but never did.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:329:34)
5) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesTue Aug 22 2023 04:42:46 GMT+0000 (Greenwich Mean Time)
EX-9885 - Part 9: Add additiona user to existing contract of the project. Tue Aug 22 2023 04:41:09 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:253:21)
6) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesTue Aug 22 2023 04:42:46 GMT+0000 (Greenwich Mean Time)
EX-9885 - Part 10: Verify email invitation for additional contract user Tue Aug 22 2023 04:42:11 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692678881937' within the element: but never did.
at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts:154:28)
7) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesTue Aug 22 2023 04:42:46 GMT+0000 (Greenwich Mean Time)
Ex-9885 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 22 2023 04:42:46 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:253:21)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_031.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 12 │
│ Passing: 5 │
│ Failing: 7 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 7 │
│ Video: true │
│ Duration: 9 minutes, 44 seconds │
│ Estimated: 11 minutes, 12 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587)
issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p
ermissions GC Admin Login as GC admin and create project and verify user privil
egesTue Aug 22 2023 043441 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 3 Ad
d customer to the Project. Tue Aug 22 2023 043441 GMT+0000 (Greenwich Mean Time.
png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587)
issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p
ermissions GC Admin Login as GC admin and create project and verify user privil
egesTue Aug 22 2023 043736 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 4 Ve
rify the invitation email for customerTue Aug 22 2023 043736 GMT+0000 (Greenwic.
png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587)
issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p
ermissions GC Admin Login as GC admin and create project and verify user privil
egesTue Aug 22 2023 043812 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 5 Ad
d company user to the Project. Tue Aug 22 2023 043812 GMT+0000 (Greenwich Mean .
png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587)
issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p
ermissions GC Admin Login as GC admin and create project and verify user privil
egesTue Aug 22 2023 043812 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 6 Ve
rify company user can access project. Tue Aug 22 2023 043812 GMT+0000 (Greenwic.
png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587)
issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p
ermissions GC Admin Login as GC admin and create project and verify user privil
egesTue Aug 22 2023 044109 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 9 Ad
d additiona user to existing contract of the project. Tue Aug 22 2023 044109 GM.
png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587)
issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p
ermissions GC Admin Login as GC admin and create project and verify user privil
egesTue Aug 22 2023 044211 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 10 V
erify email invitation for additional contract user Tue Aug 22 2023 044211 GMT+.
png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587)
issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p
ermissions GC Admin Login as GC admin and create project and verify user privil
egesTue Aug 22 2023 044246 GMT+0000 (Greenwich Mean Time) -- Ex-9885 - Part 11 N
avigate to project rates, divisons and additiona t&M signers pagesTue Aug 22 20.
png
(Video)
- Started compressing: Compressing to 32 CRF
Compression progress: 11%
Compression progress: 22%
Compression progress: 33%
Compression progress: 44%
Compression progress: 55%
Compression progress: 65%
Compression progress: 76%
Compression progress: 88%
Compression progress: 99%
- Finished compressing: 1 minute, 38 seconds
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts.mp4
(Uploading Screenshots & Videos)
- Done Uploading (1/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesTue Aug 22 2023 044246 GMT+0000 (Greenwich Mean Time) -- Ex-9885 - Part 11 Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 22 20.png
- Done Uploading (2/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesTue Aug 22 2023 043441 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 3 Add customer to the Project. Tue Aug 22 2023 043441 GMT+0000 (Greenwich Mean Time.png
- Done Uploading (3/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesTue Aug 22 2023 043812 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 5 Add company user to the Project. Tue Aug 22 2023 043812 GMT+0000 (Greenwich Mean .png
- Done Uploading (4/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesTue Aug 22 2023 044211 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 10 Verify email invitation for additional contract user Tue Aug 22 2023 044211 GMT+.png
- Done Uploading (5/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesTue Aug 22 2023 043736 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 4 Verify the invitation email for customerTue Aug 22 2023 043736 GMT+0000 (Greenwic.png
- Done Uploading (6/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesTue Aug 22 2023 043812 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 6 Verify company user can access project. Tue Aug 22 2023 043812 GMT+0000 (Greenwic.png
- Done Uploading (7/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesTue Aug 22 2023 044109 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 9 Add additiona user to existing contract of the project. Tue Aug 22 2023 044109 GM.png
- Done Uploading (8/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts.mp4
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9886-GC-PM-project-previlleges.spe (33 of 115)
c.ts
Estimated: 6 minutes, 48 seconds
User Role permissions| GC PM | Login as GC PM and create project and verify user privilegesTue Aug 22 2023 04:46:13 GMT+0000 (Greenwich Mean Time)
User Role permissions| GC PM | Login as GC PM and create project and verify user privilegesTue Aug 22 2023 04:46:13 GMT+0000 (Greenwich Mean Time)
√ EX-9886 - Part 1: Create a project Tue Aug 22 2023 04:46:13 GMT+0000 (Greenwich Mean Time) (59498ms)
√ EX-9886 - Part 1: Create a project Tue Aug 22 2023 04:46:13 GMT+0000 (Greenwich Mean Time) (59498ms)
√ EX-9886 - Part 2: Edit the project details and change the nameTue Aug 22 2023 04:46:13 GMT+0000 (Greenwich Mean Time) (37600ms)
√ EX-9886 - Part 2: Edit the project details and change the nameTue Aug 22 2023 04:46:13 GMT+0000 (Greenwich Mean Time) (37600ms)
√ EX-9886 - Part 3: Add customer to the Project. Tue Aug 22 2023 04:46:13 GMT+0000 (Greenwich Mean Time) (42377ms)
√ EX-9886 - Part 3: Add customer to the Project. Tue Aug 22 2023 04:46:13 GMT+0000 (Greenwich Mean Time) (42377ms)
√ EX-9886 - Part 4: Verify the invitation email for customerTue Aug 22 2023 04:48:40 GMT+0000 (Greenwich Mean Time)
√ EX-9886 - Part 4: Verify the invitation email for customerTue Aug 22 2023 04:48:40 GMT+0000 (Greenwich Mean Time)
√ EX-9886 - Part 5: Add company user to the Project. Tue Aug 22 2023 04:48:46 GMT+0000 (Greenwich Mean Time) (47368ms)
√ EX-9886 - Part 5: Add company user to the Project. Tue Aug 22 2023 04:48:46 GMT+0000 (Greenwich Mean Time) (47368ms)
√ EX-9886 - Part 6: Verify company user can access project. Tue Aug 22 2023 04:48:46 GMT+0000 (Greenwich Mean Time) (27568ms)
√ EX-9886 - Part 6: Verify company user can access project. Tue Aug 22 2023 04:48:46 GMT+0000 (Greenwich Mean Time) (27568ms)
√ EX-9886 - Part 7: Add Contract with a user to the project. Tue Aug 22 2023 04:48:46 GMT+0000 (Greenwich Mean Time) (39997ms)
√ EX-9886 - Part 7: Add Contract with a user to the project. Tue Aug 22 2023 04:48:46 GMT+0000 (Greenwich Mean Time) (39997ms)
√ EX-9886 - Part 8: Verify email invitation for contractor user Tue Aug 22 2023 04:50:47 GMT+0000 (Greenwich Mean Time)
√ EX-9886 - Part 8: Verify email invitation for contractor user Tue Aug 22 2023 04:50:47 GMT+0000 (Greenwich Mean Time)
√ EX-9886 - Part 9: Add additional user to existing contract of the project. Tue Aug 22 2023 04:50:53 GMT+0000 (Greenwich Mean Time) (45319ms)
√ EX-9886 - Part 9: Add additional user to existing contract of the project. Tue Aug 22 2023 04:50:53 GMT+0000 (Greenwich Mean Time) (45319ms)
√ EX-9886 - Part 10: Verify email invitation for additional contract user Tue Aug 22 2023 04:51:42 GMT+0000 (Greenwich Mean Time)
√ EX-9886 - Part 10: Verify email invitation for additional contract user Tue Aug 22 2023 04:51:42 GMT+0000 (Greenwich Mean Time)
√ Ex-9886 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 22 2023 04:51:47 GMT+0000 (Greenwich Mean Time) (41853ms)
√ Ex-9886 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 22 2023 04:51:47 GMT+0000 (Greenwich Mean Time) (41853ms)
√ EX-9886 - Part 12: Clean up Project Tue Aug 22 2023 04:51:47 GMT+0000 (Greenwich Mean Time) (35194ms)
√ EX-9886 - Part 12: Clean up Project Tue Aug 22 2023 04:51:47 GMT+0000 (Greenwich Mean Time) (35194ms)
12 passing (7m)
12 passing (7m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_032.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 12 │
│ Passing: 12 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 6 minutes, 52 seconds │
│ Estimated: 6 minutes, 48 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9886-GC-PM-project-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9886-GC-PM-project-previlleges.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges. (34 of 115)
spec.ts
Estimated: 6 minutes, 49 seconds
User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesTue Aug 22 2023 04:53:12 GMT+0000 (Greenwich Mean Time)
User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesTue Aug 22 2023 04:53:12 GMT+0000 (Greenwich Mean Time)
√ EX-9887 - Part 1: Create a project Tue Aug 22 2023 04:53:12 GMT+0000 (Greenwich Mean Time) (20044ms)
√ EX-9887 - Part 1: Create a project Tue Aug 22 2023 04:53:12 GMT+0000 (Greenwich Mean Time) (20044ms)
√ EX-9887 - Part 2: Edit the project details and change the nameTue Aug 22 2023 04:53:12 GMT+0000 (Greenwich Mean Time) (44575ms)
√ EX-9887 - Part 2: Edit the project details and change the nameTue Aug 22 2023 04:53:12 GMT+0000 (Greenwich Mean Time) (44575ms)
√ EX-9887 - Part 3: Add customer to the Project. Tue Aug 22 2023 04:53:12 GMT+0000 (Greenwich Mean Time) (41083ms)
√ EX-9887 - Part 3: Add customer to the Project. Tue Aug 22 2023 04:53:12 GMT+0000 (Greenwich Mean Time) (41083ms)
√ EX-9887 - Part 4: Verify the invitation email for customerTue Aug 22 2023 04:55:04 GMT+0000 (Greenwich Mean Time)
√ EX-9887 - Part 4: Verify the invitation email for customerTue Aug 22 2023 04:55:04 GMT+0000 (Greenwich Mean Time)
√ EX-9887 - Part 5: Add company user to the Project. Tue Aug 22 2023 04:55:10 GMT+0000 (Greenwich Mean Time) (64596ms)
√ EX-9887 - Part 5: Add company user to the Project. Tue Aug 22 2023 04:55:10 GMT+0000 (Greenwich Mean Time) (64596ms)
√ EX-9887 - Part 6: Verify company user can access project. Tue Aug 22 2023 04:55:10 GMT+0000 (Greenwich Mean Time) (29141ms)
√ EX-9887 - Part 6: Verify company user can access project. Tue Aug 22 2023 04:55:10 GMT+0000 (Greenwich Mean Time) (29141ms)
√ EX-9887 - Part 7: Add Contract with a user to the project. Tue Aug 22 2023 04:55:10 GMT+0000 (Greenwich Mean Time) (63653ms)
√ EX-9887 - Part 7: Add Contract with a user to the project. Tue Aug 22 2023 04:55:10 GMT+0000 (Greenwich Mean Time) (63653ms)
√ EX-9887 - Part 8: Verify email invitation for contractor user Tue Aug 22 2023 04:57:53 GMT+0000 (Greenwich Mean Time)
√ EX-9887 - Part 8: Verify email invitation for contractor user Tue Aug 22 2023 04:57:53 GMT+0000 (Greenwich Mean Time)
√ EX-9887 - Part 9: Add additiona user to existing contract of the project. Tue Aug 22 2023 04:57:59 GMT+0000 (Greenwich Mean Time) (48311ms)
√ EX-9887 - Part 9: Add additiona user to existing contract of the project. Tue Aug 22 2023 04:57:59 GMT+0000 (Greenwich Mean Time) (48311ms)
√ EX-9887 - Part 10: Verify email invitation for additional contract user Tue Aug 22 2023 04:58:51 GMT+0000 (Greenwich Mean Time)
√ EX-9887 - Part 10: Verify email invitation for additional contract user Tue Aug 22 2023 04:58:51 GMT+0000 (Greenwich Mean Time)
√ Ex-9887 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 22 2023 04:58:55 GMT+0000 (Greenwich Mean Time) (50412ms)
√ Ex-9887 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 22 2023 04:58:55 GMT+0000 (Greenwich Mean Time) (50412ms)
√ EX-9887 - Part 12: Clean up Project Tue Aug 22 2023 04:58:55 GMT+0000 (Greenwich Mean Time) (37782ms)
√ EX-9887 - Part 12: Clean up Project Tue Aug 22 2023 04:58:55 GMT+0000 (Greenwich Mean Time) (37782ms)
12 passing (7m)
12 passing (7m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_033.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 12 │
│ Passing: 12 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 7 minutes, 13 seconds │
│ Estimated: 6 minutes, 49 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9887-SC-Admin-project-previlleges.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9888-GC-FU-project-previlleges.spe (35 of 115)
c.ts
Estimated: 5 minutes, 1 second
User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesTue Aug 22 2023 05:00:31 GMT+0000 (Greenwich Mean Time)
User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesTue Aug 22 2023 05:00:31 GMT+0000 (Greenwich Mean Time)
√ EX-9888 - Part 1: Create a project Tue Aug 22 2023 05:00:31 GMT+0000 (Greenwich Mean Time) (47374ms)
√ EX-9888 - Part 1: Create a project Tue Aug 22 2023 05:00:31 GMT+0000 (Greenwich Mean Time) (47374ms)
√ EX-9888 - Part 2: Edit the project details and change the nameTue Aug 22 2023 05:00:31 GMT+0000 (Greenwich Mean Time) (36590ms)
√ EX-9888 - Part 2: Edit the project details and change the nameTue Aug 22 2023 05:00:31 GMT+0000 (Greenwich Mean Time) (36590ms)
√ EX-9888 - Part 3: Add customer to the Project. Tue Aug 22 2023 05:00:31 GMT+0000 (Greenwich Mean Time) (40148ms)
√ EX-9888 - Part 3: Add customer to the Project. Tue Aug 22 2023 05:00:31 GMT+0000 (Greenwich Mean Time) (40148ms)
√ EX-9888 - Part 4: Verify the invitation email for customerTue Aug 22 2023 05:02:42 GMT+0000 (Greenwich Mean Time)
√ EX-9888 - Part 4: Verify the invitation email for customerTue Aug 22 2023 05:02:42 GMT+0000 (Greenwich Mean Time)
√ EX-9888 - Part 5: Add company user to the Project. Tue Aug 22 2023 05:02:48 GMT+0000 (Greenwich Mean Time) (46618ms)
√ EX-9888 - Part 5: Add company user to the Project. Tue Aug 22 2023 05:02:48 GMT+0000 (Greenwich Mean Time) (46618ms)
√ EX-9888 - Part 6: Verify company user can access project. Tue Aug 22 2023 05:02:48 GMT+0000 (Greenwich Mean Time) (25284ms)
√ EX-9888 - Part 6: Verify company user can access project. Tue Aug 22 2023 05:02:48 GMT+0000 (Greenwich Mean Time) (25284ms)
√ EX-9888 - Part 7: Add Contract should be in disabled state Tue Aug 22 2023 05:02:48 GMT+0000 (Greenwich Mean Time) (28286ms)
√ EX-9888 - Part 7: Add Contract should be in disabled state Tue Aug 22 2023 05:02:48 GMT+0000 (Greenwich Mean Time) (28286ms)
√ Ex-9888 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 22 2023 05:02:48 GMT+0000 (Greenwich Mean Time) (24120ms)
√ Ex-9888 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 22 2023 05:02:48 GMT+0000 (Greenwich Mean Time) (24120ms)
√ EX-9888 - Part 9: Clean up Project Tue Aug 22 2023 05:02:48 GMT+0000 (Greenwich Mean Time) (35369ms)
√ EX-9888 - Part 9: Clean up Project Tue Aug 22 2023 05:02:48 GMT+0000 (Greenwich Mean Time) (35369ms)
9 passing (5m)
9 passing (5m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_034.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 9 │
│ Passing: 9 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 4 minutes, 56 seconds │
│ Estimated: 5 minutes, 1 second │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9888-GC-FU-project-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9889-SC-Owner-project-previlleges. (36 of 115)
spec.ts
Estimated: 7 minutes, 0 seconds
User Role permissions| SC Account Owner | Login as SC account owner and create project and verify user privilegesTue Aug 22 2023 05:05:35 GMT+0000 (Greenwich Mean Time)
User Role permissions| SC Account Owner | Login as SC account owner and create project and verify user privilegesTue Aug 22 2023 05:05:35 GMT+0000 (Greenwich Mean Time)
√ EX-9889 - Part 1: Create a project Tue Aug 22 2023 05:05:35 GMT+0000 (Greenwich Mean Time) (50670ms)
√ EX-9889 - Part 1: Create a project Tue Aug 22 2023 05:05:35 GMT+0000 (Greenwich Mean Time) (50670ms)
√ EX-9889 - Part 2: Edit the project details and change the nameTue Aug 22 2023 05:05:35 GMT+0000 (Greenwich Mean Time) (38365ms)
√ EX-9889 - Part 2: Edit the project details and change the nameTue Aug 22 2023 05:05:35 GMT+0000 (Greenwich Mean Time) (38365ms)
√ EX-9889 - Part 3: Add customer to the Project. Tue Aug 22 2023 05:05:35 GMT+0000 (Greenwich Mean Time) (43817ms)
√ EX-9889 - Part 3: Add customer to the Project. Tue Aug 22 2023 05:05:35 GMT+0000 (Greenwich Mean Time) (43817ms)
√ EX-9889 - Part 4: Verify the invitation email for customerTue Aug 22 2023 05:07:55 GMT+0000 (Greenwich Mean Time)
√ EX-9889 - Part 4: Verify the invitation email for customerTue Aug 22 2023 05:07:55 GMT+0000 (Greenwich Mean Time)
√ EX-9889 - Part 5: Add company user to the Project. Tue Aug 22 2023 05:08:01 GMT+0000 (Greenwich Mean Time) (50167ms)
√ EX-9889 - Part 5: Add company user to the Project. Tue Aug 22 2023 05:08:01 GMT+0000 (Greenwich Mean Time) (50167ms)
√ EX-9889 - Part 6: Verify company user can access project. Tue Aug 22 2023 05:08:01 GMT+0000 (Greenwich Mean Time) (26855ms)
√ EX-9889 - Part 6: Verify company user can access project. Tue Aug 22 2023 05:08:01 GMT+0000 (Greenwich Mean Time) (26855ms)
√ EX-9889 - Part 7: Add Contract with a user to the project. Tue Aug 22 2023 05:08:01 GMT+0000 (Greenwich Mean Time) (42658ms)
√ EX-9889 - Part 7: Add Contract with a user to the project. Tue Aug 22 2023 05:08:01 GMT+0000 (Greenwich Mean Time) (42658ms)
√ EX-9889 - Part 8: Verify email invitation for contractor user Tue Aug 22 2023 05:10:06 GMT+0000 (Greenwich Mean Time)
√ EX-9889 - Part 8: Verify email invitation for contractor user Tue Aug 22 2023 05:10:06 GMT+0000 (Greenwich Mean Time)
√ EX-9889 - Part 9: Add additional user to existing contract of the project. Tue Aug 22 2023 05:10:11 GMT+0000 (Greenwich Mean Time) (42140ms)
√ EX-9889 - Part 9: Add additional user to existing contract of the project. Tue Aug 22 2023 05:10:11 GMT+0000 (Greenwich Mean Time) (42140ms)
√ EX-9889 - Part 10: Verify email invitation for additional contract user Tue Aug 22 2023 05:10:58 GMT+0000 (Greenwich Mean Time)
√ EX-9889 - Part 10: Verify email invitation for additional contract user Tue Aug 22 2023 05:10:58 GMT+0000 (Greenwich Mean Time)
√ Ex-9889 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 22 2023 05:11:02 GMT+0000 (Greenwich Mean Time) (49300ms)
√ Ex-9889 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 22 2023 05:11:02 GMT+0000 (Greenwich Mean Time) (49300ms)
√ EX-9889 - Part 12: Clean up Project Tue Aug 22 2023 05:11:02 GMT+0000 (Greenwich Mean Time) (35325ms)
√ EX-9889 - Part 12: Clean up Project Tue Aug 22 2023 05:11:02 GMT+0000 (Greenwich Mean Time) (35325ms)
12 passing (7m)
12 passing (7m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_035.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 12 │
│ Passing: 12 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 6 minutes, 52 seconds │
│ Estimated: 7 minutes, 0 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9889-SC-Owner-project-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9889-SC-Owner-project-previlleges.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9890-SC-PM-project-previlleges.spe (37 of 115)
c.ts
Estimated: 7 minutes, 26 seconds
User Role permissions| SC PM | Login as SC PM and create project and verify user privilegesTue Aug 22 2023 05:12:34 GMT+0000 (Greenwich Mean Time)
User Role permissions| SC PM | Login as SC PM and create project and verify user privilegesTue Aug 22 2023 05:12:34 GMT+0000 (Greenwich Mean Time)
√ EX-9890 - Part 1: Create a project Tue Aug 22 2023 05:12:34 GMT+0000 (Greenwich Mean Time) (57895ms)
√ EX-9890 - Part 1: Create a project Tue Aug 22 2023 05:12:34 GMT+0000 (Greenwich Mean Time) (57895ms)
√ EX-9890 - Part 2: Edit the project details and change the nameTue Aug 22 2023 05:12:34 GMT+0000 (Greenwich Mean Time) (39804ms)
√ EX-9890 - Part 2: Edit the project details and change the nameTue Aug 22 2023 05:12:34 GMT+0000 (Greenwich Mean Time) (39804ms)
√ EX-9890 - Part 3: Add customer to the Project. Tue Aug 22 2023 05:12:34 GMT+0000 (Greenwich Mean Time) (44150ms)
√ EX-9890 - Part 3: Add customer to the Project. Tue Aug 22 2023 05:12:34 GMT+0000 (Greenwich Mean Time) (44150ms)
√ EX-9890 - Part 4: Verify the invitation email for customerTue Aug 22 2023 05:15:03 GMT+0000 (Greenwich Mean Time)
√ EX-9890 - Part 4: Verify the invitation email for customerTue Aug 22 2023 05:15:03 GMT+0000 (Greenwich Mean Time)
√ EX-9890 - Part 5: Add company user to the Project. Tue Aug 22 2023 05:15:09 GMT+0000 (Greenwich Mean Time) (65327ms)
√ EX-9890 - Part 5: Add company user to the Project. Tue Aug 22 2023 05:15:09 GMT+0000 (Greenwich Mean Time) (65327ms)
√ EX-9890 - Part 6: Verify company user can access project. Tue Aug 22 2023 05:15:09 GMT+0000 (Greenwich Mean Time) (29621ms)
√ EX-9890 - Part 6: Verify company user can access project. Tue Aug 22 2023 05:15:09 GMT+0000 (Greenwich Mean Time) (29621ms)
√ EX-9890 - Part 7: Add Contract with a user to the project. Tue Aug 22 2023 05:15:09 GMT+0000 (Greenwich Mean Time) (41630ms)
√ EX-9890 - Part 7: Add Contract with a user to the project. Tue Aug 22 2023 05:15:09 GMT+0000 (Greenwich Mean Time) (41630ms)
√ EX-9890 - Part 8: Verify email invitation for contractor user Tue Aug 22 2023 05:17:31 GMT+0000 (Greenwich Mean Time)
√ EX-9890 - Part 8: Verify email invitation for contractor user Tue Aug 22 2023 05:17:31 GMT+0000 (Greenwich Mean Time)
√ EX-9890 - Part 9: Add additiona user to existing contract of the project. Tue Aug 22 2023 05:17:37 GMT+0000 (Greenwich Mean Time) (50342ms)
√ EX-9890 - Part 9: Add additiona user to existing contract of the project. Tue Aug 22 2023 05:17:37 GMT+0000 (Greenwich Mean Time) (50342ms)
√ EX-9890 - Part 10: Verify email invitation for additional contract user Tue Aug 22 2023 05:18:32 GMT+0000 (Greenwich Mean Time)
√ EX-9890 - Part 10: Verify email invitation for additional contract user Tue Aug 22 2023 05:18:32 GMT+0000 (Greenwich Mean Time)
√ Ex-9890 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 22 2023 05:18:37 GMT+0000 (Greenwich Mean Time) (48413ms)
√ Ex-9890 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 22 2023 05:18:37 GMT+0000 (Greenwich Mean Time) (48413ms)
√ EX-9890 - Part 12: Clean up Project Tue Aug 22 2023 05:18:37 GMT+0000 (Greenwich Mean Time) (36540ms)
√ EX-9890 - Part 12: Clean up Project Tue Aug 22 2023 05:18:37 GMT+0000 (Greenwich Mean Time) (36540ms)
12 passing (7m)
12 passing (7m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_036.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 12 │
│ Passing: 12 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 7 minutes, 27 seconds │
│ Estimated: 7 minutes, 26 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9890-SC-PM-project-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9890-SC-PM-project-previlleges.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 02_PermissionLevels/User_roles/ex-9891-SC-FU-project-previlleges.spe (38 of 115)
c.ts
Estimated: 5 minutes, 31 seconds
User Role permissions| SC Field User | Login as SC Field User and create project and verify user privilegesTue Aug 22 2023 05:20:09 GMT+0000 (Greenwich Mean Time)
User Role permissions| SC Field User | Login as SC Field User and create project and verify user privilegesTue Aug 22 2023 05:20:09 GMT+0000 (Greenwich Mean Time)
√ EX-9891 - Part 1: Create a project Tue Aug 22 2023 05:20:09 GMT+0000 (Greenwich Mean Time) (49630ms)
√ EX-9891 - Part 1: Create a project Tue Aug 22 2023 05:20:09 GMT+0000 (Greenwich Mean Time) (49630ms)
√ EX-9891 - Part 2: Edit the project details and change the nameTue Aug 22 2023 05:20:09 GMT+0000 (Greenwich Mean Time) (48601ms)
√ EX-9891 - Part 2: Edit the project details and change the nameTue Aug 22 2023 05:20:09 GMT+0000 (Greenwich Mean Time) (48601ms)
√ EX-9891 - Part 3: Add customer to the Project. Tue Aug 22 2023 05:20:09 GMT+0000 (Greenwich Mean Time) (45134ms)
√ EX-9891 - Part 3: Add customer to the Project. Tue Aug 22 2023 05:20:09 GMT+0000 (Greenwich Mean Time) (45134ms)
√ EX-9891 - Part 4: Verify the invitation email for customerTue Aug 22 2023 05:22:39 GMT+0000 (Greenwich Mean Time)
√ EX-9891 - Part 4: Verify the invitation email for customerTue Aug 22 2023 05:22:39 GMT+0000 (Greenwich Mean Time)
√ EX-9891 - Part 5: Add company user to the Project. Tue Aug 22 2023 05:22:46 GMT+0000 (Greenwich Mean Time) (50404ms)
√ EX-9891 - Part 5: Add company user to the Project. Tue Aug 22 2023 05:22:46 GMT+0000 (Greenwich Mean Time) (50404ms)
√ EX-9891 - Part 6: Verify company user can access project. Tue Aug 22 2023 05:22:46 GMT+0000 (Greenwich Mean Time) (26954ms)
√ EX-9891 - Part 6: Verify company user can access project. Tue Aug 22 2023 05:22:46 GMT+0000 (Greenwich Mean Time) (26954ms)
√ EX-9891 - Part 7: Add Contract should be in disabled state Tue Aug 22 2023 05:22:46 GMT+0000 (Greenwich Mean Time) (29568ms)
√ EX-9891 - Part 7: Add Contract should be in disabled state Tue Aug 22 2023 05:22:46 GMT+0000 (Greenwich Mean Time) (29568ms)
√ Ex-9891 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 22 2023 05:22:46 GMT+0000 (Greenwich Mean Time) (25351ms)
√ Ex-9891 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesTue Aug 22 2023 05:22:46 GMT+0000 (Greenwich Mean Time) (25351ms)
√ EX-9891 - Part 9: Clean up Project Tue Aug 22 2023 05:22:46 GMT+0000 (Greenwich Mean Time) (34574ms)
√ EX-9891 - Part 9: Clean up Project Tue Aug 22 2023 05:22:46 GMT+0000 (Greenwich Mean Time) (34574ms)
9 passing (5m)
9 passing (5m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_037.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 9 │
│ Passing: 9 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 24 seconds │
│ Estimated: 5 minutes, 31 seconds │
│ Spec Ran: 02_PermissionLevels/User_roles/ex-9891-SC-FU-project-previlleges.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9891-SC-FU-project-previlleges.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Received/ex-3684-verify-user-can-see-only-cors-that-he-ha (39 of 115)
s-access-to.spec.ts
Estimated: 1 minute, 55 seconds
COR access | To verify that a logged in User can only see those project's COR, to which they have access toTue Aug 22 2023 05:25:40 GMT+0000 (Greenwich Mean Time)
COR access | To verify that a logged in User can only see those project's COR, to which they have access toTue Aug 22 2023 05:25:40 GMT+0000 (Greenwich Mean Time)
1) EX-3684 - Verify COR / Sent. Tue Aug 22 2023 05:25:40 GMT+0000 (Greenwich Mean Time)
1) EX-3684 - Verify COR / Sent. Tue Aug 22 2023 05:25:40 GMT+0000 (Greenwich Mean Time)
2) EX-3684 - Verify COR / Received. Tue Aug 22 2023 05:25:40 GMT+0000 (Greenwich Mean Time)
2) EX-3684 - Verify COR / Received. Tue Aug 22 2023 05:25:40 GMT+0000 (Greenwich Mean Time)
0 passing (2m)
2 failing
1) COR access | To verify that a logged in User can only see those project's COR, to which they have access toTue Aug 22 2023 05:25:40 GMT+0000 (Greenwich Mean Time)
EX-3684 - Verify COR / Sent. Tue Aug 22 2023 05:25:40 GMT+0000 (Greenwich Mean Time):
CypressError: Timed out retrying after 30000ms: `cy.wait()` timed out waiting `30000ms` for the 1st response to the route: `toApplyProjectFilter`. No response ever occurred.
https://on.cypress.io/wait
at cypressErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75187:18)
at Object.errByPath (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75242:10)
at checkForXhr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134821:84)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134844:28)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4315:29)
at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143192:68)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143133:14)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18)
at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1645:18)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:5450:46)
From Your Spec Code:
at corLogPage.filterByProject (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/COR_Log_.ts:181:11)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Received/ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts:15:13)
2) COR access | To verify that a logged in User can only see those project's COR, to which they have access toTue Aug 22 2023 05:25:40 GMT+0000 (Greenwich Mean Time)
EX-3684 - Verify COR / Received. Tue Aug 22 2023 05:25:40 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `button[data-cy='logoButton'] img`, but never found it.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:334:19)
0 passing (2m)
2 failing
1) COR access | To verify that a logged in User can only see those project's COR, to which they have access toTue Aug 22 2023 05:25:40 GMT+0000 (Greenwich Mean Time)
EX-3684 - Verify COR / Sent. Tue Aug 22 2023 05:25:40 GMT+0000 (Greenwich Mean Time):
CypressError: Timed out retrying after 30000ms: `cy.wait()` timed out waiting `30000ms` for the 1st response to the route: `toApplyProjectFilter`. No response ever occurred.
https://on.cypress.io/wait
at cypressErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75187:18)
at Object.errByPath (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75242:10)
at checkForXhr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134821:84)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134844:28)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4315:29)
at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143192:68)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143133:14)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18)
at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1645:18)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:5450:46)
From Your Spec Code:
at corLogPage.filterByProject (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/COR_Log_.ts:181:11)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Received/ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts:15:13)
2) COR access | To verify that a logged in User can only see those project's COR, to which they have access toTue Aug 22 2023 05:25:40 GMT+0000 (Greenwich Mean Time)
EX-3684 - Verify COR / Received. Tue Aug 22 2023 05:25:40 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `button[data-cy='logoButton'] img`, but never found it.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:334:19)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_038.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 0 │
│ Failing: 2 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 2 │
│ Video: true │
│ Duration: 1 minute, 51 seconds │
│ Estimated: 1 minute, 55 seconds │
│ Spec Ran: 04_COR_Log/Received/ex-3684-verify-user-can-see-only-cors-that-he-has-access-to. │
│ spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts
\COR access To verify that a logged in User can only see those project's COR, t
o which they have access toTue Aug 22 2023 052540 GMT+0000 (Greenwich Mean Time)
-- EX-3684 - Verify COR Sent. Tue Aug 22 2023 052540 GMT+0000 (Greenwich Mean
Time) (fail.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts
\COR access To verify that a logged in User can only see those project's COR, t
o which they have access toTue Aug 22 2023 052540 GMT+0000 (Greenwich Mean Time)
-- EX-3684 - Verify COR Received. Tue Aug 22 2023 052540 GMT+0000 (Greenwich M
ean Time) (.png
(Video)
- Started compressing: Compressing to 32 CRF
Compression progress: 80%
- Finished compressing: 18 seconds
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts.mp4
(Uploading Screenshots & Videos)
- Done Uploading (1/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts\COR access To verify that a logged in User can only see those project's COR, to which they have access toTue Aug 22 2023 052540 GMT+0000 (Greenwich Mean Time) -- EX-3684 - Verify COR Received. Tue Aug 22 2023 052540 GMT+0000 (Greenwich Mean Time) (.png
- Done Uploading (2/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts\COR access To verify that a logged in User can only see those project's COR, to which they have access toTue Aug 22 2023 052540 GMT+0000 (Greenwich Mean Time) -- EX-3684 - Verify COR Sent. Tue Aug 22 2023 052540 GMT+0000 (Greenwich Mean Time) (fail.png
- Done Uploading (3/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts.mp4
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Received/ex-9912-add-bc-to-existing-cor-with-all-role-con (40 of 115)
tractors.spec.ts
Estimated: 6 minutes, 49 seconds
Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
1) EX-9912 - Part 1: Create project add a contract with owner company user Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
1) EX-9912 - Part 1: Create project add a contract with owner company user Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
2) EX-9912 Part 2: Login as Owner and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
2) EX-9912 Part 2: Login as Owner and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
3) EX-9912 - Part 3: Add second contract with all sc users Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
3) EX-9912 - Part 3: Add second contract with all sc users Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
4) EX-9912 Part 4: Login as SC Owner and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
4) EX-9912 Part 4: Login as SC Owner and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
5) EX-9912 - Part 5: Login as SC Admin and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
5) EX-9912 - Part 5: Login as SC Admin and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
6) EX-9912 - Part 6: Login as SC PM user and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
6) EX-9912 - Part 6: Login as SC PM user and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
7) EX-9912 - Part 7: Login as SC Field user and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
7) EX-9912 - Part 7: Login as SC Field user and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
8) EX-9912 - Part 8: Create COR : Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
8) EX-9912 - Part 8: Create COR : Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
9) EX-9912 - Part 9: Upload backcharge COR. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
9) EX-9912 - Part 9: Upload backcharge COR. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
10) EX-9912 - Part 10: Verify the backcharge notification for SC PM user. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
10) EX-9912 - Part 10: Verify the backcharge notification for SC PM user. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
11) EX-9912 - Part 11: Verify the backcharge notification for SC Admin user. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
11) EX-9912 - Part 11: Verify the backcharge notification for SC Admin user. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
12) EX-9912 - Part 12: Verify the backcharge notification for SC PM user. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
12) EX-9912 - Part 12: Verify the backcharge notification for SC PM user. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
√ EX-9912 - Part 13: Verify the backcharge notification for SC FU user. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time) (10774ms)
√ EX-9912 - Part 13: Verify the backcharge notification for SC FU user. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time) (10774ms)
13) EX-9912 - Part 14: Cleanup GC... Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
13) EX-9912 - Part 14: Cleanup GC... Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
1 passing (5m)
13 failing
1) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 1: Create project add a contract with owner company user Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.request()` timed out waiting `30000ms` for a response from your server.
The request we sent was:
Method: POST
URL: https://api.staging.clearstory.dev/users/authenticate
No response was received within the timeout.
https://on.cypress.io/request
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:132377:70)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4186:41)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1697:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2407:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2400:9)
at Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2416:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2286:14)
From Your Spec Code:
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-be-apis.ts:47:7)
2) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 Part 2: Login as Owner and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
Error: A fixture file could not be found at any of the following paths:
> cypress\fixtures\tempFiles\projectId9912
> cypress\fixtures\tempFiles\projectId9912.[ext]
Cypress looked for these file extensions at the provided path:
> .json, .js, .coffee, .html, .txt, .csv, .png, .jpg, .jpeg, .gif, .tif, .tiff, .zip
Provide a path to an existing fixture file.
at Object. (:4471:111446)
at Object.tryCatcher (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\util.js:16:23)
at Promise._settlePromiseFromHandler (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:512:31)
at Promise._settlePromise (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:569:18)
at Promise._settlePromise0 (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:614:10)
at Promise._settlePromises (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:694:18)
at Promise._fulfill (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:638:18)
at (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\nodeback.js:42:21)
at s (:1868:64795)
at S. (:4471:101236)
at S.emit (node:events:527:28)
at S._finish (:4471:102103)
at d (:4471:101499)
at S._processSimple2 (:4471:107260)
at (:4471:107113)
at S._stat2 (:4471:108178)
at (:4471:108025)
at s (:2940:19687)
at s (:1868:64795)
at r (:4568:13485)
at FSReqCallback.oncomplete (node:fs:198:21)
3) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 3: Add second contract with all sc users Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.request()` timed out waiting `30000ms` for a response from your server.
The request we sent was:
Method: POST
URL: https://api.staging.clearstory.dev/users/authenticate
No response was received within the timeout.
https://on.cypress.io/request
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:132377:70)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4186:41)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1697:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2407:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2400:9)
at Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2416:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2286:14)
From Your Spec Code:
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-be-apis.ts:47:7)
4) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 Part 4: Login as SC Owner and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
Error: A fixture file could not be found at any of the following paths:
> cypress\fixtures\tempFiles\projectId9912
> cypress\fixtures\tempFiles\projectId9912.[ext]
Cypress looked for these file extensions at the provided path:
> .json, .js, .coffee, .html, .txt, .csv, .png, .jpg, .jpeg, .gif, .tif, .tiff, .zip
Provide a path to an existing fixture file.
at Object. (:4471:111446)
at Object.tryCatcher (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\util.js:16:23)
at Promise._settlePromiseFromHandler (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:512:31)
at Promise._settlePromise (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:569:18)
at Promise._settlePromise0 (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:614:10)
at Promise._settlePromises (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:694:18)
at Promise._fulfill (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:638:18)
at (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\nodeback.js:42:21)
at s (:1868:64795)
at S. (:4471:101236)
at S.emit (node:events:527:28)
at S._finish (:4471:102103)
at d (:4471:101499)
at S._processSimple2 (:4471:107260)
at (:4471:107113)
at S._stat2 (:4471:108178)
at (:4471:108025)
at s (:2940:19687)
at s (:1868:64795)
at r (:4568:13485)
at FSReqCallback.oncomplete (node:fs:198:21)
5) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 5: Login as SC Admin and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
Error: A fixture file could not be found at any of the following paths:
> cypress\fixtures\tempFiles\projectId9912
> cypress\fixtures\tempFiles\projectId9912.[ext]
Cypress looked for these file extensions at the provided path:
> .json, .js, .coffee, .html, .txt, .csv, .png, .jpg, .jpeg, .gif, .tif, .tiff, .zip
Provide a path to an existing fixture file.
at Object. (:4471:111446)
at Object.tryCatcher (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\util.js:16:23)
at Promise._settlePromiseFromHandler (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:512:31)
at Promise._settlePromise (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:569:18)
at Promise._settlePromise0 (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:614:10)
at Promise._settlePromises (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:694:18)
at Promise._fulfill (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:638:18)
at (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\nodeback.js:42:21)
at s (:1868:64795)
at S. (:4471:101236)
at S.emit (node:events:527:28)
at S._finish (:4471:102103)
at d (:4471:101499)
at S._processSimple2 (:4471:107260)
at (:4471:107113)
at S._stat2 (:4471:108178)
at (:4471:108025)
at s (:2940:19687)
at s (:1868:64795)
at r (:4568:13485)
at FSReqCallback.oncomplete (node:fs:198:21)
6) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 6: Login as SC PM user and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
Error: A fixture file could not be found at any of the following paths:
> cypress\fixtures\tempFiles\projectId9912
> cypress\fixtures\tempFiles\projectId9912.[ext]
Cypress looked for these file extensions at the provided path:
> .json, .js, .coffee, .html, .txt, .csv, .png, .jpg, .jpeg, .gif, .tif, .tiff, .zip
Provide a path to an existing fixture file.
at Object. (:4471:111446)
at Object.tryCatcher (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\util.js:16:23)
at Promise._settlePromiseFromHandler (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:512:31)
at Promise._settlePromise (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:569:18)
at Promise._settlePromise0 (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:614:10)
at Promise._settlePromises (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:694:18)
at Promise._fulfill (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:638:18)
at (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\nodeback.js:42:21)
at s (:1868:64795)
at S. (:4471:101236)
at S.emit (node:events:527:28)
at S._finish (:4471:102103)
at d (:4471:101499)
at S._processSimple2 (:4471:107260)
at (:4471:107113)
at S._stat2 (:4471:108178)
at (:4471:108025)
at s (:2940:19687)
at s (:1868:64795)
at r (:4568:13485)
at FSReqCallback.oncomplete (node:fs:198:21)
7) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 7: Login as SC Field user and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
Error: A fixture file could not be found at any of the following paths:
> cypress\fixtures\tempFiles\projectId9912
> cypress\fixtures\tempFiles\projectId9912.[ext]
Cypress looked for these file extensions at the provided path:
> .json, .js, .coffee, .html, .txt, .csv, .png, .jpg, .jpeg, .gif, .tif, .tiff, .zip
Provide a path to an existing fixture file.
at Object. (:4471:111446)
at Object.tryCatcher (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\util.js:16:23)
at Promise._settlePromiseFromHandler (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:512:31)
at Promise._settlePromise (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:569:18)
at Promise._settlePromise0 (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:614:10)
at Promise._settlePromises (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:694:18)
at Promise._fulfill (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:638:18)
at (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\nodeback.js:42:21)
at s (:1868:64795)
at S. (:4471:101236)
at S.emit (node:events:527:28)
at S._finish (:4471:102103)
at d (:4471:101499)
at S._processSimple2 (:4471:107260)
at (:4471:107113)
at S._stat2 (:4471:108178)
at (:4471:108025)
at s (:2940:19687)
at s (:1868:64795)
at r (:4568:13485)
at FSReqCallback.oncomplete (node:fs:198:21)
8) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 8: Create COR : Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.request()` failed on:
https://api.staging.clearstory.dev/users/authenticate
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx` or `3xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
-----------------------------------------------------------
The request we sent was:
Method: POST
URL: https://api.staging.clearstory.dev/users/authenticate
Headers: {
"Connection": "keep-alive",
"Content-Type": "application/json",
"user-agent": "Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/115.0.0.0 Safari/537.36",
"accept": "*/*",
"accept-encoding": "gzip, deflate",
"content-length": 59
}
Body: {"email":"ow.acc.owner@gmail.com","password":"ow@Acc.ow23"}
-----------------------------------------------------------
The response we got was:
Status: 502 - Bad Gateway
Headers: {
"content-type": "text/html; charset=UTF-8",
"referrer-policy": "no-referrer",
"content-length": "332",
"date": "Tue, 22 Aug 2023 05:29:10 GMT",
"alt-svc": "h3=\":443\"; ma=2592000,h3-29=\":443\"; ma=2592000"
}
Body:
502 Server Error
Error: Server Error
The server encountered a temporary error and could not complete your request.Please try again in 30 seconds.
https://on.cypress.io/request
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:132360:72)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2407:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2400:9)
at Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2416:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2286:14)
From Your Spec Code:
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-be-apis.ts:47:7)
9) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 9: Upload backcharge COR. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
CypressError: Timed out retrying after 30000ms: `cy.contains()` failed because it requires a DOM element, window or document.
No elements in the current DOM matched your query:
> cy.get(li[data-option-index='0'])
at isElement (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144409:62)
at validateType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144267:14)
at Object.isType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144298:7)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:131592:22)
at Object.subjectFn (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143314:16)
at $Cy.verifyUpcomingAssertions (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:142658:31)
at onRetry (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143305:15)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4315:29)
at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143192:68)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143133:14)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18)
at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1645:18)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:5450:46)
From Your Spec Code:
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:295:38)
10) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 10: Verify the backcharge notification for SC PM user. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Backcharge: Create COR for Test Project TC9912 1692682077887' within the element: but never did.
at bellNotifications.verifyBackchargeNotificationExists (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Bell_Notifications.ts:49:58)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Received/ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts:133:16)
11) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 11: Verify the backcharge notification for SC Admin user. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Backcharge: Create COR for Test Project TC9912 1692682077887' within the element: but never did.
at bellNotifications.verifyBackchargeNotificationExists (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Bell_Notifications.ts:49:58)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Received/ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts:141:16)
12) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 12: Verify the backcharge notification for SC PM user. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'A backcharge has been added to your COR log' within the element: but never did.
at bellNotifications.verifyBackchargeNotificationExists (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Bell_Notifications.ts:47:98)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Received/ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts:149:16)
13) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 14: Cleanup GC... Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
Error: A fixture file could not be found at any of the following paths:
> cypress\fixtures\tempFiles\projectId9912
> cypress\fixtures\tempFiles\projectId9912.[ext]
Cypress looked for these file extensions at the provided path:
> .json, .js, .coffee, .html, .txt, .csv, .png, .jpg, .jpeg, .gif, .tif, .tiff, .zip
Provide a path to an existing fixture file.
at Object. (:4471:111446)
at Object.tryCatcher (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\util.js:16:23)
at Promise._settlePromiseFromHandler (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:512:31)
at Promise._settlePromise (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:569:18)
at Promise._settlePromise0 (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:614:10)
at Promise._settlePromises (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:694:18)
at Promise._fulfill (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:638:18)
at (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\nodeback.js:42:21)
at s (:1868:64795)
at S. (:4471:101236)
at S.emit (node:events:527:28)
at S._finish (:4471:102103)
at d (:4471:101499)
at S._processSimple2 (:4471:107260)
at (:4471:107113)
at S._stat2 (:4471:108178)
at (:4471:108025)
at s (:2940:19687)
at s (:1868:64795)
at r (:4568:13485)
at FSReqCallback.oncomplete (node:fs:198:21)
1 passing (5m)
13 failing
1) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 1: Create project add a contract with owner company user Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.request()` timed out waiting `30000ms` for a response from your server.
The request we sent was:
Method: POST
URL: https://api.staging.clearstory.dev/users/authenticate
No response was received within the timeout.
https://on.cypress.io/request
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:132377:70)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4186:41)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1697:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2407:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2400:9)
at Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2416:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2286:14)
From Your Spec Code:
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-be-apis.ts:47:7)
2) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 Part 2: Login as Owner and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
Error: A fixture file could not be found at any of the following paths:
> cypress\fixtures\tempFiles\projectId9912
> cypress\fixtures\tempFiles\projectId9912.[ext]
Cypress looked for these file extensions at the provided path:
> .json, .js, .coffee, .html, .txt, .csv, .png, .jpg, .jpeg, .gif, .tif, .tiff, .zip
Provide a path to an existing fixture file.
at Object. (:4471:111446)
at Object.tryCatcher (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\util.js:16:23)
at Promise._settlePromiseFromHandler (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:512:31)
at Promise._settlePromise (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:569:18)
at Promise._settlePromise0 (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:614:10)
at Promise._settlePromises (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:694:18)
at Promise._fulfill (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:638:18)
at (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\nodeback.js:42:21)
at s (:1868:64795)
at S. (:4471:101236)
at S.emit (node:events:527:28)
at S._finish (:4471:102103)
at d (:4471:101499)
at S._processSimple2 (:4471:107260)
at (:4471:107113)
at S._stat2 (:4471:108178)
at (:4471:108025)
at s (:2940:19687)
at s (:1868:64795)
at r (:4568:13485)
at FSReqCallback.oncomplete (node:fs:198:21)
3) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 3: Add second contract with all sc users Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.request()` timed out waiting `30000ms` for a response from your server.
The request we sent was:
Method: POST
URL: https://api.staging.clearstory.dev/users/authenticate
No response was received within the timeout.
https://on.cypress.io/request
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:132377:70)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4186:41)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1697:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2407:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2400:9)
at Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2416:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2286:14)
From Your Spec Code:
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-be-apis.ts:47:7)
4) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 Part 4: Login as SC Owner and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
Error: A fixture file could not be found at any of the following paths:
> cypress\fixtures\tempFiles\projectId9912
> cypress\fixtures\tempFiles\projectId9912.[ext]
Cypress looked for these file extensions at the provided path:
> .json, .js, .coffee, .html, .txt, .csv, .png, .jpg, .jpeg, .gif, .tif, .tiff, .zip
Provide a path to an existing fixture file.
at Object. (:4471:111446)
at Object.tryCatcher (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\util.js:16:23)
at Promise._settlePromiseFromHandler (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:512:31)
at Promise._settlePromise (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:569:18)
at Promise._settlePromise0 (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:614:10)
at Promise._settlePromises (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:694:18)
at Promise._fulfill (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:638:18)
at (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\nodeback.js:42:21)
at s (:1868:64795)
at S. (:4471:101236)
at S.emit (node:events:527:28)
at S._finish (:4471:102103)
at d (:4471:101499)
at S._processSimple2 (:4471:107260)
at (:4471:107113)
at S._stat2 (:4471:108178)
at (:4471:108025)
at s (:2940:19687)
at s (:1868:64795)
at r (:4568:13485)
at FSReqCallback.oncomplete (node:fs:198:21)
5) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 5: Login as SC Admin and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
Error: A fixture file could not be found at any of the following paths:
> cypress\fixtures\tempFiles\projectId9912
> cypress\fixtures\tempFiles\projectId9912.[ext]
Cypress looked for these file extensions at the provided path:
> .json, .js, .coffee, .html, .txt, .csv, .png, .jpg, .jpeg, .gif, .tif, .tiff, .zip
Provide a path to an existing fixture file.
at Object. (:4471:111446)
at Object.tryCatcher (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\util.js:16:23)
at Promise._settlePromiseFromHandler (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:512:31)
at Promise._settlePromise (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:569:18)
at Promise._settlePromise0 (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:614:10)
at Promise._settlePromises (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:694:18)
at Promise._fulfill (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:638:18)
at (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\nodeback.js:42:21)
at s (:1868:64795)
at S. (:4471:101236)
at S.emit (node:events:527:28)
at S._finish (:4471:102103)
at d (:4471:101499)
at S._processSimple2 (:4471:107260)
at (:4471:107113)
at S._stat2 (:4471:108178)
at (:4471:108025)
at s (:2940:19687)
at s (:1868:64795)
at r (:4568:13485)
at FSReqCallback.oncomplete (node:fs:198:21)
6) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 6: Login as SC PM user and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
Error: A fixture file could not be found at any of the following paths:
> cypress\fixtures\tempFiles\projectId9912
> cypress\fixtures\tempFiles\projectId9912.[ext]
Cypress looked for these file extensions at the provided path:
> .json, .js, .coffee, .html, .txt, .csv, .png, .jpg, .jpeg, .gif, .tif, .tiff, .zip
Provide a path to an existing fixture file.
at Object. (:4471:111446)
at Object.tryCatcher (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\util.js:16:23)
at Promise._settlePromiseFromHandler (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:512:31)
at Promise._settlePromise (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:569:18)
at Promise._settlePromise0 (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:614:10)
at Promise._settlePromises (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:694:18)
at Promise._fulfill (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:638:18)
at (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\nodeback.js:42:21)
at s (:1868:64795)
at S. (:4471:101236)
at S.emit (node:events:527:28)
at S._finish (:4471:102103)
at d (:4471:101499)
at S._processSimple2 (:4471:107260)
at (:4471:107113)
at S._stat2 (:4471:108178)
at (:4471:108025)
at s (:2940:19687)
at s (:1868:64795)
at r (:4568:13485)
at FSReqCallback.oncomplete (node:fs:198:21)
7) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 7: Login as SC Field user and accept the contract. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
Error: A fixture file could not be found at any of the following paths:
> cypress\fixtures\tempFiles\projectId9912
> cypress\fixtures\tempFiles\projectId9912.[ext]
Cypress looked for these file extensions at the provided path:
> .json, .js, .coffee, .html, .txt, .csv, .png, .jpg, .jpeg, .gif, .tif, .tiff, .zip
Provide a path to an existing fixture file.
at Object. (:4471:111446)
at Object.tryCatcher (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\util.js:16:23)
at Promise._settlePromiseFromHandler (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:512:31)
at Promise._settlePromise (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:569:18)
at Promise._settlePromise0 (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:614:10)
at Promise._settlePromises (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:694:18)
at Promise._fulfill (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:638:18)
at (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\nodeback.js:42:21)
at s (:1868:64795)
at S. (:4471:101236)
at S.emit (node:events:527:28)
at S._finish (:4471:102103)
at d (:4471:101499)
at S._processSimple2 (:4471:107260)
at (:4471:107113)
at S._stat2 (:4471:108178)
at (:4471:108025)
at s (:2940:19687)
at s (:1868:64795)
at r (:4568:13485)
at FSReqCallback.oncomplete (node:fs:198:21)
8) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 8: Create COR : Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
CypressError: `cy.request()` failed on:
https://api.staging.clearstory.dev/users/authenticate
The response we received from your web server was:
> 502: Bad Gateway
This was considered a failure because the status code was not `2xx` or `3xx`.
If you do not want status codes to cause failures pass the option: `failOnStatusCode: false`
-----------------------------------------------------------
The request we sent was:
Method: POST
URL: https://api.staging.clearstory.dev/users/authenticate
Headers: {
"Connection": "keep-alive",
"Content-Type": "application/json",
"user-agent": "Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/115.0.0.0 Safari/537.36",
"accept": "*/*",
"accept-encoding": "gzip, deflate",
"content-length": 59
}
Body: {"email":"ow.acc.owner@gmail.com","password":"ow@Acc.ow23"}
-----------------------------------------------------------
The response we got was:
Status: 502 - Bad Gateway
Headers: {
"content-type": "text/html; charset=UTF-8",
"referrer-policy": "no-referrer",
"content-length": "332",
"date": "Tue, 22 Aug 2023 05:29:10 GMT",
"alt-svc": "h3=\":443\"; ma=2592000,h3-29=\":443\"; ma=2592000"
}
Body:
502 Server Error
Error: Server Error
The server encountered a temporary error and could not complete your request.Please try again in 30 seconds.
https://on.cypress.io/request
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:132360:72)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18)
at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2407:12)
at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2400:9)
at Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2416:5)
at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2286:14)
From Your Spec Code:
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-be-apis.ts:47:7)
9) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 9: Upload backcharge COR. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
CypressError: Timed out retrying after 30000ms: `cy.contains()` failed because it requires a DOM element, window or document.
No elements in the current DOM matched your query:
> cy.get(li[data-option-index='0'])
at isElement (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144409:62)
at validateType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144267:14)
at Object.isType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144298:7)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:131592:22)
at Object.subjectFn (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143314:16)
at $Cy.verifyUpcomingAssertions (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:142658:31)
at onRetry (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143305:15)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4315:29)
at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143192:68)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143133:14)
at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23)
at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31)
at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18)
at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10)
at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18)
at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1645:18)
at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:5450:46)
From Your Spec Code:
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:295:38)
10) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 10: Verify the backcharge notification for SC PM user. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Backcharge: Create COR for Test Project TC9912 1692682077887' within the element: but never did.
at bellNotifications.verifyBackchargeNotificationExists (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Bell_Notifications.ts:49:58)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Received/ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts:133:16)
11) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 11: Verify the backcharge notification for SC Admin user. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Backcharge: Create COR for Test Project TC9912 1692682077887' within the element: but never did.
at bellNotifications.verifyBackchargeNotificationExists (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Bell_Notifications.ts:49:58)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Received/ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts:141:16)
12) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 12: Verify the backcharge notification for SC PM user. Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'A backcharge has been added to your COR log' within the element: but never did.
at bellNotifications.verifyBackchargeNotificationExists (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Bell_Notifications.ts:47:98)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Received/ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts:149:16)
13) Backcharges | Bell Notifications | Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time)
EX-9912 - Part 14: Cleanup GC... Tue Aug 22 2023 05:27:57 GMT+0000 (Greenwich Mean Time):
Error: A fixture file could not be found at any of the following paths:
> cypress\fixtures\tempFiles\projectId9912
> cypress\fixtures\tempFiles\projectId9912.[ext]
Cypress looked for these file extensions at the provided path:
> .json, .js, .coffee, .html, .txt, .csv, .png, .jpg, .jpeg, .gif, .tif, .tiff, .zip
Provide a path to an existing fixture file.
at Object. (:4471:111446)
at Object.tryCatcher (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\util.js:16:23)
at Promise._settlePromiseFromHandler (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:512:31)
at Promise._settlePromise (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:569:18)
at Promise._settlePromise0 (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:614:10)
at Promise._settlePromises (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:694:18)
at Promise._fulfill (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\promise.js:638:18)
at (C:\Users\qateam\AppData\Local\Cypress\Cache\12.17.4\Cypress\resources\app\node_modules\bluebird\js\release\nodeback.js:42:21)
at s (:1868:64795)
at S. (:4471:101236)
at S.emit (node:events:527:28)
at S._finish (:4471:102103)
at d (:4471:101499)
at S._processSimple2 (:4471:107260)
at (:4471:107113)
at S._stat2 (:4471:108178)
at (:4471:108025)
at s (:2940:19687)
at s (:1868:64795)
at r (:4568:13485)
at FSReqCallback.oncomplete (node:fs:198:21)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_039.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 14 │
│ Passing: 1 │
│ Failing: 13 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 13 │
│ Video: true │
│ Duration: 5 minutes, 8 seconds │
│ Estimated: 6 minutes, 49 seconds │
│ Spec Ran: 04_COR_Log/Received/ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spe │
│ c.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Ba
ckcharges Bell Notifications Verify that the contractor with roles AO, admin,
and PM is able to receive a bell notification when the customer creates a BC for
the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-99
12 - Par.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Ba
ckcharges Bell Notifications Verify that the contractor with roles AO, admin,
and PM is able to receive a bell notification when the customer creates a BC for
the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-99
12 Part .png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Ba
ckcharges Bell Notifications Verify that the contractor with roles AO, admin,
and PM is able to receive a bell notification when the customer creates a BC for
the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-99
12 - (1).png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Ba
ckcharges Bell Notifications Verify that the contractor with roles AO, admin,
and PM is able to receive a bell notification when the customer creates a BC for
the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-99
12 P (1).png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Ba
ckcharges Bell Notifications Verify that the contractor with roles AO, admin,
and PM is able to receive a bell notification when the customer creates a BC for
the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-99
12 - (2).png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Ba
ckcharges Bell Notifications Verify that the contractor with roles AO, admin,
and PM is able to receive a bell notification when the customer creates a BC for
the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-99
12 - (3).png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Ba
ckcharges Bell Notifications Verify that the contractor with roles AO, admin,
and PM is able to receive a bell notification when the customer creates a BC for
the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-99
12 - (4).png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Ba
ckcharges Bell Notifications Verify that the contractor with roles AO, admin,
and PM is able to receive a bell notification when the customer creates a BC for
the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-99
12 - (5).png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Ba
ckcharges Bell Notifications Verify that the contractor with roles AO, admin,
and PM is able to receive a bell notification when the customer creates a BC for
the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-99
12 - (6).png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Ba
ckcharges Bell Notifications Verify that the contractor with roles AO, admin,
and PM is able to receive a bell notification when the customer creates a BC for
the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-99
12 - (7).png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Ba
ckcharges Bell Notifications Verify that the contractor with roles AO, admin,
and PM is able to receive a bell notification when the customer creates a BC for
the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-99
12 - (8).png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Ba
ckcharges Bell Notifications Verify that the contractor with roles AO, admin,
and PM is able to receive a bell notification when the customer creates a BC for
the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-99
12 - (9).png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Ba
ckcharges Bell Notifications Verify that the contractor with roles AO, admin,
and PM is able to receive a bell notification when the customer creates a BC for
the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-99
12 (10).png
(Video)
- Started compressing: Compressing to 32 CRF
Compression progress: 21%
Compression progress: 41%
Compression progress: 61%
Compression progress: 81%
Compression progress: 100%
- Finished compressing: 51 seconds
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts.mp4
(Uploading Screenshots & Videos)
- Done Uploading (1/14) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Backcharges Bell Notifications Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-9912 P (1).png
- Done Uploading (2/14) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Backcharges Bell Notifications Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-9912 - Par.png
- Done Uploading (3/14) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Backcharges Bell Notifications Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-9912 Part .png
- Done Uploading (4/14) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Backcharges Bell Notifications Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-9912 - (3).png
- Done Uploading (5/14) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Backcharges Bell Notifications Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-9912 - (1).png
- Done Uploading (6/14) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Backcharges Bell Notifications Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-9912 - (2).png
- Done Uploading (7/14) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Backcharges Bell Notifications Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-9912 - (5).png
- Done Uploading (8/14) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Backcharges Bell Notifications Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-9912 - (4).png
- Done Uploading (9/14) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Backcharges Bell Notifications Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-9912 (10).png
- Done Uploading (10/14) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Backcharges Bell Notifications Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-9912 - (6).png
- Done Uploading (11/14) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Backcharges Bell Notifications Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-9912 - (8).png
- Done Uploading (12/14) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Backcharges Bell Notifications Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-9912 - (9).png
- Done Uploading (13/14) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Backcharges Bell Notifications Verify that the contractor with roles AO, admin, and PM is able to receive a bell notification when the customer creates a BC for the received COR.Tue Aug 22 2023 052757 GMT+0000 (Greenwich Mean Time) -- EX-9912 - (7).png
- Done Uploading (14/14) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts.mp4
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/EX-4366-SC-creates-project-adds-gc-customer-sc-creat (41 of 115)
es-cor.spec.ts
Estimated: 9 minutes, 51 seconds
Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time)
Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time)
√ EX-4366 - Create a projcet and add customers : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (60662ms)
√ EX-4366 - Create a projcet and add customers : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (60662ms)
√ EX-4366 - Add My Company users to the project.Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (67731ms)
√ EX-4366 - Add My Company users to the project.Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (67731ms)
√ EX-4366 - Add Customer to the project.Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (64515ms)
√ EX-4366 - Add Customer to the project.Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (64515ms)
√ EX-4366 - PM Customer accept the project Invites : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (17962ms)
√ EX-4366 - PM Customer accept the project Invites : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (17962ms)
√ EX-4366 - Owner Customer accept the project Invites : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (23136ms)
√ EX-4366 - Owner Customer accept the project Invites : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (23136ms)
1) EX-4366 - Admin Customer accept the project Invites : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time)
1) EX-4366 - Admin Customer accept the project Invites : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time)
√ EX-4366 - Field User Customer accept the project Invites : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (19161ms)
√ EX-4366 - Field User Customer accept the project Invites : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (19161ms)
√ EX-4366 - Create COR : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (75924ms)
√ EX-4366 - Create COR : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (75924ms)
2) EX-4366 - Verify COR is created : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time)
2) EX-4366 - Verify COR is created : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time)
√ EX-4366 - Cleanup GC... Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (42637ms)
√ EX-4366 - Cleanup GC... Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (42637ms)
√ EX-4366 - Cleanup SC... Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (40996ms)
√ EX-4366 - Cleanup SC... Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time) (40996ms)
9 passing (9m)
2 failing
1) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time)
EX-4366 - Admin Customer accept the project Invites : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:268:5)
2) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time)
EX-4366 - Verify COR is created : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: '1 of 1' within the element: but never did.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:329:34)
9 passing (9m)
2 failing
1) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time)
EX-4366 - Admin Customer accept the project Invites : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:268:5)
2) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time)
EX-4366 - Verify COR is created : Tue Aug 22 2023 05:34:06 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: '1 of 1' within the element: but never did.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:329:34)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_040.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 11 │
│ Passing: 9 │
│ Failing: 2 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 2 │
│ Video: true │
│ Duration: 9 minutes, 5 seconds │
│ Estimated: 9 minutes, 51 seconds │
│ Spec Ran: 04_COR_Log/Sent/EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec. │
│ ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Crea
te COR SC PM creates a project. Invites GC Company for Customer. SC PM is able
to create a COR by using Create a Change Order RequestTue Aug 22 2023 053406 GMT
+0000 (Greenwich Mean Time) -- EX-4366 - Admin Customer accept the project Invit
es Tu.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Crea
te COR SC PM creates a project. Invites GC Company for Customer. SC PM is able
to create a COR by using Create a Change Order RequestTue Aug 22 2023 053406 GMT
+0000 (Greenwich Mean Time) -- EX-4366 - Verify COR is created Tue Aug 22 2023
053406.png
(Video)
- Started compressing: Compressing to 32 CRF
Compression progress: 12%
Compression progress: 23%
Compression progress: 34%
Compression progress: 45%
Compression progress: 57%
Compression progress: 69%
Compression progress: 80%
Compression progress: 93%
- Finished compressing: 1 minute, 34 seconds
Compression progress: 100%
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts.mp4
(Uploading Screenshots & Videos)
- Done Uploading (1/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Create COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 22 2023 053406 GMT+0000 (Greenwich Mean Time) -- EX-4366 - Verify COR is created Tue Aug 22 2023 053406.png
- Done Uploading (2/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Create COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 22 2023 053406 GMT+0000 (Greenwich Mean Time) -- EX-4366 - Admin Customer accept the project Invites Tu.png
- Done Uploading (3/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts.mp4
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft. (42 of 115)
spec.ts
Estimated: 6 minutes, 24 seconds
Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestTue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time)
Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestTue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time)
√ EX-4432 - Part 1: Create project Test Project TC4432 1692683094376. Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time) (60041ms)
√ EX-4432 - Part 1: Create project Test Project TC4432 1692683094376. Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time) (60041ms)
√ EX-4432 - Part 2: Add Customer.Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time) (40383ms)
√ EX-4432 - Part 2: Add Customer.Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time) (40383ms)
1) EX-4432 - Part 3: Customer Accept invite.Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time)
1) EX-4432 - Part 3: Customer Accept invite.Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time)
√ EX-4432 - Part 4: Contractor creates COR Draft. : Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time) (58655ms)
√ EX-4432 - Part 4: Contractor creates COR Draft. : Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time) (58655ms)
2) EX-4432 - Part 5: Verify the COR Draft Log has the new COR draft. : Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time)
2) EX-4432 - Part 5: Verify the COR Draft Log has the new COR draft. : Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time)
√ EX-4432 - Part 6: Cleanup GC... Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time) (39731ms)
√ EX-4432 - Part 6: Cleanup GC... Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time) (39731ms)
√ EX-4432 - Part 7: Cleanup SC... Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time) (41854ms)
√ EX-4432 - Part 7: Cleanup SC... Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time) (41854ms)
5 passing (6m)
2 failing
1) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestTue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time)
EX-4432 - Part 3: Customer Accept invite.Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC4432 1692683094376' within the selector: 'td' but never did.
at projectsPage.pressAcceptBtnForInvite (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Projects_.ts:131:7)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts:47:15)
2) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestTue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time)
EX-4432 - Part 5: Verify the COR Draft Log has the new COR draft. : Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:253:21)
5 passing (6m)
2 failing
1) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestTue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time)
EX-4432 - Part 3: Customer Accept invite.Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC4432 1692683094376' within the selector: 'td' but never did.
at projectsPage.pressAcceptBtnForInvite (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Projects_.ts:131:7)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts:47:15)
2) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestTue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time)
EX-4432 - Part 5: Verify the COR Draft Log has the new COR draft. : Tue Aug 22 2023 05:44:54 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:253:21)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_041.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 7 │
│ Passing: 5 │
│ Failing: 2 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 2 │
│ Video: true │
│ Duration: 5 minutes, 50 seconds │
│ Estimated: 6 minutes, 24 seconds │
│ Spec Ran: 04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts\Create COR
To verify that the PM is able to create a COR as Draft by using Create a Change
Order RequestTue Aug 22 2023 054454 GMT+0000 (Greenwich Mean Time) -- EX-4432 -
Part 3 Customer Accept invite.Tue Aug 22 2023 054454 GMT+0000 (Greenwich Mean .
png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts\Create COR
To verify that the PM is able to create a COR as Draft by using Create a Change
Order RequestTue Aug 22 2023 054454 GMT+0000 (Greenwich Mean Time) -- EX-4432 -
Part 5 Verify the COR Draft Log has the new COR draft. Tue Aug 22 2023 054454.
png
(Video)
- Started compressing: Compressing to 32 CRF
Compression progress: 19%
Compression progress: 37%
Compression progress: 55%
Compression progress: 74%
Compression progress: 93%
- Finished compressing: 1 minute, 1 second
Compression progress: 100%
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts.mp4
(Uploading Screenshots & Videos)
- Done Uploading (1/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts\Create COR To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestTue Aug 22 2023 054454 GMT+0000 (Greenwich Mean Time) -- EX-4432 - Part 5 Verify the COR Draft Log has the new COR draft. Tue Aug 22 2023 054454.png
- Done Uploading (2/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts\Create COR To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestTue Aug 22 2023 054454 GMT+0000 (Greenwich Mean Time) -- EX-4432 - Part 3 Customer Accept invite.Tue Aug 22 2023 054454 GMT+0000 (Greenwich Mean .png
- Done Uploading (3/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts.mp4
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/EX-5827-to-verify-multiple-cors-to-same-tag-when-cre (43 of 115)
ating-cor.spec.ts
Estimated: 36 seconds
COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Aug 22 2023 05:51:54 GMT+0000 (Greenwich Mean Time)
COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Aug 22 2023 05:51:54 GMT+0000 (Greenwich Mean Time)
√ EX-5827 - Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Aug 22 2023 05:51:54 GMT+0000 (Greenwich Mean Time) (45225ms)
√ EX-5827 - Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Aug 22 2023 05:51:54 GMT+0000 (Greenwich Mean Time) (45225ms)
1 passing (46s)
1 passing (46s)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_042.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 45 seconds │
│ Estimated: 36 seconds │
│ Spec Ran: 04_COR_Log/Sent/EX-5827-to-verify-multiple-cors-to-same-tag-when-creating-cor.sp │
│ ec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-5827-to-verify-multiple-cors-to-same-tag-when-creating-cor.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/EX-5894-to-verify-multiple-cors-to-same-tag-when-upl (44 of 115)
oading-cor.spec.ts
Estimated: 44 seconds
COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Aug 22 2023 05:52:46 GMT+0000 (Greenwich Mean Time)
COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORTue Aug 22 2023 05:52:46 GMT+0000 (Greenwich Mean Time)
√ EX-5894 - Verify Multiple CORs should not be associated with the same T&M Tag when uploading a New CORTue Aug 22 2023 05:52:46 GMT+0000 (Greenwich Mean Time) (43342ms)
√ EX-5894 - Verify Multiple CORs should not be associated with the same T&M Tag when uploading a New CORTue Aug 22 2023 05:52:46 GMT+0000 (Greenwich Mean Time) (43342ms)
1 passing (44s)
1 passing (44s)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_043.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 43 seconds │
│ Estimated: 44 seconds │
│ Spec Ran: 04_COR_Log/Sent/EX-5894-to-verify-multiple-cors-to-same-tag-when-uploading-cor.s │
│ pec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-5894-to-verify-multiple-cors-to-same-tag-when-uploading-cor.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/ex-3673-verify-contractor-is-able-to-upload-cor-with (45 of 115)
-only-mandatory-data.spec.ts
Estimated: 5 minutes, 16 seconds
Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time)
Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time)
1) EX-3673 - Part 0: Clean existing COR's : Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time)
1) EX-3673 - Part 0: Clean existing COR's : Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time)
√ EX-3673 - Part 1: Upload COR with only mandatory data.Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time) (65944ms)
√ EX-3673 - Part 1: Upload COR with only mandatory data.Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time) (65944ms)
2) EX-3673 - Part 2: Verify the COR data in the COR Log.Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time)
2) EX-3673 - Part 2: Verify the COR data in the COR Log.Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time)
3) EX-3673 - Part 0: Cleanup - Delete COR.Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time)
3) EX-3673 - Part 0: Cleanup - Delete COR.Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time)
1 passing (6m)
3 failing
1) Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time)
EX-3673 - Part 0: Clean existing COR's : Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[title="Delete"]`, but never found it.
at corLogPage.deleteAllVersionsOfCOR (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/COR_Log_.ts:593:11)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/COR_Log_.ts:641:25)
2) Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time)
EX-3673 - Part 2: Verify the COR data in the COR Log.Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: '1 of 1' within the element: but never did.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:329:34)
3) Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time)
EX-3673 - Part 0: Cleanup - Delete COR.Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: '1 of 1' within the element: but never did.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:329:34)
1 passing (6m)
3 failing
1) Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time)
EX-3673 - Part 0: Clean existing COR's : Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[title="Delete"]`, but never found it.
at corLogPage.deleteAllVersionsOfCOR (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/COR_Log_.ts:593:11)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/COR_Log_.ts:641:25)
2) Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time)
EX-3673 - Part 2: Verify the COR data in the COR Log.Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: '1 of 1' within the element: but never did.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:329:34)
3) Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time)
EX-3673 - Part 0: Cleanup - Delete COR.Tue Aug 22 2023 05:53:37 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: '1 of 1' within the element: but never did.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:329:34)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_044.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 4 │
│ Passing: 1 │
│ Failing: 3 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 3 │
│ Video: true │
│ Duration: 6 minutes, 14 seconds │
│ Estimated: 5 minutes, 16 seconds │
│ Spec Ran: 04_COR_Log/Sent/ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandat │
│ ory-data.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Sent\ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandatory-dat
a.spec.ts\Upload COR To verify that the contractor is able to Upload a Change O
rder Request with only mandatory data. Tue Aug 22 2023 055337 GMT+0000 (Greenwic
h Mean Time) -- EX-3673 - Part 0 Clean existing COR's Tue Aug 22 2023 055337 GM
T+0000 (Greenwich Me.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Sent\ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandatory-dat
a.spec.ts\Upload COR To verify that the contractor is able to Upload a Change O
rder Request with only mandatory data. Tue Aug 22 2023 055337 GMT+0000 (Greenwic
h Mean Time) -- EX-3673 - Part 2 Verify the COR data in the COR Log.Tue Aug 22 2
023 055337 GMT+0000 .png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Sent\ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandatory-dat
a.spec.ts\Upload COR To verify that the contractor is able to Upload a Change O
rder Request with only mandatory data. Tue Aug 22 2023 055337 GMT+0000 (Greenwic
h Mean Time) -- EX-3673 - Part 0 Cleanup - Delete COR.Tue Aug 22 2023 055337 GMT
+0000 (Greenwich Mea.png
(Video)
- Started compressing: Compressing to 32 CRF
Compression progress: 22%
Compression progress: 44%
Compression progress: 64%
Compression progress: 85%
- Finished compressing: 1 minute, 4 seconds
Compression progress: 100%
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandatory-data.spec.ts.mp4
(Uploading Screenshots & Videos)
- Done Uploading (1/4) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Sent\ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandatory-data.spec.ts\Upload COR To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Tue Aug 22 2023 055337 GMT+0000 (Greenwich Mean Time) -- EX-3673 - Part 2 Verify the COR data in the COR Log.Tue Aug 22 2023 055337 GMT+0000 .png
- Done Uploading (2/4) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Sent\ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandatory-data.spec.ts\Upload COR To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Tue Aug 22 2023 055337 GMT+0000 (Greenwich Mean Time) -- EX-3673 - Part 0 Clean existing COR's Tue Aug 22 2023 055337 GMT+0000 (Greenwich Me.png
- Done Uploading (3/4) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Sent\ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandatory-data.spec.ts\Upload COR To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Tue Aug 22 2023 055337 GMT+0000 (Greenwich Mean Time) -- EX-3673 - Part 0 Cleanup - Delete COR.Tue Aug 22 2023 055337 GMT+0000 (Greenwich Mea.png
- Done Uploading (4/4) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandatory-data.spec.ts.mp4
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/ex-3683-GC-creates-project-adds-contract-SC-creates- (46 of 115)
cor.spec.ts
Estimated: 9 minutes, 46 seconds
COR Log | GC PM creats a project. Adds Contract with SC Company. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 22 2023 06:01:05 GMT+0000 (Greenwich Mean Time)
COR Log | GC PM creats a project. Adds Contract with SC Company. SC PM is able to create a COR by using Create a Change Order RequestTue Aug 22 2023 06:01:05 GMT+0000 (Greenwich Mean Time)
√ EX-3683 - Part 1: Create a project. Tue Aug 22 2023 06:01:05 GMT+0000 (Greenwich Mean Time) (322459ms)
√ EX-3683 - Part 1: Create a project. Tue Aug 22 2023 06:01:05 GMT+0000 (Greenwich Mean Time) (322459ms)
1 passing (5m)
1 passing (5m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_045.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 22 seconds │
│ Estimated: 9 minutes, 46 seconds │
│ Spec Ran: 04_COR_Log/Sent/ex-3683-GC-creates-project-adds-contract-SC-creates-cor.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-3683-GC-creates-project-adds-contract-SC-creates-cor.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/ex-3686-verify-there-are-two-tabs-on-cor-log-page-se (47 of 115)
nt-received.spec.ts
Estimated: 38 seconds
COR Log | To verify that on COR Log page there are separate tabs for Sent and Received CORsTue Aug 22 2023 06:06:36 GMT+0000 (Greenwich Mean Time)
COR Log | To verify that on COR Log page there are separate tabs for Sent and Received CORsTue Aug 22 2023 06:06:36 GMT+0000 (Greenwich Mean Time)
√ EX-3686: Verify there are separate tabs for Sent and Received CORsTue Aug 22 2023 06:06:36 GMT+0000 (Greenwich Mean Time) (36933ms)
√ EX-3686: Verify there are separate tabs for Sent and Received CORsTue Aug 22 2023 06:06:36 GMT+0000 (Greenwich Mean Time) (36933ms)
1 passing (38s)
1 passing (38s)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_046.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 37 seconds │
│ Estimated: 38 seconds │
│ Spec Ran: 04_COR_Log/Sent/ex-3686-verify-there-are-two-tabs-on-cor-log-page-sent-received. │
│ spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-3686-verify-there-are-two-tabs-on-cor-log-page-sent-received.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/ex-5244-verify-shareable-link-contains-just-the-sele (48 of 115)
cted-project.spec.ts
Estimated: 1 minute, 23 seconds
COR | Verify sharable link contains CORs from just the selected project.Tue Aug 22 2023 06:07:20 GMT+0000 (Greenwich Mean Time)
COR | Verify sharable link contains CORs from just the selected project.Tue Aug 22 2023 06:07:20 GMT+0000 (Greenwich Mean Time)
√ EX-5244 Tue Aug 22 2023 06:07:20 GMT+0000 (Greenwich Mean Time) (104245ms)
√ EX-5244 Tue Aug 22 2023 06:07:20 GMT+0000 (Greenwich Mean Time) (104245ms)
1 passing (2m)
1 passing (2m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_047.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 44 seconds │
│ Estimated: 1 minute, 23 seconds │
│ Spec Ran: 04_COR_Log/Sent/ex-5244-verify-shareable-link-contains-just-the-selected-project │
│ .spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-5244-verify-shareable-link-contains-just-the-selected-project.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/ex-5333-SC-creates-cor-with-full-data.spec.ts (49 of 115)
Estimated: 4 minutes, 25 seconds
Tue Aug 22 2023 06:09:12 GMT+0000 (Greenwich Mean Time)
Tue Aug 22 2023 06:09:12 GMT+0000 (Greenwich Mean Time)
1) EX-5333 - Part 1: Create COR with full set of data: Tue Aug 22 2023 06:09:12 GMT+0000 (Greenwich Mean Time)
1) EX-5333 - Part 1: Create COR with full set of data: Tue Aug 22 2023 06:09:12 GMT+0000 (Greenwich Mean Time)
0 passing (4m)
1 failing
1) Tue Aug 22 2023 06:09:12 GMT+0000 (Greenwich Mean Time)
EX-5333 - Part 1: Create COR with full set of data: Tue Aug 22 2023 06:09:12 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: expected '' to be 'visible'
This element `` is not visible because its parent `` has CSS property: `visibility: hidden`
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:251:21)
0 passing (4m)
1 failing
1) Tue Aug 22 2023 06:09:12 GMT+0000 (Greenwich Mean Time)
EX-5333 - Part 1: Create COR with full set of data: Tue Aug 22 2023 06:09:12 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: expected '' to be 'visible'
This element `` is not visible because its parent `` has CSS property: `visibility: hidden`
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:251:21)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_048.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 0 │
│ Failing: 1 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 1 │
│ Video: true │
│ Duration: 3 minutes, 59 seconds │
│ Estimated: 4 minutes, 25 seconds │
│ Spec Ran: 04_COR_Log/Sent/ex-5333-SC-creates-cor-with-full-data.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587)
Log\Sent\ex-5333-SC-creates-cor-with-full-data.spec.ts\Tue Aug 22 2023 060912 GM
T+0000 (Greenwich Mean Time) -- EX-5333 - Part 1 Create COR with full set of dat
a Tue Aug 22 2023 060912 GMT+0000 (Greenwich Mean Time) (failed).png
(Video)
- Started compressing: Compressing to 32 CRF
- Finished compressing: 41 seconds
Compression progress: 100%
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-5333-SC-creates-cor-with-full-data.spec.ts.mp4
(Uploading Screenshots & Videos)
- Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Sent\ex-5333-SC-creates-cor-with-full-data.spec.ts\Tue Aug 22 2023 060912 GMT+0000 (Greenwich Mean Time) -- EX-5333 - Part 1 Create COR with full set of data Tue Aug 22 2023 060912 GMT+0000 (Greenwich Mean Time) (failed).png
- Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-5333-SC-creates-cor-with-full-data.spec.ts.mp4
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/ex-5396-verify-contractor-is-able-to-upload-cor-with (50 of 115)
-mandatory-and-optional-data.spec.ts
Estimated: 10 minutes, 32 seconds
Upload COR | To verify that the contractor is able to Upload a Change Order Request with full set of data. Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time)
Upload COR | To verify that the contractor is able to Upload a Change Order Request with full set of data. Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time)
√ EX-5396 - Create new project. Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (59806ms)
√ EX-5396 - Create new project. Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (59806ms)
√ EX-5396 - Add My Company users to the project.Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (63996ms)
√ EX-5396 - Add My Company users to the project.Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (63996ms)
√ EX-5396 - Add Contract to the project.Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (38175ms)
√ EX-5396 - Add Contract to the project.Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (38175ms)
√ EX-5396 - PM Customer accept the project Invites : Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (27641ms)
√ EX-5396 - PM Customer accept the project Invites : Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (27641ms)
√ EX-5396 - Owner Customer accept the project Invites : Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (26767ms)
√ EX-5396 - Owner Customer accept the project Invites : Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (26767ms)
√ EX-5396 - Admin Customer accept the project Invites : Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (24167ms)
√ EX-5396 - Admin Customer accept the project Invites : Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (24167ms)
√ EX-5396 - Field User Customer accept the project Invites : Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (24907ms)
√ EX-5396 - Field User Customer accept the project Invites : Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (24907ms)
√ EX-5396 - Upload COR with full data set, mandatory and optional data.Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (78787ms)
√ EX-5396 - Upload COR with full data set, mandatory and optional data.Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (78787ms)
√ EX-5396 - Verify the COR data in the COR Log.Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (88132ms)
√ EX-5396 - Verify the COR data in the COR Log.Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (88132ms)
√ EX-5396 - Cleanup GC... Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (48109ms)
√ EX-5396 - Cleanup GC... Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (48109ms)
√ EX-5396 - Cleanup SC... Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (35186ms)
√ EX-5396 - Cleanup SC... Tue Aug 22 2023 06:14:00 GMT+0000 (Greenwich Mean Time) (35186ms)
11 passing (9m)
11 passing (9m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_049.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 11 │
│ Passing: 11 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 8 minutes, 37 seconds │
│ Estimated: 10 minutes, 32 seconds │
│ Spec Ran: 04_COR_Log/Sent/ex-5396-verify-contractor-is-able-to-upload-cor-with-mandatory-a │
│ nd-optional-data.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-5396-verify-contractor-is-able-to-upload-cor-with-mandatory-and-optional-data.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/ex-5435-create-new-project-add-contrac-verify-origin (51 of 115)
al-contract-value.spec.ts
Estimated: 4 minutes, 40 seconds
Create New Project with full set of data, as GC PM add contractor and verify the Original Contract Value.Tue Aug 22 2023 06:22:45 GMT+0000 (Greenwich Mean Time)
Create New Project with full set of data, as GC PM add contractor and verify the Original Contract Value.Tue Aug 22 2023 06:22:45 GMT+0000 (Greenwich Mean Time)
√ EX-5435 - Create a project.Tue Aug 22 2023 06:22:45 GMT+0000 (Greenwich Mean Time) (63915ms)
√ EX-5435 - Create a project.Tue Aug 22 2023 06:22:45 GMT+0000 (Greenwich Mean Time) (63915ms)
√ EX-5435 - Add contract.Tue Aug 22 2023 06:22:45 GMT+0000 (Greenwich Mean Time) (46946ms)
√ EX-5435 - Add contract.Tue Aug 22 2023 06:22:45 GMT+0000 (Greenwich Mean Time) (46946ms)
√ EX-5435 - Sub Contractor accepts the project/contract invite.Tue Aug 22 2023 06:22:45 GMT+0000 (Greenwich Mean Time) (24517ms)
√ EX-5435 - Sub Contractor accepts the project/contract invite.Tue Aug 22 2023 06:22:45 GMT+0000 (Greenwich Mean Time) (24517ms)
√ EX-5435 - Verify Original Contract Value.Tue Aug 22 2023 06:22:45 GMT+0000 (Greenwich Mean Time) (56538ms)
√ EX-5435 - Verify Original Contract Value.Tue Aug 22 2023 06:22:45 GMT+0000 (Greenwich Mean Time) (56538ms)
√ EX-5435 - Cleanup GC... Tue Aug 22 2023 06:22:45 GMT+0000 (Greenwich Mean Time) (36151ms)
√ EX-5435 - Cleanup GC... Tue Aug 22 2023 06:22:45 GMT+0000 (Greenwich Mean Time) (36151ms)
√ EX-5435 - Cleanup SC... Tue Aug 22 2023 06:22:45 GMT+0000 (Greenwich Mean Time) (37844ms)
√ EX-5435 - Cleanup SC... Tue Aug 22 2023 06:22:45 GMT+0000 (Greenwich Mean Time) (37844ms)
6 passing (4m)
6 passing (4m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_050.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 6 │
│ Passing: 6 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 4 minutes, 26 seconds │
│ Estimated: 4 minutes, 40 seconds │
│ Spec Ran: 04_COR_Log/Sent/ex-5435-create-new-project-add-contrac-verify-original-contract- │
│ value.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-5435-create-new-project-add-contrac-verify-original-contract-value.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 04_COR_Log/Sent/ex-6681-verify-sent-summary-data-after-filtering-by- (52 of 115)
project.spec.ts
Estimated: 3 minutes, 25 seconds
As Sub Contractor go to COR Log / Sent and verify the Summary data when fitered for one and multiple projects.Tue Aug 22 2023 06:27:18 GMT+0000 (Greenwich Mean Time)
As Sub Contractor go to COR Log / Sent and verify the Summary data when fitered for one and multiple projects.Tue Aug 22 2023 06:27:18 GMT+0000 (Greenwich Mean Time)
√ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by single Project.Tue Aug 22 2023 06:27:18 GMT+0000 (Greenwich Mean Time) (75838ms)
√ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by single Project.Tue Aug 22 2023 06:27:18 GMT+0000 (Greenwich Mean Time) (75838ms)
√ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by multiple Projects.Tue Aug 22 2023 06:27:18 GMT+0000 (Greenwich Mean Time) (124478ms)
√ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by multiple Projects.Tue Aug 22 2023 06:27:18 GMT+0000 (Greenwich Mean Time) (124478ms)
2 passing (3m)
2 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_051.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 22 seconds │
│ Estimated: 3 minutes, 25 seconds │
│ Spec Ran: 04_COR_Log/Sent/ex-6681-verify-sent-summary-data-after-filtering-by-project.spec │
│ .ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-6681-verify-sent-summary-data-after-filtering-by-project.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Received/ex-5425-verify-received-summary-data-after-filte (53 of 115)
ring-by-project.spec.ts
Estimated: 2 minutes, 36 seconds
T&M | Verify the RECEIVED Labor Hours Summary and T&M Log Summary shows correct values before and after filtering.Tue Aug 22 2023 06:30:48 GMT+0000 (Greenwich Mean Time)
T&M | Verify the RECEIVED Labor Hours Summary and T&M Log Summary shows correct values before and after filtering.Tue Aug 22 2023 06:30:48 GMT+0000 (Greenwich Mean Time)
√ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by single project.Tue Aug 22 2023 06:30:48 GMT+0000 (Greenwich Mean Time) (101367ms)
√ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by single project.Tue Aug 22 2023 06:30:48 GMT+0000 (Greenwich Mean Time) (101367ms)
√ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by multiple projects.Tue Aug 22 2023 06:30:48 GMT+0000 (Greenwich Mean Time) (56276ms)
√ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by multiple projects.Tue Aug 22 2023 06:30:48 GMT+0000 (Greenwich Mean Time) (56276ms)
2 passing (3m)
2 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_052.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 2 minutes, 41 seconds │
│ Estimated: 2 minutes, 36 seconds │
│ Spec Ran: 05_T&M_Log/Received/ex-5425-verify-received-summary-data-after-filtering-by-proj │
│ ect.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Received\ex-5425-verify-received-summary-data-after-filtering-by-project.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Received/ex-5429-verify-received-export-csv-after-filteri (54 of 115)
ng-by-project.spec.ts
Estimated: 1 minute, 20 seconds
T&M | Verify the T&M Log / RECEIVED CSV exports.Tue Aug 22 2023 06:33:36 GMT+0000 (Greenwich Mean Time)
T&M | Verify the T&M Log / RECEIVED CSV exports.Tue Aug 22 2023 06:33:36 GMT+0000 (Greenwich Mean Time)
√ EX-5429 - Verify the T&M Log / RECEIVED CSV export.Tue Aug 22 2023 06:33:36 GMT+0000 (Greenwich Mean Time) (89560ms)
√ EX-5429 - Verify the T&M Log / RECEIVED CSV export.Tue Aug 22 2023 06:33:36 GMT+0000 (Greenwich Mean Time) (89560ms)
1 passing (1m)
1 passing (1m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_053.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 29 seconds │
│ Estimated: 1 minute, 20 seconds │
│ Spec Ran: 05_T&M_Log/Received/ex-5429-verify-received-export-csv-after-filtering-by-projec │
│ t.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Received\ex-5429-verify-received-export-csv-after-filtering-by-project.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Received/ex-5431-verify-received-export-sharelog-after-fi (55 of 115)
ltering-by-project.spec.ts
Estimated: 1 minute, 22 seconds
T&M | Verify the T&M Log / RECEIVED ShareLog exports.Tue Aug 22 2023 06:35:12 GMT+0000 (Greenwich Mean Time)
T&M | Verify the T&M Log / RECEIVED ShareLog exports.Tue Aug 22 2023 06:35:12 GMT+0000 (Greenwich Mean Time)
√ EX-5431 - Verify the T&M Log / RECEIVED ShareLog export.Tue Aug 22 2023 06:35:12 GMT+0000 (Greenwich Mean Time) (92521ms)
√ EX-5431 - Verify the T&M Log / RECEIVED ShareLog export.Tue Aug 22 2023 06:35:12 GMT+0000 (Greenwich Mean Time) (92521ms)
1 passing (2m)
1 passing (2m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_054.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 1 minute, 32 seconds │
│ Estimated: 1 minute, 22 seconds │
│ Spec Ran: 05_T&M_Log/Received/ex-5431-verify-received-export-sharelog-after-filtering-by-p │
│ roject.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Received\ex-5431-verify-received-export-sharelog-after-filtering-by-project.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Received/ex-5641-verify-tnm-log-received-summary-data-aft (56 of 115)
er-filtering-by-tag-status.spec.ts
Estimated: 6 minutes, 48 seconds
T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 22 2023 06:36:51 GMT+0000 (Greenwich Mean Time)
T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 22 2023 06:36:51 GMT+0000 (Greenwich Mean Time)
√ EX-5641 - Filter by status Awaiting Signature and verify the Summary data for the test project.Tue Aug 22 2023 06:36:51 GMT+0000 (Greenwich Mean Time) (87153ms)
√ EX-5641 - Filter by status Awaiting Signature and verify the Summary data for the test project.Tue Aug 22 2023 06:36:51 GMT+0000 (Greenwich Mean Time) (87153ms)
√ EX-5641 - Filter by status Open and verify the Summary data for the test project.Tue Aug 22 2023 06:36:51 GMT+0000 (Greenwich Mean Time) (80986ms)
√ EX-5641 - Filter by status Open and verify the Summary data for the test project.Tue Aug 22 2023 06:36:51 GMT+0000 (Greenwich Mean Time) (80986ms)
√ EX-5641 - Filter by status Rejected and verify the Summary data for the test project.Tue Aug 22 2023 06:36:51 GMT+0000 (Greenwich Mean Time) (82845ms)
√ EX-5641 - Filter by status Rejected and verify the Summary data for the test project.Tue Aug 22 2023 06:36:51 GMT+0000 (Greenwich Mean Time) (82845ms)
√ EX-5641 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Tue Aug 22 2023 06:36:51 GMT+0000 (Greenwich Mean Time) (79474ms)
√ EX-5641 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Tue Aug 22 2023 06:36:51 GMT+0000 (Greenwich Mean Time) (79474ms)
√ EX-5641 - Filter by status Signed and verify the Summary data for the test project.Tue Aug 22 2023 06:36:51 GMT+0000 (Greenwich Mean Time) (80380ms)
√ EX-5641 - Filter by status Signed and verify the Summary data for the test project.Tue Aug 22 2023 06:36:51 GMT+0000 (Greenwich Mean Time) (80380ms)
5 passing (7m)
5 passing (7m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_055.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 5 │
│ Passing: 5 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 6 minutes, 57 seconds │
│ Estimated: 6 minutes, 48 seconds │
│ Spec Ran: 05_T&M_Log/Received/ex-5641-verify-tnm-log-received-summary-data-after-filtering │
│ -by-tag-status.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Received\ex-5641-verify-tnm-log-received-summary-data-after-filtering-by-tag-status.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-4415-1-gc-creates-project-and-contract-sc-creates (57 of 115)
-tag-optional-signer.spec.ts
Estimated: 4 minutes, 59 seconds
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 06:43:57 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 06:43:57 GMT+0000 (Greenwich Mean Time)
√ EX-4415 - Part 1: GC PM creates a projectTue Aug 22 2023 06:43:57 GMT+0000 (Greenwich Mean Time) (58706ms)
√ EX-4415 - Part 1: GC PM creates a projectTue Aug 22 2023 06:43:57 GMT+0000 (Greenwich Mean Time) (58706ms)
√ EX-4415 - Part 2: GC PM adds a contract with SC PM.Tue Aug 22 2023 06:43:57 GMT+0000 (Greenwich Mean Time) (45684ms)
√ EX-4415 - Part 2: GC PM adds a contract with SC PM.Tue Aug 22 2023 06:43:57 GMT+0000 (Greenwich Mean Time) (45684ms)
√ EX-4415 - Part 3.1: Sub Contractor accepts invite from the bell notification.Tue Aug 22 2023 06:43:57 GMT+0000 (Greenwich Mean Time) (33138ms)
√ EX-4415 - Part 3.1: Sub Contractor accepts invite from the bell notification.Tue Aug 22 2023 06:43:57 GMT+0000 (Greenwich Mean Time) (33138ms)
√ EX-4415 - Part 3.2: Sub Contractor adds users to the project.Tue Aug 22 2023 06:43:57 GMT+0000 (Greenwich Mean Time) (85444ms)
√ EX-4415 - Part 3.2: Sub Contractor adds users to the project.Tue Aug 22 2023 06:43:57 GMT+0000 (Greenwich Mean Time) (85444ms)
√ EX-4415 - Part 4: Sub Contractor creates a Tag and sends signature request.Tue Aug 22 2023 06:43:57 GMT+0000 (Greenwich Mean Time) (83672ms)
√ EX-4415 - Part 4: Sub Contractor creates a Tag and sends signature request.Tue Aug 22 2023 06:43:57 GMT+0000 (Greenwich Mean Time) (83672ms)
5 passing (5m)
5 passing (5m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_056.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 5 │
│ Passing: 5 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 5 minutes, 7 seconds │
│ Estimated: 4 minutes, 59 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-4415-1-gc-creates-project-and-contract-sc-creates-tag-optiona │
│ l-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-1-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-4415-2-gc-creates-project-and-contract-sc-creates (58 of 115)
-tag-optional-signer.spec.ts
Estimated: 3 minutes, 59 seconds
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 06:49:11 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 06:49:11 GMT+0000 (Greenwich Mean Time)
√ EX-4415 - Part 5: Sub Contractor ADD Labor valuesTue Aug 22 2023 06:49:11 GMT+0000 (Greenwich Mean Time) (246137ms)
√ EX-4415 - Part 5: Sub Contractor ADD Labor valuesTue Aug 22 2023 06:49:11 GMT+0000 (Greenwich Mean Time) (246137ms)
√ EX-4415 - Part 6: Sub Contractor Add Material valuesTue Aug 22 2023 06:49:11 GMT+0000 (Greenwich Mean Time) (183696ms)
√ EX-4415 - Part 6: Sub Contractor Add Material valuesTue Aug 22 2023 06:49:11 GMT+0000 (Greenwich Mean Time) (183696ms)
2 passing (7m)
2 passing (7m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_057.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 7 minutes, 13 seconds │
│ Estimated: 3 minutes, 59 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-4415-2-gc-creates-project-and-contract-sc-creates-tag-optiona │
│ l-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-2-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-4415-3-gc-creates-project-and-contract-sc-creates (59 of 115)
-tag-optional-signer.spec.ts
Estimated: 1 minute, 40 seconds
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 06:56:32 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 06:56:32 GMT+0000 (Greenwich Mean Time)
√ EX-4415 - Part 7: Sub Contractor Adds Equipment. Tue Aug 22 2023 06:56:32 GMT+0000 (Greenwich Mean Time) (219081ms)
√ EX-4415 - Part 7: Sub Contractor Adds Equipment. Tue Aug 22 2023 06:56:32 GMT+0000 (Greenwich Mean Time) (219081ms)
1 passing (4m)
1 passing (4m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_058.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 40 seconds │
│ Estimated: 1 minute, 40 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-4415-3-gc-creates-project-and-contract-sc-creates-tag-optiona │
│ l-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-3-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-4415-4-gc-creates-project-and-contract-sc-creates (60 of 115)
-tag-optional-signer.spec.ts
Estimated: 1 minute, 45 seconds
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:00:20 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:00:20 GMT+0000 (Greenwich Mean Time)
1) EX-4415 - Part 8: Sub Contractor Adds Other. Tue Aug 22 2023 07:00:20 GMT+0000 (Greenwich Mean Time)
1) EX-4415 - Part 8: Sub Contractor Adds Other. Tue Aug 22 2023 07:00:20 GMT+0000 (Greenwich Mean Time)
0 passing (1m)
1 failing
1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:00:20 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 8: Sub Contractor Adds Other. Tue Aug 22 2023 07:00:20 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `li[data-option-index='1']`, but never found it.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:334:19)
0 passing (1m)
1 failing
1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:00:20 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 8: Sub Contractor Adds Other. Tue Aug 22 2023 07:00:20 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `li[data-option-index='1']`, but never found it.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:334:19)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_059.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 0 │
│ Failing: 1 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 1 │
│ Video: true │
│ Duration: 1 minute, 1 second │
│ Estimated: 1 minute, 45 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-4415-4-gc-creates-project-and-contract-sc-creates-tag-optiona │
│ l-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533)
Log\Sent\ex-4415-4-gc-creates-project-and-contract-sc-creates-tag-optional-signe
r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen
d a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 070020 GMT+0
000 (Greenwich Mean Time) -- EX-4415 - Part 8 Sub Contractor Adds Other. Tue Aug
22 2023 070020 GMT+.png
(Video)
- Started compressing: Compressing to 32 CRF
- Finished compressing: 9 seconds
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-4-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4
(Uploading Screenshots & Videos)
- Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-4-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 070020 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 8 Sub Contractor Adds Other. Tue Aug 22 2023 070020 GMT+.png
- Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-4-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-4415-5-gc-creates-project-and-contract-sc-creates (61 of 115)
-tag-optional-signer.spec.ts
Estimated: 2 minutes, 30 seconds
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:01:39 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:01:39 GMT+0000 (Greenwich Mean Time)
1) EX-4415 - Part 9 : Sub Contractor uploads files.Tue Aug 22 2023 07:01:39 GMT+0000 (Greenwich Mean Time)
1) EX-4415 - Part 9 : Sub Contractor uploads files.Tue Aug 22 2023 07:01:39 GMT+0000 (Greenwich Mean Time)
2) EX-4415 - Part 10 : Sub Contractor signs the Tag.Tue Aug 22 2023 07:01:39 GMT+0000 (Greenwich Mean Time)
2) EX-4415 - Part 10 : Sub Contractor signs the Tag.Tue Aug 22 2023 07:01:39 GMT+0000 (Greenwich Mean Time)
0 passing (3m)
2 failing
1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:01:39 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 9 : Sub Contractor uploads files.Tue Aug 22 2023 07:01:39 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Not enough elements found. Found '1', expected '5'.
+ expected - actual
-1
+5
at createNewTnMPage.verifyOtherTableRowsCount (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/T&M_Log_CreateNewT&M.ts:103:36)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/05_T&M_Log/Sent/ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts:73:18)
2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:01:39 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 10 : Sub Contractor signs the Tag.Tue Aug 22 2023 07:01:39 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `ul[class='MuiList-root MuiList-padding'] li[class='MuiListItem-root MuiListItem-gutters'] div[class='MuiListItemText-root'] span`, but never found it.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:82:7)
0 passing (3m)
2 failing
1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:01:39 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 9 : Sub Contractor uploads files.Tue Aug 22 2023 07:01:39 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Not enough elements found. Found '1', expected '5'.
+ expected - actual
-1
+5
at createNewTnMPage.verifyOtherTableRowsCount (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/T&M_Log_CreateNewT&M.ts:103:36)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/05_T&M_Log/Sent/ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts:73:18)
2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:01:39 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 10 : Sub Contractor signs the Tag.Tue Aug 22 2023 07:01:39 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `ul[class='MuiList-root MuiList-padding'] li[class='MuiListItem-root MuiListItem-gutters'] div[class='MuiListItemText-root'] span`, but never found it.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:82:7)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_060.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 0 │
│ Failing: 2 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 2 │
│ Video: true │
│ Duration: 3 minutes, 13 seconds │
│ Estimated: 2 minutes, 30 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optiona │
│ l-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533)
Log\Sent\ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signe
r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen
d a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 070139 GMT+0
000 (Greenwich Mean Time) -- EX-4415 - Part 9 Sub Contractor uploads files.Tue
Aug 22 2023 070139 G.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533)
Log\Sent\ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signe
r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen
d a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 070139 GMT+0
000 (Greenwich Mean Time) -- EX-4415 - Part 10 Sub Contractor signs the Tag.Tue
Aug 22 2023 070139 .png
(Video)
- Started compressing: Compressing to 32 CRF
Compression progress: 62%
- Finished compressing: 29 seconds
Compression progress: 100%
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4
(Uploading Screenshots & Videos)
- Done Uploading (1/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 070139 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 10 Sub Contractor signs the Tag.Tue Aug 22 2023 070139 .png
- Done Uploading (2/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 070139 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 9 Sub Contractor uploads files.Tue Aug 22 2023 070139 G.png
- Done Uploading (3/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates (62 of 115)
-tag-optional-signer.spec.ts
Estimated: 8 minutes, 15 seconds
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:05:31 GMT+0000 (Greenwich Mean Time)
T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:05:31 GMT+0000 (Greenwich Mean Time)
1) EX-4415 - Part 11 : Sub Contractor sends signature request.Tue Aug 22 2023 07:05:31 GMT+0000 (Greenwich Mean Time)
1) EX-4415 - Part 11 : Sub Contractor sends signature request.Tue Aug 22 2023 07:05:31 GMT+0000 (Greenwich Mean Time)
2) EX-4415 - Part 12: Verify the tag was created.Tue Aug 22 2023 07:05:31 GMT+0000 (Greenwich Mean Time)
2) EX-4415 - Part 12: Verify the tag was created.Tue Aug 22 2023 07:05:31 GMT+0000 (Greenwich Mean Time)
3) EX-4415 - Part 13: Verify the GC sees the tag.Tue Aug 22 2023 07:05:31 GMT+0000 (Greenwich Mean Time)
3) EX-4415 - Part 13: Verify the GC sees the tag.Tue Aug 22 2023 07:05:31 GMT+0000 (Greenwich Mean Time)
4) EX-4415 - Part 14: Verify GC PM User recived emailsTue Aug 22 2023 07:10:11 GMT+0000 (Greenwich Mean Time)
4) EX-4415 - Part 14: Verify GC PM User recived emailsTue Aug 22 2023 07:10:11 GMT+0000 (Greenwich Mean Time)
5) EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
5) EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
6) EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
6) EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
7) EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
7) EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
√ EX-4415 - Part 18: Cleanup...Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time) (50323ms)
√ EX-4415 - Part 18: Cleanup...Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time) (50323ms)
1 passing (9m)
7 failing
1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 11 : Sub Contractor sends signature request.Tue Aug 22 2023 07:05:31 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Not enough elements found. Found '1', expected '5'.
+ expected - actual
-1
+5
at createNewTnMPage.verifyOtherTableRowsCount (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/T&M_Log_CreateNewT&M.ts:103:36)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts:70:18)
2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 12: Verify the tag was created.Tue Aug 22 2023 07:05:31 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='awaitingSignatureStatus']`, but never found it. Queried from:
> cy.get(body)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:7:34)
3) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 13: Verify the GC sees the tag.Tue Aug 22 2023 07:05:31 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Create T&M Tag for Test Project TC4415 1692686637854' within the selector: 'td' but never did.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:45:26)
4) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 14: Verify GC PM User recived emailsTue Aug 22 2023 07:10:11 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC4415 1692686637854' within the selector: 'td' but never did.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34)
5) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'You have received a new T&M Tag signature request' within the element: but never did.
at bellNotifications.OpenBellNotificaitonTagSignatureRequestLink (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Bell_Notifications.ts:29:104)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts:147:20)
6) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from:
> cy.get(body)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:7:34)
7) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from:
> cy.get(body)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:7:34)
1 passing (9m)
7 failing
1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 11 : Sub Contractor sends signature request.Tue Aug 22 2023 07:05:31 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Not enough elements found. Found '1', expected '5'.
+ expected - actual
-1
+5
at createNewTnMPage.verifyOtherTableRowsCount (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/T&M_Log_CreateNewT&M.ts:103:36)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts:70:18)
2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 12: Verify the tag was created.Tue Aug 22 2023 07:05:31 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='awaitingSignatureStatus']`, but never found it. Queried from:
> cy.get(body)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:7:34)
3) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 13: Verify the GC sees the tag.Tue Aug 22 2023 07:05:31 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Create T&M Tag for Test Project TC4415 1692686637854' within the selector: 'td' but never did.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:45:26)
4) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 14: Verify GC PM User recived emailsTue Aug 22 2023 07:10:11 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC4415 1692686637854' within the selector: 'td' but never did.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34)
5) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'You have received a new T&M Tag signature request' within the element: but never did.
at bellNotifications.OpenBellNotificaitonTagSignatureRequestLink (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Bell_Notifications.ts:29:104)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts:147:20)
6) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from:
> cy.get(body)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:7:34)
7) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time)
EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Tue Aug 22 2023 07:10:48 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from:
> cy.get(body)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:7:34)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_061.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 8 │
│ Passing: 1 │
│ Failing: 7 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 7 │
│ Video: true │
│ Duration: 9 minutes, 21 seconds │
│ Estimated: 8 minutes, 15 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optiona │
│ l-signer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533)
Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe
r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen
d a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 070531 GMT+0
000 (Greenwich Mean Time) -- EX-4415 - Part 11 Sub Contractor sends signature r
equest.Tue Aug 22 20.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533)
Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe
r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen
d a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 070531 GMT+0
000 (Greenwich Mean Time) -- EX-4415 - Part 12 Verify the tag was created.Tue Au
g 22 2023 070531 GMT.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533)
Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe
r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen
d a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 070531 GMT+0
000 (Greenwich Mean Time) -- EX-4415 - Part 13 Verify the GC sees the tag.Tue Au
g 22 2023 070531 GMT.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533)
Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe
r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen
d a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 071011 GMT+0
000 (Greenwich Mean Time) -- EX-4415 - Part 14 Verify GC PM User recived emailsT
ue Aug 22 2023 07101.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533)
Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe
r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen
d a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 071048 GMT+0
000 (Greenwich Mean Time) -- EX-4415 - Part 15 Verify the GC received Bell Notif
ication and use it t.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533)
Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe
r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen
d a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 071048 GMT+0
000 (Greenwich Mean Time) -- EX-4415 - Part 16 Verify the tag status in the GC T
&M Log.Tue Aug 22 20.png
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533)
Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe
r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen
d a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 071048 GMT+0
000 (Greenwich Mean Time) -- EX-4415 - Part 17 Verify the tag status in the SC T
&MM Log.Tue Aug 22 2.png
(Video)
- Started compressing: Compressing to 32 CRF
Compression progress: 13%
Compression progress: 26%
Compression progress: 38%
Compression progress: 51%
Compression progress: 64%
Compression progress: 77%
Compression progress: 89%
- Finished compressing: 1 minute, 26 seconds
Compression progress: 100%
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4
(Uploading Screenshots & Videos)
- Done Uploading (1/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 071048 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 16 Verify the tag status in the GC T&M Log.Tue Aug 22 20.png
- Done Uploading (2/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 071048 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 17 Verify the tag status in the SC T&MM Log.Tue Aug 22 2.png
- Done Uploading (3/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 071011 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 14 Verify GC PM User recived emailsTue Aug 22 2023 07101.png
- Done Uploading (4/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 071048 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 15 Verify the GC received Bell Notification and use it t.png
- Done Uploading (5/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 070531 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 11 Sub Contractor sends signature request.Tue Aug 22 20.png
- Done Uploading (6/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 070531 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 13 Verify the GC sees the tag.Tue Aug 22 2023 070531 GMT.png
- Done Uploading (7/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Tue Aug 22 2023 070531 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 12 Verify the tag was created.Tue Aug 22 2023 070531 GMT.png
- Done Uploading (8/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-5424-verify-sent-summary-data-after-filtering-by- (63 of 115)
project.spec.ts
Estimated: 3 minutes, 22 seconds
As Sub Contractor go to T&M Log / Sent and verify the Summary data for the test project.Tue Aug 22 2023 07:16:27 GMT+0000 (Greenwich Mean Time)
As Sub Contractor go to T&M Log / Sent and verify the Summary data for the test project.Tue Aug 22 2023 07:16:27 GMT+0000 (Greenwich Mean Time)
√ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log Overview Summary shows correct values when filtered by single Project.Tue Aug 22 2023 07:16:27 GMT+0000 (Greenwich Mean Time) (75101ms)
√ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log Overview Summary shows correct values when filtered by single Project.Tue Aug 22 2023 07:16:27 GMT+0000 (Greenwich Mean Time) (75101ms)
√ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log OVerview Summary shows correct values when filtered by multiple Projects.Tue Aug 22 2023 07:16:27 GMT+0000 (Greenwich Mean Time) (116276ms)
√ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log OVerview Summary shows correct values when filtered by multiple Projects.Tue Aug 22 2023 07:16:27 GMT+0000 (Greenwich Mean Time) (116276ms)
2 passing (3m)
2 passing (3m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_062.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 15 seconds │
│ Estimated: 3 minutes, 22 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-5424-verify-sent-summary-data-after-filtering-by-project.spec │
│ .ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5424-verify-sent-summary-data-after-filtering-by-project.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-5430-verify-sent-export-csv-after-filtering-by-pr (64 of 115)
oject.spec.ts
Estimated: 57 seconds
T&M | Verify the T&M Log / Sent CSV export.Tue Aug 22 2023 07:19:49 GMT+0000 (Greenwich Mean Time)
T&M | Verify the T&M Log / Sent CSV export.Tue Aug 22 2023 07:19:49 GMT+0000 (Greenwich Mean Time)
1) EX-5430 - Verify the T&M Log / Sent CSV export.Tue Aug 22 2023 07:19:49 GMT+0000 (Greenwich Mean Time)
1) EX-5430 - Verify the T&M Log / Sent CSV export.Tue Aug 22 2023 07:19:49 GMT+0000 (Greenwich Mean Time)
0 passing (1m)
1 failing
1) T&M | Verify the T&M Log / Sent CSV export.Tue Aug 22 2023 07:19:49 GMT+0000 (Greenwich Mean Time)
EX-5430 - Verify the T&M Log / Sent CSV export.Tue Aug 22 2023 07:19:49 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:253:21)
0 passing (1m)
1 failing
1) T&M | Verify the T&M Log / Sent CSV export.Tue Aug 22 2023 07:19:49 GMT+0000 (Greenwich Mean Time)
EX-5430 - Verify the T&M Log / Sent CSV export.Tue Aug 22 2023 07:19:49 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:253:21)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_063.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 0 │
│ Failing: 1 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 1 │
│ Video: true │
│ Duration: 1 minute, 20 seconds │
│ Estimated: 57 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-5430-verify-sent-export-csv-after-filtering-by-project.spec.t │
│ s │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Screenshots)
- C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533)
Log\Sent\ex-5430-verify-sent-export-csv-after-filtering-by-project.spec.ts\T&M
Verify the T&M Log Sent CSV export.Tue Aug 22 2023 071949 GMT+0000 (Greenwich M
ean Time) -- EX-5430 - Verify the T&M Log Sent CSV export.Tue Aug 22 2023 07194
9 GMT+0000 (Greenwich Mean Time) (failed).png
(Video)
- Started compressing: Compressing to 32 CRF
- Finished compressing: 13 seconds
Compression progress: 100%
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5430-verify-sent-export-csv-after-filtering-by-project.spec.ts.mp4
(Uploading Screenshots & Videos)
- Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-5430-verify-sent-export-csv-after-filtering-by-project.spec.ts\T&M Verify the T&M Log Sent CSV export.Tue Aug 22 2023 071949 GMT+0000 (Greenwich Mean Time) -- EX-5430 - Verify the T&M Log Sent CSV export.Tue Aug 22 2023 071949 GMT+0000 (Greenwich Mean Time) (failed).png
- Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5430-verify-sent-export-csv-after-filtering-by-project.spec.ts.mp4
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-5505-verify-tnm-log-sent-summary-data-after-filte (65 of 115)
ring-by-customer.spec.ts
Estimated: 2 minutes, 11 seconds
T&M | Verify filtering the T&M Log / SENT, by Customer, returns correct values for Labor Hours Summary.Tue Aug 22 2023 07:21:31 GMT+0000 (Greenwich Mean Time)
T&M | Verify filtering the T&M Log / SENT, by Customer, returns correct values for Labor Hours Summary.Tue Aug 22 2023 07:21:31 GMT+0000 (Greenwich Mean Time)
√ EX-5505 - Filter by Customer and verify the Summary Labour Hours and T&M Log Overview Summary data for the test project.Tue Aug 22 2023 07:21:31 GMT+0000 (Greenwich Mean Time) (145373ms)
√ EX-5505 - Filter by Customer and verify the Summary Labour Hours and T&M Log Overview Summary data for the test project.Tue Aug 22 2023 07:21:31 GMT+0000 (Greenwich Mean Time) (145373ms)
1 passing (2m)
1 passing (2m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_064.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 2 minutes, 26 seconds │
│ Estimated: 2 minutes, 11 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-5505-verify-tnm-log-sent-summary-data-after-filtering-by-cust │
│ omer.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5505-verify-tnm-log-sent-summary-data-after-filtering-by-customer.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-5506-verify-tnm-log-sent-summary-data-after-filte (66 of 115)
ring-by-job-number.spec.ts
Estimated: 2 minutes, 23 seconds
T&M | Verify filtering the T&M Log / SENT, by Job Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 22 2023 07:24:05 GMT+0000 (Greenwich Mean Time)
T&M | Verify filtering the T&M Log / SENT, by Job Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 22 2023 07:24:05 GMT+0000 (Greenwich Mean Time)
√ EX-5506 - Filter by JobNumber and verify the Summary data for the test project.Tue Aug 22 2023 07:24:05 GMT+0000 (Greenwich Mean Time) (137313ms)
√ EX-5506 - Filter by JobNumber and verify the Summary data for the test project.Tue Aug 22 2023 07:24:05 GMT+0000 (Greenwich Mean Time) (137313ms)
1 passing (2m)
1 passing (2m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_065.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 2 minutes, 17 seconds │
│ Estimated: 2 minutes, 23 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-5506-verify-tnm-log-sent-summary-data-after-filtering-by-job- │
│ number.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5506-verify-tnm-log-sent-summary-data-after-filtering-by-job-number.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-5507-verify-tnm-log-sent-summary-data-after-filte (67 of 115)
ring-by-cust-ref-num.spec.ts
Estimated: 2 minutes, 9 seconds
T&M | Verify filtering the T&M Log / SENT, by Custmer Reference Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 22 2023 07:26:30 GMT+0000 (Greenwich Mean Time)
T&M | Verify filtering the T&M Log / SENT, by Custmer Reference Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 22 2023 07:26:30 GMT+0000 (Greenwich Mean Time)
√ EX-5507 - Filter by CustRefNum and verify the Summary data for the test project.Tue Aug 22 2023 07:26:30 GMT+0000 (Greenwich Mean Time) (135780ms)
√ EX-5507 - Filter by CustRefNum and verify the Summary data for the test project.Tue Aug 22 2023 07:26:30 GMT+0000 (Greenwich Mean Time) (135780ms)
1 passing (2m)
1 passing (2m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_066.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 2 minutes, 15 seconds │
│ Estimated: 2 minutes, 9 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-5507-verify-tnm-log-sent-summary-data-after-filtering-by-cust │
│ -ref-num.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5507-verify-tnm-log-sent-summary-data-after-filtering-by-cust-ref-num.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-5508-verify-tnm-log-sent-summary-data-after-filte (68 of 115)
ring-by-tag-status.spec.ts
Estimated: 15 minutes, 37 seconds
T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 22 2023 07:28:53 GMT+0000 (Greenwich Mean Time)
T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 22 2023 07:28:53 GMT+0000 (Greenwich Mean Time)
√ EX-5508 - Filter by status Awaiting Signature and verify the Summary data for the test project.Tue Aug 22 2023 07:28:53 GMT+0000 (Greenwich Mean Time) (142516ms)
√ EX-5508 - Filter by status Awaiting Signature and verify the Summary data for the test project.Tue Aug 22 2023 07:28:53 GMT+0000 (Greenwich Mean Time) (142516ms)
√ EX-5508 - Filter by status Draft and verify the Summary data for the test project.Tue Aug 22 2023 07:28:53 GMT+0000 (Greenwich Mean Time) (126901ms)
√ EX-5508 - Filter by status Draft and verify the Summary data for the test project.Tue Aug 22 2023 07:28:53 GMT+0000 (Greenwich Mean Time) (126901ms)
√ EX-5508 - Filter by status Open and verify the Summary data for the test project.Tue Aug 22 2023 07:28:53 GMT+0000 (Greenwich Mean Time) (121690ms)
√ EX-5508 - Filter by status Open and verify the Summary data for the test project.Tue Aug 22 2023 07:28:53 GMT+0000 (Greenwich Mean Time) (121690ms)
√ EX-5508 - Filter by status Rejected and verify the Summary data for the test project.Tue Aug 22 2023 07:28:53 GMT+0000 (Greenwich Mean Time) (142198ms)
√ EX-5508 - Filter by status Rejected and verify the Summary data for the test project.Tue Aug 22 2023 07:28:53 GMT+0000 (Greenwich Mean Time) (142198ms)
√ EX-5508 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Tue Aug 22 2023 07:28:53 GMT+0000 (Greenwich Mean Time) (137785ms)
√ EX-5508 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Tue Aug 22 2023 07:28:53 GMT+0000 (Greenwich Mean Time) (137785ms)
√ EX-5508 - Filter by status Signed and verify the Summary data for the test project.Tue Aug 22 2023 07:28:53 GMT+0000 (Greenwich Mean Time) (132924ms)
√ EX-5508 - Filter by status Signed and verify the Summary data for the test project.Tue Aug 22 2023 07:28:53 GMT+0000 (Greenwich Mean Time) (132924ms)
√ EX-5508 - Filter by status Signed Not Sent and verify the Summary data for the test project.Tue Aug 22 2023 07:28:53 GMT+0000 (Greenwich Mean Time) (126525ms)
√ EX-5508 - Filter by status Signed Not Sent and verify the Summary data for the test project.Tue Aug 22 2023 07:28:53 GMT+0000 (Greenwich Mean Time) (126525ms)
7 passing (16m)
7 passing (16m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_067.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 7 │
│ Passing: 7 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 15 minutes, 41 seconds │
│ Estimated: 15 minutes, 37 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-5508-verify-tnm-log-sent-summary-data-after-filtering-by-tag- │
│ status.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5508-verify-tnm-log-sent-summary-data-after-filtering-by-tag-status.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-5509-verify-tnm-log-sent-summary-data-after-filte (69 of 115)
ring-by-cust-label.spec.ts
Estimated: 2 minutes, 9 seconds
T&M | Verify filtering the T&M Log/SENT, by Label, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 22 2023 07:44:46 GMT+0000 (Greenwich Mean Time)
T&M | Verify filtering the T&M Log/SENT, by Label, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 22 2023 07:44:46 GMT+0000 (Greenwich Mean Time)
√ EX-5509 - Filter by Label and verify the Summary data for the test project.Tue Aug 22 2023 07:44:46 GMT+0000 (Greenwich Mean Time) (132919ms)
√ EX-5509 - Filter by Label and verify the Summary data for the test project.Tue Aug 22 2023 07:44:46 GMT+0000 (Greenwich Mean Time) (132919ms)
1 passing (2m)
1 passing (2m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_068.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 1 │
│ Passing: 1 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 2 minutes, 13 seconds │
│ Estimated: 2 minutes, 9 seconds │
│ Spec Ran: 05_T&M_Log/Sent/ex-5509-verify-tnm-log-sent-summary-data-after-filtering-by-cust │
│ -label.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5509-verify-tnm-log-sent-summary-data-after-filtering-by-cust-label.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-5510-verify-tnm-log-sent-summary-data-after-filte (70 of 115)
ring-by-cor-availability.spec.ts
Estimated: 4 minutes, 1 second
T&M | Verify filtering the T&M Log/SENT, by COR availability, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 22 2023 07:47:06 GMT+0000 (Greenwich Mean Time)
T&M | Verify filtering the T&M Log/SENT, by COR availability, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Tue Aug 22 2023 07:47:06 GMT+0000 (Greenwich Mean Time)
√ EX-5510 - Filter by 'Display Pending CORs only' and verify the Summary data for the test project.Tue Aug 22 2023 07:47:06 GMT+0000 (Greenwich Mean Time) (124843ms)
√ EX-5510 - Filter by 'Display Pending CORs only' and verify the Summary data for the test project.Tue Aug 22 2023 07:47:06 GMT+0000 (Greenwich Mean Time) (124843ms)
√ EX-5510 - Filter by 'Display Tags with CORs only' and verify the Summary data for the test project.Tue Aug 22 2023 07:47:06 GMT+0000 (Greenwich Mean Time) (111335ms)
√ EX-5510 - Filter by 'Display Tags with CORs only' and verify the Summary data for the test project.Tue Aug 22 2023 07:47:06 GMT+0000 (Greenwich Mean Time) (111335ms)
2 passing (4m)
2 passing (4m)
[mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_069.json
(Results)
┌────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Tests: 2 │
│ Passing: 2 │
│ Failing: 0 │
│ Pending: 0 │
│ Skipped: 0 │
│ Screenshots: 0 │
│ Video: false │
│ Duration: 3 minutes, 59 seconds │
│ Estimated: 4 minutes, 1 second │
│ Spec Ran: 05_T&M_Log/Sent/ex-5510-verify-tnm-log-sent-summary-data-after-filtering-by-cor- │
│ availability.spec.ts │
└────────────────────────────────────────────────────────────────────────────────────────────────┘
(Video)
- Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5510-verify-tnm-log-sent-summary-data-after-filtering-by-cor-availability.spec.ts.mp4
(Uploading Screenshots & Videos)
- Nothing to Upload
────────────────────────────────────────────────────────────────────────────────────────────────────
Running: 05_T&M_Log/Sent/ex-6191-sc-creates-tag-required-signer-gc-signs-tag. (71 of 115)
spec.ts
Estimated: 17 minutes, 9 seconds
T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time)
T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time)
√ EX-6191 - Part 0: Clean the tags (65652ms)
√ EX-6191 - Part 0: Clean the tags (65652ms)
√ EX-6191 - Part 1: Sub Contractor Admin creates tag and save it as draft.Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time) (112444ms)
√ EX-6191 - Part 1: Sub Contractor Admin creates tag and save it as draft.Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time) (112444ms)
1) EX-6191 - Part 2: Sub Contractor Admin adds LMEO to the draft. Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time)
1) EX-6191 - Part 2: Sub Contractor Admin adds LMEO to the draft. Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time)
2) EX-6191 - Part 3: Sub Contractor admin adds files. Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time)
2) EX-6191 - Part 3: Sub Contractor admin adds files. Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time)
3) EX-6191 - Part 4: Sub Contractor admin signs the tag.Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time)
3) EX-6191 - Part 4: Sub Contractor admin signs the tag.Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time)
4) EX-6191 - Part 5: Sub Contractor admin sends tag for signature.Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time)
4) EX-6191 - Part 5: Sub Contractor admin sends tag for signature.Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time)
5) EX-6191 - Part 6: Verify the tag was created.Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time)
5) EX-6191 - Part 6: Verify the tag was created.Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time)
6) EX-6191 - Part 7: Verify the GC Admin sees the tag.Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time)
6) EX-6191 - Part 7: Verify the GC Admin sees the tag.Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time)
7) EX-6191 - Part 8: Verify GC Admin recived emailsTue Aug 22 2023 08:04:01 GMT+0000 (Greenwich Mean Time)
7) EX-6191 - Part 8: Verify GC Admin recived emailsTue Aug 22 2023 08:04:01 GMT+0000 (Greenwich Mean Time)
8) EX-6191 - Part 9: Verify the GC Admin received Bell Notification and use it to sign the tag.Tue Aug 22 2023 08:04:38 GMT+0000 (Greenwich Mean Time)
8) EX-6191 - Part 9: Verify the GC Admin received Bell Notification and use it to sign the tag.Tue Aug 22 2023 08:04:38 GMT+0000 (Greenwich Mean Time)
9) EX-6191 - Part 10: Verify the tag status in the GC Admin T&M Log.Tue Aug 22 2023 08:04:38 GMT+0000 (Greenwich Mean Time)
9) EX-6191 - Part 10: Verify the tag status in the GC Admin T&M Log.Tue Aug 22 2023 08:04:38 GMT+0000 (Greenwich Mean Time)
10) EX-6191 - Part 11: Verify the tag status in the SC Admin T&M Log.Tue Aug 22 2023 08:04:38 GMT+0000 (Greenwich Mean Time)
10) EX-6191 - Part 11: Verify the tag status in the SC Admin T&M Log.Tue Aug 22 2023 08:04:38 GMT+0000 (Greenwich Mean Time)
11) EX-6191 - Part 12: Cleanup SC Tag ... Tue Aug 22 2023 08:04:38 GMT+0000 (Greenwich Mean Time)
11) EX-6191 - Part 12: Cleanup SC Tag ... Tue Aug 22 2023 08:04:38 GMT+0000 (Greenwich Mean Time)
2 passing (19m)
11 failing
1) T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Aug 22 2023 08:04:38 GMT+0000 (Greenwich Mean Time)
EX-6191 - Part 2: Sub Contractor Admin adds LMEO to the draft. Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: '1 of 1' within the selector: 'div span' but never did.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34)
2) T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Aug 22 2023 08:04:38 GMT+0000 (Greenwich Mean Time)
EX-6191 - Part 3: Sub Contractor admin adds files. Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: '1 of 1' within the selector: 'div span' but never did.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34)
3) T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Aug 22 2023 08:04:38 GMT+0000 (Greenwich Mean Time)
EX-6191 - Part 4: Sub Contractor admin signs the tag.Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: '1 of 1' within the selector: 'div span' but never did.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34)
4) T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Aug 22 2023 08:04:38 GMT+0000 (Greenwich Mean Time)
EX-6191 - Part 5: Sub Contractor admin sends tag for signature.Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `li[data-option-index='1']`, but never found it.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:334:19)
5) T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Aug 22 2023 08:04:38 GMT+0000 (Greenwich Mean Time)
EX-6191 - Part 6: Verify the tag was created.Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='awaitingSignatureStatus']`, but never found it. Queried from:
> cy.get(body)
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:7:34)
6) T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Aug 22 2023 08:04:38 GMT+0000 (Greenwich Mean Time)
EX-6191 - Part 7: Verify the GC Admin sees the tag.Tue Aug 22 2023 07:51:13 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'EX6191 T&M Tag 1692690673770' within the selector: 'td' but never did.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:45:26)
7) T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Aug 22 2023 08:04:38 GMT+0000 (Greenwich Mean Time)
EX-6191 - Part 8: Verify GC Admin recived emailsTue Aug 22 2023 08:04:01 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'DO NOT DELETE - Project for EX6191' within the selector: 'td' but never did.
at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34)
8) T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Tue Aug 22 2023 08:04:38 GMT+0000 (Greenwich Mean Time)
EX-6191 - Part 9: Verify the GC Admin received Bell Notification and use it to sign the tag.Tue Aug 22 2023 08:04:38 GMT+0000 (Greenwich Mean Time):
AssertionError: Timed out retrying after 30000ms: Expected to find content: 'You have received a new T&M Tag signature request' within the element: |