> cypress-extracker-webapp@1.0.0 scripts-regression
> cypress run --browser chrome --record --key f075f6c3-9e86-42b3-885a-0b6e5a07380b --spec "./cypress/e2e/regression/**"
====================================================================================================
(Run Starting)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Cypress: 12.17.3 │
│ Browser: Chrome 115 (headless) │
│ Node Version: v18.14.1 (C:\Program Files\nodejs\node.exe) │
│ Specs: 113 found (01_LoginPage/ex-3313-invalid-credentials.spec.ts, 01_LoginPage/ex-3 │
│ 316-email-input-validation.spec.ts, 01_LoginPage/ex-5751-create-new-account-wi │
│ th-already-used-email.spec.ts, 09_Analytics/ex-5428-verify-sent-export--tm-tag │
│ -detailed-report-xlsx-af...) │
│ Searched: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\e2e\regression\** │
│ Params: Tag: false, Group: false, Parallel: false │
│ Run URL: https://cloud.cypress.io/projects/1e8aku/runs/1 │
│ Experiments: experimentalMemoryManagement=true,experimentalStudio=true │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 01_LoginPage/ex-3313-invalid-credentials.spec.ts (1 of 113)
Login with invalid credentialsFri Aug 11 2023 20:05:31 GMT+0000 (Greenwich Mean Time)
Login with invalid credentialsFri Aug 11 2023 20:05:31 GMT+0000 (Greenwich Mean Time)
√ EX-3313 - Login with invalid credentials.Fri Aug 11 2023 20:05:31 GMT+0000 (Greenwich Mean Time) (11549ms)
√ EX-3313 - Login with invalid credentials.Fri Aug 11 2023 20:05:31 GMT+0000 (Greenwich Mean Time) (11549ms)
1 passing (12s)
1 passing (12s)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 11 seconds │
│ Spec Ran: 01_LoginPage/ex-3313-invalid-credentials.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 01_LoginPage/ex-3316-email-input-validation.spec.ts (2 of 113)
3316 | Verify data input validation for emailFri Aug 11 2023 20:05:48 GMT+0000 (Greenwich Mean Time)
3316 | Verify data input validation for emailFri Aug 11 2023 20:05:48 GMT+0000 (Greenwich Mean Time)
√ 3316 - Verify data input validation for emailFri Aug 11 2023 20:05:48 GMT+0000 (Greenwich Mean Time) (8207ms)
√ 3316 - Verify data input validation for emailFri Aug 11 2023 20:05:48 GMT+0000 (Greenwich Mean Time) (8207ms)
1 passing (8s)
1 passing (8s)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_001.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 8 seconds │
│ Spec Ran: 01_LoginPage/ex-3316-email-input-validation.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 01_LoginPage/ex-5751-create-new-account-with-already-used-email.spec (3 of 113)
.ts
Account Creation | Prevent users from creating separate accounts with same email domainFri Aug 11 2023 20:06:01 GMT+0000 (Greenwich Mean Time)
Account Creation | Prevent users from creating separate accounts with same email domainFri Aug 11 2023 20:06:01 GMT+0000 (Greenwich Mean Time)
√ EX-5751 - Create account with email that is already associated with existing Extracker account.Fri Aug 11 2023 20:06:01 GMT+0000 (Greenwich Mean Time) (11211ms)
√ EX-5751 - Create account with email that is already associated with existing Extracker account.Fri Aug 11 2023 20:06:01 GMT+0000 (Greenwich Mean Time) (11211ms)
1 passing (11s)
1 passing (11s)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_002.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 11 seconds │
│ Spec Ran: 01_LoginPage/ex-5751-create-new-account-with-already-used-email.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Add_users_to_Project/EX-9394-GC-creates-project- (4 of 113)
adds-new-customer-user.spec.ts
Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fields. Fri Aug 11 2023 20:06:16 GMT+0000 (Greenwich Mean Time)
Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fields. Fri Aug 11 2023 20:06:16 GMT+0000 (Greenwich Mean Time)
√ EX-9394 - Part 1: Create a project. : Fri Aug 11 2023 20:06:16 GMT+0000 (Greenwich Mean Time) (50749ms)
√ EX-9394 - Part 1: Create a project. : Fri Aug 11 2023 20:06:16 GMT+0000 (Greenwich Mean Time) (50749ms)
1) EX-9394 - Part 2: Add new Customer to the project.Fri Aug 11 2023 20:06:16 GMT+0000 (Greenwich Mean Time)
1) EX-9394 - Part 2: Add new Customer to the project.Fri Aug 11 2023 20:06:16 GMT+0000 (Greenwich Mean Time)
√ EX-9394 - Part 3: Cleanup GC... Fri Aug 11 2023 20:06:16 GMT+0000 (Greenwich Mean Time) (42413ms)
√ EX-9394 - Part 3: Cleanup GC... Fri Aug 11 2023 20:06:16 GMT+0000 (Greenwich Mean Time) (42413ms)
2 passing (3m)
1 failing
1) Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fields. Fri Aug 11 2023 20:06:16 GMT+0000 (Greenwich Mean Time)
EX-9394 - Part 2: Add new Customer to the project.Fri Aug 11 2023 20:06:16 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test User' within the selector: 'td' but never did.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34)
2 passing (3m)
1 failing
1) Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fields. Fri Aug 11 2023 20:06:16 GMT+0000 (Greenwich Mean Time)
EX-9394 - Part 2: Add new Customer to the project.Fri Aug 11 2023 20:06:16 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test User' within the selector: 'td' but never did.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_003.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 3 │
│ Passing: 2 │
│ Failing: 1 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 1 │
│ Video: false │
│ Duration: 2 minutes, 35 seconds │
│ Spec Ran: 02_PermissionLevels/Add_users_to_Project/EX-9394-GC-creates-project-adds-new-cus │
│ tomer-user.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587)
issionLevels\Add_users_to_Project\EX-9394-GC-creates-project-adds-new-customer-u
ser.spec.ts\Add Customer Add a new user as customer to the project with all man
datory and non mandatory fields. Fri Aug 11 2023 200616 GMT+0000 (Greenwich Mean
Time) -- EX-9394 - Part 2 Add new Customer to the project.Fri Aug 11 2023 20061
6 GMT+0000 (Greenwich .png
(Uploading Screenshots & Videos)
- Done Uploading (1/1) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\Add_users_to_Project\EX-9394-GC-creates-project-adds-new-customer-user.spec.ts\Add Customer Add a new user as customer to the project with all mandatory and non mandatory fields. Fri Aug 11 2023 200616 GMT+0000 (Greenwich Mean Time) -- EX-9394 - Part 2 Add new Customer to the project.Fri Aug 11 2023 200616 GMT+0000 (Greenwich .png
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Create_Project/ex-3323-create-new-project-as-own (5 of 113)
er-in-owner-company.spec.ts
Create New Project in Owner Company as Account Owner, using only mandatory data.Fri Aug 11 2023 20:08:57 GMT+0000 (Greenwich Mean Time)
Create New Project in Owner Company as Account Owner, using only mandatory data.Fri Aug 11 2023 20:08:57 GMT+0000 (Greenwich Mean Time)
√ EX-3323 - Create a project in Owner Company as Account Owner.Fri Aug 11 2023 20:08:57 GMT+0000 (Greenwich Mean Time) (51935ms)
√ EX-3323 - Create a project in Owner Company as Account Owner.Fri Aug 11 2023 20:08:57 GMT+0000 (Greenwich Mean Time) (51935ms)
√ EX-3323 - Cleanup...Fri Aug 11 2023 20:08:57 GMT+0000 (Greenwich Mean Time) (32777ms)
√ EX-3323 - Cleanup...Fri Aug 11 2023 20:08:57 GMT+0000 (Greenwich Mean Time) (32777ms)
2 passing (1m)
2 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_004.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 24 seconds │
│ Spec Ran: 02_PermissionLevels/Create_Project/ex-3323-create-new-project-as-owner-in-owner- │
│ company.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Create_Project/ex-3328-create-new-project-as-own (6 of 113)
er-in-sc-company.spec.ts
Create New Project in SC Company as Account Owner, using only mandatory data.Fri Aug 11 2023 20:10:26 GMT+0000 (Greenwich Mean Time)
Create New Project in SC Company as Account Owner, using only mandatory data.Fri Aug 11 2023 20:10:26 GMT+0000 (Greenwich Mean Time)
√ EX-3328 - Create a project in SC Company as Account Owner.Fri Aug 11 2023 20:10:26 GMT+0000 (Greenwich Mean Time) (49542ms)
√ EX-3328 - Create a project in SC Company as Account Owner.Fri Aug 11 2023 20:10:26 GMT+0000 (Greenwich Mean Time) (49542ms)
√ EX-3328 - Cleanup...Fri Aug 11 2023 20:10:26 GMT+0000 (Greenwich Mean Time) (31374ms)
√ EX-3328 - Cleanup...Fri Aug 11 2023 20:10:26 GMT+0000 (Greenwich Mean Time) (31374ms)
2 passing (1m)
2 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_005.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 21 seconds │
│ Spec Ran: 02_PermissionLevels/Create_Project/ex-3328-create-new-project-as-owner-in-sc-com │
│ pany.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Create_Project/ex-3329-create-new-project-as-own (7 of 113)
er-in-other-company.spec.ts
Create New Project in Other Company as Account Owner, using only mandatory data.Fri Aug 11 2023 20:11:51 GMT+0000 (Greenwich Mean Time)
Create New Project in Other Company as Account Owner, using only mandatory data.Fri Aug 11 2023 20:11:51 GMT+0000 (Greenwich Mean Time)
√ EX-3329 - Create a project in Other Company as Account Owner.Fri Aug 11 2023 20:11:51 GMT+0000 (Greenwich Mean Time) (50147ms)
√ EX-3329 - Create a project in Other Company as Account Owner.Fri Aug 11 2023 20:11:51 GMT+0000 (Greenwich Mean Time) (50147ms)
√ EX-3329 - Cleanup...Fri Aug 11 2023 20:11:51 GMT+0000 (Greenwich Mean Time) (30558ms)
√ EX-3329 - Cleanup...Fri Aug 11 2023 20:11:51 GMT+0000 (Greenwich Mean Time) (30558ms)
2 passing (1m)
2 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_006.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 20 seconds │
│ Spec Ran: 02_PermissionLevels/Create_Project/ex-3329-create-new-project-as-owner-in-other- │
│ company.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Create_Project/ex-3330-create-new-project-as-adm (8 of 113)
in-in-owner-company.spec.ts
Create New Project in Owner Company as Admin, using only mandatory data.Fri Aug 11 2023 20:13:17 GMT+0000 (Greenwich Mean Time)
Create New Project in Owner Company as Admin, using only mandatory data.Fri Aug 11 2023 20:13:17 GMT+0000 (Greenwich Mean Time)
√ EX-3330 - Create a project in Owner Company as Admin.Fri Aug 11 2023 20:13:17 GMT+0000 (Greenwich Mean Time) (50373ms)
√ EX-3330 - Create a project in Owner Company as Admin.Fri Aug 11 2023 20:13:17 GMT+0000 (Greenwich Mean Time) (50373ms)
√ EX-3330 - Cleanup...Fri Aug 11 2023 20:13:17 GMT+0000 (Greenwich Mean Time) (31673ms)
√ EX-3330 - Cleanup...Fri Aug 11 2023 20:13:17 GMT+0000 (Greenwich Mean Time) (31673ms)
2 passing (1m)
2 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_007.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 22 seconds │
│ Spec Ran: 02_PermissionLevels/Create_Project/ex-3330-create-new-project-as-admin-in-owner- │
│ company.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Create_Project/ex-3331-create-new-project-as-adm (9 of 113)
in-in-gc-company.spec.ts
EX-3331 | Create New Project in General Contractor Company as Admin, using only mandatory data. Fri Aug 11 2023 20:14:44 GMT+0000 (Greenwich Mean Time)
EX-3331 | Create New Project in General Contractor Company as Admin, using only mandatory data. Fri Aug 11 2023 20:14:44 GMT+0000 (Greenwich Mean Time)
√ EX-3331 - Fri Aug 11 2023 20:14:44 GMT+0000 (Greenwich Mean Time) (53425ms)
√ EX-3331 - Fri Aug 11 2023 20:14:44 GMT+0000 (Greenwich Mean Time) (53425ms)
√ EX-3331 - Cleanup...Fri Aug 11 2023 20:14:44 GMT+0000 (Greenwich Mean Time) (35129ms)
√ EX-3331 - Cleanup...Fri Aug 11 2023 20:14:44 GMT+0000 (Greenwich Mean Time) (35129ms)
2 passing (1m)
2 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_008.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 28 seconds │
│ Spec Ran: 02_PermissionLevels/Create_Project/ex-3331-create-new-project-as-admin-in-gc-com │
│ pany.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Create_Project/ex-3332-create-new-project-as-pm- (10 of 113)
in-gc-company.spec.ts
Create New Project in General Contractor Company as Project Manageer, using only mandatory data.Fri Aug 11 2023 20:16:17 GMT+0000 (Greenwich Mean Time)
Create New Project in General Contractor Company as Project Manageer, using only mandatory data.Fri Aug 11 2023 20:16:17 GMT+0000 (Greenwich Mean Time)
√ EX-3332 - Create a projct in General Contractor Company as Project Manageer.Fri Aug 11 2023 20:16:17 GMT+0000 (Greenwich Mean Time) (49970ms)
√ EX-3332 - Create a projct in General Contractor Company as Project Manageer.Fri Aug 11 2023 20:16:17 GMT+0000 (Greenwich Mean Time) (49970ms)
√ EX-3332 - Cleanup...Fri Aug 11 2023 20:16:17 GMT+0000 (Greenwich Mean Time) (38824ms)
√ EX-3332 - Cleanup...Fri Aug 11 2023 20:16:17 GMT+0000 (Greenwich Mean Time) (38824ms)
2 passing (1m)
2 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_009.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 28 seconds │
│ Spec Ran: 02_PermissionLevels/Create_Project/ex-3332-create-new-project-as-pm-in-gc-compan │
│ y.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Create_Project/ex-3333-create-new-project-as-fu- (11 of 113)
in-gc-company.spec.ts
Create New Project in General Contractor Company as Field User, using only mandatory data.Fri Aug 11 2023 20:17:50 GMT+0000 (Greenwich Mean Time)
Create New Project in General Contractor Company as Field User, using only mandatory data.Fri Aug 11 2023 20:17:50 GMT+0000 (Greenwich Mean Time)
√ EX-3333 - Create a project in General Contractor Company as Field UserFri Aug 11 2023 20:17:50 GMT+0000 (Greenwich Mean Time) (52772ms)
√ EX-3333 - Create a project in General Contractor Company as Field UserFri Aug 11 2023 20:17:50 GMT+0000 (Greenwich Mean Time) (52772ms)
√ EX-3333 - Cleanup...Fri Aug 11 2023 20:17:50 GMT+0000 (Greenwich Mean Time) (35396ms)
√ EX-3333 - Cleanup...Fri Aug 11 2023 20:17:50 GMT+0000 (Greenwich Mean Time) (35396ms)
2 passing (1m)
2 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_010.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 28 seconds │
│ Spec Ran: 02_PermissionLevels/Create_Project/ex-3333-create-new-project-as-fu-in-gc-compan │
│ y.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Create_Project/ex-3334-create-new-project-as-pm- (12 of 113)
in-owner-company.spec.ts
Create New Project in Owner Company as Project Manager, using only mandatory data.Fri Aug 11 2023 20:19:23 GMT+0000 (Greenwich Mean Time)
Create New Project in Owner Company as Project Manager, using only mandatory data.Fri Aug 11 2023 20:19:23 GMT+0000 (Greenwich Mean Time)
√ EX-3334 - Creaet a project in Owner Company as Project Manager. Fri Aug 11 2023 20:19:23 GMT+0000 (Greenwich Mean Time) (49636ms)
√ EX-3334 - Creaet a project in Owner Company as Project Manager. Fri Aug 11 2023 20:19:23 GMT+0000 (Greenwich Mean Time) (49636ms)
√ EX-3334 - Cleanup...Fri Aug 11 2023 20:19:23 GMT+0000 (Greenwich Mean Time) (31464ms)
√ EX-3334 - Cleanup...Fri Aug 11 2023 20:19:23 GMT+0000 (Greenwich Mean Time) (31464ms)
2 passing (1m)
2 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_011.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 21 seconds │
│ Spec Ran: 02_PermissionLevels/Create_Project/ex-3334-create-new-project-as-pm-in-owner-com │
│ pany.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Create_Project/ex-3335-create-new-project-as-fu- (13 of 113)
in-owner-company.spec.ts
Create New Project in Owner Company as Field User, using only mandatory data.Fri Aug 11 2023 20:20:49 GMT+0000 (Greenwich Mean Time)
Create New Project in Owner Company as Field User, using only mandatory data.Fri Aug 11 2023 20:20:49 GMT+0000 (Greenwich Mean Time)
√ EX-3335 - Create a project in Owner Company as Field User.Fri Aug 11 2023 20:20:49 GMT+0000 (Greenwich Mean Time) (49119ms)
√ EX-3335 - Create a project in Owner Company as Field User.Fri Aug 11 2023 20:20:49 GMT+0000 (Greenwich Mean Time) (49119ms)
√ EX-3335 - Cleanup...Fri Aug 11 2023 20:20:49 GMT+0000 (Greenwich Mean Time) (33119ms)
√ EX-3335 - Cleanup...Fri Aug 11 2023 20:20:49 GMT+0000 (Greenwich Mean Time) (33119ms)
2 passing (1m)
2 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_012.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 22 seconds │
│ Spec Ran: 02_PermissionLevels/Create_Project/ex-3335-create-new-project-as-fu-in-owner-com │
│ pany.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Create_Project/ex-3336-create-new-project-as-adm (14 of 113)
in-in-sc-company.spec.ts
Create New Project in SC Company as Admin, using only mandatory data.Fri Aug 11 2023 20:22:15 GMT+0000 (Greenwich Mean Time)
Create New Project in SC Company as Admin, using only mandatory data.Fri Aug 11 2023 20:22:15 GMT+0000 (Greenwich Mean Time)
√ EX-3336 - Create project in SC Company as Admin.Fri Aug 11 2023 20:22:15 GMT+0000 (Greenwich Mean Time) (55917ms)
√ EX-3336 - Create project in SC Company as Admin.Fri Aug 11 2023 20:22:15 GMT+0000 (Greenwich Mean Time) (55917ms)
√ EX-3336 - Cleanup...Fri Aug 11 2023 20:22:15 GMT+0000 (Greenwich Mean Time) (30687ms)
√ EX-3336 - Cleanup...Fri Aug 11 2023 20:22:15 GMT+0000 (Greenwich Mean Time) (30687ms)
2 passing (1m)
2 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_013.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 26 seconds │
│ Spec Ran: 02_PermissionLevels/Create_Project/ex-3336-create-new-project-as-admin-in-sc-com │
│ pany.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Create_Project/ex-3337-create-new-project-as-pm- (15 of 113)
in-sc-company.spec.ts
Create New Project in SC Company as Project Manager, using only mandatory data.Fri Aug 11 2023 20:23:47 GMT+0000 (Greenwich Mean Time)
Create New Project in SC Company as Project Manager, using only mandatory data.Fri Aug 11 2023 20:23:47 GMT+0000 (Greenwich Mean Time)
√ EX-3337Fri Aug 11 2023 20:23:47 GMT+0000 (Greenwich Mean Time) (53084ms)
√ EX-3337Fri Aug 11 2023 20:23:47 GMT+0000 (Greenwich Mean Time) (53084ms)
√ EX-3337 - Cleanup...Fri Aug 11 2023 20:23:47 GMT+0000 (Greenwich Mean Time) (33237ms)
√ EX-3337 - Cleanup...Fri Aug 11 2023 20:23:47 GMT+0000 (Greenwich Mean Time) (33237ms)
2 passing (1m)
2 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_014.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 26 seconds │
│ Spec Ran: 02_PermissionLevels/Create_Project/ex-3337-create-new-project-as-pm-in-sc-compan │
│ y.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Create_Project/ex-3338-create-new-project-as-fu- (16 of 113)
in-sc-company.spec.ts
Create New Project in SC Company as Field User, using only mandatory data.Fri Aug 11 2023 20:25:18 GMT+0000 (Greenwich Mean Time)
Create New Project in SC Company as Field User, using only mandatory data.Fri Aug 11 2023 20:25:18 GMT+0000 (Greenwich Mean Time)
√ EX-3338 - Create a project in SC Company as Field User. Fri Aug 11 2023 20:25:18 GMT+0000 (Greenwich Mean Time) (52525ms)
√ EX-3338 - Create a project in SC Company as Field User. Fri Aug 11 2023 20:25:18 GMT+0000 (Greenwich Mean Time) (52525ms)
√ EX-3338 - Cleanup...Fri Aug 11 2023 20:25:18 GMT+0000 (Greenwich Mean Time) (31380ms)
√ EX-3338 - Cleanup...Fri Aug 11 2023 20:25:18 GMT+0000 (Greenwich Mean Time) (31380ms)
2 passing (1m)
2 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_015.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 24 seconds │
│ Spec Ran: 02_PermissionLevels/Create_Project/ex-3338-create-new-project-as-fu-in-sc-compan │
│ y.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Create_Project/ex-3342-create-new-project-as-adm (17 of 113)
in-in-other-company.spec.ts
Create New Project in Other Company as Admin, using only mandatory data.Fri Aug 11 2023 20:26:47 GMT+0000 (Greenwich Mean Time)
Create New Project in Other Company as Admin, using only mandatory data.Fri Aug 11 2023 20:26:47 GMT+0000 (Greenwich Mean Time)
√ EX-3342 - Create a project in Other Company as Admin. Fri Aug 11 2023 20:26:47 GMT+0000 (Greenwich Mean Time) (49583ms)
√ EX-3342 - Create a project in Other Company as Admin. Fri Aug 11 2023 20:26:47 GMT+0000 (Greenwich Mean Time) (49583ms)
√ EX-3342 - Cleanup...Fri Aug 11 2023 20:26:47 GMT+0000 (Greenwich Mean Time) (28759ms)
√ EX-3342 - Cleanup...Fri Aug 11 2023 20:26:47 GMT+0000 (Greenwich Mean Time) (28759ms)
2 passing (1m)
2 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_016.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 18 seconds │
│ Spec Ran: 02_PermissionLevels/Create_Project/ex-3342-create-new-project-as-admin-in-other- │
│ company.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Create_Project/ex-3343-create-new-project-as-pm- (18 of 113)
in-other-company.spec.ts
Create New Project in Other Company as Project Manager, using only mandatory data.Fri Aug 11 2023 20:28:10 GMT+0000 (Greenwich Mean Time)
Create New Project in Other Company as Project Manager, using only mandatory data.Fri Aug 11 2023 20:28:10 GMT+0000 (Greenwich Mean Time)
√ EX-3343 - Create a project in Other Company as Project Manager.Fri Aug 11 2023 20:28:10 GMT+0000 (Greenwich Mean Time) (49806ms)
√ EX-3343 - Create a project in Other Company as Project Manager.Fri Aug 11 2023 20:28:10 GMT+0000 (Greenwich Mean Time) (49806ms)
√ EX-3343 - Cleanup...Fri Aug 11 2023 20:28:10 GMT+0000 (Greenwich Mean Time) (29931ms)
√ EX-3343 - Cleanup...Fri Aug 11 2023 20:28:10 GMT+0000 (Greenwich Mean Time) (29931ms)
2 passing (1m)
2 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_017.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 19 seconds │
│ Spec Ran: 02_PermissionLevels/Create_Project/ex-3343-create-new-project-as-pm-in-other-com │
│ pany.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Create_Project/ex-3344-create-new-project-as-fu- (19 of 113)
in-other-company.spec.ts
Create New Project in Other Company as Field User, using only mandatory data.Fri Aug 11 2023 20:29:34 GMT+0000 (Greenwich Mean Time)
Create New Project in Other Company as Field User, using only mandatory data.Fri Aug 11 2023 20:29:34 GMT+0000 (Greenwich Mean Time)
√ EX-3344 - Create a project in Other Company as Field User. Fri Aug 11 2023 20:29:34 GMT+0000 (Greenwich Mean Time) (49713ms)
√ EX-3344 - Create a project in Other Company as Field User. Fri Aug 11 2023 20:29:34 GMT+0000 (Greenwich Mean Time) (49713ms)
√ EX-3344 - Cleanup...Fri Aug 11 2023 20:29:34 GMT+0000 (Greenwich Mean Time) (31517ms)
√ EX-3344 - Cleanup...Fri Aug 11 2023 20:29:34 GMT+0000 (Greenwich Mean Time) (31517ms)
2 passing (1m)
2 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_018.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 21 seconds │
│ Spec Ran: 02_PermissionLevels/Create_Project/ex-3344-create-new-project-as-fu-in-other-com │
│ pany.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Project_level/ex-10783-project-level-sent-logs-e (20 of 113)
mail-for-GC-SC.spec.ts
Permissions | Project Level | Default Settings on New Contracts | Set all permissions to False for all company users and verify the permissions are set for new contracts. Fri Aug 11 2023 20:31:00 GMT+0000 (Greenwich Mean Time)
Permissions | Project Level | Default Settings on New Contracts | Set all permissions to False for all company users and verify the permissions are set for new contracts. Fri Aug 11 2023 20:31:00 GMT+0000 (Greenwich Mean Time)
√ EX-10783 - Part1: Create a project and add company users and change the default setting on new contracts to false Fri Aug 11 2023 20:31:00 GMT+0000 (Greenwich Mean Time) (72763ms)
√ EX-10783 - Part1: Create a project and add company users and change the default setting on new contracts to false Fri Aug 11 2023 20:31:00 GMT+0000 (Greenwich Mean Time) (72763ms)
√ Ex-10783 Part2: Create a new contract and verify the default permissions applied to contract (24261ms)
√ Ex-10783 Part2: Create a new contract and verify the default permissions applied to contract (24261ms)
√ EX-10783 - Part3: Set default permissions for new contractors to true Fri Aug 11 2023 20:31:00 GMT+0000 (Greenwich Mean Time) (65738ms)
√ EX-10783 - Part3: Set default permissions for new contractors to true Fri Aug 11 2023 20:31:00 GMT+0000 (Greenwich Mean Time) (65738ms)
√ Ex-10783 Part4: Create a new contract and verify the default permissions applied to contracts (28237ms)
√ Ex-10783 Part4: Create a new contract and verify the default permissions applied to contracts (28237ms)
√ EX-10783 Part5: Cleanup GC... Fri Aug 11 2023 20:31:00 GMT+0000 (Greenwich Mean Time)
√ EX-10783 Part5: Cleanup GC... Fri Aug 11 2023 20:31:00 GMT+0000 (Greenwich Mean Time)
5 passing (3m)
5 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_019.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 5 │
│ Passing: 5 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 15 seconds │
│ Spec Ran: 02_PermissionLevels/Project_level/ex-10783-project-level-sent-logs-email-for-GC- │
│ SC.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Project_level/ex-10797-project-level-sent-logs-e (21 of 113)
mail-for-GC-SC.spec.ts
Permissions | Project Level | Sent Logs & Emails | Verify proper permissions are set in My Company Users per user role for both Customer and Contractor. Fri Aug 11 2023 20:34:21 GMT+0000 (Greenwich Mean Time)
Permissions | Project Level | Sent Logs & Emails | Verify proper permissions are set in My Company Users per user role for both Customer and Contractor. Fri Aug 11 2023 20:34:21 GMT+0000 (Greenwich Mean Time)
√ EX-10797 - Part 1: Create a project. Add company users and verify the defaiult permissions for the user Fri Aug 11 2023 20:34:21 GMT+0000 (Greenwich Mean Time) (45002ms)
√ EX-10797 - Part 1: Create a project. Add company users and verify the defaiult permissions for the user Fri Aug 11 2023 20:34:21 GMT+0000 (Greenwich Mean Time) (45002ms)
√ EX-10797 - Part 2: Login as SC Owner and accept the contract (29050ms)
√ EX-10797 - Part 2: Login as SC Owner and accept the contract (29050ms)
√ EX-10797 - Part 3: Login as SC Admin and accept the contract (28363ms)
√ EX-10797 - Part 3: Login as SC Admin and accept the contract (28363ms)
√ EX-10797 - Part 4: Login as SC PM user and accept the contract (23502ms)
√ EX-10797 - Part 4: Login as SC PM user and accept the contract (23502ms)
√ EX-10797 - Part 5: Login as SC Field user and accept the contract (22196ms)
√ EX-10797 - Part 5: Login as SC Field user and accept the contract (22196ms)
√ EX-10797 - Part 6: Login as SC Owner and verify sc users default permissions (40566ms)
√ EX-10797 - Part 6: Login as SC Owner and verify sc users default permissions (40566ms)
√ EX-10797 - Part 7: Cleanup GC... Fri Aug 11 2023 20:34:21 GMT+0000 (Greenwich Mean Time) (5403ms)
√ EX-10797 - Part 7: Cleanup GC... Fri Aug 11 2023 20:34:21 GMT+0000 (Greenwich Mean Time) (5403ms)
7 passing (3m)
7 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_020.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 7 │
│ Passing: 7 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 14 seconds │
│ Spec Ran: 02_PermissionLevels/Project_level/ex-10797-project-level-sent-logs-email-for-GC- │
│ SC.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/Project_level/ex-10799-project-level-sent-logs-e (22 of 113)
mail-for-GC-SC.spec.ts
Permissions | Project Level | Sent Logs & Emails | Verify the permissions set in My Company Users are applied. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
Permissions | Project Level | Sent Logs & Emails | Verify the permissions set in My Company Users are applied. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 1: Create a project. Add company users and verify the defaiult permissions for the users. Add contract with SC. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (17917ms)
√ EX-10799 - Part 1: Create a project. Add company users and verify the defaiult permissions for the users. Add contract with SC. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (17917ms)
√ EX-10799 Part 2: Login as SC Owner and accept the contract. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (8086ms)
√ EX-10799 Part 2: Login as SC Owner and accept the contract. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (8086ms)
√ EX-10799 - Part 3: Login as SC Admin and accept the contract. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 3: Login as SC Admin and accept the contract. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 4: Login as SC PM user and accept the contract. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (5624ms)
√ EX-10799 - Part 4: Login as SC PM user and accept the contract. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (5624ms)
√ EX-10799 - Part 5: Login as SC Field user and accept the contract. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 5: Login as SC Field user and accept the contract. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 6: Create the T&M tag. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (57487ms)
√ EX-10799 - Part 6: Create the T&M tag. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (57487ms)
√ EX-10799 - Part 7: Login as SC Owner and Verify the tag in Sent Log. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (29761ms)
√ EX-10799 - Part 7: Login as SC Owner and Verify the tag in Sent Log. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (29761ms)
√ EX-10799 - Part 8: Login as SC Admin and Verify the tag in Sent Log. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (42645ms)
√ EX-10799 - Part 8: Login as SC Admin and Verify the tag in Sent Log. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (42645ms)
√ EX-10799 - Part 9: Login as SC PM and Verify the tag in Sent Log. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (26657ms)
√ EX-10799 - Part 9: Login as SC PM and Verify the tag in Sent Log. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (26657ms)
√ EX-10799 - Part 10: Login as SC FU and Verify the tag in Sent Log. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (22158ms)
√ EX-10799 - Part 10: Login as SC FU and Verify the tag in Sent Log. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (22158ms)
√ EX-10799 - Part 11: Verify the GC Admin received Bell Notification and use it to sign the tag. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (29336ms)
√ EX-10799 - Part 11: Verify the GC Admin received Bell Notification and use it to sign the tag. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (29336ms)
√ EX-10799 - Part 12: Verift sc users can receive the email for Tags. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 12: Verift sc users can receive the email for Tags. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 13: Create COR : Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (48838ms)
√ EX-10799 - Part 13: Create COR : Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (48838ms)
√ EX-10799 - Part 14: Verify the COR is in the Sent Log for SC PM user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (34007ms)
√ EX-10799 - Part 14: Verify the COR is in the Sent Log for SC PM user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (34007ms)
√ EX-10799 - Part 15: Verify the COR is in the Sent Log for SC Owner. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (30638ms)
√ EX-10799 - Part 15: Verify the COR is in the Sent Log for SC Owner. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (30638ms)
√ EX-10799 - Part 16: Verify the COR is in the Sent Log for SC Admin. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (37397ms)
√ EX-10799 - Part 16: Verify the COR is in the Sent Log for SC Admin. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (37397ms)
1) EX-10799 - Part 17: Verify the COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
1) EX-10799 - Part 17: Verify the COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 18: Verift sc users can receive the email for COR. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 18: Verift sc users can receive the email for COR. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 19: Upload COR with only mandatory data. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (58720ms)
√ EX-10799 - Part 19: Upload COR with only mandatory data. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (58720ms)
√ EX-10799 - Part 20: Verify the upload COR is in the Sent Log for SC PM user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (31538ms)
√ EX-10799 - Part 20: Verify the upload COR is in the Sent Log for SC PM user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (31538ms)
√ EX-10799 - Part 21: Verify the upload COR is in the Sent Log for SC Owner. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (28324ms)
√ EX-10799 - Part 21: Verify the upload COR is in the Sent Log for SC Owner. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (28324ms)
√ EX-10799 - Part 22: Verify the upload COR is in the Sent Log for SC Admin. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (30789ms)
√ EX-10799 - Part 22: Verify the upload COR is in the Sent Log for SC Admin. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (30789ms)
2) EX-10799 - Part 23: Verify the upload COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
2) EX-10799 - Part 23: Verify the upload COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 24: Verift sc users can receive the email for Upload COR. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 24: Verift sc users can receive the email for Upload COR. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 25: Create Lum Sum COR. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (73651ms)
√ EX-10799 - Part 25: Create Lum Sum COR. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (73651ms)
√ EX-10799 - Part 26: Verify the Lum Sum COR is in the Sent Log for SC PM user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (35406ms)
√ EX-10799 - Part 26: Verify the Lum Sum COR is in the Sent Log for SC PM user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (35406ms)
√ EX-10799 - Part 27: Verify the Lum Sum COR is in the Sent Log for SC Owner. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (26908ms)
√ EX-10799 - Part 27: Verify the Lum Sum COR is in the Sent Log for SC Owner. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (26908ms)
√ EX-10799 - Part 28: Verify the Lum Sum COR is in the Sent Log for SC Admin. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (37525ms)
√ EX-10799 - Part 28: Verify the Lum Sum COR is in the Sent Log for SC Admin. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (37525ms)
√ EX-10799 - Part 29: Verify the Lum Sum COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (23898ms)
√ EX-10799 - Part 29: Verify the Lum Sum COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (23898ms)
√ EX-10799 - Part 30: Verify the SC users receive the email for Lum Sum COR. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 30: Verify the SC users receive the email for Lum Sum COR. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 31: Create contractor COR. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (69709ms)
√ EX-10799 - Part 31: Create contractor COR. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (69709ms)
√ EX-10799 - Part 32: Verify the contractor COR is in the Sent Log for SC PM user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (36003ms)
√ EX-10799 - Part 32: Verify the contractor COR is in the Sent Log for SC PM user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (36003ms)
√ EX-10799 - Part 33: Verify the contractor COR is in the Sent Log for SC Owner. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (36832ms)
√ EX-10799 - Part 33: Verify the contractor COR is in the Sent Log for SC Owner. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (36832ms)
√ EX-10799 - Part 34: Verify the contractor COR is in the Sent Log for SC Admin. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (36776ms)
√ EX-10799 - Part 34: Verify the contractor COR is in the Sent Log for SC Admin. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (36776ms)
3) EX-10799 - Part 35: Verify the contractor COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
3) EX-10799 - Part 35: Verify the contractor COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 36: Verift sc users can receive the email for Upload contract COR. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 36: Verift sc users can receive the email for Upload contract COR. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 37: Upload backcharge COR. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (65035ms)
√ EX-10799 - Part 37: Upload backcharge COR. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (65035ms)
√ EX-10799 - Part 38: Verify the backcharge COR is in the Sent Log for SC PM user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (37318ms)
√ EX-10799 - Part 38: Verify the backcharge COR is in the Sent Log for SC PM user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (37318ms)
√ EX-10799 - Part 39: Verify the backcharge COR is in the Sent Log for SC Owner. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (39624ms)
√ EX-10799 - Part 39: Verify the backcharge COR is in the Sent Log for SC Owner. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (39624ms)
√ EX-10799 - Part 40: Verify the backcharge COR is in the Sent Log for SC Admin. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (36522ms)
√ EX-10799 - Part 40: Verify the backcharge COR is in the Sent Log for SC Admin. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (36522ms)
4) EX-10799 - Part 41: Verify the backcharge COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
4) EX-10799 - Part 41: Verify the backcharge COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 42: Verift sc users can receive the email for Upload backcharge. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 42: Verift sc users can receive the email for Upload backcharge. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
√ EX-10799 - Part 43: Cleanup GC... Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (5315ms)
√ EX-10799 - Part 43: Cleanup GC... Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time) (5315ms)
39 passing (22m)
4 failing
1) Permissions | Project Level | Sent Logs & Emails | Verify the permissions set in My Company Users are applied. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
EX-10799 - Part 17: Verify the COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:244:21)
2) Permissions | Project Level | Sent Logs & Emails | Verify the permissions set in My Company Users are applied. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
EX-10799 - Part 23: Verify the upload COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:244:21)
3) Permissions | Project Level | Sent Logs & Emails | Verify the permissions set in My Company Users are applied. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
EX-10799 - Part 35: Verify the contractor COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:244:21)
4) Permissions | Project Level | Sent Logs & Emails | Verify the permissions set in My Company Users are applied. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
EX-10799 - Part 41: Verify the backcharge COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:244:21)
39 passing (22m)
4 failing
1) Permissions | Project Level | Sent Logs & Emails | Verify the permissions set in My Company Users are applied. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
EX-10799 - Part 17: Verify the COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:244:21)
2) Permissions | Project Level | Sent Logs & Emails | Verify the permissions set in My Company Users are applied. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
EX-10799 - Part 23: Verify the upload COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:244:21)
3) Permissions | Project Level | Sent Logs & Emails | Verify the permissions set in My Company Users are applied. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
EX-10799 - Part 35: Verify the contractor COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:244:21)
4) Permissions | Project Level | Sent Logs & Emails | Verify the permissions set in My Company Users are applied. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time)
EX-10799 - Part 41: Verify the backcharge COR is in the Sent Log for SC Field user. Fri Aug 11 2023 20:37:42 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:244:21)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_021.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 43 │
│ Passing: 39 │
│ Failing: 4 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 4 │
│ Video: false │
│ Duration: 21 minutes, 44 seconds │
│ Spec Ran: 02_PermissionLevels/Project_level/ex-10799-project-level-sent-logs-email-for-GC- │
│ SC.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587)
issionLevels\Project_level\ex-10799-project-level-sent-logs-email-for-GC-SC.spec
.ts\Permissions Project Level Sent Logs & Emails Verify the permissions set i
n My Company Users are applied. Fri Aug 11 2023 203742 GMT+0000 (Greenwich Mean
Time) -- EX-10799 - Part 17 Verify the COR is in the Sent Log for SC Field user.
Fri Aug 11 20.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587)
issionLevels\Project_level\ex-10799-project-level-sent-logs-email-for-GC-SC.spec
.ts\Permissions Project Level Sent Logs & Emails Verify the permissions set i
n My Company Users are applied. Fri Aug 11 2023 203742 GMT+0000 (Greenwich Mean
Time) -- EX-10799 - Part 23 Verify the upload COR is in the Sent Log for SC Fiel
d user. Fri Au.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587)
issionLevels\Project_level\ex-10799-project-level-sent-logs-email-for-GC-SC.spec
.ts\Permissions Project Level Sent Logs & Emails Verify the permissions set i
n My Company Users are applied. Fri Aug 11 2023 203742 GMT+0000 (Greenwich Mean
Time) -- EX-10799 - Part 35 Verify the contractor COR is in the Sent Log for SC
Field user. Fr.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587)
issionLevels\Project_level\ex-10799-project-level-sent-logs-email-for-GC-SC.spec
.ts\Permissions Project Level Sent Logs & Emails Verify the permissions set i
n My Company Users are applied. Fri Aug 11 2023 203742 GMT+0000 (Greenwich Mean
Time) -- EX-10799 - Part 41 Verify the backcharge COR is in the Sent Log for SC
Field user. Fr.png
(Uploading Screenshots & Videos)
- Done Uploading (1/4) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\Project_level\ex-10799-project-level-sent-logs-email-for-GC-SC.spec.ts\Permissions Project Level Sent Logs & Emails Verify the permissions set in My Company Users are applied. Fri Aug 11 2023 203742 GMT+0000 (Greenwich Mean Time) -- EX-10799 - Part 17 Verify the COR is in the Sent Log for SC Field user. Fri Aug 11 20.png
- Done Uploading (2/4) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\Project_level\ex-10799-project-level-sent-logs-email-for-GC-SC.spec.ts\Permissions Project Level Sent Logs & Emails Verify the permissions set in My Company Users are applied. Fri Aug 11 2023 203742 GMT+0000 (Greenwich Mean Time) -- EX-10799 - Part 23 Verify the upload COR is in the Sent Log for SC Field user. Fri Au.png
- Done Uploading (3/4) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\Project_level\ex-10799-project-level-sent-logs-email-for-GC-SC.spec.ts\Permissions Project Level Sent Logs & Emails Verify the permissions set in My Company Users are applied. Fri Aug 11 2023 203742 GMT+0000 (Greenwich Mean Time) -- EX-10799 - Part 41 Verify the backcharge COR is in the Sent Log for SC Field user. Fr.png
- Done Uploading (4/4) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\Project_level\ex-10799-project-level-sent-logs-email-for-GC-SC.spec.ts\Permissions Project Level Sent Logs & Emails Verify the permissions set in My Company Users are applied. Fri Aug 11 2023 203742 GMT+0000 (Greenwich Mean Time) -- EX-10799 - Part 35 Verify the contractor COR is in the Sent Log for SC Field user. Fr.png
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9792-GC-account-owner-user-previll (23 of 113)
eges.spec.ts
User Role permissions| GC Account Owner | Login and verify users access privileges. Fri Aug 11 2023 20:59:34 GMT+0000 (Greenwich Mean Time)
User Role permissions| GC Account Owner | Login and verify users access privileges. Fri Aug 11 2023 20:59:34 GMT+0000 (Greenwich Mean Time)
√ EX-9792 - Part 1: SignUp. Fri Aug 11 2023 20:59:34 GMT+0000 (Greenwich Mean Time) (18104ms)
√ EX-9792 - Part 1: SignUp. Fri Aug 11 2023 20:59:34 GMT+0000 (Greenwich Mean Time) (18104ms)
√ EX-9792 - Part 2: Verify the confirmation email. Fri Aug 11 2023 20:59:57 GMT+0000 (Greenwich Mean Time)
√ EX-9792 - Part 2: Verify the confirmation email. Fri Aug 11 2023 20:59:57 GMT+0000 (Greenwich Mean Time)
√ EX-9792 - Part 3: Create your account | Select, This is my company. Fri Aug 11 2023 21:00:02 GMT+0000 (Greenwich Mean Time) (20258ms)
√ EX-9792 - Part 3: Create your account | Select, This is my company. Fri Aug 11 2023 21:00:02 GMT+0000 (Greenwich Mean Time) (20258ms)
√ EX-9792 - Part 4: Change the role to Account owner Fri Aug 11 2023 21:00:27 GMT+0000 (Greenwich Mean Time) (23294ms)
√ EX-9792 - Part 4: Change the role to Account owner Fri Aug 11 2023 21:00:27 GMT+0000 (Greenwich Mean Time) (23294ms)
√ EX-9792 - Part 5: Login as GC Account Owner and verify user privilegesFri Aug 11 2023 21:00:27 GMT+0000 (Greenwich Mean Time) (42409ms)
√ EX-9792 - Part 5: Login as GC Account Owner and verify user privilegesFri Aug 11 2023 21:00:27 GMT+0000 (Greenwich Mean Time) (42409ms)
√ EX-9792 - Part 6: Delete the account from the company. Fri Aug 11 2023 21:00:27 GMT+0000 (Greenwich Mean Time) (12262ms)
√ EX-9792 - Part 6: Delete the account from the company. Fri Aug 11 2023 21:00:27 GMT+0000 (Greenwich Mean Time) (12262ms)
6 passing (2m)
6 passing (2m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_022.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 6 │
│ Passing: 6 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 2 minutes, 11 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9792-GC-account-owner-user-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9793-GC-Owner-project-previlleges. (24 of 113)
spec.ts
User Role permissions| GC Account owner | Login as GC Account owner and create project and verify user privilegesFri Aug 11 2023 21:01:51 GMT+0000 (Greenwich Mean Time)
User Role permissions| GC Account owner | Login as GC Account owner and create project and verify user privilegesFri Aug 11 2023 21:01:51 GMT+0000 (Greenwich Mean Time)
√ EX-9793 - Part 1: Create a project Fri Aug 11 2023 21:01:51 GMT+0000 (Greenwich Mean Time) (50632ms)
√ EX-9793 - Part 1: Create a project Fri Aug 11 2023 21:01:51 GMT+0000 (Greenwich Mean Time) (50632ms)
√ EX-9793 - Part 2: Edit the project details and change the nameFri Aug 11 2023 21:01:51 GMT+0000 (Greenwich Mean Time) (30313ms)
√ EX-9793 - Part 2: Edit the project details and change the nameFri Aug 11 2023 21:01:51 GMT+0000 (Greenwich Mean Time) (30313ms)
√ EX-9793 - Part 3: Add customer to the Project. Fri Aug 11 2023 21:01:51 GMT+0000 (Greenwich Mean Time) (32913ms)
√ EX-9793 - Part 3: Add customer to the Project. Fri Aug 11 2023 21:01:51 GMT+0000 (Greenwich Mean Time) (32913ms)
√ EX-9793 - Part 4: Verify the invitation email for customerFri Aug 11 2023 21:03:50 GMT+0000 (Greenwich Mean Time)
√ EX-9793 - Part 4: Verify the invitation email for customerFri Aug 11 2023 21:03:50 GMT+0000 (Greenwich Mean Time)
√ EX-9793 - Part 5: Add company user to the Project. Fri Aug 11 2023 21:03:56 GMT+0000 (Greenwich Mean Time) (41340ms)
√ EX-9793 - Part 5: Add company user to the Project. Fri Aug 11 2023 21:03:56 GMT+0000 (Greenwich Mean Time) (41340ms)
√ EX-9793 - Part 6: Verify company user can access project. Fri Aug 11 2023 21:03:56 GMT+0000 (Greenwich Mean Time) (24737ms)
√ EX-9793 - Part 6: Verify company user can access project. Fri Aug 11 2023 21:03:56 GMT+0000 (Greenwich Mean Time) (24737ms)
√ EX-9793 - Part 7: Add Contract with a user to the project. Fri Aug 11 2023 21:03:56 GMT+0000 (Greenwich Mean Time) (28712ms)
√ EX-9793 - Part 7: Add Contract with a user to the project. Fri Aug 11 2023 21:03:56 GMT+0000 (Greenwich Mean Time) (28712ms)
√ EX-9793 - Part 8: Verify email invitation for contractor user Fri Aug 11 2023 21:05:35 GMT+0000 (Greenwich Mean Time)
√ EX-9793 - Part 8: Verify email invitation for contractor user Fri Aug 11 2023 21:05:35 GMT+0000 (Greenwich Mean Time)
√ EX-9793 - Part 9: Add additional user to existing contract of the project. Fri Aug 11 2023 21:05:39 GMT+0000 (Greenwich Mean Time) (38847ms)
√ EX-9793 - Part 9: Add additional user to existing contract of the project. Fri Aug 11 2023 21:05:39 GMT+0000 (Greenwich Mean Time) (38847ms)
√ EX-9793 - Part 10: Verify email invitation for additional contract user Fri Aug 11 2023 21:06:22 GMT+0000 (Greenwich Mean Time)
√ EX-9793 - Part 10: Verify email invitation for additional contract user Fri Aug 11 2023 21:06:22 GMT+0000 (Greenwich Mean Time)
√ Ex-9793 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesFri Aug 11 2023 21:06:26 GMT+0000 (Greenwich Mean Time) (33377ms)
√ Ex-9793 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesFri Aug 11 2023 21:06:26 GMT+0000 (Greenwich Mean Time) (33377ms)
√ EX-9793 - Part12: Clean up Project Fri Aug 11 2023 21:06:26 GMT+0000 (Greenwich Mean Time) (34884ms)
√ EX-9793 - Part12: Clean up Project Fri Aug 11 2023 21:06:26 GMT+0000 (Greenwich Mean Time) (34884ms)
12 passing (6m)
12 passing (6m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_023.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 12 │
│ Passing: 12 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 43 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9793-GC-Owner-project-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9828-GC-admin-user-previlleges.spe (25 of 113)
c.ts
User Role permissions| GC Admin | Login and verify users access privilegesFri Aug 11 2023 21:07:40 GMT+0000 (Greenwich Mean Time)
User Role permissions| GC Admin | Login and verify users access privilegesFri Aug 11 2023 21:07:40 GMT+0000 (Greenwich Mean Time)
√ EX-9828 - Part 1: SignUp. Fri Aug 11 2023 21:07:40 GMT+0000 (Greenwich Mean Time) (16397ms)
√ EX-9828 - Part 1: SignUp. Fri Aug 11 2023 21:07:40 GMT+0000 (Greenwich Mean Time) (16397ms)
√ EX-9828 - Part 2: Verify the confirmation email. Fri Aug 11 2023 21:08:01 GMT+0000 (Greenwich Mean Time)
√ EX-9828 - Part 2: Verify the confirmation email. Fri Aug 11 2023 21:08:01 GMT+0000 (Greenwich Mean Time)
√ EX-9828 - Part 3: Create your account | Select, This is my company. Fri Aug 11 2023 21:08:07 GMT+0000 (Greenwich Mean Time) (19649ms)
√ EX-9828 - Part 3: Create your account | Select, This is my company. Fri Aug 11 2023 21:08:07 GMT+0000 (Greenwich Mean Time) (19649ms)
√ EX-9828 - Part 4: Change the role to Account Admin Fri Aug 11 2023 21:08:31 GMT+0000 (Greenwich Mean Time) (21138ms)
√ EX-9828 - Part 4: Change the role to Account Admin Fri Aug 11 2023 21:08:31 GMT+0000 (Greenwich Mean Time) (21138ms)
√ EX-9828 - Part 5: Login as GC Account Admin and verify user privilegesFri Aug 11 2023 21:08:31 GMT+0000 (Greenwich Mean Time) (40862ms)
√ EX-9828 - Part 5: Login as GC Account Admin and verify user privilegesFri Aug 11 2023 21:08:31 GMT+0000 (Greenwich Mean Time) (40862ms)
√ EX-9828 - Part 6: Delete the account from the company. Fri Aug 11 2023 21:08:31 GMT+0000 (Greenwich Mean Time) (13731ms)
√ EX-9828 - Part 6: Delete the account from the company. Fri Aug 11 2023 21:08:31 GMT+0000 (Greenwich Mean Time) (13731ms)
6 passing (2m)
6 passing (2m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_024.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 6 │
│ Passing: 6 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 2 minutes, 7 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9828-GC-admin-user-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9829-GC-PM-user-previlleges.spec.t (26 of 113)
s
User Role permissions| GC PM | Login and verify users access privilegesFri Aug 11 2023 21:09:52 GMT+0000 (Greenwich Mean Time)
User Role permissions| GC PM | Login and verify users access privilegesFri Aug 11 2023 21:09:52 GMT+0000 (Greenwich Mean Time)
√ EX-9829 - Part 1: SignUp. Fri Aug 11 2023 21:09:52 GMT+0000 (Greenwich Mean Time) (16203ms)
√ EX-9829 - Part 1: SignUp. Fri Aug 11 2023 21:09:52 GMT+0000 (Greenwich Mean Time) (16203ms)
√ EX-9829 - Part 2: Verify the confirmation email. Fri Aug 11 2023 21:10:13 GMT+0000 (Greenwich Mean Time)
√ EX-9829 - Part 2: Verify the confirmation email. Fri Aug 11 2023 21:10:13 GMT+0000 (Greenwich Mean Time)
√ EX-9829 - Part 3: Create your account | Select, This is my company. Fri Aug 11 2023 21:10:19 GMT+0000 (Greenwich Mean Time) (13935ms)
√ EX-9829 - Part 3: Create your account | Select, This is my company. Fri Aug 11 2023 21:10:19 GMT+0000 (Greenwich Mean Time) (13935ms)
√ EX-9829 - Part 4: Change the role to Project Manager Fri Aug 11 2023 21:10:37 GMT+0000 (Greenwich Mean Time) (20836ms)
√ EX-9829 - Part 4: Change the role to Project Manager Fri Aug 11 2023 21:10:37 GMT+0000 (Greenwich Mean Time) (20836ms)
√ EX-9829 - Part 5: Login as GC PM and verify user privilegesFri Aug 11 2023 21:10:37 GMT+0000 (Greenwich Mean Time) (39464ms)
√ EX-9829 - Part 5: Login as GC PM and verify user privilegesFri Aug 11 2023 21:10:37 GMT+0000 (Greenwich Mean Time) (39464ms)
√ EX-9829 - Part 6: Delete the account from the company. Fri Aug 11 2023 21:10:37 GMT+0000 (Greenwich Mean Time) (13184ms)
√ EX-9829 - Part 6: Delete the account from the company. Fri Aug 11 2023 21:10:37 GMT+0000 (Greenwich Mean Time) (13184ms)
6 passing (2m)
6 passing (2m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_025.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 6 │
│ Passing: 6 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 57 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9829-GC-PM-user-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9830-GC-Field-user-previlleges.spe (27 of 113)
c.ts
User Role permissions| GC FieldUser | Login and verify users access privilegesFri Aug 11 2023 21:11:56 GMT+0000 (Greenwich Mean Time)
User Role permissions| GC FieldUser | Login and verify users access privilegesFri Aug 11 2023 21:11:56 GMT+0000 (Greenwich Mean Time)
√ EX-9830 - Part 1: SignUp. Fri Aug 11 2023 21:11:56 GMT+0000 (Greenwich Mean Time) (17025ms)
√ EX-9830 - Part 1: SignUp. Fri Aug 11 2023 21:11:56 GMT+0000 (Greenwich Mean Time) (17025ms)
√ EX-9830 - Part 2: Verify the confirmation email. Fri Aug 11 2023 21:12:18 GMT+0000 (Greenwich Mean Time)
√ EX-9830 - Part 2: Verify the confirmation email. Fri Aug 11 2023 21:12:18 GMT+0000 (Greenwich Mean Time)
√ EX-9830 - Part 3: Create your account | Select, This is my company. Fri Aug 11 2023 21:12:23 GMT+0000 (Greenwich Mean Time) (18118ms)
√ EX-9830 - Part 3: Create your account | Select, This is my company. Fri Aug 11 2023 21:12:23 GMT+0000 (Greenwich Mean Time) (18118ms)
√ EX-9830 - Part 4: Login as GC FU and verify user privilegesFri Aug 11 2023 21:12:46 GMT+0000 (Greenwich Mean Time) (22334ms)
√ EX-9830 - Part 4: Login as GC FU and verify user privilegesFri Aug 11 2023 21:12:46 GMT+0000 (Greenwich Mean Time) (22334ms)
√ EX-9830 - Part 5: Delete the account from the company. Fri Aug 11 2023 21:12:46 GMT+0000 (Greenwich Mean Time) (13374ms)
√ EX-9830 - Part 5: Delete the account from the company. Fri Aug 11 2023 21:12:46 GMT+0000 (Greenwich Mean Time) (13374ms)
5 passing (1m)
5 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_026.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 5 │
│ Passing: 5 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 25 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9830-GC-Field-user-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9832-SC-Field-users-user-previlleg (28 of 113)
es.spec.ts
User Role permissions| SC FU | Login and verify users access privilegesFri Aug 11 2023 21:13:27 GMT+0000 (Greenwich Mean Time)
User Role permissions| SC FU | Login and verify users access privilegesFri Aug 11 2023 21:13:27 GMT+0000 (Greenwich Mean Time)
√ EX-9832 - Part 1: Add Contractor with SC Field User to existing project. Fri Aug 11 2023 21:13:27 GMT+0000 (Greenwich Mean Time) (31335ms)
√ EX-9832 - Part 1: Add Contractor with SC Field User to existing project. Fri Aug 11 2023 21:13:27 GMT+0000 (Greenwich Mean Time) (31335ms)
√ EX-9832 - Part 2: SignUp. Fri Aug 11 2023 21:13:27 GMT+0000 (Greenwich Mean Time) (11295ms)
√ EX-9832 - Part 2: SignUp. Fri Aug 11 2023 21:13:27 GMT+0000 (Greenwich Mean Time) (11295ms)
√ EX-9832 - Part 3: Verify the confirmation email. Fri Aug 11 2023 21:14:15 GMT+0000 (Greenwich Mean Time)
√ EX-9832 - Part 3: Verify the confirmation email. Fri Aug 11 2023 21:14:15 GMT+0000 (Greenwich Mean Time)
√ EX-9832 - Part 4: Create your account | Select, This is my company. Fri Aug 11 2023 21:14:20 GMT+0000 (Greenwich Mean Time) (19361ms)
√ EX-9832 - Part 4: Create your account | Select, This is my company. Fri Aug 11 2023 21:14:20 GMT+0000 (Greenwich Mean Time) (19361ms)
√ EX-9832 - Part 5: Change the role to Field User Fri Aug 11 2023 21:14:44 GMT+0000 (Greenwich Mean Time) (21662ms)
√ EX-9832 - Part 5: Change the role to Field User Fri Aug 11 2023 21:14:44 GMT+0000 (Greenwich Mean Time) (21662ms)
√ EX-9832 - Part 6: Login as SC FU and verify user privilegesFri Aug 11 2023 21:14:44 GMT+0000 (Greenwich Mean Time) (22493ms)
√ EX-9832 - Part 6: Login as SC FU and verify user privilegesFri Aug 11 2023 21:14:44 GMT+0000 (Greenwich Mean Time) (22493ms)
√ EX-9832 - Part 7: Delete the account from the company. Fri Aug 11 2023 21:14:44 GMT+0000 (Greenwich Mean Time) (13569ms)
√ EX-9832 - Part 7: Delete the account from the company. Fri Aug 11 2023 21:14:44 GMT+0000 (Greenwich Mean Time) (13569ms)
√ EX-9832 - Part 8: Delete the contracts of existing Project Fri Aug 11 2023 21:14:44 GMT+0000 (Greenwich Mean Time) (28347ms)
√ EX-9832 - Part 8: Delete the contracts of existing Project Fri Aug 11 2023 21:14:44 GMT+0000 (Greenwich Mean Time) (28347ms)
8 passing (3m)
8 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_027.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 8 │
│ Passing: 8 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 2 minutes, 43 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9832-SC-Field-users-user-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9833-SC-PM-user-previlleges.spec.t (29 of 113)
s
User Role permissions| SC PM | Login and verify users access privilegesFri Aug 11 2023 21:16:17 GMT+0000 (Greenwich Mean Time)
User Role permissions| SC PM | Login and verify users access privilegesFri Aug 11 2023 21:16:17 GMT+0000 (Greenwich Mean Time)
√ EX-9833 - Part 1: Add Contractor with SC PM to existing project. Fri Aug 11 2023 21:16:17 GMT+0000 (Greenwich Mean Time) (30798ms)
√ EX-9833 - Part 1: Add Contractor with SC PM to existing project. Fri Aug 11 2023 21:16:17 GMT+0000 (Greenwich Mean Time) (30798ms)
√ EX-9833 - Part 2: SignUp. Fri Aug 11 2023 21:16:17 GMT+0000 (Greenwich Mean Time) (11461ms)
√ EX-9833 - Part 2: SignUp. Fri Aug 11 2023 21:16:17 GMT+0000 (Greenwich Mean Time) (11461ms)
√ EX-9833 - Part 3: Verify the confirmation email. Fri Aug 11 2023 21:17:04 GMT+0000 (Greenwich Mean Time)
√ EX-9833 - Part 3: Verify the confirmation email. Fri Aug 11 2023 21:17:04 GMT+0000 (Greenwich Mean Time)
√ EX-9833 - Part 4: Create your account | Select, This is my company. Fri Aug 11 2023 21:17:10 GMT+0000 (Greenwich Mean Time) (18812ms)
√ EX-9833 - Part 4: Create your account | Select, This is my company. Fri Aug 11 2023 21:17:10 GMT+0000 (Greenwich Mean Time) (18812ms)
√ EX-9833 - Part 5: Change the role to PM Fri Aug 11 2023 21:17:33 GMT+0000 (Greenwich Mean Time) (22376ms)
√ EX-9833 - Part 5: Change the role to PM Fri Aug 11 2023 21:17:33 GMT+0000 (Greenwich Mean Time) (22376ms)
√ EX-9833 - Part 6: Login as SC PM and verify user privilegesFri Aug 11 2023 21:17:33 GMT+0000 (Greenwich Mean Time) (37946ms)
√ EX-9833 - Part 6: Login as SC PM and verify user privilegesFri Aug 11 2023 21:17:33 GMT+0000 (Greenwich Mean Time) (37946ms)
√ EX-9833 - Part 7: Delete the account from the company. Fri Aug 11 2023 21:17:33 GMT+0000 (Greenwich Mean Time) (11725ms)
√ EX-9833 - Part 7: Delete the account from the company. Fri Aug 11 2023 21:17:33 GMT+0000 (Greenwich Mean Time) (11725ms)
√ EX-9833 - Part 8: Delete the contracts of existing Project Fri Aug 11 2023 21:17:33 GMT+0000 (Greenwich Mean Time) (29667ms)
√ EX-9833 - Part 8: Delete the contracts of existing Project Fri Aug 11 2023 21:17:33 GMT+0000 (Greenwich Mean Time) (29667ms)
8 passing (3m)
8 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_028.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 8 │
│ Passing: 8 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 2 minutes, 58 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9833-SC-PM-user-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9834-SC-Admin-user-previlleges.spe (30 of 113)
c.ts
User Role permissions| SC Admin | Login and verify users access privilegesFri Aug 11 2023 21:19:21 GMT+0000 (Greenwich Mean Time)
User Role permissions| SC Admin | Login and verify users access privilegesFri Aug 11 2023 21:19:21 GMT+0000 (Greenwich Mean Time)
√ EX-9834 - Part 1: Add Contractor with SC Admin to existing project. Fri Aug 11 2023 21:19:21 GMT+0000 (Greenwich Mean Time) (31139ms)
√ EX-9834 - Part 1: Add Contractor with SC Admin to existing project. Fri Aug 11 2023 21:19:21 GMT+0000 (Greenwich Mean Time) (31139ms)
√ EX-9834 - Part 2: SignUp. Fri Aug 11 2023 21:19:21 GMT+0000 (Greenwich Mean Time) (11741ms)
√ EX-9834 - Part 2: SignUp. Fri Aug 11 2023 21:19:21 GMT+0000 (Greenwich Mean Time) (11741ms)
√ EX-9834 - Part 3: Verify the confirmation email. Fri Aug 11 2023 21:20:09 GMT+0000 (Greenwich Mean Time)
√ EX-9834 - Part 3: Verify the confirmation email. Fri Aug 11 2023 21:20:09 GMT+0000 (Greenwich Mean Time)
√ EX-9834 - Part 4: Create your account | Select, This is my company. Fri Aug 11 2023 21:20:15 GMT+0000 (Greenwich Mean Time) (19911ms)
√ EX-9834 - Part 4: Create your account | Select, This is my company. Fri Aug 11 2023 21:20:15 GMT+0000 (Greenwich Mean Time) (19911ms)
√ EX-9834 - Part 5: Change the role to Admin Fri Aug 11 2023 21:20:39 GMT+0000 (Greenwich Mean Time) (21805ms)
√ EX-9834 - Part 5: Change the role to Admin Fri Aug 11 2023 21:20:39 GMT+0000 (Greenwich Mean Time) (21805ms)
√ EX-9834 - Part 6: Login as SC Admin and verify user privilegesFri Aug 11 2023 21:20:39 GMT+0000 (Greenwich Mean Time) (39298ms)
√ EX-9834 - Part 6: Login as SC Admin and verify user privilegesFri Aug 11 2023 21:20:39 GMT+0000 (Greenwich Mean Time) (39298ms)
√ EX-9834 - Part 7: Delete the account from the company. Fri Aug 11 2023 21:20:39 GMT+0000 (Greenwich Mean Time) (12295ms)
√ EX-9834 - Part 7: Delete the account from the company. Fri Aug 11 2023 21:20:39 GMT+0000 (Greenwich Mean Time) (12295ms)
√ EX-9834 - Part 8: Delete the contracts of existing Project Fri Aug 11 2023 21:20:39 GMT+0000 (Greenwich Mean Time) (28375ms)
√ EX-9834 - Part 8: Delete the contracts of existing Project Fri Aug 11 2023 21:20:39 GMT+0000 (Greenwich Mean Time) (28375ms)
8 passing (3m)
8 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_029.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 8 │
│ Passing: 8 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 0 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9834-SC-Admin-user-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9835-SC-account-owner-user-previll (31 of 113)
eges.spec.ts
User Role permissions| SC Account Owner | Login and verify users access privilegesFri Aug 11 2023 21:22:27 GMT+0000 (Greenwich Mean Time)
User Role permissions| SC Account Owner | Login and verify users access privilegesFri Aug 11 2023 21:22:27 GMT+0000 (Greenwich Mean Time)
√ EX-9835 - Part 1: Add Contractor with SC Account owner to existing project. Fri Aug 11 2023 21:22:27 GMT+0000 (Greenwich Mean Time) (32605ms)
√ EX-9835 - Part 1: Add Contractor with SC Account owner to existing project. Fri Aug 11 2023 21:22:27 GMT+0000 (Greenwich Mean Time) (32605ms)
√ EX-9835 - Part 2: SignUp. Fri Aug 11 2023 21:22:27 GMT+0000 (Greenwich Mean Time) (11550ms)
√ EX-9835 - Part 2: SignUp. Fri Aug 11 2023 21:22:27 GMT+0000 (Greenwich Mean Time) (11550ms)
√ EX-9835 - Part 3: Verify the confirmation email. Fri Aug 11 2023 21:23:17 GMT+0000 (Greenwich Mean Time)
√ EX-9835 - Part 3: Verify the confirmation email. Fri Aug 11 2023 21:23:17 GMT+0000 (Greenwich Mean Time)
√ EX-9835 - Part 4: Create your account | Select, This is my company. Fri Aug 11 2023 21:23:22 GMT+0000 (Greenwich Mean Time) (19721ms)
√ EX-9835 - Part 4: Create your account | Select, This is my company. Fri Aug 11 2023 21:23:22 GMT+0000 (Greenwich Mean Time) (19721ms)
√ EX-9835 - Part 5: Change the role to Account owner Fri Aug 11 2023 21:23:46 GMT+0000 (Greenwich Mean Time) (23016ms)
√ EX-9835 - Part 5: Change the role to Account owner Fri Aug 11 2023 21:23:46 GMT+0000 (Greenwich Mean Time) (23016ms)
√ EX-9835 - Part 6: Login as SC Account Owner and verify user privilegesFri Aug 11 2023 21:23:46 GMT+0000 (Greenwich Mean Time) (39340ms)
√ EX-9835 - Part 6: Login as SC Account Owner and verify user privilegesFri Aug 11 2023 21:23:46 GMT+0000 (Greenwich Mean Time) (39340ms)
√ EX-9835 - Part 7: Delete the account from the company. Fri Aug 11 2023 21:23:46 GMT+0000 (Greenwich Mean Time) (13052ms)
√ EX-9835 - Part 7: Delete the account from the company. Fri Aug 11 2023 21:23:46 GMT+0000 (Greenwich Mean Time) (13052ms)
√ EX-9835 - Part 8: Delete the contracts of existing Project Fri Aug 11 2023 21:23:46 GMT+0000 (Greenwich Mean Time) (28608ms)
√ EX-9835 - Part 8: Delete the contracts of existing Project Fri Aug 11 2023 21:23:46 GMT+0000 (Greenwich Mean Time) (28608ms)
8 passing (3m)
8 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_030.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 8 │
│ Passing: 8 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 3 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9835-SC-account-owner-user-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges. (32 of 113)
spec.ts
User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesFri Aug 11 2023 21:25:37 GMT+0000 (Greenwich Mean Time)
User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesFri Aug 11 2023 21:25:37 GMT+0000 (Greenwich Mean Time)
√ EX-9885 - Part 1: Create a project Fri Aug 11 2023 21:25:37 GMT+0000 (Greenwich Mean Time) (51548ms)
√ EX-9885 - Part 1: Create a project Fri Aug 11 2023 21:25:37 GMT+0000 (Greenwich Mean Time) (51548ms)
√ EX-9885 - Part 2: Edit the project details and change the nameFri Aug 11 2023 21:25:37 GMT+0000 (Greenwich Mean Time) (41929ms)
√ EX-9885 - Part 2: Edit the project details and change the nameFri Aug 11 2023 21:25:37 GMT+0000 (Greenwich Mean Time) (41929ms)
√ EX-9885 - Part 3: Add customer to the Project. Fri Aug 11 2023 21:25:37 GMT+0000 (Greenwich Mean Time) (37581ms)
√ EX-9885 - Part 3: Add customer to the Project. Fri Aug 11 2023 21:25:37 GMT+0000 (Greenwich Mean Time) (37581ms)
√ EX-9885 - Part 4: Verify the invitation email for customerFri Aug 11 2023 21:27:53 GMT+0000 (Greenwich Mean Time)
√ EX-9885 - Part 4: Verify the invitation email for customerFri Aug 11 2023 21:27:53 GMT+0000 (Greenwich Mean Time)
√ EX-9885 - Part 5: Add company user to the Project. Fri Aug 11 2023 21:27:58 GMT+0000 (Greenwich Mean Time) (42681ms)
√ EX-9885 - Part 5: Add company user to the Project. Fri Aug 11 2023 21:27:58 GMT+0000 (Greenwich Mean Time) (42681ms)
√ EX-9885 - Part 6: Verify company user can access project. Fri Aug 11 2023 21:27:58 GMT+0000 (Greenwich Mean Time) (25285ms)
√ EX-9885 - Part 6: Verify company user can access project. Fri Aug 11 2023 21:27:58 GMT+0000 (Greenwich Mean Time) (25285ms)
√ EX-9885 - Part 7: Add Contract with a user to the project. Fri Aug 11 2023 21:27:58 GMT+0000 (Greenwich Mean Time) (49606ms)
√ EX-9885 - Part 7: Add Contract with a user to the project. Fri Aug 11 2023 21:27:58 GMT+0000 (Greenwich Mean Time) (49606ms)
√ EX-9885 - Part 8: Verify email invitation for contractor user Fri Aug 11 2023 21:30:00 GMT+0000 (Greenwich Mean Time)
√ EX-9885 - Part 8: Verify email invitation for contractor user Fri Aug 11 2023 21:30:00 GMT+0000 (Greenwich Mean Time)
√ EX-9885 - Part 9: Add additiona user to existing contract of the project. Fri Aug 11 2023 21:30:05 GMT+0000 (Greenwich Mean Time) (45717ms)
√ EX-9885 - Part 9: Add additiona user to existing contract of the project. Fri Aug 11 2023 21:30:05 GMT+0000 (Greenwich Mean Time) (45717ms)
√ EX-9885 - Part 10: Verify email invitation for additional contract user Fri Aug 11 2023 21:30:54 GMT+0000 (Greenwich Mean Time)
√ EX-9885 - Part 10: Verify email invitation for additional contract user Fri Aug 11 2023 21:30:54 GMT+0000 (Greenwich Mean Time)
√ Ex-9885 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesFri Aug 11 2023 21:30:58 GMT+0000 (Greenwich Mean Time) (37290ms)
√ Ex-9885 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesFri Aug 11 2023 21:30:58 GMT+0000 (Greenwich Mean Time) (37290ms)
√ EX-9885 - Part12: Clean up Project Fri Aug 11 2023 21:30:58 GMT+0000 (Greenwich Mean Time) (36883ms)
√ EX-9885 - Part12: Clean up Project Fri Aug 11 2023 21:30:58 GMT+0000 (Greenwich Mean Time) (36883ms)
12 passing (7m)
12 passing (7m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_031.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 12 │
│ Passing: 12 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 6 minutes, 36 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9886-GC-PM-project-previlleges.spe (33 of 113)
c.ts
User Role permissions| GC PM | Login as GC PM and create project and verify user privilegesFri Aug 11 2023 21:32:17 GMT+0000 (Greenwich Mean Time)
User Role permissions| GC PM | Login as GC PM and create project and verify user privilegesFri Aug 11 2023 21:32:17 GMT+0000 (Greenwich Mean Time)
√ EX-9886 - Part 1: Create a project Fri Aug 11 2023 21:32:17 GMT+0000 (Greenwich Mean Time) (48611ms)
√ EX-9886 - Part 1: Create a project Fri Aug 11 2023 21:32:17 GMT+0000 (Greenwich Mean Time) (48611ms)
√ EX-9886 - Part 2: Edit the project details and change the nameFri Aug 11 2023 21:32:17 GMT+0000 (Greenwich Mean Time) (29655ms)
√ EX-9886 - Part 2: Edit the project details and change the nameFri Aug 11 2023 21:32:17 GMT+0000 (Greenwich Mean Time) (29655ms)
√ EX-9886 - Part 3: Add customer to the Project. Fri Aug 11 2023 21:32:17 GMT+0000 (Greenwich Mean Time) (34953ms)
√ EX-9886 - Part 3: Add customer to the Project. Fri Aug 11 2023 21:32:17 GMT+0000 (Greenwich Mean Time) (34953ms)
√ EX-9886 - Part 4: Verify the invitation email for customerFri Aug 11 2023 21:34:16 GMT+0000 (Greenwich Mean Time)
√ EX-9886 - Part 4: Verify the invitation email for customerFri Aug 11 2023 21:34:16 GMT+0000 (Greenwich Mean Time)
√ EX-9886 - Part 5: Add company user to the Project. Fri Aug 11 2023 21:34:21 GMT+0000 (Greenwich Mean Time) (39198ms)
√ EX-9886 - Part 5: Add company user to the Project. Fri Aug 11 2023 21:34:21 GMT+0000 (Greenwich Mean Time) (39198ms)
√ EX-9886 - Part 6: Verify company user can access project. Fri Aug 11 2023 21:34:21 GMT+0000 (Greenwich Mean Time) (24764ms)
√ EX-9886 - Part 6: Verify company user can access project. Fri Aug 11 2023 21:34:21 GMT+0000 (Greenwich Mean Time) (24764ms)
√ EX-9886 - Part 7: Add Contract with a user to the project. Fri Aug 11 2023 21:34:21 GMT+0000 (Greenwich Mean Time) (29375ms)
√ EX-9886 - Part 7: Add Contract with a user to the project. Fri Aug 11 2023 21:34:21 GMT+0000 (Greenwich Mean Time) (29375ms)
√ EX-9886 - Part 8: Verify email invitation for contractor user Fri Aug 11 2023 21:35:59 GMT+0000 (Greenwich Mean Time)
√ EX-9886 - Part 8: Verify email invitation for contractor user Fri Aug 11 2023 21:35:59 GMT+0000 (Greenwich Mean Time)
√ EX-9886 - Part 9: Add additional user to existing contract of the project. Fri Aug 11 2023 21:36:04 GMT+0000 (Greenwich Mean Time) (36039ms)
√ EX-9886 - Part 9: Add additional user to existing contract of the project. Fri Aug 11 2023 21:36:04 GMT+0000 (Greenwich Mean Time) (36039ms)
√ EX-9886 - Part 10: Verify email invitation for additional contract user Fri Aug 11 2023 21:36:43 GMT+0000 (Greenwich Mean Time)
√ EX-9886 - Part 10: Verify email invitation for additional contract user Fri Aug 11 2023 21:36:43 GMT+0000 (Greenwich Mean Time)
√ Ex-9886 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesFri Aug 11 2023 21:36:47 GMT+0000 (Greenwich Mean Time) (30129ms)
√ Ex-9886 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesFri Aug 11 2023 21:36:47 GMT+0000 (Greenwich Mean Time) (30129ms)
√ EX-9886 - Part 12: Clean up Project Fri Aug 11 2023 21:36:47 GMT+0000 (Greenwich Mean Time) (38237ms)
√ EX-9886 - Part 12: Clean up Project Fri Aug 11 2023 21:36:47 GMT+0000 (Greenwich Mean Time) (38237ms)
12 passing (6m)
12 passing (6m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_032.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 12 │
│ Passing: 12 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 38 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9886-GC-PM-project-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges. (34 of 113)
spec.ts
User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesFri Aug 11 2023 21:38:01 GMT+0000 (Greenwich Mean Time)
User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesFri Aug 11 2023 21:38:01 GMT+0000 (Greenwich Mean Time)
√ EX-9887 - Part 1: Create a project Fri Aug 11 2023 21:38:01 GMT+0000 (Greenwich Mean Time) (56091ms)
√ EX-9887 - Part 1: Create a project Fri Aug 11 2023 21:38:01 GMT+0000 (Greenwich Mean Time) (56091ms)
√ EX-9887 - Part 2: Edit the project details and change the nameFri Aug 11 2023 21:38:01 GMT+0000 (Greenwich Mean Time) (33631ms)
√ EX-9887 - Part 2: Edit the project details and change the nameFri Aug 11 2023 21:38:01 GMT+0000 (Greenwich Mean Time) (33631ms)
√ EX-9887 - Part 3: Add customer to the Project. Fri Aug 11 2023 21:38:01 GMT+0000 (Greenwich Mean Time) (35194ms)
√ EX-9887 - Part 3: Add customer to the Project. Fri Aug 11 2023 21:38:01 GMT+0000 (Greenwich Mean Time) (35194ms)
√ EX-9887 - Part 4: Verify the invitation email for customerFri Aug 11 2023 21:40:12 GMT+0000 (Greenwich Mean Time)
√ EX-9887 - Part 4: Verify the invitation email for customerFri Aug 11 2023 21:40:12 GMT+0000 (Greenwich Mean Time)
√ EX-9887 - Part 5: Add company user to the Project. Fri Aug 11 2023 21:40:17 GMT+0000 (Greenwich Mean Time) (46495ms)
√ EX-9887 - Part 5: Add company user to the Project. Fri Aug 11 2023 21:40:17 GMT+0000 (Greenwich Mean Time) (46495ms)
√ EX-9887 - Part 6: Verify company user can access project. Fri Aug 11 2023 21:40:17 GMT+0000 (Greenwich Mean Time) (25704ms)
√ EX-9887 - Part 6: Verify company user can access project. Fri Aug 11 2023 21:40:17 GMT+0000 (Greenwich Mean Time) (25704ms)
√ EX-9887 - Part 7: Add Contract with a user to the project. Fri Aug 11 2023 21:40:17 GMT+0000 (Greenwich Mean Time) (40573ms)
√ EX-9887 - Part 7: Add Contract with a user to the project. Fri Aug 11 2023 21:40:17 GMT+0000 (Greenwich Mean Time) (40573ms)
√ EX-9887 - Part 8: Verify email invitation for contractor user Fri Aug 11 2023 21:42:15 GMT+0000 (Greenwich Mean Time)
√ EX-9887 - Part 8: Verify email invitation for contractor user Fri Aug 11 2023 21:42:15 GMT+0000 (Greenwich Mean Time)
√ EX-9887 - Part 9: Add additiona user to existing contract of the project. Fri Aug 11 2023 21:42:20 GMT+0000 (Greenwich Mean Time) (52724ms)
√ EX-9887 - Part 9: Add additiona user to existing contract of the project. Fri Aug 11 2023 21:42:20 GMT+0000 (Greenwich Mean Time) (52724ms)
√ EX-9887 - Part 10: Verify email invitation for additional contract user Fri Aug 11 2023 21:43:16 GMT+0000 (Greenwich Mean Time)
√ EX-9887 - Part 10: Verify email invitation for additional contract user Fri Aug 11 2023 21:43:16 GMT+0000 (Greenwich Mean Time)
√ Ex-9887 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesFri Aug 11 2023 21:43:20 GMT+0000 (Greenwich Mean Time) (35191ms)
√ Ex-9887 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesFri Aug 11 2023 21:43:20 GMT+0000 (Greenwich Mean Time) (35191ms)
√ EX-9887 - Part 12: Clean up Project Fri Aug 11 2023 21:43:20 GMT+0000 (Greenwich Mean Time) (31340ms)
√ EX-9887 - Part 12: Clean up Project Fri Aug 11 2023 21:43:20 GMT+0000 (Greenwich Mean Time) (31340ms)
12 passing (6m)
12 passing (6m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_033.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 12 │
│ Passing: 12 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 6 minutes, 25 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9888-GC-FU-project-previlleges.spe (35 of 113)
c.ts
User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesFri Aug 11 2023 21:44:32 GMT+0000 (Greenwich Mean Time)
User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesFri Aug 11 2023 21:44:32 GMT+0000 (Greenwich Mean Time)
√ EX-9888 - Part 1: Create a project Fri Aug 11 2023 21:44:32 GMT+0000 (Greenwich Mean Time) (50235ms)
√ EX-9888 - Part 1: Create a project Fri Aug 11 2023 21:44:32 GMT+0000 (Greenwich Mean Time) (50235ms)
√ EX-9888 - Part 2: Edit the project details and change the nameFri Aug 11 2023 21:44:32 GMT+0000 (Greenwich Mean Time) (32622ms)
√ EX-9888 - Part 2: Edit the project details and change the nameFri Aug 11 2023 21:44:32 GMT+0000 (Greenwich Mean Time) (32622ms)
√ EX-9888 - Part 3: Add customer to the Project. Fri Aug 11 2023 21:44:32 GMT+0000 (Greenwich Mean Time) (33230ms)
√ EX-9888 - Part 3: Add customer to the Project. Fri Aug 11 2023 21:44:32 GMT+0000 (Greenwich Mean Time) (33230ms)
√ EX-9888 - Part 4: Verify the invitation email for customerFri Aug 11 2023 21:46:33 GMT+0000 (Greenwich Mean Time)
√ EX-9888 - Part 4: Verify the invitation email for customerFri Aug 11 2023 21:46:33 GMT+0000 (Greenwich Mean Time)
√ EX-9888 - Part 5: Add company user to the Project. Fri Aug 11 2023 21:46:38 GMT+0000 (Greenwich Mean Time) (38799ms)
√ EX-9888 - Part 5: Add company user to the Project. Fri Aug 11 2023 21:46:38 GMT+0000 (Greenwich Mean Time) (38799ms)
√ EX-9888 - Part 6: Verify company user can access project. Fri Aug 11 2023 21:46:38 GMT+0000 (Greenwich Mean Time) (26454ms)
√ EX-9888 - Part 6: Verify company user can access project. Fri Aug 11 2023 21:46:38 GMT+0000 (Greenwich Mean Time) (26454ms)
√ EX-9888 - Part 7: Add Contract should be in disabled state Fri Aug 11 2023 21:46:38 GMT+0000 (Greenwich Mean Time) (23066ms)
√ EX-9888 - Part 7: Add Contract should be in disabled state Fri Aug 11 2023 21:46:38 GMT+0000 (Greenwich Mean Time) (23066ms)
√ Ex-9888 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesFri Aug 11 2023 21:46:38 GMT+0000 (Greenwich Mean Time) (17733ms)
√ Ex-9888 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesFri Aug 11 2023 21:46:38 GMT+0000 (Greenwich Mean Time) (17733ms)
√ EX-9888 - Part 9: Clean up Project Fri Aug 11 2023 21:46:38 GMT+0000 (Greenwich Mean Time) (34092ms)
√ EX-9888 - Part 9: Clean up Project Fri Aug 11 2023 21:46:38 GMT+0000 (Greenwich Mean Time) (34092ms)
9 passing (4m)
9 passing (4m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_034.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 9 │
│ Passing: 9 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 4 minutes, 27 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9888-GC-FU-project-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9889-SC-Owner-project-previlleges. (36 of 113)
spec.ts
User Role permissions| SC Account Owner | Login as SC account owner and create project and verify user privilegesFri Aug 11 2023 21:49:04 GMT+0000 (Greenwich Mean Time)
User Role permissions| SC Account Owner | Login as SC account owner and create project and verify user privilegesFri Aug 11 2023 21:49:04 GMT+0000 (Greenwich Mean Time)
√ EX-9889 - Part 1: Create a project Fri Aug 11 2023 21:49:04 GMT+0000 (Greenwich Mean Time) (50368ms)
√ EX-9889 - Part 1: Create a project Fri Aug 11 2023 21:49:04 GMT+0000 (Greenwich Mean Time) (50368ms)
√ EX-9889 - Part 2: Edit the project details and change the nameFri Aug 11 2023 21:49:04 GMT+0000 (Greenwich Mean Time) (31130ms)
√ EX-9889 - Part 2: Edit the project details and change the nameFri Aug 11 2023 21:49:04 GMT+0000 (Greenwich Mean Time) (31130ms)
√ EX-9889 - Part 3: Add customer to the Project. Fri Aug 11 2023 21:49:04 GMT+0000 (Greenwich Mean Time) (35077ms)
√ EX-9889 - Part 3: Add customer to the Project. Fri Aug 11 2023 21:49:04 GMT+0000 (Greenwich Mean Time) (35077ms)
√ EX-9889 - Part 4: Verify the invitation email for customerFri Aug 11 2023 21:51:06 GMT+0000 (Greenwich Mean Time)
√ EX-9889 - Part 4: Verify the invitation email for customerFri Aug 11 2023 21:51:06 GMT+0000 (Greenwich Mean Time)
√ EX-9889 - Part 5: Add company user to the Project. Fri Aug 11 2023 21:51:11 GMT+0000 (Greenwich Mean Time) (40357ms)
√ EX-9889 - Part 5: Add company user to the Project. Fri Aug 11 2023 21:51:11 GMT+0000 (Greenwich Mean Time) (40357ms)
√ EX-9889 - Part 6: Verify company user can access project. Fri Aug 11 2023 21:51:11 GMT+0000 (Greenwich Mean Time) (26171ms)
√ EX-9889 - Part 6: Verify company user can access project. Fri Aug 11 2023 21:51:11 GMT+0000 (Greenwich Mean Time) (26171ms)
√ EX-9889 - Part 7: Add Contract with a user to the project. Fri Aug 11 2023 21:51:11 GMT+0000 (Greenwich Mean Time) (26368ms)
√ EX-9889 - Part 7: Add Contract with a user to the project. Fri Aug 11 2023 21:51:11 GMT+0000 (Greenwich Mean Time) (26368ms)
√ EX-9889 - Part 8: Verify email invitation for contractor user Fri Aug 11 2023 21:52:49 GMT+0000 (Greenwich Mean Time)
√ EX-9889 - Part 8: Verify email invitation for contractor user Fri Aug 11 2023 21:52:49 GMT+0000 (Greenwich Mean Time)
√ EX-9889 - Part 9: Add additional user to existing contract of the project. Fri Aug 11 2023 21:52:53 GMT+0000 (Greenwich Mean Time) (37642ms)
√ EX-9889 - Part 9: Add additional user to existing contract of the project. Fri Aug 11 2023 21:52:53 GMT+0000 (Greenwich Mean Time) (37642ms)
√ EX-9889 - Part 10: Verify email invitation for additional contract user Fri Aug 11 2023 21:53:34 GMT+0000 (Greenwich Mean Time)
√ EX-9889 - Part 10: Verify email invitation for additional contract user Fri Aug 11 2023 21:53:34 GMT+0000 (Greenwich Mean Time)
√ Ex-9889 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesFri Aug 11 2023 21:53:37 GMT+0000 (Greenwich Mean Time) (36197ms)
√ Ex-9889 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesFri Aug 11 2023 21:53:37 GMT+0000 (Greenwich Mean Time) (36197ms)
√ EX-9889 - Part 12: Clean up Project Fri Aug 11 2023 21:53:37 GMT+0000 (Greenwich Mean Time) (32309ms)
√ EX-9889 - Part 12: Clean up Project Fri Aug 11 2023 21:53:37 GMT+0000 (Greenwich Mean Time) (32309ms)
12 passing (6m)
12 passing (6m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_035.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 12 │
│ Passing: 12 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 42 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9889-SC-Owner-project-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9890-SC-PM-project-previlleges.spe (37 of 113)
c.ts
User Role permissions| SC PM | Login as SC PM and create project and verify user privilegesFri Aug 11 2023 21:54:51 GMT+0000 (Greenwich Mean Time)
User Role permissions| SC PM | Login as SC PM and create project and verify user privilegesFri Aug 11 2023 21:54:51 GMT+0000 (Greenwich Mean Time)
√ EX-9890 - Part 1: Create a project Fri Aug 11 2023 21:54:51 GMT+0000 (Greenwich Mean Time) (52090ms)
√ EX-9890 - Part 1: Create a project Fri Aug 11 2023 21:54:51 GMT+0000 (Greenwich Mean Time) (52090ms)
√ EX-9890 - Part 2: Edit the project details and change the nameFri Aug 11 2023 21:54:51 GMT+0000 (Greenwich Mean Time) (31587ms)
√ EX-9890 - Part 2: Edit the project details and change the nameFri Aug 11 2023 21:54:51 GMT+0000 (Greenwich Mean Time) (31587ms)
√ EX-9890 - Part 3: Add customer to the Project. Fri Aug 11 2023 21:54:51 GMT+0000 (Greenwich Mean Time) (33062ms)
√ EX-9890 - Part 3: Add customer to the Project. Fri Aug 11 2023 21:54:51 GMT+0000 (Greenwich Mean Time) (33062ms)
√ EX-9890 - Part 4: Verify the invitation email for customerFri Aug 11 2023 21:56:53 GMT+0000 (Greenwich Mean Time)
√ EX-9890 - Part 4: Verify the invitation email for customerFri Aug 11 2023 21:56:53 GMT+0000 (Greenwich Mean Time)
√ EX-9890 - Part 5: Add company user to the Project. Fri Aug 11 2023 21:56:59 GMT+0000 (Greenwich Mean Time) (39396ms)
√ EX-9890 - Part 5: Add company user to the Project. Fri Aug 11 2023 21:56:59 GMT+0000 (Greenwich Mean Time) (39396ms)
√ EX-9890 - Part 6: Verify company user can access project. Fri Aug 11 2023 21:56:59 GMT+0000 (Greenwich Mean Time) (25689ms)
√ EX-9890 - Part 6: Verify company user can access project. Fri Aug 11 2023 21:56:59 GMT+0000 (Greenwich Mean Time) (25689ms)
√ EX-9890 - Part 7: Add Contract with a user to the project. Fri Aug 11 2023 21:56:59 GMT+0000 (Greenwich Mean Time) (31472ms)
√ EX-9890 - Part 7: Add Contract with a user to the project. Fri Aug 11 2023 21:56:59 GMT+0000 (Greenwich Mean Time) (31472ms)
√ EX-9890 - Part 8: Verify email invitation for contractor user Fri Aug 11 2023 21:58:40 GMT+0000 (Greenwich Mean Time)
√ EX-9890 - Part 8: Verify email invitation for contractor user Fri Aug 11 2023 21:58:40 GMT+0000 (Greenwich Mean Time)
√ EX-9890 - Part 9: Add additiona user to existing contract of the project. Fri Aug 11 2023 21:58:44 GMT+0000 (Greenwich Mean Time) (33924ms)
√ EX-9890 - Part 9: Add additiona user to existing contract of the project. Fri Aug 11 2023 21:58:44 GMT+0000 (Greenwich Mean Time) (33924ms)
√ EX-9890 - Part 10: Verify email invitation for additional contract user Fri Aug 11 2023 21:59:21 GMT+0000 (Greenwich Mean Time)
√ EX-9890 - Part 10: Verify email invitation for additional contract user Fri Aug 11 2023 21:59:21 GMT+0000 (Greenwich Mean Time)
√ Ex-9890 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesFri Aug 11 2023 21:59:26 GMT+0000 (Greenwich Mean Time) (35802ms)
√ Ex-9890 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesFri Aug 11 2023 21:59:26 GMT+0000 (Greenwich Mean Time) (35802ms)
√ EX-9890 - Part 12: Clean up Project Fri Aug 11 2023 21:59:26 GMT+0000 (Greenwich Mean Time) (33179ms)
√ EX-9890 - Part 12: Clean up Project Fri Aug 11 2023 21:59:26 GMT+0000 (Greenwich Mean Time) (33179ms)
12 passing (6m)
12 passing (6m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_036.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 12 │
│ Passing: 12 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 43 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9890-SC-PM-project-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9891-SC-FU-project-previlleges.spe (38 of 113)
c.ts
User Role permissions| SC Field User | Login as SC Field User and create project and verify user privilegesFri Aug 11 2023 22:00:40 GMT+0000 (Greenwich Mean Time)
User Role permissions| SC Field User | Login as SC Field User and create project and verify user privilegesFri Aug 11 2023 22:00:40 GMT+0000 (Greenwich Mean Time)
√ EX-9891 - Part 1: Create a project Fri Aug 11 2023 22:00:40 GMT+0000 (Greenwich Mean Time) (51373ms)
√ EX-9891 - Part 1: Create a project Fri Aug 11 2023 22:00:40 GMT+0000 (Greenwich Mean Time) (51373ms)
√ EX-9891 - Part 2: Edit the project details and change the nameFri Aug 11 2023 22:00:40 GMT+0000 (Greenwich Mean Time) (31364ms)
√ EX-9891 - Part 2: Edit the project details and change the nameFri Aug 11 2023 22:00:40 GMT+0000 (Greenwich Mean Time) (31364ms)
√ EX-9891 - Part 3: Add customer to the Project. Fri Aug 11 2023 22:00:40 GMT+0000 (Greenwich Mean Time) (36423ms)
√ EX-9891 - Part 3: Add customer to the Project. Fri Aug 11 2023 22:00:40 GMT+0000 (Greenwich Mean Time) (36423ms)
√ EX-9891 - Part 4: Verify the invitation email for customerFri Aug 11 2023 22:02:44 GMT+0000 (Greenwich Mean Time)
√ EX-9891 - Part 4: Verify the invitation email for customerFri Aug 11 2023 22:02:44 GMT+0000 (Greenwich Mean Time)
√ EX-9891 - Part 5: Add company user to the Project. Fri Aug 11 2023 22:02:50 GMT+0000 (Greenwich Mean Time) (39165ms)
√ EX-9891 - Part 5: Add company user to the Project. Fri Aug 11 2023 22:02:50 GMT+0000 (Greenwich Mean Time) (39165ms)
√ EX-9891 - Part 6: Verify company user can access project. Fri Aug 11 2023 22:02:50 GMT+0000 (Greenwich Mean Time) (26113ms)
√ EX-9891 - Part 6: Verify company user can access project. Fri Aug 11 2023 22:02:50 GMT+0000 (Greenwich Mean Time) (26113ms)
√ EX-9891 - Part 7: Add Contract should be in disabled state Fri Aug 11 2023 22:02:50 GMT+0000 (Greenwich Mean Time) (21546ms)
√ EX-9891 - Part 7: Add Contract should be in disabled state Fri Aug 11 2023 22:02:50 GMT+0000 (Greenwich Mean Time) (21546ms)
√ Ex-9891 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesFri Aug 11 2023 22:02:50 GMT+0000 (Greenwich Mean Time) (18334ms)
√ Ex-9891 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesFri Aug 11 2023 22:02:50 GMT+0000 (Greenwich Mean Time) (18334ms)
√ EX-9891 - Part 9: Clean up Project Fri Aug 11 2023 22:02:50 GMT+0000 (Greenwich Mean Time) (32411ms)
√ EX-9891 - Part 9: Clean up Project Fri Aug 11 2023 22:02:50 GMT+0000 (Greenwich Mean Time) (32411ms)
9 passing (4m)
9 passing (4m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_037.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 9 │
│ Passing: 9 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 4 minutes, 27 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9891-SC-FU-project-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Received/ex-9912-add-bc-to-existing-cor-with-all-role-con (39 of 113)
tractors.spec.ts
Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time)
Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time)
√ EX-9912 - Part 1: Create project add a contract with owner company user Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time) (18158ms)
√ EX-9912 - Part 1: Create project add a contract with owner company user Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time) (18158ms)
√ EX-9912 Part 2: Login as Owner and accept the contract. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time)
√ EX-9912 Part 2: Login as Owner and accept the contract. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time)
√ EX-9912 - Part 3: Add second contract with all sc users Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time) (10911ms)
√ EX-9912 - Part 3: Add second contract with all sc users Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time) (10911ms)
√ EX-9912 Part 4: Login as SC Owner and accept the contract. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time)
√ EX-9912 Part 4: Login as SC Owner and accept the contract. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time)
√ EX-9912 - Part 5: Login as SC Admin and accept the contract. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time)
√ EX-9912 - Part 5: Login as SC Admin and accept the contract. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time)
√ EX-9912 - Part 6: Login as SC PM user and accept the contract. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time)
√ EX-9912 - Part 6: Login as SC PM user and accept the contract. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time)
√ EX-9912 - Part 7: Login as SC Field user and accept the contract. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time)
√ EX-9912 - Part 7: Login as SC Field user and accept the contract. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time)
√ EX-9912 - Part 8: Create COR : Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time) (38704ms)
√ EX-9912 - Part 8: Create COR : Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time) (38704ms)
√ EX-9912 - Part 9: Upload backcharge COR. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time) (65107ms)
√ EX-9912 - Part 9: Upload backcharge COR. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time) (65107ms)
√ EX-9912 - Part 10: Verify the backcharge notification for SC PM user. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time) (11400ms)
√ EX-9912 - Part 10: Verify the backcharge notification for SC PM user. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time) (11400ms)
√ EX-9912 - Part 11: Verify the backcharge notification for SC Admin user. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time) (10844ms)
√ EX-9912 - Part 11: Verify the backcharge notification for SC Admin user. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time) (10844ms)
√ EX-9912 - Part 12: Verify the backcharge notification for SC PM user. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time) (15189ms)
√ EX-9912 - Part 12: Verify the backcharge notification for SC PM user. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time) (15189ms)
√ EX-9912 - Part 13: Verify the backcharge notification for SC FU user. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time) (5831ms)
√ EX-9912 - Part 13: Verify the backcharge notification for SC FU user. Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time) (5831ms)
√ EX-9912 - Part 14: Cleanup GC... Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time)
√ EX-9912 - Part 14: Cleanup GC... Fri Aug 11 2023 22:05:13 GMT+0000 (Greenwich Mean Time)
14 passing (3m)
14 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_038.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 14 │
│ Passing: 14 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 20 seconds │
│ Spec Ran: 04_COR_Log/Received/ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spe │
│ c.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/EX-4366-SC-creates-project-adds-gc-customer-sc-creat (40 of 113)
es-cor.spec.ts
Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestFri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time)
Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestFri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time)
√ EX-4366 - Create a projcet and add customers : Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (51764ms)
√ EX-4366 - Create a projcet and add customers : Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (51764ms)
√ EX-4366 - Add My Company users to the project.Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (65288ms)
√ EX-4366 - Add My Company users to the project.Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (65288ms)
√ EX-4366 - Add Customer to the project.Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (68352ms)
√ EX-4366 - Add Customer to the project.Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (68352ms)
√ EX-4366 - PM Customer accept the project Invites : Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (21166ms)
√ EX-4366 - PM Customer accept the project Invites : Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (21166ms)
√ EX-4366 - Owner Customer accept the project Invites : Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (16750ms)
√ EX-4366 - Owner Customer accept the project Invites : Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (16750ms)
√ EX-4366 - Admin Customer accept the project Invites : Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (21285ms)
√ EX-4366 - Admin Customer accept the project Invites : Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (21285ms)
√ EX-4366 - Field User Customer accept the project Invites : Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (16588ms)
√ EX-4366 - Field User Customer accept the project Invites : Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (16588ms)
√ EX-4366 - Create COR : Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (53330ms)
√ EX-4366 - Create COR : Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (53330ms)
√ EX-4366 - Verify COR is created : Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (37978ms)
√ EX-4366 - Verify COR is created : Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (37978ms)
√ EX-4366 - Cleanup GC... Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (35582ms)
√ EX-4366 - Cleanup GC... Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (35582ms)
√ EX-4366 - Cleanup SC... Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (35553ms)
√ EX-4366 - Cleanup SC... Fri Aug 11 2023 22:08:39 GMT+0000 (Greenwich Mean Time) (35553ms)
11 passing (7m)
11 passing (7m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_039.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 11 │
│ Passing: 11 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 7 minutes, 4 seconds │
│ Spec Ran: 04_COR_Log/Sent/EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec. │
│ ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft. (41 of 113)
spec.ts
Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestFri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time)
Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestFri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time)
√ EX-4432 - Part 1: Create project Test Project TC4432 1691792149056. Fri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time) (51261ms)
√ EX-4432 - Part 1: Create project Test Project TC4432 1691792149056. Fri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time) (51261ms)
√ EX-4432 - Part 2: Add Customer.Fri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time) (31455ms)
√ EX-4432 - Part 2: Add Customer.Fri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time) (31455ms)
√ EX-4432 - Part 3: Customer Accept invite.Fri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time) (28892ms)
√ EX-4432 - Part 3: Customer Accept invite.Fri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time) (28892ms)
√ EX-4432 - Part 4: Contractor creates COR Draft. : Fri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time) (38967ms)
√ EX-4432 - Part 4: Contractor creates COR Draft. : Fri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time) (38967ms)
√ EX-4432 - Part 5: Verify the COR Draft Log has the new COR draft. : Fri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time) (32861ms)
√ EX-4432 - Part 5: Verify the COR Draft Log has the new COR draft. : Fri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time) (32861ms)
1) EX-4432 - Part 6: Cleanup GC... Fri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time)
1) EX-4432 - Part 6: Cleanup GC... Fri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time)
√ EX-4432 - Part 7: Cleanup SC... Fri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time) (39827ms)
√ EX-4432 - Part 7: Cleanup SC... Fri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time) (39827ms)
6 passing (5m)
1 failing
1) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestFri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time)
EX-4432 - Part 6: Cleanup GC... Fri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected not to find content: 'Test Project TC4432 1691792149056' within the element:
but continuously found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:38:38)
6 passing (5m)
1 failing
1) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestFri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time)
EX-4432 - Part 6: Cleanup GC... Fri Aug 11 2023 22:15:49 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected not to find content: 'Test Project TC4432 1691792149056' within the element: but continuously found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:38:38)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_040.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 7 │
│ Passing: 6 │
│ Failing: 1 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 1 │
│ Video: false │
│ Duration: 4 minutes, 37 seconds │
│ Spec Ran: 04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts\Create COR
To verify that the PM is able to create a COR as Draft by using Create a Change
Order RequestFri Aug 11 2023 221549 GMT+0000 (Greenwich Mean Time) -- EX-4432 -
Part 6 Cleanup GC... Fri Aug 11 2023 221549 GMT+0000 (Greenwich Mean Time) (fa.
png
(Uploading Screenshots & Videos)
- Done Uploading (1/1) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts\Create COR To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestFri Aug 11 2023 221549 GMT+0000 (Greenwich Mean Time) -- EX-4432 - Part 6 Cleanup GC... Fri Aug 11 2023 221549 GMT+0000 (Greenwich Mean Time) (fa.png
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/EX-5827-to-verify-multiple-cors-to-same-tag-when-cre (42 of 113)
ating-cor.spec.ts
COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORFri Aug 11 2023 22:20:31 GMT+0000 (Greenwich Mean Time)
COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORFri Aug 11 2023 22:20:31 GMT+0000 (Greenwich Mean Time)
√ EX-5827 - Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORFri Aug 11 2023 22:20:31 GMT+0000 (Greenwich Mean Time) (27982ms)
√ EX-5827 - Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORFri Aug 11 2023 22:20:31 GMT+0000 (Greenwich Mean Time) (27982ms)
1 passing (29s)
1 passing (29s)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_041.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 28 seconds │
│ Spec Ran: 04_COR_Log/Sent/EX-5827-to-verify-multiple-cors-to-same-tag-when-creating-cor.sp │
│ ec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/EX-5894-to-verify-multiple-cors-to-same-tag-when-upl (43 of 113)
oading-cor.spec.ts
COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORFri Aug 11 2023 22:21:05 GMT+0000 (Greenwich Mean Time)
COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORFri Aug 11 2023 22:21:05 GMT+0000 (Greenwich Mean Time)
√ EX-5894 - Verify Multiple CORs should not be associated with the same T&M Tag when uploading a New CORFri Aug 11 2023 22:21:05 GMT+0000 (Greenwich Mean Time) (40335ms)
√ EX-5894 - Verify Multiple CORs should not be associated with the same T&M Tag when uploading a New CORFri Aug 11 2023 22:21:05 GMT+0000 (Greenwich Mean Time) (40335ms)
1 passing (41s)
1 passing (41s)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_042.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 40 seconds │
│ Spec Ran: 04_COR_Log/Sent/EX-5894-to-verify-multiple-cors-to-same-tag-when-uploading-cor.s │
│ pec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/ex-3673-verify-contractor-is-able-to-upload-cor-with (44 of 113)
-only-mandatory-data.spec.ts
Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Fri Aug 11 2023 22:21:50 GMT+0000 (Greenwich Mean Time)
Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Fri Aug 11 2023 22:21:50 GMT+0000 (Greenwich Mean Time)
√ EX-7674 - Part 0: Clean existing COR's : Fri Aug 11 2023 22:21:50 GMT+0000 (Greenwich Mean Time) (48426ms)
√ EX-7674 - Part 0: Clean existing COR's : Fri Aug 11 2023 22:21:50 GMT+0000 (Greenwich Mean Time) (48426ms)
√ EX-3673 - Upload COR with only mandatory data.Fri Aug 11 2023 22:21:50 GMT+0000 (Greenwich Mean Time) (55436ms)
√ EX-3673 - Upload COR with only mandatory data.Fri Aug 11 2023 22:21:50 GMT+0000 (Greenwich Mean Time) (55436ms)
√ EX-3673 - Verify the COR data in the COR Log.Fri Aug 11 2023 22:21:50 GMT+0000 (Greenwich Mean Time) (47036ms)
√ EX-3673 - Verify the COR data in the COR Log.Fri Aug 11 2023 22:21:50 GMT+0000 (Greenwich Mean Time) (47036ms)
√ EX-3673 - Cleanup - Delete COR.Fri Aug 11 2023 22:21:50 GMT+0000 (Greenwich Mean Time) (42860ms)
√ EX-3673 - Cleanup - Delete COR.Fri Aug 11 2023 22:21:50 GMT+0000 (Greenwich Mean Time) (42860ms)
4 passing (3m)
4 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_043.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 4 │
│ Passing: 4 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 14 seconds │
│ Spec Ran: 04_COR_Log/Sent/ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandat │
│ ory-data.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/ex-3683-GC-creates-project-adds-contract-SC-creates- (45 of 113)
cor.spec.ts
COR Log | GC PM creats a project. Adds Contract with SC Company. SC PM is able to create a COR by using Create a Change Order RequestFri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time)
COR Log | GC PM creats a project. Adds Contract with SC Company. SC PM is able to create a COR by using Create a Change Order RequestFri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time)
√ EX-3683 - Part 1: Create a projcet and add customers : Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (48545ms)
√ EX-3683 - Part 1: Create a projcet and add customers : Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (48545ms)
√ EX-3683 - Part 2: Add My Company users to the project.Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (62617ms)
√ EX-3683 - Part 2: Add My Company users to the project.Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (62617ms)
√ EX-3683 - Part 3: Add Contract to the project.Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (37124ms)
√ EX-3683 - Part 3: Add Contract to the project.Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (37124ms)
√ EX-3683 - Part 4: PM Contractor accept the project Invites : Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (28393ms)
√ EX-3683 - Part 4: PM Contractor accept the project Invites : Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (28393ms)
√ EX-3683 - Part 5: Owner Contractor accept the project Invites : Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (23110ms)
√ EX-3683 - Part 5: Owner Contractor accept the project Invites : Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (23110ms)
√ EX-3683 - Part 6: Admin Contractor accept the project Invites : Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (22208ms)
√ EX-3683 - Part 6: Admin Contractor accept the project Invites : Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (22208ms)
√ EX-3683 - Part 7: Field User Contractor accept the project Invites : Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (23375ms)
√ EX-3683 - Part 7: Field User Contractor accept the project Invites : Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (23375ms)
√ EX-3683 - Part 8: Create COR : Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (54211ms)
√ EX-3683 - Part 8: Create COR : Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (54211ms)
√ EX-3683 - Part 9: Verify the COR is in the Sent Log : Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (36107ms)
√ EX-3683 - Part 9: Verify the COR is in the Sent Log : Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (36107ms)
√ EX-3683 - Part 10: Cleanup GC... Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (35668ms)
√ EX-3683 - Part 10: Cleanup GC... Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (35668ms)
√ EX-3683 - Part 11: Cleanup SC... Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (31676ms)
√ EX-3683 - Part 11: Cleanup SC... Fri Aug 11 2023 22:25:10 GMT+0000 (Greenwich Mean Time) (31676ms)
11 passing (7m)
11 passing (7m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_044.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 11 │
│ Passing: 11 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 6 minutes, 43 seconds │
│ Spec Ran: 04_COR_Log/Sent/ex-3683-GC-creates-project-adds-contract-SC-creates-cor.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/ex-3686-verify-there-are-two-tabs-on-cor-log-page-se (46 of 113)
nt-received.spec.ts
COR Log | To verify that on COR Log page there are separate tabs for Sent and Received CORsFri Aug 11 2023 22:31:59 GMT+0000 (Greenwich Mean Time)
COR Log | To verify that on COR Log page there are separate tabs for Sent and Received CORsFri Aug 11 2023 22:31:59 GMT+0000 (Greenwich Mean Time)
√ EX-3686: Verify there are separate tabs for Sent and Received CORsFri Aug 11 2023 22:31:59 GMT+0000 (Greenwich Mean Time) (27895ms)
√ EX-3686: Verify there are separate tabs for Sent and Received CORsFri Aug 11 2023 22:31:59 GMT+0000 (Greenwich Mean Time) (27895ms)
1 passing (29s)
1 passing (29s)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_045.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 28 seconds │
│ Spec Ran: 04_COR_Log/Sent/ex-3686-verify-there-are-two-tabs-on-cor-log-page-sent-received. │
│ spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/ex-5244-verify-shareable-link-contains-just-the-sele (47 of 113)
cted-project.spec.ts
COR | Verify sharable link contains CORs from just the selected project.Fri Aug 11 2023 22:32:32 GMT+0000 (Greenwich Mean Time)
COR | Verify sharable link contains CORs from just the selected project.Fri Aug 11 2023 22:32:32 GMT+0000 (Greenwich Mean Time)
√ EX-5244 Fri Aug 11 2023 22:32:32 GMT+0000 (Greenwich Mean Time) (57780ms)
√ EX-5244 Fri Aug 11 2023 22:32:32 GMT+0000 (Greenwich Mean Time) (57780ms)
1 passing (58s)
1 passing (58s)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_046.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 58 seconds │
│ Spec Ran: 04_COR_Log/Sent/ex-5244-verify-shareable-link-contains-just-the-selected-project │
│ .spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/ex-5333-SC-creates-cor-with-full-data.spec.ts (48 of 113)
Fri Aug 11 2023 22:33:35 GMT+0000 (Greenwich Mean Time)
Fri Aug 11 2023 22:33:35 GMT+0000 (Greenwich Mean Time)
√ EX-5333 - Part 1: Create COR with full set of data: Fri Aug 11 2023 22:33:35 GMT+0000 (Greenwich Mean Time) (172303ms)
√ EX-5333 - Part 1: Create COR with full set of data: Fri Aug 11 2023 22:33:35 GMT+0000 (Greenwich Mean Time) (172303ms)
1 passing (3m)
1 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_047.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 2 minutes, 52 seconds │
│ Spec Ran: 04_COR_Log/Sent/ex-5333-SC-creates-cor-with-full-data.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/ex-5396-verify-contractor-is-able-to-upload-cor-with (49 of 113)
-mandatory-and-optional-data.spec.ts
Upload COR | To verify that the contractor is able to Upload a Change Order Request with full set of data. Fri Aug 11 2023 22:36:34 GMT+0000 (Greenwich Mean Time)
Upload COR | To verify that the contractor is able to Upload a Change Order Request with full set of data. Fri Aug 11 2023 22:36:34 GMT+0000 (Greenwich Mean Time)
√ EX-5396 - Create new project. Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (50632ms)
√ EX-5396 - Create new project. Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (50632ms)
√ EX-5396 - Add My Company users to the project.Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (67667ms)
√ EX-5396 - Add My Company users to the project.Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (67667ms)
√ EX-5396 - Add Contract to the project.Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (34930ms)
√ EX-5396 - Add Contract to the project.Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (34930ms)
√ EX-5396 - PM Customer accept the project Invites : Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (26826ms)
√ EX-5396 - PM Customer accept the project Invites : Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (26826ms)
√ EX-5396 - Owner Customer accept the project Invites : Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (24059ms)
√ EX-5396 - Owner Customer accept the project Invites : Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (24059ms)
√ EX-5396 - Admin Customer accept the project Invites : Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (23139ms)
√ EX-5396 - Admin Customer accept the project Invites : Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (23139ms)
√ EX-5396 - Field User Customer accept the project Invites : Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (23092ms)
√ EX-5396 - Field User Customer accept the project Invites : Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (23092ms)
√ EX-5396 - Upload COR with full data set, mandatory and optional data.Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (67537ms)
√ EX-5396 - Upload COR with full data set, mandatory and optional data.Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (67537ms)
√ EX-5396 - Verify the COR data in the COR Log.Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (49968ms)
√ EX-5396 - Verify the COR data in the COR Log.Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (49968ms)
√ EX-5396 - Cleanup GC... Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (36348ms)
√ EX-5396 - Cleanup GC... Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (36348ms)
√ EX-5396 - Cleanup SC... Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (29958ms)
√ EX-5396 - Cleanup SC... Fri Aug 11 2023 22:36:35 GMT+0000 (Greenwich Mean Time) (29958ms)
11 passing (7m)
11 passing (7m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_048.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 11 │
│ Passing: 11 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 7 minutes, 15 seconds │
│ Spec Ran: 04_COR_Log/Sent/ex-5396-verify-contractor-is-able-to-upload-cor-with-mandatory-a │
│ nd-optional-data.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/ex-5435-create-new-project-add-contrac-verify-origin (50 of 113)
al-contract-value.spec.ts
Create New Project with full set of data, as GC PM add contractor and verify the Original Contract Value.Fri Aug 11 2023 22:43:55 GMT+0000 (Greenwich Mean Time)
Create New Project with full set of data, as GC PM add contractor and verify the Original Contract Value.Fri Aug 11 2023 22:43:55 GMT+0000 (Greenwich Mean Time)
√ EX-5435 - Create a project.Fri Aug 11 2023 22:43:55 GMT+0000 (Greenwich Mean Time) (51510ms)
√ EX-5435 - Create a project.Fri Aug 11 2023 22:43:55 GMT+0000 (Greenwich Mean Time) (51510ms)
√ EX-5435 - Add contract.Fri Aug 11 2023 22:43:55 GMT+0000 (Greenwich Mean Time) (37044ms)
√ EX-5435 - Add contract.Fri Aug 11 2023 22:43:55 GMT+0000 (Greenwich Mean Time) (37044ms)
√ EX-5435 - Sub Contractor accepts the project/contract invite.Fri Aug 11 2023 22:43:55 GMT+0000 (Greenwich Mean Time) (22966ms)
√ EX-5435 - Sub Contractor accepts the project/contract invite.Fri Aug 11 2023 22:43:55 GMT+0000 (Greenwich Mean Time) (22966ms)
√ EX-5435 - Verify Original Contract Value.Fri Aug 11 2023 22:43:55 GMT+0000 (Greenwich Mean Time) (27548ms)
√ EX-5435 - Verify Original Contract Value.Fri Aug 11 2023 22:43:55 GMT+0000 (Greenwich Mean Time) (27548ms)
√ EX-5435 - Cleanup GC... Fri Aug 11 2023 22:43:55 GMT+0000 (Greenwich Mean Time) (34912ms)
√ EX-5435 - Cleanup GC... Fri Aug 11 2023 22:43:55 GMT+0000 (Greenwich Mean Time) (34912ms)
√ EX-5435 - Cleanup SC... Fri Aug 11 2023 22:43:55 GMT+0000 (Greenwich Mean Time) (33222ms)
√ EX-5435 - Cleanup SC... Fri Aug 11 2023 22:43:55 GMT+0000 (Greenwich Mean Time) (33222ms)
6 passing (3m)
6 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_049.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 6 │
│ Passing: 6 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 27 seconds │
│ Spec Ran: 04_COR_Log/Sent/ex-5435-create-new-project-add-contrac-verify-original-contract- │
│ value.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/ex-6681-verify-sent-summary-data-after-filtering-by- (51 of 113)
project.spec.ts
As Sub Contractor go to COR Log / Sent and verify the Summary data when fitered for one and multiple projects.Fri Aug 11 2023 22:47:28 GMT+0000 (Greenwich Mean Time)
As Sub Contractor go to COR Log / Sent and verify the Summary data when fitered for one and multiple projects.Fri Aug 11 2023 22:47:28 GMT+0000 (Greenwich Mean Time)
√ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by single Project.Fri Aug 11 2023 22:47:28 GMT+0000 (Greenwich Mean Time) (49240ms)
√ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by single Project.Fri Aug 11 2023 22:47:28 GMT+0000 (Greenwich Mean Time) (49240ms)
√ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by multiple Projects.Fri Aug 11 2023 22:47:28 GMT+0000 (Greenwich Mean Time) (65813ms)
√ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by multiple Projects.Fri Aug 11 2023 22:47:28 GMT+0000 (Greenwich Mean Time) (65813ms)
2 passing (2m)
2 passing (2m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_050.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 56 seconds │
│ Spec Ran: 04_COR_Log/Sent/ex-6681-verify-sent-summary-data-after-filtering-by-project.spec │
│ .ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Received/ex-5425-verify-received-summary-data-after-filte (52 of 113)
ring-by-project.spec.ts
T&M | Verify the RECEIVED Labor Hours Summary and T&M Log Summary shows correct values before and after filtering.Fri Aug 11 2023 22:49:29 GMT+0000 (Greenwich Mean Time)
T&M | Verify the RECEIVED Labor Hours Summary and T&M Log Summary shows correct values before and after filtering.Fri Aug 11 2023 22:49:29 GMT+0000 (Greenwich Mean Time)
√ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by single project.Fri Aug 11 2023 22:49:29 GMT+0000 (Greenwich Mean Time) (67049ms)
√ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by single project.Fri Aug 11 2023 22:49:29 GMT+0000 (Greenwich Mean Time) (67049ms)
√ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by multiple projects.Fri Aug 11 2023 22:49:29 GMT+0000 (Greenwich Mean Time) (46541ms)
√ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by multiple projects.Fri Aug 11 2023 22:49:29 GMT+0000 (Greenwich Mean Time) (46541ms)
2 passing (2m)
2 passing (2m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_051.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 56 seconds │
│ Spec Ran: 05_T&M_Log/Received/ex-5425-verify-received-summary-data-after-filtering-by-proj │
│ ect.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Received/ex-5429-verify-received-export-csv-after-filteri (53 of 113)
ng-by-project.spec.ts
T&M | Verify the T&M Log / RECEIVED CSV exports.Fri Aug 11 2023 22:51:31 GMT+0000 (Greenwich Mean Time)
T&M | Verify the T&M Log / RECEIVED CSV exports.Fri Aug 11 2023 22:51:31 GMT+0000 (Greenwich Mean Time)
√ EX-5429 - Verify the T&M Log / RECEIVED CSV export.Fri Aug 11 2023 22:51:31 GMT+0000 (Greenwich Mean Time) (55544ms)
√ EX-5429 - Verify the T&M Log / RECEIVED CSV export.Fri Aug 11 2023 22:51:31 GMT+0000 (Greenwich Mean Time) (55544ms)
1 passing (56s)
1 passing (56s)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_052.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 55 seconds │
│ Spec Ran: 05_T&M_Log/Received/ex-5429-verify-received-export-csv-after-filtering-by-projec │
│ t.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Received/ex-5431-verify-received-export-sharelog-after-fi (54 of 113)
ltering-by-project.spec.ts
T&M | Verify the T&M Log / RECEIVED ShareLog exports.Fri Aug 11 2023 22:52:31 GMT+0000 (Greenwich Mean Time)
T&M | Verify the T&M Log / RECEIVED ShareLog exports.Fri Aug 11 2023 22:52:31 GMT+0000 (Greenwich Mean Time)
√ EX-5431 - Verify the T&M Log / RECEIVED ShareLog export.Fri Aug 11 2023 22:52:31 GMT+0000 (Greenwich Mean Time) (54314ms)
√ EX-5431 - Verify the T&M Log / RECEIVED ShareLog export.Fri Aug 11 2023 22:52:31 GMT+0000 (Greenwich Mean Time) (54314ms)
1 passing (55s)
1 passing (55s)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_053.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 54 seconds │
│ Spec Ran: 05_T&M_Log/Received/ex-5431-verify-received-export-sharelog-after-filtering-by-p │
│ roject.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Received/ex-5641-verify-tnm-log-received-summary-data-aft (55 of 113)
er-filtering-by-tag-status.spec.ts
T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Fri Aug 11 2023 22:53:31 GMT+0000 (Greenwich Mean Time)
T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Fri Aug 11 2023 22:53:31 GMT+0000 (Greenwich Mean Time)
√ EX-5641 - Filter by status Awaiting Signature and verify the Summary data for the test project.Fri Aug 11 2023 22:53:31 GMT+0000 (Greenwich Mean Time) (63529ms)
√ EX-5641 - Filter by status Awaiting Signature and verify the Summary data for the test project.Fri Aug 11 2023 22:53:31 GMT+0000 (Greenwich Mean Time) (63529ms)
√ EX-5641 - Filter by status Open and verify the Summary data for the test project.Fri Aug 11 2023 22:53:31 GMT+0000 (Greenwich Mean Time) (61709ms)
√ EX-5641 - Filter by status Open and verify the Summary data for the test project.Fri Aug 11 2023 22:53:31 GMT+0000 (Greenwich Mean Time) (61709ms)
√ EX-5641 - Filter by status Rejected and verify the Summary data for the test project.Fri Aug 11 2023 22:53:31 GMT+0000 (Greenwich Mean Time) (58783ms)
√ EX-5641 - Filter by status Rejected and verify the Summary data for the test project.Fri Aug 11 2023 22:53:31 GMT+0000 (Greenwich Mean Time) (58783ms)
√ EX-5641 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Fri Aug 11 2023 22:53:31 GMT+0000 (Greenwich Mean Time) (59925ms)
√ EX-5641 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Fri Aug 11 2023 22:53:31 GMT+0000 (Greenwich Mean Time) (59925ms)
√ EX-5641 - Filter by status Signed and verify the Summary data for the test project.Fri Aug 11 2023 22:53:31 GMT+0000 (Greenwich Mean Time) (58038ms)
√ EX-5641 - Filter by status Signed and verify the Summary data for the test project.Fri Aug 11 2023 22:53:31 GMT+0000 (Greenwich Mean Time) (58038ms)
5 passing (5m)
5 passing (5m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_054.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 5 │
│ Passing: 5 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 6 seconds │
│ Spec Ran: 05_T&M_Log/Received/ex-5641-verify-tnm-log-received-summary-data-after-filtering │
│ -by-tag-status.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-4415-1-gc-creates-project-and-contract-sc-creates (56 of 113)
-tag-optional-signer.spec.ts
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Fri Aug 11 2023 22:58:43 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Fri Aug 11 2023 22:58:43 GMT+0000 (Greenwich Mean Time)
√ EX-4415 - Part 1: GC PM creates a projectFri Aug 11 2023 22:58:43 GMT+0000 (Greenwich Mean Time) (49757ms)
√ EX-4415 - Part 1: GC PM creates a projectFri Aug 11 2023 22:58:43 GMT+0000 (Greenwich Mean Time) (49757ms)
√ EX-4415 - Part 2: GC PM adds a contract with SC PM.Fri Aug 11 2023 22:58:43 GMT+0000 (Greenwich Mean Time) (38699ms)
√ EX-4415 - Part 2: GC PM adds a contract with SC PM.Fri Aug 11 2023 22:58:43 GMT+0000 (Greenwich Mean Time) (38699ms)
√ EX-4415 - Part 3.1: Sub Contractor accepts invite from the bell notification.Fri Aug 11 2023 22:58:43 GMT+0000 (Greenwich Mean Time) (27622ms)
√ EX-4415 - Part 3.1: Sub Contractor accepts invite from the bell notification.Fri Aug 11 2023 22:58:43 GMT+0000 (Greenwich Mean Time) (27622ms)
√ EX-4415 - Part 3.2: Sub Contractor adds users to the project.Fri Aug 11 2023 22:58:43 GMT+0000 (Greenwich Mean Time) (74686ms)
√ EX-4415 - Part 3.2: Sub Contractor adds users to the project.Fri Aug 11 2023 22:58:43 GMT+0000 (Greenwich Mean Time) (74686ms)
√ EX-4415 - Part 4: Sub Contractor creates a Tag and sends signature request.Fri Aug 11 2023 22:58:43 GMT+0000 (Greenwich Mean Time) (75178ms)
√ EX-4415 - Part 4: Sub Contractor creates a Tag and sends signature request.Fri Aug 11 2023 22:58:43 GMT+0000 (Greenwich Mean Time) (75178ms)
5 passing (4m)
5 passing (4m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_055.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 5 │
│ Passing: 5 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 4 minutes, 26 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-4415-1-gc-creates-project-and-contract-sc-creates-tag-optiona │
│ l-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-4415-2-gc-creates-project-and-contract-sc-creates (57 of 113)
-tag-optional-signer.spec.ts
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Fri Aug 11 2023 23:03:15 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Fri Aug 11 2023 23:03:15 GMT+0000 (Greenwich Mean Time)
√ EX-4415 - Part 5: Sub Contractor ADD Labor valuesFri Aug 11 2023 23:03:15 GMT+0000 (Greenwich Mean Time) (190959ms)
√ EX-4415 - Part 5: Sub Contractor ADD Labor valuesFri Aug 11 2023 23:03:15 GMT+0000 (Greenwich Mean Time) (190959ms)
√ EX-4415 - Part 6: Sub Contractor Add Material valuesFri Aug 11 2023 23:03:15 GMT+0000 (Greenwich Mean Time) (145923ms)
√ EX-4415 - Part 6: Sub Contractor Add Material valuesFri Aug 11 2023 23:03:15 GMT+0000 (Greenwich Mean Time) (145923ms)
2 passing (6m)
2 passing (6m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_056.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 38 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-4415-2-gc-creates-project-and-contract-sc-creates-tag-optiona │
│ l-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-4415-3-gc-creates-project-and-contract-sc-creates (58 of 113)
-tag-optional-signer.spec.ts
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Fri Aug 11 2023 23:08:58 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Fri Aug 11 2023 23:08:58 GMT+0000 (Greenwich Mean Time)
√ EX-4415 - Part 7: Sub Contractor Adds Equipment. Fri Aug 11 2023 23:08:58 GMT+0000 (Greenwich Mean Time) (169905ms)
√ EX-4415 - Part 7: Sub Contractor Adds Equipment. Fri Aug 11 2023 23:08:58 GMT+0000 (Greenwich Mean Time) (169905ms)
1 passing (3m)
1 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_057.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 2 minutes, 50 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-4415-3-gc-creates-project-and-contract-sc-creates-tag-optiona │
│ l-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-4415-4-gc-creates-project-and-contract-sc-creates (59 of 113)
-tag-optional-signer.spec.ts
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Fri Aug 11 2023 23:11:55 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Fri Aug 11 2023 23:11:55 GMT+0000 (Greenwich Mean Time)
√ EX-4415 - Part 8: Sub Contractor Adds Other. Fri Aug 11 2023 23:11:55 GMT+0000 (Greenwich Mean Time) (190334ms)
√ EX-4415 - Part 8: Sub Contractor Adds Other. Fri Aug 11 2023 23:11:55 GMT+0000 (Greenwich Mean Time) (190334ms)
1 passing (3m)
1 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_058.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 10 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-4415-4-gc-creates-project-and-contract-sc-creates-tag-optiona │
│ l-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-4415-5-gc-creates-project-and-contract-sc-creates (60 of 113)
-tag-optional-signer.spec.ts
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Fri Aug 11 2023 23:15:12 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Fri Aug 11 2023 23:15:12 GMT+0000 (Greenwich Mean Time)
√ EX-4415 - Part 9 : Sub Contractor uploads files.Fri Aug 11 2023 23:15:12 GMT+0000 (Greenwich Mean Time) (101168ms)
√ EX-4415 - Part 9 : Sub Contractor uploads files.Fri Aug 11 2023 23:15:12 GMT+0000 (Greenwich Mean Time) (101168ms)
√ EX-4415 - Part 10 : Sub Contractor signs the Tag.Fri Aug 11 2023 23:15:12 GMT+0000 (Greenwich Mean Time) (67839ms)
√ EX-4415 - Part 10 : Sub Contractor signs the Tag.Fri Aug 11 2023 23:15:12 GMT+0000 (Greenwich Mean Time) (67839ms)
2 passing (3m)
2 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_059.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 2 minutes, 49 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optiona │
│ l-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates (61 of 113)
-tag-optional-signer.spec.ts
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Fri Aug 11 2023 23:18:07 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Fri Aug 11 2023 23:18:07 GMT+0000 (Greenwich Mean Time)
√ EX-4415 - Part 11 : Sub Contractor sends signature request.Fri Aug 11 2023 23:18:07 GMT+0000 (Greenwich Mean Time) (80886ms)
√ EX-4415 - Part 11 : Sub Contractor sends signature request.Fri Aug 11 2023 23:18:07 GMT+0000 (Greenwich Mean Time) (80886ms)
√ EX-4415 - Part 12: Verify the tag was created.Fri Aug 11 2023 23:18:07 GMT+0000 (Greenwich Mean Time) (33687ms)
√ EX-4415 - Part 12: Verify the tag was created.Fri Aug 11 2023 23:18:07 GMT+0000 (Greenwich Mean Time) (33687ms)
√ EX-4415 - Part 13: Verify the GC sees the tag.Fri Aug 11 2023 23:18:07 GMT+0000 (Greenwich Mean Time) (28962ms)
√ EX-4415 - Part 13: Verify the GC sees the tag.Fri Aug 11 2023 23:18:07 GMT+0000 (Greenwich Mean Time) (28962ms)
√ EX-4415 - Part 14: Verify GC PM User recived emailsFri Aug 11 2023 23:20:37 GMT+0000 (Greenwich Mean Time)
√ EX-4415 - Part 14: Verify GC PM User recived emailsFri Aug 11 2023 23:20:37 GMT+0000 (Greenwich Mean Time)
√ EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Fri Aug 11 2023 23:20:42 GMT+0000 (Greenwich Mean Time) (30919ms)
√ EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Fri Aug 11 2023 23:20:42 GMT+0000 (Greenwich Mean Time) (30919ms)
√ EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Fri Aug 11 2023 23:20:42 GMT+0000 (Greenwich Mean Time) (33408ms)
√ EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Fri Aug 11 2023 23:20:42 GMT+0000 (Greenwich Mean Time) (33408ms)
√ EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Fri Aug 11 2023 23:20:42 GMT+0000 (Greenwich Mean Time) (28061ms)
√ EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Fri Aug 11 2023 23:20:42 GMT+0000 (Greenwich Mean Time) (28061ms)
√ EX-4415 - Part 18: Cleanup...Fri Aug 11 2023 23:20:42 GMT+0000 (Greenwich Mean Time) (34520ms)
√ EX-4415 - Part 18: Cleanup...Fri Aug 11 2023 23:20:42 GMT+0000 (Greenwich Mean Time) (34520ms)
8 passing (5m)
8 passing (5m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_060.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 8 │
│ Passing: 8 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 4 minutes, 42 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optiona │
│ l-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-5424-verify-sent-summary-data-after-filtering-by- (62 of 113)
project.spec.ts
As Sub Contractor go to T&M Log / Sent and verify the Summary data for the test project.Fri Aug 11 2023 23:22:54 GMT+0000 (Greenwich Mean Time)
As Sub Contractor go to T&M Log / Sent and verify the Summary data for the test project.Fri Aug 11 2023 23:22:54 GMT+0000 (Greenwich Mean Time)
√ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log Overview Summary shows correct values when filtered by single Project.Fri Aug 11 2023 23:22:54 GMT+0000 (Greenwich Mean Time) (52797ms)
√ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log Overview Summary shows correct values when filtered by single Project.Fri Aug 11 2023 23:22:54 GMT+0000 (Greenwich Mean Time) (52797ms)
√ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log OVerview Summary shows correct values when filtered by multiple Projects.Fri Aug 11 2023 23:22:54 GMT+0000 (Greenwich Mean Time) (91519ms)
√ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log OVerview Summary shows correct values when filtered by multiple Projects.Fri Aug 11 2023 23:22:54 GMT+0000 (Greenwich Mean Time) (91519ms)
2 passing (2m)
2 passing (2m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_061.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 2 minutes, 26 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-5424-verify-sent-summary-data-after-filtering-by-project.spec │
│ .ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-5430-verify-sent-export-csv-after-filtering-by-pr (63 of 113)
oject.spec.ts
T&M | Verify the T&M Log / Sent CSV export.Fri Aug 11 2023 23:25:26 GMT+0000 (Greenwich Mean Time)
T&M | Verify the T&M Log / Sent CSV export.Fri Aug 11 2023 23:25:26 GMT+0000 (Greenwich Mean Time)
√ EX-5430 - Verify the T&M Log / Sent CSV export.Fri Aug 11 2023 23:25:26 GMT+0000 (Greenwich Mean Time) (46264ms)
√ EX-5430 - Verify the T&M Log / Sent CSV export.Fri Aug 11 2023 23:25:26 GMT+0000 (Greenwich Mean Time) (46264ms)
1 passing (47s)
1 passing (47s)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_062.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 46 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-5430-verify-sent-export-csv-after-filtering-by-project.spec.t │
│ s │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-5505-verify-tnm-log-sent-summary-data-after-filte (64 of 113)
ring-by-customer.spec.ts
T&M | Verify filtering the T&M Log / SENT, by Customer, returns correct values for Labor Hours Summary.Fri Aug 11 2023 23:26:18 GMT+0000 (Greenwich Mean Time)
T&M | Verify filtering the T&M Log / SENT, by Customer, returns correct values for Labor Hours Summary.Fri Aug 11 2023 23:26:18 GMT+0000 (Greenwich Mean Time)
√ EX-5505 - Filter by Customer and verify the Summary Labour Hours and T&M Log Overview Summary data for the test project.Fri Aug 11 2023 23:26:18 GMT+0000 (Greenwich Mean Time) (94156ms)
√ EX-5505 - Filter by Customer and verify the Summary Labour Hours and T&M Log Overview Summary data for the test project.Fri Aug 11 2023 23:26:18 GMT+0000 (Greenwich Mean Time) (94156ms)
1 passing (2m)
1 passing (2m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_063.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 35 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-5505-verify-tnm-log-sent-summary-data-after-filtering-by-cust │
│ omer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-5506-verify-tnm-log-sent-summary-data-after-filte (65 of 113)
ring-by-job-number.spec.ts
T&M | Verify filtering the T&M Log / SENT, by Job Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Fri Aug 11 2023 23:27:58 GMT+0000 (Greenwich Mean Time)
T&M | Verify filtering the T&M Log / SENT, by Job Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Fri Aug 11 2023 23:27:58 GMT+0000 (Greenwich Mean Time)
√ EX-5506 - Filter by JobNumber and verify the Summary data for the test project.Fri Aug 11 2023 23:27:58 GMT+0000 (Greenwich Mean Time) (97192ms)
√ EX-5506 - Filter by JobNumber and verify the Summary data for the test project.Fri Aug 11 2023 23:27:58 GMT+0000 (Greenwich Mean Time) (97192ms)
1 passing (2m)
1 passing (2m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_064.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 37 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-5506-verify-tnm-log-sent-summary-data-after-filtering-by-job- │
│ number.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-5507-verify-tnm-log-sent-summary-data-after-filte (66 of 113)
ring-by-cust-ref-num.spec.ts
T&M | Verify filtering the T&M Log / SENT, by Custmer Reference Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Fri Aug 11 2023 23:29:41 GMT+0000 (Greenwich Mean Time)
T&M | Verify filtering the T&M Log / SENT, by Custmer Reference Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Fri Aug 11 2023 23:29:41 GMT+0000 (Greenwich Mean Time)
√ EX-5507 - Filter by CustRefNum and verify the Summary data for the test project.Fri Aug 11 2023 23:29:41 GMT+0000 (Greenwich Mean Time) (89932ms)
√ EX-5507 - Filter by CustRefNum and verify the Summary data for the test project.Fri Aug 11 2023 23:29:41 GMT+0000 (Greenwich Mean Time) (89932ms)
1 passing (2m)
1 passing (2m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_065.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 31 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-5507-verify-tnm-log-sent-summary-data-after-filtering-by-cust │
│ -ref-num.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-5508-verify-tnm-log-sent-summary-data-after-filte (67 of 113)
ring-by-tag-status.spec.ts
T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Fri Aug 11 2023 23:31:17 GMT+0000 (Greenwich Mean Time)
T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Fri Aug 11 2023 23:31:17 GMT+0000 (Greenwich Mean Time)
√ EX-5508 - Filter by status Awaiting Signature and verify the Summary data for the test project.Fri Aug 11 2023 23:31:17 GMT+0000 (Greenwich Mean Time) (98282ms)
√ EX-5508 - Filter by status Awaiting Signature and verify the Summary data for the test project.Fri Aug 11 2023 23:31:17 GMT+0000 (Greenwich Mean Time) (98282ms)
√ EX-5508 - Filter by status Draft and verify the Summary data for the test project.Fri Aug 11 2023 23:31:17 GMT+0000 (Greenwich Mean Time) (91918ms)
√ EX-5508 - Filter by status Draft and verify the Summary data for the test project.Fri Aug 11 2023 23:31:17 GMT+0000 (Greenwich Mean Time) (91918ms)
√ EX-5508 - Filter by status Open and verify the Summary data for the test project.Fri Aug 11 2023 23:31:17 GMT+0000 (Greenwich Mean Time) (87435ms)
√ EX-5508 - Filter by status Open and verify the Summary data for the test project.Fri Aug 11 2023 23:31:17 GMT+0000 (Greenwich Mean Time) (87435ms)
√ EX-5508 - Filter by status Rejected and verify the Summary data for the test project.Fri Aug 11 2023 23:31:17 GMT+0000 (Greenwich Mean Time) (84744ms)
√ EX-5508 - Filter by status Rejected and verify the Summary data for the test project.Fri Aug 11 2023 23:31:17 GMT+0000 (Greenwich Mean Time) (84744ms)
√ EX-5508 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Fri Aug 11 2023 23:31:17 GMT+0000 (Greenwich Mean Time) (91792ms)
√ EX-5508 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Fri Aug 11 2023 23:31:17 GMT+0000 (Greenwich Mean Time) (91792ms)
√ EX-5508 - Filter by status Signed and verify the Summary data for the test project.Fri Aug 11 2023 23:31:17 GMT+0000 (Greenwich Mean Time) (86615ms)
√ EX-5508 - Filter by status Signed and verify the Summary data for the test project.Fri Aug 11 2023 23:31:17 GMT+0000 (Greenwich Mean Time) (86615ms)
√ EX-5508 - Filter by status Signed Not Sent and verify the Summary data for the test project.Fri Aug 11 2023 23:31:17 GMT+0000 (Greenwich Mean Time) (92807ms)
√ EX-5508 - Filter by status Signed Not Sent and verify the Summary data for the test project.Fri Aug 11 2023 23:31:17 GMT+0000 (Greenwich Mean Time) (92807ms)
7 passing (11m)
7 passing (11m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_066.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 7 │
│ Passing: 7 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 10 minutes, 41 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-5508-verify-tnm-log-sent-summary-data-after-filtering-by-tag- │
│ status.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-5509-verify-tnm-log-sent-summary-data-after-filte (68 of 113)
ring-by-cust-label.spec.ts
T&M | Verify filtering the T&M Log/SENT, by Label, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Fri Aug 11 2023 23:42:04 GMT+0000 (Greenwich Mean Time)
T&M | Verify filtering the T&M Log/SENT, by Label, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Fri Aug 11 2023 23:42:04 GMT+0000 (Greenwich Mean Time)
√ EX-5509 - Filter by Label and verify the Summary data for the test project.Fri Aug 11 2023 23:42:04 GMT+0000 (Greenwich Mean Time) (88345ms)
√ EX-5509 - Filter by Label and verify the Summary data for the test project.Fri Aug 11 2023 23:42:04 GMT+0000 (Greenwich Mean Time) (88345ms)
1 passing (1m)
1 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_067.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 29 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-5509-verify-tnm-log-sent-summary-data-after-filtering-by-cust │
│ -label.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-5510-verify-tnm-log-sent-summary-data-after-filte (69 of 113)
ring-by-cor-availability.spec.ts
T&M | Verify filtering the T&M Log/SENT, by COR availability, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Fri Aug 11 2023 23:43:39 GMT+0000 (Greenwich Mean Time)
T&M | Verify filtering the T&M Log/SENT, by COR availability, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Fri Aug 11 2023 23:43:39 GMT+0000 (Greenwich Mean Time)
√ EX-5510 - Filter by 'Display Pending CORs only' and verify the Summary data for the test project.Fri Aug 11 2023 23:43:39 GMT+0000 (Greenwich Mean Time) (91923ms)
√ EX-5510 - Filter by 'Display Pending CORs only' and verify the Summary data for the test project.Fri Aug 11 2023 23:43:39 GMT+0000 (Greenwich Mean Time) (91923ms)
√ EX-5510 - Filter by 'Display Tags with CORs only' and verify the Summary data for the test project.Fri Aug 11 2023 23:43:39 GMT+0000 (Greenwich Mean Time) (81339ms)
√ EX-5510 - Filter by 'Display Tags with CORs only' and verify the Summary data for the test project.Fri Aug 11 2023 23:43:39 GMT+0000 (Greenwich Mean Time) (81339ms)
2 passing (3m)
2 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_068.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 2 minutes, 55 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-5510-verify-tnm-log-sent-summary-data-after-filtering-by-cor- │
│ availability.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-5846-sc-creates-project-add-gc-as-customer-sc-cre (70 of 113)
ates-tag-req-and-optional-signer.spec.ts
T&M | Workflow | SC PM creates a project(adds GC PM as Req.Signer and GC Owner as Optional), SC PM send a tag, GC signs the tag as Required Signer.Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time)
T&M | Workflow | SC PM creates a project(adds GC PM as Req.Signer and GC Owner as Optional), SC PM send a tag, GC signs the tag as Required Signer.Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time)
√ EX-5846 - SC PM creates a project. Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (54721ms)
√ EX-5846 - SC PM creates a project. Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (54721ms)
√ EX-5846 - SC PM adds GC PM as Req. Signer and GC Owner as Optinal Signer. Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (44756ms)
√ EX-5846 - SC PM adds GC PM as Req. Signer and GC Owner as Optinal Signer. Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (44756ms)
√ EX-5846 - GC PM accepts invite. Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (33110ms)
√ EX-5846 - GC PM accepts invite. Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (33110ms)
√ EX-5846 - GC Owner accepts invite. Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (30935ms)
√ EX-5846 - GC Owner accepts invite. Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (30935ms)
√ EX-5846 - Sub Contractor creates a Tag and sends signature request.Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (54634ms)
√ EX-5846 - Sub Contractor creates a Tag and sends signature request.Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (54634ms)
√ EX-5846 - Verify the tag was created.Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (32151ms)
√ EX-5846 - Verify the tag was created.Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (32151ms)
√ EX-5846 - Sign the tag as GC Owner(Optional Signer).Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (57907ms)
√ EX-5846 - Sign the tag as GC Owner(Optional Signer).Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (57907ms)
√ EX-5846 - Sign the tag as GC PM(Required Signer).Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (45650ms)
√ EX-5846 - Sign the tag as GC PM(Required Signer).Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (45650ms)
√ EX-5846 - Verify the tag is signed as as GC PM(Required Signer). Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (31489ms)
√ EX-5846 - Verify the tag is signed as as GC PM(Required Signer). Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (31489ms)
√ EX-5846 - Verify the tag is signed as as GC Owner(Optional Signer). Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (34293ms)
√ EX-5846 - Verify the tag is signed as as GC Owner(Optional Signer). Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (34293ms)
√ EX-5846 - Verify the tag is signed as as SC PM. Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (32344ms)
√ EX-5846 - Verify the tag is signed as as SC PM. Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (32344ms)
√ EX-5846 - Cleanup...Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (27846ms)
√ EX-5846 - Cleanup...Fri Aug 11 2023 23:46:41 GMT+0000 (Greenwich Mean Time) (27846ms)
12 passing (8m)
12 passing (8m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_069.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 12 │
│ Passing: 12 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 8 minutes, 1 second │
│ Spec Ran: 05_T&M_Log/Sent/ex-5846-sc-creates-project-add-gc-as-customer-sc-creates-tag-req │
│ -and-optional-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-6181-1-gc-creates-project-and-contract-sc-creates (71 of 113)
-tag-optional-signer.spec.ts
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Fri Aug 11 2023 23:54:48 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Fri Aug 11 2023 23:54:48 GMT+0000 (Greenwich Mean Time)
√ EX-6181 - Part 1: GC Owner creates a project.Fri Aug 11 2023 23:54:48 GMT+0000 (Greenwich Mean Time) (49703ms)
√ EX-6181 - Part 1: GC Owner creates a project.Fri Aug 11 2023 23:54:48 GMT+0000 (Greenwich Mean Time) (49703ms)
√ EX-6181 - Part 2: GC Owner adds a contract with SC Owner.Fri Aug 11 2023 23:54:48 GMT+0000 (Greenwich Mean Time) (35356ms)
√ EX-6181 - Part 2: GC Owner adds a contract with SC Owner.Fri Aug 11 2023 23:54:48 GMT+0000 (Greenwich Mean Time) (35356ms)
√ EX-6181 - Part 3: SC Owner adds the Admin, PM and field user to the projectFri Aug 11 2023 23:54:48 GMT+0000 (Greenwich Mean Time) (89971ms)
√ EX-6181 - Part 3: SC Owner adds the Admin, PM and field user to the projectFri Aug 11 2023 23:54:48 GMT+0000 (Greenwich Mean Time) (89971ms)
3 passing (3m)
3 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_070.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 3 │
│ Passing: 3 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 2 minutes, 55 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-6181-1-gc-creates-project-and-contract-sc-creates-tag-optiona │
│ l-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-6181-2-gc-creates-project-and-contract-sc-creates (72 of 113)
-tag-optional-signer.spec.ts
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Fri Aug 11 2023 23:57:48 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Fri Aug 11 2023 23:57:48 GMT+0000 (Greenwich Mean Time)
√ EX-6181 - Part 4: Sub Contractor creates a Tag and sends signature request.Fri Aug 11 2023 23:57:48 GMT+0000 (Greenwich Mean Time) (967882ms)
√ EX-6181 - Part 4: Sub Contractor creates a Tag and sends signature request.Fri Aug 11 2023 23:57:48 GMT+0000 (Greenwich Mean Time) (967882ms)
1 passing (16m)
1 passing (16m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_071.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 16 minutes, 8 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-6181-2-gc-creates-project-and-contract-sc-creates-tag-optiona │
│ l-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-6181-3-gc-creates-project-and-contract-sc-creates (73 of 113)
-tag-optional-signer.spec.ts
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 00:14:04 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 00:14:04 GMT+0000 (Greenwich Mean Time)
√ EX-6181 - Part 5: Verify the tag was created.Sat Aug 12 2023 00:14:04 GMT+0000 (Greenwich Mean Time) (41122ms)
√ EX-6181 - Part 5: Verify the tag was created.Sat Aug 12 2023 00:14:04 GMT+0000 (Greenwich Mean Time) (41122ms)
√ EX-6181 - Part 6: Verify GC Owner recived emailsSat Aug 12 2023 00:14:51 GMT+0000 (Greenwich Mean Time)
√ EX-6181 - Part 6: Verify GC Owner recived emailsSat Aug 12 2023 00:14:51 GMT+0000 (Greenwich Mean Time)
√ EX-6181 - Part 7: Verify the GC Owner received Bell Notification and use it to sign the tag.Sat Aug 12 2023 00:14:55 GMT+0000 (Greenwich Mean Time) (31252ms)
√ EX-6181 - Part 7: Verify the GC Owner received Bell Notification and use it to sign the tag.Sat Aug 12 2023 00:14:55 GMT+0000 (Greenwich Mean Time) (31252ms)
√ EX-6181 - Part 8: Cleanup GC... Sat Aug 12 2023 00:14:55 GMT+0000 (Greenwich Mean Time) (36182ms)
√ EX-6181 - Part 8: Cleanup GC... Sat Aug 12 2023 00:14:55 GMT+0000 (Greenwich Mean Time) (36182ms)
√ EX-6181 - Part 9: Cleanup SC... Sat Aug 12 2023 00:14:55 GMT+0000 (Greenwich Mean Time) (34164ms)
√ EX-6181 - Part 9: Cleanup SC... Sat Aug 12 2023 00:14:55 GMT+0000 (Greenwich Mean Time) (34164ms)
5 passing (3m)
5 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_072.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 5 │
│ Passing: 5 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 2 minutes, 32 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-6181-3-gc-creates-project-and-contract-sc-creates-tag-optiona │
│ l-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-6191-sc-creates-tag-required-signer-gc-signs-tag. (74 of 113)
spec.ts
T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Sat Aug 12 2023 00:16:42 GMT+0000 (Greenwich Mean Time)
T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Sat Aug 12 2023 00:16:42 GMT+0000 (Greenwich Mean Time)
√ EX-6191 - Part 0: Clean the tags (47681ms)
√ EX-6191 - Part 0: Clean the tags (47681ms)
√ EX-6191 - Part 1: Sub Contractor Admin creates tag and save it as draft.Sat Aug 12 2023 00:16:42 GMT+0000 (Greenwich Mean Time) (83442ms)
√ EX-6191 - Part 1: Sub Contractor Admin creates tag and save it as draft.Sat Aug 12 2023 00:16:42 GMT+0000 (Greenwich Mean Time) (83442ms)
√ EX-6191 - Part 2: Sub Contractor Admin adds LMEO to the draft. Sat Aug 12 2023 00:16:42 GMT+0000 (Greenwich Mean Time) (128288ms)
√ EX-6191 - Part 2: Sub Contractor Admin adds LMEO to the draft. Sat Aug 12 2023 00:16:42 GMT+0000 (Greenwich Mean Time) (128288ms)
√ EX-6191 - Part 3: Sub Contractor admin adds files. Sat Aug 12 2023 00:16:42 GMT+0000 (Greenwich Mean Time) (81658ms)
√ EX-6191 - Part 3: Sub Contractor admin adds files. Sat Aug 12 2023 00:16:42 GMT+0000 (Greenwich Mean Time) (81658ms)
√ EX-6191 - Part 4: Sub Contractor admin signs the tag.Sat Aug 12 2023 00:16:42 GMT+0000 (Greenwich Mean Time) (79753ms)
√ EX-6191 - Part 4: Sub Contractor admin signs the tag.Sat Aug 12 2023 00:16:42 GMT+0000 (Greenwich Mean Time) (79753ms)
√ EX-6191 - Part 5: Sub Contractor admin sends tag for signature.Sat Aug 12 2023 00:16:42 GMT+0000 (Greenwich Mean Time) (70070ms)
√ EX-6191 - Part 5: Sub Contractor admin sends tag for signature.Sat Aug 12 2023 00:16:42 GMT+0000 (Greenwich Mean Time) (70070ms)
√ EX-6191 - Part 6: Verify the tag was created.Sat Aug 12 2023 00:16:42 GMT+0000 (Greenwich Mean Time) (38953ms)
√ EX-6191 - Part 6: Verify the tag was created.Sat Aug 12 2023 00:16:42 GMT+0000 (Greenwich Mean Time) (38953ms)
√ EX-6191 - Part 7: Verify the GC Admin sees the tag.Sat Aug 12 2023 00:16:42 GMT+0000 (Greenwich Mean Time) (40534ms)
√ EX-6191 - Part 7: Verify the GC Admin sees the tag.Sat Aug 12 2023 00:16:42 GMT+0000 (Greenwich Mean Time) (40534ms)
√ EX-6191 - Part 8: Verify GC Admin recived emailsSat Aug 12 2023 00:26:20 GMT+0000 (Greenwich Mean Time)
√ EX-6191 - Part 8: Verify GC Admin recived emailsSat Aug 12 2023 00:26:20 GMT+0000 (Greenwich Mean Time)
√ EX-6191 - Part 9: Verify the GC Admin received Bell Notification and use it to sign the tag.Sat Aug 12 2023 00:26:26 GMT+0000 (Greenwich Mean Time) (29699ms)
√ EX-6191 - Part 9: Verify the GC Admin received Bell Notification and use it to sign the tag.Sat Aug 12 2023 00:26:26 GMT+0000 (Greenwich Mean Time) (29699ms)
√ EX-6191 - Part 10: Verify the tag status in the GC Admin T&M Log.Sat Aug 12 2023 00:26:26 GMT+0000 (Greenwich Mean Time) (45492ms)
√ EX-6191 - Part 10: Verify the tag status in the GC Admin T&M Log.Sat Aug 12 2023 00:26:26 GMT+0000 (Greenwich Mean Time) (45492ms)
√ EX-6191 - Part 11: Verify the tag status in the SC Admin T&M Log.Sat Aug 12 2023 00:26:26 GMT+0000 (Greenwich Mean Time) (40159ms)
√ EX-6191 - Part 11: Verify the tag status in the SC Admin T&M Log.Sat Aug 12 2023 00:26:26 GMT+0000 (Greenwich Mean Time) (40159ms)
√ EX-6191 - Part 12: Cleanup SC Tag ... Sat Aug 12 2023 00:26:26 GMT+0000 (Greenwich Mean Time) (40677ms)
√ EX-6191 - Part 12: Cleanup SC Tag ... Sat Aug 12 2023 00:26:26 GMT+0000 (Greenwich Mean Time) (40677ms)
13 passing (12m)
13 passing (12m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_073.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 13 │
│ Passing: 13 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 12 minutes, 19 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-6191-sc-creates-tag-required-signer-gc-signs-tag.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-6193-sc-fu-creates-tag-required-signer-gc-fu-sign (75 of 113)
s-tag.spec.ts
T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Sat Aug 12 2023 00:29:07 GMT+0000 (Greenwich Mean Time)
T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Sat Aug 12 2023 00:29:07 GMT+0000 (Greenwich Mean Time)
√ EX-6193 - Part 1: Sub Contractor FU creates a Tag and sends signature request.Sat Aug 12 2023 00:29:07 GMT+0000 (Greenwich Mean Time) (189130ms)
√ EX-6193 - Part 1: Sub Contractor FU creates a Tag and sends signature request.Sat Aug 12 2023 00:29:07 GMT+0000 (Greenwich Mean Time) (189130ms)
√ EX-6193 - Part 2: Verify the tag was created.Sat Aug 12 2023 00:29:07 GMT+0000 (Greenwich Mean Time) (29027ms)
√ EX-6193 - Part 2: Verify the tag was created.Sat Aug 12 2023 00:29:07 GMT+0000 (Greenwich Mean Time) (29027ms)
√ EX-6193 - Part 3: Verify the GC FU sees the tag.Sat Aug 12 2023 00:29:07 GMT+0000 (Greenwich Mean Time) (25759ms)
√ EX-6193 - Part 3: Verify the GC FU sees the tag.Sat Aug 12 2023 00:29:07 GMT+0000 (Greenwich Mean Time) (25759ms)
√ EX-6193 - Part 4: Verify GC FU recived emailsSat Aug 12 2023 00:33:17 GMT+0000 (Greenwich Mean Time)
√ EX-6193 - Part 4: Verify GC FU recived emailsSat Aug 12 2023 00:33:17 GMT+0000 (Greenwich Mean Time)
√ EX-6193 - Part 5: Verify the GC FU received Bell Notification and use it to sign the tag.Sat Aug 12 2023 00:33:23 GMT+0000 (Greenwich Mean Time) (29852ms)
√ EX-6193 - Part 5: Verify the GC FU received Bell Notification and use it to sign the tag.Sat Aug 12 2023 00:33:23 GMT+0000 (Greenwich Mean Time) (29852ms)
√ EX-6193 - Part 6: Verify the tag status in the GC FU T&M Log.Sat Aug 12 2023 00:33:23 GMT+0000 (Greenwich Mean Time) (27000ms)
√ EX-6193 - Part 6: Verify the tag status in the GC FU T&M Log.Sat Aug 12 2023 00:33:23 GMT+0000 (Greenwich Mean Time) (27000ms)
√ EX-6193 - Part 7: Verify the tag status in the SC FU T&MM Log.Sat Aug 12 2023 00:33:23 GMT+0000 (Greenwich Mean Time) (25315ms)
√ EX-6193 - Part 7: Verify the tag status in the SC FU T&MM Log.Sat Aug 12 2023 00:33:23 GMT+0000 (Greenwich Mean Time) (25315ms)
√ EX-6193 - Part 8: Cleanup SC Tag ... Sat Aug 12 2023 00:33:23 GMT+0000 (Greenwich Mean Time) (37692ms)
√ EX-6193 - Part 8: Cleanup SC Tag ... Sat Aug 12 2023 00:33:23 GMT+0000 (Greenwich Mean Time) (37692ms)
8 passing (6m)
8 passing (6m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_074.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 8 │
│ Passing: 8 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 6 minutes, 15 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-6193-sc-fu-creates-tag-required-signer-gc-fu-signs-tag.spec.t │
│ s │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-6324-1-sc-pm-creates-project-and-contract-gc-pm-c (76 of 113)
reates-tag-optional-signer.spec.ts
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 00:35:29 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 00:35:29 GMT+0000 (Greenwich Mean Time)
√ EX-6324 - Part 0: Clean existing tags. Sat Aug 12 2023 00:35:29 GMT+0000 (Greenwich Mean Time) (48761ms)
√ EX-6324 - Part 0: Clean existing tags. Sat Aug 12 2023 00:35:29 GMT+0000 (Greenwich Mean Time) (48761ms)
√ EX-6324 - Part 1: Sub Contractor creates a Tag and saves it as draft.Sat Aug 12 2023 00:35:29 GMT+0000 (Greenwich Mean Time) (78452ms)
√ EX-6324 - Part 1: Sub Contractor creates a Tag and saves it as draft.Sat Aug 12 2023 00:35:29 GMT+0000 (Greenwich Mean Time) (78452ms)
√ EX-6324 - Part 2: Sub Contractor ADD Labor values to the draft.Sat Aug 12 2023 00:35:29 GMT+0000 (Greenwich Mean Time) (186734ms)
√ EX-6324 - Part 2: Sub Contractor ADD Labor values to the draft.Sat Aug 12 2023 00:35:29 GMT+0000 (Greenwich Mean Time) (186734ms)
√ EX-6324 - Part 3: Sub Contractor Add Material values to the draft.Sat Aug 12 2023 00:35:29 GMT+0000 (Greenwich Mean Time) (143366ms)
√ EX-6324 - Part 3: Sub Contractor Add Material values to the draft.Sat Aug 12 2023 00:35:29 GMT+0000 (Greenwich Mean Time) (143366ms)
√ EX-6324 - Part 4: Sub Contractor Adds Equipment to the draft. Sat Aug 12 2023 00:35:29 GMT+0000 (Greenwich Mean Time) (168288ms)
√ EX-6324 - Part 4: Sub Contractor Adds Equipment to the draft. Sat Aug 12 2023 00:35:29 GMT+0000 (Greenwich Mean Time) (168288ms)
5 passing (10m)
5 passing (10m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_075.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 5 │
│ Passing: 5 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 10 minutes, 28 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-6324-1-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │
│ ptional-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-6324-2-sc-pm-creates-project-and-contract-gc-pm-c (77 of 113)
reates-tag-optional-signer.spec.ts
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 00:46:03 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 00:46:03 GMT+0000 (Greenwich Mean Time)
√ EX-6324 - Part 5: Sub Contractor Adds Other to the draft. Sat Aug 12 2023 00:46:03 GMT+0000 (Greenwich Mean Time) (191866ms)
√ EX-6324 - Part 5: Sub Contractor Adds Other to the draft. Sat Aug 12 2023 00:46:03 GMT+0000 (Greenwich Mean Time) (191866ms)
√ EX-6324 - Part 6 : Sub Contractor upload files to the draft.Sat Aug 12 2023 00:46:03 GMT+0000 (Greenwich Mean Time) (95749ms)
√ EX-6324 - Part 6 : Sub Contractor upload files to the draft.Sat Aug 12 2023 00:46:03 GMT+0000 (Greenwich Mean Time) (95749ms)
√ EX-6324 - Part 7 : Sub Contractor removes one file from the draft.Sat Aug 12 2023 00:46:03 GMT+0000 (Greenwich Mean Time) (90822ms)
√ EX-6324 - Part 7 : Sub Contractor removes one file from the draft.Sat Aug 12 2023 00:46:03 GMT+0000 (Greenwich Mean Time) (90822ms)
√ EX-6324 - Part 8 : Sub Contractor signs the tag.Sat Aug 12 2023 00:46:03 GMT+0000 (Greenwich Mean Time) (97957ms)
√ EX-6324 - Part 8 : Sub Contractor signs the tag.Sat Aug 12 2023 00:46:03 GMT+0000 (Greenwich Mean Time) (97957ms)
4 passing (8m)
4 passing (8m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_076.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 4 │
│ Passing: 4 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 7 minutes, 58 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-6324-2-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │
│ ptional-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-c (78 of 113)
reates-tag-optional-signer.spec.ts
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 00:54:07 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 00:54:07 GMT+0000 (Greenwich Mean Time)
√ EX-6324 - Part 9 : Sub Contractor removes his signature and re-adds it.Sat Aug 12 2023 00:54:07 GMT+0000 (Greenwich Mean Time) (105440ms)
√ EX-6324 - Part 9 : Sub Contractor removes his signature and re-adds it.Sat Aug 12 2023 00:54:07 GMT+0000 (Greenwich Mean Time) (105440ms)
√ EX-6324 - Part 10 : Sub Contractor removes a user from the TO list and adds another signerSat Aug 12 2023 00:54:07 GMT+0000 (Greenwich Mean Time) (110090ms)
√ EX-6324 - Part 10 : Sub Contractor removes a user from the TO list and adds another signerSat Aug 12 2023 00:54:07 GMT+0000 (Greenwich Mean Time) (110090ms)
√ EX-6324 - Part 11 : Sub Contractor sends signature request.Sat Aug 12 2023 00:54:07 GMT+0000 (Greenwich Mean Time) (98099ms)
√ EX-6324 - Part 11 : Sub Contractor sends signature request.Sat Aug 12 2023 00:54:07 GMT+0000 (Greenwich Mean Time) (98099ms)
√ EX-6324 - Part 12: Verify the tag status is Awaiting Signatures.Sat Aug 12 2023 00:54:07 GMT+0000 (Greenwich Mean Time) (35477ms)
√ EX-6324 - Part 12: Verify the tag status is Awaiting Signatures.Sat Aug 12 2023 00:54:07 GMT+0000 (Greenwich Mean Time) (35477ms)
4 passing (6m)
4 passing (6m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_077.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 4 │
│ Passing: 4 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 50 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │
│ ptional-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-c (79 of 113)
reates-tag-optional-signer.spec.ts
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 01:00:04 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 01:00:04 GMT+0000 (Greenwich Mean Time)
√ EX-6324 - Part 13: Verify the GC sees the tag.Sat Aug 12 2023 01:00:04 GMT+0000 (Greenwich Mean Time) (37461ms)
√ EX-6324 - Part 13: Verify the GC sees the tag.Sat Aug 12 2023 01:00:04 GMT+0000 (Greenwich Mean Time) (37461ms)
√ EX-6324 - Part 14: Verify GC PM User recived emailsSat Aug 12 2023 01:00:47 GMT+0000 (Greenwich Mean Time)
√ EX-6324 - Part 14: Verify GC PM User recived emailsSat Aug 12 2023 01:00:47 GMT+0000 (Greenwich Mean Time)
1) EX-6324 - Part 15: Verify GC Owner User recived emails and sign the tagSat Aug 12 2023 01:00:47 GMT+0000 (Greenwich Mean Time)
1) EX-6324 - Part 15: Verify GC Owner User recived emails and sign the tagSat Aug 12 2023 01:00:47 GMT+0000 (Greenwich Mean Time)
2 passing (1m)
1 failing
1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 01:00:47 GMT+0000 (Greenwich Mean Time)
EX-6324 - Part 15: Verify GC Owner User recived emails and sign the tagSat Aug 12 2023 01:00:47 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'DO NOT DELETE - Project for EX6324' within the selector: 'td' but never did.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34)
2 passing (1m)
1 failing
1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 01:00:47 GMT+0000 (Greenwich Mean Time)
EX-6324 - Part 15: Verify GC Owner User recived emails and sign the tagSat Aug 12 2023 01:00:47 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'DO NOT DELETE - Project for EX6324' within the selector: 'td' but never did.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_078.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 3 │
│ Passing: 2 │
│ Failing: 1 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 1 │
│ Video: false │
│ Duration: 1 minute, 14 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │
│ ptional-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533)
Log\Sent\ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional
-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC
PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 010047
GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 15 Verify GC Owner User recive
d emails and sign the tagS.png
(Uploading Screenshots & Videos)
- Done Uploading (1/1) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 010047 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 15 Verify GC Owner User recived emails and sign the tagS.png
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-c (80 of 113)
reates-tag-optional-signer.spec.ts
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
1) EX-6324 - Part 16: Verify the tag status in the GC T&M Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
1) EX-6324 - Part 16: Verify the tag status in the GC T&M Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
2) EX-6324 - Part 17: Verify the tag status in the SC PM T&MM Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
2) EX-6324 - Part 17: Verify the tag status in the SC PM T&MM Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
3) EX-6324 - Part 18: Verify the tag status in the SC Owner T&MM Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
3) EX-6324 - Part 18: Verify the tag status in the SC Owner T&MM Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
4) EX-6324 - Part 19: Verify the tag status in the SC Admin T&MM Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
4) EX-6324 - Part 19: Verify the tag status in the SC Admin T&MM Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
5) EX-6324 - Part 20: Verify the tag status in the SC PM T&MM Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
5) EX-6324 - Part 20: Verify the tag status in the SC PM T&MM Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
√ EX-6324 - Part 21: Cleanup...Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time) (60153ms)
√ EX-6324 - Part 21: Cleanup...Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time) (60153ms)
1 passing (7m)
5 failing
1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
EX-6324 - Part 16: Verify the tag status in the GC T&M Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from:
> cy.get(body)
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34)
2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
EX-6324 - Part 17: Verify the tag status in the SC PM T&MM Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from:
> cy.get(body)
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34)
3) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
EX-6324 - Part 18: Verify the tag status in the SC Owner T&MM Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from:
> cy.get(body)
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34)
4) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
EX-6324 - Part 19: Verify the tag status in the SC Admin T&MM Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from:
> cy.get(body)
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34)
5) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
EX-6324 - Part 20: Verify the tag status in the SC PM T&MM Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from:
> cy.get(body)
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34)
1 passing (7m)
5 failing
1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
EX-6324 - Part 16: Verify the tag status in the GC T&M Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from:
> cy.get(body)
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34)
2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
EX-6324 - Part 17: Verify the tag status in the SC PM T&MM Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from:
> cy.get(body)
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34)
3) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
EX-6324 - Part 18: Verify the tag status in the SC Owner T&MM Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from:
> cy.get(body)
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34)
4) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
EX-6324 - Part 19: Verify the tag status in the SC Admin T&MM Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from:
> cy.get(body)
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34)
5) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time)
EX-6324 - Part 20: Verify the tag status in the SC PM T&MM Log.Sat Aug 12 2023 01:01:25 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from:
> cy.get(body)
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:7:34)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_079.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 6 │
│ Passing: 1 │
│ Failing: 5 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 5 │
│ Video: false │
│ Duration: 6 minutes, 51 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │
│ ptional-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533)
Log\Sent\ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional
-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC
PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 010125
GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 16 Verify the tag status in th
e GC T&M Log.Sat Aug 12 20.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533)
Log\Sent\ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional
-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC
PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 010125
GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 17 Verify the tag status in th
e SC PM T&MM Log.Sat Aug 1.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533)
Log\Sent\ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional
-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC
PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 010125
GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 18 Verify the tag status in th
e SC Owner T&MM Log.Sat Au.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533)
Log\Sent\ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional
-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC
PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 010125
GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 19 Verify the tag status in th
e SC Admin T&MM Log.Sat Au.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533)
Log\Sent\ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional
-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC
PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 010125
GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 20 Verify the tag status in th
e SC PM T&MM Log.Sat Aug 1.png
(Uploading Screenshots & Videos)
- Done Uploading (1/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 010125 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 20 Verify the tag status in the SC PM T&MM Log.Sat Aug 1.png
- Done Uploading (2/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 010125 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 18 Verify the tag status in the SC Owner T&MM Log.Sat Au.png
- Done Uploading (3/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 010125 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 17 Verify the tag status in the SC PM T&MM Log.Sat Aug 1.png
- Done Uploading (4/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 010125 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 16 Verify the tag status in the GC T&M Log.Sat Aug 12 20.png
- Done Uploading (5/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sat Aug 12 2023 010125 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 19 Verify the tag status in the SC Admin T&MM Log.Sat Au.png
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-6335-sc-sends-tag-gc-signs-tag-as-optional-not-sa (81 of 113)
ved-drafts.spec.ts
EX-6335 | T&M | Workflow | Existing project and contract, SC PM send a tag. GC Owner signs the tag as one of four Optional Signers. Do not save as draft.Sat Aug 12 2023 01:08:23 GMT+0000 (Greenwich Mean Time)
EX-6335 | T&M | Workflow | Existing project and contract, SC PM send a tag. GC Owner signs the tag as one of four Optional Signers. Do not save as draft.Sat Aug 12 2023 01:08:23 GMT+0000 (Greenwich Mean Time)
√ EX-6335 - Part 1: Sub Contractor creates a Tag and sends signature request. Sat Aug 12 2023 01:08:23 GMT+0000 (Greenwich Mean Time) (204368ms)
√ EX-6335 - Part 1: Sub Contractor creates a Tag and sends signature request. Sat Aug 12 2023 01:08:23 GMT+0000 (Greenwich Mean Time) (204368ms)
√ EX-6335 - Part 2: Verify the tag was created. Sat Aug 12 2023 01:08:23 GMT+0000 (Greenwich Mean Time) (37034ms)
√ EX-6335 - Part 2: Verify the tag was created. Sat Aug 12 2023 01:08:23 GMT+0000 (Greenwich Mean Time) (37034ms)
√ EX-6335 - Part 3: Verify GC User and GC Feild user recived emails. Sat Aug 12 2023 01:12:31 GMT+0000 (Greenwich Mean Time)
√ EX-6335 - Part 3: Verify GC User and GC Feild user recived emails. Sat Aug 12 2023 01:12:31 GMT+0000 (Greenwich Mean Time)
√ EX-6335 - Part 4: Sign the Tag from Email. Sat Aug 12 2023 01:12:31 GMT+0000 (Greenwich Mean Time) (11656ms)
√ EX-6335 - Part 4: Sign the Tag from Email. Sat Aug 12 2023 01:12:31 GMT+0000 (Greenwich Mean Time) (11656ms)
√ EX-6335 - Part 5: Verify the tag status in the GC T&M Log. Sat Aug 12 2023 01:12:49 GMT+0000 (Greenwich Mean Time) (35354ms)
√ EX-6335 - Part 5: Verify the tag status in the GC T&M Log. Sat Aug 12 2023 01:12:49 GMT+0000 (Greenwich Mean Time) (35354ms)
√ EX-6335 - Part 6: Verify the tag status in the SC Admin T&M Log. Sat Aug 12 2023 01:12:49 GMT+0000 (Greenwich Mean Time) (45826ms)
√ EX-6335 - Part 6: Verify the tag status in the SC Admin T&M Log. Sat Aug 12 2023 01:12:49 GMT+0000 (Greenwich Mean Time) (45826ms)
√ EX-6335 - Part 7: Verify the tag status in the SC PM T&M Log. Sat Aug 12 2023 01:12:49 GMT+0000 (Greenwich Mean Time) (35489ms)
√ EX-6335 - Part 7: Verify the tag status in the SC PM T&M Log. Sat Aug 12 2023 01:12:49 GMT+0000 (Greenwich Mean Time) (35489ms)
√ EX-6335 - Part 8: Verify the tag status in the SC Owner T&MM Log. Sat Aug 12 2023 01:12:49 GMT+0000 (Greenwich Mean Time) (36245ms)
√ EX-6335 - Part 8: Verify the tag status in the SC Owner T&MM Log. Sat Aug 12 2023 01:12:49 GMT+0000 (Greenwich Mean Time) (36245ms)
√ EX-6335 - Part 9: Verify the tag status in the SC FieldUser T&MM Log. Sat Aug 12 2023 01:12:49 GMT+0000 (Greenwich Mean Time) (33746ms)
√ EX-6335 - Part 9: Verify the tag status in the SC FieldUser T&MM Log. Sat Aug 12 2023 01:12:49 GMT+0000 (Greenwich Mean Time) (33746ms)
√ EX-6335 - Part 10: Cleanup SC Tag ... Sat Aug 12 2023 01:12:49 GMT+0000 (Greenwich Mean Time) (39787ms)
√ EX-6335 - Part 10: Cleanup SC Tag ... Sat Aug 12 2023 01:12:49 GMT+0000 (Greenwich Mean Time) (39787ms)
10 passing (8m)
10 passing (8m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_080.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 10 │
│ Passing: 10 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 8 minutes, 16 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-6335-sc-sends-tag-gc-signs-tag-as-optional-not-saved-drafts.s │
│ pec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-7224-switch-project-workflow.spec.ts (82 of 113)
T&M | SC PM creates a project, creates a tag for it, creates another project, moves the tag to the new project.Sat Aug 12 2023 01:16:46 GMT+0000 (Greenwich Mean Time)
T&M | SC PM creates a project, creates a tag for it, creates another project, moves the tag to the new project.Sat Aug 12 2023 01:16:46 GMT+0000 (Greenwich Mean Time)
√ EX-7224 - Part 1: SC PM creates a Project A.Sat Aug 12 2023 01:16:46 GMT+0000 (Greenwich Mean Time) (50781ms)
√ EX-7224 - Part 1: SC PM creates a Project A.Sat Aug 12 2023 01:16:46 GMT+0000 (Greenwich Mean Time) (50781ms)
√ EX-7224 - Part 2: SC adds customer to Project A.Sat Aug 12 2023 01:16:46 GMT+0000 (Greenwich Mean Time) (31707ms)
√ EX-7224 - Part 2: SC adds customer to Project A.Sat Aug 12 2023 01:16:46 GMT+0000 (Greenwich Mean Time) (31707ms)
√ EX-7224 - Part 3: Sub Contractor creates a tag.Sat Aug 12 2023 01:16:46 GMT+0000 (Greenwich Mean Time) (64873ms)
√ EX-7224 - Part 3: Sub Contractor creates a tag.Sat Aug 12 2023 01:16:46 GMT+0000 (Greenwich Mean Time) (64873ms)
√ EX-7224 - Part 4: Sub Contractor creates Project B.Sat Aug 12 2023 01:16:46 GMT+0000 (Greenwich Mean Time) (47365ms)
√ EX-7224 - Part 4: Sub Contractor creates Project B.Sat Aug 12 2023 01:16:46 GMT+0000 (Greenwich Mean Time) (47365ms)
√ EX-7224 - Part 5: Sub Contractor switches the tag to Project B.Sat Aug 12 2023 01:16:46 GMT+0000 (Greenwich Mean Time) (68135ms)
√ EX-7224 - Part 5: Sub Contractor switches the tag to Project B.Sat Aug 12 2023 01:16:46 GMT+0000 (Greenwich Mean Time) (68135ms)
√ EX-7224 - Part 7: Clean up Project A.Sat Aug 12 2023 01:16:46 GMT+0000 (Greenwich Mean Time) (31618ms)
√ EX-7224 - Part 7: Clean up Project A.Sat Aug 12 2023 01:16:46 GMT+0000 (Greenwich Mean Time) (31618ms)
√ EX-7224 - Part 8: Cleanup Proejct B.Sat Aug 12 2023 01:16:46 GMT+0000 (Greenwich Mean Time) (31954ms)
√ EX-7224 - Part 8: Cleanup Proejct B.Sat Aug 12 2023 01:16:46 GMT+0000 (Greenwich Mean Time) (31954ms)
7 passing (5m)
7 passing (5m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_081.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 7 │
│ Passing: 7 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 27 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-7224-switch-project-workflow.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 07_ChangeNotificationLog/Sent/ex-6030-create-cn-respond-with-upload- (83 of 113)
cor-verify-all-data.spec.ts
Change Notifications | Create CN, respond to it with Upload COR and verify the data in the CN Log. Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time)
Change Notifications | Create CN, respond to it with Upload COR and verify the data in the CN Log. Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time)
√ EX-6030 Part 1: Create a project and send invite.Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time) (49923ms)
√ EX-6030 Part 1: Create a project and send invite.Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time) (49923ms)
√ EX-6030 Part 2: Add contractor.Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time) (36788ms)
√ EX-6030 Part 2: Add contractor.Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time) (36788ms)
√ EX-6030 Part 3: Sub Contractor accepts the invite.Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time) (22312ms)
√ EX-6030 Part 3: Sub Contractor accepts the invite.Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time) (22312ms)
√ EX-6030 Part 4: Gen Contractor creates a Pricing Request Change Notification.Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time) (44096ms)
√ EX-6030 Part 4: Gen Contractor creates a Pricing Request Change Notification.Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time) (44096ms)
√ EX-6030 Part 5: Sub Contractor responds to the Change Notification with Upload COR.Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time) (73992ms)
√ EX-6030 Part 5: Sub Contractor responds to the Change Notification with Upload COR.Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time) (73992ms)
√ EX-6030 Part 6: GC verifies CN data and status.Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time) (28274ms)
√ EX-6030 Part 6: GC verifies CN data and status.Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time) (28274ms)
√ EX-6030 Part 7: Cleanup GC...Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time) (36059ms)
√ EX-6030 Part 7: Cleanup GC...Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time) (36059ms)
√ EX-6030 Part 7: Cleanup SC...Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time) (34761ms)
√ EX-6030 Part 7: Cleanup SC...Sat Aug 12 2023 01:22:19 GMT+0000 (Greenwich Mean Time) (34761ms)
8 passing (5m)
8 passing (5m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_082.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 8 │
│ Passing: 8 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 27 seconds │
│ Spec Ran: 07_ChangeNotificationLog/Sent/ex-6030-create-cn-respond-with-upload-cor-verify-a │
│ ll-data.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 07_ChangeNotificationLog/Sent/ex-8597-respond-to-cn-as-SC-and-GC-cle (84 of 113)
ar-response.spec.ts
Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseSat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time)
Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseSat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time)
√ EX-8597 Part 1: Delete existing CORs. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (45270ms)
√ EX-8597 Part 1: Delete existing CORs. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (45270ms)
√ EX-8597 Part 2: Delete existing CNs. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (22865ms)
√ EX-8597 Part 2: Delete existing CNs. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (22865ms)
√ EX-8597 Part 3: Create a CN with type as Authorize T&M Work and send it to Contractor. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (40886ms)
√ EX-8597 Part 3: Create a CN with type as Authorize T&M Work and send it to Contractor. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (40886ms)
√ EX-8597 Part 4: Respond to CN with No Cost Impact as SC PM. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (45376ms)
√ EX-8597 Part 4: Respond to CN with No Cost Impact as SC PM. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (45376ms)
√ EX-8597 Part 5: Verify the reponse and clear the response. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (47722ms)
√ EX-8597 Part 5: Verify the reponse and clear the response. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (47722ms)
√ EX-8597 Part 6: Respond to CN by creating a COR. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (56920ms)
√ EX-8597 Part 6: Respond to CN by creating a COR. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (56920ms)
√ EX-8597 Part 7: Verify the reponse and clear the response. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (44943ms)
√ EX-8597 Part 7: Verify the reponse and clear the response. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (44943ms)
1) EX-8597 Part 8: Respond to CN as SC PM by uploading a COR. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time)
1) EX-8597 Part 8: Respond to CN as SC PM by uploading a COR. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time)
2) EX-8597 Part 9: Verify the reponse and clear the response. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time)
2) EX-8597 Part 9: Verify the reponse and clear the response. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time)
√ EX-8597 Part 10: Respond to CN with No Cost Impact as GC PM and verify the reponse and clear the response. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (78045ms)
√ EX-8597 Part 10: Respond to CN with No Cost Impact as GC PM and verify the reponse and clear the response. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (78045ms)
3) EX-8597 Part 11: Respond to CN by linking received COR as GC PM and verify the reponse and clear the response. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time)
3) EX-8597 Part 11: Respond to CN by linking received COR as GC PM and verify the reponse and clear the response. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time)
√ EX-8597 Part 12: Clean the CORs. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (67336ms)
√ EX-8597 Part 12: Clean the CORs. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (67336ms)
√ EX-8597 Part 13: Clean the CNs. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (50422ms)
√ EX-8597 Part 13: Clean the CNs. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time) (50422ms)
10 passing (12m)
3 failing
1) Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseSat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time)
EX-8597 Part 8: Respond to CN as SC PM by uploading a COR. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'ext.gc.company+pm@gmail.com' within the selector: '#emailTo span' but never did.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34)
2) Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseSat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time)
EX-8597 Part 9: Verify the reponse and clear the response. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time):
Timed out retrying after 30000ms
+ expected - actual
+'08/12/2023'
at changeNotificationDetailsReceivedPage.verifyResponseDate (webpack:///./cypress/support/PageObjects/CN_Log_ChangeNotificationDetailsReceived.ts:77:36)
at Context.eval (webpack:///./cypress/e2e/regression/07_ChangeNotificationLog/Sent/ex-8597-respond-to-cn-as-SC-and-GC-clear-response.spec.ts:147:24)
3) Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseSat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time)
EX-8597 Part 11: Respond to CN by linking received COR as GC PM and verify the reponse and clear the response. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: '2' within the element: but never did.
at changeNotificationDetailsReceivedPage.checkTheCORBasedOnText (webpack:///./cypress/support/PageObjects/CN_Log_ChangeNotificationDetailsReceived.ts:137:47)
at changeNotificationDetailsReceivedPage.linToExistingCORBasedOnNumber (webpack:///./cypress/support/PageObjects/CN_Log_ChangeNotificationDetailsReceived.ts:155:13)
at Context.eval (webpack:///./cypress/e2e/regression/07_ChangeNotificationLog/Sent/ex-8597-respond-to-cn-as-SC-and-GC-clear-response.spec.ts:187:24)
10 passing (12m)
3 failing
1) Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseSat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time)
EX-8597 Part 8: Respond to CN as SC PM by uploading a COR. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'ext.gc.company+pm@gmail.com' within the selector: '#emailTo span' but never did.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34)
2) Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseSat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time)
EX-8597 Part 9: Verify the reponse and clear the response. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time):
Timed out retrying after 30000ms
+ expected - actual
+'08/12/2023'
at changeNotificationDetailsReceivedPage.verifyResponseDate (webpack:///./cypress/support/PageObjects/CN_Log_ChangeNotificationDetailsReceived.ts:77:36)
at Context.eval (webpack:///./cypress/e2e/regression/07_ChangeNotificationLog/Sent/ex-8597-respond-to-cn-as-SC-and-GC-clear-response.spec.ts:147:24)
3) Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseSat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time)
EX-8597 Part 11: Respond to CN by linking received COR as GC PM and verify the reponse and clear the response. Sat Aug 12 2023 01:27:51 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: '2' within the element: but never did.
at changeNotificationDetailsReceivedPage.checkTheCORBasedOnText (webpack:///./cypress/support/PageObjects/CN_Log_ChangeNotificationDetailsReceived.ts:137:47)
at changeNotificationDetailsReceivedPage.linToExistingCORBasedOnNumber (webpack:///./cypress/support/PageObjects/CN_Log_ChangeNotificationDetailsReceived.ts:155:13)
at Context.eval (webpack:///./cypress/e2e/regression/07_ChangeNotificationLog/Sent/ex-8597-respond-to-cn-as-SC-and-GC-clear-response.spec.ts:187:24)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_083.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 13 │
│ Passing: 10 │
│ Failing: 3 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 3 │
│ Video: false │
│ Duration: 12 minutes, 4 seconds │
│ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8597-respond-to-cn-as-SC-and-GC-clear-response. │
│ spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8597-respond-to-cn-as-SC-and-GC-clear-response.spec.ts
\Change Notifications Clear Response Respond to CN as GC and SC with all optio
ns and clear the responseSat Aug 12 2023 012751 GMT+0000 (Greenwich Mean Time) -
- EX-8597 Part 8 Respond to CN as SC PM by uploading a COR. Sat Aug 12 2023 0127
51 GMT+0000.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8597-respond-to-cn-as-SC-and-GC-clear-response.spec.ts
\Change Notifications Clear Response Respond to CN as GC and SC with all optio
ns and clear the responseSat Aug 12 2023 012751 GMT+0000 (Greenwich Mean Time) -
- EX-8597 Part 9 Verify the reponse and clear the response. Sat Aug 12 2023 0127
51 GMT+0000.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8597-respond-to-cn-as-SC-and-GC-clear-response.spec.ts
\Change Notifications Clear Response Respond to CN as GC and SC with all optio
ns and clear the responseSat Aug 12 2023 012751 GMT+0000 (Greenwich Mean Time) -
- EX-8597 Part 11 Respond to CN by linking received COR as GC PM and verify the
reponse and.png
(Uploading Screenshots & Videos)
- Done Uploading (1/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8597-respond-to-cn-as-SC-and-GC-clear-response.spec.ts\Change Notifications Clear Response Respond to CN as GC and SC with all options and clear the responseSat Aug 12 2023 012751 GMT+0000 (Greenwich Mean Time) -- EX-8597 Part 9 Verify the reponse and clear the response. Sat Aug 12 2023 012751 GMT+0000.png
- Done Uploading (2/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8597-respond-to-cn-as-SC-and-GC-clear-response.spec.ts\Change Notifications Clear Response Respond to CN as GC and SC with all options and clear the responseSat Aug 12 2023 012751 GMT+0000 (Greenwich Mean Time) -- EX-8597 Part 11 Respond to CN by linking received COR as GC PM and verify the reponse and.png
- Done Uploading (3/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8597-respond-to-cn-as-SC-and-GC-clear-response.spec.ts\Change Notifications Clear Response Respond to CN as GC and SC with all options and clear the responseSat Aug 12 2023 012751 GMT+0000 (Greenwich Mean Time) -- EX-8597 Part 8 Respond to CN as SC PM by uploading a COR. Sat Aug 12 2023 012751 GMT+0000.png
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 07_ChangeNotificationLog/Sent/ex-8599-create-cn-authorize-t&mwork-re (85 of 113)
spond-as-SC-PM-with-no-cost-impact.spec.ts
Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor. ) Sat Aug 12 2023 01:40:02 GMT+0000 (Greenwich Mean Time)
Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor. ) Sat Aug 12 2023 01:40:02 GMT+0000 (Greenwich Mean Time)
√ EX-8599 Part 1: Delete existing CN (27441ms)
√ EX-8599 Part 1: Delete existing CN (27441ms)
√ EX-8599 Part 2: Create a CN with type as Authorize T&M Work and send it to Contractor. Sat Aug 12 2023 01:40:02 GMT+0000 (Greenwich Mean Time) (45209ms)
√ EX-8599 Part 2: Create a CN with type as Authorize T&M Work and send it to Contractor. Sat Aug 12 2023 01:40:02 GMT+0000 (Greenwich Mean Time) (45209ms)
√ EX-8599 Part 3: Respond to CN with No Cost Impact. Sat Aug 12 2023 01:40:02 GMT+0000 (Greenwich Mean Time) (54110ms)
√ EX-8599 Part 3: Respond to CN with No Cost Impact. Sat Aug 12 2023 01:40:02 GMT+0000 (Greenwich Mean Time) (54110ms)
√ EX-8599 Part 4: Verify the data as Gc. Sat Aug 12 2023 01:40:02 GMT+0000 (Greenwich Mean Time) (33778ms)
√ EX-8599 Part 4: Verify the data as Gc. Sat Aug 12 2023 01:40:02 GMT+0000 (Greenwich Mean Time) (33778ms)
√ EX-8599 Part 5: Delete the CN. Sat Aug 12 2023 01:40:02 GMT+0000 (Greenwich Mean Time) (32620ms)
√ EX-8599 Part 5: Delete the CN. Sat Aug 12 2023 01:40:02 GMT+0000 (Greenwich Mean Time) (32620ms)
5 passing (3m)
5 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_084.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 5 │
│ Passing: 5 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 13 seconds │
│ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8599-create-cn-authorize-t&mwork-respond-as-SC- │
│ PM-with-no-cost-impact.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 07_ChangeNotificationLog/Sent/ex-8942-create-cn-pricing-request-resp (86 of 113)
ond-as-SC-PM-with-no-cost-impact.spec.ts
Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 01:43:21 GMT+0000 (Greenwich Mean Time)
Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 01:43:21 GMT+0000 (Greenwich Mean Time)
√ EX-8942 Part 1: Delete existing CN (30576ms)
√ EX-8942 Part 1: Delete existing CN (30576ms)
√ EX-8942 Part 2: Create a CN with type as Pricing Request and send it to ContractorSat Aug 12 2023 01:43:21 GMT+0000 (Greenwich Mean Time) (42450ms)
√ EX-8942 Part 2: Create a CN with type as Pricing Request and send it to ContractorSat Aug 12 2023 01:43:21 GMT+0000 (Greenwich Mean Time) (42450ms)
√ EX-8942 Part 3: Respond to CN with No Cost ImpactSat Aug 12 2023 01:43:21 GMT+0000 (Greenwich Mean Time) (59666ms)
√ EX-8942 Part 3: Respond to CN with No Cost ImpactSat Aug 12 2023 01:43:21 GMT+0000 (Greenwich Mean Time) (59666ms)
√ EX-8942 Part 4: Verify the data as GcSat Aug 12 2023 01:43:21 GMT+0000 (Greenwich Mean Time) (32704ms)
√ EX-8942 Part 4: Verify the data as GcSat Aug 12 2023 01:43:21 GMT+0000 (Greenwich Mean Time) (32704ms)
√ EX-8942 Part 5: Delete the CNSat Aug 12 2023 01:43:21 GMT+0000 (Greenwich Mean Time) (35479ms)
√ EX-8942 Part 5: Delete the CNSat Aug 12 2023 01:43:21 GMT+0000 (Greenwich Mean Time) (35479ms)
5 passing (3m)
5 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_085.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 5 │
│ Passing: 5 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 21 seconds │
│ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8942-create-cn-pricing-request-respond-as-SC-PM │
│ -with-no-cost-impact.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 07_ChangeNotificationLog/Sent/ex-8943-create-cn-pricing-request-resp (87 of 113)
ond-as-SC-PM-with-create-cor.spec.ts
Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 01:46:47 GMT+0000 (Greenwich Mean Time)
Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 01:46:47 GMT+0000 (Greenwich Mean Time)
√ EX-8943 Part 1: Delete existing CN (31348ms)
√ EX-8943 Part 1: Delete existing CN (31348ms)
√ EX-8943 Part 2: Delete existing CORsSat Aug 12 2023 01:46:47 GMT+0000 (Greenwich Mean Time) (36336ms)
√ EX-8943 Part 2: Delete existing CORsSat Aug 12 2023 01:46:47 GMT+0000 (Greenwich Mean Time) (36336ms)
√ EX-8943 Part 3: Create a CN with type as Pricing Request and send it to ContractorSat Aug 12 2023 01:46:47 GMT+0000 (Greenwich Mean Time) (41342ms)
√ EX-8943 Part 3: Create a CN with type as Pricing Request and send it to ContractorSat Aug 12 2023 01:46:47 GMT+0000 (Greenwich Mean Time) (41342ms)
√ EX-8943 Part 4: Respond to CN with create corSat Aug 12 2023 01:46:47 GMT+0000 (Greenwich Mean Time) (71489ms)
√ EX-8943 Part 4: Respond to CN with create corSat Aug 12 2023 01:46:47 GMT+0000 (Greenwich Mean Time) (71489ms)
√ EX-8943 Part 5: Verify the data as GcSat Aug 12 2023 01:46:47 GMT+0000 (Greenwich Mean Time) (34306ms)
√ EX-8943 Part 5: Verify the data as GcSat Aug 12 2023 01:46:47 GMT+0000 (Greenwich Mean Time) (34306ms)
√ EX-8943 Part 6: Delete all CORsSat Aug 12 2023 01:46:47 GMT+0000 (Greenwich Mean Time) (49016ms)
√ EX-8943 Part 6: Delete all CORsSat Aug 12 2023 01:46:47 GMT+0000 (Greenwich Mean Time) (49016ms)
√ EX-8943 Part 7: Delete the CNSat Aug 12 2023 01:46:47 GMT+0000 (Greenwich Mean Time) (32436ms)
√ EX-8943 Part 7: Delete the CNSat Aug 12 2023 01:46:47 GMT+0000 (Greenwich Mean Time) (32436ms)
7 passing (5m)
7 passing (5m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_086.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 7 │
│ Passing: 7 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 4 minutes, 57 seconds │
│ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8943-create-cn-pricing-request-respond-as-SC-PM │
│ -with-create-cor.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 07_ChangeNotificationLog/Sent/ex-8944-create-cn-pricing-request-resp (88 of 113)
ond-as-SC-PM-with-upload-cor.spec.ts
Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 01:51:50 GMT+0000 (Greenwich Mean Time)
Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 01:51:50 GMT+0000 (Greenwich Mean Time)
√ EX-8944 Part 1: Delete existing CN (27586ms)
√ EX-8944 Part 1: Delete existing CN (27586ms)
√ EX-8944 Part 2: Delete existing CORsSat Aug 12 2023 01:51:50 GMT+0000 (Greenwich Mean Time) (39971ms)
√ EX-8944 Part 2: Delete existing CORsSat Aug 12 2023 01:51:50 GMT+0000 (Greenwich Mean Time) (39971ms)
√ EX-8944 Part 3: Create a CN with type as Pricing Request and send it to ContractorSat Aug 12 2023 01:51:50 GMT+0000 (Greenwich Mean Time) (42075ms)
√ EX-8944 Part 3: Create a CN with type as Pricing Request and send it to ContractorSat Aug 12 2023 01:51:50 GMT+0000 (Greenwich Mean Time) (42075ms)
√ EX-8944 Part 4: Respond to CN with upload corSat Aug 12 2023 01:51:50 GMT+0000 (Greenwich Mean Time) (77325ms)
√ EX-8944 Part 4: Respond to CN with upload corSat Aug 12 2023 01:51:50 GMT+0000 (Greenwich Mean Time) (77325ms)
√ EX-8944 Part 5: Verify the data as GcSat Aug 12 2023 01:51:50 GMT+0000 (Greenwich Mean Time) (35707ms)
√ EX-8944 Part 5: Verify the data as GcSat Aug 12 2023 01:51:50 GMT+0000 (Greenwich Mean Time) (35707ms)
√ EX-8944 Part 6: Delete all CORsSat Aug 12 2023 01:51:50 GMT+0000 (Greenwich Mean Time) (49238ms)
√ EX-8944 Part 6: Delete all CORsSat Aug 12 2023 01:51:50 GMT+0000 (Greenwich Mean Time) (49238ms)
√ EX-8944 Part 7: Delete the CNSat Aug 12 2023 01:51:50 GMT+0000 (Greenwich Mean Time) (35368ms)
√ EX-8944 Part 7: Delete the CNSat Aug 12 2023 01:51:50 GMT+0000 (Greenwich Mean Time) (35368ms)
7 passing (5m)
7 passing (5m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_087.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 7 │
│ Passing: 7 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 8 seconds │
│ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8944-create-cn-pricing-request-respond-as-SC-PM │
│ -with-upload-cor.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 07_ChangeNotificationLog/Sent/ex-8945-create-cn-pricing-request-resp (89 of 113)
ond-as-GC-PM-with-no-cost-impact.spec.ts
Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 01:57:03 GMT+0000 (Greenwich Mean Time)
Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 01:57:03 GMT+0000 (Greenwich Mean Time)
√ EX-8945 Part 1: Delete existing CN (31724ms)
√ EX-8945 Part 1: Delete existing CN (31724ms)
√ EX-8945 Part 2: Create a CN with type as Pricing Request and send it to ContractorSat Aug 12 2023 01:57:03 GMT+0000 (Greenwich Mean Time) (41799ms)
√ EX-8945 Part 2: Create a CN with type as Pricing Request and send it to ContractorSat Aug 12 2023 01:57:03 GMT+0000 (Greenwich Mean Time) (41799ms)
√ EX-8945 Part 3: Respond to CN with No Cost Impact as GC PMSat Aug 12 2023 01:57:03 GMT+0000 (Greenwich Mean Time) (54964ms)
√ EX-8945 Part 3: Respond to CN with No Cost Impact as GC PMSat Aug 12 2023 01:57:03 GMT+0000 (Greenwich Mean Time) (54964ms)
√ EX-8945 Part 4: Verify the data as ScSat Aug 12 2023 01:57:03 GMT+0000 (Greenwich Mean Time) (34625ms)
√ EX-8945 Part 4: Verify the data as ScSat Aug 12 2023 01:57:03 GMT+0000 (Greenwich Mean Time) (34625ms)
√ EX-8945 Part 5: Delete the CNSat Aug 12 2023 01:57:03 GMT+0000 (Greenwich Mean Time) (33091ms)
√ EX-8945 Part 5: Delete the CNSat Aug 12 2023 01:57:03 GMT+0000 (Greenwich Mean Time) (33091ms)
5 passing (3m)
5 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_088.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 5 │
│ Passing: 5 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 17 seconds │
│ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8945-create-cn-pricing-request-respond-as-GC-PM │
│ -with-no-cost-impact.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 07_ChangeNotificationLog/Sent/ex-8946-create-cn-pricing-request-resp (90 of 113)
ond-as-GC-PM-by-linking-existing-cor.spec.ts
Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:00:26 GMT+0000 (Greenwich Mean Time)
Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:00:26 GMT+0000 (Greenwich Mean Time)
√ EX-8946 Part 1: Delete existing CN (32237ms)
√ EX-8946 Part 1: Delete existing CN (32237ms)
√ EX-8946 Part 2: Create a CN with type as Pricing Request and send it to ContractorSat Aug 12 2023 02:00:26 GMT+0000 (Greenwich Mean Time) (45696ms)
√ EX-8946 Part 2: Create a CN with type as Pricing Request and send it to ContractorSat Aug 12 2023 02:00:26 GMT+0000 (Greenwich Mean Time) (45696ms)
√ EX-8946 Part 3: Respond to CN by linking received COR as GC PMSat Aug 12 2023 02:00:26 GMT+0000 (Greenwich Mean Time) (50819ms)
√ EX-8946 Part 3: Respond to CN by linking received COR as GC PMSat Aug 12 2023 02:00:26 GMT+0000 (Greenwich Mean Time) (50819ms)
√ EX-8946 Part 4: Verify the data as ScSat Aug 12 2023 02:00:26 GMT+0000 (Greenwich Mean Time) (35190ms)
√ EX-8946 Part 4: Verify the data as ScSat Aug 12 2023 02:00:26 GMT+0000 (Greenwich Mean Time) (35190ms)
√ EX-8946 Part 5: Delete the CNSat Aug 12 2023 02:00:26 GMT+0000 (Greenwich Mean Time) (34070ms)
√ EX-8946 Part 5: Delete the CNSat Aug 12 2023 02:00:26 GMT+0000 (Greenwich Mean Time) (34070ms)
5 passing (3m)
5 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_089.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 5 │
│ Passing: 5 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 19 seconds │
│ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8946-create-cn-pricing-request-respond-as-GC-PM │
│ -by-linking-existing-cor.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 07_ChangeNotificationLog/Sent/ex-8947-create-cn-authorize-t&mwork-re (91 of 113)
spond-as-SC-PM-with-create-cor.spec.ts
Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:03:50 GMT+0000 (Greenwich Mean Time)
Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:03:50 GMT+0000 (Greenwich Mean Time)
√ EX-8947 Part 1: Delete existing CN (28570ms)
√ EX-8947 Part 1: Delete existing CN (28570ms)
√ EX-8947 Part 2: Delete existing CORsSat Aug 12 2023 02:03:50 GMT+0000 (Greenwich Mean Time) (33962ms)
√ EX-8947 Part 2: Delete existing CORsSat Aug 12 2023 02:03:50 GMT+0000 (Greenwich Mean Time) (33962ms)
√ EX-8947 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorSat Aug 12 2023 02:03:50 GMT+0000 (Greenwich Mean Time) (44638ms)
√ EX-8947 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorSat Aug 12 2023 02:03:50 GMT+0000 (Greenwich Mean Time) (44638ms)
√ EX-8947 Part 4: Respond to CN with create corSat Aug 12 2023 02:03:50 GMT+0000 (Greenwich Mean Time) (65089ms)
√ EX-8947 Part 4: Respond to CN with create corSat Aug 12 2023 02:03:50 GMT+0000 (Greenwich Mean Time) (65089ms)
√ EX-8947 Part 5: Verify the data as GcSat Aug 12 2023 02:03:50 GMT+0000 (Greenwich Mean Time) (35350ms)
√ EX-8947 Part 5: Verify the data as GcSat Aug 12 2023 02:03:50 GMT+0000 (Greenwich Mean Time) (35350ms)
√ EX-8947 Part 6: Delete all CORsSat Aug 12 2023 02:03:50 GMT+0000 (Greenwich Mean Time) (50496ms)
√ EX-8947 Part 6: Delete all CORsSat Aug 12 2023 02:03:50 GMT+0000 (Greenwich Mean Time) (50496ms)
√ EX-8947 Part 7: Delete the CNSat Aug 12 2023 02:03:50 GMT+0000 (Greenwich Mean Time) (36216ms)
√ EX-8947 Part 7: Delete the CNSat Aug 12 2023 02:03:50 GMT+0000 (Greenwich Mean Time) (36216ms)
7 passing (5m)
7 passing (5m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_090.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 7 │
│ Passing: 7 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 4 minutes, 55 seconds │
│ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8947-create-cn-authorize-t&mwork-respond-as-SC- │
│ PM-with-create-cor.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 07_ChangeNotificationLog/Sent/ex-8948-create-cn-authorize-t&mwork-re (92 of 113)
spond-as-SC-PM-with-upload-cor.spec.ts
Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
1) EX-8948 Part 1.1: Delete existing CN
1) EX-8948 Part 1.1: Delete existing CN
√ EX-8948 Part 1.2: Delete all CORs. Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time) (71704ms)
√ EX-8948 Part 1.2: Delete all CORs. Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time) (71704ms)
√ EX-8948 Part 2: Delete existing CORsSat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time) (42782ms)
√ EX-8948 Part 2: Delete existing CORsSat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time) (42782ms)
2) EX-8948 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorSat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
2) EX-8948 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorSat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
3) EX-8948 Part 4: Respond to CN with upload corSat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
3) EX-8948 Part 4: Respond to CN with upload corSat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
4) EX-8948 Part 5: Verify the data as Gc. Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
4) EX-8948 Part 5: Verify the data as Gc. Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
5) EX-8948 Part 6: Delete all CORs. Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
5) EX-8948 Part 6: Delete all CORs. Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
6) EX-8948 Part 7: Delete the CN. Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
6) EX-8948 Part 7: Delete the CN. Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
2 passing (4m)
6 failing
1) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
EX-8948 Part 1.1: Delete existing CN:
CypressError: Timed out after waiting `30000ms` for your remote page to load.
Your page did not fire its `load` event within `30000ms`.
You can try increasing the `pageLoadTimeout` value in `cypress.config.ts` to wait longer.
Browsers will not fire the `load` event until all stylesheets and scripts are done downloading.
When this `load` event occurs, Cypress will continue running commands.
at timedOutWaitingForPageLoad (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:146876:72)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147850:16)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13866:41)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
2) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
EX-8948 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorSat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time):
CypressError: Timed out retrying after 30000ms: `cy.contains()` failed because it requires a DOM element, window or document.
No elements in the current DOM matched your query:
> cy.get(div[role='alert'])
at isElement (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161645:70)
at validateType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161503:14)
at Object.isType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161534:7)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:148739:22)
at Object.subjectFn (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:159495:16)
at $Cy.verifyUpcomingAssertions (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:140576:31)
at onRetry (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:159486:15)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16018:29)
at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:156356:65)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:155797:14)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16861:18)
at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16805:18)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18419:46)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:261:36)
3) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
EX-8948 Part 4: Respond to CN with upload corSat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:334:7)
4) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
EX-8948 Part 5: Verify the data as Gc. Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
5) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
EX-8948 Part 6: Delete all CORs. Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:334:7)
6) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
EX-8948 Part 7: Delete the CN. Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
2 passing (4m)
6 failing
1) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
EX-8948 Part 1.1: Delete existing CN:
CypressError: Timed out after waiting `30000ms` for your remote page to load.
Your page did not fire its `load` event within `30000ms`.
You can try increasing the `pageLoadTimeout` value in `cypress.config.ts` to wait longer.
Browsers will not fire the `load` event until all stylesheets and scripts are done downloading.
When this `load` event occurs, Cypress will continue running commands.
at timedOutWaitingForPageLoad (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:146876:72)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147850:16)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13866:41)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
2) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
EX-8948 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorSat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time):
CypressError: Timed out retrying after 30000ms: `cy.contains()` failed because it requires a DOM element, window or document.
No elements in the current DOM matched your query:
> cy.get(div[role='alert'])
at isElement (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161645:70)
at validateType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161503:14)
at Object.isType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161534:7)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:148739:22)
at Object.subjectFn (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:159495:16)
at $Cy.verifyUpcomingAssertions (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:140576:31)
at onRetry (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:159486:15)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16018:29)
at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:156356:65)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:155797:14)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16861:18)
at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16805:18)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18419:46)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:261:36)
3) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
EX-8948 Part 4: Respond to CN with upload corSat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:334:7)
4) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
EX-8948 Part 5: Verify the data as Gc. Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
5) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
EX-8948 Part 6: Delete all CORs. Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:334:7)
6) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time)
EX-8948 Part 7: Delete the CN. Sat Aug 12 2023 02:08:50 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_091.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 8 │
│ Passing: 2 │
│ Failing: 6 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 6 │
│ Video: false │
│ Duration: 4 minutes, 10 seconds │
│ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8948-create-cn-authorize-t&mwork-respond-as-SC- │
│ PM-with-upload-cor.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8948-create-cn-authorize-t&mwork-respond-as-SC-PM-with
-upload-cor.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM
and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 020
850 GMT+0000 (Greenwich Mean Time) -- EX-8948 Part 1.1 Delete existing CN (faile
d).png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8948-create-cn-authorize-t&mwork-respond-as-SC-PM-with
-upload-cor.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM
and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 020
850 GMT+0000 (Greenwich Mean Time) -- EX-8948 Part 3 Create a CN with type as Au
thorize T&M Work and send it t.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8948-create-cn-authorize-t&mwork-respond-as-SC-PM-with
-upload-cor.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM
and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 020
850 GMT+0000 (Greenwich Mean Time) -- EX-8948 Part 4 Respond to CN with upload c
orSat Aug 12 2023 020850 GMT+0.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8948-create-cn-authorize-t&mwork-respond-as-SC-PM-with
-upload-cor.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM
and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 020
850 GMT+0000 (Greenwich Mean Time) -- EX-8948 Part 5 Verify the data as Gc. Sat
Aug 12 2023 020850 GMT+0000 (G.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8948-create-cn-authorize-t&mwork-respond-as-SC-PM-with
-upload-cor.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM
and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 020
850 GMT+0000 (Greenwich Mean Time) -- EX-8948 Part 6 Delete all CORs. Sat Aug 12
2023 020850 GMT+0000 (Greenwi.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8948-create-cn-authorize-t&mwork-respond-as-SC-PM-with
-upload-cor.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM
and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 020
850 GMT+0000 (Greenwich Mean Time) -- EX-8948 Part 7 Delete the CN. Sat Aug 12 2
023 020850 GMT+0000 (Greenwich.png
(Uploading Screenshots & Videos)
- Done Uploading (1/6) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8948-create-cn-authorize-t&mwork-respond-as-SC-PM-with-upload-cor.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 020850 GMT+0000 (Greenwich Mean Time) -- EX-8948 Part 4 Respond to CN with upload corSat Aug 12 2023 020850 GMT+0.png
- Done Uploading (2/6) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8948-create-cn-authorize-t&mwork-respond-as-SC-PM-with-upload-cor.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 020850 GMT+0000 (Greenwich Mean Time) -- EX-8948 Part 7 Delete the CN. Sat Aug 12 2023 020850 GMT+0000 (Greenwich.png
- Done Uploading (3/6) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8948-create-cn-authorize-t&mwork-respond-as-SC-PM-with-upload-cor.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 020850 GMT+0000 (Greenwich Mean Time) -- EX-8948 Part 5 Verify the data as Gc. Sat Aug 12 2023 020850 GMT+0000 (G.png
- Done Uploading (4/6) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8948-create-cn-authorize-t&mwork-respond-as-SC-PM-with-upload-cor.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 020850 GMT+0000 (Greenwich Mean Time) -- EX-8948 Part 1.1 Delete existing CN (failed).png
- Done Uploading (5/6) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8948-create-cn-authorize-t&mwork-respond-as-SC-PM-with-upload-cor.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 020850 GMT+0000 (Greenwich Mean Time) -- EX-8948 Part 6 Delete all CORs. Sat Aug 12 2023 020850 GMT+0000 (Greenwi.png
- Done Uploading (6/6) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8948-create-cn-authorize-t&mwork-respond-as-SC-PM-with-upload-cor.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 020850 GMT+0000 (Greenwich Mean Time) -- EX-8948 Part 3 Create a CN with type as Authorize T&M Work and send it t.png
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 07_ChangeNotificationLog/Sent/ex-8949-create-cn-authorize-t&mwork-re (93 of 113)
spond-as-GC-PM-with-no-cost-impact.spec.ts
Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
1) EX-8949 Part 1: Delete existing CN
1) EX-8949 Part 1: Delete existing CN
2) EX-8949 Part 2: Create a CN with type as Authorize T&M Work and send it to ContractorSat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
2) EX-8949 Part 2: Create a CN with type as Authorize T&M Work and send it to ContractorSat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
3) EX-8949 Part 3: Respond to CN with No Cost Impact as GC PMSat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
3) EX-8949 Part 3: Respond to CN with No Cost Impact as GC PMSat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
4) EX-8949 Part 4: Verify the data as ScSat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
4) EX-8949 Part 4: Verify the data as ScSat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
5) EX-8949 Part 5: Delete the CNSat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
5) EX-8949 Part 5: Delete the CNSat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
0 passing (47s)
5 failing
1) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
EX-8949 Part 1: Delete existing CN:
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
2) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
EX-8949 Part 2: Create a CN with type as Authorize T&M Work and send it to ContractorSat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
3) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
EX-8949 Part 3: Respond to CN with No Cost Impact as GC PMSat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
4) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
EX-8949 Part 4: Verify the data as ScSat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:334:7)
5) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
EX-8949 Part 5: Delete the CNSat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
0 passing (47s)
5 failing
1) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
EX-8949 Part 1: Delete existing CN:
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
2) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
EX-8949 Part 2: Create a CN with type as Authorize T&M Work and send it to ContractorSat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
3) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
EX-8949 Part 3: Respond to CN with No Cost Impact as GC PMSat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
4) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
EX-8949 Part 4: Verify the data as ScSat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:334:7)
5) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time)
EX-8949 Part 5: Delete the CNSat Aug 12 2023 02:13:07 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_092.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 5 │
│ Passing: 0 │
│ Failing: 5 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 5 │
│ Video: false │
│ Duration: 46 seconds │
│ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8949-create-cn-authorize-t&mwork-respond-as-GC- │
│ PM-with-no-cost-impact.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8949-create-cn-authorize-t&mwork-respond-as-GC-PM-with
-no-cost-impact.spec.ts\Change Notifications Authorize T&M Work Create CN as G
C PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023
021307 GMT+0000 (Greenwich Mean Time) -- EX-8949 Part 1 Delete existing CN (fai
led).png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8949-create-cn-authorize-t&mwork-respond-as-GC-PM-with
-no-cost-impact.spec.ts\Change Notifications Authorize T&M Work Create CN as G
C PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023
021307 GMT+0000 (Greenwich Mean Time) -- EX-8949 Part 2 Create a CN with type a
s Authorize T&M Work and send it t.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8949-create-cn-authorize-t&mwork-respond-as-GC-PM-with
-no-cost-impact.spec.ts\Change Notifications Authorize T&M Work Create CN as G
C PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023
021307 GMT+0000 (Greenwich Mean Time) -- EX-8949 Part 3 Respond to CN with No C
ost Impact as GC PMSat Aug 12 2023.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8949-create-cn-authorize-t&mwork-respond-as-GC-PM-with
-no-cost-impact.spec.ts\Change Notifications Authorize T&M Work Create CN as G
C PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023
021307 GMT+0000 (Greenwich Mean Time) -- EX-8949 Part 4 Verify the data as ScSa
t Aug 12 2023 021307 GMT+0000 (Gre.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8949-create-cn-authorize-t&mwork-respond-as-GC-PM-with
-no-cost-impact.spec.ts\Change Notifications Authorize T&M Work Create CN as G
C PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023
021307 GMT+0000 (Greenwich Mean Time) -- EX-8949 Part 5 Delete the CNSat Aug 12
2023 021307 GMT+0000 (Greenwich M.png
(Uploading Screenshots & Videos)
- Done Uploading (1/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8949-create-cn-authorize-t&mwork-respond-as-GC-PM-with-no-cost-impact.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 021307 GMT+0000 (Greenwich Mean Time) -- EX-8949 Part 3 Respond to CN with No Cost Impact as GC PMSat Aug 12 2023.png
- Done Uploading (2/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8949-create-cn-authorize-t&mwork-respond-as-GC-PM-with-no-cost-impact.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 021307 GMT+0000 (Greenwich Mean Time) -- EX-8949 Part 5 Delete the CNSat Aug 12 2023 021307 GMT+0000 (Greenwich M.png
- Done Uploading (3/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8949-create-cn-authorize-t&mwork-respond-as-GC-PM-with-no-cost-impact.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 021307 GMT+0000 (Greenwich Mean Time) -- EX-8949 Part 4 Verify the data as ScSat Aug 12 2023 021307 GMT+0000 (Gre.png
- Done Uploading (4/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8949-create-cn-authorize-t&mwork-respond-as-GC-PM-with-no-cost-impact.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 021307 GMT+0000 (Greenwich Mean Time) -- EX-8949 Part 2 Create a CN with type as Authorize T&M Work and send it t.png
- Done Uploading (5/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8949-create-cn-authorize-t&mwork-respond-as-GC-PM-with-no-cost-impact.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 021307 GMT+0000 (Greenwich Mean Time) -- EX-8949 Part 1 Delete existing CN (failed).png
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 07_ChangeNotificationLog/Sent/ex-8950-create-cn-authorize-t&mwork-re (94 of 113)
spond-as-GC-PM-by-linking-existing-cor.spec.ts
Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
1) EX-8950 Part 1: Delete existing CN
1) EX-8950 Part 1: Delete existing CN
2) EX-8950 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorSat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
2) EX-8950 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorSat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
3) EX-8950 Part 4: Respond to CN by linking received COR as GC PMSat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
3) EX-8950 Part 4: Respond to CN by linking received COR as GC PMSat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
4) EX-8950 Part 5: Verify the data as ScSat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
4) EX-8950 Part 5: Verify the data as ScSat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
5) EX-8950 Part 6: Delete the CNSat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
5) EX-8950 Part 6: Delete the CNSat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
0 passing (47s)
5 failing
1) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
EX-8950 Part 1: Delete existing CN:
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
2) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
EX-8950 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorSat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
3) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
EX-8950 Part 4: Respond to CN by linking received COR as GC PMSat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
4) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
EX-8950 Part 5: Verify the data as ScSat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:334:7)
5) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
EX-8950 Part 6: Delete the CNSat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
0 passing (47s)
5 failing
1) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
EX-8950 Part 1: Delete existing CN:
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
2) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
EX-8950 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorSat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
3) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
EX-8950 Part 4: Respond to CN by linking received COR as GC PMSat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
4) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
EX-8950 Part 5: Verify the data as ScSat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:334:7)
5) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time)
EX-8950 Part 6: Delete the CNSat Aug 12 2023 02:14:00 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_093.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 5 │
│ Passing: 0 │
│ Failing: 5 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 5 │
│ Video: false │
│ Duration: 47 seconds │
│ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8950-create-cn-authorize-t&mwork-respond-as-GC- │
│ PM-by-linking-existing-cor.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8950-create-cn-authorize-t&mwork-respond-as-GC-PM-by-l
inking-existing-cor.spec.ts\Change Notifications Authorize T&M Work Create CN
as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12
2023 021400 GMT+0000 (Greenwich Mean Time) -- EX-8950 Part 1 Delete existing CN
(failed).png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8950-create-cn-authorize-t&mwork-respond-as-GC-PM-by-l
inking-existing-cor.spec.ts\Change Notifications Authorize T&M Work Create CN
as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12
2023 021400 GMT+0000 (Greenwich Mean Time) -- EX-8950 Part 3 Create a CN with ty
pe as Authorize T&M Work and send it t.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8950-create-cn-authorize-t&mwork-respond-as-GC-PM-by-l
inking-existing-cor.spec.ts\Change Notifications Authorize T&M Work Create CN
as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12
2023 021400 GMT+0000 (Greenwich Mean Time) -- EX-8950 Part 4 Respond to CN by li
nking received COR as GC PMSat Aug 12 .png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8950-create-cn-authorize-t&mwork-respond-as-GC-PM-by-l
inking-existing-cor.spec.ts\Change Notifications Authorize T&M Work Create CN
as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12
2023 021400 GMT+0000 (Greenwich Mean Time) -- EX-8950 Part 5 Verify the data as
ScSat Aug 12 2023 021400 GMT+0000 (Gre.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_Chan (1272x533)
geNotificationLog\Sent\ex-8950-create-cn-authorize-t&mwork-respond-as-GC-PM-by-l
inking-existing-cor.spec.ts\Change Notifications Authorize T&M Work Create CN
as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12
2023 021400 GMT+0000 (Greenwich Mean Time) -- EX-8950 Part 6 Delete the CNSat Au
g 12 2023 021400 GMT+0000 (Greenwich M.png
(Uploading Screenshots & Videos)
- Done Uploading (1/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8950-create-cn-authorize-t&mwork-respond-as-GC-PM-by-linking-existing-cor.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 021400 GMT+0000 (Greenwich Mean Time) -- EX-8950 Part 5 Verify the data as ScSat Aug 12 2023 021400 GMT+0000 (Gre.png
- Done Uploading (2/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8950-create-cn-authorize-t&mwork-respond-as-GC-PM-by-linking-existing-cor.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 021400 GMT+0000 (Greenwich Mean Time) -- EX-8950 Part 6 Delete the CNSat Aug 12 2023 021400 GMT+0000 (Greenwich M.png
- Done Uploading (3/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8950-create-cn-authorize-t&mwork-respond-as-GC-PM-by-linking-existing-cor.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 021400 GMT+0000 (Greenwich Mean Time) -- EX-8950 Part 3 Create a CN with type as Authorize T&M Work and send it t.png
- Done Uploading (4/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8950-create-cn-authorize-t&mwork-respond-as-GC-PM-by-linking-existing-cor.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 021400 GMT+0000 (Greenwich Mean Time) -- EX-8950 Part 4 Respond to CN by linking received COR as GC PMSat Aug 12 .png
- Done Uploading (5/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\07_ChangeNotificationLog\Sent\ex-8950-create-cn-authorize-t&mwork-respond-as-GC-PM-by-linking-existing-cor.spec.ts\Change Notifications Authorize T&M Work Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sat Aug 12 2023 021400 GMT+0000 (Greenwich Mean Time) -- EX-8950 Part 1 Delete existing CN (failed).png
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 08_Projects/Active Projects/ex-5467-verify-job-number-propagation-be (95 of 113)
tween-project.spec.ts
Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
1) EX-5467 - Create project as GC.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
1) EX-5467 - Create project as GC.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
2) EX-5467 - Add contract.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
2) EX-5467 - Add contract.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
3) EX-5467 - Verify the contract is added.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
3) EX-5467 - Verify the contract is added.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
4) EX-5467 - Add Customer.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
4) EX-5467 - Add Customer.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
5) EX-5467 - Verify Project Details at GC side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
5) EX-5467 - Verify Project Details at GC side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
6) EX-5467 - Accept the project invite at the SC side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
6) EX-5467 - Accept the project invite at the SC side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
7) EX-5467 - Verify Project Details at SC side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
7) EX-5467 - Verify Project Details at SC side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
8) EX-5467 - Accept project invite at the Customer side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
8) EX-5467 - Accept project invite at the Customer side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
9) EX-5467 - Verify Project Details at the Customer side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
9) EX-5467 - Verify Project Details at the Customer side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
10) EX-5467 - Cleanup GC... Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
10) EX-5467 - Cleanup GC... Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
11) EX-5467 - Cleanup SC... Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
11) EX-5467 - Cleanup SC... Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
12) EX-5467 - Cleanup for Owner.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
12) EX-5467 - Cleanup for Owner.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
0 passing (8m)
12 failing
1) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Create project as GC.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
2) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Add contract.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
3) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Verify the contract is added.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
4) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Add Customer.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
5) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Verify Project Details at GC side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
6) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Accept the project invite at the SC side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
7) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Verify Project Details at SC side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
8) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Accept project invite at the Customer side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
9) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Verify Project Details at the Customer side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
10) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Cleanup GC... Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
11) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Cleanup SC... Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
12) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Cleanup for Owner.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
0 passing (8m)
12 failing
1) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Create project as GC.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
2) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Add contract.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
3) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Verify the contract is added.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
4) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Add Customer.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
5) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Verify Project Details at GC side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.visit()` failed trying to load:
https://staging.clearstory.dev/auth/login?redirect=/
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147817:84)
at visitFailedByErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147225:12)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:147800:13)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands.ts:220:5)
6) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Accept the project invite at the SC side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
7) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Verify Project Details at SC side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
8) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Accept project invite at the Customer side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
9) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Verify Project Details at the Customer side.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
10) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Cleanup GC... Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
11) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Cleanup SC... Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
12) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time)
EX-5467 - Cleanup for Owner.Sat Aug 12 2023 02:14:52 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_094.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 12 │
│ Passing: 0 │
│ Failing: 12 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 12 │
│ Video: false │
│ Duration: 7 minutes, 37 seconds │
│ Spec Ran: 08_Projects/Active Projects/ex-5467-verify-job-number-propagation-between-projec │
│ t.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.
ts\Projects Verify Customer Job Number and My Job Number propagate properly bet
ween customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean T
ime) -- EX-5467 - Create project as GC.Sat Aug 12 2023 021452 GMT+0000 (Greenwic
h Mean Time) .png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.
ts\Projects Verify Customer Job Number and My Job Number propagate properly bet
ween customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean T
ime) -- EX-5467 - Add contract.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean T
ime) (failed).png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.
ts\Projects Verify Customer Job Number and My Job Number propagate properly bet
ween customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean T
ime) -- EX-5467 - Verify the contract is added.Sat Aug 12 2023 021452 GMT+0000 (
Greenwich Mea.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.
ts\Projects Verify Customer Job Number and My Job Number propagate properly bet
ween customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean T
ime) -- EX-5467 - Add Customer.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean T
ime) (failed).png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.
ts\Projects Verify Customer Job Number and My Job Number propagate properly bet
ween customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean T
ime) -- EX-5467 - Verify Project Details at GC side.Sat Aug 12 2023 021452 GMT+0
000 (Greenwic.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.
ts\Projects Verify Customer Job Number and My Job Number propagate properly bet
ween customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean T
ime) -- EX-5467 - Accept the project invite at the SC side.Sat Aug 12 2023 02145
2 GMT+0000 (G.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.
ts\Projects Verify Customer Job Number and My Job Number propagate properly bet
ween customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean T
ime) -- EX-5467 - Verify Project Details at SC side.Sat Aug 12 2023 021452 GMT+0
000 (Greenwic.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.
ts\Projects Verify Customer Job Number and My Job Number propagate properly bet
ween customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean T
ime) -- EX-5467 - Accept project invite at the Customer side.Sat Aug 12 2023 021
452 GMT+0000 .png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.
ts\Projects Verify Customer Job Number and My Job Number propagate properly bet
ween customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean T
ime) -- EX-5467 - Verify Project Details at the Customer side.Sat Aug 12 2023 02
1452 GMT+0000.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.
ts\Projects Verify Customer Job Number and My Job Number propagate properly bet
ween customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean T
ime) -- EX-5467 - Cleanup GC... Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean
Time) (failed.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.
ts\Projects Verify Customer Job Number and My Job Number propagate properly bet
ween customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean T
ime) -- EX-5467 - Cleanup SC... Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean
Time) (failed.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.
ts\Projects Verify Customer Job Number and My Job Number propagate properly bet
ween customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean T
ime) -- EX-5467 - Cleanup for Owner.Sat Aug 12 2023 021452 GMT+0000 (Greenwich M
ean Time) (fa.png
(Uploading Screenshots & Videos)
- Done Uploading (1/12) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) -- EX-5467 - Accept the project invite at the SC side.Sat Aug 12 2023 021452 GMT+0000 (G.png
- Done Uploading (2/12) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) -- EX-5467 - Cleanup for Owner.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) (fa.png
- Done Uploading (3/12) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) -- EX-5467 - Add Customer.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) (failed).png
- Done Uploading (4/12) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) -- EX-5467 - Verify the contract is added.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mea.png
- Done Uploading (5/12) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) -- EX-5467 - Verify Project Details at GC side.Sat Aug 12 2023 021452 GMT+0000 (Greenwic.png
- Done Uploading (6/12) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) -- EX-5467 - Verify Project Details at the Customer side.Sat Aug 12 2023 021452 GMT+0000.png
- Done Uploading (7/12) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) -- EX-5467 - Accept project invite at the Customer side.Sat Aug 12 2023 021452 GMT+0000 .png
- Done Uploading (8/12) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) -- EX-5467 - Create project as GC.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) .png
- Done Uploading (9/12) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) -- EX-5467 - Verify Project Details at SC side.Sat Aug 12 2023 021452 GMT+0000 (Greenwic.png
- Done Uploading (10/12) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) -- EX-5467 - Cleanup GC... Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) (failed.png
- Done Uploading (11/12) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) -- EX-5467 - Cleanup SC... Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) (failed.png
- Done Uploading (12/12) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) -- EX-5467 - Add contract.Sat Aug 12 2023 021452 GMT+0000 (Greenwich Mean Time) (failed).png
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 08_Projects/Active Projects/ex-7362-verify-job-number-propagation-to (96 of 113)
-draft-cors.spec.ts
Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
1) EX-7362 - Part 1: Create project as SC.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
1) EX-7362 - Part 1: Create project as SC.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
2) EX-7362 - Part 2: Add Customer.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
2) EX-7362 - Part 2: Add Customer.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
3) EX-7362 - Part 3: Accept the project invite at the GC side.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
3) EX-7362 - Part 3: Accept the project invite at the GC side.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
4) EX-7362 - Part 4: Create COR and Save it as Draft.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
4) EX-7362 - Part 4: Create COR and Save it as Draft.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
5) EX-7362 - Part 5: Verify Draft COR data in the Draft COR Log.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
5) EX-7362 - Part 5: Verify Draft COR data in the Draft COR Log.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
6) EX-7362 - Cleanup GC... Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
6) EX-7362 - Cleanup GC... Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
7) EX-7362 - Cleanup SC... Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
7) EX-7362 - Cleanup SC... Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
0 passing (6m)
7 failing
1) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
EX-7362 - Part 1: Create project as SC.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
2) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
EX-7362 - Part 2: Add Customer.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
3) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
EX-7362 - Part 3: Accept the project invite at the GC side.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
4) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
EX-7362 - Part 4: Create COR and Save it as Draft.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.screenshot()` timed out waiting `15000ms` to complete.
at https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:149460:81
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13866:41
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
5) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
EX-7362 - Part 5: Verify Draft COR data in the Draft COR Log.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `li[data-option-index='0']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:275:5)
6) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
EX-7362 - Cleanup GC... Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC7362 1691806956340' within the element: but never did.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:319:34)
7) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
EX-7362 - Cleanup SC... Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC7362 1691806956340' but never did.
at projectsPage.archivePoject (webpack:///./cypress/support/PageObjects/Projects_.ts:76:7)
at Context.eval (webpack:///./cypress/support/commands.ts:860:11)
0 passing (6m)
7 failing
1) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
EX-7362 - Part 1: Create project as SC.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
2) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
EX-7362 - Part 2: Add Customer.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
3) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
EX-7362 - Part 3: Accept the project invite at the GC side.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[data-cy='dashboard']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:324:19)
4) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
EX-7362 - Part 4: Create COR and Save it as Draft.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.screenshot()` timed out waiting `15000ms` to complete.
at https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:149460:81
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13866:41
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16857:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13451:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13444:9)
at ../../node_modules/bluebird/js/release/async.js.Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13460:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:13330:14)
5) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
EX-7362 - Part 5: Verify Draft COR data in the Draft COR Log.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `li[data-option-index='0']`, but never found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:275:5)
6) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
EX-7362 - Cleanup GC... Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC7362 1691806956340' within the element: but never did.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:319:34)
7) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time)
EX-7362 - Cleanup SC... Sat Aug 12 2023 02:22:36 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC7362 1691806956340' but never did.
at projectsPage.archivePoject (webpack:///./cypress/support/PageObjects/Projects_.ts:76:7)
at Context.eval (webpack:///./cypress/support/commands.ts:860:11)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_095.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 7 │
│ Passing: 0 │
│ Failing: 7 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 7 │
│ Video: false │
│ Duration: 6 minutes, 27 seconds │
│ Spec Ran: 08_Projects/Active Projects/ex-7362-verify-job-number-propagation-to-draft-cors. │
│ spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts
\Projects Verify Customer Job Number and My Job Number propagate properly betwe
en customers and contractors.Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Tim
e) -- EX-7362 - Part 1 Create project as SC.Sat Aug 12 2023 022236 GMT+0000 (Gre
enwich Mean.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts
\Projects Verify Customer Job Number and My Job Number propagate properly betwe
en customers and contractors.Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Tim
e) -- EX-7362 - Part 2 Add Customer.Sat Aug 12 2023 022236 GMT+0000 (Greenwich M
ean Time) (.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts
\Projects Verify Customer Job Number and My Job Number propagate properly betwe
en customers and contractors.Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Tim
e) -- EX-7362 - Part 3 Accept the project invite at the GC side.Sat Aug 12 2023
022236 GMT+.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts
\Projects Verify Customer Job Number and My Job Number propagate properly betwe
en customers and contractors.Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Tim
e) -- EX-7362 - Part 4 Create COR and Save it as Draft.Sat Aug 12 2023 022236 GM
T+0000 (Gre.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts
\Projects Verify Customer Job Number and My Job Number propagate properly betwe
en customers and contractors.Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Tim
e) -- EX-7362 - Part 5 Verify Draft COR data in the Draft COR Log.Sat Aug 12 202
3 022236 GM.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts
\Projects Verify Customer Job Number and My Job Number propagate properly betwe
en customers and contractors.Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Tim
e) -- EX-7362 - Cleanup GC... Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Ti
me) (failed.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533)
ects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts
\Projects Verify Customer Job Number and My Job Number propagate properly betwe
en customers and contractors.Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Tim
e) -- EX-7362 - Cleanup SC... Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Ti
me) (failed.png
(Uploading Screenshots & Videos)
- Done Uploading (1/7) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Time) -- EX-7362 - Part 1 Create project as SC.Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean.png
- Done Uploading (2/7) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Time) -- EX-7362 - Part 2 Add Customer.Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Time) (.png
- Done Uploading (3/7) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Time) -- EX-7362 - Cleanup GC... Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Time) (failed.png
- Done Uploading (4/7) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Time) -- EX-7362 - Part 4 Create COR and Save it as Draft.Sat Aug 12 2023 022236 GMT+0000 (Gre.png
- Done Uploading (5/7) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Time) -- EX-7362 - Part 3 Accept the project invite at the GC side.Sat Aug 12 2023 022236 GMT+.png
- Done Uploading (6/7) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Time) -- EX-7362 - Cleanup SC... Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Time) (failed.png
- Done Uploading (7/7) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sat Aug 12 2023 022236 GMT+0000 (Greenwich Mean Time) -- EX-7362 - Part 5 Verify Draft COR data in the Draft COR Log.Sat Aug 12 2023 022236 GM.png
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 09_Analytics/ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx (97 of 113)
-after-filtering-by-project.spec.ts
Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Sat Aug 12 2023 02:29:10 GMT+0000 (Greenwich Mean Time)
Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Sat Aug 12 2023 02:29:10 GMT+0000 (Greenwich Mean Time)
√ EX-5428 - Verify the SENT, Detailed TM Tags Report (Excel).Sat Aug 12 2023 02:29:10 GMT+0000 (Greenwich Mean Time) (43595ms)
√ EX-5428 - Verify the SENT, Detailed TM Tags Report (Excel).Sat Aug 12 2023 02:29:10 GMT+0000 (Greenwich Mean Time) (43595ms)
1 passing (44s)
1 passing (44s)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_096.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 43 seconds │
│ Spec Ran: 09_Analytics/ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx-after-filte │
│ ring-by-project.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 09_Analytics/ex-8799-verify-received-export--tm-tag-detailed-report- (98 of 113)
xlsx-after-filtering-by-project.spec.ts
Analytics | Verify the Received, Detailed TM Tags Report (Excel)Sat Aug 12 2023 02:29:58 GMT+0000 (Greenwich Mean Time)
Analytics | Verify the Received, Detailed TM Tags Report (Excel)Sat Aug 12 2023 02:29:58 GMT+0000 (Greenwich Mean Time)
√ EX-8799 - Verify the Received, Detailed TM Tags Report (Excel).Sat Aug 12 2023 02:29:58 GMT+0000 (Greenwich Mean Time) (37035ms)
√ EX-8799 - Verify the Received, Detailed TM Tags Report (Excel).Sat Aug 12 2023 02:29:58 GMT+0000 (Greenwich Mean Time) (37035ms)
1 passing (37s)
1 passing (37s)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_097.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 37 seconds │
│ Spec Ran: 09_Analytics/ex-8799-verify-received-export--tm-tag-detailed-report-xlsx-after-f │
│ iltering-by-project.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 11_Emails/CORs/ex-3720-verify-all-links-in-cor-recieved-email.spec.t (99 of 113)
s
Email Hyperlinks | To verify that all links on COR received email works fineSat Aug 12 2023 02:30:40 GMT+0000 (Greenwich Mean Time)
Email Hyperlinks | To verify that all links on COR received email works fineSat Aug 12 2023 02:30:40 GMT+0000 (Greenwich Mean Time)
√ EX-3720 Part 1: Create a project. Sat Aug 12 2023 02:30:40 GMT+0000 (Greenwich Mean Time) (51734ms)
√ EX-3720 Part 1: Create a project. Sat Aug 12 2023 02:30:40 GMT+0000 (Greenwich Mean Time) (51734ms)
√ EX-3720 Part 2: Add contract. Sat Aug 12 2023 02:30:40 GMT+0000 (Greenwich Mean Time) (37136ms)
√ EX-3720 Part 2: Add contract. Sat Aug 12 2023 02:30:40 GMT+0000 (Greenwich Mean Time) (37136ms)
√ EX-3720 Part 3: Sub Contractor accepts the project invite.Sat Aug 12 2023 02:30:40 GMT+0000 (Greenwich Mean Time) (25282ms)
√ EX-3720 Part 3: Sub Contractor accepts the project invite.Sat Aug 12 2023 02:30:40 GMT+0000 (Greenwich Mean Time) (25282ms)
√ EX-3720 Part 4: Sub Contractor creates COR.Sat Aug 12 2023 02:30:40 GMT+0000 (Greenwich Mean Time) (83938ms)
√ EX-3720 Part 4: Sub Contractor creates COR.Sat Aug 12 2023 02:30:40 GMT+0000 (Greenwich Mean Time) (83938ms)
√ EX-3720 Part 5: Verify the new COR email links to clearstory.build.Sat Aug 12 2023 02:34:04 GMT+0000 (Greenwich Mean Time) (10370ms)
√ EX-3720 Part 5: Verify the new COR email links to clearstory.build.Sat Aug 12 2023 02:34:04 GMT+0000 (Greenwich Mean Time) (10370ms)
√ EX-3720 Part 6: Verify the VIEW/COMMENT/DOWNLOAD button link.Sat Aug 12 2023 02:34:19 GMT+0000 (Greenwich Mean Time) (14896ms)
√ EX-3720 Part 6: Verify the VIEW/COMMENT/DOWNLOAD button link.Sat Aug 12 2023 02:34:19 GMT+0000 (Greenwich Mean Time) (14896ms)
1) EX-3720 Part 7: Cleanup GC...Sat Aug 12 2023 02:34:19 GMT+0000 (Greenwich Mean Time)
1) EX-3720 Part 7: Cleanup GC...Sat Aug 12 2023 02:34:19 GMT+0000 (Greenwich Mean Time)
2) EX-3720 Part 8: Cleanup SC...Sat Aug 12 2023 02:34:19 GMT+0000 (Greenwich Mean Time)
2) EX-3720 Part 8: Cleanup SC...Sat Aug 12 2023 02:34:19 GMT+0000 (Greenwich Mean Time)
6 passing (6m)
2 failing
1) Email Hyperlinks | To verify that all links on COR received email works fineSat Aug 12 2023 02:34:19 GMT+0000 (Greenwich Mean Time)
EX-3720 Part 7: Cleanup GC...Sat Aug 12 2023 02:34:19 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected not to find content: 'Test Project TC3720 1691807440811' within the element: but continuously found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:38:38)
2) Email Hyperlinks | To verify that all links on COR received email works fineSat Aug 12 2023 02:34:19 GMT+0000 (Greenwich Mean Time)
EX-3720 Part 8: Cleanup SC...Sat Aug 12 2023 02:34:19 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected not to find content: 'Test Project TC3720 1691807440811' within the element: but continuously found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:38:38)
6 passing (6m)
2 failing
1) Email Hyperlinks | To verify that all links on COR received email works fineSat Aug 12 2023 02:34:19 GMT+0000 (Greenwich Mean Time)
EX-3720 Part 7: Cleanup GC...Sat Aug 12 2023 02:34:19 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected not to find content: 'Test Project TC3720 1691807440811' within the element: but continuously found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:38:38)
2) Email Hyperlinks | To verify that all links on COR received email works fineSat Aug 12 2023 02:34:19 GMT+0000 (Greenwich Mean Time)
EX-3720 Part 8: Cleanup SC...Sat Aug 12 2023 02:34:19 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected not to find content: 'Test Project TC3720 1691807440811' within the element: but continuously found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:38:38)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_098.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 8 │
│ Passing: 6 │
│ Failing: 2 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 2 │
│ Video: false │
│ Duration: 6 minutes, 7 seconds │
│ Spec Ran: 11_Emails/CORs/ex-3720-verify-all-links-in-cor-recieved-email.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\11_Emai (1272x533)
ls\CORs\ex-3720-verify-all-links-in-cor-recieved-email.spec.ts\Email Hyperlinks
To verify that all links on COR received email works fineSat Aug 12 2023 023419
GMT+0000 (Greenwich Mean Time) -- EX-3720 Part 7 Cleanup GC...Sat Aug 12 2023 0
23419 GMT+0000 (Greenwich Mean Time) (failed).png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\11_Emai (1272x533)
ls\CORs\ex-3720-verify-all-links-in-cor-recieved-email.spec.ts\Email Hyperlinks
To verify that all links on COR received email works fineSat Aug 12 2023 023419
GMT+0000 (Greenwich Mean Time) -- EX-3720 Part 8 Cleanup SC...Sat Aug 12 2023 0
23419 GMT+0000 (Greenwich Mean Time) (failed).png
(Uploading Screenshots & Videos)
- Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\11_Emails\CORs\ex-3720-verify-all-links-in-cor-recieved-email.spec.ts\Email Hyperlinks To verify that all links on COR received email works fineSat Aug 12 2023 023419 GMT+0000 (Greenwich Mean Time) -- EX-3720 Part 7 Cleanup GC...Sat Aug 12 2023 023419 GMT+0000 (Greenwich Mean Time) (failed).png
- Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\11_Emails\CORs\ex-3720-verify-all-links-in-cor-recieved-email.spec.ts\Email Hyperlinks To verify that all links on COR received email works fineSat Aug 12 2023 023419 GMT+0000 (Greenwich Mean Time) -- EX-3720 Part 8 Cleanup SC...Sat Aug 12 2023 023419 GMT+0000 (Greenwich Mean Time) (failed).png
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 11_Emails/ChangeNotifications/ex-3723-verify-all-links-in-pricing-re (100 of 113)
quest-cn-response-needed-email.spec.ts
Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 02:36:53 GMT+0000 (Greenwich Mean Time)
Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 02:36:53 GMT+0000 (Greenwich Mean Time)
√ EX-3723 Part 1: Create a project and send invite.Sat Aug 12 2023 02:36:53 GMT+0000 (Greenwich Mean Time) (49680ms)
√ EX-3723 Part 1: Create a project and send invite.Sat Aug 12 2023 02:36:53 GMT+0000 (Greenwich Mean Time) (49680ms)
√ EX-3723 Part 2: Add Sub-Contractor.Sat Aug 12 2023 02:36:53 GMT+0000 (Greenwich Mean Time) (38132ms)
√ EX-3723 Part 2: Add Sub-Contractor.Sat Aug 12 2023 02:36:53 GMT+0000 (Greenwich Mean Time) (38132ms)
√ EX-3723 Part 3: Login to the Sub Contractor account and Accept the invite.Sat Aug 12 2023 02:36:53 GMT+0000 (Greenwich Mean Time) (23081ms)
√ EX-3723 Part 3: Login to the Sub Contractor account and Accept the invite.Sat Aug 12 2023 02:36:53 GMT+0000 (Greenwich Mean Time) (23081ms)
1) EX-3723 Part 4: Log in back to the Gen Contractor account and create a Pricing Request Change Notification.Sat Aug 12 2023 02:36:53 GMT+0000 (Greenwich Mean Time)
1) EX-3723 Part 4: Log in back to the Gen Contractor account and create a Pricing Request Change Notification.Sat Aug 12 2023 02:36:53 GMT+0000 (Greenwich Mean Time)
2) EX-3723 Part 5: Verify the Response Needed CN email.Sat Aug 12 2023 02:39:53 GMT+0000 (Greenwich Mean Time)
2) EX-3723 Part 5: Verify the Response Needed CN email.Sat Aug 12 2023 02:39:53 GMT+0000 (Greenwich Mean Time)
3) EX-3723 Part 6: Verify LinksSat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time)
3) EX-3723 Part 6: Verify LinksSat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time)
4) EX-3723 Part 7: Cleanup GC...Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time)
4) EX-3723 Part 7: Cleanup GC...Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time)
5) EX-3723 Part 7: Cleanup SC...Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time)
5) EX-3723 Part 7: Cleanup SC...Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time)
3 passing (7m)
5 failing
1) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time)
EX-3723 Part 4: Log in back to the Gen Contractor account and create a Pricing Request Change Notification.Sat Aug 12 2023 02:36:53 GMT+0000 (Greenwich Mean Time):
CypressError: Timed out retrying after 30000ms: `cy.contains()` failed because it requires a DOM element, window or document.
No elements in the current DOM matched your query:
> cy.get(div[role='alert'])
at isElement (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161645:70)
at validateType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161503:14)
at Object.isType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161534:7)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:148739:22)
at Object.subjectFn (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:159495:16)
at $Cy.verifyUpcomingAssertions (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:140576:31)
at onRetry (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:159486:15)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16018:29)
at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:156356:65)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:155797:14)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16861:18)
at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16805:18)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18419:46)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:319:34)
2) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time)
EX-3723 Part 5: Verify the Response Needed CN email.Sat Aug 12 2023 02:39:53 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'VIEW CHANGE NOTIFICATON' within the selector: '.button-a' but never did.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34)
3) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time)
EX-3723 Part 6: Verify LinksSat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'CN for TC3723' within the selector: 'div[aria-label='Application Toolbar'] p' but never did.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34)
4) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time)
EX-3723 Part 7: Cleanup GC...Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected not to find content: 'Test Project for TC3723 1691807813944' within the element: but continuously found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:38:38)
5) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time)
EX-3723 Part 7: Cleanup SC...Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected not to find content: 'Test Project for TC3723 1691807813944' within the element: but continuously found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:38:38)
3 passing (7m)
5 failing
1) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time)
EX-3723 Part 4: Log in back to the Gen Contractor account and create a Pricing Request Change Notification.Sat Aug 12 2023 02:36:53 GMT+0000 (Greenwich Mean Time):
CypressError: Timed out retrying after 30000ms: `cy.contains()` failed because it requires a DOM element, window or document.
No elements in the current DOM matched your query:
> cy.get(div[role='alert'])
at isElement (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161645:70)
at validateType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161503:14)
at Object.isType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:161534:7)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:148739:22)
at Object.subjectFn (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:159495:16)
at $Cy.verifyUpcomingAssertions (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:140576:31)
at onRetry (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:159486:15)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16018:29)
at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:156356:65)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:155797:14)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18744:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16679:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16736:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16781:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16861:18)
at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:16805:18)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:18419:46)
From Your Spec Code:
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:319:34)
2) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time)
EX-3723 Part 5: Verify the Response Needed CN email.Sat Aug 12 2023 02:39:53 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'VIEW CHANGE NOTIFICATON' within the selector: '.button-a' but never did.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34)
3) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time)
EX-3723 Part 6: Verify LinksSat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'CN for TC3723' within the selector: 'div[aria-label='Application Toolbar'] p' but never did.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:31:34)
4) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time)
EX-3723 Part 7: Cleanup GC...Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected not to find content: 'Test Project for TC3723 1691807813944' within the element: but continuously found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:38:38)
5) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time)
EX-3723 Part 7: Cleanup SC...Sat Aug 12 2023 02:40:29 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected not to find content: 'Test Project for TC3723 1691807813944' within the element: but continuously found it.
at Context.eval (webpack:///./cypress/support/commands-object-actions.ts:38:38)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_099.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 8 │
│ Passing: 3 │
│ Failing: 5 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 5 │
│ Video: false │
│ Duration: 6 minutes, 37 seconds │
│ Spec Ran: 11_Emails/ChangeNotifications/ex-3723-verify-all-links-in-pricing-request-cn-res │
│ ponse-needed-email.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\11_Emai (1272x533)
ls\ChangeNotifications\ex-3723-verify-all-links-in-pricing-request-cn-response-n
eeded-email.spec.ts\Email Hyperlinks To verify that all links on Change Notific
ation Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 02
3653 GMT+0000 (Greenwich Mean Time) -- EX-3723 Part 4 Log in back to the Gen Con
tractor account and create a P.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\11_Emai (1272x533)
ls\ChangeNotifications\ex-3723-verify-all-links-in-pricing-request-cn-response-n
eeded-email.spec.ts\Email Hyperlinks To verify that all links on Change Notific
ation Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 02
3953 GMT+0000 (Greenwich Mean Time) -- EX-3723 Part 5 Verify the Response Needed
CN email.Sat Aug 12 2023 0239.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\11_Emai (1272x533)
ls\ChangeNotifications\ex-3723-verify-all-links-in-pricing-request-cn-response-n
eeded-email.spec.ts\Email Hyperlinks To verify that all links on Change Notific
ation Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 02
4029 GMT+0000 (Greenwich Mean Time) -- EX-3723 Part 6 Verify LinksSat Aug 12 202
3 024029 GMT+0000 (Greenwich M.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\11_Emai (1272x533)
ls\ChangeNotifications\ex-3723-verify-all-links-in-pricing-request-cn-response-n
eeded-email.spec.ts\Email Hyperlinks To verify that all links on Change Notific
ation Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 02
4029 GMT+0000 (Greenwich Mean Time) -- EX-3723 Part 7 Cleanup GC...Sat Aug 12 20
23 024029 GMT+0000 (Greenwich .png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\11_Emai (1272x533)
ls\ChangeNotifications\ex-3723-verify-all-links-in-pricing-request-cn-response-n
eeded-email.spec.ts\Email Hyperlinks To verify that all links on Change Notific
ation Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 02
4029 GMT+0000 (Greenwich Mean Time) -- EX-3723 Part 7 Cleanup SC...Sat Aug 12 20
23 024029 GMT+0000 (Greenwich .png
(Uploading Screenshots & Videos)
- Done Uploading (1/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\11_Emails\ChangeNotifications\ex-3723-verify-all-links-in-pricing-request-cn-response-needed-email.spec.ts\Email Hyperlinks To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 024029 GMT+0000 (Greenwich Mean Time) -- EX-3723 Part 7 Cleanup GC...Sat Aug 12 2023 024029 GMT+0000 (Greenwich .png
- Done Uploading (2/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\11_Emails\ChangeNotifications\ex-3723-verify-all-links-in-pricing-request-cn-response-needed-email.spec.ts\Email Hyperlinks To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 023653 GMT+0000 (Greenwich Mean Time) -- EX-3723 Part 4 Log in back to the Gen Contractor account and create a P.png
- Done Uploading (3/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\11_Emails\ChangeNotifications\ex-3723-verify-all-links-in-pricing-request-cn-response-needed-email.spec.ts\Email Hyperlinks To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 024029 GMT+0000 (Greenwich Mean Time) -- EX-3723 Part 7 Cleanup SC...Sat Aug 12 2023 024029 GMT+0000 (Greenwich .png
- Done Uploading (4/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\11_Emails\ChangeNotifications\ex-3723-verify-all-links-in-pricing-request-cn-response-needed-email.spec.ts\Email Hyperlinks To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 024029 GMT+0000 (Greenwich Mean Time) -- EX-3723 Part 6 Verify LinksSat Aug 12 2023 024029 GMT+0000 (Greenwich M.png
- Done Uploading (5/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\11_Emails\ChangeNotifications\ex-3723-verify-all-links-in-pricing-request-cn-response-needed-email.spec.ts\Email Hyperlinks To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sat Aug 12 2023 023953 GMT+0000 (Greenwich Mean Time) -- EX-3723 Part 5 Verify the Response Needed CN email.Sat Aug 12 2023 0239.png
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 11_Emails/ChangeNotifications/ex-5287-verify-all-links-in-authorize- (101 of 113)
work-cn-response-needed-email.spec.ts
Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Authorize Work CN.Sat Aug 12 2023 02:43:37 GMT+0000 (Greenwich Mean Time)
Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Authorize Work CN.Sat Aug 12 2023 02:43:37 GMT+0000 (Greenwich Mean Time)
√ EX-5287 Part 1: Create a project.Sat Aug 12 2023 02:43:37 GMT+0000 (Greenwich Mean Time) (52021ms)
√ EX-5287 Part 1: Create a project.Sat Aug 12 2023 02:43:37 GMT+0000 (Greenwich Mean Time) (52021ms)
√ EX-5287 Part 2: Send invite.Sat Aug 12 2023 02:43:37 GMT+0000 (Greenwich Mean Time) (37203ms)
√ EX-5287 Part 2: Send invite.Sat Aug 12 2023 02:43:37 GMT+0000 (Greenwich Mean Time) (37203ms)
√ EX-5287 Part 3: Login to the Sub Contractor account and Accept the invite.Sat Aug 12 2023 02:43:37 GMT+0000 (Greenwich Mean Time) (23334ms)
√ EX-5287 Part 3: Login to the Sub Contractor account and Accept the invite.Sat Aug 12 2023 02:43:37 GMT+0000 (Greenwich Mean Time) (23334ms)
√ EX-5287 Part 4: Log in back to the Gen Contractor account and create a Authorize T&M Work Change Notification.Sat Aug 12 2023 02:43:37 GMT+0000 (Greenwich Mean Time) (41201ms)
√ EX-5287 Part 4: Log in back to the Gen Contractor account and create a Authorize T&M Work Change Notification.Sat Aug 12 2023 02:43:37 GMT+0000 (Greenwich Mean Time) (41201ms)
√ EX-5287 Part 5: Verify the Response Needed CN email.Sat Aug 12 2023 02:46:17 GMT+0000 (Greenwich Mean Time) (8153ms)
√ EX-5287 Part 5: Verify the Response Needed CN email.Sat Aug 12 2023 02:46:17 GMT+0000 (Greenwich Mean Time) (8153ms)
√ EX-5287 Part 6: Verify LinksSat Aug 12 2023 02:46:30 GMT+0000 (Greenwich Mean Time) (16689ms)
√ EX-5287 Part 6: Verify LinksSat Aug 12 2023 02:46:30 GMT+0000 (Greenwich Mean Time) (16689ms)
√ EX-5287 Part 7: Cleanup GC...Sat Aug 12 2023 02:46:30 GMT+0000 (Greenwich Mean Time) (37209ms)
√ EX-5287 Part 7: Cleanup GC...Sat Aug 12 2023 02:46:30 GMT+0000 (Greenwich Mean Time) (37209ms)
7 passing (4m)
7 passing (4m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_100.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 7 │
│ Passing: 7 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 45 seconds │
│ Spec Ran: 11_Emails/ChangeNotifications/ex-5287-verify-all-links-in-authorize-work-cn-resp │
│ onse-needed-email.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 11_Emails/Projects/ex-3717-verify-all-links-in-add-my-company-email. (102 of 113)
spec.ts
Email Hyperlinks | To verify that all links on Add My Company email work fineSat Aug 12 2023 02:47:28 GMT+0000 (Greenwich Mean Time)
Email Hyperlinks | To verify that all links on Add My Company email work fineSat Aug 12 2023 02:47:28 GMT+0000 (Greenwich Mean Time)
√ EX-3717 Part 1: Create project and send invite.Sat Aug 12 2023 02:47:28 GMT+0000 (Greenwich Mean Time) (49329ms)
√ EX-3717 Part 1: Create project and send invite.Sat Aug 12 2023 02:47:28 GMT+0000 (Greenwich Mean Time) (49329ms)
√ EX-3717 Part 2: Add My Comapny Users. Sat Aug 12 2023 02:47:28 GMT+0000 (Greenwich Mean Time) (33630ms)
√ EX-3717 Part 2: Add My Comapny Users. Sat Aug 12 2023 02:47:28 GMT+0000 (Greenwich Mean Time) (33630ms)
√ EX-3717 Part 3: Verify the email links to clearstory.build.Sat Aug 12 2023 02:48:57 GMT+0000 (Greenwich Mean Time) (9327ms)
√ EX-3717 Part 3: Verify the email links to clearstory.build.Sat Aug 12 2023 02:48:57 GMT+0000 (Greenwich Mean Time) (9327ms)
√ EX-3717 Part 4: Verify the JOIN PROJECT button link.Sat Aug 12 2023 02:49:13 GMT+0000 (Greenwich Mean Time) (10365ms)
√ EX-3717 Part 4: Verify the JOIN PROJECT button link.Sat Aug 12 2023 02:49:13 GMT+0000 (Greenwich Mean Time) (10365ms)
√ EX-3717 Part 5: Cleanup...Sat Aug 12 2023 02:49:13 GMT+0000 (Greenwich Mean Time) (35114ms)
√ EX-3717 Part 5: Cleanup...Sat Aug 12 2023 02:49:13 GMT+0000 (Greenwich Mean Time) (35114ms)
5 passing (2m)
5 passing (2m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_101.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 5 │
│ Passing: 5 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 2 minutes, 29 seconds │
│ Spec Ran: 11_Emails/Projects/ex-3717-verify-all-links-in-add-my-company-email.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 11_Emails/Projects/ex-3718-verify-all-links-in-add-my-customer-email (103 of 113)
.spec.ts
Email Hyperlinks | To verify that all the links on Add My Customer worksSat Aug 12 2023 02:50:03 GMT+0000 (Greenwich Mean Time)
Email Hyperlinks | To verify that all the links on Add My Customer worksSat Aug 12 2023 02:50:03 GMT+0000 (Greenwich Mean Time)
√ EX-3718 Part 1: Create project and send invite.Sat Aug 12 2023 02:50:03 GMT+0000 (Greenwich Mean Time) (49574ms)
√ EX-3718 Part 1: Create project and send invite.Sat Aug 12 2023 02:50:03 GMT+0000 (Greenwich Mean Time) (49574ms)
√ EX-3718 Part 2: Add Customers.Sat Aug 12 2023 02:50:03 GMT+0000 (Greenwich Mean Time) (34889ms)
√ EX-3718 Part 2: Add Customers.Sat Aug 12 2023 02:50:03 GMT+0000 (Greenwich Mean Time) (34889ms)
√ EX-3718 Part 3: Login to the Owner PM account and Accept the invite.Sat Aug 12 2023 02:50:03 GMT+0000 (Greenwich Mean Time) (17485ms)
√ EX-3718 Part 3: Login to the Owner PM account and Accept the invite.Sat Aug 12 2023 02:50:03 GMT+0000 (Greenwich Mean Time) (17485ms)
√ EX-3718 Part 4: Verify the email links to clearstory.build.Sat Aug 12 2023 02:51:51 GMT+0000 (Greenwich Mean Time) (17697ms)
√ EX-3718 Part 4: Verify the email links to clearstory.build.Sat Aug 12 2023 02:51:51 GMT+0000 (Greenwich Mean Time) (17697ms)
√ EX-3718 Part 5: Verify the JOIN PROJECT button link.Sat Aug 12 2023 02:52:14 GMT+0000 (Greenwich Mean Time) (13283ms)
√ EX-3718 Part 5: Verify the JOIN PROJECT button link.Sat Aug 12 2023 02:52:14 GMT+0000 (Greenwich Mean Time) (13283ms)
√ EX-3718 Part 6: Cleanup Ow...Sat Aug 12 2023 02:52:14 GMT+0000 (Greenwich Mean Time) (33137ms)
√ EX-3718 Part 6: Cleanup Ow...Sat Aug 12 2023 02:52:14 GMT+0000 (Greenwich Mean Time) (33137ms)
√ EX-3718 Part 7: Cleanup GC...Sat Aug 12 2023 02:52:14 GMT+0000 (Greenwich Mean Time) (35948ms)
√ EX-3718 Part 7: Cleanup GC...Sat Aug 12 2023 02:52:14 GMT+0000 (Greenwich Mean Time) (35948ms)
7 passing (4m)
7 passing (4m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_102.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 7 │
│ Passing: 7 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 33 seconds │
│ Spec Ran: 11_Emails/Projects/ex-3718-verify-all-links-in-add-my-customer-email.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 11_Emails/Projects/ex-3719-verify-all-links-in-add-contrctor-email.s (104 of 113)
pec.ts
Email Hyperlinks | To verify that all the links on Add Contractors email workSat Aug 12 2023 02:53:42 GMT+0000 (Greenwich Mean Time)
Email Hyperlinks | To verify that all the links on Add Contractors email workSat Aug 12 2023 02:53:42 GMT+0000 (Greenwich Mean Time)
√ EX-3719 Part 1: Create a project Sat Aug 12 2023 02:53:42 GMT+0000 (Greenwich Mean Time) (49799ms)
√ EX-3719 Part 1: Create a project Sat Aug 12 2023 02:53:42 GMT+0000 (Greenwich Mean Time) (49799ms)
√ EX-3719 Part 2: Send invite.Sat Aug 12 2023 02:53:42 GMT+0000 (Greenwich Mean Time) (36460ms)
√ EX-3719 Part 2: Send invite.Sat Aug 12 2023 02:53:42 GMT+0000 (Greenwich Mean Time) (36460ms)
√ EX-3719 Part 3: Accept invite. Sat Aug 12 2023 02:53:42 GMT+0000 (Greenwich Mean Time) (22440ms)
√ EX-3719 Part 3: Accept invite. Sat Aug 12 2023 02:53:42 GMT+0000 (Greenwich Mean Time) (22440ms)
√ EX-3719 Part 4: Verify the email links to Eclearstory.build.Sat Aug 12 2023 02:55:36 GMT+0000 (Greenwich Mean Time) (13597ms)
√ EX-3719 Part 4: Verify the email links to Eclearstory.build.Sat Aug 12 2023 02:55:36 GMT+0000 (Greenwich Mean Time) (13597ms)
√ EX-3719 Part 5: Verify JOIN PROJECT button link.Sat Aug 12 2023 02:55:56 GMT+0000 (Greenwich Mean Time) (14324ms)
√ EX-3719 Part 5: Verify JOIN PROJECT button link.Sat Aug 12 2023 02:55:56 GMT+0000 (Greenwich Mean Time) (14324ms)
√ EX-3719 Part 6: Cleanup GC...Sat Aug 12 2023 02:55:56 GMT+0000 (Greenwich Mean Time) (40687ms)
√ EX-3719 Part 6: Cleanup GC...Sat Aug 12 2023 02:55:56 GMT+0000 (Greenwich Mean Time) (40687ms)
√ EX-3719 Part 7: Cleanup SC...Sat Aug 12 2023 02:55:56 GMT+0000 (Greenwich Mean Time) (35480ms)
√ EX-3719 Part 7: Cleanup SC...Sat Aug 12 2023 02:55:56 GMT+0000 (Greenwich Mean Time) (35480ms)
7 passing (4m)
7 passing (4m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_103.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 7 │
│ Passing: 7 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 44 seconds │
│ Spec Ran: 11_Emails/Projects/ex-3719-verify-all-links-in-add-contrctor-email.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 11_Emails/T&M_Tags/ex-3721-verify-all-links-in-please-sign-tm-tag-em (105 of 113)
ail.spec.ts
Email Hyperlinks | To verify that all links on Please sign T&M tag email works fineSat Aug 12 2023 02:57:33 GMT+0000 (Greenwich Mean Time)
Email Hyperlinks | To verify that all links on Please sign T&M tag email works fineSat Aug 12 2023 02:57:33 GMT+0000 (Greenwich Mean Time)
√ EX-3721 Part 1: Create a project and send invite.Sat Aug 12 2023 02:57:33 GMT+0000 (Greenwich Mean Time) (54793ms)
√ EX-3721 Part 1: Create a project and send invite.Sat Aug 12 2023 02:57:33 GMT+0000 (Greenwich Mean Time) (54793ms)
√ EX-3721 Part 2: Send invite.Sat Aug 12 2023 02:57:33 GMT+0000 (Greenwich Mean Time) (41958ms)
√ EX-3721 Part 2: Send invite.Sat Aug 12 2023 02:57:33 GMT+0000 (Greenwich Mean Time) (41958ms)
√ EX-3721 Part 3: Sub Contractor Accepts the invite.Sat Aug 12 2023 02:57:33 GMT+0000 (Greenwich Mean Time) (24586ms)
√ EX-3721 Part 3: Sub Contractor Accepts the invite.Sat Aug 12 2023 02:57:33 GMT+0000 (Greenwich Mean Time) (24586ms)
√ EX-3721 Part 4: Sub Contractor creates a Tag.Sat Aug 12 2023 02:57:33 GMT+0000 (Greenwich Mean Time) (56916ms)
√ EX-3721 Part 4: Sub Contractor creates a Tag.Sat Aug 12 2023 02:57:33 GMT+0000 (Greenwich Mean Time) (56916ms)
√ EX-3721 Part 5: Verify the tag was created.Sat Aug 12 2023 02:57:33 GMT+0000 (Greenwich Mean Time) (38610ms)
√ EX-3721 Part 5: Verify the tag was created.Sat Aug 12 2023 02:57:33 GMT+0000 (Greenwich Mean Time) (38610ms)
√ EX-3721 Part 6: Verify the please sign T&M email.Sat Aug 12 2023 03:01:16 GMT+0000 (Greenwich Mean Time) (14150ms)
√ EX-3721 Part 6: Verify the please sign T&M email.Sat Aug 12 2023 03:01:16 GMT+0000 (Greenwich Mean Time) (14150ms)
√ EX-3721 Part 7: Cleanup GC...Sat Aug 12 2023 03:01:35 GMT+0000 (Greenwich Mean Time) (38805ms)
√ EX-3721 Part 7: Cleanup GC...Sat Aug 12 2023 03:01:35 GMT+0000 (Greenwich Mean Time) (38805ms)
√ EX-3721 Part 7: Cleanup SC...Sat Aug 12 2023 03:01:35 GMT+0000 (Greenwich Mean Time) (32159ms)
√ EX-3721 Part 7: Cleanup SC...Sat Aug 12 2023 03:01:35 GMT+0000 (Greenwich Mean Time) (32159ms)
8 passing (5m)
8 passing (5m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_104.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 8 │
│ Passing: 8 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 12 seconds │
│ Spec Ran: 11_Emails/T&M_Tags/ex-3721-verify-all-links-in-please-sign-tm-tag-email.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 12_Tag_Activity/ex-7214-tag-activity-create-sign-send-reject-from-we (106 of 113)
b.spec.ts
Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification)Sat Aug 12 2023 03:02:51 GMT+0000 (Greenwich Mean Time)
Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification)Sat Aug 12 2023 03:02:51 GMT+0000 (Greenwich Mean Time)
√ EX-7214 - Part 1: Clean the tags (47223ms)
√ EX-7214 - Part 1: Clean the tags (47223ms)
√ EX-7214 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagSat Aug 12 2023 03:02:51 GMT+0000 (Greenwich Mean Time) (84313ms)
√ EX-7214 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagSat Aug 12 2023 03:02:51 GMT+0000 (Greenwich Mean Time) (84313ms)
√ EX-7214 - Part 3: Verify activity feed. Sat Aug 12 2023 03:02:51 GMT+0000 (Greenwich Mean Time) (43313ms)
√ EX-7214 - Part 3: Verify activity feed. Sat Aug 12 2023 03:02:51 GMT+0000 (Greenwich Mean Time) (43313ms)
√ EX-7214 - Part 4: Verify the GC Admin received Bell Notification and use it to reject the tag.Sat Aug 12 2023 03:02:51 GMT+0000 (Greenwich Mean Time) (24868ms)
√ EX-7214 - Part 4: Verify the GC Admin received Bell Notification and use it to reject the tag.Sat Aug 12 2023 03:02:51 GMT+0000 (Greenwich Mean Time) (24868ms)
√ EX-7214 - Part 5: Verify the tag activity in the SC Admin T&M Log pageSat Aug 12 2023 03:02:51 GMT+0000 (Greenwich Mean Time) (39980ms)
√ EX-7214 - Part 5: Verify the tag activity in the SC Admin T&M Log pageSat Aug 12 2023 03:02:51 GMT+0000 (Greenwich Mean Time) (39980ms)
√ EX-7214 - Part 6: Verify the tag activity in the GC Admin T&M Log page in Receiver tabSat Aug 12 2023 03:02:51 GMT+0000 (Greenwich Mean Time) (46790ms)
√ EX-7214 - Part 6: Verify the tag activity in the GC Admin T&M Log page in Receiver tabSat Aug 12 2023 03:02:51 GMT+0000 (Greenwich Mean Time) (46790ms)
√ EX-7214 - Part 7: Cleanup SC Tag ... Sat Aug 12 2023 03:02:51 GMT+0000 (Greenwich Mean Time) (38637ms)
√ EX-7214 - Part 7: Cleanup SC Tag ... Sat Aug 12 2023 03:02:51 GMT+0000 (Greenwich Mean Time) (38637ms)
7 passing (5m)
7 passing (5m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_105.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 7 │
│ Passing: 7 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 25 seconds │
│ Spec Ran: 12_Tag_Activity/ex-7214-tag-activity-create-sign-send-reject-from-web.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 12_Tag_Activity/ex-7215-tag-activity-create-sign-send-revise-resubmi (107 of 113)
t-from-web.spec.ts
Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Revise and Resubmit the tag from the web(Bell notification)Sat Aug 12 2023 03:08:22 GMT+0000 (Greenwich Mean Time)
Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Revise and Resubmit the tag from the web(Bell notification)Sat Aug 12 2023 03:08:22 GMT+0000 (Greenwich Mean Time)
√ EX-7215 - Part 1: Clean the tags (54066ms)
√ EX-7215 - Part 1: Clean the tags (54066ms)
√ EX-7215 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagSat Aug 12 2023 03:08:22 GMT+0000 (Greenwich Mean Time) (90755ms)
√ EX-7215 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagSat Aug 12 2023 03:08:22 GMT+0000 (Greenwich Mean Time) (90755ms)
√ EX-7215 - Part 3: Verify the GC Admin received Bell Notification and use it to revise and resubmit the tag.Sat Aug 12 2023 03:08:22 GMT+0000 (Greenwich Mean Time) (27218ms)
√ EX-7215 - Part 3: Verify the GC Admin received Bell Notification and use it to revise and resubmit the tag.Sat Aug 12 2023 03:08:22 GMT+0000 (Greenwich Mean Time) (27218ms)
√ EX-7215 - Part 4: Verify the tag activity in the SC Admin T&M Log pageSat Aug 12 2023 03:08:22 GMT+0000 (Greenwich Mean Time) (52932ms)
√ EX-7215 - Part 4: Verify the tag activity in the SC Admin T&M Log pageSat Aug 12 2023 03:08:22 GMT+0000 (Greenwich Mean Time) (52932ms)
√ EX-7215 - Part 5: Verify the tag activity in the GC Admin T&M Log page in Receiver tabSat Aug 12 2023 03:08:22 GMT+0000 (Greenwich Mean Time) (53751ms)
√ EX-7215 - Part 5: Verify the tag activity in the GC Admin T&M Log page in Receiver tabSat Aug 12 2023 03:08:22 GMT+0000 (Greenwich Mean Time) (53751ms)
√ EX-7215 - Part 6: Cleanup SC Tag ... Sat Aug 12 2023 03:08:22 GMT+0000 (Greenwich Mean Time) (39908ms)
√ EX-7215 - Part 6: Cleanup SC Tag ... Sat Aug 12 2023 03:08:22 GMT+0000 (Greenwich Mean Time) (39908ms)
6 passing (5m)
6 passing (5m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_106.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 6 │
│ Passing: 6 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 19 seconds │
│ Spec Ran: 12_Tag_Activity/ex-7215-tag-activity-create-sign-send-revise-resubmit-from-web.s │
│ pec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 12_Tag_Activity/ex-7353-tag-activity-create-tag-opened-status.spec.t (108 of 113)
s
Activity Log | T&M Tag | Create a Tag with status Open and verify its Activity Feed messages. Sat Aug 12 2023 03:13:47 GMT+0000 (Greenwich Mean Time)
Activity Log | T&M Tag | Create a Tag with status Open and verify its Activity Feed messages. Sat Aug 12 2023 03:13:47 GMT+0000 (Greenwich Mean Time)
√ EX-7353 - Part 1: GC PM creates a projectSat Aug 12 2023 03:13:47 GMT+0000 (Greenwich Mean Time) (48141ms)
√ EX-7353 - Part 1: GC PM creates a projectSat Aug 12 2023 03:13:47 GMT+0000 (Greenwich Mean Time) (48141ms)
√ EX-7353 - Part 2: GC PM adds a contract with SC PM.Sat Aug 12 2023 03:13:47 GMT+0000 (Greenwich Mean Time) (36900ms)
√ EX-7353 - Part 2: GC PM adds a contract with SC PM.Sat Aug 12 2023 03:13:47 GMT+0000 (Greenwich Mean Time) (36900ms)
√ EX-7353 - Part 3: Sub Contractor accepts invite from the bell notification.Sat Aug 12 2023 03:13:47 GMT+0000 (Greenwich Mean Time) (25757ms)
√ EX-7353 - Part 3: Sub Contractor accepts invite from the bell notification.Sat Aug 12 2023 03:13:47 GMT+0000 (Greenwich Mean Time) (25757ms)
√ EX-7353 - Part 4: Gen Contractor creates a Authorize T&M Work Change Notification.Sat Aug 12 2023 03:13:47 GMT+0000 (Greenwich Mean Time) (42049ms)
√ EX-7353 - Part 4: Gen Contractor creates a Authorize T&M Work Change Notification.Sat Aug 12 2023 03:13:47 GMT+0000 (Greenwich Mean Time) (42049ms)
√ EX-7353 - Part 5: Verify the tag activity in the GC Admin T&M Log page at the receiver tabSat Aug 12 2023 03:13:47 GMT+0000 (Greenwich Mean Time) (34307ms)
√ EX-7353 - Part 5: Verify the tag activity in the GC Admin T&M Log page at the receiver tabSat Aug 12 2023 03:13:47 GMT+0000 (Greenwich Mean Time) (34307ms)
√ EX-7353 - Part 6: Cleanup SC. Sat Aug 12 2023 03:13:47 GMT+0000 (Greenwich Mean Time) (32939ms)
√ EX-7353 - Part 6: Cleanup SC. Sat Aug 12 2023 03:13:47 GMT+0000 (Greenwich Mean Time) (32939ms)
√ EX-7353 - Part 6: Cleanup GC. Sat Aug 12 2023 03:13:47 GMT+0000 (Greenwich Mean Time) (34773ms)
√ EX-7353 - Part 6: Cleanup GC. Sat Aug 12 2023 03:13:47 GMT+0000 (Greenwich Mean Time) (34773ms)
7 passing (4m)
7 passing (4m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_107.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 7 │
│ Passing: 7 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 4 minutes, 15 seconds │
│ Spec Ran: 12_Tag_Activity/ex-7353-tag-activity-create-tag-opened-status.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 13_Cor_Activity/ex-10248-cor-activity-create-bc.spec.ts (109 of 113)
Activity Log | COR | Create a Backcharge and send out for distributionSat Aug 12 2023 03:18:08 GMT+0000 (Greenwich Mean Time)
Activity Log | COR | Create a Backcharge and send out for distributionSat Aug 12 2023 03:18:08 GMT+0000 (Greenwich Mean Time)
√ EX-10248 - Part 1: Create a project with contract Sat Aug 12 2023 03:18:08 GMT+0000 (Greenwich Mean Time) (17112ms)
√ EX-10248 - Part 1: Create a project with contract Sat Aug 12 2023 03:18:08 GMT+0000 (Greenwich Mean Time) (17112ms)
√ Ex-10248 Part 2: Login as SC Owner and accept the contract (6700ms)
√ Ex-10248 Part 2: Login as SC Owner and accept the contract (6700ms)
√ EX-10248 - Part 3: Upload backcharge COR and verify the activity logSat Aug 12 2023 03:18:08 GMT+0000 (Greenwich Mean Time) (66282ms)
√ EX-10248 - Part 3: Upload backcharge COR and verify the activity logSat Aug 12 2023 03:18:08 GMT+0000 (Greenwich Mean Time) (66282ms)
√ EX-10248 Part4: Cleanup GC... Sat Aug 12 2023 03:18:08 GMT+0000 (Greenwich Mean Time)
√ EX-10248 Part4: Cleanup GC... Sat Aug 12 2023 03:18:08 GMT+0000 (Greenwich Mean Time)
4 passing (2m)
4 passing (2m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_108.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 4 │
│ Passing: 4 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 34 seconds │
│ Spec Ran: 13_Cor_Activity/ex-10248-cor-activity-create-bc.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 13_Cor_Activity/ex-7673-cor-activity-create-cor-draft-view-cor.spec. (110 of 113)
ts
Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiverSat Aug 12 2023 03:19:47 GMT+0000 (Greenwich Mean Time)
Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiverSat Aug 12 2023 03:19:47 GMT+0000 (Greenwich Mean Time)
√ EX-7673 - Part 0: Clean existing COR's : Sat Aug 12 2023 03:19:47 GMT+0000 (Greenwich Mean Time) (49660ms)
√ EX-7673 - Part 0: Clean existing COR's : Sat Aug 12 2023 03:19:47 GMT+0000 (Greenwich Mean Time) (49660ms)
√ EX-7673 - Part 1: Create COR as draft: Sat Aug 12 2023 03:19:47 GMT+0000 (Greenwich Mean Time) (49698ms)
√ EX-7673 - Part 1: Create COR as draft: Sat Aug 12 2023 03:19:47 GMT+0000 (Greenwich Mean Time) (49698ms)
√ EX-7673 - Part 2: Verify the COR Draft Log has the new COR draft and send the COR for email distribution : Sat Aug 12 2023 03:19:47 GMT+0000 (Greenwich Mean Time) (53393ms)
√ EX-7673 - Part 2: Verify the COR Draft Log has the new COR draft and send the COR for email distribution : Sat Aug 12 2023 03:19:47 GMT+0000 (Greenwich Mean Time) (53393ms)
√ EX-7673 - Part 3: Verify the Activity Feed in the Sent Log : Sat Aug 12 2023 03:19:47 GMT+0000 (Greenwich Mean Time) (45794ms)
√ EX-7673 - Part 3: Verify the Activity Feed in the Sent Log : Sat Aug 12 2023 03:19:47 GMT+0000 (Greenwich Mean Time) (45794ms)
√ EX-7673 - Part 4: Verify the activity at the Received Log for the Customer: Sat Aug 12 2023 03:19:47 GMT+0000 (Greenwich Mean Time) (40826ms)
√ EX-7673 - Part 4: Verify the activity at the Received Log for the Customer: Sat Aug 12 2023 03:19:47 GMT+0000 (Greenwich Mean Time) (40826ms)
√ EX-7673 - Part 5: Clean the COR Sat Aug 12 2023 03:19:47 GMT+0000 (Greenwich Mean Time) (53551ms)
√ EX-7673 - Part 5: Clean the COR Sat Aug 12 2023 03:19:47 GMT+0000 (Greenwich Mean Time) (53551ms)
6 passing (5m)
6 passing (5m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_109.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 6 │
│ Passing: 6 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 4 minutes, 53 seconds │
│ Spec Ran: 13_Cor_Activity/ex-7673-cor-activity-create-cor-draft-view-cor.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 13_Cor_Activity/ex-7674-cor-activity-create-cor-resend-cor-resend-co (111 of 113)
r-with-email-message-view-cor.spec.ts
COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageSat Aug 12 2023 03:24:46 GMT+0000 (Greenwich Mean Time)
COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageSat Aug 12 2023 03:24:46 GMT+0000 (Greenwich Mean Time)
√ EX-7674 - Part 0: Clean existing COR's : Sat Aug 12 2023 03:24:46 GMT+0000 (Greenwich Mean Time) (50908ms)
√ EX-7674 - Part 0: Clean existing COR's : Sat Aug 12 2023 03:24:46 GMT+0000 (Greenwich Mean Time) (50908ms)
√ EX-7674 - Part 1: Create COR. Sat Aug 12 2023 03:24:46 GMT+0000 (Greenwich Mean Time) (58904ms)
√ EX-7674 - Part 1: Create COR. Sat Aug 12 2023 03:24:46 GMT+0000 (Greenwich Mean Time) (58904ms)
√ EX-7674 - Part 2: Verify the COR is in the Sent Log : Sat Aug 12 2023 03:24:46 GMT+0000 (Greenwich Mean Time) (44580ms)
√ EX-7674 - Part 2: Verify the COR is in the Sent Log : Sat Aug 12 2023 03:24:46 GMT+0000 (Greenwich Mean Time) (44580ms)
√ EX-7674 - Part 3: Resend the COR and resend the cor with email message and verify activity in sent log : Sat Aug 12 2023 03:24:46 GMT+0000 (Greenwich Mean Time) (60978ms)
√ EX-7674 - Part 3: Resend the COR and resend the cor with email message and verify activity in sent log : Sat Aug 12 2023 03:24:46 GMT+0000 (Greenwich Mean Time) (60978ms)
√ EX-7674 - Part 4: Verify the activity at the reciver side : Sat Aug 12 2023 03:24:46 GMT+0000 (Greenwich Mean Time) (47614ms)
√ EX-7674 - Part 4: Verify the activity at the reciver side : Sat Aug 12 2023 03:24:46 GMT+0000 (Greenwich Mean Time) (47614ms)
√ EX-7674 - Part 5: Clean the COR: Sat Aug 12 2023 03:24:46 GMT+0000 (Greenwich Mean Time) (57064ms)
√ EX-7674 - Part 5: Clean the COR: Sat Aug 12 2023 03:24:46 GMT+0000 (Greenwich Mean Time) (57064ms)
6 passing (5m)
6 passing (5m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_110.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 6 │
│ Passing: 6 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 20 seconds │
│ Spec Ran: 13_Cor_Activity/ex-7674-cor-activity-create-cor-resend-cor-resend-cor-with-email │
│ -message-view-cor.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 13_Cor_Activity/ex-7678-cor-activity-create-cor-change-status-state- (112 of 113)
at-receiver.spec.ts
Create a COR and send the COR and change the status and stage with email message at the receiver sideSat Aug 12 2023 03:30:12 GMT+0000 (Greenwich Mean Time)
Create a COR and send the COR and change the status and stage with email message at the receiver sideSat Aug 12 2023 03:30:12 GMT+0000 (Greenwich Mean Time)
√ EX-7678 - Part 1: Clean existing COR's : Sat Aug 12 2023 03:30:12 GMT+0000 (Greenwich Mean Time) (53939ms)
√ EX-7678 - Part 1: Clean existing COR's : Sat Aug 12 2023 03:30:12 GMT+0000 (Greenwich Mean Time) (53939ms)
√ EX-7678 - Part 2: Create COR : Sat Aug 12 2023 03:30:12 GMT+0000 (Greenwich Mean Time) (48882ms)
√ EX-7678 - Part 2: Create COR : Sat Aug 12 2023 03:30:12 GMT+0000 (Greenwich Mean Time) (48882ms)
√ EX-7678 - Part 3: Verify the COR is in the Sent Log : Sat Aug 12 2023 03:30:12 GMT+0000 (Greenwich Mean Time) (40878ms)
√ EX-7678 - Part 3: Verify the COR is in the Sent Log : Sat Aug 12 2023 03:30:12 GMT+0000 (Greenwich Mean Time) (40878ms)
√ EX-7678 - Part 4: Change status and state at sent side verify activity in received log : Sat Aug 12 2023 03:30:12 GMT+0000 (Greenwich Mean Time) (73032ms)
√ EX-7678 - Part 4: Change status and state at sent side verify activity in received log : Sat Aug 12 2023 03:30:12 GMT+0000 (Greenwich Mean Time) (73032ms)
√ EX-7678 - Part 5: Verify the activity at the sent side : Sat Aug 12 2023 03:30:12 GMT+0000 (Greenwich Mean Time) (51025ms)
√ EX-7678 - Part 5: Verify the activity at the sent side : Sat Aug 12 2023 03:30:12 GMT+0000 (Greenwich Mean Time) (51025ms)
√ EX-7678 - Part 6: Clean the COR:Sat Aug 12 2023 03:30:12 GMT+0000 (Greenwich Mean Time) (61893ms)
√ EX-7678 - Part 6: Clean the COR:Sat Aug 12 2023 03:30:12 GMT+0000 (Greenwich Mean Time) (61893ms)
6 passing (6m)
6 passing (6m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_111.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 6 │
│ Passing: 6 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 30 seconds │
│ Spec Ran: 13_Cor_Activity/ex-7678-cor-activity-create-cor-change-status-state-at-receiver. │
│ spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts (113 of 113)
COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageSat Aug 12 2023 03:35:47 GMT+0000 (Greenwich Mean Time)
COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageSat Aug 12 2023 03:35:47 GMT+0000 (Greenwich Mean Time)
√ EX-7798 - Part 1: Clean existing COR's : Sat Aug 12 2023 03:35:47 GMT+0000 (Greenwich Mean Time) (48764ms)
√ EX-7798 - Part 1: Clean existing COR's : Sat Aug 12 2023 03:35:47 GMT+0000 (Greenwich Mean Time) (48764ms)
√ EX-7798 - Part 2: Upload COR : Sat Aug 12 2023 03:35:47 GMT+0000 (Greenwich Mean Time) (63508ms)
√ EX-7798 - Part 2: Upload COR : Sat Aug 12 2023 03:35:47 GMT+0000 (Greenwich Mean Time) (63508ms)
√ EX-7798 - Part 3: View the COR at receiver side : Sat Aug 12 2023 03:35:47 GMT+0000 (Greenwich Mean Time) (55316ms)
√ EX-7798 - Part 3: View the COR at receiver side : Sat Aug 12 2023 03:35:47 GMT+0000 (Greenwich Mean Time) (55316ms)
√ EX-7798 - Part 4: Verify the COR is in the Sent Log : Sat Aug 12 2023 03:35:47 GMT+0000 (Greenwich Mean Time) (46066ms)
√ EX-7798 - Part 4: Verify the COR is in the Sent Log : Sat Aug 12 2023 03:35:47 GMT+0000 (Greenwich Mean Time) (46066ms)
√ EX-7798 - Part 5: Verify the activity at the reciver side : Sat Aug 12 2023 03:35:47 GMT+0000 (Greenwich Mean Time) (44403ms)
√ EX-7798 - Part 5: Verify the activity at the reciver side : Sat Aug 12 2023 03:35:47 GMT+0000 (Greenwich Mean Time) (44403ms)
√ EX-7798 - Part 6: Clean the COR:Sat Aug 12 2023 03:35:47 GMT+0000 (Greenwich Mean Time) (54597ms)
√ EX-7798 - Part 6: Clean the COR:Sat Aug 12 2023 03:35:47 GMT+0000 (Greenwich Mean Time) (54597ms)
6 passing (5m)
6 passing (5m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_112.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 6 │
│ Passing: 6 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 13 seconds │
│ Spec Ran: 13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Uploading Screenshots & Videos)
- Nothing to Upload
====================================================================================================
(Run Finished)
Spec Tests Passing Failing Pending Skipped
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ √ 01_LoginPage/ex-3313-invalid-creden 00:11 1 1 - - - │
│ tials.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 01_LoginPage/ex-3316-email-input-va 00:08 1 1 - - - │
│ lidation.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 01_LoginPage/ex-5751-create-new-acc 00:11 1 1 - - - │
│ ount-with-already-used-email.spec.t │
│ s │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ × 02_PermissionLevels/Add_users_to_Pr 02:35 3 2 1 - - │
│ oject/EX-9394-GC-creates-project-ad │
│ ds-new-customer-user.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/Create_Project/ 01:24 2 2 - - - │
│ ex-3323-create-new-project-as-owner │
│ -in-owner-company.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/Create_Project/ 01:21 2 2 - - - │
│ ex-3328-create-new-project-as-owner │
│ -in-sc-company.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/Create_Project/ 01:20 2 2 - - - │
│ ex-3329-create-new-project-as-owner │
│ -in-other-company.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/Create_Project/ 01:22 2 2 - - - │
│ ex-3330-create-new-project-as-admin │
│ -in-owner-company.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/Create_Project/ 01:28 2 2 - - - │
│ ex-3331-create-new-project-as-admin │
│ -in-gc-company.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/Create_Project/ 01:28 2 2 - - - │
│ ex-3332-create-new-project-as-pm-in │
│ -gc-company.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/Create_Project/ 01:28 2 2 - - - │
│ ex-3333-create-new-project-as-fu-in │
│ -gc-company.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/Create_Project/ 01:21 2 2 - - - │
│ ex-3334-create-new-project-as-pm-in │
│ -owner-company.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/Create_Project/ 01:22 2 2 - - - │
│ ex-3335-create-new-project-as-fu-in │
│ -owner-company.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/Create_Project/ 01:26 2 2 - - - │
│ ex-3336-create-new-project-as-admin │
│ -in-sc-company.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/Create_Project/ 01:26 2 2 - - - │
│ ex-3337-create-new-project-as-pm-in │
│ -sc-company.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/Create_Project/ 01:24 2 2 - - - │
│ ex-3338-create-new-project-as-fu-in │
│ -sc-company.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/Create_Project/ 01:18 2 2 - - - │
│ ex-3342-create-new-project-as-admin │
│ -in-other-company.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/Create_Project/ 01:19 2 2 - - - │
│ ex-3343-create-new-project-as-pm-in │
│ -other-company.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/Create_Project/ 01:21 2 2 - - - │
│ ex-3344-create-new-project-as-fu-in │
│ -other-company.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/Project_level/e 03:15 5 5 - - - │
│ x-10783-project-level-sent-logs-ema │
│ il-for-GC-SC.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/Project_level/e 03:14 7 7 - - - │
│ x-10797-project-level-sent-logs-ema │
│ il-for-GC-SC.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ × 02_PermissionLevels/Project_level/e 21:44 43 39 4 - - │
│ x-10799-project-level-sent-logs-ema │
│ il-for-GC-SC.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/User_roles/ex-9 02:11 6 6 - - - │
│ 792-GC-account-owner-user-previlleg │
│ es.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/User_roles/ex-9 05:43 12 12 - - - │
│ 793-GC-Owner-project-previlleges.sp │
│ ec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/User_roles/ex-9 02:07 6 6 - - - │
│ 828-GC-admin-user-previlleges.spec. │
│ ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/User_roles/ex-9 01:57 6 6 - - - │
│ 829-GC-PM-user-previlleges.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/User_roles/ex-9 01:25 5 5 - - - │
│ 830-GC-Field-user-previlleges.spec. │
│ ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/User_roles/ex-9 02:43 8 8 - - - │
│ 832-SC-Field-users-user-previlleges │
│ .spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/User_roles/ex-9 02:58 8 8 - - - │
│ 833-SC-PM-user-previlleges.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/User_roles/ex-9 03:00 8 8 - - - │
│ 834-SC-Admin-user-previlleges.spec. │
│ ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/User_roles/ex-9 03:03 8 8 - - - │
│ 835-SC-account-owner-user-previlleg │
│ es.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/User_roles/ex-9 06:36 12 12 - - - │
│ 885-GC-Admin-project-previlleges.sp │
│ ec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/User_roles/ex-9 05:38 12 12 - - - │
│ 886-GC-PM-project-previlleges.spec. │
│ ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/User_roles/ex-9 06:25 12 12 - - - │
│ 887-SC-Admin-project-previlleges.sp │
│ ec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/User_roles/ex-9 04:27 9 9 - - - │
│ 888-GC-FU-project-previlleges.spec. │
│ ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/User_roles/ex-9 05:42 12 12 - - - │
│ 889-SC-Owner-project-previlleges.sp │
│ ec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/User_roles/ex-9 05:43 12 12 - - - │
│ 890-SC-PM-project-previlleges.spec. │
│ ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 02_PermissionLevels/User_roles/ex-9 04:27 9 9 - - - │
│ 891-SC-FU-project-previlleges.spec. │
│ ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 04_COR_Log/Received/ex-9912-add-bc- 03:20 14 14 - - - │
│ to-existing-cor-with-all-role-contr │
│ actors.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 04_COR_Log/Sent/EX-4366-SC-creates- 07:04 11 11 - - - │
│ project-adds-gc-customer-sc-creates │
│ -cor.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ × 04_COR_Log/Sent/EX-4432-to-verify-P 04:37 7 6 1 - - │
│ M-is-able-to-create-cor-as-draft.sp │
│ ec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 04_COR_Log/Sent/EX-5827-to-verify-m 00:28 1 1 - - - │
│ ultiple-cors-to-same-tag-when-creat │
│ ing-cor.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 04_COR_Log/Sent/EX-5894-to-verify-m 00:40 1 1 - - - │
│ ultiple-cors-to-same-tag-when-uploa │
│ ding-cor.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 04_COR_Log/Sent/ex-3673-verify-cont 03:14 4 4 - - - │
│ ractor-is-able-to-upload-cor-with-o │
│ nly-mandatory-data.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 04_COR_Log/Sent/ex-3683-GC-creates- 06:43 11 11 - - - │
│ project-adds-contract-SC-creates-co │
│ r.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 04_COR_Log/Sent/ex-3686-verify-ther 00:28 1 1 - - - │
│ e-are-two-tabs-on-cor-log-page-sent │
│ -received.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 04_COR_Log/Sent/ex-5244-verify-shar 00:58 1 1 - - - │
│ eable-link-contains-just-the-select │
│ ed-project.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 04_COR_Log/Sent/ex-5333-SC-creates- 02:52 1 1 - - - │
│ cor-with-full-data.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 04_COR_Log/Sent/ex-5396-verify-cont 07:15 11 11 - - - │
│ ractor-is-able-to-upload-cor-with-m │
│ andatory-and-optional-data.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 04_COR_Log/Sent/ex-5435-create-new- 03:27 6 6 - - - │
│ project-add-contrac-verify-original │
│ -contract-value.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 04_COR_Log/Sent/ex-6681-verify-sent 01:56 2 2 - - - │
│ -summary-data-after-filtering-by-pr │
│ oject.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Received/ex-5425-verify- 01:56 2 2 - - - │
│ received-summary-data-after-filteri │
│ ng-by-project.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Received/ex-5429-verify- 00:55 1 1 - - - │
│ received-export-csv-after-filtering │
│ -by-project.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Received/ex-5431-verify- 00:54 1 1 - - - │
│ received-export-sharelog-after-filt │
│ ering-by-project.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Received/ex-5641-verify- 05:06 5 5 - - - │
│ tnm-log-received-summary-data-after │
│ -filtering-by-tag-status.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-4415-1-gc-create 04:26 5 5 - - - │
│ s-project-and-contract-sc-creates-t │
│ ag-optional-signer.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-4415-2-gc-create 05:38 2 2 - - - │
│ s-project-and-contract-sc-creates-t │
│ ag-optional-signer.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-4415-3-gc-create 02:50 1 1 - - - │
│ s-project-and-contract-sc-creates-t │
│ ag-optional-signer.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-4415-4-gc-create 03:10 1 1 - - - │
│ s-project-and-contract-sc-creates-t │
│ ag-optional-signer.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-4415-5-gc-create 02:49 2 2 - - - │
│ s-project-and-contract-sc-creates-t │
│ ag-optional-signer.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-4415-6-gc-create 04:42 8 8 - - - │
│ s-project-and-contract-sc-creates-t │
│ ag-optional-signer.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-5424-verify-sent 02:26 2 2 - - - │
│ -summary-data-after-filtering-by-pr │
│ oject.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-5430-verify-sent 00:46 1 1 - - - │
│ -export-csv-after-filtering-by-proj │
│ ect.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-5505-verify-tnm- 01:35 1 1 - - - │
│ log-sent-summary-data-after-filteri │
│ ng-by-customer.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-5506-verify-tnm- 01:37 1 1 - - - │
│ log-sent-summary-data-after-filteri │
│ ng-by-job-number.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-5507-verify-tnm- 01:31 1 1 - - - │
│ log-sent-summary-data-after-filteri │
│ ng-by-cust-ref-num.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-5508-verify-tnm- 10:41 7 7 - - - │
│ log-sent-summary-data-after-filteri │
│ ng-by-tag-status.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-5509-verify-tnm- 01:29 1 1 - - - │
│ log-sent-summary-data-after-filteri │
│ ng-by-cust-label.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-5510-verify-tnm- 02:55 2 2 - - - │
│ log-sent-summary-data-after-filteri │
│ ng-by-cor-availability.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-5846-sc-creates- 08:01 12 12 - - - │
│ project-add-gc-as-customer-sc-creat │
│ es-tag-req-and-optional-signer.spec │
│ .ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-6181-1-gc-create 02:55 3 3 - - - │
│ s-project-and-contract-sc-creates-t │
│ ag-optional-signer.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-6181-2-gc-create 16:08 1 1 - - - │
│ s-project-and-contract-sc-creates-t │
│ ag-optional-signer.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-6181-3-gc-create 02:32 5 5 - - - │
│ s-project-and-contract-sc-creates-t │
│ ag-optional-signer.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-6191-sc-creates- 12:19 13 13 - - - │
│ tag-required-signer-gc-signs-tag.sp │
│ ec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-6193-sc-fu-creat 06:15 8 8 - - - │
│ es-tag-required-signer-gc-fu-signs- │
│ tag.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-6324-1-sc-pm-cre 10:28 5 5 - - - │
│ ates-project-and-contract-gc-pm-cre │
│ ates-tag-optional-signer.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-6324-2-sc-pm-cre 07:58 4 4 - - - │
│ ates-project-and-contract-gc-pm-cre │
│ ates-tag-optional-signer.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-6324-3-sc-pm-cre 05:50 4 4 - - - │
│ ates-project-and-contract-gc-pm-cre │
│ ates-tag-optional-signer.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ × 05_T&M_Log/Sent/ex-6324-4-sc-pm-cre 01:14 3 2 1 - - │
│ ates-project-and-contract-gc-pm-cre │
│ ates-tag-optional-signer.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ × 05_T&M_Log/Sent/ex-6324-5-sc-pm-cre 06:51 6 1 5 - - │
│ ates-project-and-contract-gc-pm-cre │
│ ates-tag-optional-signer.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-6335-sc-sends-ta 08:16 10 10 - - - │
│ g-gc-signs-tag-as-optional-not-save │
│ d-drafts.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 05_T&M_Log/Sent/ex-7224-switch-proj 05:27 7 7 - - - │
│ ect-workflow.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 07_ChangeNotificationLog/Sent/ex-60 05:27 8 8 - - - │
│ 30-create-cn-respond-with-upload-co │
│ r-verify-all-data.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ × 07_ChangeNotificationLog/Sent/ex-85 12:04 13 10 3 - - │
│ 97-respond-to-cn-as-SC-and-GC-clear │
│ -response.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 07_ChangeNotificationLog/Sent/ex-85 03:13 5 5 - - - │
│ 99-create-cn-authorize-t&mwork-resp │
│ ond-as-SC-PM-with-no-cost-impact.sp │
│ ec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 07_ChangeNotificationLog/Sent/ex-89 03:21 5 5 - - - │
│ 42-create-cn-pricing-request-respon │
│ d-as-SC-PM-with-no-cost-impact.spec │
│ .ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 07_ChangeNotificationLog/Sent/ex-89 04:57 7 7 - - - │
│ 43-create-cn-pricing-request-respon │
│ d-as-SC-PM-with-create-cor.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 07_ChangeNotificationLog/Sent/ex-89 05:08 7 7 - - - │
│ 44-create-cn-pricing-request-respon │
│ d-as-SC-PM-with-upload-cor.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 07_ChangeNotificationLog/Sent/ex-89 03:17 5 5 - - - │
│ 45-create-cn-pricing-request-respon │
│ d-as-GC-PM-with-no-cost-impact.spec │
│ .ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 07_ChangeNotificationLog/Sent/ex-89 03:19 5 5 - - - │
│ 46-create-cn-pricing-request-respon │
│ d-as-GC-PM-by-linking-existing-cor. │
│ spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 07_ChangeNotificationLog/Sent/ex-89 04:55 7 7 - - - │
│ 47-create-cn-authorize-t&mwork-resp │
│ ond-as-SC-PM-with-create-cor.spec.t │
│ s │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ × 07_ChangeNotificationLog/Sent/ex-89 04:10 8 2 6 - - │
│ 48-create-cn-authorize-t&mwork-resp │
│ ond-as-SC-PM-with-upload-cor.spec.t │
│ s │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ × 07_ChangeNotificationLog/Sent/ex-89 00:46 5 - 5 - - │
│ 49-create-cn-authorize-t&mwork-resp │
│ ond-as-GC-PM-with-no-cost-impact.sp │
│ ec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ × 07_ChangeNotificationLog/Sent/ex-89 00:47 5 - 5 - - │
│ 50-create-cn-authorize-t&mwork-resp │
│ ond-as-GC-PM-by-linking-existing-co │
│ r.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ × 08_Projects/Active Projects/ex-5467 07:37 12 - 12 - - │
│ -verify-job-number-propagation-betw │
│ een-project.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ × 08_Projects/Active Projects/ex-7362 06:27 7 - 7 - - │
│ -verify-job-number-propagation-to-d │
│ raft-cors.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 09_Analytics/ex-5428-verify-sent-ex 00:43 1 1 - - - │
│ port--tm-tag-detailed-report-xlsx-a │
│ fter-filtering-by-project.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 09_Analytics/ex-8799-verify-receive 00:37 1 1 - - - │
│ d-export--tm-tag-detailed-report-xl │
│ sx-after-filtering-by-project.spec. │
│ ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ × 11_Emails/CORs/ex-3720-verify-all-l 06:07 8 6 2 - - │
│ inks-in-cor-recieved-email.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ × 11_Emails/ChangeNotifications/ex-37 06:37 8 3 5 - - │
│ 23-verify-all-links-in-pricing-requ │
│ est-cn-response-needed-email.spec.t │
│ s │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 11_Emails/ChangeNotifications/ex-52 03:45 7 7 - - - │
│ 87-verify-all-links-in-authorize-wo │
│ rk-cn-response-needed-email.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 11_Emails/Projects/ex-3717-verify-a 02:29 5 5 - - - │
│ ll-links-in-add-my-company-email.sp │
│ ec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 11_Emails/Projects/ex-3718-verify-a 03:33 7 7 - - - │
│ ll-links-in-add-my-customer-email.s │
│ pec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 11_Emails/Projects/ex-3719-verify-a 03:44 7 7 - - - │
│ ll-links-in-add-contrctor-email.spe │
│ c.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 11_Emails/T&M_Tags/ex-3721-verify-a 05:12 8 8 - - - │
│ ll-links-in-please-sign-tm-tag-emai │
│ l.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 12_Tag_Activity/ex-7214-tag-activit 05:25 7 7 - - - │
│ y-create-sign-send-reject-from-web. │
│ spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 12_Tag_Activity/ex-7215-tag-activit 05:19 6 6 - - - │
│ y-create-sign-send-revise-resubmit- │
│ from-web.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 12_Tag_Activity/ex-7353-tag-activit 04:15 7 7 - - - │
│ y-create-tag-opened-status.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 13_Cor_Activity/ex-10248-cor-activi 01:34 4 4 - - - │
│ ty-create-bc.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 13_Cor_Activity/ex-7673-cor-activit 04:53 6 6 - - - │
│ y-create-cor-draft-view-cor.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 13_Cor_Activity/ex-7674-cor-activit 05:20 6 6 - - - │
│ y-create-cor-resend-cor-resend-cor- │
│ with-email-message-view-cor.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 13_Cor_Activity/ex-7678-cor-activit 05:30 6 6 - - - │
│ y-create-cor-change-status-state-at │
│ -receiver.spec.ts │
├────────────────────────────────────────────────────────────────────────────────────────────────┤
│ √ 13_Cor_Activity/ex-7798-cor-activit 05:13 6 6 - - - │
│ y-upload-cor-view-cor.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
× 13 of 113 failed (12%) 7:25:36 631 574 57 - -
───────────────────────────────────────────────────────────────────────────────────────────────────────
Recorded Run: https://cloud.cypress.io/projects/1e8aku/runs/1