000 (Greenwich Mean Time) (31033ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_023.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 22 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3337-create-new-project-as-pm-in-sc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3338-create-new-project-as-fu- (25 of 110) in-sc-company.spec.ts Create New Project in SC Company as Field User, using only mandatory data.Tue Aug 08 2023 01:42:29 GMT+0000 (Greenwich Mean Time) Create New Project in SC Company as Field User, using only mandatory data.Tue Aug 08 2023 01:42:29 GMT+0000 (Greenwich Mean Time) √ EX-3338 - Create a project in SC Company as Field User. Tue Aug 08 2023 01:42:29 GMT+0000 (Greenwich Mean Time) (51406ms) √ EX-3338 - Create a project in SC Company as Field User. Tue Aug 08 2023 01:42:29 GMT+0000 (Greenwich Mean Time) (51406ms) √ EX-3338 - Cleanup...Tue Aug 08 2023 01:42:29 GMT+0000 (Greenwich Mean Time) (31857ms) √ EX-3338 - Cleanup...Tue Aug 08 2023 01:42:29 GMT+0000 (Greenwich Mean Time) (31857ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_024.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 23 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3338-create-new-project-as-fu-in-sc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3342-create-new-project-as-adm (26 of 110) in-in-other-company.spec.ts Create New Project in Other Company as Admin, using only mandatory data.Tue Aug 08 2023 01:43:56 GMT+0000 (Greenwich Mean Time) Create New Project in Other Company as Admin, using only mandatory data.Tue Aug 08 2023 01:43:56 GMT+0000 (Greenwich Mean Time) √ EX-3342 - Create a project in Other Company as Admin. Tue Aug 08 2023 01:43:56 GMT+0000 (Greenwich Mean Time) (50408ms) √ EX-3342 - Create a project in Other Company as Admin. Tue Aug 08 2023 01:43:56 GMT+0000 (Greenwich Mean Time) (50408ms) √ EX-3342 - Cleanup...Tue Aug 08 2023 01:43:56 GMT+0000 (Greenwich Mean Time) (30073ms) √ EX-3342 - Cleanup...Tue Aug 08 2023 01:43:56 GMT+0000 (Greenwich Mean Time) (30073ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_025.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 20 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3342-create-new-project-as-admin-in-other- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3343-create-new-project-as-pm- (27 of 110) in-other-company.spec.ts Create New Project in Other Company as Project Manager, using only mandatory data.Tue Aug 08 2023 01:45:21 GMT+0000 (Greenwich Mean Time) Create New Project in Other Company as Project Manager, using only mandatory data.Tue Aug 08 2023 01:45:21 GMT+0000 (Greenwich Mean Time) √ EX-3343 - Create a project in Other Company as Project Manager.Tue Aug 08 2023 01:45:21 GMT+0000 (Greenwich Mean Time) (50145ms) √ EX-3343 - Create a project in Other Company as Project Manager.Tue Aug 08 2023 01:45:21 GMT+0000 (Greenwich Mean Time) (50145ms) √ EX-3343 - Cleanup...Tue Aug 08 2023 01:45:21 GMT+0000 (Greenwich Mean Time) (32511ms) √ EX-3343 - Cleanup...Tue Aug 08 2023 01:45:21 GMT+0000 (Greenwich Mean Time) (32511ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_026.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 22 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3343-create-new-project-as-pm-in-other-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3344-create-new-project-as-fu- (28 of 110) in-other-company.spec.ts Create New Project in Other Company as Field User, using only mandatory data.Tue Aug 08 2023 01:46:47 GMT+0000 (Greenwich Mean Time) Create New Project in Other Company as Field User, using only mandatory data.Tue Aug 08 2023 01:46:47 GMT+0000 (Greenwich Mean Time) √ EX-3344 - Create a project in Other Company as Field User. Tue Aug 08 2023 01:46:47 GMT+0000 (Greenwich Mean Time) (51880ms) √ EX-3344 - Create a project in Other Company as Field User. Tue Aug 08 2023 01:46:47 GMT+0000 (Greenwich Mean Time) (51880ms) √ EX-3344 - Cleanup...Tue Aug 08 2023 01:46:47 GMT+0000 (Greenwich Mean Time) (31031ms) √ EX-3344 - Cleanup...Tue Aug 08 2023 01:46:47 GMT+0000 (Greenwich Mean Time) (31031ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_027.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 23 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3344-create-new-project-as-fu-in-other-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Project_level/ex-10783-project-level-sent-logs-e (29 of 110) mail-for-GC-SC.spec.ts Permissions | Project Level | Default Settings on New Contracts | Set all permissions to False for all company users and verify the permissions are set for new contracts. Tue Aug 08 2023 01:48:15 GMT+0000 (Greenwich Mean Time) Permissions | Project Level | Default Settings on New Contracts | Set all permissions to False for all company users and verify the permissions are set for new contracts. Tue Aug 08 2023 01:48:15 GMT+0000 (Greenwich Mean Time) √ EX-10783 - Part1: Create a project and add company users and change the default setting on new contracts to false Tue Aug 08 2023 01:48:15 GMT+0000 (Greenwich Mean Time) (75505ms) √ EX-10783 - Part1: Create a project and add company users and change the default setting on new contracts to false Tue Aug 08 2023 01:48:15 GMT+0000 (Greenwich Mean Time) (75505ms) √ Ex-10783 Part2: Create a new contract and verify the default permissions applied to contract (22496ms) √ Ex-10783 Part2: Create a new contract and verify the default permissions applied to contract (22496ms) √ EX-10783 - Part3: Set default permissions for new contractors to true Tue Aug 08 2023 01:48:15 GMT+0000 (Greenwich Mean Time) (63775ms) √ EX-10783 - Part3: Set default permissions for new contractors to true Tue Aug 08 2023 01:48:15 GMT+0000 (Greenwich Mean Time) (63775ms) √ Ex-10783 Part4: Create a new contract and verify the default permissions applied to contracts (28195ms) √ Ex-10783 Part4: Create a new contract and verify the default permissions applied to contracts (28195ms) √ EX-10783 Part5: Cleanup GC... Tue Aug 08 2023 01:48:15 GMT+0000 (Greenwich Mean Time) √ EX-10783 Part5: Cleanup GC... Tue Aug 08 2023 01:48:15 GMT+0000 (Greenwich Mean Time) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_028.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 14 seconds │ │ Spec Ran: 02_PermissionLevels/Project_level/ex-10783-project-level-sent-logs-email-for-GC- │ │ SC.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Project_level/ex-10797-project-level-sent-logs-e (30 of 110) mail-for-GC-SC.spec.ts Permissions | Project Level | Sent Logs & Emails | Verify proper permissions are set in My Company Users per user role for both Customer and Contractor. Tue Aug 08 2023 01:51:34 GMT+0000 (Greenwich Mean Time) Permissions | Project Level | Sent Logs & Emails | Verify proper permissions are set in My Company Users per user role for both Customer and Contractor. Tue Aug 08 2023 01:51:34 GMT+0000 (Greenwich Mean Time) √ EX-10797 - Part1: Add company users and verify the defaiult permissions for the user Tue Aug 08 2023 01:51:34 GMT+0000 (Greenwich Mean Time) (35807ms) √ EX-10797 - Part1: Add company users and verify the defaiult permissions for the user Tue Aug 08 2023 01:51:34 GMT+0000 (Greenwich Mean Time) (35807ms) √ Ex-10797 Part2: Login as SC Owner and accept the contract (26042ms) √ Ex-10797 Part2: Login as SC Owner and accept the contract (26042ms) √ Ex-10797 Part3: Login as SC Admin and accept the contract (26747ms) √ Ex-10797 Part3: Login as SC Admin and accept the contract (26747ms) √ Ex-10797 Part4: Login as SC PM user and accept the contract (21667ms) √ Ex-10797 Part4: Login as SC PM user and accept the contract (21667ms) √ Ex-10797 Part5: Login as SC Field user and accept the contract (23254ms) √ Ex-10797 Part5: Login as SC Field user and accept the contract (23254ms) √ Ex-10797 Part6: Login as SC Owner and verify sc users default permissions (36257ms) √ Ex-10797 Part6: Login as SC Owner and verify sc users default permissions (36257ms) √ EX-10797 Part7: Cleanup GC... Tue Aug 08 2023 01:51:34 GMT+0000 (Greenwich Mean Time) √ EX-10797 Part7: Cleanup GC... Tue Aug 08 2023 01:51:34 GMT+0000 (Greenwich Mean Time) 7 passing (3m) 7 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_029.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 55 seconds │ │ Spec Ran: 02_PermissionLevels/Project_level/ex-10797-project-level-sent-logs-email-for-GC- │ │ SC.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9792-GC-account-owner-user-previll (31 of 110) eges.spec.ts User Role permissions| GC Account Owner | Login and verify users access privileges. Tue Aug 08 2023 01:54:34 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Account Owner | Login and verify users access privileges. Tue Aug 08 2023 01:54:34 GMT+0000 (Greenwich Mean Time) √ EX-9792 - Part 1: SignUp. Tue Aug 08 2023 01:54:34 GMT+0000 (Greenwich Mean Time) (16510ms) √ EX-9792 - Part 1: SignUp. Tue Aug 08 2023 01:54:34 GMT+0000 (Greenwich Mean Time) (16510ms) √ EX-9792 - Part 2: Verify the confirmation email. Tue Aug 08 2023 01:54:55 GMT+0000 (Greenwich Mean Time) √ EX-9792 - Part 2: Verify the confirmation email. Tue Aug 08 2023 01:54:55 GMT+0000 (Greenwich Mean Time) √ EX-9792 - Part 3: Create your account | Select, This is my company. Tue Aug 08 2023 01:55:01 GMT+0000 (Greenwich Mean Time) (19141ms) √ EX-9792 - Part 3: Create your account | Select, This is my company. Tue Aug 08 2023 01:55:01 GMT+0000 (Greenwich Mean Time) (19141ms) √ EX-9792 - Part 4: Change the role to Account owner Tue Aug 08 2023 01:55:24 GMT+0000 (Greenwich Mean Time) (21484ms) √ EX-9792 - Part 4: Change the role to Account owner Tue Aug 08 2023 01:55:24 GMT+0000 (Greenwich Mean Time) (21484ms) √ EX-9792 - Part 5: Login as GC Account Owner and verify user privilegesTue Aug 08 2023 01:55:24 GMT+0000 (Greenwich Mean Time) (41973ms) √ EX-9792 - Part 5: Login as GC Account Owner and verify user privilegesTue Aug 08 2023 01:55:24 GMT+0000 (Greenwich Mean Time) (41973ms) √ EX-9792 - Part 6: Delete the account from the company. Tue Aug 08 2023 01:55:24 GMT+0000 (Greenwich Mean Time) (12591ms) √ EX-9792 - Part 6: Delete the account from the company. Tue Aug 08 2023 01:55:24 GMT+0000 (Greenwich Mean Time) (12591ms) 6 passing (2m) 6 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_030.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 6 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9792-GC-account-owner-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9793-GC-Owner-project-previlleges. (32 of 110) spec.ts User Role permissions| GC Account owner | Login as GC Account owner and create project and verify user privilegesTue Aug 08 2023 01:56:46 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Account owner | Login as GC Account owner and create project and verify user privilegesTue Aug 08 2023 01:56:46 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 1: Create a project Tue Aug 08 2023 01:56:46 GMT+0000 (Greenwich Mean Time) (49021ms) √ EX-9793 - Part 1: Create a project Tue Aug 08 2023 01:56:46 GMT+0000 (Greenwich Mean Time) (49021ms) √ EX-9793 - Part 2: Edit the project details and change the nameTue Aug 08 2023 01:56:46 GMT+0000 (Greenwich Mean Time) (32533ms) √ EX-9793 - Part 2: Edit the project details and change the nameTue Aug 08 2023 01:56:46 GMT+0000 (Greenwich Mean Time) (32533ms) √ EX-9793 - Part 3: Add customer to the Project. Tue Aug 08 2023 01:56:46 GMT+0000 (Greenwich Mean Time) (34542ms) √ EX-9793 - Part 3: Add customer to the Project. Tue Aug 08 2023 01:56:46 GMT+0000 (Greenwich Mean Time) (34542ms) √ EX-9793 - Part 4: Verify the invitation email for customerTue Aug 08 2023 01:58:47 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 4: Verify the invitation email for customerTue Aug 08 2023 01:58:47 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 5: Add company user to the Project. Tue Aug 08 2023 01:58:53 GMT+0000 (Greenwich Mean Time) (37084ms) √ EX-9793 - Part 5: Add company user to the Project. Tue Aug 08 2023 01:58:53 GMT+0000 (Greenwich Mean Time) (37084ms) √ EX-9793 - Part 6: Verify company user can access project. Tue Aug 08 2023 01:58:53 GMT+0000 (Greenwich Mean Time) (24975ms) √ EX-9793 - Part 6: Verify company user can access project. Tue Aug 08 2023 01:58:53 GMT+0000 (Greenwich Mean Time) (24975ms) √ EX-9793 - Part 7: Add Contract with a user to the project. Tue Aug 08 2023 01:58:53 GMT+0000 (Greenwich Mean Time) (29374ms) √ EX-9793 - Part 7: Add Contract with a user to the project. Tue Aug 08 2023 01:58:53 GMT+0000 (Greenwich Mean Time) (29374ms) √ EX-9793 - Part 8: Verify email invitation for contractor user Tue Aug 08 2023 02:00:29 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 8: Verify email invitation for contractor user Tue Aug 08 2023 02:00:29 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 9: Add additional user to existing contract of the project. Tue Aug 08 2023 02:00:33 GMT+0000 (Greenwich Mean Time) (39292ms) √ EX-9793 - Part 9: Add additional user to existing contract of the project. Tue Aug 08 2023 02:00:33 GMT+0000 (Greenwich Mean Time) (39292ms) √ EX-9793 - Part 10: Verify email invitation for additional contract user Tue Aug 08 2023 02:01:16 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 10: Verify email invitation for additional contract user Tue Aug 08 2023 02:01:16 GMT+0000 (Greenwich Mean Time) √ Ex-9793 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 08 2023 02:01:20 GMT+0000 (Greenwich Mean Time) (32648ms) √ Ex-9793 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 08 2023 02:01:20 GMT+0000 (Greenwich Mean Time) (32648ms) √ EX-9793 - Part12: Clean up Project Tue Aug 08 2023 02:01:20 GMT+0000 (Greenwich Mean Time) (35729ms) √ EX-9793 - Part12: Clean up Project Tue Aug 08 2023 02:01:20 GMT+0000 (Greenwich Mean Time) (35729ms) 12 passing (6m) 12 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_031.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 43 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9793-GC-Owner-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9828-GC-admin-user-previlleges.spe (33 of 110) c.ts User Role permissions| GC Admin | Login and verify users access privilegesTue Aug 08 2023 02:02:34 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Admin | Login and verify users access privilegesTue Aug 08 2023 02:02:34 GMT+0000 (Greenwich Mean Time) √ EX-9828 - Part 1: SignUp. Tue Aug 08 2023 02:02:34 GMT+0000 (Greenwich Mean Time) (16460ms) √ EX-9828 - Part 1: SignUp. Tue Aug 08 2023 02:02:34 GMT+0000 (Greenwich Mean Time) (16460ms) √ EX-9828 - Part 2: Verify the confirmation email. Tue Aug 08 2023 02:02:55 GMT+0000 (Greenwich Mean Time) √ EX-9828 - Part 2: Verify the confirmation email. Tue Aug 08 2023 02:02:55 GMT+0000 (Greenwich Mean Time) √ EX-9828 - Part 3: Create your account | Select, This is my company. Tue Aug 08 2023 02:03:01 GMT+0000 (Greenwich Mean Time) (19764ms) √ EX-9828 - Part 3: Create your account | Select, This is my company. Tue Aug 08 2023 02:03:01 GMT+0000 (Greenwich Mean Time) (19764ms) √ EX-9828 - Part 4: Change the role to Account Admin Tue Aug 08 2023 02:03:25 GMT+0000 (Greenwich Mean Time) (20854ms) √ EX-9828 - Part 4: Change the role to Account Admin Tue Aug 08 2023 02:03:25 GMT+0000 (Greenwich Mean Time) (20854ms) √ EX-9828 - Part 5: Login as GC Account Admin and verify user privilegesTue Aug 08 2023 02:03:25 GMT+0000 (Greenwich Mean Time) (41749ms) √ EX-9828 - Part 5: Login as GC Account Admin and verify user privilegesTue Aug 08 2023 02:03:25 GMT+0000 (Greenwich Mean Time) (41749ms) √ EX-9828 - Part 6: Delete the account from the company. Tue Aug 08 2023 02:03:25 GMT+0000 (Greenwich Mean Time) (12619ms) √ EX-9828 - Part 6: Delete the account from the company. Tue Aug 08 2023 02:03:25 GMT+0000 (Greenwich Mean Time) (12619ms) 6 passing (2m) 6 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_032.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 6 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9828-GC-admin-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9829-GC-PM-user-previlleges.spec.t (34 of 110) s User Role permissions| GC PM | Login and verify users access privilegesTue Aug 08 2023 02:04:46 GMT+0000 (Greenwich Mean Time) User Role permissions| GC PM | Login and verify users access privilegesTue Aug 08 2023 02:04:46 GMT+0000 (Greenwich Mean Time) √ EX-9829 - Part 1: SignUp. Tue Aug 08 2023 02:04:46 GMT+0000 (Greenwich Mean Time) (15888ms) √ EX-9829 - Part 1: SignUp. Tue Aug 08 2023 02:04:46 GMT+0000 (Greenwich Mean Time) (15888ms) √ EX-9829 - Part 2: Verify the confirmation email. Tue Aug 08 2023 02:05:06 GMT+0000 (Greenwich Mean Time) √ EX-9829 - Part 2: Verify the confirmation email. Tue Aug 08 2023 02:05:06 GMT+0000 (Greenwich Mean Time) √ EX-9829 - Part 3: Create your account | Select, This is my company. Tue Aug 08 2023 02:05:12 GMT+0000 (Greenwich Mean Time) (18834ms) √ EX-9829 - Part 3: Create your account | Select, This is my company. Tue Aug 08 2023 02:05:12 GMT+0000 (Greenwich Mean Time) (18834ms) √ EX-9829 - Part 4: Change the role to Project Manager Tue Aug 08 2023 02:05:35 GMT+0000 (Greenwich Mean Time) (23209ms) √ EX-9829 - Part 4: Change the role to Project Manager Tue Aug 08 2023 02:05:35 GMT+0000 (Greenwich Mean Time) (23209ms) √ EX-9829 - Part 5: Login as GC PM and verify user privilegesTue Aug 08 2023 02:05:35 GMT+0000 (Greenwich Mean Time) (37852ms) √ EX-9829 - Part 5: Login as GC PM and verify user privilegesTue Aug 08 2023 02:05:35 GMT+0000 (Greenwich Mean Time) (37852ms) √ EX-9829 - Part 6: Delete the account from the company. Tue Aug 08 2023 02:05:35 GMT+0000 (Greenwich Mean Time) (12407ms) √ EX-9829 - Part 6: Delete the account from the company. Tue Aug 08 2023 02:05:35 GMT+0000 (Greenwich Mean Time) (12407ms) 6 passing (2m) 6 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_033.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 3 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9829-GC-PM-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9830-GC-Field-user-previlleges.spe (35 of 110) c.ts User Role permissions| GC FieldUser | Login and verify users access privilegesTue Aug 08 2023 02:06:54 GMT+0000 (Greenwich Mean Time) User Role permissions| GC FieldUser | Login and verify users access privilegesTue Aug 08 2023 02:06:54 GMT+0000 (Greenwich Mean Time) √ EX-9830 - Part 1: SignUp. Tue Aug 08 2023 02:06:54 GMT+0000 (Greenwich Mean Time) (16856ms) √ EX-9830 - Part 1: SignUp. Tue Aug 08 2023 02:06:54 GMT+0000 (Greenwich Mean Time) (16856ms) √ EX-9830 - Part 2: Verify the confirmation email. Tue Aug 08 2023 02:07:16 GMT+0000 (Greenwich Mean Time) √ EX-9830 - Part 2: Verify the confirmation email. Tue Aug 08 2023 02:07:16 GMT+0000 (Greenwich Mean Time) √ EX-9830 - Part 3: Create your account | Select, This is my company. Tue Aug 08 2023 02:07:21 GMT+0000 (Greenwich Mean Time) (19370ms) √ EX-9830 - Part 3: Create your account | Select, This is my company. Tue Aug 08 2023 02:07:21 GMT+0000 (Greenwich Mean Time) (19370ms) √ EX-9830 - Part 4: Login as GC FU and verify user privilegesTue Aug 08 2023 02:07:45 GMT+0000 (Greenwich Mean Time) (23220ms) √ EX-9830 - Part 4: Login as GC FU and verify user privilegesTue Aug 08 2023 02:07:45 GMT+0000 (Greenwich Mean Time) (23220ms) √ EX-9830 - Part 5: Delete the account from the company. Tue Aug 08 2023 02:07:45 GMT+0000 (Greenwich Mean Time) (12876ms) √ EX-9830 - Part 5: Delete the account from the company. Tue Aug 08 2023 02:07:45 GMT+0000 (Greenwich Mean Time) (12876ms) 5 passing (1m) 5 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_034.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 27 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9830-GC-Field-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9832-SC-Field-users-user-previlleg (36 of 110) es.spec.ts User Role permissions| SC FU | Login and verify users access privilegesTue Aug 08 2023 02:08:26 GMT+0000 (Greenwich Mean Time) User Role permissions| SC FU | Login and verify users access privilegesTue Aug 08 2023 02:08:26 GMT+0000 (Greenwich Mean Time) √ EX-9832 - Part 1: Add Contractor with SC Field User to existing project. Tue Aug 08 2023 02:08:26 GMT+0000 (Greenwich Mean Time) (32553ms) √ EX-9832 - Part 1: Add Contractor with SC Field User to existing project. Tue Aug 08 2023 02:08:26 GMT+0000 (Greenwich Mean Time) (32553ms) √ EX-9832 - Part 2: SignUp. Tue Aug 08 2023 02:08:26 GMT+0000 (Greenwich Mean Time) (11475ms) √ EX-9832 - Part 2: SignUp. Tue Aug 08 2023 02:08:26 GMT+0000 (Greenwich Mean Time) (11475ms) √ EX-9832 - Part 3: Verify the confirmation email. Tue Aug 08 2023 02:09:15 GMT+0000 (Greenwich Mean Time) √ EX-9832 - Part 3: Verify the confirmation email. Tue Aug 08 2023 02:09:15 GMT+0000 (Greenwich Mean Time) √ EX-9832 - Part 4: Create your account | Select, This is my company. Tue Aug 08 2023 02:09:20 GMT+0000 (Greenwich Mean Time) (20874ms) √ EX-9832 - Part 4: Create your account | Select, This is my company. Tue Aug 08 2023 02:09:20 GMT+0000 (Greenwich Mean Time) (20874ms) √ EX-9832 - Part 5: Change the role to Field User Tue Aug 08 2023 02:09:46 GMT+0000 (Greenwich Mean Time) (21702ms) √ EX-9832 - Part 5: Change the role to Field User Tue Aug 08 2023 02:09:46 GMT+0000 (Greenwich Mean Time) (21702ms) √ EX-9832 - Part 6: Login as SC FU and verify user privilegesTue Aug 08 2023 02:09:46 GMT+0000 (Greenwich Mean Time) (21152ms) √ EX-9832 - Part 6: Login as SC FU and verify user privilegesTue Aug 08 2023 02:09:46 GMT+0000 (Greenwich Mean Time) (21152ms) √ EX-9832 - Part 7: Delete the account from the company. Tue Aug 08 2023 02:09:46 GMT+0000 (Greenwich Mean Time) (13682ms) √ EX-9832 - Part 7: Delete the account from the company. Tue Aug 08 2023 02:09:46 GMT+0000 (Greenwich Mean Time) (13682ms) √ EX-9832 - Part 8: Delete the contracts of existing Project Tue Aug 08 2023 02:09:46 GMT+0000 (Greenwich Mean Time) (30133ms) √ EX-9832 - Part 8: Delete the contracts of existing Project Tue Aug 08 2023 02:09:46 GMT+0000 (Greenwich Mean Time) (30133ms) 8 passing (3m) 8 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_035.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 46 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9832-SC-Field-users-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9833-SC-PM-user-previlleges.spec.t (37 of 110) s User Role permissions| SC PM | Login and verify users access privilegesTue Aug 08 2023 02:11:18 GMT+0000 (Greenwich Mean Time) User Role permissions| SC PM | Login and verify users access privilegesTue Aug 08 2023 02:11:18 GMT+0000 (Greenwich Mean Time) √ EX-9833 - Part 1: Add Contractor with SC PM to existing project. Tue Aug 08 2023 02:11:18 GMT+0000 (Greenwich Mean Time) (32882ms) √ EX-9833 - Part 1: Add Contractor with SC PM to existing project. Tue Aug 08 2023 02:11:18 GMT+0000 (Greenwich Mean Time) (32882ms) √ EX-9833 - Part 2: SignUp. Tue Aug 08 2023 02:11:18 GMT+0000 (Greenwich Mean Time) (10100ms) √ EX-9833 - Part 2: SignUp. Tue Aug 08 2023 02:11:18 GMT+0000 (Greenwich Mean Time) (10100ms) √ EX-9833 - Part 3: Verify the confirmation email. Tue Aug 08 2023 02:12:07 GMT+0000 (Greenwich Mean Time) √ EX-9833 - Part 3: Verify the confirmation email. Tue Aug 08 2023 02:12:07 GMT+0000 (Greenwich Mean Time) √ EX-9833 - Part 4: Create your account | Select, This is my company. Tue Aug 08 2023 02:12:12 GMT+0000 (Greenwich Mean Time) (18696ms) √ EX-9833 - Part 4: Create your account | Select, This is my company. Tue Aug 08 2023 02:12:12 GMT+0000 (Greenwich Mean Time) (18696ms) √ EX-9833 - Part 5: Change the role to PM Tue Aug 08 2023 02:12:35 GMT+0000 (Greenwich Mean Time) (22824ms) √ EX-9833 - Part 5: Change the role to PM Tue Aug 08 2023 02:12:35 GMT+0000 (Greenwich Mean Time) (22824ms) √ EX-9833 - Part 6: Login as SC PM and verify user privilegesTue Aug 08 2023 02:12:35 GMT+0000 (Greenwich Mean Time) (38335ms) √ EX-9833 - Part 6: Login as SC PM and verify user privilegesTue Aug 08 2023 02:12:35 GMT+0000 (Greenwich Mean Time) (38335ms) √ EX-9833 - Part 7: Delete the account from the company. Tue Aug 08 2023 02:12:35 GMT+0000 (Greenwich Mean Time) (12244ms) √ EX-9833 - Part 7: Delete the account from the company. Tue Aug 08 2023 02:12:35 GMT+0000 (Greenwich Mean Time) (12244ms) √ EX-9833 - Part 8: Delete the contracts of existing Project Tue Aug 08 2023 02:12:35 GMT+0000 (Greenwich Mean Time) (29250ms) √ EX-9833 - Part 8: Delete the contracts of existing Project Tue Aug 08 2023 02:12:35 GMT+0000 (Greenwich Mean Time) (29250ms) 8 passing (3m) 8 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_036.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 1 second │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9833-SC-PM-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9834-SC-Admin-user-previlleges.spe (38 of 110) c.ts User Role permissions| SC Admin | Login and verify users access privilegesTue Aug 08 2023 02:14:24 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Admin | Login and verify users access privilegesTue Aug 08 2023 02:14:24 GMT+0000 (Greenwich Mean Time) √ EX-9834 - Part 1: Add Contractor with SC Admin to existing project. Tue Aug 08 2023 02:14:24 GMT+0000 (Greenwich Mean Time) (33063ms) √ EX-9834 - Part 1: Add Contractor with SC Admin to existing project. Tue Aug 08 2023 02:14:24 GMT+0000 (Greenwich Mean Time) (33063ms) √ EX-9834 - Part 2: SignUp. Tue Aug 08 2023 02:14:24 GMT+0000 (Greenwich Mean Time) (11499ms) √ EX-9834 - Part 2: SignUp. Tue Aug 08 2023 02:14:24 GMT+0000 (Greenwich Mean Time) (11499ms) √ EX-9834 - Part 3: Verify the confirmation email. Tue Aug 08 2023 02:15:14 GMT+0000 (Greenwich Mean Time) √ EX-9834 - Part 3: Verify the confirmation email. Tue Aug 08 2023 02:15:14 GMT+0000 (Greenwich Mean Time) √ EX-9834 - Part 4: Create your account | Select, This is my company. Tue Aug 08 2023 02:15:19 GMT+0000 (Greenwich Mean Time) (19082ms) √ EX-9834 - Part 4: Create your account | Select, This is my company. Tue Aug 08 2023 02:15:19 GMT+0000 (Greenwich Mean Time) (19082ms) √ EX-9834 - Part 5: Change the role to Admin Tue Aug 08 2023 02:15:43 GMT+0000 (Greenwich Mean Time) (22190ms) √ EX-9834 - Part 5: Change the role to Admin Tue Aug 08 2023 02:15:43 GMT+0000 (Greenwich Mean Time) (22190ms) √ EX-9834 - Part 6: Login as SC Admin and verify user privilegesTue Aug 08 2023 02:15:43 GMT+0000 (Greenwich Mean Time) (40882ms) √ EX-9834 - Part 6: Login as SC Admin and verify user privilegesTue Aug 08 2023 02:15:43 GMT+0000 (Greenwich Mean Time) (40882ms) √ EX-9834 - Part 7: Delete the account from the company. Tue Aug 08 2023 02:15:43 GMT+0000 (Greenwich Mean Time) (14047ms) √ EX-9834 - Part 7: Delete the account from the company. Tue Aug 08 2023 02:15:43 GMT+0000 (Greenwich Mean Time) (14047ms) √ EX-9834 - Part 8: Delete the contracts of existing Project Tue Aug 08 2023 02:15:43 GMT+0000 (Greenwich Mean Time) (30324ms) √ EX-9834 - Part 8: Delete the contracts of existing Project Tue Aug 08 2023 02:15:43 GMT+0000 (Greenwich Mean Time) (30324ms) 8 passing (3m) 8 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_037.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 6 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9834-SC-Admin-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9835-SC-account-owner-user-previll (39 of 110) eges.spec.ts User Role permissions| SC Account Owner | Login and verify users access privilegesTue Aug 08 2023 02:17:36 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Account Owner | Login and verify users access privilegesTue Aug 08 2023 02:17:36 GMT+0000 (Greenwich Mean Time) √ EX-9835 - Part 1: Add Contractor with SC Account owner to existing project. Tue Aug 08 2023 02:17:36 GMT+0000 (Greenwich Mean Time) (32845ms) √ EX-9835 - Part 1: Add Contractor with SC Account owner to existing project. Tue Aug 08 2023 02:17:36 GMT+0000 (Greenwich Mean Time) (32845ms) √ EX-9835 - Part 2: SignUp. Tue Aug 08 2023 02:17:36 GMT+0000 (Greenwich Mean Time) (11828ms) √ EX-9835 - Part 2: SignUp. Tue Aug 08 2023 02:17:36 GMT+0000 (Greenwich Mean Time) (11828ms) √ EX-9835 - Part 3: Verify the confirmation email. Tue Aug 08 2023 02:18:26 GMT+0000 (Greenwich Mean Time) √ EX-9835 - Part 3: Verify the confirmation email. Tue Aug 08 2023 02:18:26 GMT+0000 (Greenwich Mean Time) √ EX-9835 - Part 4: Create your account | Select, This is my company. Tue Aug 08 2023 02:18:31 GMT+0000 (Greenwich Mean Time) (20399ms) √ EX-9835 - Part 4: Create your account | Select, This is my company. Tue Aug 08 2023 02:18:31 GMT+0000 (Greenwich Mean Time) (20399ms) √ EX-9835 - Part 5: Change the role to Account owner Tue Aug 08 2023 02:18:56 GMT+0000 (Greenwich Mean Time) (22488ms) √ EX-9835 - Part 5: Change the role to Account owner Tue Aug 08 2023 02:18:56 GMT+0000 (Greenwich Mean Time) (22488ms) √ EX-9835 - Part 6: Login as SC Account Owner and verify user privilegesTue Aug 08 2023 02:18:56 GMT+0000 (Greenwich Mean Time) (39007ms) √ EX-9835 - Part 6: Login as SC Account Owner and verify user privilegesTue Aug 08 2023 02:18:56 GMT+0000 (Greenwich Mean Time) (39007ms) √ EX-9835 - Part 7: Delete the account from the company. Tue Aug 08 2023 02:18:56 GMT+0000 (Greenwich Mean Time) (12467ms) √ EX-9835 - Part 7: Delete the account from the company. Tue Aug 08 2023 02:18:56 GMT+0000 (Greenwich Mean Time) (12467ms) √ EX-9835 - Part 8: Delete the contracts of existing Project Tue Aug 08 2023 02:18:56 GMT+0000 (Greenwich Mean Time) (30432ms) √ EX-9835 - Part 8: Delete the contracts of existing Project Tue Aug 08 2023 02:18:56 GMT+0000 (Greenwich Mean Time) (30432ms) 8 passing (3m) 8 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_038.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 5 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9835-SC-account-owner-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges. (40 of 110) spec.ts User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesTue Aug 08 2023 02:20:46 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesTue Aug 08 2023 02:20:46 GMT+0000 (Greenwich Mean Time) √ EX-9885 - Part 1: Create a project Tue Aug 08 2023 02:20:46 GMT+0000 (Greenwich Mean Time) (56622ms) √ EX-9885 - Part 1: Create a project Tue Aug 08 2023 02:20:46 GMT+0000 (Greenwich Mean Time) (56622ms) √ EX-9885 - Part 2: Edit the project details and change the nameTue Aug 08 2023 02:20:46 GMT+0000 (Greenwich Mean Time) (39548ms) √ EX-9885 - Part 2: Edit the project details and change the nameTue Aug 08 2023 02:20:46 GMT+0000 (Greenwich Mean Time) (39548ms) √ EX-9885 - Part 3: Add customer to the Project. Tue Aug 08 2023 02:20:46 GMT+0000 (Greenwich Mean Time) (42785ms) √ EX-9885 - Part 3: Add customer to the Project. Tue Aug 08 2023 02:20:46 GMT+0000 (Greenwich Mean Time) (42785ms) √ EX-9885 - Part 4: Verify the invitation email for customerTue Aug 08 2023 02:23:11 GMT+0000 (Greenwich Mean Time) √ EX-9885 - Part 4: Verify the invitation email for customerTue Aug 08 2023 02:23:11 GMT+0000 (Greenwich Mean Time) √ EX-9885 - Part 5: Add company user to the Project. Tue Aug 08 2023 02:23:17 GMT+0000 (Greenwich Mean Time) (52462ms) √ EX-9885 - Part 5: Add company user to the Project. Tue Aug 08 2023 02:23:17 GMT+0000 (Greenwich Mean Time) (52462ms) √ EX-9885 - Part 6: Verify company user can access project. Tue Aug 08 2023 02:23:17 GMT+0000 (Greenwich Mean Time) (27266ms) √ EX-9885 - Part 6: Verify company user can access project. Tue Aug 08 2023 02:23:17 GMT+0000 (Greenwich Mean Time) (27266ms) √ EX-9885 - Part 7: Add Contract with a user to the project. Tue Aug 08 2023 02:23:17 GMT+0000 (Greenwich Mean Time) (33901ms) √ EX-9885 - Part 7: Add Contract with a user to the project. Tue Aug 08 2023 02:23:17 GMT+0000 (Greenwich Mean Time) (33901ms) √ EX-9885 - Part 8: Verify email invitation for contractor user Tue Aug 08 2023 02:25:16 GMT+0000 (Greenwich Mean Time) √ EX-9885 - Part 8: Verify email invitation for contractor user Tue Aug 08 2023 02:25:16 GMT+0000 (Greenwich Mean Time) √ EX-9885 - Part 9: Add additiona user to existing contract of the project. Tue Aug 08 2023 02:25:21 GMT+0000 (Greenwich Mean Time) (55260ms) √ EX-9885 - Part 9: Add additiona user to existing contract of the project. Tue Aug 08 2023 02:25:21 GMT+0000 (Greenwich Mean Time) (55260ms) √ EX-9885 - Part 10: Verify email invitation for additional contract user Tue Aug 08 2023 02:26:20 GMT+0000 (Greenwich Mean Time) √ EX-9885 - Part 10: Verify email invitation for additional contract user Tue Aug 08 2023 02:26:20 GMT+0000 (Greenwich Mean Time) √ Ex-9885 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 08 2023 02:26:24 GMT+0000 (Greenwich Mean Time) (39217ms) √ Ex-9885 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 08 2023 02:26:24 GMT+0000 (Greenwich Mean Time) (39217ms) √ EX-9885 - Part12: Clean up Project Tue Aug 08 2023 02:26:24 GMT+0000 (Greenwich Mean Time) (36927ms) √ EX-9885 - Part12: Clean up Project Tue Aug 08 2023 02:26:24 GMT+0000 (Greenwich Mean Time) (36927ms) 12 passing (7m) 12 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_039.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 55 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9886-GC-PM-project-previlleges.spe (41 of 110) c.ts User Role permissions| GC PM | Login as GC PM and create project and verify user privilegesTue Aug 08 2023 02:27:46 GMT+0000 (Greenwich Mean Time) User Role permissions| GC PM | Login as GC PM and create project and verify user privilegesTue Aug 08 2023 02:27:46 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 1: Create a project Tue Aug 08 2023 02:27:46 GMT+0000 (Greenwich Mean Time) (48578ms) √ EX-9886 - Part 1: Create a project Tue Aug 08 2023 02:27:46 GMT+0000 (Greenwich Mean Time) (48578ms) √ EX-9886 - Part 2: Edit the project details and change the nameTue Aug 08 2023 02:27:46 GMT+0000 (Greenwich Mean Time) (33008ms) √ EX-9886 - Part 2: Edit the project details and change the nameTue Aug 08 2023 02:27:46 GMT+0000 (Greenwich Mean Time) (33008ms) √ EX-9886 - Part 3: Add customer to the Project. Tue Aug 08 2023 02:27:46 GMT+0000 (Greenwich Mean Time) (33053ms) √ EX-9886 - Part 3: Add customer to the Project. Tue Aug 08 2023 02:27:46 GMT+0000 (Greenwich Mean Time) (33053ms) √ EX-9886 - Part 4: Verify the invitation email for customerTue Aug 08 2023 02:29:46 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 4: Verify the invitation email for customerTue Aug 08 2023 02:29:46 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 5: Add company user to the Project. Tue Aug 08 2023 02:29:51 GMT+0000 (Greenwich Mean Time) (36069ms) √ EX-9886 - Part 5: Add company user to the Project. Tue Aug 08 2023 02:29:51 GMT+0000 (Greenwich Mean Time) (36069ms) √ EX-9886 - Part 6: Verify company user can access project. Tue Aug 08 2023 02:29:51 GMT+0000 (Greenwich Mean Time) (26310ms) √ EX-9886 - Part 6: Verify company user can access project. Tue Aug 08 2023 02:29:51 GMT+0000 (Greenwich Mean Time) (26310ms) √ EX-9886 - Part 7: Add Contract with a user to the project. Tue Aug 08 2023 02:29:51 GMT+0000 (Greenwich Mean Time) (29436ms) √ EX-9886 - Part 7: Add Contract with a user to the project. Tue Aug 08 2023 02:29:51 GMT+0000 (Greenwich Mean Time) (29436ms) √ EX-9886 - Part 8: Verify email invitation for contractor user Tue Aug 08 2023 02:31:28 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 8: Verify email invitation for contractor user Tue Aug 08 2023 02:31:28 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 9: Add additional user to existing contract of the project. Tue Aug 08 2023 02:31:32 GMT+0000 (Greenwich Mean Time) (38602ms) √ EX-9886 - Part 9: Add additional user to existing contract of the project. Tue Aug 08 2023 02:31:32 GMT+0000 (Greenwich Mean Time) (38602ms) √ EX-9886 - Part 10: Verify email invitation for additional contract user Tue Aug 08 2023 02:32:15 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 10: Verify email invitation for additional contract user Tue Aug 08 2023 02:32:15 GMT+0000 (Greenwich Mean Time) √ Ex-9886 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 08 2023 02:32:19 GMT+0000 (Greenwich Mean Time) (35295ms) √ Ex-9886 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 08 2023 02:32:19 GMT+0000 (Greenwich Mean Time) (35295ms) √ EX-9886 - Part 12: Clean up Project Tue Aug 08 2023 02:32:19 GMT+0000 (Greenwich Mean Time) (36454ms) √ EX-9886 - Part 12: Clean up Project Tue Aug 08 2023 02:32:19 GMT+0000 (Greenwich Mean Time) (36454ms) 12 passing (6m) 12 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_040.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 44 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9886-GC-PM-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges. (42 of 110) spec.ts User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesTue Aug 08 2023 02:33:35 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesTue Aug 08 2023 02:33:35 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 1: Create a project Tue Aug 08 2023 02:33:35 GMT+0000 (Greenwich Mean Time) (61829ms) √ EX-9887 - Part 1: Create a project Tue Aug 08 2023 02:33:35 GMT+0000 (Greenwich Mean Time) (61829ms) √ EX-9887 - Part 2: Edit the project details and change the nameTue Aug 08 2023 02:33:35 GMT+0000 (Greenwich Mean Time) (35151ms) √ EX-9887 - Part 2: Edit the project details and change the nameTue Aug 08 2023 02:33:35 GMT+0000 (Greenwich Mean Time) (35151ms) √ EX-9887 - Part 3: Add customer to the Project. Tue Aug 08 2023 02:33:35 GMT+0000 (Greenwich Mean Time) (42959ms) √ EX-9887 - Part 3: Add customer to the Project. Tue Aug 08 2023 02:33:35 GMT+0000 (Greenwich Mean Time) (42959ms) √ EX-9887 - Part 4: Verify the invitation email for customerTue Aug 08 2023 02:36:00 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 4: Verify the invitation email for customerTue Aug 08 2023 02:36:00 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 5: Add company user to the Project. Tue Aug 08 2023 02:36:06 GMT+0000 (Greenwich Mean Time) (47273ms) √ EX-9887 - Part 5: Add company user to the Project. Tue Aug 08 2023 02:36:06 GMT+0000 (Greenwich Mean Time) (47273ms) √ EX-9887 - Part 6: Verify company user can access project. Tue Aug 08 2023 02:36:06 GMT+0000 (Greenwich Mean Time) (25623ms) √ EX-9887 - Part 6: Verify company user can access project. Tue Aug 08 2023 02:36:06 GMT+0000 (Greenwich Mean Time) (25623ms) √ EX-9887 - Part 7: Add Contract with a user to the project. Tue Aug 08 2023 02:36:06 GMT+0000 (Greenwich Mean Time) (37688ms) √ EX-9887 - Part 7: Add Contract with a user to the project. Tue Aug 08 2023 02:36:06 GMT+0000 (Greenwich Mean Time) (37688ms) √ EX-9887 - Part 8: Verify email invitation for contractor user Tue Aug 08 2023 02:38:01 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 8: Verify email invitation for contractor user Tue Aug 08 2023 02:38:01 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 9: Add additiona user to existing contract of the project. Tue Aug 08 2023 02:38:05 GMT+0000 (Greenwich Mean Time) (46044ms) √ EX-9887 - Part 9: Add additiona user to existing contract of the project. Tue Aug 08 2023 02:38:05 GMT+0000 (Greenwich Mean Time) (46044ms) √ EX-9887 - Part 10: Verify email invitation for additional contract user Tue Aug 08 2023 02:38:55 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 10: Verify email invitation for additional contract user Tue Aug 08 2023 02:38:55 GMT+0000 (Greenwich Mean Time) √ Ex-9887 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 08 2023 02:38:59 GMT+0000 (Greenwich Mean Time) (45424ms) √ Ex-9887 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 08 2023 02:38:59 GMT+0000 (Greenwich Mean Time) (45424ms) √ EX-9887 - Part 12: Clean up Project Tue Aug 08 2023 02:38:59 GMT+0000 (Greenwich Mean Time) (34655ms) √ EX-9887 - Part 12: Clean up Project Tue Aug 08 2023 02:38:59 GMT+0000 (Greenwich Mean Time) (34655ms) 12 passing (7m) 12 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_041.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 44 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9888-GC-FU-project-previlleges.spe (43 of 110) c.ts User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesTue Aug 08 2023 02:40:24 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesTue Aug 08 2023 02:40:24 GMT+0000 (Greenwich Mean Time) √ EX-9888 - Part 1: Create a project Tue Aug 08 2023 02:40:24 GMT+0000 (Greenwich Mean Time) (47837ms) √ EX-9888 - Part 1: Create a project Tue Aug 08 2023 02:40:24 GMT+0000 (Greenwich Mean Time) (47837ms) √ EX-9888 - Part 2: Edit the project details and change the nameTue Aug 08 2023 02:40:24 GMT+0000 (Greenwich Mean Time) (28830ms) √ EX-9888 - Part 2: Edit the project details and change the nameTue Aug 08 2023 02:40:24 GMT+0000 (Greenwich Mean Time) (28830ms) √ EX-9888 - Part 3: Add customer to the Project. Tue Aug 08 2023 02:40:24 GMT+0000 (Greenwich Mean Time) (33159ms) √ EX-9888 - Part 3: Add customer to the Project. Tue Aug 08 2023 02:40:24 GMT+0000 (Greenwich Mean Time) (33159ms) √ EX-9888 - Part 4: Verify the invitation email for customerTue Aug 08 2023 02:42:19 GMT+0000 (Greenwich Mean Time) √ EX-9888 - Part 4: Verify the invitation email for customerTue Aug 08 2023 02:42:19 GMT+0000 (Greenwich Mean Time) √ EX-9888 - Part 5: Add company user to the Project. Tue Aug 08 2023 02:42:24 GMT+0000 (Greenwich Mean Time) (39099ms) √ EX-9888 - Part 5: Add company user to the Project. Tue Aug 08 2023 02:42:24 GMT+0000 (Greenwich Mean Time) (39099ms) √ EX-9888 - Part 6: Verify company user can access project. Tue Aug 08 2023 02:42:24 GMT+0000 (Greenwich Mean Time) (26175ms) √ EX-9888 - Part 6: Verify company user can access project. Tue Aug 08 2023 02:42:24 GMT+0000 (Greenwich Mean Time) (26175ms) √ EX-9888 - Part 7: Add Contract should be in disabled state Tue Aug 08 2023 02:42:24 GMT+0000 (Greenwich Mean Time) (21072ms) √ EX-9888 - Part 7: Add Contract should be in disabled state Tue Aug 08 2023 02:42:24 GMT+0000 (Greenwich Mean Time) (21072ms) √ Ex-9888 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 08 2023 02:42:24 GMT+0000 (Greenwich Mean Time) (18011ms) √ Ex-9888 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 08 2023 02:42:24 GMT+0000 (Greenwich Mean Time) (18011ms) √ EX-9888 - Part 9: Clean up Project Tue Aug 08 2023 02:42:24 GMT+0000 (Greenwich Mean Time) (36312ms) √ EX-9888 - Part 9: Clean up Project Tue Aug 08 2023 02:42:24 GMT+0000 (Greenwich Mean Time) (36312ms) 9 passing (4m) 9 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_042.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 9 │ │ Passing: 9 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 21 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9888-GC-FU-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9889-SC-Owner-project-previlleges. (44 of 110) spec.ts User Role permissions| SC Account Owner | Login as SC account owner and create project and verify user privilegesTue Aug 08 2023 02:44:50 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Account Owner | Login as SC account owner and create project and verify user privilegesTue Aug 08 2023 02:44:50 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 1: Create a project Tue Aug 08 2023 02:44:50 GMT+0000 (Greenwich Mean Time) (49418ms) √ EX-9889 - Part 1: Create a project Tue Aug 08 2023 02:44:50 GMT+0000 (Greenwich Mean Time) (49418ms) √ EX-9889 - Part 2: Edit the project details and change the nameTue Aug 08 2023 02:44:50 GMT+0000 (Greenwich Mean Time) (31356ms) √ EX-9889 - Part 2: Edit the project details and change the nameTue Aug 08 2023 02:44:50 GMT+0000 (Greenwich Mean Time) (31356ms) √ EX-9889 - Part 3: Add customer to the Project. Tue Aug 08 2023 02:44:50 GMT+0000 (Greenwich Mean Time) (35632ms) √ EX-9889 - Part 3: Add customer to the Project. Tue Aug 08 2023 02:44:50 GMT+0000 (Greenwich Mean Time) (35632ms) √ EX-9889 - Part 4: Verify the invitation email for customerTue Aug 08 2023 02:46:52 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 4: Verify the invitation email for customerTue Aug 08 2023 02:46:52 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 5: Add company user to the Project. Tue Aug 08 2023 02:46:57 GMT+0000 (Greenwich Mean Time) (35416ms) √ EX-9889 - Part 5: Add company user to the Project. Tue Aug 08 2023 02:46:57 GMT+0000 (Greenwich Mean Time) (35416ms) √ EX-9889 - Part 6: Verify company user can access project. Tue Aug 08 2023 02:46:57 GMT+0000 (Greenwich Mean Time) (25865ms) √ EX-9889 - Part 6: Verify company user can access project. Tue Aug 08 2023 02:46:57 GMT+0000 (Greenwich Mean Time) (25865ms) √ EX-9889 - Part 7: Add Contract with a user to the project. Tue Aug 08 2023 02:46:57 GMT+0000 (Greenwich Mean Time) (27639ms) √ EX-9889 - Part 7: Add Contract with a user to the project. Tue Aug 08 2023 02:46:57 GMT+0000 (Greenwich Mean Time) (27639ms) √ EX-9889 - Part 8: Verify email invitation for contractor user Tue Aug 08 2023 02:48:31 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 8: Verify email invitation for contractor user Tue Aug 08 2023 02:48:31 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 9: Add additional user to existing contract of the project. Tue Aug 08 2023 02:48:35 GMT+0000 (Greenwich Mean Time) (41042ms) √ EX-9889 - Part 9: Add additional user to existing contract of the project. Tue Aug 08 2023 02:48:35 GMT+0000 (Greenwich Mean Time) (41042ms) √ EX-9889 - Part 10: Verify email invitation for additional contract user Tue Aug 08 2023 02:49:19 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 10: Verify email invitation for additional contract user Tue Aug 08 2023 02:49:19 GMT+0000 (Greenwich Mean Time) √ Ex-9889 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 08 2023 02:49:23 GMT+0000 (Greenwich Mean Time) (33709ms) √ Ex-9889 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 08 2023 02:49:23 GMT+0000 (Greenwich Mean Time) (33709ms) √ EX-9889 - Part 12: Clean up Project Tue Aug 08 2023 02:49:23 GMT+0000 (Greenwich Mean Time) (29344ms) √ EX-9889 - Part 12: Clean up Project Tue Aug 08 2023 02:49:23 GMT+0000 (Greenwich Mean Time) (29344ms) 12 passing (6m) 12 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_043.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 36 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9889-SC-Owner-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9890-SC-PM-project-previlleges.spe (45 of 110) c.ts User Role permissions| SC PM | Login as SC PM and create project and verify user privilegesTue Aug 08 2023 02:50:31 GMT+0000 (Greenwich Mean Time) User Role permissions| SC PM | Login as SC PM and create project and verify user privilegesTue Aug 08 2023 02:50:31 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 1: Create a project Tue Aug 08 2023 02:50:31 GMT+0000 (Greenwich Mean Time) (52867ms) √ EX-9890 - Part 1: Create a project Tue Aug 08 2023 02:50:31 GMT+0000 (Greenwich Mean Time) (52867ms) √ EX-9890 - Part 2: Edit the project details and change the nameTue Aug 08 2023 02:50:31 GMT+0000 (Greenwich Mean Time) (34166ms) √ EX-9890 - Part 2: Edit the project details and change the nameTue Aug 08 2023 02:50:31 GMT+0000 (Greenwich Mean Time) (34166ms) √ EX-9890 - Part 3: Add customer to the Project. Tue Aug 08 2023 02:50:31 GMT+0000 (Greenwich Mean Time) (34540ms) √ EX-9890 - Part 3: Add customer to the Project. Tue Aug 08 2023 02:50:31 GMT+0000 (Greenwich Mean Time) (34540ms) √ EX-9890 - Part 4: Verify the invitation email for customerTue Aug 08 2023 02:52:40 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 4: Verify the invitation email for customerTue Aug 08 2023 02:52:40 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 5: Add company user to the Project. Tue Aug 08 2023 02:52:45 GMT+0000 (Greenwich Mean Time) (39294ms) √ EX-9890 - Part 5: Add company user to the Project. Tue Aug 08 2023 02:52:45 GMT+0000 (Greenwich Mean Time) (39294ms) √ EX-9890 - Part 6: Verify company user can access project. Tue Aug 08 2023 02:52:45 GMT+0000 (Greenwich Mean Time) (25236ms) √ EX-9890 - Part 6: Verify company user can access project. Tue Aug 08 2023 02:52:45 GMT+0000 (Greenwich Mean Time) (25236ms) √ EX-9890 - Part 7: Add Contract with a user to the project. Tue Aug 08 2023 02:52:45 GMT+0000 (Greenwich Mean Time) (30226ms) √ EX-9890 - Part 7: Add Contract with a user to the project. Tue Aug 08 2023 02:52:45 GMT+0000 (Greenwich Mean Time) (30226ms) √ EX-9890 - Part 8: Verify email invitation for contractor user Tue Aug 08 2023 02:54:25 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 8: Verify email invitation for contractor user Tue Aug 08 2023 02:54:25 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 9: Add additiona user to existing contract of the project. Tue Aug 08 2023 02:54:29 GMT+0000 (Greenwich Mean Time) (40380ms) √ EX-9890 - Part 9: Add additiona user to existing contract of the project. Tue Aug 08 2023 02:54:29 GMT+0000 (Greenwich Mean Time) (40380ms) √ EX-9890 - Part 10: Verify email invitation for additional contract user Tue Aug 08 2023 02:55:14 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 10: Verify email invitation for additional contract user Tue Aug 08 2023 02:55:14 GMT+0000 (Greenwich Mean Time) √ Ex-9890 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 08 2023 02:55:18 GMT+0000 (Greenwich Mean Time) (35678ms) √ Ex-9890 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 08 2023 02:55:18 GMT+0000 (Greenwich Mean Time) (35678ms) √ EX-9890 - Part 12: Clean up Project Tue Aug 08 2023 02:55:18 GMT+0000 (Greenwich Mean Time) (31522ms) √ EX-9890 - Part 12: Clean up Project Tue Aug 08 2023 02:55:18 GMT+0000 (Greenwich Mean Time) (31522ms) 12 passing (6m) 12 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_044.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 54 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9890-SC-PM-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9891-SC-FU-project-previlleges.spe (46 of 110) c.ts User Role permissions| SC Field User | Login as SC Field User and create project and verify user privilegesTue Aug 08 2023 02:56:29 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Field User | Login as SC Field User and create project and verify user privilegesTue Aug 08 2023 02:56:29 GMT+0000 (Greenwich Mean Time) √ EX-9891 - Part 1: Create a project Tue Aug 08 2023 02:56:29 GMT+0000 (Greenwich Mean Time) (49230ms) √ EX-9891 - Part 1: Create a project Tue Aug 08 2023 02:56:29 GMT+0000 (Greenwich Mean Time) (49230ms) √ EX-9891 - Part 2: Edit the project details and change the nameTue Aug 08 2023 02:56:29 GMT+0000 (Greenwich Mean Time) (28982ms) √ EX-9891 - Part 2: Edit the project details and change the nameTue Aug 08 2023 02:56:29 GMT+0000 (Greenwich Mean Time) (28982ms) √ EX-9891 - Part 3: Add customer to the Project. Tue Aug 08 2023 02:56:29 GMT+0000 (Greenwich Mean Time) (33216ms) √ EX-9891 - Part 3: Add customer to the Project. Tue Aug 08 2023 02:56:29 GMT+0000 (Greenwich Mean Time) (33216ms) √ EX-9891 - Part 4: Verify the invitation email for customerTue Aug 08 2023 02:58:26 GMT+0000 (Greenwich Mean Time) √ EX-9891 - Part 4: Verify the invitation email for customerTue Aug 08 2023 02:58:26 GMT+0000 (Greenwich Mean Time) √ EX-9891 - Part 5: Add company user to the Project. Tue Aug 08 2023 02:58:31 GMT+0000 (Greenwich Mean Time) (38605ms) √ EX-9891 - Part 5: Add company user to the Project. Tue Aug 08 2023 02:58:31 GMT+0000 (Greenwich Mean Time) (38605ms) √ EX-9891 - Part 6: Verify company user can access project. Tue Aug 08 2023 02:58:31 GMT+0000 (Greenwich Mean Time) (27014ms) √ EX-9891 - Part 6: Verify company user can access project. Tue Aug 08 2023 02:58:31 GMT+0000 (Greenwich Mean Time) (27014ms) √ EX-9891 - Part 7: Add Contract should be in disabled state Tue Aug 08 2023 02:58:31 GMT+0000 (Greenwich Mean Time) (22172ms) √ EX-9891 - Part 7: Add Contract should be in disabled state Tue Aug 08 2023 02:58:31 GMT+0000 (Greenwich Mean Time) (22172ms) √ Ex-9891 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 08 2023 02:58:31 GMT+0000 (Greenwich Mean Time) (17909ms) √ Ex-9891 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 08 2023 02:58:31 GMT+0000 (Greenwich Mean Time) (17909ms) √ EX-9891 - Part 9: Clean up Project Tue Aug 08 2023 02:58:31 GMT+0000 (Greenwich Mean Time) (31197ms) √ EX-9891 - Part 9: Clean up Project Tue Aug 08 2023 02:58:31 GMT+0000 (Greenwich Mean Time) (31197ms) 9 passing (4m) 9 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_045.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 9 │ │ Passing: 9 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 19 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9891-SC-FU-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-3673-verify-contractor-is-able-to-upload-cor-with (47 of 110) -only-mandatory-data.spec.ts Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Tue Aug 08 2023 03:00:53 GMT+0000 (Greenwich Mean Time) Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Tue Aug 08 2023 03:00:53 GMT+0000 (Greenwich Mean Time) √ EX-7674 - Part 0: Clean existing COR's : Tue Aug 08 2023 03:00:53 GMT+0000 (Greenwich Mean Time) (44415ms) √ EX-7674 - Part 0: Clean existing COR's : Tue Aug 08 2023 03:00:53 GMT+0000 (Greenwich Mean Time) (44415ms) √ EX-3673 - Upload COR with only mandatory data.Tue Aug 08 2023 03:00:53 GMT+0000 (Greenwich Mean Time) (52743ms) √ EX-3673 - Upload COR with only mandatory data.Tue Aug 08 2023 03:00:53 GMT+0000 (Greenwich Mean Time) (52743ms) √ EX-3673 - Verify the COR data in the COR Log.Tue Aug 08 2023 03:00:53 GMT+0000 (Greenwich Mean Time) (44395ms) √ EX-3673 - Verify the COR data in the COR Log.Tue Aug 08 2023 03:00:53 GMT+0000 (Greenwich Mean Time) (44395ms) √ EX-3673 - Cleanup - Delete COR.Tue Aug 08 2023 03:00:53 GMT+0000 (Greenwich Mean Time) (45619ms) √ EX-3673 - Cleanup - Delete COR.Tue Aug 08 2023 03:00:53 GMT+0000 (Greenwich Mean Time) (45619ms) 4 passing (3m) 4 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_046.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 4 │ │ Passing: 4 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 7 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandat │ │ ory-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-3683-GC-creates-project-adds-contract-SC-creates- (48 of 110) cor.spec.ts COR Log | GC PM creats a project. Adds Contract with SC Company. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) COR Log | GC PM creats a project. Adds Contract with SC Company. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) √ EX-3683 - Part 1: Create a projcet and add customers : Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (50213ms) √ EX-3683 - Part 1: Create a projcet and add customers : Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (50213ms) √ EX-3683 - Part 2: Add My Company users to the project.Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (63659ms) √ EX-3683 - Part 2: Add My Company users to the project.Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (63659ms) √ EX-3683 - Part 3: Add Contract to the project.Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (34899ms) √ EX-3683 - Part 3: Add Contract to the project.Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (34899ms) √ EX-3683 - Part 4: PM Contractor accept the project Invites : Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (26169ms) √ EX-3683 - Part 4: PM Contractor accept the project Invites : Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (26169ms) √ EX-3683 - Part 5: Owner Contractor accept the project Invites : Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (27146ms) √ EX-3683 - Part 5: Owner Contractor accept the project Invites : Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (27146ms) √ EX-3683 - Part 6: Admin Contractor accept the project Invites : Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (21066ms) √ EX-3683 - Part 6: Admin Contractor accept the project Invites : Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (21066ms) √ EX-3683 - Part 7: Field User Contractor accept the project Invites : Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (21731ms) √ EX-3683 - Part 7: Field User Contractor accept the project Invites : Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (21731ms) √ EX-3683 - Part 8: Create COR : Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (58779ms) √ EX-3683 - Part 8: Create COR : Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (58779ms) √ EX-3683 - Part 9: Verify the COR is in the Sent Log : Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (37767ms) √ EX-3683 - Part 9: Verify the COR is in the Sent Log : Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (37767ms) √ EX-3683 - Part 10: Cleanup GC... Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (34888ms) √ EX-3683 - Part 10: Cleanup GC... Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (34888ms) √ EX-3683 - Part 11: Cleanup SC... Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (32408ms) √ EX-3683 - Part 11: Cleanup SC... Tue Aug 08 2023 03:04:05 GMT+0000 (Greenwich Mean Time) (32408ms) 11 passing (7m) 11 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_047.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 11 │ │ Passing: 11 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 49 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-3683-GC-creates-project-adds-contract-SC-creates-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-3686-verify-there-are-two-tabs-on-cor-log-page-se (49 of 110) nt-received.spec.ts COR Log | To verify that on COR Log page there are separate tabs for Sent and Received CORsTue Aug 08 2023 03:10:59 GMT+0000 (Greenwich Mean Time) COR Log | To verify that on COR Log page there are separate tabs for Sent and Received CORsTue Aug 08 2023 03:10:59 GMT+0000 (Greenwich Mean Time) √ EX-3686: Verify there are separate tabs for Sent and Received CORsTue Aug 08 2023 03:10:59 GMT+0000 (Greenwich Mean Time) (27499ms) √ EX-3686: Verify there are separate tabs for Sent and Received CORsTue Aug 08 2023 03:10:59 GMT+0000 (Greenwich Mean Time) (27499ms) 1 passing (29s) 1 passing (29s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_048.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 28 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-3686-verify-there-are-two-tabs-on-cor-log-page-sent-received. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-4366-SC-creates-project-adds-gc-customer-sc-creat (50 of 110) es-cor.spec.ts Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) √ EX-4366 - Create a projcet and add customers : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (52948ms) √ EX-4366 - Create a projcet and add customers : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (52948ms) √ EX-4366 - Add My Company users to the project.Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (70992ms) √ EX-4366 - Add My Company users to the project.Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (70992ms) √ EX-4366 - Add Customer to the project.Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (68291ms) √ EX-4366 - Add Customer to the project.Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (68291ms) 1) EX-4366 - PM Customer accept the project Invites : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) 1) EX-4366 - PM Customer accept the project Invites : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) √ EX-4366 - Owner Customer accept the project Invites : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (21956ms) √ EX-4366 - Owner Customer accept the project Invites : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (21956ms) 2) EX-4366 - Admin Customer accept the project Invites : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) 2) EX-4366 - Admin Customer accept the project Invites : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) √ EX-4366 - Field User Customer accept the project Invites : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (19395ms) √ EX-4366 - Field User Customer accept the project Invites : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (19395ms) √ EX-4366 - Create COR : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (60989ms) √ EX-4366 - Create COR : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (60989ms) √ EX-4366 - Verify COR is created : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (39827ms) √ EX-4366 - Verify COR is created : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (39827ms) √ EX-4366 - Cleanup GC... Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (41007ms) √ EX-4366 - Cleanup GC... Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (41007ms) √ EX-4366 - Cleanup SC... Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (36556ms) √ EX-4366 - Cleanup SC... Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) (36556ms) 9 passing (8m) 2 failing 1) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) EX-4366 - PM Customer accept the project Invites : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:257:5) 2) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) EX-4366 - Admin Customer accept the project Invites : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:257:5) 9 passing (8m) 2 failing 1) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) EX-4366 - PM Customer accept the project Invites : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:257:5) 2) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time) EX-4366 - Admin Customer accept the project Invites : Tue Aug 08 2023 03:11:32 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:257:5) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_049.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 11 │ │ Passing: 9 │ │ Failing: 2 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 2 │ │ Video: false │ │ Duration: 8 minutes, 17 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec. │ │ ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x533) Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Crea te COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 08 2023 031132 GMT +0000 (Greenwich Mean Time) -- EX-4366 - PM Customer accept the project Invites Tue A.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x533) Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Crea te COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 08 2023 031132 GMT +0000 (Greenwich Mean Time) -- EX-4366 - Admin Customer accept the project Invit es Tu.png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft. (51 of 110) spec.ts Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestTue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestTue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) √ EX-4432 - Part 1: Create project Test Project TC4432 1691464794583. Tue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) (51723ms) √ EX-4432 - Part 1: Create project Test Project TC4432 1691464794583. Tue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) (51723ms) √ EX-4432 - Part 2: Add Customer.Tue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) (31499ms) √ EX-4432 - Part 2: Add Customer.Tue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) (31499ms) 1) EX-4432 - Part 3: Customer Accept invite.Tue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) 1) EX-4432 - Part 3: Customer Accept invite.Tue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) √ EX-4432 - Part 4: Contractor creates COR Draft. : Tue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) (41674ms) √ EX-4432 - Part 4: Contractor creates COR Draft. : Tue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) (41674ms) √ EX-4432 - Part 5: Verify the COR Draft Log has the new COR draft. : Tue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) (33450ms) √ EX-4432 - Part 5: Verify the COR Draft Log has the new COR draft. : Tue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) (33450ms) √ EX-4432 - Part 6: Cleanup GC... Tue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) (38566ms) √ EX-4432 - Part 6: Cleanup GC... Tue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) (38566ms) √ EX-4432 - Part 7: Cleanup SC... Tue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) (35163ms) √ EX-4432 - Part 7: Cleanup SC... Tue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) (35163ms) 6 passing (5m) 1 failing 1) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestTue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) EX-4432 - Part 3: Customer Accept invite.Tue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:257:5) 6 passing (5m) 1 failing 1) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestTue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time) EX-4432 - Part 3: Customer Accept invite.Tue Aug 08 2023 03:19:54 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:257:5) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_050.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 6 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: false │ │ Duration: 4 minutes, 35 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x533) Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts\Create COR To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestTue Aug 08 2023 031954 GMT+0000 (Greenwich Mean Time) -- EX-4432 - Part 3 Customer Accept invite.Tue Aug 08 2023 031954 GMT+0000 (Greenwich Mean . png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5244-verify-shareable-link-contains-just-the-sele (52 of 110) cted-project.spec.ts COR | Verify sharable link contains CORs from just the selected project.Tue Aug 08 2023 03:24:34 GMT+0000 (Greenwich Mean Time) COR | Verify sharable link contains CORs from just the selected project.Tue Aug 08 2023 03:24:34 GMT+0000 (Greenwich Mean Time) √ EX-5244 Tue Aug 08 2023 03:24:34 GMT+0000 (Greenwich Mean Time) (61233ms) √ EX-5244 Tue Aug 08 2023 03:24:34 GMT+0000 (Greenwich Mean Time) (61233ms) 1 passing (1m) 1 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_051.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 1 second │ │ Spec Ran: 04_COR_Log/Sent/ex-5244-verify-shareable-link-contains-just-the-selected-project │ │ .spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5333-SC-creates-cor-with-full-data.spec.ts (53 of 110) Tue Aug 08 2023 03:25:41 GMT+0000 (Greenwich Mean Time) Tue Aug 08 2023 03:25:41 GMT+0000 (Greenwich Mean Time) √ EX-5333 - Part 1: Create COR with full set of data: Tue Aug 08 2023 03:25:41 GMT+0000 (Greenwich Mean Time) (157306ms) √ EX-5333 - Part 1: Create COR with full set of data: Tue Aug 08 2023 03:25:41 GMT+0000 (Greenwich Mean Time) (157306ms) 1 passing (3m) 1 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_052.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 37 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5333-SC-creates-cor-with-full-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5396-verify-contractor-is-able-to-upload-cor-with (54 of 110) -mandatory-and-optional-data.spec.ts Upload COR | To verify that the contractor is able to Upload a Change Order Request with full set of data. Tue Aug 08 2023 03:28:23 GMT+0000 (Greenwich Mean Time) Upload COR | To verify that the contractor is able to Upload a Change Order Request with full set of data. Tue Aug 08 2023 03:28:23 GMT+0000 (Greenwich Mean Time) √ EX-5396 - Create new project. Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (50485ms) √ EX-5396 - Create new project. Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (50485ms) √ EX-5396 - Add My Company users to the project.Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (67218ms) √ EX-5396 - Add My Company users to the project.Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (67218ms) √ EX-5396 - Add Contract to the project.Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (34843ms) √ EX-5396 - Add Contract to the project.Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (34843ms) √ EX-5396 - PM Customer accept the project Invites : Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (24365ms) √ EX-5396 - PM Customer accept the project Invites : Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (24365ms) √ EX-5396 - Owner Customer accept the project Invites : Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (26233ms) √ EX-5396 - Owner Customer accept the project Invites : Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (26233ms) √ EX-5396 - Admin Customer accept the project Invites : Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (22363ms) √ EX-5396 - Admin Customer accept the project Invites : Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (22363ms) √ EX-5396 - Field User Customer accept the project Invites : Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (23288ms) √ EX-5396 - Field User Customer accept the project Invites : Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (23288ms) √ EX-5396 - Upload COR with full data set, mandatory and optional data.Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (65528ms) √ EX-5396 - Upload COR with full data set, mandatory and optional data.Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (65528ms) √ EX-5396 - Verify the COR data in the COR Log.Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (54136ms) √ EX-5396 - Verify the COR data in the COR Log.Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (54136ms) √ EX-5396 - Cleanup GC... Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (34849ms) √ EX-5396 - Cleanup GC... Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (34849ms) √ EX-5396 - Cleanup SC... Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (31768ms) √ EX-5396 - Cleanup SC... Tue Aug 08 2023 03:28:24 GMT+0000 (Greenwich Mean Time) (31768ms) 11 passing (7m) 11 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_053.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 11 │ │ Passing: 11 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 16 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5396-verify-contractor-is-able-to-upload-cor-with-mandatory-a │ │ nd-optional-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5435-create-new-project-add-contrac-verify-origin (55 of 110) al-contract-value.spec.ts Create New Project with full set of data, as GC PM add contractor and verify the Original Contract Value.Tue Aug 08 2023 03:35:44 GMT+0000 (Greenwich Mean Time) Create New Project with full set of data, as GC PM add contractor and verify the Original Contract Value.Tue Aug 08 2023 03:35:44 GMT+0000 (Greenwich Mean Time) √ EX-5435 - Create a project.Tue Aug 08 2023 03:35:44 GMT+0000 (Greenwich Mean Time) (51766ms) √ EX-5435 - Create a project.Tue Aug 08 2023 03:35:44 GMT+0000 (Greenwich Mean Time) (51766ms) √ EX-5435 - Add contract.Tue Aug 08 2023 03:35:44 GMT+0000 (Greenwich Mean Time) (39988ms) √ EX-5435 - Add contract.Tue Aug 08 2023 03:35:44 GMT+0000 (Greenwich Mean Time) (39988ms) √ EX-5435 - Sub Contractor accepts the project/contract invite.Tue Aug 08 2023 03:35:44 GMT+0000 (Greenwich Mean Time) (26831ms) √ EX-5435 - Sub Contractor accepts the project/contract invite.Tue Aug 08 2023 03:35:44 GMT+0000 (Greenwich Mean Time) (26831ms) √ EX-5435 - Verify Original Contract Value.Tue Aug 08 2023 03:35:44 GMT+0000 (Greenwich Mean Time) (27081ms) √ EX-5435 - Verify Original Contract Value.Tue Aug 08 2023 03:35:44 GMT+0000 (Greenwich Mean Time) (27081ms) √ EX-5435 - Cleanup GC... Tue Aug 08 2023 03:35:44 GMT+0000 (Greenwich Mean Time) (36988ms) √ EX-5435 - Cleanup GC... Tue Aug 08 2023 03:35:44 GMT+0000 (Greenwich Mean Time) (36988ms) √ EX-5435 - Cleanup SC... Tue Aug 08 2023 03:35:44 GMT+0000 (Greenwich Mean Time) (31062ms) √ EX-5435 - Cleanup SC... Tue Aug 08 2023 03:35:44 GMT+0000 (Greenwich Mean Time) (31062ms) 6 passing (4m) 6 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_054.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 34 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5435-create-new-project-add-contrac-verify-original-contract- │ │ value.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-5827-to-verify-multiple-cors-to-same-tag-when-cre (56 of 110) ating-cor.spec.ts COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Aug 08 2023 03:39:22 GMT+0000 (Greenwich Mean Time) COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Aug 08 2023 03:39:22 GMT+0000 (Greenwich Mean Time) √ EX-5827 - Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Aug 08 2023 03:39:22 GMT+0000 (Greenwich Mean Time) (27837ms) √ EX-5827 - Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Aug 08 2023 03:39:22 GMT+0000 (Greenwich Mean Time) (27837ms) 1 passing (28s) 1 passing (28s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_055.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 27 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-5827-to-verify-multiple-cors-to-same-tag-when-creating-cor.sp │ │ ec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-5894-to-verify-multiple-cors-to-same-tag-when-upl (57 of 110) oading-cor.spec.ts COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Aug 08 2023 03:39:54 GMT+0000 (Greenwich Mean Time) COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Aug 08 2023 03:39:54 GMT+0000 (Greenwich Mean Time) √ EX-5894 - Verify Multiple CORs should not be associated with the same T&M Tag when uploading a New CORTue Aug 08 2023 03:39:54 GMT+0000 (Greenwich Mean Time) (40520ms) √ EX-5894 - Verify Multiple CORs should not be associated with the same T&M Tag when uploading a New CORTue Aug 08 2023 03:39:54 GMT+0000 (Greenwich Mean Time) (40520ms) 1 passing (41s) 1 passing (41s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_056.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 40 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-5894-to-verify-multiple-cors-to-same-tag-when-uploading-cor.s │ │ pec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-6681-verify-sent-summary-data-after-filtering-by- (58 of 110) project.spec.ts As Sub Contractor go to COR Log / Sent and verify the Summary data when fitered for one and multiple projects.Tue Aug 08 2023 03:40:39 GMT+0000 (Greenwich Mean Time) As Sub Contractor go to COR Log / Sent and verify the Summary data when fitered for one and multiple projects.Tue Aug 08 2023 03:40:39 GMT+0000 (Greenwich Mean Time) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by single Project.Tue Aug 08 2023 03:40:39 GMT+0000 (Greenwich Mean Time) (43620ms) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by single Project.Tue Aug 08 2023 03:40:39 GMT+0000 (Greenwich Mean Time) (43620ms) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by multiple Projects.Tue Aug 08 2023 03:40:39 GMT+0000 (Greenwich Mean Time) (70692ms) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by multiple Projects.Tue Aug 08 2023 03:40:39 GMT+0000 (Greenwich Mean Time) (70692ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_057.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 55 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-6681-verify-sent-summary-data-after-filtering-by-project.spec │ │ .ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5425-verify-received-summary-data-after-filte (59 of 110) ring-by-project.spec.ts T&M | Verify the RECEIVED Labor Hours Summary and T&M Log Summary shows correct values before and after filtering.Tue Aug 08 2023 03:42:39 GMT+0000 (Greenwich Mean Time) T&M | Verify the RECEIVED Labor Hours Summary and T&M Log Summary shows correct values before and after filtering.Tue Aug 08 2023 03:42:39 GMT+0000 (Greenwich Mean Time) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by single project.Tue Aug 08 2023 03:42:39 GMT+0000 (Greenwich Mean Time) (63638ms) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by single project.Tue Aug 08 2023 03:42:39 GMT+0000 (Greenwich Mean Time) (63638ms) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by multiple projects.Tue Aug 08 2023 03:42:39 GMT+0000 (Greenwich Mean Time) (45237ms) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by multiple projects.Tue Aug 08 2023 03:42:39 GMT+0000 (Greenwich Mean Time) (45237ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_058.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 51 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5425-verify-received-summary-data-after-filtering-by-proj │ │ ect.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5429-verify-received-export-csv-after-filteri (60 of 110) ng-by-project.spec.ts T&M | Verify the T&M Log / RECEIVED CSV exports.Tue Aug 08 2023 03:44:35 GMT+0000 (Greenwich Mean Time) T&M | Verify the T&M Log / RECEIVED CSV exports.Tue Aug 08 2023 03:44:35 GMT+0000 (Greenwich Mean Time) √ EX-5429 - Verify the T&M Log / RECEIVED CSV export.Tue Aug 08 2023 03:44:35 GMT+0000 (Greenwich Mean Time) (49675ms) √ EX-5429 - Verify the T&M Log / RECEIVED CSV export.Tue Aug 08 2023 03:44:35 GMT+0000 (Greenwich Mean Time) (49675ms) 1 passing (50s) 1 passing (50s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_059.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 49 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5429-verify-received-export-csv-after-filtering-by-projec │ │ t.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5431-verify-received-export-sharelog-after-fi (61 of 110) ltering-by-project.spec.ts T&M | Verify the T&M Log / RECEIVED ShareLog exports.Tue Aug 08 2023 03:45:29 GMT+0000 (Greenwich Mean Time) T&M | Verify the T&M Log / RECEIVED ShareLog exports.Tue Aug 08 2023 03:45:29 GMT+0000 (Greenwich Mean Time) √ EX-5431 - Verify the T&M Log / RECEIVED ShareLog export.Tue Aug 08 2023 03:45:29 GMT+0000 (Greenwich Mean Time) (56870ms) √ EX-5431 - Verify the T&M Log / RECEIVED ShareLog export.Tue Aug 08 2023 03:45:29 GMT+0000 (Greenwich Mean Time) (56870ms) 1 passing (57s) 1 passing (57s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_060.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 56 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5431-verify-received-export-sharelog-after-filtering-by-p │ │ roject.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5641-verify-tnm-log-received-summary-data-aft (62 of 110) er-filtering-by-tag-status.spec.ts T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 08 2023 03:46:31 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 08 2023 03:46:31 GMT+0000 (Greenwich Mean Time) √ EX-5641 - Filter by status Awaiting Signature and verify the Summary data for the test project.Tue Aug 08 2023 03:46:31 GMT+0000 (Greenwich Mean Time) (63249ms) √ EX-5641 - Filter by status Awaiting Signature and verify the Summary data for the test project.Tue Aug 08 2023 03:46:31 GMT+0000 (Greenwich Mean Time) (63249ms) √ EX-5641 - Filter by status Open and verify the Summary data for the test project.Tue Aug 08 2023 03:46:31 GMT+0000 (Greenwich Mean Time) (58023ms) √ EX-5641 - Filter by status Open and verify the Summary data for the test project.Tue Aug 08 2023 03:46:31 GMT+0000 (Greenwich Mean Time) (58023ms) √ EX-5641 - Filter by status Rejected and verify the Summary data for the test project.Tue Aug 08 2023 03:46:31 GMT+0000 (Greenwich Mean Time) (58824ms) √ EX-5641 - Filter by status Rejected and verify the Summary data for the test project.Tue Aug 08 2023 03:46:31 GMT+0000 (Greenwich Mean Time) (58824ms) √ EX-5641 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Tue Aug 08 2023 03:46:31 GMT+0000 (Greenwich Mean Time) (58011ms) √ EX-5641 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Tue Aug 08 2023 03:46:31 GMT+0000 (Greenwich Mean Time) (58011ms) √ EX-5641 - Filter by status Signed and verify the Summary data for the test project.Tue Aug 08 2023 03:46:31 GMT+0000 (Greenwich Mean Time) (58914ms) √ EX-5641 - Filter by status Signed and verify the Summary data for the test project.Tue Aug 08 2023 03:46:31 GMT+0000 (Greenwich Mean Time) (58914ms) 5 passing (5m) 5 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_061.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 3 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5641-verify-tnm-log-received-summary-data-after-filtering │ │ -by-tag-status.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-6030-create-cn-respond-with-upload- (63 of 110) cor-verify-all-data.spec.ts Change Notifications | Create CN, respond to it with Upload COR and verify the data in the CN Log. Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) Change Notifications | Create CN, respond to it with Upload COR and verify the data in the CN Log. Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) √ EX-6030 Part 1: Create a project and send invite.Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) (49429ms) √ EX-6030 Part 1: Create a project and send invite.Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) (49429ms) √ EX-6030 Part 2: Add contractor.Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) (38215ms) √ EX-6030 Part 2: Add contractor.Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) (38215ms) √ EX-6030 Part 3: Sub Contractor accepts the invite.Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) (23220ms) √ EX-6030 Part 3: Sub Contractor accepts the invite.Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) (23220ms) √ EX-6030 Part 4: Gen Contractor creates a Pricing Request Change Notification.Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) (44604ms) √ EX-6030 Part 4: Gen Contractor creates a Pricing Request Change Notification.Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) (44604ms) √ EX-6030 Part 5: Sub Contractor responds to the Change Notification with Upload COR.Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) (72852ms) √ EX-6030 Part 5: Sub Contractor responds to the Change Notification with Upload COR.Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) (72852ms) √ EX-6030 Part 6: GC verifies CN data and status.Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) (29075ms) √ EX-6030 Part 6: GC verifies CN data and status.Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) (29075ms) √ EX-6030 Part 7: Cleanup GC...Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) (36415ms) √ EX-6030 Part 7: Cleanup GC...Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) (36415ms) √ EX-6030 Part 7: Cleanup SC...Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) (32949ms) √ EX-6030 Part 7: Cleanup SC...Tue Aug 08 2023 03:51:38 GMT+0000 (Greenwich Mean Time) (32949ms) 8 passing (5m) 8 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_062.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 27 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-6030-create-cn-respond-with-upload-cor-verify-a │ │ ll-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8597-respond-to-cn-as-SC-and-GC-cle (64 of 110) ar-response.spec.ts Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseTue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseTue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) √ EX-8597 Part 1: Delete existing CORs. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (41534ms) √ EX-8597 Part 1: Delete existing CORs. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (41534ms) √ EX-8597 Part 2: Delete existing CNs. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (25936ms) √ EX-8597 Part 2: Delete existing CNs. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (25936ms) √ EX-8597 Part 3: Create a CN with type as Authorize T&M Work and send it to Contractor. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (42716ms) √ EX-8597 Part 3: Create a CN with type as Authorize T&M Work and send it to Contractor. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (42716ms) √ EX-8597 Part 4: Respond to CN with No Cost Impact as SC PM. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (49122ms) √ EX-8597 Part 4: Respond to CN with No Cost Impact as SC PM. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (49122ms) √ EX-8597 Part 5: Verify the reponse and clear the response. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (43938ms) √ EX-8597 Part 5: Verify the reponse and clear the response. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (43938ms) √ EX-8597 Part 6: Respond to CN by creating a COR. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (63801ms) √ EX-8597 Part 6: Respond to CN by creating a COR. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (63801ms) √ EX-8597 Part 7: Verify the reponse and clear the response. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (46476ms) √ EX-8597 Part 7: Verify the reponse and clear the response. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (46476ms) √ EX-8597 Part 8: Respond to CN as SC PM by uploading a COR. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (75426ms) √ EX-8597 Part 8: Respond to CN as SC PM by uploading a COR. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (75426ms) √ EX-8597 Part 9: Verify the reponse and clear the response. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (45234ms) √ EX-8597 Part 9: Verify the reponse and clear the response. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (45234ms) √ EX-8597 Part 10: Respond to CN with No Cost Impact as GC PM and verify the reponse and clear the response. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (61971ms) √ EX-8597 Part 10: Respond to CN with No Cost Impact as GC PM and verify the reponse and clear the response. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (61971ms) √ EX-8597 Part 11: Respond to CN by linking received COR as GC PM and verify the reponse and clear the response. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (57706ms) √ EX-8597 Part 11: Respond to CN by linking received COR as GC PM and verify the reponse and clear the response. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (57706ms) √ EX-8597 Part 12: Clean the CORs. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (61953ms) √ EX-8597 Part 12: Clean the CORs. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (61953ms) √ EX-8597 Part 13: Clean the CNs. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (52939ms) √ EX-8597 Part 13: Clean the CNs. Tue Aug 08 2023 03:57:10 GMT+0000 (Greenwich Mean Time) (52939ms) 13 passing (11m) 13 passing (11m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_063.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 13 │ │ Passing: 13 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 11 minutes, 10 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8597-respond-to-cn-as-SC-and-GC-clear-response. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8599-create-cn-authorize-t&mwork-re (65 of 110) spond-as-SC-PM-with-no-cost-impact.spec.ts Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor. ) Tue Aug 08 2023 04:08:25 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor. ) Tue Aug 08 2023 04:08:25 GMT+0000 (Greenwich Mean Time) √ EX-8599 Part 1: Delete existing CN (30837ms) √ EX-8599 Part 1: Delete existing CN (30837ms) √ EX-8599 Part 2: Create a CN with type as Authorize T&M Work and send it to Contractor. Tue Aug 08 2023 04:08:25 GMT+0000 (Greenwich Mean Time) (50460ms) √ EX-8599 Part 2: Create a CN with type as Authorize T&M Work and send it to Contractor. Tue Aug 08 2023 04:08:25 GMT+0000 (Greenwich Mean Time) (50460ms) √ EX-8599 Part 3: Respond to CN with No Cost Impact. Tue Aug 08 2023 04:08:25 GMT+0000 (Greenwich Mean Time) (54785ms) √ EX-8599 Part 3: Respond to CN with No Cost Impact. Tue Aug 08 2023 04:08:25 GMT+0000 (Greenwich Mean Time) (54785ms) √ EX-8599 Part 4: Verify the data as Gc. Tue Aug 08 2023 04:08:25 GMT+0000 (Greenwich Mean Time) (32747ms) √ EX-8599 Part 4: Verify the data as Gc. Tue Aug 08 2023 04:08:25 GMT+0000 (Greenwich Mean Time) (32747ms) √ EX-8599 Part 5: Delete the CN. Tue Aug 08 2023 04:08:25 GMT+0000 (Greenwich Mean Time) (33277ms) √ EX-8599 Part 5: Delete the CN. Tue Aug 08 2023 04:08:25 GMT+0000 (Greenwich Mean Time) (33277ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_064.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 22 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8599-create-cn-authorize-t&mwork-respond-as-SC- │ │ PM-with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8942-create-cn-pricing-request-resp (66 of 110) ond-as-SC-PM-with-no-cost-impact.spec.ts Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:11:52 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:11:52 GMT+0000 (Greenwich Mean Time) √ EX-8942 Part 1: Delete existing CN (31559ms) √ EX-8942 Part 1: Delete existing CN (31559ms) √ EX-8942 Part 2: Create a CN with type as Pricing Request and send it to ContractorTue Aug 08 2023 04:11:52 GMT+0000 (Greenwich Mean Time) (41722ms) √ EX-8942 Part 2: Create a CN with type as Pricing Request and send it to ContractorTue Aug 08 2023 04:11:52 GMT+0000 (Greenwich Mean Time) (41722ms) √ EX-8942 Part 3: Respond to CN with No Cost ImpactTue Aug 08 2023 04:11:52 GMT+0000 (Greenwich Mean Time) (56577ms) √ EX-8942 Part 3: Respond to CN with No Cost ImpactTue Aug 08 2023 04:11:52 GMT+0000 (Greenwich Mean Time) (56577ms) √ EX-8942 Part 4: Verify the data as GcTue Aug 08 2023 04:11:52 GMT+0000 (Greenwich Mean Time) (34229ms) √ EX-8942 Part 4: Verify the data as GcTue Aug 08 2023 04:11:52 GMT+0000 (Greenwich Mean Time) (34229ms) √ EX-8942 Part 5: Delete the CNTue Aug 08 2023 04:11:52 GMT+0000 (Greenwich Mean Time) (28002ms) √ EX-8942 Part 5: Delete the CNTue Aug 08 2023 04:11:52 GMT+0000 (Greenwich Mean Time) (28002ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_065.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 13 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8942-create-cn-pricing-request-respond-as-SC-PM │ │ -with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8943-create-cn-pricing-request-resp (67 of 110) ond-as-SC-PM-with-create-cor.spec.ts Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:15:10 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:15:10 GMT+0000 (Greenwich Mean Time) √ EX-8943 Part 1: Delete existing CN (30510ms) √ EX-8943 Part 1: Delete existing CN (30510ms) √ EX-8943 Part 2: Delete existing CORsTue Aug 08 2023 04:15:10 GMT+0000 (Greenwich Mean Time) (34635ms) √ EX-8943 Part 2: Delete existing CORsTue Aug 08 2023 04:15:10 GMT+0000 (Greenwich Mean Time) (34635ms) √ EX-8943 Part 3: Create a CN with type as Pricing Request and send it to ContractorTue Aug 08 2023 04:15:10 GMT+0000 (Greenwich Mean Time) (43068ms) √ EX-8943 Part 3: Create a CN with type as Pricing Request and send it to ContractorTue Aug 08 2023 04:15:10 GMT+0000 (Greenwich Mean Time) (43068ms) √ EX-8943 Part 4: Respond to CN with create corTue Aug 08 2023 04:15:10 GMT+0000 (Greenwich Mean Time) (76246ms) √ EX-8943 Part 4: Respond to CN with create corTue Aug 08 2023 04:15:10 GMT+0000 (Greenwich Mean Time) (76246ms) √ EX-8943 Part 5: Verify the data as GcTue Aug 08 2023 04:15:10 GMT+0000 (Greenwich Mean Time) (35103ms) √ EX-8943 Part 5: Verify the data as GcTue Aug 08 2023 04:15:10 GMT+0000 (Greenwich Mean Time) (35103ms) √ EX-8943 Part 6: Delete all CORsTue Aug 08 2023 04:15:10 GMT+0000 (Greenwich Mean Time) (49230ms) √ EX-8943 Part 6: Delete all CORsTue Aug 08 2023 04:15:10 GMT+0000 (Greenwich Mean Time) (49230ms) √ EX-8943 Part 7: Delete the CNTue Aug 08 2023 04:15:10 GMT+0000 (Greenwich Mean Time) (35221ms) √ EX-8943 Part 7: Delete the CNTue Aug 08 2023 04:15:10 GMT+0000 (Greenwich Mean Time) (35221ms) 7 passing (5m) 7 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_066.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 4 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8943-create-cn-pricing-request-respond-as-SC-PM │ │ -with-create-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8944-create-cn-pricing-request-resp (68 of 110) ond-as-SC-PM-with-upload-cor.spec.ts Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:20:19 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:20:19 GMT+0000 (Greenwich Mean Time) √ EX-8944 Part 1: Delete existing CN (25669ms) √ EX-8944 Part 1: Delete existing CN (25669ms) √ EX-8944 Part 2: Delete existing CORsTue Aug 08 2023 04:20:19 GMT+0000 (Greenwich Mean Time) (37417ms) √ EX-8944 Part 2: Delete existing CORsTue Aug 08 2023 04:20:19 GMT+0000 (Greenwich Mean Time) (37417ms) √ EX-8944 Part 3: Create a CN with type as Pricing Request and send it to ContractorTue Aug 08 2023 04:20:19 GMT+0000 (Greenwich Mean Time) (42900ms) √ EX-8944 Part 3: Create a CN with type as Pricing Request and send it to ContractorTue Aug 08 2023 04:20:19 GMT+0000 (Greenwich Mean Time) (42900ms) √ EX-8944 Part 4: Respond to CN with upload corTue Aug 08 2023 04:20:19 GMT+0000 (Greenwich Mean Time) (82550ms) √ EX-8944 Part 4: Respond to CN with upload corTue Aug 08 2023 04:20:19 GMT+0000 (Greenwich Mean Time) (82550ms) √ EX-8944 Part 5: Verify the data as GcTue Aug 08 2023 04:20:19 GMT+0000 (Greenwich Mean Time) (29987ms) √ EX-8944 Part 5: Verify the data as GcTue Aug 08 2023 04:20:19 GMT+0000 (Greenwich Mean Time) (29987ms) √ EX-8944 Part 6: Delete all CORsTue Aug 08 2023 04:20:19 GMT+0000 (Greenwich Mean Time) (51602ms) √ EX-8944 Part 6: Delete all CORsTue Aug 08 2023 04:20:19 GMT+0000 (Greenwich Mean Time) (51602ms) √ EX-8944 Part 7: Delete the CNTue Aug 08 2023 04:20:19 GMT+0000 (Greenwich Mean Time) (34079ms) √ EX-8944 Part 7: Delete the CNTue Aug 08 2023 04:20:19 GMT+0000 (Greenwich Mean Time) (34079ms) 7 passing (5m) 7 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_067.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 4 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8944-create-cn-pricing-request-respond-as-SC-PM │ │ -with-upload-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8945-create-cn-pricing-request-resp (69 of 110) ond-as-GC-PM-with-no-cost-impact.spec.ts Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:25:28 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:25:28 GMT+0000 (Greenwich Mean Time) √ EX-8945 Part 1: Delete existing CN (30692ms) √ EX-8945 Part 1: Delete existing CN (30692ms) √ EX-8945 Part 2: Create a CN with type as Pricing Request and send it to ContractorTue Aug 08 2023 04:25:28 GMT+0000 (Greenwich Mean Time) (44492ms) √ EX-8945 Part 2: Create a CN with type as Pricing Request and send it to ContractorTue Aug 08 2023 04:25:28 GMT+0000 (Greenwich Mean Time) (44492ms) √ EX-8945 Part 3: Respond to CN with No Cost Impact as GC PMTue Aug 08 2023 04:25:28 GMT+0000 (Greenwich Mean Time) (57654ms) √ EX-8945 Part 3: Respond to CN with No Cost Impact as GC PMTue Aug 08 2023 04:25:28 GMT+0000 (Greenwich Mean Time) (57654ms) √ EX-8945 Part 4: Verify the data as ScTue Aug 08 2023 04:25:28 GMT+0000 (Greenwich Mean Time) (33687ms) √ EX-8945 Part 4: Verify the data as ScTue Aug 08 2023 04:25:28 GMT+0000 (Greenwich Mean Time) (33687ms) √ EX-8945 Part 5: Delete the CNTue Aug 08 2023 04:25:28 GMT+0000 (Greenwich Mean Time) (33048ms) √ EX-8945 Part 5: Delete the CNTue Aug 08 2023 04:25:28 GMT+0000 (Greenwich Mean Time) (33048ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_068.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 21 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8945-create-cn-pricing-request-respond-as-GC-PM │ │ -with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8946-create-cn-pricing-request-resp (70 of 110) ond-as-GC-PM-by-linking-existing-cor.spec.ts Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:28:53 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:28:53 GMT+0000 (Greenwich Mean Time) √ EX-8946 Part 1: Delete existing CN (32945ms) √ EX-8946 Part 1: Delete existing CN (32945ms) √ EX-8946 Part 2: Create a CN with type as Pricing Request and send it to ContractorTue Aug 08 2023 04:28:53 GMT+0000 (Greenwich Mean Time) (47592ms) √ EX-8946 Part 2: Create a CN with type as Pricing Request and send it to ContractorTue Aug 08 2023 04:28:53 GMT+0000 (Greenwich Mean Time) (47592ms) √ EX-8946 Part 3: Respond to CN by linking received COR as GC PMTue Aug 08 2023 04:28:53 GMT+0000 (Greenwich Mean Time) (48975ms) √ EX-8946 Part 3: Respond to CN by linking received COR as GC PMTue Aug 08 2023 04:28:53 GMT+0000 (Greenwich Mean Time) (48975ms) √ EX-8946 Part 4: Verify the data as ScTue Aug 08 2023 04:28:53 GMT+0000 (Greenwich Mean Time) (33077ms) √ EX-8946 Part 4: Verify the data as ScTue Aug 08 2023 04:28:53 GMT+0000 (Greenwich Mean Time) (33077ms) √ EX-8946 Part 5: Delete the CNTue Aug 08 2023 04:28:53 GMT+0000 (Greenwich Mean Time) (31810ms) √ EX-8946 Part 5: Delete the CNTue Aug 08 2023 04:28:53 GMT+0000 (Greenwich Mean Time) (31810ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_069.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 15 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8946-create-cn-pricing-request-respond-as-GC-PM │ │ -by-linking-existing-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8947-create-cn-authorize-t&mwork-re (71 of 110) spond-as-SC-PM-with-create-cor.spec.ts Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:32:13 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:32:13 GMT+0000 (Greenwich Mean Time) √ EX-8947 Part 1: Delete existing CN (31569ms) √ EX-8947 Part 1: Delete existing CN (31569ms) √ EX-8947 Part 2: Delete existing CORsTue Aug 08 2023 04:32:13 GMT+0000 (Greenwich Mean Time) (37016ms) √ EX-8947 Part 2: Delete existing CORsTue Aug 08 2023 04:32:13 GMT+0000 (Greenwich Mean Time) (37016ms) √ EX-8947 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorTue Aug 08 2023 04:32:13 GMT+0000 (Greenwich Mean Time) (49643ms) √ EX-8947 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorTue Aug 08 2023 04:32:13 GMT+0000 (Greenwich Mean Time) (49643ms) √ EX-8947 Part 4: Respond to CN with create corTue Aug 08 2023 04:32:13 GMT+0000 (Greenwich Mean Time) (75631ms) √ EX-8947 Part 4: Respond to CN with create corTue Aug 08 2023 04:32:13 GMT+0000 (Greenwich Mean Time) (75631ms) √ EX-8947 Part 5: Verify the data as GcTue Aug 08 2023 04:32:13 GMT+0000 (Greenwich Mean Time) (34471ms) √ EX-8947 Part 5: Verify the data as GcTue Aug 08 2023 04:32:13 GMT+0000 (Greenwich Mean Time) (34471ms) √ EX-8947 Part 6: Delete all CORsTue Aug 08 2023 04:32:13 GMT+0000 (Greenwich Mean Time) (46314ms) √ EX-8947 Part 6: Delete all CORsTue Aug 08 2023 04:32:13 GMT+0000 (Greenwich Mean Time) (46314ms) √ EX-8947 Part 7: Delete the CNTue Aug 08 2023 04:32:13 GMT+0000 (Greenwich Mean Time) (35773ms) √ EX-8947 Part 7: Delete the CNTue Aug 08 2023 04:32:13 GMT+0000 (Greenwich Mean Time) (35773ms) 7 passing (5m) 7 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_070.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 11 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8947-create-cn-authorize-t&mwork-respond-as-SC- │ │ PM-with-create-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8948-create-cn-authorize-t&mwork-re (72 of 110) spond-as-SC-PM-with-upload-cor.spec.ts Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:37:29 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:37:29 GMT+0000 (Greenwich Mean Time) √ EX-8948 Part 1.1: Delete existing CN (32038ms) √ EX-8948 Part 1.1: Delete existing CN (32038ms) √ EX-8948 Part 1.2: Delete all CORs. Tue Aug 08 2023 04:37:29 GMT+0000 (Greenwich Mean Time) (41001ms) √ EX-8948 Part 1.2: Delete all CORs. Tue Aug 08 2023 04:37:29 GMT+0000 (Greenwich Mean Time) (41001ms) √ EX-8948 Part 2: Delete existing CORsTue Aug 08 2023 04:37:29 GMT+0000 (Greenwich Mean Time) (35804ms) √ EX-8948 Part 2: Delete existing CORsTue Aug 08 2023 04:37:29 GMT+0000 (Greenwich Mean Time) (35804ms) √ EX-8948 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorTue Aug 08 2023 04:37:29 GMT+0000 (Greenwich Mean Time) (48401ms) √ EX-8948 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorTue Aug 08 2023 04:37:29 GMT+0000 (Greenwich Mean Time) (48401ms) √ EX-8948 Part 4: Respond to CN with upload corTue Aug 08 2023 04:37:29 GMT+0000 (Greenwich Mean Time) (74680ms) √ EX-8948 Part 4: Respond to CN with upload corTue Aug 08 2023 04:37:29 GMT+0000 (Greenwich Mean Time) (74680ms) √ EX-8948 Part 5: Verify the data as Gc. Tue Aug 08 2023 04:37:29 GMT+0000 (Greenwich Mean Time) (35579ms) √ EX-8948 Part 5: Verify the data as Gc. Tue Aug 08 2023 04:37:29 GMT+0000 (Greenwich Mean Time) (35579ms) √ EX-8948 Part 6: Delete all CORs. Tue Aug 08 2023 04:37:29 GMT+0000 (Greenwich Mean Time) (45308ms) √ EX-8948 Part 6: Delete all CORs. Tue Aug 08 2023 04:37:29 GMT+0000 (Greenwich Mean Time) (45308ms) √ EX-8948 Part 7: Delete the CN. Tue Aug 08 2023 04:37:29 GMT+0000 (Greenwich Mean Time) (35251ms) √ EX-8948 Part 7: Delete the CN. Tue Aug 08 2023 04:37:29 GMT+0000 (Greenwich Mean Time) (35251ms) 8 passing (6m) 8 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_071.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 49 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8948-create-cn-authorize-t&mwork-respond-as-SC- │ │ PM-with-upload-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8949-create-cn-authorize-t&mwork-re (73 of 110) spond-as-GC-PM-with-no-cost-impact.spec.ts Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:43:23 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:43:23 GMT+0000 (Greenwich Mean Time) √ EX-8949 Part 1: Delete existing CN (30386ms) √ EX-8949 Part 1: Delete existing CN (30386ms) √ EX-8949 Part 2: Create a CN with type as Authorize T&M Work and send it to ContractorTue Aug 08 2023 04:43:23 GMT+0000 (Greenwich Mean Time) (47160ms) √ EX-8949 Part 2: Create a CN with type as Authorize T&M Work and send it to ContractorTue Aug 08 2023 04:43:23 GMT+0000 (Greenwich Mean Time) (47160ms) √ EX-8949 Part 3: Respond to CN with No Cost Impact as GC PMTue Aug 08 2023 04:43:23 GMT+0000 (Greenwich Mean Time) (54727ms) √ EX-8949 Part 3: Respond to CN with No Cost Impact as GC PMTue Aug 08 2023 04:43:23 GMT+0000 (Greenwich Mean Time) (54727ms) √ EX-8949 Part 4: Verify the data as ScTue Aug 08 2023 04:43:23 GMT+0000 (Greenwich Mean Time) (39342ms) √ EX-8949 Part 4: Verify the data as ScTue Aug 08 2023 04:43:23 GMT+0000 (Greenwich Mean Time) (39342ms) √ EX-8949 Part 5: Delete the CNTue Aug 08 2023 04:43:23 GMT+0000 (Greenwich Mean Time) (33122ms) √ EX-8949 Part 5: Delete the CNTue Aug 08 2023 04:43:23 GMT+0000 (Greenwich Mean Time) (33122ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_072.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 26 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8949-create-cn-authorize-t&mwork-respond-as-GC- │ │ PM-with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8950-create-cn-authorize-t&mwork-re (74 of 110) spond-as-GC-PM-by-linking-existing-cor.spec.ts Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:46:53 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Tue Aug 08 2023 04:46:53 GMT+0000 (Greenwich Mean Time) √ EX-8950 Part 1: Delete existing CN (28134ms) √ EX-8950 Part 1: Delete existing CN (28134ms) √ EX-8950 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorTue Aug 08 2023 04:46:53 GMT+0000 (Greenwich Mean Time) (48140ms) √ EX-8950 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorTue Aug 08 2023 04:46:53 GMT+0000 (Greenwich Mean Time) (48140ms) √ EX-8950 Part 4: Respond to CN by linking received COR as GC PMTue Aug 08 2023 04:46:53 GMT+0000 (Greenwich Mean Time) (51023ms) √ EX-8950 Part 4: Respond to CN by linking received COR as GC PMTue Aug 08 2023 04:46:53 GMT+0000 (Greenwich Mean Time) (51023ms) √ EX-8950 Part 5: Verify the data as ScTue Aug 08 2023 04:46:53 GMT+0000 (Greenwich Mean Time) (34717ms) √ EX-8950 Part 5: Verify the data as ScTue Aug 08 2023 04:46:53 GMT+0000 (Greenwich Mean Time) (34717ms) √ EX-8950 Part 6: Delete the CNTue Aug 08 2023 04:46:53 GMT+0000 (Greenwich Mean Time) (35884ms) √ EX-8950 Part 6: Delete the CNTue Aug 08 2023 04:46:53 GMT+0000 (Greenwich Mean Time) (35884ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_073.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 18 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8950-create-cn-authorize-t&mwork-respond-as-GC- │ │ PM-by-linking-existing-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-1-gc-creates-project-and-contract-sc-creates (75 of 110) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 04:50:17 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 04:50:17 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 1: GC PM creates a projectTue Aug 08 2023 04:50:17 GMT+0000 (Greenwich Mean Time) (48863ms) √ EX-4415 - Part 1: GC PM creates a projectTue Aug 08 2023 04:50:17 GMT+0000 (Greenwich Mean Time) (48863ms) √ EX-4415 - Part 2: GC PM adds a contract with SC PM.Tue Aug 08 2023 04:50:17 GMT+0000 (Greenwich Mean Time) (36668ms) √ EX-4415 - Part 2: GC PM adds a contract with SC PM.Tue Aug 08 2023 04:50:17 GMT+0000 (Greenwich Mean Time) (36668ms) √ EX-4415 - Part 3.1: Sub Contractor accepts invite from the bell notification.Tue Aug 08 2023 04:50:17 GMT+0000 (Greenwich Mean Time) (26483ms) √ EX-4415 - Part 3.1: Sub Contractor accepts invite from the bell notification.Tue Aug 08 2023 04:50:17 GMT+0000 (Greenwich Mean Time) (26483ms) √ EX-4415 - Part 3.2: Sub Contractor adds users to the project.Tue Aug 08 2023 04:50:17 GMT+0000 (Greenwich Mean Time) (71396ms) √ EX-4415 - Part 3.2: Sub Contractor adds users to the project.Tue Aug 08 2023 04:50:17 GMT+0000 (Greenwich Mean Time) (71396ms) √ EX-4415 - Part 4: Sub Contractor creates a Tag and sends signature request.Tue Aug 08 2023 04:50:17 GMT+0000 (Greenwich Mean Time) (73518ms) √ EX-4415 - Part 4: Sub Contractor creates a Tag and sends signature request.Tue Aug 08 2023 04:50:17 GMT+0000 (Greenwich Mean Time) (73518ms) 5 passing (4m) 5 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_074.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 17 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-1-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-2-gc-creates-project-and-contract-sc-creates (76 of 110) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 04:54:39 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 04:54:39 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 5: Sub Contractor ADD Labor valuesTue Aug 08 2023 04:54:39 GMT+0000 (Greenwich Mean Time) (192867ms) √ EX-4415 - Part 5: Sub Contractor ADD Labor valuesTue Aug 08 2023 04:54:39 GMT+0000 (Greenwich Mean Time) (192867ms) √ EX-4415 - Part 6: Sub Contractor Add Material valuesTue Aug 08 2023 04:54:39 GMT+0000 (Greenwich Mean Time) (145978ms) √ EX-4415 - Part 6: Sub Contractor Add Material valuesTue Aug 08 2023 04:54:39 GMT+0000 (Greenwich Mean Time) (145978ms) 2 passing (6m) 2 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_075.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 40 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-2-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-3-gc-creates-project-and-contract-sc-creates (77 of 110) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 05:00:24 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 05:00:24 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 7: Sub Contractor Adds Equipment. Tue Aug 08 2023 05:00:24 GMT+0000 (Greenwich Mean Time) (172480ms) √ EX-4415 - Part 7: Sub Contractor Adds Equipment. Tue Aug 08 2023 05:00:24 GMT+0000 (Greenwich Mean Time) (172480ms) 1 passing (3m) 1 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_076.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 53 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-3-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-4-gc-creates-project-and-contract-sc-creates (78 of 110) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 05:03:23 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 05:03:23 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 8: Sub Contractor Adds Other. Tue Aug 08 2023 05:03:23 GMT+0000 (Greenwich Mean Time) (190128ms) √ EX-4415 - Part 8: Sub Contractor Adds Other. Tue Aug 08 2023 05:03:23 GMT+0000 (Greenwich Mean Time) (190128ms) 1 passing (3m) 1 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_077.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 10 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-4-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-5-gc-creates-project-and-contract-sc-creates (79 of 110) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 05:06:40 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 05:06:40 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 9 : Sub Contractor uploads files.Tue Aug 08 2023 05:06:40 GMT+0000 (Greenwich Mean Time) (103864ms) √ EX-4415 - Part 9 : Sub Contractor uploads files.Tue Aug 08 2023 05:06:40 GMT+0000 (Greenwich Mean Time) (103864ms) √ EX-4415 - Part 10 : Sub Contractor signs the Tag.Tue Aug 08 2023 05:06:40 GMT+0000 (Greenwich Mean Time) (72450ms) √ EX-4415 - Part 10 : Sub Contractor signs the Tag.Tue Aug 08 2023 05:06:40 GMT+0000 (Greenwich Mean Time) (72450ms) 2 passing (3m) 2 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_078.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 56 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates (80 of 110) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 05:09:41 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 05:09:41 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 11 : Sub Contractor sends signature request.Tue Aug 08 2023 05:09:41 GMT+0000 (Greenwich Mean Time) (86665ms) √ EX-4415 - Part 11 : Sub Contractor sends signature request.Tue Aug 08 2023 05:09:41 GMT+0000 (Greenwich Mean Time) (86665ms) √ EX-4415 - Part 12: Verify the tag was created.Tue Aug 08 2023 05:09:41 GMT+0000 (Greenwich Mean Time) (32392ms) √ EX-4415 - Part 12: Verify the tag was created.Tue Aug 08 2023 05:09:41 GMT+0000 (Greenwich Mean Time) (32392ms) √ EX-4415 - Part 13: Verify the GC sees the tag.Tue Aug 08 2023 05:09:41 GMT+0000 (Greenwich Mean Time) (30837ms) √ EX-4415 - Part 13: Verify the GC sees the tag.Tue Aug 08 2023 05:09:41 GMT+0000 (Greenwich Mean Time) (30837ms) √ EX-4415 - Part 14: Verify GC PM User recived emailsTue Aug 08 2023 05:12:18 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 14: Verify GC PM User recived emailsTue Aug 08 2023 05:12:18 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Tue Aug 08 2023 05:12:23 GMT+0000 (Greenwich Mean Time) (32082ms) √ EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Tue Aug 08 2023 05:12:23 GMT+0000 (Greenwich Mean Time) (32082ms) √ EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Tue Aug 08 2023 05:12:23 GMT+0000 (Greenwich Mean Time) (29576ms) √ EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Tue Aug 08 2023 05:12:23 GMT+0000 (Greenwich Mean Time) (29576ms) √ EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Tue Aug 08 2023 05:12:23 GMT+0000 (Greenwich Mean Time) (28428ms) √ EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Tue Aug 08 2023 05:12:23 GMT+0000 (Greenwich Mean Time) (28428ms) √ EX-4415 - Part 18: Cleanup...Tue Aug 08 2023 05:12:23 GMT+0000 (Greenwich Mean Time) (31176ms) √ EX-4415 - Part 18: Cleanup...Tue Aug 08 2023 05:12:23 GMT+0000 (Greenwich Mean Time) (31176ms) 8 passing (5m) 8 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_079.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 43 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5424-verify-sent-summary-data-after-filtering-by- (81 of 110) project.spec.ts As Sub Contractor go to T&M Log / Sent and verify the Summary data for the test project.Tue Aug 08 2023 05:14:30 GMT+0000 (Greenwich Mean Time) As Sub Contractor go to T&M Log / Sent and verify the Summary data for the test project.Tue Aug 08 2023 05:14:30 GMT+0000 (Greenwich Mean Time) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log Overview Summary shows correct values when filtered by single Project.Tue Aug 08 2023 05:14:30 GMT+0000 (Greenwich Mean Time) (54361ms) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log Overview Summary shows correct values when filtered by single Project.Tue Aug 08 2023 05:14:30 GMT+0000 (Greenwich Mean Time) (54361ms) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log OVerview Summary shows correct values when filtered by multiple Projects.Tue Aug 08 2023 05:14:30 GMT+0000 (Greenwich Mean Time) (91167ms) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log OVerview Summary shows correct values when filtered by multiple Projects.Tue Aug 08 2023 05:14:30 GMT+0000 (Greenwich Mean Time) (91167ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_080.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 28 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5424-verify-sent-summary-data-after-filtering-by-project.spec │ │ .ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5430-verify-sent-export-csv-after-filtering-by-pr (82 of 110) oject.spec.ts T&M | Verify the T&M Log / Sent CSV export.Tue Aug 08 2023 05:17:02 GMT+0000 (Greenwich Mean Time) T&M | Verify the T&M Log / Sent CSV export.Tue Aug 08 2023 05:17:02 GMT+0000 (Greenwich Mean Time) √ EX-5430 - Verify the T&M Log / Sent CSV export.Tue Aug 08 2023 05:17:02 GMT+0000 (Greenwich Mean Time) (46651ms) √ EX-5430 - Verify the T&M Log / Sent CSV export.Tue Aug 08 2023 05:17:02 GMT+0000 (Greenwich Mean Time) (46651ms) 1 passing (47s) 1 passing (47s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_081.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 46 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5430-verify-sent-export-csv-after-filtering-by-project.spec.t │ │ s │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5505-verify-tnm-log-sent-summary-data-after-filte (83 of 110) ring-by-customer.spec.ts T&M | Verify filtering the T&M Log / SENT, by Customer, returns correct values for Labor Hours Summary.Tue Aug 08 2023 05:17:53 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Customer, returns correct values for Labor Hours Summary.Tue Aug 08 2023 05:17:53 GMT+0000 (Greenwich Mean Time) √ EX-5505 - Filter by Customer and verify the Summary Labour Hours and T&M Log Overview Summary data for the test project.Tue Aug 08 2023 05:17:53 GMT+0000 (Greenwich Mean Time) (94020ms) √ EX-5505 - Filter by Customer and verify the Summary Labour Hours and T&M Log Overview Summary data for the test project.Tue Aug 08 2023 05:17:53 GMT+0000 (Greenwich Mean Time) (94020ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_082.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 35 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5505-verify-tnm-log-sent-summary-data-after-filtering-by-cust │ │ omer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5506-verify-tnm-log-sent-summary-data-after-filte (84 of 110) ring-by-job-number.spec.ts T&M | Verify filtering the T&M Log / SENT, by Job Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 08 2023 05:19:33 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Job Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 08 2023 05:19:33 GMT+0000 (Greenwich Mean Time) √ EX-5506 - Filter by JobNumber and verify the Summary data for the test project.Tue Aug 08 2023 05:19:33 GMT+0000 (Greenwich Mean Time) (94476ms) √ EX-5506 - Filter by JobNumber and verify the Summary data for the test project.Tue Aug 08 2023 05:19:33 GMT+0000 (Greenwich Mean Time) (94476ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_083.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 34 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5506-verify-tnm-log-sent-summary-data-after-filtering-by-job- │ │ number.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5507-verify-tnm-log-sent-summary-data-after-filte (85 of 110) ring-by-cust-ref-num.spec.ts T&M | Verify filtering the T&M Log / SENT, by Custmer Reference Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 08 2023 05:21:13 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Custmer Reference Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 08 2023 05:21:13 GMT+0000 (Greenwich Mean Time) √ EX-5507 - Filter by CustRefNum and verify the Summary data for the test project.Tue Aug 08 2023 05:21:13 GMT+0000 (Greenwich Mean Time) (88503ms) √ EX-5507 - Filter by CustRefNum and verify the Summary data for the test project.Tue Aug 08 2023 05:21:13 GMT+0000 (Greenwich Mean Time) (88503ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_084.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 29 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5507-verify-tnm-log-sent-summary-data-after-filtering-by-cust │ │ -ref-num.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5508-verify-tnm-log-sent-summary-data-after-filte (86 of 110) ring-by-tag-status.spec.ts T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 08 2023 05:22:47 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 08 2023 05:22:47 GMT+0000 (Greenwich Mean Time) √ EX-5508 - Filter by status Awaiting Signature and verify the Summary data for the test project.Tue Aug 08 2023 05:22:47 GMT+0000 (Greenwich Mean Time) (95376ms) √ EX-5508 - Filter by status Awaiting Signature and verify the Summary data for the test project.Tue Aug 08 2023 05:22:47 GMT+0000 (Greenwich Mean Time) (95376ms) √ EX-5508 - Filter by status Draft and verify the Summary data for the test project.Tue Aug 08 2023 05:22:47 GMT+0000 (Greenwich Mean Time) (89346ms) √ EX-5508 - Filter by status Draft and verify the Summary data for the test project.Tue Aug 08 2023 05:22:47 GMT+0000 (Greenwich Mean Time) (89346ms) √ EX-5508 - Filter by status Open and verify the Summary data for the test project.Tue Aug 08 2023 05:22:47 GMT+0000 (Greenwich Mean Time) (83194ms) √ EX-5508 - Filter by status Open and verify the Summary data for the test project.Tue Aug 08 2023 05:22:47 GMT+0000 (Greenwich Mean Time) (83194ms) √ EX-5508 - Filter by status Rejected and verify the Summary data for the test project.Tue Aug 08 2023 05:22:47 GMT+0000 (Greenwich Mean Time) (85718ms) √ EX-5508 - Filter by status Rejected and verify the Summary data for the test project.Tue Aug 08 2023 05:22:47 GMT+0000 (Greenwich Mean Time) (85718ms) √ EX-5508 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Tue Aug 08 2023 05:22:47 GMT+0000 (Greenwich Mean Time) (85967ms) √ EX-5508 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Tue Aug 08 2023 05:22:47 GMT+0000 (Greenwich Mean Time) (85967ms) √ EX-5508 - Filter by status Signed and verify the Summary data for the test project.Tue Aug 08 2023 05:22:47 GMT+0000 (Greenwich Mean Time) (89881ms) √ EX-5508 - Filter by status Signed and verify the Summary data for the test project.Tue Aug 08 2023 05:22:47 GMT+0000 (Greenwich Mean Time) (89881ms) √ EX-5508 - Filter by status Signed Not Sent and verify the Summary data for the test project.Tue Aug 08 2023 05:22:47 GMT+0000 (Greenwich Mean Time) (85080ms) √ EX-5508 - Filter by status Signed Not Sent and verify the Summary data for the test project.Tue Aug 08 2023 05:22:47 GMT+0000 (Greenwich Mean Time) (85080ms) 7 passing (10m) 7 passing (10m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_085.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 10 minutes, 22 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5508-verify-tnm-log-sent-summary-data-after-filtering-by-tag- │ │ status.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5509-verify-tnm-log-sent-summary-data-after-filte (87 of 110) ring-by-cust-label.spec.ts T&M | Verify filtering the T&M Log/SENT, by Label, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 08 2023 05:33:15 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log/SENT, by Label, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 08 2023 05:33:15 GMT+0000 (Greenwich Mean Time) √ EX-5509 - Filter by Label and verify the Summary data for the test project.Tue Aug 08 2023 05:33:15 GMT+0000 (Greenwich Mean Time) (88694ms) √ EX-5509 - Filter by Label and verify the Summary data for the test project.Tue Aug 08 2023 05:33:15 GMT+0000 (Greenwich Mean Time) (88694ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_086.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 30 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5509-verify-tnm-log-sent-summary-data-after-filtering-by-cust │ │ -label.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5510-verify-tnm-log-sent-summary-data-after-filte (88 of 110) ring-by-cor-availability.spec.ts T&M | Verify filtering the T&M Log/SENT, by COR availability, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 08 2023 05:34:50 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log/SENT, by COR availability, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 08 2023 05:34:50 GMT+0000 (Greenwich Mean Time) √ EX-5510 - Filter by 'Display Pending CORs only' and verify the Summary data for the test project.Tue Aug 08 2023 05:34:50 GMT+0000 (Greenwich Mean Time) (91046ms) √ EX-5510 - Filter by 'Display Pending CORs only' and verify the Summary data for the test project.Tue Aug 08 2023 05:34:50 GMT+0000 (Greenwich Mean Time) (91046ms) √ EX-5510 - Filter by 'Display Tags with CORs only' and verify the Summary data for the test project.Tue Aug 08 2023 05:34:50 GMT+0000 (Greenwich Mean Time) (82307ms) √ EX-5510 - Filter by 'Display Tags with CORs only' and verify the Summary data for the test project.Tue Aug 08 2023 05:34:50 GMT+0000 (Greenwich Mean Time) (82307ms) 2 passing (3m) 2 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_087.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 56 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5510-verify-tnm-log-sent-summary-data-after-filtering-by-cor- │ │ availability.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5846-sc-creates-project-add-gc-as-customer-sc-cre (89 of 110) ates-tag-req-and-optional-signer.spec.ts T&M | Workflow | SC PM creates a project(adds GC PM as Req.Signer and GC Owner as Optional), SC PM send a tag, GC signs the tag as Required Signer.Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) T&M | Workflow | SC PM creates a project(adds GC PM as Req.Signer and GC Owner as Optional), SC PM send a tag, GC signs the tag as Required Signer.Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) √ EX-5846 - SC PM creates a project. Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (53240ms) √ EX-5846 - SC PM creates a project. Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (53240ms) √ EX-5846 - SC PM adds GC PM as Req. Signer and GC Owner as Optinal Signer. Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (44076ms) √ EX-5846 - SC PM adds GC PM as Req. Signer and GC Owner as Optinal Signer. Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (44076ms) 1) EX-5846 - GC PM accepts invite. Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) 1) EX-5846 - GC PM accepts invite. Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) √ EX-5846 - GC Owner accepts invite. Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (36503ms) √ EX-5846 - GC Owner accepts invite. Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (36503ms) √ EX-5846 - Sub Contractor creates a Tag and sends signature request.Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (62770ms) √ EX-5846 - Sub Contractor creates a Tag and sends signature request.Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (62770ms) √ EX-5846 - Verify the tag was created.Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (33866ms) √ EX-5846 - Verify the tag was created.Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (33866ms) √ EX-5846 - Sign the tag as GC Owner(Optional Signer).Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (56380ms) √ EX-5846 - Sign the tag as GC Owner(Optional Signer).Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (56380ms) √ EX-5846 - Sign the tag as GC PM(Required Signer).Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (50508ms) √ EX-5846 - Sign the tag as GC PM(Required Signer).Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (50508ms) √ EX-5846 - Verify the tag is signed as as GC PM(Required Signer). Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (32816ms) √ EX-5846 - Verify the tag is signed as as GC PM(Required Signer). Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (32816ms) √ EX-5846 - Verify the tag is signed as as GC Owner(Optional Signer). Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (35488ms) √ EX-5846 - Verify the tag is signed as as GC Owner(Optional Signer). Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (35488ms) √ EX-5846 - Verify the tag is signed as as SC PM. Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (31764ms) √ EX-5846 - Verify the tag is signed as as SC PM. Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (31764ms) √ EX-5846 - Cleanup...Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (29226ms) √ EX-5846 - Cleanup...Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) (29226ms) 11 passing (9m) 1 failing 1) T&M | Workflow | SC PM creates a project(adds GC PM as Req.Signer and GC Owner as Optional), SC PM send a tag, GC signs the tag as Required Signer.Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) EX-5846 - GC PM accepts invite. Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:257:5) 11 passing (9m) 1 failing 1) T&M | Workflow | SC PM creates a project(adds GC PM as Req.Signer and GC Owner as Optional), SC PM send a tag, GC signs the tag as Required Signer.Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time) EX-5846 - GC PM accepts invite. Tue Aug 08 2023 05:37:51 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:257:5) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_088.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 11 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: false │ │ Duration: 8 minutes, 30 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5846-sc-creates-project-add-gc-as-customer-sc-creates-tag-req │ │ -and-optional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-5846-sc-creates-project-add-gc-as-customer-sc-creates-tag-req-and-op tional-signer.spec.ts\T&M Workflow SC PM creates a project(adds GC PM as Req.S igner and GC Owner as Optional), SC PM send a tag, GC signs the tag as Required Signer.Tue Aug 08 2023 053751 GMT+0000 (Greenwich Mean Time) -- EX-5846 - GC PM accepts invite. Tue Aug 08 2023 .png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6181-1-gc-creates-project-and-contract-sc-creates (90 of 110) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 05:46:26 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 05:46:26 GMT+0000 (Greenwich Mean Time) √ EX-6181 - Part 1: GC Owner creates a project.Tue Aug 08 2023 05:46:26 GMT+0000 (Greenwich Mean Time) (51757ms) √ EX-6181 - Part 1: GC Owner creates a project.Tue Aug 08 2023 05:46:26 GMT+0000 (Greenwich Mean Time) (51757ms) √ EX-6181 - Part 2: GC Owner adds a contract with SC Owner.Tue Aug 08 2023 05:46:26 GMT+0000 (Greenwich Mean Time) (36108ms) √ EX-6181 - Part 2: GC Owner adds a contract with SC Owner.Tue Aug 08 2023 05:46:26 GMT+0000 (Greenwich Mean Time) (36108ms) √ EX-6181 - Part 3: SC Owner adds the Admin, PM and field user to the projectTue Aug 08 2023 05:46:26 GMT+0000 (Greenwich Mean Time) (89888ms) √ EX-6181 - Part 3: SC Owner adds the Admin, PM and field user to the projectTue Aug 08 2023 05:46:26 GMT+0000 (Greenwich Mean Time) (89888ms) 3 passing (3m) 3 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_089.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 3 │ │ Passing: 3 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 58 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6181-1-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6181-2-gc-creates-project-and-contract-sc-creates (91 of 110) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 05:49:29 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 05:49:29 GMT+0000 (Greenwich Mean Time) √ EX-6181 - Part 4: Sub Contractor creates a Tag and sends signature request.Tue Aug 08 2023 05:49:29 GMT+0000 (Greenwich Mean Time) (979763ms) √ EX-6181 - Part 4: Sub Contractor creates a Tag and sends signature request.Tue Aug 08 2023 05:49:29 GMT+0000 (Greenwich Mean Time) (979763ms) 1 passing (16m) 1 passing (16m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_090.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 16 minutes, 21 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6181-2-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6181-3-gc-creates-project-and-contract-sc-creates (92 of 110) -tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:05:59 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:05:59 GMT+0000 (Greenwich Mean Time) √ EX-6181 - Part 5: Verify the tag was created.Tue Aug 08 2023 06:05:59 GMT+0000 (Greenwich Mean Time) (39663ms) √ EX-6181 - Part 5: Verify the tag was created.Tue Aug 08 2023 06:05:59 GMT+0000 (Greenwich Mean Time) (39663ms) √ EX-6181 - Part 6: Verify GC Owner recived emailsTue Aug 08 2023 06:06:46 GMT+0000 (Greenwich Mean Time) √ EX-6181 - Part 6: Verify GC Owner recived emailsTue Aug 08 2023 06:06:46 GMT+0000 (Greenwich Mean Time) √ EX-6181 - Part 7: Verify the GC Owner received Bell Notification and use it to sign the tag.Tue Aug 08 2023 06:06:51 GMT+0000 (Greenwich Mean Time) (31957ms) √ EX-6181 - Part 7: Verify the GC Owner received Bell Notification and use it to sign the tag.Tue Aug 08 2023 06:06:51 GMT+0000 (Greenwich Mean Time) (31957ms) √ EX-6181 - Part 8: Cleanup GC... Tue Aug 08 2023 06:06:51 GMT+0000 (Greenwich Mean Time) (35306ms) √ EX-6181 - Part 8: Cleanup GC... Tue Aug 08 2023 06:06:51 GMT+0000 (Greenwich Mean Time) (35306ms) √ EX-6181 - Part 9: Cleanup SC... Tue Aug 08 2023 06:06:51 GMT+0000 (Greenwich Mean Time) (33097ms) √ EX-6181 - Part 9: Cleanup SC... Tue Aug 08 2023 06:06:51 GMT+0000 (Greenwich Mean Time) (33097ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_091.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 31 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6181-3-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6191-sc-creates-tag-required-signer-gc-signs-tag. (93 of 110) spec.ts T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Aug 08 2023 06:08:36 GMT+0000 (Greenwich Mean Time) T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Aug 08 2023 06:08:36 GMT+0000 (Greenwich Mean Time) √ EX-6191 - Part 0: Clean the tags (45278ms) √ EX-6191 - Part 0: Clean the tags (45278ms) √ EX-6191 - Part 1: Sub Contractor Admin creates tag and save it as draft.Tue Aug 08 2023 06:08:36 GMT+0000 (Greenwich Mean Time) (82555ms) √ EX-6191 - Part 1: Sub Contractor Admin creates tag and save it as draft.Tue Aug 08 2023 06:08:36 GMT+0000 (Greenwich Mean Time) (82555ms) √ EX-6191 - Part 2: Sub Contractor Admin adds LMEO to the draft. Tue Aug 08 2023 06:08:36 GMT+0000 (Greenwich Mean Time) (124420ms) √ EX-6191 - Part 2: Sub Contractor Admin adds LMEO to the draft. Tue Aug 08 2023 06:08:36 GMT+0000 (Greenwich Mean Time) (124420ms) √ EX-6191 - Part 3: Sub Contractor admin adds files. Tue Aug 08 2023 06:08:36 GMT+0000 (Greenwich Mean Time) (76585ms) √ EX-6191 - Part 3: Sub Contractor admin adds files. Tue Aug 08 2023 06:08:36 GMT+0000 (Greenwich Mean Time) (76585ms) √ EX-6191 - Part 4: Sub Contractor admin signs the tag.Tue Aug 08 2023 06:08:36 GMT+0000 (Greenwich Mean Time) (76360ms) √ EX-6191 - Part 4: Sub Contractor admin signs the tag.Tue Aug 08 2023 06:08:36 GMT+0000 (Greenwich Mean Time) (76360ms) √ EX-6191 - Part 5: Sub Contractor admin sends tag for signature.Tue Aug 08 2023 06:08:36 GMT+0000 (Greenwich Mean Time) (69063ms) √ EX-6191 - Part 5: Sub Contractor admin sends tag for signature.Tue Aug 08 2023 06:08:36 GMT+0000 (Greenwich Mean Time) (69063ms) √ EX-6191 - Part 6: Verify the tag was created.Tue Aug 08 2023 06:08:36 GMT+0000 (Greenwich Mean Time) (36073ms) √ EX-6191 - Part 6: Verify the tag was created.Tue Aug 08 2023 06:08:36 GMT+0000 (Greenwich Mean Time) (36073ms) √ EX-6191 - Part 7: Verify the GC Admin sees the tag.Tue Aug 08 2023 06:08:36 GMT+0000 (Greenwich Mean Time) (43432ms) √ EX-6191 - Part 7: Verify the GC Admin sees the tag.Tue Aug 08 2023 06:08:36 GMT+0000 (Greenwich Mean Time) (43432ms) √ EX-6191 - Part 8: Verify GC Admin recived emailsTue Aug 08 2023 06:17:58 GMT+0000 (Greenwich Mean Time) √ EX-6191 - Part 8: Verify GC Admin recived emailsTue Aug 08 2023 06:17:58 GMT+0000 (Greenwich Mean Time) √ EX-6191 - Part 9: Verify the GC Admin received Bell Notification and use it to sign the tag.Tue Aug 08 2023 06:18:04 GMT+0000 (Greenwich Mean Time) (33772ms) √ EX-6191 - Part 9: Verify the GC Admin received Bell Notification and use it to sign the tag.Tue Aug 08 2023 06:18:04 GMT+0000 (Greenwich Mean Time) (33772ms) √ EX-6191 - Part 10: Verify the tag status in the GC Admin T&M Log.Tue Aug 08 2023 06:18:04 GMT+0000 (Greenwich Mean Time) (39036ms) √ EX-6191 - Part 10: Verify the tag status in the GC Admin T&M Log.Tue Aug 08 2023 06:18:04 GMT+0000 (Greenwich Mean Time) (39036ms) √ EX-6191 - Part 11: Verify the tag status in the SC Admin T&M Log.Tue Aug 08 2023 06:18:04 GMT+0000 (Greenwich Mean Time) (38412ms) √ EX-6191 - Part 11: Verify the tag status in the SC Admin T&M Log.Tue Aug 08 2023 06:18:04 GMT+0000 (Greenwich Mean Time) (38412ms) √ EX-6191 - Part 12: Cleanup SC Tag ... Tue Aug 08 2023 06:18:04 GMT+0000 (Greenwich Mean Time) (38860ms) √ EX-6191 - Part 12: Cleanup SC Tag ... Tue Aug 08 2023 06:18:04 GMT+0000 (Greenwich Mean Time) (38860ms) 13 passing (12m) 13 passing (12m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_092.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 13 │ │ Passing: 13 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 11 minutes, 58 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6191-sc-creates-tag-required-signer-gc-signs-tag.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6193-sc-fu-creates-tag-required-signer-gc-fu-sign (94 of 110) s-tag.spec.ts T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Tue Aug 08 2023 06:20:39 GMT+0000 (Greenwich Mean Time) T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Tue Aug 08 2023 06:20:39 GMT+0000 (Greenwich Mean Time) √ EX-6193 - Part 1: Sub Contractor FU creates a Tag and sends signature request.Tue Aug 08 2023 06:20:39 GMT+0000 (Greenwich Mean Time) (194991ms) √ EX-6193 - Part 1: Sub Contractor FU creates a Tag and sends signature request.Tue Aug 08 2023 06:20:39 GMT+0000 (Greenwich Mean Time) (194991ms) √ EX-6193 - Part 2: Verify the tag was created.Tue Aug 08 2023 06:20:39 GMT+0000 (Greenwich Mean Time) (30114ms) √ EX-6193 - Part 2: Verify the tag was created.Tue Aug 08 2023 06:20:39 GMT+0000 (Greenwich Mean Time) (30114ms) √ EX-6193 - Part 3: Verify the GC FU sees the tag.Tue Aug 08 2023 06:20:39 GMT+0000 (Greenwich Mean Time) (24906ms) √ EX-6193 - Part 3: Verify the GC FU sees the tag.Tue Aug 08 2023 06:20:39 GMT+0000 (Greenwich Mean Time) (24906ms) √ EX-6193 - Part 4: Verify GC FU recived emailsTue Aug 08 2023 06:24:55 GMT+0000 (Greenwich Mean Time) √ EX-6193 - Part 4: Verify GC FU recived emailsTue Aug 08 2023 06:24:55 GMT+0000 (Greenwich Mean Time) 1) EX-6193 - Part 5: Verify the GC FU received Bell Notification and use it to sign the tag.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time) 1) EX-6193 - Part 5: Verify the GC FU received Bell Notification and use it to sign the tag.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time) 2) EX-6193 - Part 6: Verify the tag status in the GC FU T&M Log.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time) 2) EX-6193 - Part 6: Verify the tag status in the GC FU T&M Log.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time) 3) EX-6193 - Part 7: Verify the tag status in the SC FU T&MM Log.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time) 3) EX-6193 - Part 7: Verify the tag status in the SC FU T&MM Log.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time) √ EX-6193 - Part 8: Cleanup SC Tag ... Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time) (39728ms) √ EX-6193 - Part 8: Cleanup SC Tag ... Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time) (39728ms) 5 passing (7m) 3 failing 1) T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time) EX-6193 - Part 5: Verify the GC FU received Bell Notification and use it to sign the tag.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time): CypressError: Timed out after waiting `30000ms` for your remote page to load. Your page did not fire its `load` event within `30000ms`. You can try increasing the `pageLoadTimeout` value in `cypress.config.ts` to wait longer. Browsers will not fire the `load` event until all stylesheets and scripts are done downloading. When this `load` event occurs, Cypress will continue running commands. at timedOutWaitingForPageLoad (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:146876:72) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147850:16) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13866:41) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18) at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12) at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9) at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5) at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14) From Your Spec Code: at Context.eval (webpack:///./cypress/support/commands.ts:234:5) 2) T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time) EX-6193 - Part 6: Verify the tag status in the GC FU T&M Log.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 3) T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time) EX-6193 - Part 7: Verify the tag status in the SC FU T&MM Log.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 5 passing (7m) 3 failing 1) T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time) EX-6193 - Part 5: Verify the GC FU received Bell Notification and use it to sign the tag.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time): CypressError: Timed out after waiting `30000ms` for your remote page to load. Your page did not fire its `load` event within `30000ms`. You can try increasing the `pageLoadTimeout` value in `cypress.config.ts` to wait longer. Browsers will not fire the `load` event until all stylesheets and scripts are done downloading. When this `load` event occurs, Cypress will continue running commands. at timedOutWaitingForPageLoad (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:146876:72) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147850:16) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13866:41) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18) at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12) at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9) at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5) at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14) From Your Spec Code: at Context.eval (webpack:///./cypress/support/commands.ts:234:5) 2) T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time) EX-6193 - Part 6: Verify the tag status in the GC FU T&M Log.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 3) T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time) EX-6193 - Part 7: Verify the tag status in the SC FU T&MM Log.Tue Aug 08 2023 06:25:00 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_093.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 5 │ │ Failing: 3 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 3 │ │ Video: false │ │ Duration: 7 minutes, 29 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6193-sc-fu-creates-tag-required-signer-gc-fu-signs-tag.spec.t │ │ s │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6193-sc-fu-creates-tag-required-signer-gc-fu-signs-tag.spec.ts\T&M Workflow Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Tue Aug 08 2023 062500 GMT+0000 (Greenw ich Mean Time) -- EX-6193 - Part 5 Verify the GC FU received Bell Notification a nd us.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6193-sc-fu-creates-tag-required-signer-gc-fu-signs-tag.spec.ts\T&M Workflow Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Tue Aug 08 2023 062500 GMT+0000 (Greenw ich Mean Time) -- EX-6193 - Part 6 Verify the tag status in the GC FU T&M Log.Tu e Aug.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6193-sc-fu-creates-tag-required-signer-gc-fu-signs-tag.spec.ts\T&M Workflow Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Tue Aug 08 2023 062500 GMT+0000 (Greenw ich Mean Time) -- EX-6193 - Part 7 Verify the tag status in the SC FU T&MM Log.T ue Au.png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-1-sc-pm-creates-project-and-contract-gc-pm-c (95 of 110) reates-tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:28:13 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:28:13 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 0: Clean existing tags. Tue Aug 08 2023 06:28:13 GMT+0000 (Greenwich Mean Time) (45001ms) √ EX-6324 - Part 0: Clean existing tags. Tue Aug 08 2023 06:28:13 GMT+0000 (Greenwich Mean Time) (45001ms) √ EX-6324 - Part 1: Sub Contractor creates a Tag and saves it as draft.Tue Aug 08 2023 06:28:13 GMT+0000 (Greenwich Mean Time) (83327ms) √ EX-6324 - Part 1: Sub Contractor creates a Tag and saves it as draft.Tue Aug 08 2023 06:28:13 GMT+0000 (Greenwich Mean Time) (83327ms) √ EX-6324 - Part 2: Sub Contractor ADD Labor values to the draft.Tue Aug 08 2023 06:28:13 GMT+0000 (Greenwich Mean Time) (187561ms) √ EX-6324 - Part 2: Sub Contractor ADD Labor values to the draft.Tue Aug 08 2023 06:28:13 GMT+0000 (Greenwich Mean Time) (187561ms) √ EX-6324 - Part 3: Sub Contractor Add Material values to the draft.Tue Aug 08 2023 06:28:13 GMT+0000 (Greenwich Mean Time) (150060ms) √ EX-6324 - Part 3: Sub Contractor Add Material values to the draft.Tue Aug 08 2023 06:28:13 GMT+0000 (Greenwich Mean Time) (150060ms) √ EX-6324 - Part 4: Sub Contractor Adds Equipment to the draft. Tue Aug 08 2023 06:28:13 GMT+0000 (Greenwich Mean Time) (172741ms) √ EX-6324 - Part 4: Sub Contractor Adds Equipment to the draft. Tue Aug 08 2023 06:28:13 GMT+0000 (Greenwich Mean Time) (172741ms) 5 passing (11m) 5 passing (11m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_094.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 10 minutes, 41 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-1-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-2-sc-pm-creates-project-and-contract-gc-pm-c (96 of 110) reates-tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 5: Sub Contractor Adds Other to the draft. Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time) (207353ms) √ EX-6324 - Part 5: Sub Contractor Adds Other to the draft. Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time) (207353ms) 1) EX-6324 - Part 6 : Sub Contractor upload files to the draft.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time) 1) EX-6324 - Part 6 : Sub Contractor upload files to the draft.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time) 2) EX-6324 - Part 7 : Sub Contractor removes one file from the draft.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time) 2) EX-6324 - Part 7 : Sub Contractor removes one file from the draft.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time) 3) EX-6324 - Part 8 : Sub Contractor signs the tag.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time) 3) EX-6324 - Part 8 : Sub Contractor signs the tag.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time) 1 passing (10m) 3 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 6 : Sub Contractor upload files to the draft.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time): CypressError: `cy.fixture()` timed out waiting `15000ms` to receive a fixture. No fixture was ever sent by the server. https://on.cypress.io/fixture at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:146584:85) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13866:41) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18) at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12) at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9) at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5) at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14) From Your Spec Code: at getFileContent (webpack:///./node_modules/cypress-file-upload/dist/bundle.js:273:0) at eval (webpack:///./node_modules/cypress-file-upload/dist/bundle.js:454:0) at resolveFile (webpack:///./node_modules/cypress-file-upload/dist/bundle.js:454:0) at eval (webpack:///./node_modules/cypress-file-upload/dist/bundle.js:651:0) at Array.map () at Context.eval (webpack:///./node_modules/cypress-file-upload/dist/bundle.js:651:0) 2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 7 : Sub Contractor removes one file from the draft.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `ul[class='MuiList-root MuiList-padding'] li[class='MuiListItem-root MuiListItem-gutters'] div[class='MuiListItemText-root'] span`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:82:7) 3) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 8 : Sub Contractor signs the tag.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `ul[class='MuiList-root MuiList-padding'] li[class='MuiListItem-root MuiListItem-gutters'] div[class='MuiListItemText-root'] span`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:82:7) 1 passing (10m) 3 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 6 : Sub Contractor upload files to the draft.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time): CypressError: `cy.fixture()` timed out waiting `15000ms` to receive a fixture. No fixture was ever sent by the server. https://on.cypress.io/fixture at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:146584:85) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13866:41) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18) at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12) at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9) at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5) at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14) From Your Spec Code: at getFileContent (webpack:///./node_modules/cypress-file-upload/dist/bundle.js:273:0) at eval (webpack:///./node_modules/cypress-file-upload/dist/bundle.js:454:0) at resolveFile (webpack:///./node_modules/cypress-file-upload/dist/bundle.js:454:0) at eval (webpack:///./node_modules/cypress-file-upload/dist/bundle.js:651:0) at Array.map () at Context.eval (webpack:///./node_modules/cypress-file-upload/dist/bundle.js:651:0) 2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 7 : Sub Contractor removes one file from the draft.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `ul[class='MuiList-root MuiList-padding'] li[class='MuiListItem-root MuiListItem-gutters'] div[class='MuiListItemText-root'] span`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:82:7) 3) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 8 : Sub Contractor signs the tag.Tue Aug 08 2023 06:38:59 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `ul[class='MuiList-root MuiList-padding'] li[class='MuiListItem-root MuiListItem-gutters'] div[class='MuiListItemText-root'] span`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:82:7) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_095.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 4 │ │ Passing: 1 │ │ Failing: 3 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 3 │ │ Video: false │ │ Duration: 9 minutes, 40 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-2-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6324-2-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional -signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 063859 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 6 Sub Contractor upload files to the draft.Tue Aug 08 2.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6324-2-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional -signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 063859 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 7 Sub Contractor removes one file from the draft.Tue Au.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6324-2-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional -signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 063859 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 8 Sub Contractor signs the ta g.Tue Aug 08 2023 063859 G.png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-c (97 of 110) reates-tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) 1) EX-6324 - Part 9 : Sub Contractor removes his signature and re-adds it.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) 1) EX-6324 - Part 9 : Sub Contractor removes his signature and re-adds it.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) 2) EX-6324 - Part 10 : Sub Contractor removes a user from the TO list and adds another signerTue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) 2) EX-6324 - Part 10 : Sub Contractor removes a user from the TO list and adds another signerTue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) 3) EX-6324 - Part 11 : Sub Contractor sends signature request.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) 3) EX-6324 - Part 11 : Sub Contractor sends signature request.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) 4) EX-6324 - Part 12: Verify the tag status is Awaiting Signatures.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) 4) EX-6324 - Part 12: Verify the tag status is Awaiting Signatures.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) 0 passing (8m) 4 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 9 : Sub Contractor removes his signature and re-adds it.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `ul[class='MuiList-root MuiList-padding'] li[class='MuiListItem-root MuiListItem-gutters'] div[class='MuiListItemText-root'] span`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:82:7) 2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 10 : Sub Contractor removes a user from the TO list and adds another signerTue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `ul[class='MuiList-root MuiList-padding'] li[class='MuiListItem-root MuiListItem-gutters'] div[class='MuiListItemText-root'] span`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:82:7) 3) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 11 : Sub Contractor sends signature request.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `ul[class='MuiList-root MuiList-padding'] li[class='MuiListItem-root MuiListItem-gutters'] div[class='MuiListItemText-root'] span`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:82:7) 4) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 12: Verify the tag status is Awaiting Signatures.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='awaitingSignatureStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 0 passing (8m) 4 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 9 : Sub Contractor removes his signature and re-adds it.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `ul[class='MuiList-root MuiList-padding'] li[class='MuiListItem-root MuiListItem-gutters'] div[class='MuiListItemText-root'] span`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:82:7) 2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 10 : Sub Contractor removes a user from the TO list and adds another signerTue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `ul[class='MuiList-root MuiList-padding'] li[class='MuiListItem-root MuiListItem-gutters'] div[class='MuiListItemText-root'] span`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:82:7) 3) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 11 : Sub Contractor sends signature request.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `ul[class='MuiList-root MuiList-padding'] li[class='MuiListItem-root MuiListItem-gutters'] div[class='MuiListItemText-root'] span`, but never found it. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:82:7) 4) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 12: Verify the tag status is Awaiting Signatures.Tue Aug 08 2023 06:48:45 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='awaitingSignatureStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_096.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 4 │ │ Passing: 0 │ │ Failing: 4 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 4 │ │ Video: false │ │ Duration: 8 minutes, 17 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional -signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 064845 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 9 Sub Contractor removes his signature and re-adds it.T.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional -signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 064845 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 10 Sub Contractor removes a u ser from the TO list and a.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional -signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 064845 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 11 Sub Contractor sends signa ture request.Tue Aug 08 20.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional -signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 064845 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 12 Verify the tag status is Aw aiting Signatures.Tue Aug .png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-c (98 of 110) reates-tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:57:08 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:57:08 GMT+0000 (Greenwich Mean Time) 1) EX-6324 - Part 13: Verify the GC sees the tag.Tue Aug 08 2023 06:57:08 GMT+0000 (Greenwich Mean Time) 1) EX-6324 - Part 13: Verify the GC sees the tag.Tue Aug 08 2023 06:57:08 GMT+0000 (Greenwich Mean Time) 2) EX-6324 - Part 14: Verify GC PM User recived emailsTue Aug 08 2023 06:58:20 GMT+0000 (Greenwich Mean Time) 2) EX-6324 - Part 14: Verify GC PM User recived emailsTue Aug 08 2023 06:58:20 GMT+0000 (Greenwich Mean Time) 3) EX-6324 - Part 15: Verify GC Owner User recived emails and sign the tagTue Aug 08 2023 06:58:20 GMT+0000 (Greenwich Mean Time) 3) EX-6324 - Part 15: Verify GC Owner User recived emails and sign the tagTue Aug 08 2023 06:58:20 GMT+0000 (Greenwich Mean Time) 0 passing (2m) 3 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:58:20 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 13: Verify the GC sees the tag.Tue Aug 08 2023 06:57:08 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Create T&M Tag for DO NOT DELETE - Project for EX6324' within the selector: 'td' but never did. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:45:26) 2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:58:20 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 14: Verify GC PM User recived emailsTue Aug 08 2023 06:58:20 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'DO NOT DELETE - Project for EX6324' within the selector: 'td' but never did. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34) 3) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:58:20 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 15: Verify GC Owner User recived emails and sign the tagTue Aug 08 2023 06:58:20 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'DO NOT DELETE - Project for EX6324' within the selector: 'td' but never did. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34) 0 passing (2m) 3 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:58:20 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 13: Verify the GC sees the tag.Tue Aug 08 2023 06:57:08 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Create T&M Tag for DO NOT DELETE - Project for EX6324' within the selector: 'td' but never did. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:45:26) 2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:58:20 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 14: Verify GC PM User recived emailsTue Aug 08 2023 06:58:20 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'DO NOT DELETE - Project for EX6324' within the selector: 'td' but never did. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34) 3) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:58:20 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 15: Verify GC Owner User recived emails and sign the tagTue Aug 08 2023 06:58:20 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'DO NOT DELETE - Project for EX6324' within the selector: 'td' but never did. at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_097.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 3 │ │ Passing: 0 │ │ Failing: 3 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 3 │ │ Video: false │ │ Duration: 2 minutes, 14 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional -signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 065708 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 13 Verify the GC sees the tag. Tue Aug 08 2023 065708 GMT.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional -signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 065820 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 14 Verify GC PM User recived e mailsTue Aug 08 2023 06582.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional -signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 065820 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 15 Verify GC Owner User recive d emails and sign the tagT.png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-c (99 of 110) reates-tag-optional-signer.spec.ts T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) 1) EX-6324 - Part 16: Verify the tag status in the GC T&M Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) 1) EX-6324 - Part 16: Verify the tag status in the GC T&M Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) 2) EX-6324 - Part 17: Verify the tag status in the SC PM T&MM Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) 2) EX-6324 - Part 17: Verify the tag status in the SC PM T&MM Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) 3) EX-6324 - Part 18: Verify the tag status in the SC Owner T&MM Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) 3) EX-6324 - Part 18: Verify the tag status in the SC Owner T&MM Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) 4) EX-6324 - Part 19: Verify the tag status in the SC Admin T&MM Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) 4) EX-6324 - Part 19: Verify the tag status in the SC Admin T&MM Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) 5) EX-6324 - Part 20: Verify the tag status in the SC PM T&MM Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) 5) EX-6324 - Part 20: Verify the tag status in the SC PM T&MM Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 21: Cleanup...Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) (59405ms) √ EX-6324 - Part 21: Cleanup...Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) (59405ms) 1 passing (7m) 5 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 16: Verify the tag status in the GC T&M Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 17: Verify the tag status in the SC PM T&MM Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 3) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 18: Verify the tag status in the SC Owner T&MM Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 4) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 19: Verify the tag status in the SC Admin T&MM Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 5) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 20: Verify the tag status in the SC PM T&MM Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 1 passing (7m) 5 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 16: Verify the tag status in the GC T&M Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 17: Verify the tag status in the SC PM T&MM Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 3) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 18: Verify the tag status in the SC Owner T&MM Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 4) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 19: Verify the tag status in the SC Admin T&MM Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) 5) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 20: Verify the tag status in the SC PM T&MM Log.Tue Aug 08 2023 06:59:27 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_098.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 1 │ │ Failing: 5 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 5 │ │ Video: false │ │ Duration: 6 minutes, 43 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional -signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 065927 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 16 Verify the tag status in th e GC T&M Log.Tue Aug 08 20.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional -signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 065927 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 17 Verify the tag status in th e SC PM T&MM Log.Tue Aug 0.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional -signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 065927 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 18 Verify the tag status in th e SC Owner T&MM Log.Tue Au.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional -signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 065927 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 19 Verify the tag status in th e SC Admin T&MM Log.Tue Au.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional -signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 08 2023 065927 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 20 Verify the tag status in th e SC PM T&MM Log.Tue Aug 0.png ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6335-sc-sends-tag-gc-signs-tag-as-optional-not-sa (100 of 110) ved-drafts.spec.ts EX-6335 | T&M | Workflow | Existing project and contract, SC PM send a tag. GC Owner signs the tag as one of four Optional Signers. Do not save as draft.Tue Aug 08 2023 07:06:16 GMT+0000 (Greenwich Mean Time) EX-6335 | T&M | Workflow | Existing project and contract, SC PM send a tag. GC Owner signs the tag as one of four Optional Signers. Do not save as draft.Tue Aug 08 2023 07:06:16 GMT+0000 (Greenwich Mean Time) √ EX-6335 - Part 1: Sub Contractor creates a Tag and sends signature request. Tue Aug 08 2023 07:06:16 GMT+0000 (Greenwich Mean Time) (203511ms) √ EX-6335 - Part 1: Sub Contractor creates a Tag and sends signature request. Tue Aug 08 2023 07:06:16 GMT+0000 (Greenwich Mean Time) (203511ms) √ EX-6335 - Part 2: Verify the tag was created. Tue Aug 08 2023 07:06:16 GMT+0000 (Greenwich Mean Time) (40394ms) √ EX-6335 - Part 2: Verify the tag was created. Tue Aug 08 2023 07:06:16 GMT+0000 (Greenwich Mean Time) (40394ms) √ EX-6335 - Part 3: Verify GC User and GC Feild user recived emails. Tue Aug 08 2023 07:10:26 GMT+0000 (Greenwich Mean Time) √ EX-6335 - Part 3: Verify GC User and GC Feild user recived emails. Tue Aug 08 2023 07:10:26 GMT+0000 (Greenwich Mean Time) √ EX-6335 - Part 4: Sign the Tag from Email. Tue Aug 08 2023 07:10:26 GMT+0000 (Greenwich Mean Time) (11070ms) √ EX-6335 - Part 4: Sign the Tag from Email. Tue Aug 08 2023 07:10:26 GMT+0000 (Greenwich Mean Time) (11070ms) √ EX-6335 - Part 5: Verify the tag status in the GC T&M Log. Tue Aug 08 2023 07:10:43 GMT+0000 (Greenwich Mean Time) (34779ms) √ EX-6335 - Part 5: Verify the tag status in the GC T&M Log. Tue Aug 08 2023 07:10:43 GMT+0000 (Greenwich Mean Time) (34779ms) √ EX-6335 - Part 6: Verify the tag status in the SC Admin T&M Log. Tue Aug 08 2023 07:10:43 GMT+0000 (Greenwich Mean Time) (39614ms) √ EX-6335 - Part 6: Verify the tag status in the SC Admin T&M Log. Tue Aug 08 2023 07:10:43 GMT+0000 (Greenwich Mean Time) (39614ms) √ EX-6335 - Part 7: Verify the tag status in the SC PM T&M Log. Tue Aug 08 2023 07:10:43 GMT+0000 (Greenwich Mean Time) (31653ms) √ EX-6335 - Part 7: Verify the tag status in the SC PM T&M Log. Tue Aug 08 2023 07:10:43 GMT+0000 (Greenwich Mean Time) (31653ms) √ EX-6335 - Part 8: Verify the tag status in the SC Owner T&MM Log. Tue Aug 08 2023 07:10:43 GMT+0000 (Greenwich Mean Time) (39868ms) √ EX-6335 - Part 8: Verify the tag status in the SC Owner T&MM Log. Tue Aug 08 2023 07:10:43 GMT+0000 (Greenwich Mean Time) (39868ms) √ EX-6335 - Part 9: Verify the tag status in the SC FieldUser T&MM Log. Tue Aug 08 2023 07:10:43 GMT+0000 (Greenwich Mean Time) (29629ms) √ EX-6335 - Part 9: Verify the tag status in the SC FieldUser T&MM Log. Tue Aug 08 2023 07:10:43 GMT+0000 (Greenwich Mean Time) (29629ms) √ EX-6335 - Part 10: Cleanup SC Tag ... Tue Aug 08 2023 07:10:43 GMT+0000 (Greenwich Mean Time) (36808ms) √ EX-6335 - Part 10: Cleanup SC Tag ... Tue Aug 08 2023 07:10:43 GMT+0000 (Greenwich Mean Time) (36808ms) 10 passing (8m) 10 passing (8m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_099.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 10 │ │ Passing: 10 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 8 minutes, 5 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6335-sc-sends-tag-gc-signs-tag-as-optional-not-saved-drafts.s │ │ pec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-7224-switch-project-workflow.spec.ts (101 of 110) T&M | SC PM creates a project, creates a tag for it, creates another project, moves the tag to the new project.Tue Aug 08 2023 07:14:26 GMT+0000 (Greenwich Mean Time) T&M | SC PM creates a project, creates a tag for it, creates another project, moves the tag to the new project.Tue Aug 08 2023 07:14:26 GMT+0000 (Greenwich Mean Time) √ EX-7224 - Part 1: SC PM creates a Project A.Tue Aug 08 2023 07:14:26 GMT+0000 (Greenwich Mean Time) (48790ms) √ EX-7224 - Part 1: SC PM creates a Project A.Tue Aug 08 2023 07:14:26 GMT+0000 (Greenwich Mean Time) (48790ms) √ EX-7224 - Part 2: SC adds customer to Project A.Tue Aug 08 2023 07:14:26 GMT+0000 (Greenwich Mean Time) (31677ms) √ EX-7224 - Part 2: SC adds customer to Project A.Tue Aug 08 2023 07:14:26 GMT+0000 (Greenwich Mean Time) (31677ms) √ EX-7224 - Part 3: Sub Contractor creates a tag.Tue Aug 08 2023 07:14:26 GMT+0000 (Greenwich Mean Time) (64778ms) √ EX-7224 - Part 3: Sub Contractor creates a tag.Tue Aug 08 2023 07:14:26 GMT+0000 (Greenwich Mean Time) (64778ms) √ EX-7224 - Part 4: Sub Contractor creates Project B.Tue Aug 08 2023 07:14:26 GMT+0000 (Greenwich Mean Time) (43799ms) √ EX-7224 - Part 4: Sub Contractor creates Project B.Tue Aug 08 2023 07:14:26 GMT+0000 (Greenwich Mean Time) (43799ms) √ EX-7224 - Part 5: Sub Contractor switches the tag to Project B.Tue Aug 08 2023 07:14:26 GMT+0000 (Greenwich Mean Time) (70259ms) √ EX-7224 - Part 5: Sub Contractor switches the tag to Project B.Tue Aug 08 2023 07:14:26 GMT+0000 (Greenwich Mean Time) (70259ms) √ EX-7224 - Part 7: Clean up Project A.Tue Aug 08 2023 07:14:26 GMT+0000 (Greenwich Mean Time) (31903ms) √ EX-7224 - Part 7: Clean up Project A.Tue Aug 08 2023 07:14:26 GMT+0000 (Greenwich Mean Time) (31903ms) √ EX-7224 - Part 8: Cleanup Proejct B.Tue Aug 08 2023 07:14:26 GMT+0000 (Greenwich Mean Time) (30230ms) √ EX-7224 - Part 8: Cleanup Proejct B.Tue Aug 08 2023 07:14:26 GMT+0000 (Greenwich Mean Time) (30230ms) 7 passing (5m) 7 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_100.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 22 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-7224-switch-project-workflow.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 08_Projects/Active Projects/ex-5467-verify-job-number-propagation-be (102 of 110) tween-project.spec.ts Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) √ EX-5467 - Create project as GC.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (41222ms) √ EX-5467 - Create project as GC.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (41222ms) √ EX-5467 - Add contract.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (36675ms) √ EX-5467 - Add contract.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (36675ms) √ EX-5467 - Verify the contract is added.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (22229ms) √ EX-5467 - Verify the contract is added.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (22229ms) √ EX-5467 - Add Customer.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (28564ms) √ EX-5467 - Add Customer.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (28564ms) √ EX-5467 - Verify Project Details at GC side.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (31326ms) √ EX-5467 - Verify Project Details at GC side.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (31326ms) √ EX-5467 - Accept the project invite at the SC side.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (39295ms) √ EX-5467 - Accept the project invite at the SC side.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (39295ms) √ EX-5467 - Verify Project Details at SC side.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (21261ms) √ EX-5467 - Verify Project Details at SC side.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (21261ms) √ EX-5467 - Accept project invite at the Customer side.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (26296ms) √ EX-5467 - Accept project invite at the Customer side.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (26296ms) √ EX-5467 - Verify Project Details at the Customer side.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (20258ms) √ EX-5467 - Verify Project Details at the Customer side.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (20258ms) √ EX-5467 - Cleanup GC... Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (35075ms) √ EX-5467 - Cleanup GC... Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (35075ms) √ EX-5467 - Cleanup SC... Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (32839ms) √ EX-5467 - Cleanup SC... Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (32839ms) √ EX-5467 - Cleanup for Owner.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (28842ms) √ EX-5467 - Cleanup for Owner.Tue Aug 08 2023 07:19:52 GMT+0000 (Greenwich Mean Time) (28842ms) 12 passing (6m) 12 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_101.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 5 seconds │ │ Spec Ran: 08_Projects/Active Projects/ex-5467-verify-job-number-propagation-between-projec │ │ t.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 08_Projects/Active Projects/ex-7362-verify-job-number-propagation-to (103 of 110) -draft-cors.spec.ts Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Tue Aug 08 2023 07:26:02 GMT+0000 (Greenwich Mean Time) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Tue Aug 08 2023 07:26:02 GMT+0000 (Greenwich Mean Time) √ EX-7362 - Part 1: Create project as SC.Tue Aug 08 2023 07:26:02 GMT+0000 (Greenwich Mean Time) (37226ms) √ EX-7362 - Part 1: Create project as SC.Tue Aug 08 2023 07:26:02 GMT+0000 (Greenwich Mean Time) (37226ms) √ EX-7362 - Part 2: Add Customer.Tue Aug 08 2023 07:26:02 GMT+0000 (Greenwich Mean Time) (35315ms) √ EX-7362 - Part 2: Add Customer.Tue Aug 08 2023 07:26:02 GMT+0000 (Greenwich Mean Time) (35315ms) √ EX-7362 - Part 3: Accept the project invite at the GC side.Tue Aug 08 2023 07:26:02 GMT+0000 (Greenwich Mean Time) (37660ms) √ EX-7362 - Part 3: Accept the project invite at the GC side.Tue Aug 08 2023 07:26:02 GMT+0000 (Greenwich Mean Time) (37660ms) √ EX-7362 - Part 4: Create COR and Save it as Draft.Tue Aug 08 2023 07:26:02 GMT+0000 (Greenwich Mean Time) (40718ms) √ EX-7362 - Part 4: Create COR and Save it as Draft.Tue Aug 08 2023 07:26:02 GMT+0000 (Greenwich Mean Time) (40718ms) √ EX-7362 - Part 5: Verify Draft COR data in the Draft COR Log.Tue Aug 08 2023 07:26:02 GMT+0000 (Greenwich Mean Time) (25331ms) √ EX-7362 - Part 5: Verify Draft COR data in the Draft COR Log.Tue Aug 08 2023 07:26:02 GMT+0000 (Greenwich Mean Time) (25331ms) √ EX-7362 - Cleanup GC... Tue Aug 08 2023 07:26:02 GMT+0000 (Greenwich Mean Time) (37777ms) √ EX-7362 - Cleanup GC... Tue Aug 08 2023 07:26:02 GMT+0000 (Greenwich Mean Time) (37777ms) √ EX-7362 - Cleanup SC... Tue Aug 08 2023 07:26:02 GMT+0000 (Greenwich Mean Time) (34643ms) √ EX-7362 - Cleanup SC... Tue Aug 08 2023 07:26:02 GMT+0000 (Greenwich Mean Time) (34643ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_102.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 9 seconds │ │ Spec Ran: 08_Projects/Active Projects/ex-7362-verify-job-number-propagation-to-draft-cors. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/ChangeNotifications/ex-3723-verify-all-links-in-pricing-re (104 of 110) quest-cn-response-needed-email.spec.ts Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Tue Aug 08 2023 07:30:17 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Tue Aug 08 2023 07:30:17 GMT+0000 (Greenwich Mean Time) √ EX-3723 Part 1: Create a project and send invite.Tue Aug 08 2023 07:30:17 GMT+0000 (Greenwich Mean Time) (51772ms) √ EX-3723 Part 1: Create a project and send invite.Tue Aug 08 2023 07:30:17 GMT+0000 (Greenwich Mean Time) (51772ms) √ EX-3723 Part 2: Add Sub-Contractor.Tue Aug 08 2023 07:30:17 GMT+0000 (Greenwich Mean Time) (38882ms) √ EX-3723 Part 2: Add Sub-Contractor.Tue Aug 08 2023 07:30:17 GMT+0000 (Greenwich Mean Time) (38882ms) √ EX-3723 Part 3: Login to the Sub Contractor account and Accept the invite.Tue Aug 08 2023 07:30:17 GMT+0000 (Greenwich Mean Time) (22381ms) √ EX-3723 Part 3: Login to the Sub Contractor account and Accept the invite.Tue Aug 08 2023 07:30:17 GMT+0000 (Greenwich Mean Time) (22381ms) √ EX-3723 Part 4: Log in back to the Gen Contractor account and create a Pricing Request Change Notification.Tue Aug 08 2023 07:30:17 GMT+0000 (Greenwich Mean Time) (45156ms) √ EX-3723 Part 4: Log in back to the Gen Contractor account and create a Pricing Request Change Notification.Tue Aug 08 2023 07:30:17 GMT+0000 (Greenwich Mean Time) (45156ms) √ EX-3723 Part 5: Verify the Response Needed CN email.Tue Aug 08 2023 07:33:01 GMT+0000 (Greenwich Mean Time) (8305ms) √ EX-3723 Part 5: Verify the Response Needed CN email.Tue Aug 08 2023 07:33:01 GMT+0000 (Greenwich Mean Time) (8305ms) √ EX-3723 Part 6: Verify LinksTue Aug 08 2023 07:33:14 GMT+0000 (Greenwich Mean Time) (13264ms) √ EX-3723 Part 6: Verify LinksTue Aug 08 2023 07:33:14 GMT+0000 (Greenwich Mean Time) (13264ms) √ EX-3723 Part 7: Cleanup GC...Tue Aug 08 2023 07:33:14 GMT+0000 (Greenwich Mean Time) (36352ms) √ EX-3723 Part 7: Cleanup GC...Tue Aug 08 2023 07:33:14 GMT+0000 (Greenwich Mean Time) (36352ms) √ EX-3723 Part 7: Cleanup SC...Tue Aug 08 2023 07:33:14 GMT+0000 (Greenwich Mean Time) (32091ms) √ EX-3723 Part 7: Cleanup SC...Tue Aug 08 2023 07:33:14 GMT+0000 (Greenwich Mean Time) (32091ms) 8 passing (4m) 8 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_103.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 19 seconds │ │ Spec Ran: 11_Emails/ChangeNotifications/ex-3723-verify-all-links-in-pricing-request-cn-res │ │ ponse-needed-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/ChangeNotifications/ex-5287-verify-all-links-in-authorize- (105 of 110) work-cn-response-needed-email.spec.ts Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Authorize Work CN.Tue Aug 08 2023 07:34:40 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Authorize Work CN.Tue Aug 08 2023 07:34:40 GMT+0000 (Greenwich Mean Time) √ EX-5287 Part 1: Create a project.Tue Aug 08 2023 07:34:40 GMT+0000 (Greenwich Mean Time) (50890ms) √ EX-5287 Part 1: Create a project.Tue Aug 08 2023 07:34:40 GMT+0000 (Greenwich Mean Time) (50890ms) √ EX-5287 Part 2: Send invite.Tue Aug 08 2023 07:34:40 GMT+0000 (Greenwich Mean Time) (36087ms) √ EX-5287 Part 2: Send invite.Tue Aug 08 2023 07:34:40 GMT+0000 (Greenwich Mean Time) (36087ms) √ EX-5287 Part 3: Login to the Sub Contractor account and Accept the invite.Tue Aug 08 2023 07:34:40 GMT+0000 (Greenwich Mean Time) (23362ms) √ EX-5287 Part 3: Login to the Sub Contractor account and Accept the invite.Tue Aug 08 2023 07:34:40 GMT+0000 (Greenwich Mean Time) (23362ms) √ EX-5287 Part 4: Log in back to the Gen Contractor account and create a Authorize T&M Work Change Notification.Tue Aug 08 2023 07:34:40 GMT+0000 (Greenwich Mean Time) (41090ms) √ EX-5287 Part 4: Log in back to the Gen Contractor account and create a Authorize T&M Work Change Notification.Tue Aug 08 2023 07:34:40 GMT+0000 (Greenwich Mean Time) (41090ms) √ EX-5287 Part 5: Verify the Response Needed CN email.Tue Aug 08 2023 07:37:18 GMT+0000 (Greenwich Mean Time) (7585ms) √ EX-5287 Part 5: Verify the Response Needed CN email.Tue Aug 08 2023 07:37:18 GMT+0000 (Greenwich Mean Time) (7585ms) √ EX-5287 Part 6: Verify LinksTue Aug 08 2023 07:37:30 GMT+0000 (Greenwich Mean Time) (11853ms) √ EX-5287 Part 6: Verify LinksTue Aug 08 2023 07:37:30 GMT+0000 (Greenwich Mean Time) (11853ms) √ EX-5287 Part 7: Cleanup GC...Tue Aug 08 2023 07:37:30 GMT+0000 (Greenwich Mean Time) (35572ms) √ EX-5287 Part 7: Cleanup GC...Tue Aug 08 2023 07:37:30 GMT+0000 (Greenwich Mean Time) (35572ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_104.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 37 seconds │ │ Spec Ran: 11_Emails/ChangeNotifications/ex-5287-verify-all-links-in-authorize-work-cn-resp │ │ onse-needed-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/CORs/ex-3720-verify-all-links-in-cor-recieved-email.spec.t (106 of 110) s Email Hyperlinks | To verify that all links on COR received email works fineTue Aug 08 2023 07:38:22 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on COR received email works fineTue Aug 08 2023 07:38:22 GMT+0000 (Greenwich Mean Time) √ EX-3720 Part 1: Create a project. Tue Aug 08 2023 07:38:22 GMT+0000 (Greenwich Mean Time) (50575ms) √ EX-3720 Part 1: Create a project. Tue Aug 08 2023 07:38:22 GMT+0000 (Greenwich Mean Time) (50575ms) √ EX-3720 Part 2: Add contract. Tue Aug 08 2023 07:38:22 GMT+0000 (Greenwich Mean Time) (36473ms) √ EX-3720 Part 2: Add contract. Tue Aug 08 2023 07:38:22 GMT+0000 (Greenwich Mean Time) (36473ms) √ EX-3720 Part 3: Sub Contractor accepts the project invite.Tue Aug 08 2023 07:38:22 GMT+0000 (Greenwich Mean Time) (24289ms) √ EX-3720 Part 3: Sub Contractor accepts the project invite.Tue Aug 08 2023 07:38:22 GMT+0000 (Greenwich Mean Time) (24289ms) √ EX-3720 Part 4: Sub Contractor creates COR.Tue Aug 08 2023 07:38:22 GMT+0000 (Greenwich Mean Time) (81188ms) √ EX-3720 Part 4: Sub Contractor creates COR.Tue Aug 08 2023 07:38:22 GMT+0000 (Greenwich Mean Time) (81188ms) √ EX-3720 Part 5: Verify the new COR email links to clearstory.build.Tue Aug 08 2023 07:41:40 GMT+0000 (Greenwich Mean Time) (12918ms) √ EX-3720 Part 5: Verify the new COR email links to clearstory.build.Tue Aug 08 2023 07:41:40 GMT+0000 (Greenwich Mean Time) (12918ms) √ EX-3720 Part 6: Verify the VIEW/COMMENT/DOWNLOAD button link.Tue Aug 08 2023 07:41:58 GMT+0000 (Greenwich Mean Time) (13158ms) √ EX-3720 Part 6: Verify the VIEW/COMMENT/DOWNLOAD button link.Tue Aug 08 2023 07:41:58 GMT+0000 (Greenwich Mean Time) (13158ms) √ EX-3720 Part 7: Cleanup GC...Tue Aug 08 2023 07:41:58 GMT+0000 (Greenwich Mean Time) (37245ms) √ EX-3720 Part 7: Cleanup GC...Tue Aug 08 2023 07:41:58 GMT+0000 (Greenwich Mean Time) (37245ms) √ EX-3720 Part 8: Cleanup SC...Tue Aug 08 2023 07:41:58 GMT+0000 (Greenwich Mean Time) (36075ms) √ EX-3720 Part 8: Cleanup SC...Tue Aug 08 2023 07:41:58 GMT+0000 (Greenwich Mean Time) (36075ms) 8 passing (5m) 8 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_105.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 2 seconds │ │ Spec Ran: 11_Emails/CORs/ex-3720-verify-all-links-in-cor-recieved-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/Projects/ex-3717-verify-all-links-in-add-my-company-email. (107 of 110) spec.ts Email Hyperlinks | To verify that all links on Add My Company email work fineTue Aug 08 2023 07:43:28 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Add My Company email work fineTue Aug 08 2023 07:43:28 GMT+0000 (Greenwich Mean Time) √ EX-3717 Part 1: Create project and send invite.Tue Aug 08 2023 07:43:28 GMT+0000 (Greenwich Mean Time) (50685ms) √ EX-3717 Part 1: Create project and send invite.Tue Aug 08 2023 07:43:28 GMT+0000 (Greenwich Mean Time) (50685ms) √ EX-3717 Part 2: Add My Comapny Users. Tue Aug 08 2023 07:43:28 GMT+0000 (Greenwich Mean Time) (35669ms) √ EX-3717 Part 2: Add My Comapny Users. Tue Aug 08 2023 07:43:28 GMT+0000 (Greenwich Mean Time) (35669ms) √ EX-3717 Part 3: Verify the email links to clearstory.build.Tue Aug 08 2023 07:45:01 GMT+0000 (Greenwich Mean Time) (10464ms) √ EX-3717 Part 3: Verify the email links to clearstory.build.Tue Aug 08 2023 07:45:01 GMT+0000 (Greenwich Mean Time) (10464ms) √ EX-3717 Part 4: Verify the JOIN PROJECT button link.Tue Aug 08 2023 07:45:17 GMT+0000 (Greenwich Mean Time) (8642ms) √ EX-3717 Part 4: Verify the JOIN PROJECT button link.Tue Aug 08 2023 07:45:17 GMT+0000 (Greenwich Mean Time) (8642ms) √ EX-3717 Part 5: Cleanup...Tue Aug 08 2023 07:45:17 GMT+0000 (Greenwich Mean Time) (37316ms) √ EX-3717 Part 5: Cleanup...Tue Aug 08 2023 07:45:17 GMT+0000 (Greenwich Mean Time) (37316ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_106.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 34 seconds │ │ Spec Ran: 11_Emails/Projects/ex-3717-verify-all-links-in-add-my-company-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/Projects/ex-3718-verify-all-links-in-add-my-customer-email (108 of 110) .spec.ts Email Hyperlinks | To verify that all the links on Add My Customer worksTue Aug 08 2023 07:46:08 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all the links on Add My Customer worksTue Aug 08 2023 07:46:08 GMT+0000 (Greenwich Mean Time) √ EX-3718 Part 1: Create project and send invite.Tue Aug 08 2023 07:46:08 GMT+0000 (Greenwich Mean Time) (50767ms) √ EX-3718 Part 1: Create project and send invite.Tue Aug 08 2023 07:46:08 GMT+0000 (Greenwich Mean Time) (50767ms) √ EX-3718 Part 2: Add Customers.Tue Aug 08 2023 07:46:08 GMT+0000 (Greenwich Mean Time) (34146ms) √ EX-3718 Part 2: Add Customers.Tue Aug 08 2023 07:46:08 GMT+0000 (Greenwich Mean Time) (34146ms) √ EX-3718 Part 3: Login to the Owner PM account and Accept the invite.Tue Aug 08 2023 07:46:08 GMT+0000 (Greenwich Mean Time) (16240ms) √ EX-3718 Part 3: Login to the Owner PM account and Accept the invite.Tue Aug 08 2023 07:46:08 GMT+0000 (Greenwich Mean Time) (16240ms) √ EX-3718 Part 4: Verify the email links to clearstory.build.Tue Aug 08 2023 07:47:54 GMT+0000 (Greenwich Mean Time) (18868ms) √ EX-3718 Part 4: Verify the email links to clearstory.build.Tue Aug 08 2023 07:47:54 GMT+0000 (Greenwich Mean Time) (18868ms) √ EX-3718 Part 5: Verify the JOIN PROJECT button link.Tue Aug 08 2023 07:48:19 GMT+0000 (Greenwich Mean Time) (9445ms) √ EX-3718 Part 5: Verify the JOIN PROJECT button link.Tue Aug 08 2023 07:48:19 GMT+0000 (Greenwich Mean Time) (9445ms) √ EX-3718 Part 6: Cleanup Ow...Tue Aug 08 2023 07:48:19 GMT+0000 (Greenwich Mean Time) (32376ms) √ EX-3718 Part 6: Cleanup Ow...Tue Aug 08 2023 07:48:19 GMT+0000 (Greenwich Mean Time) (32376ms) √ EX-3718 Part 7: Cleanup GC...Tue Aug 08 2023 07:48:19 GMT+0000 (Greenwich Mean Time) (35508ms) √ EX-3718 Part 7: Cleanup GC...Tue Aug 08 2023 07:48:19 GMT+0000 (Greenwich Mean Time) (35508ms) 7 passing (3m) 7 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_107.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 29 seconds │ │ Spec Ran: 11_Emails/Projects/ex-3718-verify-all-links-in-add-my-customer-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/Projects/ex-3719-verify-all-links-in-add-contrctor-email.s (109 of 110) pec.ts Email Hyperlinks | To verify that all the links on Add Contractors email workTue Aug 08 2023 07:49:41 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all the links on Add Contractors email workTue Aug 08 2023 07:49:41 GMT+0000 (Greenwich Mean Time) √ EX-3719 Part 1: Create a project Tue Aug 08 2023 07:49:41 GMT+0000 (Greenwich Mean Time) (52264ms) √ EX-3719 Part 1: Create a project Tue Aug 08 2023 07:49:41 GMT+0000 (Greenwich Mean Time) (52264ms) √ EX-3719 Part 2: Send invite.Tue Aug 08 2023 07:49:41 GMT+0000 (Greenwich Mean Time) (37582ms) √ EX-3719 Part 2: Send invite.Tue Aug 08 2023 07:49:41 GMT+0000 (Greenwich Mean Time) (37582ms) √ EX-3719 Part 3: Accept invite. Tue Aug 08 2023 07:49:41 GMT+0000 (Greenwich Mean Time) (22024ms) √ EX-3719 Part 3: Accept invite. Tue Aug 08 2023 07:49:41 GMT+0000 (Greenwich Mean Time) (22024ms) √ EX-3719 Part 4: Verify the email links to Eclearstory.build.Tue Aug 08 2023 07:51:39 GMT+0000 (Greenwich Mean Time) (14596ms) √ EX-3719 Part 4: Verify the email links to Eclearstory.build.Tue Aug 08 2023 07:51:39 GMT+0000 (Greenwich Mean Time) (14596ms) √ EX-3719 Part 5: Verify JOIN PROJECT button link.Tue Aug 08 2023 07:52:00 GMT+0000 (Greenwich Mean Time) (13207ms) √ EX-3719 Part 5: Verify JOIN PROJECT button link.Tue Aug 08 2023 07:52:00 GMT+0000 (Greenwich Mean Time) (13207ms) √ EX-3719 Part 6: Cleanup GC...Tue Aug 08 2023 07:52:00 GMT+0000 (Greenwich Mean Time) (36970ms) √ EX-3719 Part 6: Cleanup GC...Tue Aug 08 2023 07:52:00 GMT+0000 (Greenwich Mean Time) (36970ms) √ EX-3719 Part 7: Cleanup SC...Tue Aug 08 2023 07:52:00 GMT+0000 (Greenwich Mean Time) (32209ms) √ EX-3719 Part 7: Cleanup SC...Tue Aug 08 2023 07:52:00 GMT+0000 (Greenwich Mean Time) (32209ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_108.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 40 seconds │ │ Spec Ran: 11_Emails/Projects/ex-3719-verify-all-links-in-add-contrctor-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/T&M_Tags/ex-3721-verify-all-links-in-please-sign-tm-tag-em (110 of 110) ail.spec.ts Email Hyperlinks | To verify that all links on Please sign T&M tag email works fineTue Aug 08 2023 07:53:27 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Please sign T&M tag email works fineTue Aug 08 2023 07:53:27 GMT+0000 (Greenwich Mean Time) √ EX-3721 Part 1: Create a project and send invite.Tue Aug 08 2023 07:53:27 GMT+0000 (Greenwich Mean Time) (50975ms) √ EX-3721 Part 1: Create a project and send invite.Tue Aug 08 2023 07:53:27 GMT+0000 (Greenwich Mean Time) (50975ms) √ EX-3721 Part 2: Send invite.Tue Aug 08 2023 07:53:27 GMT+0000 (Greenwich Mean Time) (37316ms) √ EX-3721 Part 2: Send invite.Tue Aug 08 2023 07:53:27 GMT+0000 (Greenwich Mean Time) (37316ms) √ EX-3721 Part 3: Sub Contractor Accepts the invite.Tue Aug 08 2023 07:53:27 GMT+0000 (Greenwich Mean Time) (23632ms) √ EX-3721 Part 3: Sub Contractor Accepts the invite.Tue Aug 08 2023 07:53:27 GMT+0000 (Greenwich Mean Time) (23632ms) √ EX-3721 Part 4: Sub Contractor creates a Tag.Tue Aug 08 2023 07:53:27 GMT+0000 (Greenwich Mean Time) (50533ms) √ EX-3721 Part 4: Sub Contractor creates a Tag.Tue Aug 08 2023 07:53:27 GMT+0000 (Greenwich Mean Time) (50533ms) √ EX-3721 Part 5: Verify the tag was created.Tue Aug 08 2023 07:53:27 GMT+0000 (Greenwich Mean Time) (31218ms) √ EX-3721 Part 5: Verify the tag was created.Tue Aug 08 2023 07:53:27 GMT+0000 (Greenwich Mean Time) (31218ms) √ EX-3721 Part 6: Verify the please sign T&M email.Tue Aug 08 2023 07:56:46 GMT+0000 (Greenwich Mean Time) (14519ms) √ EX-3721 Part 6: Verify the please sign T&M email.Tue Aug 08 2023 07:56:46 GMT+0000 (Greenwich Mean Time) (14519ms) √ EX-3721 Part 7: Cleanup GC...Tue Aug 08 2023 07:57:06 GMT+0000 (Greenwich Mean Time) (37679ms) √ EX-3721 Part 7: Cleanup GC...Tue Aug 08 2023 07:57:06 GMT+0000 (Greenwich Mean Time) (37679ms) √ EX-3721 Part 7: Cleanup SC...Tue Aug 08 2023 07:57:06 GMT+0000 (Greenwich Mean Time) (32116ms) √ EX-3721 Part 7: Cleanup SC...Tue Aug 08 2023 07:57:06 GMT+0000 (Greenwich Mean Time) (32116ms) 8 passing (5m) 8 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_109.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 49 seconds │ │ Spec Ran: 11_Emails/T&M_Tags/ex-3721-verify-all-links-in-please-sign-tm-tag-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ==================================================================================================== (Run Finished) Spec Tests Passing Failing Pending Skipped ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ √ 01_LoginPage/ex-3313-invalid-creden 00:11 1 1 - - - │ │ tials.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 01_LoginPage/ex-3316-email-input-va 00:09 1 1 - - - │ │ lidation.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 01_LoginPage/ex-5751-create-new-acc 00:12 1 1 - - - │ │ ount-with-already-used-email.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 09_Analytics/ex-5428-verify-sent-ex 00:38 1 1 - - - │ │ port--tm-tag-detailed-report-xlsx-a │ │ fter-filtering-by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 09_Analytics/ex-8799-verify-receive 00:39 1 1 - - - │ │ d-export--tm-tag-detailed-report-xl │ │ sx-after-filtering-by-project.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 12_Tag_Activity/ex-7214-tag-activit 05:15 7 7 - - - │ │ y-create-sign-send-reject-from-web. │ │ spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 12_Tag_Activity/ex-7215-tag-activit 04:44 6 6 - - - │ │ y-create-sign-send-revise-resubmit- │ │ from-web.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 12_Tag_Activity/ex-7353-tag-activit 04:26 7 7 - - - │ │ y-create-tag-opened-status.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-7673-cor-activit 04:56 6 6 - - - │ │ y-create-cor-draft-view-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-7674-cor-activit 04:57 6 6 - - - │ │ y-create-cor-resend-cor-resend-cor- │ │ with-email-message-view-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-7678-cor-activit 05:11 6 6 - - - │ │ y-create-cor-change-status-state-at │ │ -receiver.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-7798-cor-activit 05:03 6 6 - - - │ │ y-upload-cor-view-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 02_PermissionLevels/Add_users_to_Pr 02:36 3 2 1 - - │ │ oject/EX-9394-GC-creates-project-ad │ │ ds-new-customer-user.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:18 2 2 - - - │ │ ex-3323-create-new-project-as-owner │ │ -in-owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:21 2 2 - - - │ │ ex-3328-create-new-project-as-owner │ │ -in-sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:20 2 2 - - - │ │ ex-3329-create-new-project-as-owner │ │ -in-other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:23 2 2 - - - │ │ ex-3330-create-new-project-as-admin │ │ -in-owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:37 2 2 - - - │ │ ex-3331-create-new-project-as-admin │ │ -in-gc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:27 2 2 - - - │ │ ex-3332-create-new-project-as-pm-in │ │ -gc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:27 2 2 - - - │ │ ex-3333-create-new-project-as-fu-in │ │ -gc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:21 2 2 - - - │ │ ex-3334-create-new-project-as-pm-in │ │ -owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:18 2 2 - - - │ │ ex-3335-create-new-project-as-fu-in │ │ -owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:22 2 2 - - - │ │ ex-3336-create-new-project-as-admin │ │ -in-sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:22 2 2 - - - │ │ ex-3337-create-new-project-as-pm-in │ │ -sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:23 2 2 - - - │ │ ex-3338-create-new-project-as-fu-in │ │ -sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:20 2 2 - - - │ │ ex-3342-create-new-project-as-admin │ │ -in-other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:22 2 2 - - - │ │ ex-3343-create-new-project-as-pm-in │ │ -other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:23 2 2 - - - │ │ ex-3344-create-new-project-as-fu-in │ │ -other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Project_level/e 03:14 5 5 - - - │ │ x-10783-project-level-sent-logs-ema │ │ il-for-GC-SC.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Project_level/e 02:55 7 7 - - - │ │ x-10797-project-level-sent-logs-ema │ │ il-for-GC-SC.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 02:06 6 6 - - - │ │ 792-GC-account-owner-user-previlleg │ │ es.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 05:43 12 12 - - - │ │ 793-GC-Owner-project-previlleges.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 02:06 6 6 - - - │ │ 828-GC-admin-user-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 02:03 6 6 - - - │ │ 829-GC-PM-user-previlleges.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 01:27 5 5 - - - │ │ 830-GC-Field-user-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 02:46 8 8 - - - │ │ 832-SC-Field-users-user-previlleges │ │ .spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 03:01 8 8 - - - │ │ 833-SC-PM-user-previlleges.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 03:06 8 8 - - - │ │ 834-SC-Admin-user-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 03:05 8 8 - - - │ │ 835-SC-account-owner-user-previlleg │ │ es.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 06:55 12 12 - - - │ │ 885-GC-Admin-project-previlleges.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 05:44 12 12 - - - │ │ 886-GC-PM-project-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 06:44 12 12 - - - │ │ 887-SC-Admin-project-previlleges.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 04:21 9 9 - - - │ │ 888-GC-FU-project-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 05:36 12 12 - - - │ │ 889-SC-Owner-project-previlleges.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 05:54 12 12 - - - │ │ 890-SC-PM-project-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 04:19 9 9 - - - │ │ 891-SC-FU-project-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-3673-verify-cont 03:07 4 4 - - - │ │ ractor-is-able-to-upload-cor-with-o │ │ nly-mandatory-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-3683-GC-creates- 06:49 11 11 - - - │ │ project-adds-contract-SC-creates-co │ │ r.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-3686-verify-ther 00:28 1 1 - - - │ │ e-are-two-tabs-on-cor-log-page-sent │ │ -received.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 04_COR_Log/Sent/EX-4366-SC-creates- 08:17 11 9 2 - - │ │ project-adds-gc-customer-sc-creates │ │ -cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 04_COR_Log/Sent/EX-4432-to-verify-P 04:35 7 6 1 - - │ │ M-is-able-to-create-cor-as-draft.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5244-verify-shar 01:01 1 1 - - - │ │ eable-link-contains-just-the-select │ │ ed-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5333-SC-creates- 02:37 1 1 - - - │ │ cor-with-full-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5396-verify-cont 07:16 11 11 - - - │ │ ractor-is-able-to-upload-cor-with-m │ │ andatory-and-optional-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5435-create-new- 03:34 6 6 - - - │ │ project-add-contrac-verify-original │ │ -contract-value.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/EX-5827-to-verify-m 00:27 1 1 - - - │ │ ultiple-cors-to-same-tag-when-creat │ │ ing-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/EX-5894-to-verify-m 00:40 1 1 - - - │ │ ultiple-cors-to-same-tag-when-uploa │ │ ding-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-6681-verify-sent 01:55 2 2 - - - │ │ -summary-data-after-filtering-by-pr │ │ oject.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5425-verify- 01:51 2 2 - - - │ │ received-summary-data-after-filteri │ │ ng-by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5429-verify- 00:49 1 1 - - - │ │ received-export-csv-after-filtering │ │ -by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5431-verify- 00:56 1 1 - - - │ │ received-export-sharelog-after-filt │ │ ering-by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5641-verify- 05:03 5 5 - - - │ │ tnm-log-received-summary-data-after │ │ -filtering-by-tag-status.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-60 05:27 8 8 - - - │ │ 30-create-cn-respond-with-upload-co │ │ r-verify-all-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-85 11:10 13 13 - - - │ │ 97-respond-to-cn-as-SC-and-GC-clear │ │ -response.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-85 03:22 5 5 - - - │ │ 99-create-cn-authorize-t&mwork-resp │ │ ond-as-SC-PM-with-no-cost-impact.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 03:13 5 5 - - - │ │ 42-create-cn-pricing-request-respon │ │ d-as-SC-PM-with-no-cost-impact.spec │ │ .ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 05:04 7 7 - - - │ │ 43-create-cn-pricing-request-respon │ │ d-as-SC-PM-with-create-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 05:04 7 7 - - - │ │ 44-create-cn-pricing-request-respon │ │ d-as-SC-PM-with-upload-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 03:21 5 5 - - - │ │ 45-create-cn-pricing-request-respon │ │ d-as-GC-PM-with-no-cost-impact.spec │ │ .ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 03:15 5 5 - - - │ │ 46-create-cn-pricing-request-respon │ │ d-as-GC-PM-by-linking-existing-cor. │ │ spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 05:11 7 7 - - - │ │ 47-create-cn-authorize-t&mwork-resp │ │ ond-as-SC-PM-with-create-cor.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 05:49 8 8 - - - │ │ 48-create-cn-authorize-t&mwork-resp │ │ ond-as-SC-PM-with-upload-cor.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 03:26 5 5 - - - │ │ 49-create-cn-authorize-t&mwork-resp │ │ ond-as-GC-PM-with-no-cost-impact.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 03:18 5 5 - - - │ │ 50-create-cn-authorize-t&mwork-resp │ │ ond-as-GC-PM-by-linking-existing-co │ │ r.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-1-gc-create 04:17 5 5 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-2-gc-create 05:40 2 2 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-3-gc-create 02:53 1 1 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-4-gc-create 03:10 1 1 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-5-gc-create 02:56 2 2 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-6-gc-create 04:43 8 8 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5424-verify-sent 02:28 2 2 - - - │ │ -summary-data-after-filtering-by-pr │ │ oject.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5430-verify-sent 00:46 1 1 - - - │ │ -export-csv-after-filtering-by-proj │ │ ect.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5505-verify-tnm- 01:35 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-customer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5506-verify-tnm- 01:34 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-job-number.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5507-verify-tnm- 01:29 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-cust-ref-num.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5508-verify-tnm- 10:22 7 7 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-tag-status.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5509-verify-tnm- 01:30 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-cust-label.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5510-verify-tnm- 02:56 2 2 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-cor-availability.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 05_T&M_Log/Sent/ex-5846-sc-creates- 08:30 12 11 1 - - │ │ project-add-gc-as-customer-sc-creat │ │ es-tag-req-and-optional-signer.spec │ │ .ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6181-1-gc-create 02:58 3 3 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6181-2-gc-create 16:21 1 1 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6181-3-gc-create 02:31 5 5 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6191-sc-creates- 11:58 13 13 - - - │ │ tag-required-signer-gc-signs-tag.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 05_T&M_Log/Sent/ex-6193-sc-fu-creat 07:29 8 5 3 - - │ │ es-tag-required-signer-gc-fu-signs- │ │ tag.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-1-sc-pm-cre 10:41 5 5 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 05_T&M_Log/Sent/ex-6324-2-sc-pm-cre 09:40 4 1 3 - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 05_T&M_Log/Sent/ex-6324-3-sc-pm-cre 08:17 4 - 4 - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 05_T&M_Log/Sent/ex-6324-4-sc-pm-cre 02:14 3 - 3 - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 05_T&M_Log/Sent/ex-6324-5-sc-pm-cre 06:43 6 1 5 - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6335-sc-sends-ta 08:05 10 10 - - - │ │ g-gc-signs-tag-as-optional-not-save │ │ d-drafts.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-7224-switch-proj 05:22 7 7 - - - │ │ ect-workflow.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 08_Projects/Active Projects/ex-5467 06:05 12 12 - - - │ │ -verify-job-number-propagation-betw │ │ een-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 08_Projects/Active Projects/ex-7362 04:09 7 7 - - - │ │ -verify-job-number-propagation-to-d │ │ raft-cors.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/ChangeNotifications/ex-37 04:19 8 8 - - - │ │ 23-verify-all-links-in-pricing-requ │ │ est-cn-response-needed-email.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/ChangeNotifications/ex-52 03:37 7 7 - - - │ │ 87-verify-all-links-in-authorize-wo │ │ rk-cn-response-needed-email.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/CORs/ex-3720-verify-all-l 05:02 8 8 - - - │ │ inks-in-cor-recieved-email.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/Projects/ex-3717-verify-a 02:34 5 5 - - - │ │ ll-links-in-add-my-company-email.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/Projects/ex-3718-verify-a 03:29 7 7 - - - │ │ ll-links-in-add-my-customer-email.s │ │ pec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/Projects/ex-3719-verify-a 03:40 7 7 - - - │ │ ll-links-in-add-contrctor-email.spe │ │ c.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/T&M_Tags/ex-3721-verify-a 04:49 8 8 - - - │ │ ll-links-in-please-sign-tm-tag-emai │ │ l.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ × 9 of 110 failed (8%) 7:03:40 570 547 23 - -