> cypress-extracker-webapp@1.0.0 scripts-regression-record-vm > cypress run --config-file cypress.config_staging_regression.ts --browser chrome --record --key f075f6c3-9e86-42b3-885a-0b6e5a07380b --spec "./cypress/e2e/regression/**" Warning: We failed to remove old browser profiles from previous runs. This error will not affect or change the exit code. Error: EBUSY: resource busy or locked, unlink 'C:\Users\qateam\AppData\Roaming\Cypress\cy\production\browsers\chrome-stable\run-292\lockfile' ==================================================================================================== (Run Starting) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Cypress: 12.17.4 │ │ Browser: Chrome 116 (headless) │ │ Node Version: v18.14.1 (C:\Program Files\nodejs\node.exe) │ │ Specs: 114 found (01_LoginPage/ex-3313-invalid-credentials.spec.ts, 01_LoginPage/ex-3 │ │ 316-email-input-validation.spec.ts, 01_LoginPage/ex-5751-create-new-account-wi │ │ th-already-used-email.spec.ts, 06_Draft_COR_Log/ex-11248-to-verify-that-draft- │ │ cor-can-be-created-and-i...) │ │ Searched: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\e2e\regression\** │ │ Params: Tag: false, Group: false, Parallel: false │ │ Run URL: https://cloud.cypress.io/projects/1e8aku/runs/16 │ │ Experiments: experimentalMemoryManagement=true,experimentalStudio=true │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 01_LoginPage/ex-3313-invalid-credentials.spec.ts (1 of 114) Estimated: 15 seconds Login with invalid credentialsThu Aug 24 2023 06:32:05 GMT+0000 (Greenwich Mean Time) Login with invalid credentialsThu Aug 24 2023 06:32:05 GMT+0000 (Greenwich Mean Time) √ EX-3313 - Login with invalid credentials.Thu Aug 24 2023 06:32:05 GMT+0000 (Greenwich Mean Time) (16206ms) √ EX-3313 - Login with invalid credentials.Thu Aug 24 2023 06:32:05 GMT+0000 (Greenwich Mean Time) (16206ms) 1 passing (16s) 1 passing (16s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 16 seconds │ │ Estimated: 15 seconds │ │ Spec Ran: 01_LoginPage/ex-3313-invalid-credentials.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\01_LoginPage\ex-3313-invalid-credentials.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 01_LoginPage/ex-3316-email-input-validation.spec.ts (2 of 114) Estimated: 10 seconds 3316 | Verify data input validation for emailThu Aug 24 2023 06:32:29 GMT+0000 (Greenwich Mean Time) 3316 | Verify data input validation for emailThu Aug 24 2023 06:32:29 GMT+0000 (Greenwich Mean Time) √ 3316 - Verify data input validation for emailThu Aug 24 2023 06:32:29 GMT+0000 (Greenwich Mean Time) (11324ms) √ 3316 - Verify data input validation for emailThu Aug 24 2023 06:32:29 GMT+0000 (Greenwich Mean Time) (11324ms) 1 passing (12s) 1 passing (12s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_001.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 11 seconds │ │ Estimated: 10 seconds │ │ Spec Ran: 01_LoginPage/ex-3316-email-input-validation.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\01_LoginPage\ex-3316-email-input-validation.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 01_LoginPage/ex-5751-create-new-account-with-already-used-email.spec (3 of 114) .ts Estimated: 14 seconds Account Creation | Prevent users from creating separate accounts with same email domainThu Aug 24 2023 06:32:48 GMT+0000 (Greenwich Mean Time) Account Creation | Prevent users from creating separate accounts with same email domainThu Aug 24 2023 06:32:48 GMT+0000 (Greenwich Mean Time) √ EX-5751 - Create account with email that is already associated with existing Extracker account.Thu Aug 24 2023 06:32:48 GMT+0000 (Greenwich Mean Time) (17662ms) √ EX-5751 - Create account with email that is already associated with existing Extracker account.Thu Aug 24 2023 06:32:48 GMT+0000 (Greenwich Mean Time) (17662ms) 1 passing (18s) 1 passing (18s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_002.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 17 seconds │ │ Estimated: 14 seconds │ │ Spec Ran: 01_LoginPage/ex-5751-create-new-account-with-already-used-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\01_LoginPage\ex-5751-create-new-account-with-already-used-email.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Add_users_to_Project/EX-9394-GC-creates-project- (4 of 114) adds-new-customer-user.spec.ts Estimated: 2 minutes, 48 seconds Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fields. Thu Aug 24 2023 06:33:13 GMT+0000 (Greenwich Mean Time) Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fields. Thu Aug 24 2023 06:33:13 GMT+0000 (Greenwich Mean Time) √ EX-9394 - Part 1: Create a project. : Thu Aug 24 2023 06:33:13 GMT+0000 (Greenwich Mean Time) (65092ms) √ EX-9394 - Part 1: Create a project. : Thu Aug 24 2023 06:33:13 GMT+0000 (Greenwich Mean Time) (65092ms) 1) EX-9394 - Part 2: Add new Customer to the project.Thu Aug 24 2023 06:33:13 GMT+0000 (Greenwich Mean Time) 1) EX-9394 - Part 2: Add new Customer to the project.Thu Aug 24 2023 06:33:13 GMT+0000 (Greenwich Mean Time) √ EX-9394 - Part 3: Cleanup GC... Thu Aug 24 2023 06:33:13 GMT+0000 (Greenwich Mean Time) (46392ms) √ EX-9394 - Part 3: Cleanup GC... Thu Aug 24 2023 06:33:13 GMT+0000 (Greenwich Mean Time) (46392ms) 2 passing (3m) 1 failing 1) Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fields. Thu Aug 24 2023 06:33:13 GMT+0000 (Greenwich Mean Time) EX-9394 - Part 2: Add new Customer to the project.Thu Aug 24 2023 06:33:13 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test User' within the selector: 'td' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34) 2 passing (3m) 1 failing 1) Add Customer | Add a new user as customer to the project with all mandatory and non mandatory fields. Thu Aug 24 2023 06:33:13 GMT+0000 (Greenwich Mean Time) EX-9394 - Part 2: Add new Customer to the project.Thu Aug 24 2023 06:33:13 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test User' within the selector: 'td' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_003.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 3 │ │ Passing: 2 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: true │ │ Duration: 2 minutes, 59 seconds │ │ Estimated: 2 minutes, 48 seconds │ │ Spec Ran: 02_PermissionLevels/Add_users_to_Project/EX-9394-GC-creates-project-adds-new-cus │ │ tomer-user.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\Add_users_to_Project\EX-9394-GC-creates-project-adds-new-customer-u ser.spec.ts\Add Customer Add a new user as customer to the project with all man datory and non mandatory fields. Thu Aug 24 2023 063313 GMT+0000 (Greenwich Mean Time) -- EX-9394 - Part 2 Add new Customer to the project.Thu Aug 24 2023 06331 3 GMT+0000 (Greenwich .png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 40% Compression progress: 79% - Finished compressing: 34 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Add_users_to_Project\EX-9394-GC-creates-project-adds-new-customer-user.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\Add_users_to_Project\EX-9394-GC-creates-project-adds-new-customer-user.spec.ts\Add Customer Add a new user as customer to the project with all mandatory and non mandatory fields. Thu Aug 24 2023 063313 GMT+0000 (Greenwich Mean Time) -- EX-9394 - Part 2 Add new Customer to the project.Thu Aug 24 2023 063313 GMT+0000 (Greenwich .png - Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Add_users_to_Project\EX-9394-GC-creates-project-adds-new-customer-user.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3323-create-new-project-as-own (5 of 114) er-in-owner-company.spec.ts Estimated: 1 minute, 29 seconds Create New Project in Owner Company as Account Owner, using only mandatory data.Thu Aug 24 2023 06:36:55 GMT+0000 (Greenwich Mean Time) Create New Project in Owner Company as Account Owner, using only mandatory data.Thu Aug 24 2023 06:36:55 GMT+0000 (Greenwich Mean Time) √ EX-3323 - Create a project in Owner Company as Account Owner.Thu Aug 24 2023 06:36:55 GMT+0000 (Greenwich Mean Time) (52829ms) √ EX-3323 - Create a project in Owner Company as Account Owner.Thu Aug 24 2023 06:36:55 GMT+0000 (Greenwich Mean Time) (52829ms) √ EX-3323 - Cleanup...Thu Aug 24 2023 06:36:55 GMT+0000 (Greenwich Mean Time) (42647ms) √ EX-3323 - Cleanup...Thu Aug 24 2023 06:36:55 GMT+0000 (Greenwich Mean Time) (42647ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_004.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 36 seconds │ │ Estimated: 1 minute, 29 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3323-create-new-project-as-owner-in-owner- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3323-create-new-project-as-owner-in-owner-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3328-create-new-project-as-own (6 of 114) er-in-sc-company.spec.ts Estimated: 1 minute, 26 seconds Create New Project in SC Company as Account Owner, using only mandatory data.Thu Aug 24 2023 06:38:37 GMT+0000 (Greenwich Mean Time) Create New Project in SC Company as Account Owner, using only mandatory data.Thu Aug 24 2023 06:38:37 GMT+0000 (Greenwich Mean Time) √ EX-3328 - Create a project in SC Company as Account Owner.Thu Aug 24 2023 06:38:37 GMT+0000 (Greenwich Mean Time) (55367ms) √ EX-3328 - Create a project in SC Company as Account Owner.Thu Aug 24 2023 06:38:37 GMT+0000 (Greenwich Mean Time) (55367ms) √ EX-3328 - Cleanup...Thu Aug 24 2023 06:38:37 GMT+0000 (Greenwich Mean Time) (36629ms) √ EX-3328 - Cleanup...Thu Aug 24 2023 06:38:37 GMT+0000 (Greenwich Mean Time) (36629ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_005.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 32 seconds │ │ Estimated: 1 minute, 26 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3328-create-new-project-as-owner-in-sc-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3328-create-new-project-as-owner-in-sc-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3329-create-new-project-as-own (7 of 114) er-in-other-company.spec.ts Estimated: 1 minute, 24 seconds Create New Project in Other Company as Account Owner, using only mandatory data.Thu Aug 24 2023 06:40:16 GMT+0000 (Greenwich Mean Time) Create New Project in Other Company as Account Owner, using only mandatory data.Thu Aug 24 2023 06:40:16 GMT+0000 (Greenwich Mean Time) √ EX-3329 - Create a project in Other Company as Account Owner.Thu Aug 24 2023 06:40:16 GMT+0000 (Greenwich Mean Time) (54052ms) √ EX-3329 - Create a project in Other Company as Account Owner.Thu Aug 24 2023 06:40:16 GMT+0000 (Greenwich Mean Time) (54052ms) √ EX-3329 - Cleanup...Thu Aug 24 2023 06:40:16 GMT+0000 (Greenwich Mean Time) (36685ms) √ EX-3329 - Cleanup...Thu Aug 24 2023 06:40:16 GMT+0000 (Greenwich Mean Time) (36685ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_006.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 31 seconds │ │ Estimated: 1 minute, 24 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3329-create-new-project-as-owner-in-other- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3329-create-new-project-as-owner-in-other-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3330-create-new-project-as-adm (8 of 114) in-in-owner-company.spec.ts Estimated: 1 minute, 36 seconds Create New Project in Owner Company as Admin, using only mandatory data.Thu Aug 24 2023 06:41:54 GMT+0000 (Greenwich Mean Time) Create New Project in Owner Company as Admin, using only mandatory data.Thu Aug 24 2023 06:41:54 GMT+0000 (Greenwich Mean Time) √ EX-3330 - Create a project in Owner Company as Admin.Thu Aug 24 2023 06:41:54 GMT+0000 (Greenwich Mean Time) (60995ms) √ EX-3330 - Create a project in Owner Company as Admin.Thu Aug 24 2023 06:41:54 GMT+0000 (Greenwich Mean Time) (60995ms) √ EX-3330 - Cleanup...Thu Aug 24 2023 06:41:54 GMT+0000 (Greenwich Mean Time) (37263ms) √ EX-3330 - Cleanup...Thu Aug 24 2023 06:41:54 GMT+0000 (Greenwich Mean Time) (37263ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_007.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 38 seconds │ │ Estimated: 1 minute, 36 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3330-create-new-project-as-admin-in-owner- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3330-create-new-project-as-admin-in-owner-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3331-create-new-project-as-adm (9 of 114) in-in-gc-company.spec.ts Estimated: 1 minute, 30 seconds EX-3331 | Create New Project in General Contractor Company as Admin, using only mandatory data. Thu Aug 24 2023 06:43:39 GMT+0000 (Greenwich Mean Time) EX-3331 | Create New Project in General Contractor Company as Admin, using only mandatory data. Thu Aug 24 2023 06:43:39 GMT+0000 (Greenwich Mean Time) √ EX-3331 - Thu Aug 24 2023 06:43:39 GMT+0000 (Greenwich Mean Time) (51028ms) √ EX-3331 - Thu Aug 24 2023 06:43:39 GMT+0000 (Greenwich Mean Time) (51028ms) √ EX-3331 - Cleanup...Thu Aug 24 2023 06:43:39 GMT+0000 (Greenwich Mean Time) (37686ms) √ EX-3331 - Cleanup...Thu Aug 24 2023 06:43:39 GMT+0000 (Greenwich Mean Time) (37686ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_008.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 28 seconds │ │ Estimated: 1 minute, 30 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3331-create-new-project-as-admin-in-gc-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3331-create-new-project-as-admin-in-gc-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3332-create-new-project-as-pm- (10 of 114) in-gc-company.spec.ts Estimated: 1 minute, 29 seconds Create New Project in General Contractor Company as Project Manageer, using only mandatory data.Thu Aug 24 2023 06:45:14 GMT+0000 (Greenwich Mean Time) Create New Project in General Contractor Company as Project Manageer, using only mandatory data.Thu Aug 24 2023 06:45:14 GMT+0000 (Greenwich Mean Time) √ EX-3332 - Create a projct in General Contractor Company as Project Manageer.Thu Aug 24 2023 06:45:14 GMT+0000 (Greenwich Mean Time) (54560ms) √ EX-3332 - Create a projct in General Contractor Company as Project Manageer.Thu Aug 24 2023 06:45:14 GMT+0000 (Greenwich Mean Time) (54560ms) √ EX-3332 - Cleanup...Thu Aug 24 2023 06:45:14 GMT+0000 (Greenwich Mean Time) (33997ms) √ EX-3332 - Cleanup...Thu Aug 24 2023 06:45:14 GMT+0000 (Greenwich Mean Time) (33997ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_009.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 28 seconds │ │ Estimated: 1 minute, 29 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3332-create-new-project-as-pm-in-gc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3332-create-new-project-as-pm-in-gc-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3333-create-new-project-as-fu- (11 of 114) in-gc-company.spec.ts Estimated: 1 minute, 26 seconds Create New Project in General Contractor Company as Field User, using only mandatory data.Thu Aug 24 2023 06:46:49 GMT+0000 (Greenwich Mean Time) Create New Project in General Contractor Company as Field User, using only mandatory data.Thu Aug 24 2023 06:46:49 GMT+0000 (Greenwich Mean Time) √ EX-3333 - Create a project in General Contractor Company as Field UserThu Aug 24 2023 06:46:50 GMT+0000 (Greenwich Mean Time) (54292ms) √ EX-3333 - Create a project in General Contractor Company as Field UserThu Aug 24 2023 06:46:50 GMT+0000 (Greenwich Mean Time) (54292ms) √ EX-3333 - Cleanup...Thu Aug 24 2023 06:46:50 GMT+0000 (Greenwich Mean Time) (32518ms) √ EX-3333 - Cleanup...Thu Aug 24 2023 06:46:50 GMT+0000 (Greenwich Mean Time) (32518ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_010.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 27 seconds │ │ Estimated: 1 minute, 26 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3333-create-new-project-as-fu-in-gc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3333-create-new-project-as-fu-in-gc-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3334-create-new-project-as-pm- (12 of 114) in-owner-company.spec.ts Estimated: 1 minute, 25 seconds Create New Project in Owner Company as Project Manager, using only mandatory data.Thu Aug 24 2023 06:48:23 GMT+0000 (Greenwich Mean Time) Create New Project in Owner Company as Project Manager, using only mandatory data.Thu Aug 24 2023 06:48:23 GMT+0000 (Greenwich Mean Time) √ EX-3334 - Creaet a project in Owner Company as Project Manager. Thu Aug 24 2023 06:48:23 GMT+0000 (Greenwich Mean Time) (53073ms) √ EX-3334 - Creaet a project in Owner Company as Project Manager. Thu Aug 24 2023 06:48:23 GMT+0000 (Greenwich Mean Time) (53073ms) √ EX-3334 - Cleanup...Thu Aug 24 2023 06:48:23 GMT+0000 (Greenwich Mean Time) (35640ms) √ EX-3334 - Cleanup...Thu Aug 24 2023 06:48:23 GMT+0000 (Greenwich Mean Time) (35640ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_011.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 28 seconds │ │ Estimated: 1 minute, 25 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3334-create-new-project-as-pm-in-owner-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3334-create-new-project-as-pm-in-owner-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3335-create-new-project-as-fu- (13 of 114) in-owner-company.spec.ts Estimated: 1 minute, 30 seconds Create New Project in Owner Company as Field User, using only mandatory data.Thu Aug 24 2023 06:49:58 GMT+0000 (Greenwich Mean Time) Create New Project in Owner Company as Field User, using only mandatory data.Thu Aug 24 2023 06:49:58 GMT+0000 (Greenwich Mean Time) √ EX-3335 - Create a project in Owner Company as Field User.Thu Aug 24 2023 06:49:58 GMT+0000 (Greenwich Mean Time) (58519ms) √ EX-3335 - Create a project in Owner Company as Field User.Thu Aug 24 2023 06:49:58 GMT+0000 (Greenwich Mean Time) (58519ms) √ EX-3335 - Cleanup...Thu Aug 24 2023 06:49:58 GMT+0000 (Greenwich Mean Time) (50229ms) √ EX-3335 - Cleanup...Thu Aug 24 2023 06:49:58 GMT+0000 (Greenwich Mean Time) (50229ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_012.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 49 seconds │ │ Estimated: 1 minute, 30 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3335-create-new-project-as-fu-in-owner-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3335-create-new-project-as-fu-in-owner-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3336-create-new-project-as-adm (14 of 114) in-in-sc-company.spec.ts Estimated: 1 minute, 44 seconds Create New Project in SC Company as Admin, using only mandatory data.Thu Aug 24 2023 06:51:53 GMT+0000 (Greenwich Mean Time) Create New Project in SC Company as Admin, using only mandatory data.Thu Aug 24 2023 06:51:53 GMT+0000 (Greenwich Mean Time) √ EX-3336 - Create project in SC Company as Admin.Thu Aug 24 2023 06:51:53 GMT+0000 (Greenwich Mean Time) (58065ms) √ EX-3336 - Create project in SC Company as Admin.Thu Aug 24 2023 06:51:53 GMT+0000 (Greenwich Mean Time) (58065ms) √ EX-3336 - Cleanup...Thu Aug 24 2023 06:51:53 GMT+0000 (Greenwich Mean Time) (36199ms) √ EX-3336 - Cleanup...Thu Aug 24 2023 06:51:53 GMT+0000 (Greenwich Mean Time) (36199ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_013.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 34 seconds │ │ Estimated: 1 minute, 44 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3336-create-new-project-as-admin-in-sc-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3336-create-new-project-as-admin-in-sc-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3337-create-new-project-as-pm- (15 of 114) in-sc-company.spec.ts Estimated: 1 minute, 49 seconds Create New Project in SC Company as Project Manager, using only mandatory data.Thu Aug 24 2023 06:53:34 GMT+0000 (Greenwich Mean Time) Create New Project in SC Company as Project Manager, using only mandatory data.Thu Aug 24 2023 06:53:34 GMT+0000 (Greenwich Mean Time) √ EX-3337Thu Aug 24 2023 06:53:34 GMT+0000 (Greenwich Mean Time) (55267ms) √ EX-3337Thu Aug 24 2023 06:53:34 GMT+0000 (Greenwich Mean Time) (55267ms) √ EX-3337 - Cleanup...Thu Aug 24 2023 06:53:34 GMT+0000 (Greenwich Mean Time) (47112ms) √ EX-3337 - Cleanup...Thu Aug 24 2023 06:53:34 GMT+0000 (Greenwich Mean Time) (47112ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_014.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 42 seconds │ │ Estimated: 1 minute, 49 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3337-create-new-project-as-pm-in-sc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3337-create-new-project-as-pm-in-sc-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3338-create-new-project-as-fu- (16 of 114) in-sc-company.spec.ts Estimated: 1 minute, 40 seconds Create New Project in SC Company as Field User, using only mandatory data.Thu Aug 24 2023 06:55:23 GMT+0000 (Greenwich Mean Time) Create New Project in SC Company as Field User, using only mandatory data.Thu Aug 24 2023 06:55:23 GMT+0000 (Greenwich Mean Time) √ EX-3338 - Create a project in SC Company as Field User. Thu Aug 24 2023 06:55:23 GMT+0000 (Greenwich Mean Time) (52504ms) √ EX-3338 - Create a project in SC Company as Field User. Thu Aug 24 2023 06:55:23 GMT+0000 (Greenwich Mean Time) (52504ms) √ EX-3338 - Cleanup...Thu Aug 24 2023 06:55:23 GMT+0000 (Greenwich Mean Time) (34387ms) √ EX-3338 - Cleanup...Thu Aug 24 2023 06:55:23 GMT+0000 (Greenwich Mean Time) (34387ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_015.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 27 seconds │ │ Estimated: 1 minute, 40 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3338-create-new-project-as-fu-in-sc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3338-create-new-project-as-fu-in-sc-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3342-create-new-project-as-adm (17 of 114) in-in-other-company.spec.ts Estimated: 1 minute, 39 seconds Create New Project in Other Company as Admin, using only mandatory data.Thu Aug 24 2023 06:56:57 GMT+0000 (Greenwich Mean Time) Create New Project in Other Company as Admin, using only mandatory data.Thu Aug 24 2023 06:56:57 GMT+0000 (Greenwich Mean Time) √ EX-3342 - Create a project in Other Company as Admin. Thu Aug 24 2023 06:56:57 GMT+0000 (Greenwich Mean Time) (50156ms) √ EX-3342 - Create a project in Other Company as Admin. Thu Aug 24 2023 06:56:57 GMT+0000 (Greenwich Mean Time) (50156ms) √ EX-3342 - Cleanup...Thu Aug 24 2023 06:56:57 GMT+0000 (Greenwich Mean Time) (34915ms) √ EX-3342 - Cleanup...Thu Aug 24 2023 06:56:57 GMT+0000 (Greenwich Mean Time) (34915ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_016.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 25 seconds │ │ Estimated: 1 minute, 39 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3342-create-new-project-as-admin-in-other- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3342-create-new-project-as-admin-in-other-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3343-create-new-project-as-pm- (18 of 114) in-other-company.spec.ts Estimated: 1 minute, 43 seconds Create New Project in Other Company as Project Manager, using only mandatory data.Thu Aug 24 2023 06:58:29 GMT+0000 (Greenwich Mean Time) Create New Project in Other Company as Project Manager, using only mandatory data.Thu Aug 24 2023 06:58:29 GMT+0000 (Greenwich Mean Time) √ EX-3343 - Create a project in Other Company as Project Manager.Thu Aug 24 2023 06:58:29 GMT+0000 (Greenwich Mean Time) (59714ms) √ EX-3343 - Create a project in Other Company as Project Manager.Thu Aug 24 2023 06:58:29 GMT+0000 (Greenwich Mean Time) (59714ms) √ EX-3343 - Cleanup...Thu Aug 24 2023 06:58:29 GMT+0000 (Greenwich Mean Time) (34089ms) √ EX-3343 - Cleanup...Thu Aug 24 2023 06:58:29 GMT+0000 (Greenwich Mean Time) (34089ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_017.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 34 seconds │ │ Estimated: 1 minute, 43 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3343-create-new-project-as-pm-in-other-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3343-create-new-project-as-pm-in-other-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3344-create-new-project-as-fu- (19 of 114) in-other-company.spec.ts Estimated: 1 minute, 34 seconds Create New Project in Other Company as Field User, using only mandatory data.Thu Aug 24 2023 07:00:10 GMT+0000 (Greenwich Mean Time) Create New Project in Other Company as Field User, using only mandatory data.Thu Aug 24 2023 07:00:10 GMT+0000 (Greenwich Mean Time) √ EX-3344 - Create a project in Other Company as Field User. Thu Aug 24 2023 07:00:10 GMT+0000 (Greenwich Mean Time) (50884ms) √ EX-3344 - Create a project in Other Company as Field User. Thu Aug 24 2023 07:00:10 GMT+0000 (Greenwich Mean Time) (50884ms) √ EX-3344 - Cleanup...Thu Aug 24 2023 07:00:10 GMT+0000 (Greenwich Mean Time) (34228ms) √ EX-3344 - Cleanup...Thu Aug 24 2023 07:00:10 GMT+0000 (Greenwich Mean Time) (34228ms) 2 passing (1m) 2 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_018.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 25 seconds │ │ Estimated: 1 minute, 34 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3344-create-new-project-as-fu-in-other-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3344-create-new-project-as-fu-in-other-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Project_level/ex-10783-project-level-sent-logs-e (20 of 114) mail-for-GC-SC.spec.ts Estimated: 4 minutes, 27 seconds Permissions | Project Level | Default Settings on New Contracts | Set all permissions to False for all company users and verify the permissions are set for new contracts. Thu Aug 24 2023 07:01:42 GMT+0000 (Greenwich Mean Time) Permissions | Project Level | Default Settings on New Contracts | Set all permissions to False for all company users and verify the permissions are set for new contracts. Thu Aug 24 2023 07:01:42 GMT+0000 (Greenwich Mean Time) √ EX-10783 - Part 1: Create a project and add company users and change the default setting on new contracts to false Thu Aug 24 2023 07:01:42 GMT+0000 (Greenwich Mean Time) (102692ms) √ EX-10783 - Part 1: Create a project and add company users and change the default setting on new contracts to false Thu Aug 24 2023 07:01:42 GMT+0000 (Greenwich Mean Time) (102692ms) √ Ex-10783 Part 2: Create a new contract and verify the default permissions applied to contract (48390ms) √ Ex-10783 Part 2: Create a new contract and verify the default permissions applied to contract (48390ms) √ EX-10783 - Part 3: Set default permissions for new contractors to true Thu Aug 24 2023 07:01:42 GMT+0000 (Greenwich Mean Time) (86117ms) √ EX-10783 - Part 3: Set default permissions for new contractors to true Thu Aug 24 2023 07:01:42 GMT+0000 (Greenwich Mean Time) (86117ms) √ Ex-10783 Part 4: Create a new contract and verify the default permissions applied to contracts (40466ms) √ Ex-10783 Part 4: Create a new contract and verify the default permissions applied to contracts (40466ms) √ EX-10783 Part 5: Cleanup GC... Thu Aug 24 2023 07:01:42 GMT+0000 (Greenwich Mean Time) (5963ms) √ EX-10783 Part 5: Cleanup GC... Thu Aug 24 2023 07:01:42 GMT+0000 (Greenwich Mean Time) (5963ms) 5 passing (5m) 5 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_019.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 44 seconds │ │ Estimated: 4 minutes, 27 seconds │ │ Spec Ran: 02_PermissionLevels/Project_level/ex-10783-project-level-sent-logs-email-for-GC- │ │ SC.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Project_level\ex-10783-project-level-sent-logs-email-for-GC-SC.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Project_level/ex-10797-project-level-sent-logs-e (21 of 114) mail-for-GC-SC.spec.ts Estimated: 3 minutes, 48 seconds Permissions | Project Level | Sent Logs & Emails | Verify proper permissions are set in My Company Users per user role for both Customer and Contractor. Thu Aug 24 2023 07:06:33 GMT+0000 (Greenwich Mean Time) Permissions | Project Level | Sent Logs & Emails | Verify proper permissions are set in My Company Users per user role for both Customer and Contractor. Thu Aug 24 2023 07:06:33 GMT+0000 (Greenwich Mean Time) √ EX-10797 - Part 1: Create a project. Add company users and verify the defaiult permissions for the user Thu Aug 24 2023 07:06:33 GMT+0000 (Greenwich Mean Time) (53211ms) √ EX-10797 - Part 1: Create a project. Add company users and verify the defaiult permissions for the user Thu Aug 24 2023 07:06:33 GMT+0000 (Greenwich Mean Time) (53211ms) √ EX-10797 - Part 2: Login as SC Owner and accept the contract (27696ms) √ EX-10797 - Part 2: Login as SC Owner and accept the contract (27696ms) √ EX-10797 - Part 3: Login as SC Admin and accept the contract (24967ms) √ EX-10797 - Part 3: Login as SC Admin and accept the contract (24967ms) √ EX-10797 - Part 4: Login as SC PM user and accept the contract (24967ms) √ EX-10797 - Part 4: Login as SC PM user and accept the contract (24967ms) √ EX-10797 - Part 5: Login as SC Field user and accept the contract (25451ms) √ EX-10797 - Part 5: Login as SC Field user and accept the contract (25451ms) √ EX-10797 - Part 6: Login as SC Owner and verify sc users default permissions (64417ms) √ EX-10797 - Part 6: Login as SC Owner and verify sc users default permissions (64417ms) √ EX-10797 - Part 7: Cleanup GC... Thu Aug 24 2023 07:06:33 GMT+0000 (Greenwich Mean Time) (5803ms) √ EX-10797 - Part 7: Cleanup GC... Thu Aug 24 2023 07:06:33 GMT+0000 (Greenwich Mean Time) (5803ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_020.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 47 seconds │ │ Estimated: 3 minutes, 48 seconds │ │ Spec Ran: 02_PermissionLevels/Project_level/ex-10797-project-level-sent-logs-email-for-GC- │ │ SC.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Project_level\ex-10797-project-level-sent-logs-email-for-GC-SC.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9792-GC-account-owner-user-previll (22 of 114) eges.spec.ts Estimated: 2 minutes, 42 seconds User Role permissions| GC Account Owner | Login and verify users access privileges. Thu Aug 24 2023 07:10:28 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Account Owner | Login and verify users access privileges. Thu Aug 24 2023 07:10:28 GMT+0000 (Greenwich Mean Time) √ EX-9792 - Part 1: SignUp. Thu Aug 24 2023 07:10:28 GMT+0000 (Greenwich Mean Time) (22508ms) √ EX-9792 - Part 1: SignUp. Thu Aug 24 2023 07:10:28 GMT+0000 (Greenwich Mean Time) (22508ms) √ EX-9792 - Part 2: Verify the confirmation email. Thu Aug 24 2023 07:10:58 GMT+0000 (Greenwich Mean Time) √ EX-9792 - Part 2: Verify the confirmation email. Thu Aug 24 2023 07:10:58 GMT+0000 (Greenwich Mean Time) √ EX-9792 - Part 3: Create your account | Select, This is my company. Thu Aug 24 2023 07:11:05 GMT+0000 (Greenwich Mean Time) (38881ms) √ EX-9792 - Part 3: Create your account | Select, This is my company. Thu Aug 24 2023 07:11:05 GMT+0000 (Greenwich Mean Time) (38881ms) √ EX-9792 - Part 4: Change the role to Account owner Thu Aug 24 2023 07:11:50 GMT+0000 (Greenwich Mean Time) (28680ms) √ EX-9792 - Part 4: Change the role to Account owner Thu Aug 24 2023 07:11:50 GMT+0000 (Greenwich Mean Time) (28680ms) √ EX-9792 - Part 5: Login as GC Account Owner and verify user privilegesThu Aug 24 2023 07:11:50 GMT+0000 (Greenwich Mean Time) (64242ms) √ EX-9792 - Part 5: Login as GC Account Owner and verify user privilegesThu Aug 24 2023 07:11:50 GMT+0000 (Greenwich Mean Time) (64242ms) √ EX-9792 - Part 6: Delete the account from the company. Thu Aug 24 2023 07:11:50 GMT+0000 (Greenwich Mean Time) (15924ms) √ EX-9792 - Part 6: Delete the account from the company. Thu Aug 24 2023 07:11:50 GMT+0000 (Greenwich Mean Time) (15924ms) 6 passing (3m) 6 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_021.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 11 seconds │ │ Estimated: 2 minutes, 42 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9792-GC-account-owner-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9792-GC-account-owner-user-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9793-GC-Owner-project-previlleges. (23 of 114) spec.ts Estimated: 6 minutes, 1 second User Role permissions| GC Account owner | Login as GC Account owner and create project and verify user privilegesThu Aug 24 2023 07:13:47 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Account owner | Login as GC Account owner and create project and verify user privilegesThu Aug 24 2023 07:13:47 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 1: Create a project Thu Aug 24 2023 07:13:47 GMT+0000 (Greenwich Mean Time) (47068ms) √ EX-9793 - Part 1: Create a project Thu Aug 24 2023 07:13:47 GMT+0000 (Greenwich Mean Time) (47068ms) √ EX-9793 - Part 2: Edit the project details and change the nameThu Aug 24 2023 07:13:47 GMT+0000 (Greenwich Mean Time) (33219ms) √ EX-9793 - Part 2: Edit the project details and change the nameThu Aug 24 2023 07:13:47 GMT+0000 (Greenwich Mean Time) (33219ms) √ EX-9793 - Part 3: Add customer to the Project. Thu Aug 24 2023 07:13:47 GMT+0000 (Greenwich Mean Time) (40670ms) √ EX-9793 - Part 3: Add customer to the Project. Thu Aug 24 2023 07:13:47 GMT+0000 (Greenwich Mean Time) (40670ms) √ EX-9793 - Part 4: Verify the invitation email for customerThu Aug 24 2023 07:15:54 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 4: Verify the invitation email for customerThu Aug 24 2023 07:15:54 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 5: Add company user to the Project. Thu Aug 24 2023 07:16:01 GMT+0000 (Greenwich Mean Time) (44713ms) √ EX-9793 - Part 5: Add company user to the Project. Thu Aug 24 2023 07:16:01 GMT+0000 (Greenwich Mean Time) (44713ms) √ EX-9793 - Part 6: Verify company user can access project. Thu Aug 24 2023 07:16:01 GMT+0000 (Greenwich Mean Time) (27922ms) √ EX-9793 - Part 6: Verify company user can access project. Thu Aug 24 2023 07:16:01 GMT+0000 (Greenwich Mean Time) (27922ms) √ EX-9793 - Part 7: Add Contract with a user to the project. Thu Aug 24 2023 07:16:01 GMT+0000 (Greenwich Mean Time) (40287ms) √ EX-9793 - Part 7: Add Contract with a user to the project. Thu Aug 24 2023 07:16:01 GMT+0000 (Greenwich Mean Time) (40287ms) √ EX-9793 - Part 8: Verify email invitation for contractor user Thu Aug 24 2023 07:18:00 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 8: Verify email invitation for contractor user Thu Aug 24 2023 07:18:00 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 9: Add additional user to existing contract of the project. Thu Aug 24 2023 07:18:08 GMT+0000 (Greenwich Mean Time) (63834ms) √ EX-9793 - Part 9: Add additional user to existing contract of the project. Thu Aug 24 2023 07:18:08 GMT+0000 (Greenwich Mean Time) (63834ms) √ EX-9793 - Part 10: Verify email invitation for additional contract user Thu Aug 24 2023 07:19:16 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 10: Verify email invitation for additional contract user Thu Aug 24 2023 07:19:16 GMT+0000 (Greenwich Mean Time) √ Ex-9793 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 07:19:22 GMT+0000 (Greenwich Mean Time) (42250ms) √ Ex-9793 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 07:19:22 GMT+0000 (Greenwich Mean Time) (42250ms) √ EX-9793 - Part 12: Clean up Project Thu Aug 24 2023 07:19:22 GMT+0000 (Greenwich Mean Time) (41034ms) √ EX-9793 - Part 12: Clean up Project Thu Aug 24 2023 07:19:22 GMT+0000 (Greenwich Mean Time) (41034ms) 12 passing (7m) 12 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_022.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 59 seconds │ │ Estimated: 6 minutes, 1 second │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9793-GC-Owner-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9793-GC-Owner-project-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9828-GC-admin-user-previlleges.spe (24 of 114) c.ts Estimated: 2 minutes, 30 seconds User Role permissions| GC Admin | Login and verify users access privilegesThu Aug 24 2023 07:20:55 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Admin | Login and verify users access privilegesThu Aug 24 2023 07:20:55 GMT+0000 (Greenwich Mean Time) √ EX-9828 - Part 1: SignUp. Thu Aug 24 2023 07:20:55 GMT+0000 (Greenwich Mean Time) (21524ms) √ EX-9828 - Part 1: SignUp. Thu Aug 24 2023 07:20:55 GMT+0000 (Greenwich Mean Time) (21524ms) √ EX-9828 - Part 2: Verify the confirmation email. Thu Aug 24 2023 07:21:23 GMT+0000 (Greenwich Mean Time) √ EX-9828 - Part 2: Verify the confirmation email. Thu Aug 24 2023 07:21:23 GMT+0000 (Greenwich Mean Time) √ EX-9828 - Part 3: Create your account | Select, This is my company. Thu Aug 24 2023 07:21:30 GMT+0000 (Greenwich Mean Time) (25501ms) √ EX-9828 - Part 3: Create your account | Select, This is my company. Thu Aug 24 2023 07:21:30 GMT+0000 (Greenwich Mean Time) (25501ms) √ EX-9828 - Part 4: Change the role to Account Admin Thu Aug 24 2023 07:22:02 GMT+0000 (Greenwich Mean Time) (27407ms) √ EX-9828 - Part 4: Change the role to Account Admin Thu Aug 24 2023 07:22:02 GMT+0000 (Greenwich Mean Time) (27407ms) √ EX-9828 - Part 5: Login as GC Account Admin and verify user privilegesThu Aug 24 2023 07:22:02 GMT+0000 (Greenwich Mean Time) (72294ms) √ EX-9828 - Part 5: Login as GC Account Admin and verify user privilegesThu Aug 24 2023 07:22:02 GMT+0000 (Greenwich Mean Time) (72294ms) √ EX-9828 - Part 6: Delete the account from the company. Thu Aug 24 2023 07:22:02 GMT+0000 (Greenwich Mean Time) (23340ms) √ EX-9828 - Part 6: Delete the account from the company. Thu Aug 24 2023 07:22:02 GMT+0000 (Greenwich Mean Time) (23340ms) 6 passing (3m) 6 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_023.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 10 seconds │ │ Estimated: 2 minutes, 30 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9828-GC-admin-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9828-GC-admin-user-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9829-GC-PM-user-previlleges.spec.t (25 of 114) s Estimated: 2 minutes, 53 seconds User Role permissions| GC PM | Login and verify users access privilegesThu Aug 24 2023 07:24:14 GMT+0000 (Greenwich Mean Time) User Role permissions| GC PM | Login and verify users access privilegesThu Aug 24 2023 07:24:14 GMT+0000 (Greenwich Mean Time) √ EX-9829 - Part 1: SignUp. Thu Aug 24 2023 07:24:14 GMT+0000 (Greenwich Mean Time) (22065ms) √ EX-9829 - Part 1: SignUp. Thu Aug 24 2023 07:24:14 GMT+0000 (Greenwich Mean Time) (22065ms) √ EX-9829 - Part 2: Verify the confirmation email. Thu Aug 24 2023 07:24:43 GMT+0000 (Greenwich Mean Time) √ EX-9829 - Part 2: Verify the confirmation email. Thu Aug 24 2023 07:24:43 GMT+0000 (Greenwich Mean Time) √ EX-9829 - Part 3: Create your account | Select, This is my company. Thu Aug 24 2023 07:24:50 GMT+0000 (Greenwich Mean Time) (39730ms) √ EX-9829 - Part 3: Create your account | Select, This is my company. Thu Aug 24 2023 07:24:50 GMT+0000 (Greenwich Mean Time) (39730ms) √ EX-9829 - Part 4: Change the role to Project Manager Thu Aug 24 2023 07:25:36 GMT+0000 (Greenwich Mean Time) (26671ms) √ EX-9829 - Part 4: Change the role to Project Manager Thu Aug 24 2023 07:25:36 GMT+0000 (Greenwich Mean Time) (26671ms) √ EX-9829 - Part 5: Login as GC PM and verify user privilegesThu Aug 24 2023 07:25:36 GMT+0000 (Greenwich Mean Time) (65367ms) √ EX-9829 - Part 5: Login as GC PM and verify user privilegesThu Aug 24 2023 07:25:36 GMT+0000 (Greenwich Mean Time) (65367ms) √ EX-9829 - Part 6: Delete the account from the company. Thu Aug 24 2023 07:25:36 GMT+0000 (Greenwich Mean Time) (18947ms) √ EX-9829 - Part 6: Delete the account from the company. Thu Aug 24 2023 07:25:36 GMT+0000 (Greenwich Mean Time) (18947ms) 6 passing (3m) 6 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_024.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 14 seconds │ │ Estimated: 2 minutes, 53 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9829-GC-PM-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9829-GC-PM-user-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9830-GC-Field-user-previlleges.spe (26 of 114) c.ts Estimated: 2 minutes, 6 seconds User Role permissions| GC FieldUser | Login and verify users access privilegesThu Aug 24 2023 07:27:36 GMT+0000 (Greenwich Mean Time) User Role permissions| GC FieldUser | Login and verify users access privilegesThu Aug 24 2023 07:27:36 GMT+0000 (Greenwich Mean Time) √ EX-9830 - Part 1: SignUp. Thu Aug 24 2023 07:27:36 GMT+0000 (Greenwich Mean Time) (21396ms) √ EX-9830 - Part 1: SignUp. Thu Aug 24 2023 07:27:36 GMT+0000 (Greenwich Mean Time) (21396ms) √ EX-9830 - Part 2: Verify the confirmation email. Thu Aug 24 2023 07:28:04 GMT+0000 (Greenwich Mean Time) √ EX-9830 - Part 2: Verify the confirmation email. Thu Aug 24 2023 07:28:04 GMT+0000 (Greenwich Mean Time) √ EX-9830 - Part 3: Create your account | Select, This is my company. Thu Aug 24 2023 07:28:12 GMT+0000 (Greenwich Mean Time) (28235ms) √ EX-9830 - Part 3: Create your account | Select, This is my company. Thu Aug 24 2023 07:28:12 GMT+0000 (Greenwich Mean Time) (28235ms) √ EX-9830 - Part 4: Login as GC FU and verify user privilegesThu Aug 24 2023 07:28:46 GMT+0000 (Greenwich Mean Time) (34690ms) √ EX-9830 - Part 4: Login as GC FU and verify user privilegesThu Aug 24 2023 07:28:46 GMT+0000 (Greenwich Mean Time) (34690ms) √ EX-9830 - Part 5: Delete the account from the company. Thu Aug 24 2023 07:28:46 GMT+0000 (Greenwich Mean Time) (21193ms) √ EX-9830 - Part 5: Delete the account from the company. Thu Aug 24 2023 07:28:46 GMT+0000 (Greenwich Mean Time) (21193ms) 5 passing (2m) 5 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_025.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 6 seconds │ │ Estimated: 2 minutes, 6 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9830-GC-Field-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9830-GC-Field-user-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9832-SC-Field-users-user-previlleg (27 of 114) es.spec.ts Estimated: 5 minutes, 21 seconds User Role permissions| SC FU | Login and verify users access privilegesThu Aug 24 2023 07:29:51 GMT+0000 (Greenwich Mean Time) User Role permissions| SC FU | Login and verify users access privilegesThu Aug 24 2023 07:29:51 GMT+0000 (Greenwich Mean Time) √ EX-9832 - Part 1: Add Contractor with SC Field User to existing project. Thu Aug 24 2023 07:29:51 GMT+0000 (Greenwich Mean Time) (46434ms) √ EX-9832 - Part 1: Add Contractor with SC Field User to existing project. Thu Aug 24 2023 07:29:51 GMT+0000 (Greenwich Mean Time) (46434ms) √ EX-9832 - Part 2: SignUp. Thu Aug 24 2023 07:29:51 GMT+0000 (Greenwich Mean Time) (14581ms) √ EX-9832 - Part 2: SignUp. Thu Aug 24 2023 07:29:51 GMT+0000 (Greenwich Mean Time) (14581ms) √ EX-9832 - Part 3: Verify the confirmation email. Thu Aug 24 2023 07:30:58 GMT+0000 (Greenwich Mean Time) √ EX-9832 - Part 3: Verify the confirmation email. Thu Aug 24 2023 07:30:58 GMT+0000 (Greenwich Mean Time) √ EX-9832 - Part 4: Create your account | Select, This is my company. Thu Aug 24 2023 07:31:05 GMT+0000 (Greenwich Mean Time) (24526ms) √ EX-9832 - Part 4: Create your account | Select, This is my company. Thu Aug 24 2023 07:31:05 GMT+0000 (Greenwich Mean Time) (24526ms) √ EX-9832 - Part 5: Change the role to Field User Thu Aug 24 2023 07:31:35 GMT+0000 (Greenwich Mean Time) (25376ms) √ EX-9832 - Part 5: Change the role to Field User Thu Aug 24 2023 07:31:35 GMT+0000 (Greenwich Mean Time) (25376ms) √ EX-9832 - Part 6: Login as SC FU and verify user privilegesThu Aug 24 2023 07:31:35 GMT+0000 (Greenwich Mean Time) (30093ms) √ EX-9832 - Part 6: Login as SC FU and verify user privilegesThu Aug 24 2023 07:31:35 GMT+0000 (Greenwich Mean Time) (30093ms) √ EX-9832 - Part 7: Delete the account from the company. Thu Aug 24 2023 07:31:35 GMT+0000 (Greenwich Mean Time) (17580ms) √ EX-9832 - Part 7: Delete the account from the company. Thu Aug 24 2023 07:31:35 GMT+0000 (Greenwich Mean Time) (17580ms) √ EX-9832 - Part 8: Delete the contracts of existing Project Thu Aug 24 2023 07:31:35 GMT+0000 (Greenwich Mean Time) (37081ms) √ EX-9832 - Part 8: Delete the contracts of existing Project Thu Aug 24 2023 07:31:35 GMT+0000 (Greenwich Mean Time) (37081ms) 8 passing (4m) 8 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_026.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 35 seconds │ │ Estimated: 5 minutes, 21 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9832-SC-Field-users-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9832-SC-Field-users-user-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9833-SC-PM-user-previlleges.spec.t (28 of 114) s Estimated: 3 minutes, 51 seconds User Role permissions| SC PM | Login and verify users access privilegesThu Aug 24 2023 07:33:34 GMT+0000 (Greenwich Mean Time) User Role permissions| SC PM | Login and verify users access privilegesThu Aug 24 2023 07:33:34 GMT+0000 (Greenwich Mean Time) √ EX-9833 - Part 1: Add Contractor with SC PM to existing project. Thu Aug 24 2023 07:33:34 GMT+0000 (Greenwich Mean Time) (48469ms) √ EX-9833 - Part 1: Add Contractor with SC PM to existing project. Thu Aug 24 2023 07:33:34 GMT+0000 (Greenwich Mean Time) (48469ms) √ EX-9833 - Part 2: SignUp. Thu Aug 24 2023 07:33:34 GMT+0000 (Greenwich Mean Time) (14845ms) √ EX-9833 - Part 2: SignUp. Thu Aug 24 2023 07:33:34 GMT+0000 (Greenwich Mean Time) (14845ms) √ EX-9833 - Part 3: Verify the confirmation email. Thu Aug 24 2023 07:34:46 GMT+0000 (Greenwich Mean Time) √ EX-9833 - Part 3: Verify the confirmation email. Thu Aug 24 2023 07:34:46 GMT+0000 (Greenwich Mean Time) 1) EX-9833 - Part 4: Create your account | Select, This is my company. Thu Aug 24 2023 07:34:53 GMT+0000 (Greenwich Mean Time) 1) EX-9833 - Part 4: Create your account | Select, This is my company. Thu Aug 24 2023 07:34:53 GMT+0000 (Greenwich Mean Time) 2) EX-9833 - Part 5: Change the role to PM Thu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time) 2) EX-9833 - Part 5: Change the role to PM Thu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time) 3) EX-9833 - Part 6: Login as SC PM and verify user privilegesThu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time) 3) EX-9833 - Part 6: Login as SC PM and verify user privilegesThu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time) 4) EX-9833 - Part 7: Delete the account from the company. Thu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time) 4) EX-9833 - Part 7: Delete the account from the company. Thu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time) √ EX-9833 - Part 8: Delete the contracts of existing Project Thu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time) (49788ms) √ EX-9833 - Part 8: Delete the contracts of existing Project Thu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time) (49788ms) 4 passing (6m) 4 failing 1) User Role permissions| SC PM | Login and verify users access privilegesThu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time) EX-9833 - Part 4: Create your account | Select, This is my company. Thu Aug 24 2023 07:34:53 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'ProjectManager Account' within the selector: '[style='display: inline-flex; flex: 0 0 auto;'] > .MuiButtonBase-root > .MuiButton-label' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34) 2) User Role permissions| SC PM | Login and verify users access privilegesThu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time) EX-9833 - Part 5: Change the role to PM Thu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'sc.pm1692862414959@urpsc.com' within the element: but never did. at settingsManageUsers.changeTheUserRole (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Settings_ManageUsers.ts:29:19) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9833-SC-PM-user-previlleges.spec.ts:141:22) 3) User Role permissions| SC PM | Login and verify users access privilegesThu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time) EX-9833 - Part 6: Login as SC PM and verify user privilegesThu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `button[data-cy='logoButton'] img`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:342:19) 4) User Role permissions| SC PM | Login and verify users access privilegesThu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time) EX-9833 - Part 7: Delete the account from the company. Thu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'sc.pm1692862414959@urpsc.com' but never did. at settingsManageUsers.deleteUser (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Settings_ManageUsers.ts:16:11) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9833-SC-PM-user-previlleges.spec.ts:218:22) 4 passing (6m) 4 failing 1) User Role permissions| SC PM | Login and verify users access privilegesThu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time) EX-9833 - Part 4: Create your account | Select, This is my company. Thu Aug 24 2023 07:34:53 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'ProjectManager Account' within the selector: '[style='display: inline-flex; flex: 0 0 auto;'] > .MuiButtonBase-root > .MuiButton-label' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34) 2) User Role permissions| SC PM | Login and verify users access privilegesThu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time) EX-9833 - Part 5: Change the role to PM Thu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'sc.pm1692862414959@urpsc.com' within the element: but never did. at settingsManageUsers.changeTheUserRole (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Settings_ManageUsers.ts:29:19) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9833-SC-PM-user-previlleges.spec.ts:141:22) 3) User Role permissions| SC PM | Login and verify users access privilegesThu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time) EX-9833 - Part 6: Login as SC PM and verify user privilegesThu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `button[data-cy='logoButton'] img`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:342:19) 4) User Role permissions| SC PM | Login and verify users access privilegesThu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time) EX-9833 - Part 7: Delete the account from the company. Thu Aug 24 2023 07:36:03 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'sc.pm1692862414959@urpsc.com' but never did. at settingsManageUsers.deleteUser (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Settings_ManageUsers.ts:16:11) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9833-SC-PM-user-previlleges.spec.ts:218:22) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_027.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 4 │ │ Failing: 4 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 4 │ │ Video: true │ │ Duration: 5 minutes, 41 seconds │ │ Estimated: 3 minutes, 51 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9833-SC-PM-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9833-SC-PM-user-previlleges.spec.ts\User Role permiss ions SC PM Login and verify users access privilegesThu Aug 24 2023 073453 GMT+0 000 (Greenwich Mean Time) -- EX-9833 - Part 4 Create your account Select, This is my company. Thu Aug 24 2023 073453 GMT+0000 (Greenwich Mean Time) (fai.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9833-SC-PM-user-previlleges.spec.ts\User Role permiss ions SC PM Login and verify users access privilegesThu Aug 24 2023 073603 GMT+0 000 (Greenwich Mean Time) -- EX-9833 - Part 5 Change the role to PM Thu Aug 24 2 023 073603 GMT+0000 (Greenwich Mean Time) (failed).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9833-SC-PM-user-previlleges.spec.ts\User Role permiss ions SC PM Login and verify users access privilegesThu Aug 24 2023 073603 GMT+0 000 (Greenwich Mean Time) -- EX-9833 - Part 6 Login as SC PM and verify user pri vilegesThu Aug 24 2023 073603 GMT+0000 (Greenwich Mean Time) (failed).png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9833-SC-PM-user-previlleges.spec.ts\User Role permiss ions SC PM Login and verify users access privilegesThu Aug 24 2023 073603 GMT+0 000 (Greenwich Mean Time) -- EX-9833 - Part 7 Delete the account from the compan y. Thu Aug 24 2023 073603 GMT+0000 (Greenwich Mean Time) (failed).png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 16% Compression progress: 34% Compression progress: 53% Compression progress: 71% Compression progress: 89% - Finished compressing: 1 minute, 6 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9833-SC-PM-user-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9833-SC-PM-user-previlleges.spec.ts\User Role permissions SC PM Login and verify users access privilegesThu Aug 24 2023 073603 GMT+0000 (Greenwich Mean Time) -- EX-9833 - Part 6 Login as SC PM and verify user privilegesThu Aug 24 2023 073603 GMT+0000 (Greenwich Mean Time) (failed).png - Done Uploading (2/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9833-SC-PM-user-previlleges.spec.ts\User Role permissions SC PM Login and verify users access privilegesThu Aug 24 2023 073603 GMT+0000 (Greenwich Mean Time) -- EX-9833 - Part 7 Delete the account from the company. Thu Aug 24 2023 073603 GMT+0000 (Greenwich Mean Time) (failed).png - Done Uploading (3/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9833-SC-PM-user-previlleges.spec.ts\User Role permissions SC PM Login and verify users access privilegesThu Aug 24 2023 073603 GMT+0000 (Greenwich Mean Time) -- EX-9833 - Part 5 Change the role to PM Thu Aug 24 2023 073603 GMT+0000 (Greenwich Mean Time) (failed).png - Done Uploading (4/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9833-SC-PM-user-previlleges.spec.ts\User Role permissions SC PM Login and verify users access privilegesThu Aug 24 2023 073453 GMT+0000 (Greenwich Mean Time) -- EX-9833 - Part 4 Create your account Select, This is my company. Thu Aug 24 2023 073453 GMT+0000 (Greenwich Mean Time) (fai.png - Done Uploading (5/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9833-SC-PM-user-previlleges.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9834-SC-Admin-user-previlleges.spe (29 of 114) c.ts Estimated: 3 minutes, 54 seconds User Role permissions| SC Admin | Login and verify users access privilegesThu Aug 24 2023 07:40:35 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Admin | Login and verify users access privilegesThu Aug 24 2023 07:40:35 GMT+0000 (Greenwich Mean Time) √ EX-9834 - Part 1: Add Contractor with SC Admin to existing project. Thu Aug 24 2023 07:40:35 GMT+0000 (Greenwich Mean Time) (47500ms) √ EX-9834 - Part 1: Add Contractor with SC Admin to existing project. Thu Aug 24 2023 07:40:35 GMT+0000 (Greenwich Mean Time) (47500ms) √ EX-9834 - Part 2: SignUp. Thu Aug 24 2023 07:40:35 GMT+0000 (Greenwich Mean Time) (14196ms) √ EX-9834 - Part 2: SignUp. Thu Aug 24 2023 07:40:35 GMT+0000 (Greenwich Mean Time) (14196ms) √ EX-9834 - Part 3: Verify the confirmation email. Thu Aug 24 2023 07:41:45 GMT+0000 (Greenwich Mean Time) √ EX-9834 - Part 3: Verify the confirmation email. Thu Aug 24 2023 07:41:45 GMT+0000 (Greenwich Mean Time) √ EX-9834 - Part 4: Create your account | Select, This is my company. Thu Aug 24 2023 07:41:52 GMT+0000 (Greenwich Mean Time) (39316ms) √ EX-9834 - Part 4: Create your account | Select, This is my company. Thu Aug 24 2023 07:41:52 GMT+0000 (Greenwich Mean Time) (39316ms) √ EX-9834 - Part 5: Change the role to Admin Thu Aug 24 2023 07:42:38 GMT+0000 (Greenwich Mean Time) (26181ms) √ EX-9834 - Part 5: Change the role to Admin Thu Aug 24 2023 07:42:38 GMT+0000 (Greenwich Mean Time) (26181ms) √ EX-9834 - Part 6: Login as SC Admin and verify user privilegesThu Aug 24 2023 07:42:38 GMT+0000 (Greenwich Mean Time) (56781ms) √ EX-9834 - Part 6: Login as SC Admin and verify user privilegesThu Aug 24 2023 07:42:38 GMT+0000 (Greenwich Mean Time) (56781ms) √ EX-9834 - Part 7: Delete the account from the company. Thu Aug 24 2023 07:42:38 GMT+0000 (Greenwich Mean Time) (16651ms) √ EX-9834 - Part 7: Delete the account from the company. Thu Aug 24 2023 07:42:38 GMT+0000 (Greenwich Mean Time) (16651ms) √ EX-9834 - Part 8: Delete the contracts of existing Project Thu Aug 24 2023 07:42:38 GMT+0000 (Greenwich Mean Time) (36602ms) √ EX-9834 - Part 8: Delete the contracts of existing Project Thu Aug 24 2023 07:42:38 GMT+0000 (Greenwich Mean Time) (36602ms) 8 passing (4m) 8 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_028.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 19 seconds │ │ Estimated: 3 minutes, 54 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9834-SC-Admin-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9834-SC-Admin-user-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9835-SC-account-owner-user-previll (30 of 114) eges.spec.ts Estimated: 4 minutes, 6 seconds User Role permissions| SC Account Owner | Login and verify users access privilegesThu Aug 24 2023 07:45:02 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Account Owner | Login and verify users access privilegesThu Aug 24 2023 07:45:02 GMT+0000 (Greenwich Mean Time) √ EX-9835 - Part 1: Add Contractor with SC Account owner to existing project. Thu Aug 24 2023 07:45:02 GMT+0000 (Greenwich Mean Time) (44830ms) √ EX-9835 - Part 1: Add Contractor with SC Account owner to existing project. Thu Aug 24 2023 07:45:02 GMT+0000 (Greenwich Mean Time) (44830ms) √ EX-9835 - Part 2: SignUp. Thu Aug 24 2023 07:45:02 GMT+0000 (Greenwich Mean Time) (14449ms) √ EX-9835 - Part 2: SignUp. Thu Aug 24 2023 07:45:02 GMT+0000 (Greenwich Mean Time) (14449ms) √ EX-9835 - Part 3: Verify the confirmation email. Thu Aug 24 2023 07:46:08 GMT+0000 (Greenwich Mean Time) √ EX-9835 - Part 3: Verify the confirmation email. Thu Aug 24 2023 07:46:08 GMT+0000 (Greenwich Mean Time) √ EX-9835 - Part 4: Create your account | Select, This is my company. Thu Aug 24 2023 07:46:15 GMT+0000 (Greenwich Mean Time) (38595ms) √ EX-9835 - Part 4: Create your account | Select, This is my company. Thu Aug 24 2023 07:46:15 GMT+0000 (Greenwich Mean Time) (38595ms) √ EX-9835 - Part 5: Change the role to Account owner Thu Aug 24 2023 07:46:59 GMT+0000 (Greenwich Mean Time) (24605ms) √ EX-9835 - Part 5: Change the role to Account owner Thu Aug 24 2023 07:46:59 GMT+0000 (Greenwich Mean Time) (24605ms) √ EX-9835 - Part 6: Login as SC Account Owner and verify user privilegesThu Aug 24 2023 07:46:59 GMT+0000 (Greenwich Mean Time) (55128ms) √ EX-9835 - Part 6: Login as SC Account Owner and verify user privilegesThu Aug 24 2023 07:46:59 GMT+0000 (Greenwich Mean Time) (55128ms) √ EX-9835 - Part 7: Delete the account from the company. Thu Aug 24 2023 07:46:59 GMT+0000 (Greenwich Mean Time) (15918ms) √ EX-9835 - Part 7: Delete the account from the company. Thu Aug 24 2023 07:46:59 GMT+0000 (Greenwich Mean Time) (15918ms) √ EX-9835 - Part 8: Delete the contracts of existing Project Thu Aug 24 2023 07:46:59 GMT+0000 (Greenwich Mean Time) (36602ms) √ EX-9835 - Part 8: Delete the contracts of existing Project Thu Aug 24 2023 07:46:59 GMT+0000 (Greenwich Mean Time) (36602ms) 8 passing (4m) 8 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_029.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 9 seconds │ │ Estimated: 4 minutes, 6 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9835-SC-account-owner-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9835-SC-account-owner-user-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges. (31 of 114) spec.ts Estimated: 8 minutes, 9 seconds User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesThu Aug 24 2023 07:49:20 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesThu Aug 24 2023 07:49:20 GMT+0000 (Greenwich Mean Time) √ EX-9885 - Part 1: Create a project Thu Aug 24 2023 07:49:20 GMT+0000 (Greenwich Mean Time) (55183ms) √ EX-9885 - Part 1: Create a project Thu Aug 24 2023 07:49:20 GMT+0000 (Greenwich Mean Time) (55183ms) √ EX-9885 - Part 2: Edit the project details and change the nameThu Aug 24 2023 07:49:20 GMT+0000 (Greenwich Mean Time) (44686ms) √ EX-9885 - Part 2: Edit the project details and change the nameThu Aug 24 2023 07:49:20 GMT+0000 (Greenwich Mean Time) (44686ms) √ EX-9885 - Part 3: Add customer to the Project. Thu Aug 24 2023 07:49:20 GMT+0000 (Greenwich Mean Time) (41877ms) √ EX-9885 - Part 3: Add customer to the Project. Thu Aug 24 2023 07:49:20 GMT+0000 (Greenwich Mean Time) (41877ms) √ EX-9885 - Part 4: Verify the invitation email for customerThu Aug 24 2023 07:51:48 GMT+0000 (Greenwich Mean Time) √ EX-9885 - Part 4: Verify the invitation email for customerThu Aug 24 2023 07:51:48 GMT+0000 (Greenwich Mean Time) √ EX-9885 - Part 5: Add company user to the Project. Thu Aug 24 2023 07:51:54 GMT+0000 (Greenwich Mean Time) (57574ms) √ EX-9885 - Part 5: Add company user to the Project. Thu Aug 24 2023 07:51:54 GMT+0000 (Greenwich Mean Time) (57574ms) √ EX-9885 - Part 6: Verify company user can access project. Thu Aug 24 2023 07:51:54 GMT+0000 (Greenwich Mean Time) (25153ms) √ EX-9885 - Part 6: Verify company user can access project. Thu Aug 24 2023 07:51:54 GMT+0000 (Greenwich Mean Time) (25153ms) √ EX-9885 - Part 7: Add Contract with a user to the project. Thu Aug 24 2023 07:51:54 GMT+0000 (Greenwich Mean Time) (42896ms) √ EX-9885 - Part 7: Add Contract with a user to the project. Thu Aug 24 2023 07:51:54 GMT+0000 (Greenwich Mean Time) (42896ms) √ EX-9885 - Part 8: Verify email invitation for contractor user Thu Aug 24 2023 07:54:06 GMT+0000 (Greenwich Mean Time) √ EX-9885 - Part 8: Verify email invitation for contractor user Thu Aug 24 2023 07:54:06 GMT+0000 (Greenwich Mean Time) √ EX-9885 - Part 9: Add additiona user to existing contract of the project. Thu Aug 24 2023 07:54:12 GMT+0000 (Greenwich Mean Time) (64945ms) √ EX-9885 - Part 9: Add additiona user to existing contract of the project. Thu Aug 24 2023 07:54:12 GMT+0000 (Greenwich Mean Time) (64945ms) √ EX-9885 - Part 10: Verify email invitation for additional contract user Thu Aug 24 2023 07:55:21 GMT+0000 (Greenwich Mean Time) √ EX-9885 - Part 10: Verify email invitation for additional contract user Thu Aug 24 2023 07:55:21 GMT+0000 (Greenwich Mean Time) √ Ex-9885 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 07:55:26 GMT+0000 (Greenwich Mean Time) (50095ms) √ Ex-9885 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 07:55:26 GMT+0000 (Greenwich Mean Time) (50095ms) √ EX-9885 - Part12: Clean up Project Thu Aug 24 2023 07:55:26 GMT+0000 (Greenwich Mean Time) (34232ms) √ EX-9885 - Part12: Clean up Project Thu Aug 24 2023 07:55:26 GMT+0000 (Greenwich Mean Time) (34232ms) 12 passing (8m) 12 passing (8m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_030.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 31 seconds │ │ Estimated: 8 minutes, 9 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9886-GC-PM-project-previlleges.spe (32 of 114) c.ts Estimated: 7 minutes, 41 seconds User Role permissions| GC PM | Login as GC PM and create project and verify user privilegesThu Aug 24 2023 07:56:58 GMT+0000 (Greenwich Mean Time) User Role permissions| GC PM | Login as GC PM and create project and verify user privilegesThu Aug 24 2023 07:56:58 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 1: Create a project Thu Aug 24 2023 07:56:58 GMT+0000 (Greenwich Mean Time) (56439ms) √ EX-9886 - Part 1: Create a project Thu Aug 24 2023 07:56:58 GMT+0000 (Greenwich Mean Time) (56439ms) √ EX-9886 - Part 2: Edit the project details and change the nameThu Aug 24 2023 07:56:58 GMT+0000 (Greenwich Mean Time) (36972ms) √ EX-9886 - Part 2: Edit the project details and change the nameThu Aug 24 2023 07:56:58 GMT+0000 (Greenwich Mean Time) (36972ms) √ EX-9886 - Part 3: Add customer to the Project. Thu Aug 24 2023 07:56:58 GMT+0000 (Greenwich Mean Time) (40972ms) √ EX-9886 - Part 3: Add customer to the Project. Thu Aug 24 2023 07:56:58 GMT+0000 (Greenwich Mean Time) (40972ms) √ EX-9886 - Part 4: Verify the invitation email for customerThu Aug 24 2023 07:59:19 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 4: Verify the invitation email for customerThu Aug 24 2023 07:59:19 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 5: Add company user to the Project. Thu Aug 24 2023 07:59:25 GMT+0000 (Greenwich Mean Time) (48931ms) √ EX-9886 - Part 5: Add company user to the Project. Thu Aug 24 2023 07:59:25 GMT+0000 (Greenwich Mean Time) (48931ms) √ EX-9886 - Part 6: Verify company user can access project. Thu Aug 24 2023 07:59:25 GMT+0000 (Greenwich Mean Time) (25349ms) √ EX-9886 - Part 6: Verify company user can access project. Thu Aug 24 2023 07:59:25 GMT+0000 (Greenwich Mean Time) (25349ms) √ EX-9886 - Part 7: Add Contract with a user to the project. Thu Aug 24 2023 07:59:25 GMT+0000 (Greenwich Mean Time) (40523ms) √ EX-9886 - Part 7: Add Contract with a user to the project. Thu Aug 24 2023 07:59:25 GMT+0000 (Greenwich Mean Time) (40523ms) √ EX-9886 - Part 8: Verify email invitation for contractor user Thu Aug 24 2023 08:01:26 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 8: Verify email invitation for contractor user Thu Aug 24 2023 08:01:26 GMT+0000 (Greenwich Mean Time) 1) EX-9886 - Part 9: Add additional user to existing contract of the project. Thu Aug 24 2023 08:01:32 GMT+0000 (Greenwich Mean Time) 1) EX-9886 - Part 9: Add additional user to existing contract of the project. Thu Aug 24 2023 08:01:32 GMT+0000 (Greenwich Mean Time) 2) EX-9886 - Part 10: Verify email invitation for additional contract user Thu Aug 24 2023 08:02:36 GMT+0000 (Greenwich Mean Time) 2) EX-9886 - Part 10: Verify email invitation for additional contract user Thu Aug 24 2023 08:02:36 GMT+0000 (Greenwich Mean Time) √ Ex-9886 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 08:03:11 GMT+0000 (Greenwich Mean Time) (45188ms) √ Ex-9886 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 08:03:11 GMT+0000 (Greenwich Mean Time) (45188ms) √ EX-9886 - Part 12: Clean up Project Thu Aug 24 2023 08:03:11 GMT+0000 (Greenwich Mean Time) (34604ms) √ EX-9886 - Part 12: Clean up Project Thu Aug 24 2023 08:03:11 GMT+0000 (Greenwich Mean Time) (34604ms) 10 passing (8m) 2 failing 1) User Role permissions| GC PM | Login as GC PM and create project and verify user privilegesThu Aug 24 2023 08:03:11 GMT+0000 (Greenwich Mean Time) EX-9886 - Part 9: Add additional user to existing contract of the project. Thu Aug 24 2023 08:01:32 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: '1 of 1' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 2) User Role permissions| GC PM | Login as GC PM and create project and verify user privilegesThu Aug 24 2023 08:03:11 GMT+0000 (Greenwich Mean Time) EX-9886 - Part 10: Verify email invitation for additional contract user Thu Aug 24 2023 08:02:36 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9886 1692863818207' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9886-GC-PM-project-previlleges.spec.ts:154:28) 10 passing (8m) 2 failing 1) User Role permissions| GC PM | Login as GC PM and create project and verify user privilegesThu Aug 24 2023 08:03:11 GMT+0000 (Greenwich Mean Time) EX-9886 - Part 9: Add additional user to existing contract of the project. Thu Aug 24 2023 08:01:32 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: '1 of 1' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 2) User Role permissions| GC PM | Login as GC PM and create project and verify user privilegesThu Aug 24 2023 08:03:11 GMT+0000 (Greenwich Mean Time) EX-9886 - Part 10: Verify email invitation for additional contract user Thu Aug 24 2023 08:02:36 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9886 1692863818207' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9886-GC-PM-project-previlleges.spec.ts:154:28) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_031.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 10 │ │ Failing: 2 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 2 │ │ Video: true │ │ Duration: 7 minutes, 33 seconds │ │ Estimated: 7 minutes, 41 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9886-GC-PM-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9886-GC-PM-project-previlleges.spec.ts\User Role perm issions GC PM Login as GC PM and create project and verify user privilegesThu A ug 24 2023 080132 GMT+0000 (Greenwich Mean Time) -- EX-9886 - Part 9 Add additio nal user to existing contract of the project. Thu Aug 24 2023 080132 GMT+000.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9886-GC-PM-project-previlleges.spec.ts\User Role perm issions GC PM Login as GC PM and create project and verify user privilegesThu A ug 24 2023 080236 GMT+0000 (Greenwich Mean Time) -- EX-9886 - Part 10 Verify ema il invitation for additional contract user Thu Aug 24 2023 080236 GMT+0000 (.png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 13% Compression progress: 26% Compression progress: 40% Compression progress: 52% Compression progress: 65% Compression progress: 79% Compression progress: 93% - Finished compressing: 1 minute, 22 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9886-GC-PM-project-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9886-GC-PM-project-previlleges.spec.ts\User Role permissions GC PM Login as GC PM and create project and verify user privilegesThu Aug 24 2023 080236 GMT+0000 (Greenwich Mean Time) -- EX-9886 - Part 10 Verify email invitation for additional contract user Thu Aug 24 2023 080236 GMT+0000 (.png - Done Uploading (2/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9886-GC-PM-project-previlleges.spec.ts\User Role permissions GC PM Login as GC PM and create project and verify user privilegesThu Aug 24 2023 080132 GMT+0000 (Greenwich Mean Time) -- EX-9886 - Part 9 Add additional user to existing contract of the project. Thu Aug 24 2023 080132 GMT+000.png - Done Uploading (3/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9886-GC-PM-project-previlleges.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges. (33 of 114) spec.ts Estimated: 6 minutes, 27 seconds User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesThu Aug 24 2023 08:06:03 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesThu Aug 24 2023 08:06:03 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 1: Create a project Thu Aug 24 2023 08:06:03 GMT+0000 (Greenwich Mean Time) (17568ms) √ EX-9887 - Part 1: Create a project Thu Aug 24 2023 08:06:03 GMT+0000 (Greenwich Mean Time) (17568ms) √ EX-9887 - Part 2: Edit the project details and change the nameThu Aug 24 2023 08:06:03 GMT+0000 (Greenwich Mean Time) (37813ms) √ EX-9887 - Part 2: Edit the project details and change the nameThu Aug 24 2023 08:06:03 GMT+0000 (Greenwich Mean Time) (37813ms) √ EX-9887 - Part 3: Add customer to the Project. Thu Aug 24 2023 08:06:03 GMT+0000 (Greenwich Mean Time) (38737ms) √ EX-9887 - Part 3: Add customer to the Project. Thu Aug 24 2023 08:06:03 GMT+0000 (Greenwich Mean Time) (38737ms) √ EX-9887 - Part 4: Verify the invitation email for customerThu Aug 24 2023 08:07:43 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 4: Verify the invitation email for customerThu Aug 24 2023 08:07:43 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 5: Add company user to the Project. Thu Aug 24 2023 08:07:49 GMT+0000 (Greenwich Mean Time) (53789ms) √ EX-9887 - Part 5: Add company user to the Project. Thu Aug 24 2023 08:07:49 GMT+0000 (Greenwich Mean Time) (53789ms) √ EX-9887 - Part 6: Verify company user can access project. Thu Aug 24 2023 08:07:49 GMT+0000 (Greenwich Mean Time) (30001ms) √ EX-9887 - Part 6: Verify company user can access project. Thu Aug 24 2023 08:07:49 GMT+0000 (Greenwich Mean Time) (30001ms) √ EX-9887 - Part 7: Add Contract with a user to the project. Thu Aug 24 2023 08:07:49 GMT+0000 (Greenwich Mean Time) (42517ms) √ EX-9887 - Part 7: Add Contract with a user to the project. Thu Aug 24 2023 08:07:49 GMT+0000 (Greenwich Mean Time) (42517ms) √ EX-9887 - Part 8: Verify email invitation for contractor user Thu Aug 24 2023 08:10:00 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 8: Verify email invitation for contractor user Thu Aug 24 2023 08:10:00 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 9: Add additiona user to existing contract of the project. Thu Aug 24 2023 08:10:06 GMT+0000 (Greenwich Mean Time) (44411ms) √ EX-9887 - Part 9: Add additiona user to existing contract of the project. Thu Aug 24 2023 08:10:06 GMT+0000 (Greenwich Mean Time) (44411ms) √ EX-9887 - Part 10: Verify email invitation for additional contract user Thu Aug 24 2023 08:10:54 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 10: Verify email invitation for additional contract user Thu Aug 24 2023 08:10:54 GMT+0000 (Greenwich Mean Time) √ Ex-9887 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 08:10:58 GMT+0000 (Greenwich Mean Time) (40707ms) √ Ex-9887 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 08:10:58 GMT+0000 (Greenwich Mean Time) (40707ms) √ EX-9887 - Part 12: Clean up Project Thu Aug 24 2023 08:10:58 GMT+0000 (Greenwich Mean Time) (36407ms) √ EX-9887 - Part 12: Clean up Project Thu Aug 24 2023 08:10:58 GMT+0000 (Greenwich Mean Time) (36407ms) 12 passing (6m) 12 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_032.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 13 seconds │ │ Estimated: 6 minutes, 27 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9887-SC-Admin-project-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9888-GC-FU-project-previlleges.spe (34 of 114) c.ts Estimated: 5 minutes, 12 seconds User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:12:23 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:12:23 GMT+0000 (Greenwich Mean Time) 1) EX-9888 - Part 1: Create a project Thu Aug 24 2023 08:12:23 GMT+0000 (Greenwich Mean Time) 1) EX-9888 - Part 1: Create a project Thu Aug 24 2023 08:12:23 GMT+0000 (Greenwich Mean Time) 2) EX-9888 - Part 2: Edit the project details and change the nameThu Aug 24 2023 08:12:23 GMT+0000 (Greenwich Mean Time) 2) EX-9888 - Part 2: Edit the project details and change the nameThu Aug 24 2023 08:12:23 GMT+0000 (Greenwich Mean Time) 3) EX-9888 - Part 3: Add customer to the Project. Thu Aug 24 2023 08:12:23 GMT+0000 (Greenwich Mean Time) 3) EX-9888 - Part 3: Add customer to the Project. Thu Aug 24 2023 08:12:23 GMT+0000 (Greenwich Mean Time) 4) EX-9888 - Part 4: Verify the invitation email for customerThu Aug 24 2023 08:15:38 GMT+0000 (Greenwich Mean Time) 4) EX-9888 - Part 4: Verify the invitation email for customerThu Aug 24 2023 08:15:38 GMT+0000 (Greenwich Mean Time) 5) EX-9888 - Part 5: Add company user to the Project. Thu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) 5) EX-9888 - Part 5: Add company user to the Project. Thu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) 6) EX-9888 - Part 6: Verify company user can access project. Thu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) 6) EX-9888 - Part 6: Verify company user can access project. Thu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) 7) EX-9888 - Part 7: Add Contract should be in disabled state Thu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) 7) EX-9888 - Part 7: Add Contract should be in disabled state Thu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) 8) Ex-9888 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) 8) Ex-9888 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) 9) EX-9888 - Part 9: Clean up Project Thu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) 9) EX-9888 - Part 9: Clean up Project Thu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) 0 passing (9m) 9 failing 1) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) EX-9888 - Part 1: Create a project Thu Aug 24 2023 08:12:23 GMT+0000 (Greenwich Mean Time): CypressError: Timed out retrying after 30000ms: `cy.contains()` failed because it requires a DOM element, window or document. No elements in the current DOM matched your query: > cy.get(div[role='alert']) at isElement (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144409:62) at validateType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144267:14) at Object.isType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144298:7) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:131592:22) at Object.subjectFn (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143314:16) at $Cy.verifyUpcomingAssertions (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:142658:31) at onRetry (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143305:15) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4315:29) at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143192:68) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143133:14) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18) at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1645:18) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:5450:46) From Your Spec Code: at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:276:36) 2) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) EX-9888 - Part 2: Edit the project details and change the nameThu Aug 24 2023 08:12:23 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Old Test Project TC9888 1692864743644' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 3) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) EX-9888 - Part 3: Add customer to the Project. Thu Aug 24 2023 08:12:23 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1692864363178' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 4) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) EX-9888 - Part 4: Verify the invitation email for customerThu Aug 24 2023 08:15:38 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1692864363178' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9888-GC-FU-project-previlleges.spec.ts:69:28) 5) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) EX-9888 - Part 5: Add company user to the Project. Thu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1692864363178' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 6) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) EX-9888 - Part 6: Verify company user can access project. Thu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1692864363178' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 7) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) EX-9888 - Part 7: Add Contract should be in disabled state Thu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1692864363178' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 8) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) Ex-9888 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1692864363178' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 9) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) EX-9888 - Part 9: Clean up Project Thu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1692864363178' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 0 passing (9m) 9 failing 1) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) EX-9888 - Part 1: Create a project Thu Aug 24 2023 08:12:23 GMT+0000 (Greenwich Mean Time): CypressError: Timed out retrying after 30000ms: `cy.contains()` failed because it requires a DOM element, window or document. No elements in the current DOM matched your query: > cy.get(div[role='alert']) at isElement (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144409:62) at validateType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144267:14) at Object.isType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144298:7) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:131592:22) at Object.subjectFn (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143314:16) at $Cy.verifyUpcomingAssertions (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:142658:31) at onRetry (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143305:15) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4315:29) at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143192:68) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143133:14) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18) at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1645:18) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:5450:46) From Your Spec Code: at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:276:36) 2) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) EX-9888 - Part 2: Edit the project details and change the nameThu Aug 24 2023 08:12:23 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Old Test Project TC9888 1692864743644' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 3) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) EX-9888 - Part 3: Add customer to the Project. Thu Aug 24 2023 08:12:23 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1692864363178' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 4) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) EX-9888 - Part 4: Verify the invitation email for customerThu Aug 24 2023 08:15:38 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1692864363178' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9888-GC-FU-project-previlleges.spec.ts:69:28) 5) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) EX-9888 - Part 5: Add company user to the Project. Thu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1692864363178' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 6) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) EX-9888 - Part 6: Verify company user can access project. Thu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1692864363178' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 7) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) EX-9888 - Part 7: Add Contract should be in disabled state Thu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1692864363178' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 8) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) Ex-9888 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1692864363178' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 9) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time) EX-9888 - Part 9: Clean up Project Thu Aug 24 2023 08:16:15 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1692864363178' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_033.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 9 │ │ Passing: 0 │ │ Failing: 9 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 9 │ │ Video: true │ │ Duration: 8 minutes, 58 seconds │ │ Estimated: 5 minutes, 12 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9888-GC-FU-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role perm issions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081223 GMT+0000 (Greenwich Mean Time) -- EX-9888 - Pa rt 1 Create a project Thu Aug 24 2023 081223 GMT+0000 (Greenwich Mean Time) .png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role perm issions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081223 GMT+0000 (Greenwich Mean Time) -- EX-9888 - Pa rt 2 Edit the project details and change the nameThu Aug 24 2023 081223 GMT+.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role perm issions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081223 GMT+0000 (Greenwich Mean Time) -- EX-9888 - Pa rt 3 Add customer to the Project. Thu Aug 24 2023 081223 GMT+0000 (Greenwich.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role perm issions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081538 GMT+0000 (Greenwich Mean Time) -- EX-9888 - Pa rt 4 Verify the invitation email for customerThu Aug 24 2023 081538 GMT+0000.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role perm issions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081615 GMT+0000 (Greenwich Mean Time) -- EX-9888 - Pa rt 5 Add company user to the Project. Thu Aug 24 2023 081615 GMT+0000 (Green.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role perm issions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081615 GMT+0000 (Greenwich Mean Time) -- EX-9888 - Pa rt 6 Verify company user can access project. Thu Aug 24 2023 081615 GMT+0000.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role perm issions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081615 GMT+0000 (Greenwich Mean Time) -- EX-9888 - Pa rt 7 Add Contract should be in disabled state Thu Aug 24 2023 081615 GMT+000.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role perm issions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081615 GMT+0000 (Greenwich Mean Time) -- Ex-9888 - Pa rt 8 Navigate to project rates, divisons and additiona t&M signers pagesThu .png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role perm issions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081615 GMT+0000 (Greenwich Mean Time) -- EX-9888 - Pa rt 9 Clean up Project Thu Aug 24 2023 081615 GMT+0000 (Greenwich Mean Time) .png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 11% Compression progress: 22% Compression progress: 34% Compression progress: 45% Compression progress: 56% Compression progress: 68% Compression progress: 79% Compression progress: 90% - Finished compressing: 1 minute, 39 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/10) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role permissions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081615 GMT+0000 (Greenwich Mean Time) -- EX-9888 - Part 5 Add company user to the Project. Thu Aug 24 2023 081615 GMT+0000 (Green.png - Done Uploading (2/10) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role permissions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081615 GMT+0000 (Greenwich Mean Time) -- EX-9888 - Part 9 Clean up Project Thu Aug 24 2023 081615 GMT+0000 (Greenwich Mean Time) .png - Done Uploading (3/10) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role permissions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081223 GMT+0000 (Greenwich Mean Time) -- EX-9888 - Part 1 Create a project Thu Aug 24 2023 081223 GMT+0000 (Greenwich Mean Time) .png - Done Uploading (4/10) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role permissions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081223 GMT+0000 (Greenwich Mean Time) -- EX-9888 - Part 2 Edit the project details and change the nameThu Aug 24 2023 081223 GMT+.png - Done Uploading (5/10) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role permissions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081615 GMT+0000 (Greenwich Mean Time) -- Ex-9888 - Part 8 Navigate to project rates, divisons and additiona t&M signers pagesThu .png - Done Uploading (6/10) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role permissions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081538 GMT+0000 (Greenwich Mean Time) -- EX-9888 - Part 4 Verify the invitation email for customerThu Aug 24 2023 081538 GMT+0000.png - Done Uploading (7/10) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role permissions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081615 GMT+0000 (Greenwich Mean Time) -- EX-9888 - Part 7 Add Contract should be in disabled state Thu Aug 24 2023 081615 GMT+000.png - Done Uploading (8/10) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role permissions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081615 GMT+0000 (Greenwich Mean Time) -- EX-9888 - Part 6 Verify company user can access project. Thu Aug 24 2023 081615 GMT+0000.png - Done Uploading (9/10) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts\User Role permissions GC Field User Login as GC Field User and create project and verify user privilegesThu Aug 24 2023 081223 GMT+0000 (Greenwich Mean Time) -- EX-9888 - Part 3 Add customer to the Project. Thu Aug 24 2023 081223 GMT+0000 (Greenwich.png - Done Uploading (10/10) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9889-SC-Owner-project-previlleges. (35 of 114) spec.ts Estimated: 7 minutes, 5 seconds User Role permissions| SC Account Owner | Login as SC account owner and create project and verify user privilegesThu Aug 24 2023 08:23:11 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Account Owner | Login as SC account owner and create project and verify user privilegesThu Aug 24 2023 08:23:11 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 1: Create a project Thu Aug 24 2023 08:23:11 GMT+0000 (Greenwich Mean Time) (55920ms) √ EX-9889 - Part 1: Create a project Thu Aug 24 2023 08:23:11 GMT+0000 (Greenwich Mean Time) (55920ms) √ EX-9889 - Part 2: Edit the project details and change the nameThu Aug 24 2023 08:23:11 GMT+0000 (Greenwich Mean Time) (40994ms) √ EX-9889 - Part 2: Edit the project details and change the nameThu Aug 24 2023 08:23:11 GMT+0000 (Greenwich Mean Time) (40994ms) √ EX-9889 - Part 3: Add customer to the Project. Thu Aug 24 2023 08:23:11 GMT+0000 (Greenwich Mean Time) (63718ms) √ EX-9889 - Part 3: Add customer to the Project. Thu Aug 24 2023 08:23:11 GMT+0000 (Greenwich Mean Time) (63718ms) √ EX-9889 - Part 4: Verify the invitation email for customerThu Aug 24 2023 08:26:00 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 4: Verify the invitation email for customerThu Aug 24 2023 08:26:00 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 5: Add company user to the Project. Thu Aug 24 2023 08:26:06 GMT+0000 (Greenwich Mean Time) (56546ms) √ EX-9889 - Part 5: Add company user to the Project. Thu Aug 24 2023 08:26:06 GMT+0000 (Greenwich Mean Time) (56546ms) √ EX-9889 - Part 6: Verify company user can access project. Thu Aug 24 2023 08:26:06 GMT+0000 (Greenwich Mean Time) (29121ms) √ EX-9889 - Part 6: Verify company user can access project. Thu Aug 24 2023 08:26:06 GMT+0000 (Greenwich Mean Time) (29121ms) √ EX-9889 - Part 7: Add Contract with a user to the project. Thu Aug 24 2023 08:26:06 GMT+0000 (Greenwich Mean Time) (51256ms) √ EX-9889 - Part 7: Add Contract with a user to the project. Thu Aug 24 2023 08:26:06 GMT+0000 (Greenwich Mean Time) (51256ms) √ EX-9889 - Part 8: Verify email invitation for contractor user Thu Aug 24 2023 08:28:30 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 8: Verify email invitation for contractor user Thu Aug 24 2023 08:28:30 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 9: Add additional user to existing contract of the project. Thu Aug 24 2023 08:28:36 GMT+0000 (Greenwich Mean Time) (53248ms) √ EX-9889 - Part 9: Add additional user to existing contract of the project. Thu Aug 24 2023 08:28:36 GMT+0000 (Greenwich Mean Time) (53248ms) √ EX-9889 - Part 10: Verify email invitation for additional contract user Thu Aug 24 2023 08:29:34 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 10: Verify email invitation for additional contract user Thu Aug 24 2023 08:29:34 GMT+0000 (Greenwich Mean Time) √ Ex-9889 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 08:29:39 GMT+0000 (Greenwich Mean Time) (64382ms) √ Ex-9889 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 08:29:39 GMT+0000 (Greenwich Mean Time) (64382ms) √ EX-9889 - Part 12: Clean up Project Thu Aug 24 2023 08:29:39 GMT+0000 (Greenwich Mean Time) (38118ms) √ EX-9889 - Part 12: Clean up Project Thu Aug 24 2023 08:29:39 GMT+0000 (Greenwich Mean Time) (38118ms) 12 passing (8m) 12 passing (8m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_034.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 8 minutes, 11 seconds │ │ Estimated: 7 minutes, 5 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9889-SC-Owner-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9889-SC-Owner-project-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9890-SC-PM-project-previlleges.spe (36 of 114) c.ts Estimated: 7 minutes, 18 seconds User Role permissions| SC PM | Login as SC PM and create project and verify user privilegesThu Aug 24 2023 08:31:30 GMT+0000 (Greenwich Mean Time) User Role permissions| SC PM | Login as SC PM and create project and verify user privilegesThu Aug 24 2023 08:31:30 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 1: Create a project Thu Aug 24 2023 08:31:30 GMT+0000 (Greenwich Mean Time) (61002ms) √ EX-9890 - Part 1: Create a project Thu Aug 24 2023 08:31:30 GMT+0000 (Greenwich Mean Time) (61002ms) √ EX-9890 - Part 2: Edit the project details and change the nameThu Aug 24 2023 08:31:30 GMT+0000 (Greenwich Mean Time) (44091ms) √ EX-9890 - Part 2: Edit the project details and change the nameThu Aug 24 2023 08:31:30 GMT+0000 (Greenwich Mean Time) (44091ms) √ EX-9890 - Part 3: Add customer to the Project. Thu Aug 24 2023 08:31:30 GMT+0000 (Greenwich Mean Time) (46913ms) √ EX-9890 - Part 3: Add customer to the Project. Thu Aug 24 2023 08:31:30 GMT+0000 (Greenwich Mean Time) (46913ms) √ EX-9890 - Part 4: Verify the invitation email for customerThu Aug 24 2023 08:34:09 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 4: Verify the invitation email for customerThu Aug 24 2023 08:34:09 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 5: Add company user to the Project. Thu Aug 24 2023 08:34:15 GMT+0000 (Greenwich Mean Time) (56391ms) √ EX-9890 - Part 5: Add company user to the Project. Thu Aug 24 2023 08:34:15 GMT+0000 (Greenwich Mean Time) (56391ms) √ EX-9890 - Part 6: Verify company user can access project. Thu Aug 24 2023 08:34:15 GMT+0000 (Greenwich Mean Time) (27013ms) √ EX-9890 - Part 6: Verify company user can access project. Thu Aug 24 2023 08:34:15 GMT+0000 (Greenwich Mean Time) (27013ms) √ EX-9890 - Part 7: Add Contract with a user to the project. Thu Aug 24 2023 08:34:15 GMT+0000 (Greenwich Mean Time) (45133ms) √ EX-9890 - Part 7: Add Contract with a user to the project. Thu Aug 24 2023 08:34:15 GMT+0000 (Greenwich Mean Time) (45133ms) √ EX-9890 - Part 8: Verify email invitation for contractor user Thu Aug 24 2023 08:36:30 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 8: Verify email invitation for contractor user Thu Aug 24 2023 08:36:30 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 9: Add additiona user to existing contract of the project. Thu Aug 24 2023 08:36:37 GMT+0000 (Greenwich Mean Time) (49671ms) √ EX-9890 - Part 9: Add additiona user to existing contract of the project. Thu Aug 24 2023 08:36:37 GMT+0000 (Greenwich Mean Time) (49671ms) √ EX-9890 - Part 10: Verify email invitation for additional contract user Thu Aug 24 2023 08:37:31 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 10: Verify email invitation for additional contract user Thu Aug 24 2023 08:37:31 GMT+0000 (Greenwich Mean Time) √ Ex-9890 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 08:37:36 GMT+0000 (Greenwich Mean Time) (60691ms) √ Ex-9890 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 08:37:36 GMT+0000 (Greenwich Mean Time) (60691ms) √ EX-9890 - Part 12: Clean up Project Thu Aug 24 2023 08:37:36 GMT+0000 (Greenwich Mean Time) (37864ms) √ EX-9890 - Part 12: Clean up Project Thu Aug 24 2023 08:37:36 GMT+0000 (Greenwich Mean Time) (37864ms) 12 passing (8m) 12 passing (8m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_035.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 45 seconds │ │ Estimated: 7 minutes, 18 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9890-SC-PM-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9890-SC-PM-project-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9891-SC-FU-project-previlleges.spe (37 of 114) c.ts Estimated: 5 minutes, 17 seconds User Role permissions| SC Field User | Login as SC Field User and create project and verify user privilegesThu Aug 24 2023 08:39:22 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Field User | Login as SC Field User and create project and verify user privilegesThu Aug 24 2023 08:39:22 GMT+0000 (Greenwich Mean Time) √ EX-9891 - Part 1: Create a project Thu Aug 24 2023 08:39:22 GMT+0000 (Greenwich Mean Time) (54250ms) √ EX-9891 - Part 1: Create a project Thu Aug 24 2023 08:39:22 GMT+0000 (Greenwich Mean Time) (54250ms) √ EX-9891 - Part 2: Edit the project details and change the nameThu Aug 24 2023 08:39:22 GMT+0000 (Greenwich Mean Time) (40475ms) √ EX-9891 - Part 2: Edit the project details and change the nameThu Aug 24 2023 08:39:22 GMT+0000 (Greenwich Mean Time) (40475ms) √ EX-9891 - Part 3: Add customer to the Project. Thu Aug 24 2023 08:39:22 GMT+0000 (Greenwich Mean Time) (58160ms) √ EX-9891 - Part 3: Add customer to the Project. Thu Aug 24 2023 08:39:22 GMT+0000 (Greenwich Mean Time) (58160ms) √ EX-9891 - Part 4: Verify the invitation email for customerThu Aug 24 2023 08:42:02 GMT+0000 (Greenwich Mean Time) √ EX-9891 - Part 4: Verify the invitation email for customerThu Aug 24 2023 08:42:02 GMT+0000 (Greenwich Mean Time) √ EX-9891 - Part 5: Add company user to the Project. Thu Aug 24 2023 08:42:08 GMT+0000 (Greenwich Mean Time) (57849ms) √ EX-9891 - Part 5: Add company user to the Project. Thu Aug 24 2023 08:42:08 GMT+0000 (Greenwich Mean Time) (57849ms) √ EX-9891 - Part 6: Verify company user can access project. Thu Aug 24 2023 08:42:08 GMT+0000 (Greenwich Mean Time) (31549ms) √ EX-9891 - Part 6: Verify company user can access project. Thu Aug 24 2023 08:42:08 GMT+0000 (Greenwich Mean Time) (31549ms) √ EX-9891 - Part 7: Add Contract should be in disabled state Thu Aug 24 2023 08:42:08 GMT+0000 (Greenwich Mean Time) (32237ms) √ EX-9891 - Part 7: Add Contract should be in disabled state Thu Aug 24 2023 08:42:08 GMT+0000 (Greenwich Mean Time) (32237ms) √ Ex-9891 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 08:42:08 GMT+0000 (Greenwich Mean Time) (31824ms) √ Ex-9891 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesThu Aug 24 2023 08:42:08 GMT+0000 (Greenwich Mean Time) (31824ms) √ EX-9891 - Part 9: Clean up Project Thu Aug 24 2023 08:42:08 GMT+0000 (Greenwich Mean Time) (40426ms) √ EX-9891 - Part 9: Clean up Project Thu Aug 24 2023 08:42:08 GMT+0000 (Greenwich Mean Time) (40426ms) 9 passing (6m) 9 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_036.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 9 │ │ Passing: 9 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 1 second │ │ Estimated: 5 minutes, 17 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9891-SC-FU-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9891-SC-FU-project-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Received/ex-3684-verify-user-can-see-only-cors-that-he-ha (38 of 114) s-access-to.spec.ts Estimated: 1 minute, 53 seconds COR access | To verify that a logged in User can only see those project's COR, to which they have access toThu Aug 24 2023 08:45:31 GMT+0000 (Greenwich Mean Time) COR access | To verify that a logged in User can only see those project's COR, to which they have access toThu Aug 24 2023 08:45:31 GMT+0000 (Greenwich Mean Time) 1) EX-3684 - Verify COR / Sent. Thu Aug 24 2023 08:45:31 GMT+0000 (Greenwich Mean Time) 1) EX-3684 - Verify COR / Sent. Thu Aug 24 2023 08:45:31 GMT+0000 (Greenwich Mean Time) 2) EX-3684 - Verify COR / Received. Thu Aug 24 2023 08:45:31 GMT+0000 (Greenwich Mean Time) 2) EX-3684 - Verify COR / Received. Thu Aug 24 2023 08:45:31 GMT+0000 (Greenwich Mean Time) 0 passing (2m) 2 failing 1) COR access | To verify that a logged in User can only see those project's COR, to which they have access toThu Aug 24 2023 08:45:31 GMT+0000 (Greenwich Mean Time) EX-3684 - Verify COR / Sent. Thu Aug 24 2023 08:45:31 GMT+0000 (Greenwich Mean Time): CypressError: Timed out retrying after 30000ms: `cy.wait()` timed out waiting `30000ms` for the 1st response to the route: `toApplyProjectFilter`. No response ever occurred. https://on.cypress.io/wait at cypressErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75187:18) at Object.errByPath (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75242:10) at checkForXhr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134821:84) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134844:28) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4315:29) at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143192:68) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143133:14) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18) at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1645:18) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:5450:46) From Your Spec Code: at corLogPage.filterByProject (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/COR_Log_.ts:181:11) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Received/ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts:15:13) 2) COR access | To verify that a logged in User can only see those project's COR, to which they have access toThu Aug 24 2023 08:45:31 GMT+0000 (Greenwich Mean Time) EX-3684 - Verify COR / Received. Thu Aug 24 2023 08:45:31 GMT+0000 (Greenwich Mean Time): CypressError: Timed out retrying after 30000ms: `cy.wait()` timed out waiting `30000ms` for the 1st response to the route: `waitOnUsersMe`. No response ever occurred. https://on.cypress.io/wait at cypressErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75187:18) at Object.errByPath (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75242:10) at checkForXhr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134821:84) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134844:28) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4315:29) at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143192:68) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143133:14) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18) at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1645:18) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:5450:46) From Your Spec Code: at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands.ts:249:7) 0 passing (2m) 2 failing 1) COR access | To verify that a logged in User can only see those project's COR, to which they have access toThu Aug 24 2023 08:45:31 GMT+0000 (Greenwich Mean Time) EX-3684 - Verify COR / Sent. Thu Aug 24 2023 08:45:31 GMT+0000 (Greenwich Mean Time): CypressError: Timed out retrying after 30000ms: `cy.wait()` timed out waiting `30000ms` for the 1st response to the route: `toApplyProjectFilter`. No response ever occurred. https://on.cypress.io/wait at cypressErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75187:18) at Object.errByPath (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75242:10) at checkForXhr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134821:84) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134844:28) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4315:29) at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143192:68) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143133:14) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18) at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1645:18) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:5450:46) From Your Spec Code: at corLogPage.filterByProject (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/COR_Log_.ts:181:11) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Received/ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts:15:13) 2) COR access | To verify that a logged in User can only see those project's COR, to which they have access toThu Aug 24 2023 08:45:31 GMT+0000 (Greenwich Mean Time) EX-3684 - Verify COR / Received. Thu Aug 24 2023 08:45:31 GMT+0000 (Greenwich Mean Time): CypressError: Timed out retrying after 30000ms: `cy.wait()` timed out waiting `30000ms` for the 1st response to the route: `waitOnUsersMe`. No response ever occurred. https://on.cypress.io/wait at cypressErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75187:18) at Object.errByPath (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75242:10) at checkForXhr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134821:84) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134844:28) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4315:29) at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143192:68) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143133:14) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18) at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1645:18) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:5450:46) From Your Spec Code: at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands.ts:249:7) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_037.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 0 │ │ Failing: 2 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 2 │ │ Video: true │ │ Duration: 1 minute, 52 seconds │ │ Estimated: 1 minute, 53 seconds │ │ Spec Ran: 04_COR_Log/Received/ex-3684-verify-user-can-see-only-cors-that-he-has-access-to. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587) Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts \COR access To verify that a logged in User can only see those project's COR, t o which they have access toThu Aug 24 2023 084531 GMT+0000 (Greenwich Mean Time) -- EX-3684 - Verify COR Sent. Thu Aug 24 2023 084531 GMT+0000 (Greenwich Mean Time) (fail.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587) Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts \COR access To verify that a logged in User can only see those project's COR, t o which they have access toThu Aug 24 2023 084531 GMT+0000 (Greenwich Mean Time) -- EX-3684 - Verify COR Received. Thu Aug 24 2023 084531 GMT+0000 (Greenwich M ean Time) (.png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 72% - Finished compressing: 20 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts\COR access To verify that a logged in User can only see those project's COR, to which they have access toThu Aug 24 2023 084531 GMT+0000 (Greenwich Mean Time) -- EX-3684 - Verify COR Received. Thu Aug 24 2023 084531 GMT+0000 (Greenwich Mean Time) (.png - Done Uploading (2/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts\COR access To verify that a logged in User can only see those project's COR, to which they have access toThu Aug 24 2023 084531 GMT+0000 (Greenwich Mean Time) -- EX-3684 - Verify COR Sent. Thu Aug 24 2023 084531 GMT+0000 (Greenwich Mean Time) (fail.png - Done Uploading (3/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Received/ex-9912-add-bc-to-existing-cor-with-all-role-con (39 of 114) tractors.spec.ts Estimated: 7 minutes, 7 seconds Backcharges | Bell Notifications | Verify that the contractor with roles AO, Admin and PM is able to receive a bell notification when the customer creates a BC for the received COR.Thu Aug 24 2023 08:47:51 GMT+0000 (Greenwich Mean Time) Backcharges | Bell Notifications | Verify that the contractor with roles AO, Admin and PM is able to receive a bell notification when the customer creates a BC for the received COR.Thu Aug 24 2023 08:47:51 GMT+0000 (Greenwich Mean Time) 1) EX-9912 | Backcharges | Bell Notifications | Verify the contractor is able to receive a bell notification when the customer creates a BC for the received COR.Thu Aug 24 2023 08:47:51 GMT+0000 (Greenwich Mean Time) 1) EX-9912 | Backcharges | Bell Notifications | Verify the contractor is able to receive a bell notification when the customer creates a BC for the received COR.Thu Aug 24 2023 08:47:51 GMT+0000 (Greenwich Mean Time) 0 passing (31s) 1 failing 1) Backcharges | Bell Notifications | Verify that the contractor with roles AO, Admin and PM is able to receive a bell notification when the customer creates a BC for the received COR.Thu Aug 24 2023 08:47:51 GMT+0000 (Greenwich Mean Time) EX-9912 | Backcharges | Bell Notifications | Verify the contractor is able to receive a bell notification when the customer creates a BC for the received COR.Thu Aug 24 2023 08:47:51 GMT+0000 (Greenwich Mean Time): CypressError: `cy.request()` timed out waiting `30000ms` for a response from your server. The request we sent was: Method: POST URL: https://api.staging.clearstory.dev/users/authenticate No response was received within the timeout. https://on.cypress.io/request at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:132377:70) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4186:41) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1697:18) at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2407:12) at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2400:9) at Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2416:5) at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2286:14) From Your Spec Code: at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-be-apis.ts:48:7) 0 passing (31s) 1 failing 1) Backcharges | Bell Notifications | Verify that the contractor with roles AO, Admin and PM is able to receive a bell notification when the customer creates a BC for the received COR.Thu Aug 24 2023 08:47:51 GMT+0000 (Greenwich Mean Time) EX-9912 | Backcharges | Bell Notifications | Verify the contractor is able to receive a bell notification when the customer creates a BC for the received COR.Thu Aug 24 2023 08:47:51 GMT+0000 (Greenwich Mean Time): CypressError: `cy.request()` timed out waiting `30000ms` for a response from your server. The request we sent was: Method: POST URL: https://api.staging.clearstory.dev/users/authenticate No response was received within the timeout. https://on.cypress.io/request at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:132377:70) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4186:41) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1697:18) at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2407:12) at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2400:9) at Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2416:5) at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2286:14) From Your Spec Code: at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-be-apis.ts:48:7) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_038.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 0 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: true │ │ Duration: 30 seconds │ │ Estimated: 7 minutes, 7 seconds │ │ Spec Ran: 04_COR_Log/Received/ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spe │ │ c.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587) Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Ba ckcharges Bell Notifications Verify that the contractor with roles AO, Admin a nd PM is able to receive a bell notification when the customer creates a BC for the received COR.Thu Aug 24 2023 084751 GMT+0000 (Greenwich Mean Time) -- EX-991 2 Backc.png (Video) - Started compressing: Compressing to 32 CRF - Finished compressing: 5 seconds - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Backcharges Bell Notifications Verify that the contractor with roles AO, Admin and PM is able to receive a bell notification when the customer creates a BC for the received COR.Thu Aug 24 2023 084751 GMT+0000 (Greenwich Mean Time) -- EX-9912 Backc.png - Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-4366-SC-creates-project-adds-gc-customer-sc-creat (40 of 114) es-cor.spec.ts Estimated: 9 minutes, 7 seconds Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestThu Aug 24 2023 08:48:35 GMT+0000 (Greenwich Mean Time) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestThu Aug 24 2023 08:48:35 GMT+0000 (Greenwich Mean Time) √ EX-4366 - Create a projcet and add customers : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (59322ms) √ EX-4366 - Create a projcet and add customers : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (59322ms) √ EX-4366 - Add My Company users to the project.Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (70786ms) √ EX-4366 - Add My Company users to the project.Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (70786ms) √ EX-4366 - Add Customer to the project.Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (69338ms) √ EX-4366 - Add Customer to the project.Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (69338ms) √ EX-4366 - PM Customer accept the project Invites : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (19067ms) √ EX-4366 - PM Customer accept the project Invites : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (19067ms) 1) EX-4366 - Owner Customer accept the project Invites : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) 1) EX-4366 - Owner Customer accept the project Invites : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) √ EX-4366 - Admin Customer accept the project Invites : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (26018ms) √ EX-4366 - Admin Customer accept the project Invites : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (26018ms) 2) EX-4366 - Field User Customer accept the project Invites : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) 2) EX-4366 - Field User Customer accept the project Invites : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) √ EX-4366 - Create COR : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (76466ms) √ EX-4366 - Create COR : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (76466ms) √ EX-4366 - Verify COR is created : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (72560ms) √ EX-4366 - Verify COR is created : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (72560ms) √ EX-4366 - Cleanup GC... Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (41498ms) √ EX-4366 - Cleanup GC... Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (41498ms) √ EX-4366 - Cleanup SC... Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (43275ms) √ EX-4366 - Cleanup SC... Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time) (43275ms) 9 passing (10m) 2 failing 1) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestThu Aug 24 2023 08:48:35 GMT+0000 (Greenwich Mean Time) EX-4366 - Owner Customer accept the project Invites : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:276:5) 2) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestThu Aug 24 2023 08:48:35 GMT+0000 (Greenwich Mean Time) EX-4366 - Field User Customer accept the project Invites : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:276:5) 9 passing (10m) 2 failing 1) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestThu Aug 24 2023 08:48:35 GMT+0000 (Greenwich Mean Time) EX-4366 - Owner Customer accept the project Invites : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:276:5) 2) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestThu Aug 24 2023 08:48:35 GMT+0000 (Greenwich Mean Time) EX-4366 - Field User Customer accept the project Invites : Thu Aug 24 2023 08:48:36 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:276:5) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_039.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 11 │ │ Passing: 9 │ │ Failing: 2 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 2 │ │ Video: true │ │ Duration: 9 minutes, 32 seconds │ │ Estimated: 9 minutes, 7 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec. │ │ ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587) Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Crea te COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestThu Aug 24 2023 084835 GMT +0000 (Greenwich Mean Time) -- EX-4366 - Owner Customer accept the project Invit es Th.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587) Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Crea te COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestThu Aug 24 2023 084835 GMT +0000 (Greenwich Mean Time) -- EX-4366 - Field User Customer accept the project Invite.png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 10% Compression progress: 21% Compression progress: 30% Compression progress: 41% Compression progress: 51% Compression progress: 62% Compression progress: 73% Compression progress: 83% Compression progress: 94% - Finished compressing: 1 minute, 44 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Create COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestThu Aug 24 2023 084835 GMT+0000 (Greenwich Mean Time) -- EX-4366 - Owner Customer accept the project Invites Th.png - Done Uploading (2/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Create COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestThu Aug 24 2023 084835 GMT+0000 (Greenwich Mean Time) -- EX-4366 - Field User Customer accept the project Invite.png - Done Uploading (3/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft. (41 of 114) spec.ts Estimated: 5 minutes, 18 seconds Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestThu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestThu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) √ EX-4432 - Part 1: Create project Test Project TC4432 1692867601109. Thu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) (58567ms) √ EX-4432 - Part 1: Create project Test Project TC4432 1692867601109. Thu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) (58567ms) √ EX-4432 - Part 2: Add Customer.Thu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) (46755ms) √ EX-4432 - Part 2: Add Customer.Thu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) (46755ms) 1) EX-4432 - Part 3: Customer Accept invite.Thu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) 1) EX-4432 - Part 3: Customer Accept invite.Thu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) √ EX-4432 - Part 4: Contractor creates COR Draft. : Thu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) (62104ms) √ EX-4432 - Part 4: Contractor creates COR Draft. : Thu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) (62104ms) √ EX-4432 - Part 5: Verify the COR Draft Log has the new COR draft. : Thu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) (49292ms) √ EX-4432 - Part 5: Verify the COR Draft Log has the new COR draft. : Thu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) (49292ms) √ EX-4432 - Part 6: Cleanup GC... Thu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) (38376ms) √ EX-4432 - Part 6: Cleanup GC... Thu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) (38376ms) √ EX-4432 - Part 7: Cleanup SC... Thu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) (53200ms) √ EX-4432 - Part 7: Cleanup SC... Thu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) (53200ms) 6 passing (6m) 1 failing 1) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestThu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) EX-4432 - Part 3: Customer Accept invite.Thu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC4432 1692867601109' within the selector: 'td' but never did. at projectsPage.pressAcceptBtnForInvite (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Projects_.ts:131:7) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts:47:15) 6 passing (6m) 1 failing 1) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestThu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time) EX-4432 - Part 3: Customer Accept invite.Thu Aug 24 2023 09:00:01 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC4432 1692867601109' within the selector: 'td' but never did. at projectsPage.pressAcceptBtnForInvite (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Projects_.ts:131:7) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts:47:15) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_040.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 6 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: true │ │ Duration: 6 minutes, 3 seconds │ │ Estimated: 5 minutes, 18 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587) Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts\Create COR To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestThu Aug 24 2023 090001 GMT+0000 (Greenwich Mean Time) -- EX-4432 - Part 3 Customer Accept invite.Thu Aug 24 2023 090001 GMT+0000 (Greenwich Mean . png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 18% Compression progress: 35% Compression progress: 54% Compression progress: 70% Compression progress: 89% - Finished compressing: 1 minute, 6 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts\Create COR To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestThu Aug 24 2023 090001 GMT+0000 (Greenwich Mean Time) -- EX-4432 - Part 3 Customer Accept invite.Thu Aug 24 2023 090001 GMT+0000 (Greenwich Mean .png - Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-5827-to-verify-multiple-cors-to-same-tag-when-cre (42 of 114) ating-cor.spec.ts Estimated: 39 seconds COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORThu Aug 24 2023 09:07:19 GMT+0000 (Greenwich Mean Time) COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORThu Aug 24 2023 09:07:19 GMT+0000 (Greenwich Mean Time) √ EX-5827 - Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORThu Aug 24 2023 09:07:19 GMT+0000 (Greenwich Mean Time) (38965ms) √ EX-5827 - Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORThu Aug 24 2023 09:07:19 GMT+0000 (Greenwich Mean Time) (38965ms) 1 passing (40s) 1 passing (40s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_041.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 39 seconds │ │ Estimated: 39 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-5827-to-verify-multiple-cors-to-same-tag-when-creating-cor.sp │ │ ec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-5827-to-verify-multiple-cors-to-same-tag-when-creating-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-5894-to-verify-multiple-cors-to-same-tag-when-upl (43 of 114) oading-cor.spec.ts Estimated: 43 seconds COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORThu Aug 24 2023 09:08:05 GMT+0000 (Greenwich Mean Time) COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORThu Aug 24 2023 09:08:05 GMT+0000 (Greenwich Mean Time) √ EX-5894 - Verify Multiple CORs should not be associated with the same T&M Tag when uploading a New CORThu Aug 24 2023 09:08:05 GMT+0000 (Greenwich Mean Time) (45301ms) √ EX-5894 - Verify Multiple CORs should not be associated with the same T&M Tag when uploading a New CORThu Aug 24 2023 09:08:05 GMT+0000 (Greenwich Mean Time) (45301ms) 1 passing (46s) 1 passing (46s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_042.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 45 seconds │ │ Estimated: 43 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-5894-to-verify-multiple-cors-to-same-tag-when-uploading-cor.s │ │ pec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-5894-to-verify-multiple-cors-to-same-tag-when-uploading-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-3673-verify-contractor-is-able-to-upload-cor-with (44 of 114) -only-mandatory-data.spec.ts Estimated: 5 minutes, 47 seconds Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Thu Aug 24 2023 09:08:58 GMT+0000 (Greenwich Mean Time) Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Thu Aug 24 2023 09:08:58 GMT+0000 (Greenwich Mean Time) 1) EX-3673 - Part 0: Clean existing COR's : Thu Aug 24 2023 09:08:58 GMT+0000 (Greenwich Mean Time) 1) EX-3673 - Part 0: Clean existing COR's : Thu Aug 24 2023 09:08:58 GMT+0000 (Greenwich Mean Time) √ EX-3673 - Part 1: Upload COR with only mandatory data.Thu Aug 24 2023 09:08:58 GMT+0000 (Greenwich Mean Time) (67587ms) √ EX-3673 - Part 1: Upload COR with only mandatory data.Thu Aug 24 2023 09:08:58 GMT+0000 (Greenwich Mean Time) (67587ms) √ EX-3673 - Part 2: Verify the COR data in the COR Log.Thu Aug 24 2023 09:08:58 GMT+0000 (Greenwich Mean Time) (81168ms) √ EX-3673 - Part 2: Verify the COR data in the COR Log.Thu Aug 24 2023 09:08:58 GMT+0000 (Greenwich Mean Time) (81168ms) √ EX-3673 - Part 0: Cleanup - Delete COR.Thu Aug 24 2023 09:08:58 GMT+0000 (Greenwich Mean Time) (110091ms) √ EX-3673 - Part 0: Cleanup - Delete COR.Thu Aug 24 2023 09:08:58 GMT+0000 (Greenwich Mean Time) (110091ms) 3 passing (6m) 1 failing 1) Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Thu Aug 24 2023 09:08:58 GMT+0000 (Greenwich Mean Time) EX-3673 - Part 0: Clean existing COR's : Thu Aug 24 2023 09:08:58 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[title="Delete"]`, but never found it. at corLogPage.deleteAllVersionsOfCOR (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/COR_Log_.ts:593:11) at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/COR_Log_.ts:641:25) 3 passing (6m) 1 failing 1) Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Thu Aug 24 2023 09:08:58 GMT+0000 (Greenwich Mean Time) EX-3673 - Part 0: Clean existing COR's : Thu Aug 24 2023 09:08:58 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `a[title="Delete"]`, but never found it. at corLogPage.deleteAllVersionsOfCOR (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/COR_Log_.ts:593:11) at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/COR_Log_.ts:641:25) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_043.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 4 │ │ Passing: 3 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: true │ │ Duration: 5 minutes, 56 seconds │ │ Estimated: 5 minutes, 47 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandat │ │ ory-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587) Log\Sent\ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandatory-dat a.spec.ts\Upload COR To verify that the contractor is able to Upload a Change O rder Request with only mandatory data. Thu Aug 24 2023 090858 GMT+0000 (Greenwic h Mean Time) -- EX-3673 - Part 0 Clean existing COR's Thu Aug 24 2023 090858 GM T+0000 (Greenwich Me.png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 23% Compression progress: 46% Compression progress: 68% Compression progress: 89% - Finished compressing: 1 minute, 3 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandatory-data.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Sent\ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandatory-data.spec.ts\Upload COR To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Thu Aug 24 2023 090858 GMT+0000 (Greenwich Mean Time) -- EX-3673 - Part 0 Clean existing COR's Thu Aug 24 2023 090858 GMT+0000 (Greenwich Me.png - Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandatory-data.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-3683-GC-creates-project-adds-contract-SC-creates- (45 of 114) cor.spec.ts Estimated: 4 minutes, 58 seconds COR Log | GC PM creats a project. Adds Contract with SC Company. SC PM is able to create a COR by using Create a Change Order RequestThu Aug 24 2023 09:16:07 GMT+0000 (Greenwich Mean Time) COR Log | GC PM creats a project. Adds Contract with SC Company. SC PM is able to create a COR by using Create a Change Order RequestThu Aug 24 2023 09:16:07 GMT+0000 (Greenwich Mean Time) √ EX-3683 - Part 1: Create a project. Thu Aug 24 2023 09:16:07 GMT+0000 (Greenwich Mean Time) (330272ms) √ EX-3683 - Part 1: Create a project. Thu Aug 24 2023 09:16:07 GMT+0000 (Greenwich Mean Time) (330272ms) 1 passing (6m) 1 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_044.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 30 seconds │ │ Estimated: 4 minutes, 58 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-3683-GC-creates-project-adds-contract-SC-creates-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-3683-GC-creates-project-adds-contract-SC-creates-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-3686-verify-there-are-two-tabs-on-cor-log-page-se (46 of 114) nt-received.spec.ts Estimated: 37 seconds COR Log | To verify that on COR Log page there are separate tabs for Sent and Received CORsThu Aug 24 2023 09:21:47 GMT+0000 (Greenwich Mean Time) COR Log | To verify that on COR Log page there are separate tabs for Sent and Received CORsThu Aug 24 2023 09:21:47 GMT+0000 (Greenwich Mean Time) √ EX-3686: Verify there are separate tabs for Sent and Received CORsThu Aug 24 2023 09:21:47 GMT+0000 (Greenwich Mean Time) (60954ms) √ EX-3686: Verify there are separate tabs for Sent and Received CORsThu Aug 24 2023 09:21:47 GMT+0000 (Greenwich Mean Time) (60954ms) 1 passing (1m) 1 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_045.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 2 seconds │ │ Estimated: 37 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-3686-verify-there-are-two-tabs-on-cor-log-page-sent-received. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-3686-verify-there-are-two-tabs-on-cor-log-page-sent-received.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5244-verify-shareable-link-contains-just-the-sele (47 of 114) cted-project.spec.ts Estimated: 1 minute, 27 seconds COR | Verify sharable link contains CORs from just the selected project.Thu Aug 24 2023 09:22:57 GMT+0000 (Greenwich Mean Time) COR | Verify sharable link contains CORs from just the selected project.Thu Aug 24 2023 09:22:57 GMT+0000 (Greenwich Mean Time) √ EX-5244 Thu Aug 24 2023 09:22:57 GMT+0000 (Greenwich Mean Time) (91877ms) √ EX-5244 Thu Aug 24 2023 09:22:57 GMT+0000 (Greenwich Mean Time) (91877ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_046.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 32 seconds │ │ Estimated: 1 minute, 27 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5244-verify-shareable-link-contains-just-the-selected-project │ │ .spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-5244-verify-shareable-link-contains-just-the-selected-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5333-SC-creates-cor-with-full-data.spec.ts (48 of 114) Estimated: 3 minutes, 51 seconds Thu Aug 24 2023 09:24:37 GMT+0000 (Greenwich Mean Time) Thu Aug 24 2023 09:24:37 GMT+0000 (Greenwich Mean Time) √ EX-5333 - Part 1: Create COR with full set of data: Thu Aug 24 2023 09:24:37 GMT+0000 (Greenwich Mean Time) (249393ms) √ EX-5333 - Part 1: Create COR with full set of data: Thu Aug 24 2023 09:24:37 GMT+0000 (Greenwich Mean Time) (249393ms) 1 passing (4m) 1 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_047.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 9 seconds │ │ Estimated: 3 minutes, 51 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5333-SC-creates-cor-with-full-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-5333-SC-creates-cor-with-full-data.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5396-verify-contractor-is-able-to-upload-cor-with (49 of 114) -mandatory-and-optional-data.spec.ts Estimated: 8 minutes, 25 seconds Upload COR | To verify that the contractor is able to Upload a Change Order Request with full set of data. Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) Upload COR | To verify that the contractor is able to Upload a Change Order Request with full set of data. Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) √ EX-5396 - Create new project. Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (67668ms) √ EX-5396 - Create new project. Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (67668ms) √ EX-5396 - Add My Company users to the project.Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (72062ms) √ EX-5396 - Add My Company users to the project.Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (72062ms) √ EX-5396 - Add Contract to the project.Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (57984ms) √ EX-5396 - Add Contract to the project.Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (57984ms) √ EX-5396 - PM Customer accept the project Invites : Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (33896ms) √ EX-5396 - PM Customer accept the project Invites : Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (33896ms) √ EX-5396 - Owner Customer accept the project Invites : Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (32449ms) √ EX-5396 - Owner Customer accept the project Invites : Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (32449ms) √ EX-5396 - Admin Customer accept the project Invites : Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (26842ms) √ EX-5396 - Admin Customer accept the project Invites : Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (26842ms) √ EX-5396 - Field User Customer accept the project Invites : Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (28602ms) √ EX-5396 - Field User Customer accept the project Invites : Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (28602ms) √ EX-5396 - Upload COR with full data set, mandatory and optional data.Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (86124ms) √ EX-5396 - Upload COR with full data set, mandatory and optional data.Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (86124ms) √ EX-5396 - Verify the COR data in the COR Log.Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (82422ms) √ EX-5396 - Verify the COR data in the COR Log.Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (82422ms) √ EX-5396 - Cleanup GC... Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (45430ms) √ EX-5396 - Cleanup GC... Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (45430ms) √ EX-5396 - Cleanup SC... Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (45960ms) √ EX-5396 - Cleanup SC... Thu Aug 24 2023 09:28:55 GMT+0000 (Greenwich Mean Time) (45960ms) 11 passing (10m) 11 passing (10m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_048.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 11 │ │ Passing: 11 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 9 minutes, 41 seconds │ │ Estimated: 8 minutes, 25 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5396-verify-contractor-is-able-to-upload-cor-with-mandatory-a │ │ nd-optional-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-5396-verify-contractor-is-able-to-upload-cor-with-mandatory-and-optional-data.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5435-create-new-project-add-contrac-verify-origin (50 of 114) al-contract-value.spec.ts Estimated: 4 minutes, 19 seconds Create New Project with full set of data, as GC PM add contractor and verify the Original Contract Value.Thu Aug 24 2023 09:38:44 GMT+0000 (Greenwich Mean Time) Create New Project with full set of data, as GC PM add contractor and verify the Original Contract Value.Thu Aug 24 2023 09:38:44 GMT+0000 (Greenwich Mean Time) √ EX-5435 - Create a project.Thu Aug 24 2023 09:38:44 GMT+0000 (Greenwich Mean Time) (52911ms) √ EX-5435 - Create a project.Thu Aug 24 2023 09:38:44 GMT+0000 (Greenwich Mean Time) (52911ms) √ EX-5435 - Add contract.Thu Aug 24 2023 09:38:44 GMT+0000 (Greenwich Mean Time) (47920ms) √ EX-5435 - Add contract.Thu Aug 24 2023 09:38:44 GMT+0000 (Greenwich Mean Time) (47920ms) √ EX-5435 - Sub Contractor accepts the project/contract invite.Thu Aug 24 2023 09:38:44 GMT+0000 (Greenwich Mean Time) (24043ms) √ EX-5435 - Sub Contractor accepts the project/contract invite.Thu Aug 24 2023 09:38:44 GMT+0000 (Greenwich Mean Time) (24043ms) √ EX-5435 - Verify Original Contract Value.Thu Aug 24 2023 09:38:44 GMT+0000 (Greenwich Mean Time) (61247ms) √ EX-5435 - Verify Original Contract Value.Thu Aug 24 2023 09:38:44 GMT+0000 (Greenwich Mean Time) (61247ms) √ EX-5435 - Cleanup GC... Thu Aug 24 2023 09:38:44 GMT+0000 (Greenwich Mean Time) (35707ms) √ EX-5435 - Cleanup GC... Thu Aug 24 2023 09:38:44 GMT+0000 (Greenwich Mean Time) (35707ms) √ EX-5435 - Cleanup SC... Thu Aug 24 2023 09:38:44 GMT+0000 (Greenwich Mean Time) (34997ms) √ EX-5435 - Cleanup SC... Thu Aug 24 2023 09:38:44 GMT+0000 (Greenwich Mean Time) (34997ms) 6 passing (4m) 6 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_049.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 17 seconds │ │ Estimated: 4 minutes, 19 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5435-create-new-project-add-contrac-verify-original-contract- │ │ value.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-5435-create-new-project-add-contrac-verify-original-contract-value.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-6681-verify-sent-summary-data-after-filtering-by- (51 of 114) project.spec.ts Estimated: 3 minutes, 5 seconds As Sub Contractor go to COR Log / Sent and verify the Summary data when fitered for one and multiple projects.Thu Aug 24 2023 09:43:08 GMT+0000 (Greenwich Mean Time) As Sub Contractor go to COR Log / Sent and verify the Summary data when fitered for one and multiple projects.Thu Aug 24 2023 09:43:08 GMT+0000 (Greenwich Mean Time) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by single Project.Thu Aug 24 2023 09:43:08 GMT+0000 (Greenwich Mean Time) (91422ms) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by single Project.Thu Aug 24 2023 09:43:08 GMT+0000 (Greenwich Mean Time) (91422ms) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by multiple Projects.Thu Aug 24 2023 09:43:08 GMT+0000 (Greenwich Mean Time) (113277ms) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by multiple Projects.Thu Aug 24 2023 09:43:08 GMT+0000 (Greenwich Mean Time) (113277ms) 2 passing (3m) 2 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_050.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 25 seconds │ │ Estimated: 3 minutes, 5 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-6681-verify-sent-summary-data-after-filtering-by-project.spec │ │ .ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-6681-verify-sent-summary-data-after-filtering-by-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5425-verify-received-summary-data-after-filte (52 of 114) ring-by-project.spec.ts Estimated: 2 minutes, 38 seconds T&M | Verify the RECEIVED Labor Hours Summary and T&M Log Summary shows correct values before and after filtering.Thu Aug 24 2023 09:46:45 GMT+0000 (Greenwich Mean Time) T&M | Verify the RECEIVED Labor Hours Summary and T&M Log Summary shows correct values before and after filtering.Thu Aug 24 2023 09:46:45 GMT+0000 (Greenwich Mean Time) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by single project.Thu Aug 24 2023 09:46:45 GMT+0000 (Greenwich Mean Time) (94202ms) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by single project.Thu Aug 24 2023 09:46:45 GMT+0000 (Greenwich Mean Time) (94202ms) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by multiple projects.Thu Aug 24 2023 09:46:45 GMT+0000 (Greenwich Mean Time) (54903ms) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by multiple projects.Thu Aug 24 2023 09:46:45 GMT+0000 (Greenwich Mean Time) (54903ms) 2 passing (3m) 2 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_051.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 33 seconds │ │ Estimated: 2 minutes, 38 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5425-verify-received-summary-data-after-filtering-by-proj │ │ ect.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Received\ex-5425-verify-received-summary-data-after-filtering-by-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5429-verify-received-export-csv-after-filteri (53 of 114) ng-by-project.spec.ts Estimated: 1 minute, 24 seconds T&M | Verify the T&M Log / RECEIVED CSV exports.Thu Aug 24 2023 09:49:25 GMT+0000 (Greenwich Mean Time) T&M | Verify the T&M Log / RECEIVED CSV exports.Thu Aug 24 2023 09:49:25 GMT+0000 (Greenwich Mean Time) √ EX-5429 - Verify the T&M Log / RECEIVED CSV export.Thu Aug 24 2023 09:49:25 GMT+0000 (Greenwich Mean Time) (79724ms) √ EX-5429 - Verify the T&M Log / RECEIVED CSV export.Thu Aug 24 2023 09:49:25 GMT+0000 (Greenwich Mean Time) (79724ms) 1 passing (1m) 1 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_052.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 20 seconds │ │ Estimated: 1 minute, 24 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5429-verify-received-export-csv-after-filtering-by-projec │ │ t.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Received\ex-5429-verify-received-export-csv-after-filtering-by-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5431-verify-received-export-sharelog-after-fi (54 of 114) ltering-by-project.spec.ts Estimated: 1 minute, 24 seconds T&M | Verify the T&M Log / RECEIVED ShareLog exports.Thu Aug 24 2023 09:50:53 GMT+0000 (Greenwich Mean Time) T&M | Verify the T&M Log / RECEIVED ShareLog exports.Thu Aug 24 2023 09:50:53 GMT+0000 (Greenwich Mean Time) √ EX-5431 - Verify the T&M Log / RECEIVED ShareLog export.Thu Aug 24 2023 09:50:53 GMT+0000 (Greenwich Mean Time) (86076ms) √ EX-5431 - Verify the T&M Log / RECEIVED ShareLog export.Thu Aug 24 2023 09:50:53 GMT+0000 (Greenwich Mean Time) (86076ms) 1 passing (1m) 1 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_053.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 26 seconds │ │ Estimated: 1 minute, 24 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5431-verify-received-export-sharelog-after-filtering-by-p │ │ roject.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Received\ex-5431-verify-received-export-sharelog-after-filtering-by-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5641-verify-tnm-log-received-summary-data-aft (55 of 114) er-filtering-by-tag-status.spec.ts Estimated: 6 minutes, 44 seconds T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Thu Aug 24 2023 09:52:26 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Thu Aug 24 2023 09:52:26 GMT+0000 (Greenwich Mean Time) √ EX-5641 - Filter by status Awaiting Signature and verify the Summary data for the test project.Thu Aug 24 2023 09:52:26 GMT+0000 (Greenwich Mean Time) (83880ms) √ EX-5641 - Filter by status Awaiting Signature and verify the Summary data for the test project.Thu Aug 24 2023 09:52:26 GMT+0000 (Greenwich Mean Time) (83880ms) √ EX-5641 - Filter by status Open and verify the Summary data for the test project.Thu Aug 24 2023 09:52:26 GMT+0000 (Greenwich Mean Time) (81326ms) √ EX-5641 - Filter by status Open and verify the Summary data for the test project.Thu Aug 24 2023 09:52:26 GMT+0000 (Greenwich Mean Time) (81326ms) √ EX-5641 - Filter by status Rejected and verify the Summary data for the test project.Thu Aug 24 2023 09:52:26 GMT+0000 (Greenwich Mean Time) (79671ms) √ EX-5641 - Filter by status Rejected and verify the Summary data for the test project.Thu Aug 24 2023 09:52:26 GMT+0000 (Greenwich Mean Time) (79671ms) √ EX-5641 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Thu Aug 24 2023 09:52:26 GMT+0000 (Greenwich Mean Time) (80283ms) √ EX-5641 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Thu Aug 24 2023 09:52:26 GMT+0000 (Greenwich Mean Time) (80283ms) √ EX-5641 - Filter by status Signed and verify the Summary data for the test project.Thu Aug 24 2023 09:52:26 GMT+0000 (Greenwich Mean Time) (74716ms) √ EX-5641 - Filter by status Signed and verify the Summary data for the test project.Thu Aug 24 2023 09:52:26 GMT+0000 (Greenwich Mean Time) (74716ms) 5 passing (7m) 5 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_054.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 46 seconds │ │ Estimated: 6 minutes, 44 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5641-verify-tnm-log-received-summary-data-after-filtering │ │ -by-tag-status.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Received\ex-5641-verify-tnm-log-received-summary-data-after-filtering-by-tag-status.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-1-gc-creates-project-and-contract-sc-creates (56 of 114) -tag-optional-signer.spec.ts Estimated: 5 minutes, 8 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 09:59:20 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 09:59:20 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 1: GC PM creates a projectThu Aug 24 2023 09:59:20 GMT+0000 (Greenwich Mean Time) (67228ms) √ EX-4415 - Part 1: GC PM creates a projectThu Aug 24 2023 09:59:20 GMT+0000 (Greenwich Mean Time) (67228ms) √ EX-4415 - Part 2: GC PM adds a contract with SC PM.Thu Aug 24 2023 09:59:20 GMT+0000 (Greenwich Mean Time) (47947ms) √ EX-4415 - Part 2: GC PM adds a contract with SC PM.Thu Aug 24 2023 09:59:20 GMT+0000 (Greenwich Mean Time) (47947ms) √ EX-4415 - Part 3.1: Sub Contractor accepts invite from the bell notification.Thu Aug 24 2023 09:59:20 GMT+0000 (Greenwich Mean Time) (32587ms) √ EX-4415 - Part 3.1: Sub Contractor accepts invite from the bell notification.Thu Aug 24 2023 09:59:20 GMT+0000 (Greenwich Mean Time) (32587ms) √ EX-4415 - Part 3.2: Sub Contractor adds users to the project.Thu Aug 24 2023 09:59:20 GMT+0000 (Greenwich Mean Time) (83443ms) √ EX-4415 - Part 3.2: Sub Contractor adds users to the project.Thu Aug 24 2023 09:59:20 GMT+0000 (Greenwich Mean Time) (83443ms) √ EX-4415 - Part 4: Sub Contractor creates a Tag and sends signature request.Thu Aug 24 2023 09:59:20 GMT+0000 (Greenwich Mean Time) (104518ms) √ EX-4415 - Part 4: Sub Contractor creates a Tag and sends signature request.Thu Aug 24 2023 09:59:20 GMT+0000 (Greenwich Mean Time) (104518ms) 5 passing (6m) 5 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_055.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 36 seconds │ │ Estimated: 5 minutes, 8 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-1-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-1-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-2-gc-creates-project-and-contract-sc-creates (57 of 114) -tag-optional-signer.spec.ts Estimated: 7 minutes, 19 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:05:04 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:05:04 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 5: Sub Contractor ADD Labor valuesThu Aug 24 2023 10:05:04 GMT+0000 (Greenwich Mean Time) (253927ms) √ EX-4415 - Part 5: Sub Contractor ADD Labor valuesThu Aug 24 2023 10:05:04 GMT+0000 (Greenwich Mean Time) (253927ms) √ EX-4415 - Part 6: Sub Contractor Add Material valuesThu Aug 24 2023 10:05:04 GMT+0000 (Greenwich Mean Time) (182732ms) √ EX-4415 - Part 6: Sub Contractor Add Material valuesThu Aug 24 2023 10:05:04 GMT+0000 (Greenwich Mean Time) (182732ms) 2 passing (7m) 2 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_056.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 19 seconds │ │ Estimated: 7 minutes, 19 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-2-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-2-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-3-gc-creates-project-and-contract-sc-creates (58 of 114) -tag-optional-signer.spec.ts Estimated: 3 minutes, 48 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:12:31 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:12:31 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 7: Sub Contractor Adds Equipment. Thu Aug 24 2023 10:12:31 GMT+0000 (Greenwich Mean Time) (225139ms) √ EX-4415 - Part 7: Sub Contractor Adds Equipment. Thu Aug 24 2023 10:12:31 GMT+0000 (Greenwich Mean Time) (225139ms) 1 passing (4m) 1 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_057.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 45 seconds │ │ Estimated: 3 minutes, 48 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-3-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-3-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-4-gc-creates-project-and-contract-sc-creates (59 of 114) -tag-optional-signer.spec.ts Estimated: 3 minutes, 54 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:16:25 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:16:25 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 8: Sub Contractor Adds Other. Thu Aug 24 2023 10:16:25 GMT+0000 (Greenwich Mean Time) (291898ms) √ EX-4415 - Part 8: Sub Contractor Adds Other. Thu Aug 24 2023 10:16:25 GMT+0000 (Greenwich Mean Time) (291898ms) 1 passing (5m) 1 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_058.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 54 seconds │ │ Estimated: 3 minutes, 54 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-4-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-4-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-5-gc-creates-project-and-contract-sc-creates (60 of 114) -tag-optional-signer.spec.ts Estimated: 3 minutes, 28 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:21:29 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:21:29 GMT+0000 (Greenwich Mean Time) 1) EX-4415 - Part 9 : Sub Contractor uploads files.Thu Aug 24 2023 10:21:29 GMT+0000 (Greenwich Mean Time) 1) EX-4415 - Part 9 : Sub Contractor uploads files.Thu Aug 24 2023 10:21:29 GMT+0000 (Greenwich Mean Time) 2) EX-4415 - Part 10 : Sub Contractor signs the Tag.Thu Aug 24 2023 10:21:29 GMT+0000 (Greenwich Mean Time) 2) EX-4415 - Part 10 : Sub Contractor signs the Tag.Thu Aug 24 2023 10:21:29 GMT+0000 (Greenwich Mean Time) 0 passing (4m) 2 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:21:29 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 9 : Sub Contractor uploads files.Thu Aug 24 2023 10:21:29 GMT+0000 (Greenwich Mean Time): CypressError: `cy.fixture()` timed out waiting `30000ms` to receive a fixture. No fixture was ever sent by the server. https://on.cypress.io/fixture at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:119584:77) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4186:41) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1697:18) at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2407:12) at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2400:9) at Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2416:5) at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2286:14) From Your Spec Code: at getFileContent (webpack://cypress-extracker-webapp/./node_modules/cypress-file-upload/dist/bundle.js:273:0) at eval (webpack://cypress-extracker-webapp/./node_modules/cypress-file-upload/dist/bundle.js:454:0) at resolveFile (webpack://cypress-extracker-webapp/./node_modules/cypress-file-upload/dist/bundle.js:454:0) at eval (webpack://cypress-extracker-webapp/./node_modules/cypress-file-upload/dist/bundle.js:651:0) at Array.map () at Context.eval (webpack://cypress-extracker-webapp/./node_modules/cypress-file-upload/dist/bundle.js:651:0) 2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:21:29 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 10 : Sub Contractor signs the Tag.Thu Aug 24 2023 10:21:29 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `ul[class='MuiList-root MuiList-padding'] li[class='MuiListItem-root MuiListItem-gutters'] div[class='MuiListItemText-root'] span`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:82:7) 0 passing (4m) 2 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:21:29 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 9 : Sub Contractor uploads files.Thu Aug 24 2023 10:21:29 GMT+0000 (Greenwich Mean Time): CypressError: `cy.fixture()` timed out waiting `30000ms` to receive a fixture. No fixture was ever sent by the server. https://on.cypress.io/fixture at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:119584:77) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4186:41) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1697:18) at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2407:12) at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2400:9) at Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2416:5) at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2286:14) From Your Spec Code: at getFileContent (webpack://cypress-extracker-webapp/./node_modules/cypress-file-upload/dist/bundle.js:273:0) at eval (webpack://cypress-extracker-webapp/./node_modules/cypress-file-upload/dist/bundle.js:454:0) at resolveFile (webpack://cypress-extracker-webapp/./node_modules/cypress-file-upload/dist/bundle.js:454:0) at eval (webpack://cypress-extracker-webapp/./node_modules/cypress-file-upload/dist/bundle.js:651:0) at Array.map () at Context.eval (webpack://cypress-extracker-webapp/./node_modules/cypress-file-upload/dist/bundle.js:651:0) 2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:21:29 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 10 : Sub Contractor signs the Tag.Thu Aug 24 2023 10:21:29 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `ul[class='MuiList-root MuiList-padding'] li[class='MuiListItem-root MuiListItem-gutters'] div[class='MuiListItemText-root'] span`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:82:7) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_059.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 0 │ │ Failing: 2 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 2 │ │ Video: true │ │ Duration: 4 minutes, 17 seconds │ │ Estimated: 3 minutes, 28 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 102129 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 9 Sub Contractor uploads files.Thu Aug 24 2023 102129 G.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 102129 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 10 Sub Contractor signs the Tag.Thu Aug 24 2023 102129 .png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 43% Compression progress: 87% - Finished compressing: 43 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 102129 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 9 Sub Contractor uploads files.Thu Aug 24 2023 102129 G.png - Done Uploading (2/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 102129 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 10 Sub Contractor signs the Tag.Thu Aug 24 2023 102129 .png - Done Uploading (3/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates (61 of 114) -tag-optional-signer.spec.ts Estimated: 6 minutes, 28 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:26:39 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:26:39 GMT+0000 (Greenwich Mean Time) 1) EX-4415 - Part 11 : Sub Contractor sends signature request.Thu Aug 24 2023 10:26:39 GMT+0000 (Greenwich Mean Time) 1) EX-4415 - Part 11 : Sub Contractor sends signature request.Thu Aug 24 2023 10:26:39 GMT+0000 (Greenwich Mean Time) 2) EX-4415 - Part 12: Verify the tag was created.Thu Aug 24 2023 10:26:39 GMT+0000 (Greenwich Mean Time) 2) EX-4415 - Part 12: Verify the tag was created.Thu Aug 24 2023 10:26:39 GMT+0000 (Greenwich Mean Time) 3) EX-4415 - Part 13: Verify the GC sees the tag.Thu Aug 24 2023 10:26:39 GMT+0000 (Greenwich Mean Time) 3) EX-4415 - Part 13: Verify the GC sees the tag.Thu Aug 24 2023 10:26:39 GMT+0000 (Greenwich Mean Time) 4) EX-4415 - Part 14: Verify GC PM User recived emailsThu Aug 24 2023 10:33:01 GMT+0000 (Greenwich Mean Time) 4) EX-4415 - Part 14: Verify GC PM User recived emailsThu Aug 24 2023 10:33:01 GMT+0000 (Greenwich Mean Time) 5) EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) 5) EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) 6) EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) 6) EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) 7) EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) 7) EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 18: Cleanup...Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) (52443ms) √ EX-4415 - Part 18: Cleanup...Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) (52443ms) 1 passing (11m) 7 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 11 : Sub Contractor sends signature request.Thu Aug 24 2023 10:26:39 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `[data-cy="sign-field"] img`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:7:34) 2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 12: Verify the tag was created.Thu Aug 24 2023 10:26:39 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='awaitingSignatureStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:7:34) 3) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 13: Verify the GC sees the tag.Thu Aug 24 2023 10:26:39 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Create T&M Tag for Test Project TC4415 1692871161709' within the selector: 'td' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:45:26) 4) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 14: Verify GC PM User recived emailsThu Aug 24 2023 10:33:01 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC4415 1692871161709' within the selector: 'td' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34) 5) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'You have received a new T&M Tag signature request' within the element: but never did. at bellNotifications.OpenBellNotificaitonTagSignatureRequestLink (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Bell_Notifications.ts:29:104) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts:147:20) 6) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:7:34) 7) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:7:34) 1 passing (11m) 7 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 11 : Sub Contractor sends signature request.Thu Aug 24 2023 10:26:39 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `[data-cy="sign-field"] img`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:7:34) 2) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 12: Verify the tag was created.Thu Aug 24 2023 10:26:39 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='awaitingSignatureStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:7:34) 3) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 13: Verify the GC sees the tag.Thu Aug 24 2023 10:26:39 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Create T&M Tag for Test Project TC4415 1692871161709' within the selector: 'td' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:45:26) 4) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 14: Verify GC PM User recived emailsThu Aug 24 2023 10:33:01 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC4415 1692871161709' within the selector: 'td' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34) 5) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'You have received a new T&M Tag signature request' within the element: but never did. at bellNotifications.OpenBellNotificaitonTagSignatureRequestLink (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Bell_Notifications.ts:29:104) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts:147:20) 6) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:7:34) 7) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time) EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Thu Aug 24 2023 10:33:37 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[data-cy='signedStatus']`, but never found it. Queried from: > cy.get(body) at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:7:34) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_060.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 1 │ │ Failing: 7 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 7 │ │ Video: true │ │ Duration: 11 minutes, 13 seconds │ │ Estimated: 6 minutes, 28 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 102639 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 11 Sub Contractor sends signature r equest.Thu Aug 24 20.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 102639 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 12 Verify the tag was created.Thu Au g 24 2023 102639 GMT.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 102639 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 13 Verify the GC sees the tag.Thu Au g 24 2023 102639 GMT.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 103301 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 14 Verify GC PM User recived emailsT hu Aug 24 2023 10330.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 103337 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 15 Verify the GC received Bell Notif ication and use it t.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 103337 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 16 Verify the tag status in the GC T &M Log.Thu Aug 24 20.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signe r.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM sen d a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 103337 GMT+0 000 (Greenwich Mean Time) -- EX-4415 - Part 17 Verify the tag status in the SC T &MM Log.Thu Aug 24 2.png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 10% Compression progress: 21% Compression progress: 31% Compression progress: 41% Compression progress: 51% Compression progress: 61% Compression progress: 71% Compression progress: 82% Compression progress: 92% - Finished compressing: 1 minute, 47 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 103337 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 17 Verify the tag status in the SC T&MM Log.Thu Aug 24 2.png - Done Uploading (2/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 103337 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 15 Verify the GC received Bell Notification and use it t.png - Done Uploading (3/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 102639 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 12 Verify the tag was created.Thu Aug 24 2023 102639 GMT.png - Done Uploading (4/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 102639 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 13 Verify the GC sees the tag.Thu Aug 24 2023 102639 GMT.png - Done Uploading (5/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 103337 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 16 Verify the tag status in the GC T&M Log.Thu Aug 24 20.png - Done Uploading (6/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 102639 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 11 Sub Contractor sends signature request.Thu Aug 24 20.png - Done Uploading (7/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 103301 GMT+0000 (Greenwich Mean Time) -- EX-4415 - Part 14 Verify GC PM User recived emailsThu Aug 24 2023 10330.png - Done Uploading (8/8) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5424-verify-sent-summary-data-after-filtering-by- (62 of 114) project.spec.ts Estimated: 3 minutes, 20 seconds As Sub Contractor go to T&M Log / Sent and verify the Summary data for the test project.Thu Aug 24 2023 10:39:48 GMT+0000 (Greenwich Mean Time) As Sub Contractor go to T&M Log / Sent and verify the Summary data for the test project.Thu Aug 24 2023 10:39:48 GMT+0000 (Greenwich Mean Time) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log Overview Summary shows correct values when filtered by single Project.Thu Aug 24 2023 10:39:48 GMT+0000 (Greenwich Mean Time) (84109ms) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log Overview Summary shows correct values when filtered by single Project.Thu Aug 24 2023 10:39:48 GMT+0000 (Greenwich Mean Time) (84109ms) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log OVerview Summary shows correct values when filtered by multiple Projects.Thu Aug 24 2023 10:39:48 GMT+0000 (Greenwich Mean Time) (134026ms) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log OVerview Summary shows correct values when filtered by multiple Projects.Thu Aug 24 2023 10:39:48 GMT+0000 (Greenwich Mean Time) (134026ms) 2 passing (4m) 2 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_061.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 42 seconds │ │ Estimated: 3 minutes, 20 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5424-verify-sent-summary-data-after-filtering-by-project.spec │ │ .ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5424-verify-sent-summary-data-after-filtering-by-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5430-verify-sent-export-csv-after-filtering-by-pr (63 of 114) oject.spec.ts Estimated: 1 minute, 22 seconds T&M | Verify the T&M Log / Sent CSV export.Thu Aug 24 2023 10:43:36 GMT+0000 (Greenwich Mean Time) T&M | Verify the T&M Log / Sent CSV export.Thu Aug 24 2023 10:43:36 GMT+0000 (Greenwich Mean Time) √ EX-5430 - Verify the T&M Log / Sent CSV export.Thu Aug 24 2023 10:43:37 GMT+0000 (Greenwich Mean Time) (62084ms) √ EX-5430 - Verify the T&M Log / Sent CSV export.Thu Aug 24 2023 10:43:37 GMT+0000 (Greenwich Mean Time) (62084ms) 1 passing (1m) 1 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_062.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 2 seconds │ │ Estimated: 1 minute, 22 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5430-verify-sent-export-csv-after-filtering-by-project.spec.t │ │ s │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5430-verify-sent-export-csv-after-filtering-by-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5505-verify-tnm-log-sent-summary-data-after-filte (64 of 114) ring-by-customer.spec.ts Estimated: 2 minutes, 18 seconds T&M | Verify filtering the T&M Log / SENT, by Customer, returns correct values for Labor Hours Summary.Thu Aug 24 2023 10:44:45 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Customer, returns correct values for Labor Hours Summary.Thu Aug 24 2023 10:44:45 GMT+0000 (Greenwich Mean Time) √ EX-5505 - Filter by Customer and verify the Summary Labour Hours and T&M Log Overview Summary data for the test project.Thu Aug 24 2023 10:44:45 GMT+0000 (Greenwich Mean Time) (136959ms) √ EX-5505 - Filter by Customer and verify the Summary Labour Hours and T&M Log Overview Summary data for the test project.Thu Aug 24 2023 10:44:45 GMT+0000 (Greenwich Mean Time) (136959ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_063.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 18 seconds │ │ Estimated: 2 minutes, 18 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5505-verify-tnm-log-sent-summary-data-after-filtering-by-cust │ │ omer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5505-verify-tnm-log-sent-summary-data-after-filtering-by-customer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5506-verify-tnm-log-sent-summary-data-after-filte (65 of 114) ring-by-job-number.spec.ts Estimated: 2 minutes, 17 seconds T&M | Verify filtering the T&M Log / SENT, by Job Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Thu Aug 24 2023 10:47:11 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Job Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Thu Aug 24 2023 10:47:11 GMT+0000 (Greenwich Mean Time) √ EX-5506 - Filter by JobNumber and verify the Summary data for the test project.Thu Aug 24 2023 10:47:11 GMT+0000 (Greenwich Mean Time) (137264ms) √ EX-5506 - Filter by JobNumber and verify the Summary data for the test project.Thu Aug 24 2023 10:47:11 GMT+0000 (Greenwich Mean Time) (137264ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_064.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 18 seconds │ │ Estimated: 2 minutes, 17 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5506-verify-tnm-log-sent-summary-data-after-filtering-by-job- │ │ number.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5506-verify-tnm-log-sent-summary-data-after-filtering-by-job-number.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5507-verify-tnm-log-sent-summary-data-after-filte (66 of 114) ring-by-cust-ref-num.spec.ts Estimated: 2 minutes, 9 seconds T&M | Verify filtering the T&M Log / SENT, by Custmer Reference Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Thu Aug 24 2023 10:49:37 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Custmer Reference Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Thu Aug 24 2023 10:49:37 GMT+0000 (Greenwich Mean Time) √ EX-5507 - Filter by CustRefNum and verify the Summary data for the test project.Thu Aug 24 2023 10:49:37 GMT+0000 (Greenwich Mean Time) (136124ms) √ EX-5507 - Filter by CustRefNum and verify the Summary data for the test project.Thu Aug 24 2023 10:49:37 GMT+0000 (Greenwich Mean Time) (136124ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_065.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 16 seconds │ │ Estimated: 2 minutes, 9 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5507-verify-tnm-log-sent-summary-data-after-filtering-by-cust │ │ -ref-num.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5507-verify-tnm-log-sent-summary-data-after-filtering-by-cust-ref-num.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5508-verify-tnm-log-sent-summary-data-after-filte (67 of 114) ring-by-tag-status.spec.ts Estimated: 15 minutes, 7 seconds T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Thu Aug 24 2023 10:52:01 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Thu Aug 24 2023 10:52:01 GMT+0000 (Greenwich Mean Time) √ EX-5508 - Filter by status Awaiting Signature and verify the Summary data for the test project.Thu Aug 24 2023 10:52:01 GMT+0000 (Greenwich Mean Time) (136394ms) √ EX-5508 - Filter by status Awaiting Signature and verify the Summary data for the test project.Thu Aug 24 2023 10:52:01 GMT+0000 (Greenwich Mean Time) (136394ms) √ EX-5508 - Filter by status Draft and verify the Summary data for the test project.Thu Aug 24 2023 10:52:01 GMT+0000 (Greenwich Mean Time) (125848ms) √ EX-5508 - Filter by status Draft and verify the Summary data for the test project.Thu Aug 24 2023 10:52:01 GMT+0000 (Greenwich Mean Time) (125848ms) √ EX-5508 - Filter by status Open and verify the Summary data for the test project.Thu Aug 24 2023 10:52:01 GMT+0000 (Greenwich Mean Time) (124543ms) √ EX-5508 - Filter by status Open and verify the Summary data for the test project.Thu Aug 24 2023 10:52:01 GMT+0000 (Greenwich Mean Time) (124543ms) √ EX-5508 - Filter by status Rejected and verify the Summary data for the test project.Thu Aug 24 2023 10:52:01 GMT+0000 (Greenwich Mean Time) (134570ms) √ EX-5508 - Filter by status Rejected and verify the Summary data for the test project.Thu Aug 24 2023 10:52:01 GMT+0000 (Greenwich Mean Time) (134570ms) √ EX-5508 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Thu Aug 24 2023 10:52:01 GMT+0000 (Greenwich Mean Time) (133083ms) √ EX-5508 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Thu Aug 24 2023 10:52:01 GMT+0000 (Greenwich Mean Time) (133083ms) √ EX-5508 - Filter by status Signed and verify the Summary data for the test project.Thu Aug 24 2023 10:52:01 GMT+0000 (Greenwich Mean Time) (131133ms) √ EX-5508 - Filter by status Signed and verify the Summary data for the test project.Thu Aug 24 2023 10:52:01 GMT+0000 (Greenwich Mean Time) (131133ms) √ EX-5508 - Filter by status Signed Not Sent and verify the Summary data for the test project.Thu Aug 24 2023 10:52:01 GMT+0000 (Greenwich Mean Time) (133416ms) √ EX-5508 - Filter by status Signed Not Sent and verify the Summary data for the test project.Thu Aug 24 2023 10:52:01 GMT+0000 (Greenwich Mean Time) (133416ms) 7 passing (15m) 7 passing (15m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_066.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 15 minutes, 29 seconds │ │ Estimated: 15 minutes, 7 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5508-verify-tnm-log-sent-summary-data-after-filtering-by-tag- │ │ status.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5508-verify-tnm-log-sent-summary-data-after-filtering-by-tag-status.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5509-verify-tnm-log-sent-summary-data-after-filte (68 of 114) ring-by-cust-label.spec.ts Estimated: 2 minutes, 12 seconds T&M | Verify filtering the T&M Log/SENT, by Label, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Thu Aug 24 2023 11:07:37 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log/SENT, by Label, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Thu Aug 24 2023 11:07:37 GMT+0000 (Greenwich Mean Time) √ EX-5509 - Filter by Label and verify the Summary data for the test project.Thu Aug 24 2023 11:07:37 GMT+0000 (Greenwich Mean Time) (135581ms) √ EX-5509 - Filter by Label and verify the Summary data for the test project.Thu Aug 24 2023 11:07:37 GMT+0000 (Greenwich Mean Time) (135581ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_067.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 15 seconds │ │ Estimated: 2 minutes, 12 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5509-verify-tnm-log-sent-summary-data-after-filtering-by-cust │ │ -label.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5509-verify-tnm-log-sent-summary-data-after-filtering-by-cust-label.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5510-verify-tnm-log-sent-summary-data-after-filte (69 of 114) ring-by-cor-availability.spec.ts Estimated: 4 minutes, 8 seconds T&M | Verify filtering the T&M Log/SENT, by COR availability, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Thu Aug 24 2023 11:10:01 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log/SENT, by COR availability, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Thu Aug 24 2023 11:10:01 GMT+0000 (Greenwich Mean Time) √ EX-5510 - Filter by 'Display Pending CORs only' and verify the Summary data for the test project.Thu Aug 24 2023 11:10:01 GMT+0000 (Greenwich Mean Time) (136089ms) √ EX-5510 - Filter by 'Display Pending CORs only' and verify the Summary data for the test project.Thu Aug 24 2023 11:10:01 GMT+0000 (Greenwich Mean Time) (136089ms) √ EX-5510 - Filter by 'Display Tags with CORs only' and verify the Summary data for the test project.Thu Aug 24 2023 11:10:01 GMT+0000 (Greenwich Mean Time) (119983ms) √ EX-5510 - Filter by 'Display Tags with CORs only' and verify the Summary data for the test project.Thu Aug 24 2023 11:10:01 GMT+0000 (Greenwich Mean Time) (119983ms) 2 passing (4m) 2 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_068.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 20 seconds │ │ Estimated: 4 minutes, 8 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5510-verify-tnm-log-sent-summary-data-after-filtering-by-cor- │ │ availability.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5510-verify-tnm-log-sent-summary-data-after-filtering-by-cor-availability.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6191-sc-creates-tag-required-signer-gc-signs-tag. (70 of 114) spec.ts Estimated: 16 minutes, 37 seconds T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Thu Aug 24 2023 11:14:29 GMT+0000 (Greenwich Mean Time) T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Thu Aug 24 2023 11:14:29 GMT+0000 (Greenwich Mean Time) √ EX-6191 - Part 0: Clean the tags (57846ms) √ EX-6191 - Part 0: Clean the tags (57846ms) √ EX-6191 - Part 1: Sub Contractor Admin creates tag and save it as draft.Thu Aug 24 2023 11:14:29 GMT+0000 (Greenwich Mean Time) (118346ms) √ EX-6191 - Part 1: Sub Contractor Admin creates tag and save it as draft.Thu Aug 24 2023 11:14:29 GMT+0000 (Greenwich Mean Time) (118346ms) √ EX-6191 - Part 2: Sub Contractor Admin adds LMEO to the draft. Thu Aug 24 2023 11:14:29 GMT+0000 (Greenwich Mean Time) (198869ms) √ EX-6191 - Part 2: Sub Contractor Admin adds LMEO to the draft. Thu Aug 24 2023 11:14:29 GMT+0000 (Greenwich Mean Time) (198869ms) √ EX-6191 - Part 3: Sub Contractor admin adds files. Thu Aug 24 2023 11:14:29 GMT+0000 (Greenwich Mean Time) (146849ms) √ EX-6191 - Part 3: Sub Contractor admin adds files. Thu Aug 24 2023 11:14:29 GMT+0000 (Greenwich Mean Time) (146849ms) √ EX-6191 - Part 4: Sub Contractor admin signs the tag.Thu Aug 24 2023 11:14:29 GMT+0000 (Greenwich Mean Time) (123993ms) √ EX-6191 - Part 4: Sub Contractor admin signs the tag.Thu Aug 24 2023 11:14:29 GMT+0000 (Greenwich Mean Time) (123993ms) √ EX-6191 - Part 5: Sub Contractor admin sends tag for signature.Thu Aug 24 2023 11:14:29 GMT+0000 (Greenwich Mean Time) (120898ms) √ EX-6191 - Part 5: Sub Contractor admin sends tag for signature.Thu Aug 24 2023 11:14:29 GMT+0000 (Greenwich Mean Time) (120898ms) √ EX-6191 - Part 6: Verify the tag was created.Thu Aug 24 2023 11:14:29 GMT+0000 (Greenwich Mean Time) (56968ms) √ EX-6191 - Part 6: Verify the tag was created.Thu Aug 24 2023 11:14:29 GMT+0000 (Greenwich Mean Time) (56968ms) √ EX-6191 - Part 7: Verify the GC Admin sees the tag.Thu Aug 24 2023 11:14:29 GMT+0000 (Greenwich Mean Time) (64122ms) √ EX-6191 - Part 7: Verify the GC Admin sees the tag.Thu Aug 24 2023 11:14:29 GMT+0000 (Greenwich Mean Time) (64122ms) √ EX-6191 - Part 8: Verify GC Admin recived emailsThu Aug 24 2023 11:29:37 GMT+0000 (Greenwich Mean Time) √ EX-6191 - Part 8: Verify GC Admin recived emailsThu Aug 24 2023 11:29:37 GMT+0000 (Greenwich Mean Time) √ EX-6191 - Part 9: Verify the GC Admin received Bell Notification and use it to sign the tag.Thu Aug 24 2023 11:29:45 GMT+0000 (Greenwich Mean Time) (38208ms) √ EX-6191 - Part 9: Verify the GC Admin received Bell Notification and use it to sign the tag.Thu Aug 24 2023 11:29:45 GMT+0000 (Greenwich Mean Time) (38208ms) √ EX-6191 - Part 10: Verify the tag status in the GC Admin T&M Log.Thu Aug 24 2023 11:29:45 GMT+0000 (Greenwich Mean Time) (69352ms) √ EX-6191 - Part 10: Verify the tag status in the GC Admin T&M Log.Thu Aug 24 2023 11:29:45 GMT+0000 (Greenwich Mean Time) (69352ms) √ EX-6191 - Part 11: Verify the tag status in the SC Admin T&M Log.Thu Aug 24 2023 11:29:45 GMT+0000 (Greenwich Mean Time) (59834ms) √ EX-6191 - Part 11: Verify the tag status in the SC Admin T&M Log.Thu Aug 24 2023 11:29:45 GMT+0000 (Greenwich Mean Time) (59834ms) √ EX-6191 - Part 12: Cleanup SC Tag ... Thu Aug 24 2023 11:29:45 GMT+0000 (Greenwich Mean Time) (55276ms) √ EX-6191 - Part 12: Cleanup SC Tag ... Thu Aug 24 2023 11:29:45 GMT+0000 (Greenwich Mean Time) (55276ms) 13 passing (19m) 13 passing (19m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_069.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 13 │ │ Passing: 13 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 18 minutes, 59 seconds │ │ Estimated: 16 minutes, 37 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6191-sc-creates-tag-required-signer-gc-signs-tag.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-6191-sc-creates-tag-required-signer-gc-signs-tag.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6193-sc-fu-creates-tag-required-signer-gc-fu-sign (71 of 114) s-tag.spec.ts Estimated: 7 minutes, 38 seconds T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Thu Aug 24 2023 11:33:37 GMT+0000 (Greenwich Mean Time) T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Thu Aug 24 2023 11:33:37 GMT+0000 (Greenwich Mean Time) √ EX-6193 - Part 1: Sub Contractor FU creates a Tag and sends signature request.Thu Aug 24 2023 11:33:37 GMT+0000 (Greenwich Mean Time) (297763ms) √ EX-6193 - Part 1: Sub Contractor FU creates a Tag and sends signature request.Thu Aug 24 2023 11:33:37 GMT+0000 (Greenwich Mean Time) (297763ms) √ EX-6193 - Part 2: Verify the tag was created.Thu Aug 24 2023 11:33:37 GMT+0000 (Greenwich Mean Time) (35909ms) √ EX-6193 - Part 2: Verify the tag was created.Thu Aug 24 2023 11:33:37 GMT+0000 (Greenwich Mean Time) (35909ms) √ EX-6193 - Part 3: Verify the GC FU sees the tag.Thu Aug 24 2023 11:33:37 GMT+0000 (Greenwich Mean Time) (28021ms) √ EX-6193 - Part 3: Verify the GC FU sees the tag.Thu Aug 24 2023 11:33:37 GMT+0000 (Greenwich Mean Time) (28021ms) √ EX-6193 - Part 4: Verify GC FU recived emailsThu Aug 24 2023 11:39:47 GMT+0000 (Greenwich Mean Time) √ EX-6193 - Part 4: Verify GC FU recived emailsThu Aug 24 2023 11:39:47 GMT+0000 (Greenwich Mean Time) √ EX-6193 - Part 5: Verify the GC FU received Bell Notification and use it to sign the tag.Thu Aug 24 2023 11:39:54 GMT+0000 (Greenwich Mean Time) (37158ms) √ EX-6193 - Part 5: Verify the GC FU received Bell Notification and use it to sign the tag.Thu Aug 24 2023 11:39:54 GMT+0000 (Greenwich Mean Time) (37158ms) √ EX-6193 - Part 6: Verify the tag status in the GC FU T&M Log.Thu Aug 24 2023 11:39:54 GMT+0000 (Greenwich Mean Time) (27374ms) √ EX-6193 - Part 6: Verify the tag status in the GC FU T&M Log.Thu Aug 24 2023 11:39:54 GMT+0000 (Greenwich Mean Time) (27374ms) √ EX-6193 - Part 7: Verify the tag status in the SC FU T&MM Log.Thu Aug 24 2023 11:39:54 GMT+0000 (Greenwich Mean Time) (33097ms) √ EX-6193 - Part 7: Verify the tag status in the SC FU T&MM Log.Thu Aug 24 2023 11:39:54 GMT+0000 (Greenwich Mean Time) (33097ms) √ EX-6193 - Part 8: Cleanup SC Tag ... Thu Aug 24 2023 11:39:54 GMT+0000 (Greenwich Mean Time) (50177ms) √ EX-6193 - Part 8: Cleanup SC Tag ... Thu Aug 24 2023 11:39:54 GMT+0000 (Greenwich Mean Time) (50177ms) 8 passing (9m) 8 passing (9m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_070.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 8 minutes, 44 seconds │ │ Estimated: 7 minutes, 38 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6193-sc-fu-creates-tag-required-signer-gc-fu-signs-tag.spec.t │ │ s │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-6193-sc-fu-creates-tag-required-signer-gc-fu-signs-tag.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-1-sc-pm-creates-project-and-contract-gc-pm-c (72 of 114) reates-tag-optional-signer.spec.ts Estimated: 13 minutes, 49 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 11:42:30 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 11:42:30 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 0: Clean existing tags. Thu Aug 24 2023 11:42:30 GMT+0000 (Greenwich Mean Time) (53378ms) √ EX-6324 - Part 0: Clean existing tags. Thu Aug 24 2023 11:42:30 GMT+0000 (Greenwich Mean Time) (53378ms) √ EX-6324 - Part 1: Sub Contractor creates a Tag and saves it as draft.Thu Aug 24 2023 11:42:30 GMT+0000 (Greenwich Mean Time) (104209ms) √ EX-6324 - Part 1: Sub Contractor creates a Tag and saves it as draft.Thu Aug 24 2023 11:42:30 GMT+0000 (Greenwich Mean Time) (104209ms) √ EX-6324 - Part 2: Sub Contractor ADD Labor values to the draft.Thu Aug 24 2023 11:42:30 GMT+0000 (Greenwich Mean Time) (265434ms) √ EX-6324 - Part 2: Sub Contractor ADD Labor values to the draft.Thu Aug 24 2023 11:42:30 GMT+0000 (Greenwich Mean Time) (265434ms) √ EX-6324 - Part 3: Sub Contractor Add Material values to the draft.Thu Aug 24 2023 11:42:30 GMT+0000 (Greenwich Mean Time) (195245ms) √ EX-6324 - Part 3: Sub Contractor Add Material values to the draft.Thu Aug 24 2023 11:42:30 GMT+0000 (Greenwich Mean Time) (195245ms) √ EX-6324 - Part 4: Sub Contractor Adds Equipment to the draft. Thu Aug 24 2023 11:42:30 GMT+0000 (Greenwich Mean Time) (236097ms) √ EX-6324 - Part 4: Sub Contractor Adds Equipment to the draft. Thu Aug 24 2023 11:42:30 GMT+0000 (Greenwich Mean Time) (236097ms) 5 passing (14m) 5 passing (14m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_071.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 14 minutes, 18 seconds │ │ Estimated: 13 minutes, 49 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-1-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-6324-1-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-2-sc-pm-creates-project-and-contract-gc-pm-c (73 of 114) reates-tag-optional-signer.spec.ts Estimated: 11 minutes, 24 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 11:56:56 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 11:56:56 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 5: Sub Contractor Adds Other to the draft. Thu Aug 24 2023 11:56:56 GMT+0000 (Greenwich Mean Time) (264490ms) √ EX-6324 - Part 5: Sub Contractor Adds Other to the draft. Thu Aug 24 2023 11:56:56 GMT+0000 (Greenwich Mean Time) (264490ms) √ EX-6324 - Part 6 : Sub Contractor upload files to the draft.Thu Aug 24 2023 11:56:56 GMT+0000 (Greenwich Mean Time) (136585ms) √ EX-6324 - Part 6 : Sub Contractor upload files to the draft.Thu Aug 24 2023 11:56:56 GMT+0000 (Greenwich Mean Time) (136585ms) √ EX-6324 - Part 7 : Sub Contractor removes one file from the draft.Thu Aug 24 2023 11:56:56 GMT+0000 (Greenwich Mean Time) (124565ms) √ EX-6324 - Part 7 : Sub Contractor removes one file from the draft.Thu Aug 24 2023 11:56:56 GMT+0000 (Greenwich Mean Time) (124565ms) √ EX-6324 - Part 8 : Sub Contractor signs the tag.Thu Aug 24 2023 11:56:56 GMT+0000 (Greenwich Mean Time) (132858ms) √ EX-6324 - Part 8 : Sub Contractor signs the tag.Thu Aug 24 2023 11:56:56 GMT+0000 (Greenwich Mean Time) (132858ms) 4 passing (11m) 4 passing (11m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_072.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 4 │ │ Passing: 4 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 11 minutes, 2 seconds │ │ Estimated: 11 minutes, 24 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-2-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-6324-2-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-c (74 of 114) reates-tag-optional-signer.spec.ts Estimated: 11 minutes, 23 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 12:08:06 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 12:08:06 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 9 : Sub Contractor removes his signature and re-adds it.Thu Aug 24 2023 12:08:06 GMT+0000 (Greenwich Mean Time) (139242ms) √ EX-6324 - Part 9 : Sub Contractor removes his signature and re-adds it.Thu Aug 24 2023 12:08:06 GMT+0000 (Greenwich Mean Time) (139242ms) √ EX-6324 - Part 10 : Sub Contractor removes a user from the TO list and adds another signerThu Aug 24 2023 12:08:06 GMT+0000 (Greenwich Mean Time) (154000ms) √ EX-6324 - Part 10 : Sub Contractor removes a user from the TO list and adds another signerThu Aug 24 2023 12:08:06 GMT+0000 (Greenwich Mean Time) (154000ms) √ EX-6324 - Part 11 : Sub Contractor sends signature request.Thu Aug 24 2023 12:08:06 GMT+0000 (Greenwich Mean Time) (128850ms) √ EX-6324 - Part 11 : Sub Contractor sends signature request.Thu Aug 24 2023 12:08:06 GMT+0000 (Greenwich Mean Time) (128850ms) √ EX-6324 - Part 12: Verify the tag status is Awaiting Signatures.Thu Aug 24 2023 12:08:06 GMT+0000 (Greenwich Mean Time) (49009ms) √ EX-6324 - Part 12: Verify the tag status is Awaiting Signatures.Thu Aug 24 2023 12:08:06 GMT+0000 (Greenwich Mean Time) (49009ms) 4 passing (8m) 4 passing (8m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_073.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 4 │ │ Passing: 4 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 54 seconds │ │ Estimated: 11 minutes, 23 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-c (75 of 114) reates-tag-optional-signer.spec.ts Estimated: 2 minutes, 20 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 12:16:08 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 12:16:08 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 13: Verify the GC sees the tag.Thu Aug 24 2023 12:16:08 GMT+0000 (Greenwich Mean Time) (46903ms) √ EX-6324 - Part 13: Verify the GC sees the tag.Thu Aug 24 2023 12:16:08 GMT+0000 (Greenwich Mean Time) (46903ms) √ EX-6324 - Part 14: Verify GC PM User recived emailsThu Aug 24 2023 12:17:02 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 14: Verify GC PM User recived emailsThu Aug 24 2023 12:17:02 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 15: Verify GC Owner User recived emails and sign the tagThu Aug 24 2023 12:17:02 GMT+0000 (Greenwich Mean Time) (13884ms) √ EX-6324 - Part 15: Verify GC Owner User recived emails and sign the tagThu Aug 24 2023 12:17:02 GMT+0000 (Greenwich Mean Time) (13884ms) 3 passing (1m) 3 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_074.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 3 │ │ Passing: 3 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 9 seconds │ │ Estimated: 2 minutes, 20 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-c (76 of 114) reates-tag-optional-signer.spec.ts Estimated: 8 minutes, 18 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 12:17:25 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Thu Aug 24 2023 12:17:25 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 16: Verify the tag status in the GC T&M Log.Thu Aug 24 2023 12:17:25 GMT+0000 (Greenwich Mean Time) (61606ms) √ EX-6324 - Part 16: Verify the tag status in the GC T&M Log.Thu Aug 24 2023 12:17:25 GMT+0000 (Greenwich Mean Time) (61606ms) √ EX-6324 - Part 17: Verify the tag status in the SC PM T&MM Log.Thu Aug 24 2023 12:17:25 GMT+0000 (Greenwich Mean Time) (46695ms) √ EX-6324 - Part 17: Verify the tag status in the SC PM T&MM Log.Thu Aug 24 2023 12:17:25 GMT+0000 (Greenwich Mean Time) (46695ms) √ EX-6324 - Part 18: Verify the tag status in the SC Owner T&MM Log.Thu Aug 24 2023 12:17:25 GMT+0000 (Greenwich Mean Time) (53814ms) √ EX-6324 - Part 18: Verify the tag status in the SC Owner T&MM Log.Thu Aug 24 2023 12:17:25 GMT+0000 (Greenwich Mean Time) (53814ms) √ EX-6324 - Part 19: Verify the tag status in the SC Admin T&MM Log.Thu Aug 24 2023 12:17:25 GMT+0000 (Greenwich Mean Time) (54565ms) √ EX-6324 - Part 19: Verify the tag status in the SC Admin T&MM Log.Thu Aug 24 2023 12:17:25 GMT+0000 (Greenwich Mean Time) (54565ms) √ EX-6324 - Part 20: Verify the tag status in the SC PM T&MM Log.Thu Aug 24 2023 12:17:25 GMT+0000 (Greenwich Mean Time) (34804ms) √ EX-6324 - Part 20: Verify the tag status in the SC PM T&MM Log.Thu Aug 24 2023 12:17:25 GMT+0000 (Greenwich Mean Time) (34804ms) √ EX-6324 - Part 21: Cleanup...Thu Aug 24 2023 12:17:25 GMT+0000 (Greenwich Mean Time) (63774ms) √ EX-6324 - Part 21: Cleanup...Thu Aug 24 2023 12:17:25 GMT+0000 (Greenwich Mean Time) (63774ms) 6 passing (5m) 6 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_075.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 16 seconds │ │ Estimated: 8 minutes, 18 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6335-sc-sends-tag-gc-signs-tag-as-optional-not-sa (77 of 114) ved-drafts.spec.ts Estimated: 10 minutes, 33 seconds EX-6335 | T&M | Workflow | Existing project and contract, SC PM send a tag. GC Owner signs the tag as one of four Optional Signers. Do not save as draft.Thu Aug 24 2023 12:22:50 GMT+0000 (Greenwich Mean Time) EX-6335 | T&M | Workflow | Existing project and contract, SC PM send a tag. GC Owner signs the tag as one of four Optional Signers. Do not save as draft.Thu Aug 24 2023 12:22:50 GMT+0000 (Greenwich Mean Time) √ EX-6335 - Part 1: Sub Contractor creates a Tag and sends signature request. Thu Aug 24 2023 12:22:50 GMT+0000 (Greenwich Mean Time) (296694ms) √ EX-6335 - Part 1: Sub Contractor creates a Tag and sends signature request. Thu Aug 24 2023 12:22:50 GMT+0000 (Greenwich Mean Time) (296694ms) √ EX-6335 - Part 2: Verify the tag was created. Thu Aug 24 2023 12:22:50 GMT+0000 (Greenwich Mean Time) (56919ms) √ EX-6335 - Part 2: Verify the tag was created. Thu Aug 24 2023 12:22:50 GMT+0000 (Greenwich Mean Time) (56919ms) √ EX-6335 - Part 3: Verify GC User and GC Feild user recived emails. Thu Aug 24 2023 12:28:54 GMT+0000 (Greenwich Mean Time) √ EX-6335 - Part 3: Verify GC User and GC Feild user recived emails. Thu Aug 24 2023 12:28:54 GMT+0000 (Greenwich Mean Time) √ EX-6335 - Part 4: Sign the Tag from Email. Thu Aug 24 2023 12:28:54 GMT+0000 (Greenwich Mean Time) (17401ms) √ EX-6335 - Part 4: Sign the Tag from Email. Thu Aug 24 2023 12:28:54 GMT+0000 (Greenwich Mean Time) (17401ms) √ EX-6335 - Part 5: Verify the tag status in the GC T&M Log. Thu Aug 24 2023 12:29:19 GMT+0000 (Greenwich Mean Time) (50700ms) √ EX-6335 - Part 5: Verify the tag status in the GC T&M Log. Thu Aug 24 2023 12:29:19 GMT+0000 (Greenwich Mean Time) (50700ms) √ EX-6335 - Part 6: Verify the tag status in the SC Admin T&M Log. Thu Aug 24 2023 12:29:19 GMT+0000 (Greenwich Mean Time) (62968ms) √ EX-6335 - Part 6: Verify the tag status in the SC Admin T&M Log. Thu Aug 24 2023 12:29:19 GMT+0000 (Greenwich Mean Time) (62968ms) √ EX-6335 - Part 7: Verify the tag status in the SC PM T&M Log. Thu Aug 24 2023 12:29:19 GMT+0000 (Greenwich Mean Time) (49354ms) √ EX-6335 - Part 7: Verify the tag status in the SC PM T&M Log. Thu Aug 24 2023 12:29:19 GMT+0000 (Greenwich Mean Time) (49354ms) √ EX-6335 - Part 8: Verify the tag status in the SC Owner T&MM Log. Thu Aug 24 2023 12:29:19 GMT+0000 (Greenwich Mean Time) (57339ms) √ EX-6335 - Part 8: Verify the tag status in the SC Owner T&MM Log. Thu Aug 24 2023 12:29:19 GMT+0000 (Greenwich Mean Time) (57339ms) √ EX-6335 - Part 9: Verify the tag status in the SC FieldUser T&MM Log. Thu Aug 24 2023 12:29:19 GMT+0000 (Greenwich Mean Time) (45097ms) √ EX-6335 - Part 9: Verify the tag status in the SC FieldUser T&MM Log. Thu Aug 24 2023 12:29:19 GMT+0000 (Greenwich Mean Time) (45097ms) √ EX-6335 - Part 10: Cleanup SC Tag ... Thu Aug 24 2023 12:29:19 GMT+0000 (Greenwich Mean Time) (47807ms) √ EX-6335 - Part 10: Cleanup SC Tag ... Thu Aug 24 2023 12:29:19 GMT+0000 (Greenwich Mean Time) (47807ms) 10 passing (12m) 10 passing (12m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_076.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 10 │ │ Passing: 10 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 11 minutes, 43 seconds │ │ Estimated: 10 minutes, 33 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6335-sc-sends-tag-gc-signs-tag-as-optional-not-saved-drafts.s │ │ pec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-6335-sc-sends-tag-gc-signs-tag-as-optional-not-saved-drafts.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-7224-switch-project-workflow.spec.ts (78 of 114) Estimated: 7 minutes, 0 seconds T&M | SC PM creates a project, creates a tag for it, creates another project, moves the tag to the new project.Thu Aug 24 2023 12:34:41 GMT+0000 (Greenwich Mean Time) T&M | SC PM creates a project, creates a tag for it, creates another project, moves the tag to the new project.Thu Aug 24 2023 12:34:41 GMT+0000 (Greenwich Mean Time) √ EX-7224 - Part 1: SC PM creates a Project A.Thu Aug 24 2023 12:34:41 GMT+0000 (Greenwich Mean Time) (55184ms) √ EX-7224 - Part 1: SC PM creates a Project A.Thu Aug 24 2023 12:34:41 GMT+0000 (Greenwich Mean Time) (55184ms) √ EX-7224 - Part 2: SC adds customer to Project A.Thu Aug 24 2023 12:34:41 GMT+0000 (Greenwich Mean Time) (44880ms) √ EX-7224 - Part 2: SC adds customer to Project A.Thu Aug 24 2023 12:34:41 GMT+0000 (Greenwich Mean Time) (44880ms) √ EX-7224 - Part 3: Sub Contractor creates a tag.Thu Aug 24 2023 12:34:41 GMT+0000 (Greenwich Mean Time) (112533ms) √ EX-7224 - Part 3: Sub Contractor creates a tag.Thu Aug 24 2023 12:34:41 GMT+0000 (Greenwich Mean Time) (112533ms) √ EX-7224 - Part 4: Sub Contractor creates Project B.Thu Aug 24 2023 12:34:41 GMT+0000 (Greenwich Mean Time) (47553ms) √ EX-7224 - Part 4: Sub Contractor creates Project B.Thu Aug 24 2023 12:34:41 GMT+0000 (Greenwich Mean Time) (47553ms) √ EX-7224 - Part 5: Sub Contractor switches the tag to Project B.Thu Aug 24 2023 12:34:41 GMT+0000 (Greenwich Mean Time) (86951ms) √ EX-7224 - Part 5: Sub Contractor switches the tag to Project B.Thu Aug 24 2023 12:34:41 GMT+0000 (Greenwich Mean Time) (86951ms) √ EX-7224 - Part 7: Clean up Project A.Thu Aug 24 2023 12:34:41 GMT+0000 (Greenwich Mean Time) (36359ms) √ EX-7224 - Part 7: Clean up Project A.Thu Aug 24 2023 12:34:41 GMT+0000 (Greenwich Mean Time) (36359ms) √ EX-7224 - Part 8: Cleanup Proejct B.Thu Aug 24 2023 12:34:41 GMT+0000 (Greenwich Mean Time) (35905ms) √ EX-7224 - Part 8: Cleanup Proejct B.Thu Aug 24 2023 12:34:41 GMT+0000 (Greenwich Mean Time) (35905ms) 7 passing (7m) 7 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_077.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 1 second │ │ Estimated: 7 minutes, 0 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-7224-switch-project-workflow.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-7224-switch-project-workflow.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 06_Draft_COR_Log/ex-11248-to-verify-that-draft-cor-can-be-created-an (79 of 114) d-is-in-CorDraftLog.spec.ts Estimated: 3 minutes, 12 seconds Draft COR Log | Create a Draft COR, verify its email distr. lists, verify it is not available in the COR Log and Delete it. Thu Aug 24 2023 12:41:50 GMT+0000 (Greenwich Mean Time) Draft COR Log | Create a Draft COR, verify its email distr. lists, verify it is not available in the COR Log and Delete it. Thu Aug 24 2023 12:41:50 GMT+0000 (Greenwich Mean Time) √ EX-11248 | Draft COR Log | Create a Draft COR and Delete it. Thu Aug 24 2023 12:41:50 GMT+0000 (Greenwich Mean Time) (183223ms) √ EX-11248 | Draft COR Log | Create a Draft COR and Delete it. Thu Aug 24 2023 12:41:50 GMT+0000 (Greenwich Mean Time) (183223ms) 1 passing (3m) 1 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_078.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 3 seconds │ │ Estimated: 3 minutes, 12 seconds │ │ Spec Ran: 06_Draft_COR_Log/ex-11248-to-verify-that-draft-cor-can-be-created-and-is-in-CorD │ │ raftLog.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\06_Draft_COR_Log\ex-11248-to-verify-that-draft-cor-can-be-created-and-is-in-CorDraftLog.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-6030-create-cn-respond-with-upload- (80 of 114) cor-verify-all-data.spec.ts Estimated: 7 minutes, 32 seconds Change Notifications | Create CN, respond to it with Upload COR and verify the data in the CN Log. Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) Change Notifications | Create CN, respond to it with Upload COR and verify the data in the CN Log. Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) √ EX-6030 Part 1: Create a project and send invite.Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) (55674ms) √ EX-6030 Part 1: Create a project and send invite.Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) (55674ms) √ EX-6030 Part 2: Add contractor.Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) (47015ms) √ EX-6030 Part 2: Add contractor.Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) (47015ms) √ EX-6030 Part 3: Sub Contractor accepts the invite.Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) (22607ms) √ EX-6030 Part 3: Sub Contractor accepts the invite.Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) (22607ms) √ EX-6030 Part 4: Gen Contractor creates a Pricing Request Change Notification.Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) (50783ms) √ EX-6030 Part 4: Gen Contractor creates a Pricing Request Change Notification.Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) (50783ms) √ EX-6030 Part 5: Sub Contractor responds to the Change Notification with Upload COR.Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) (96054ms) √ EX-6030 Part 5: Sub Contractor responds to the Change Notification with Upload COR.Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) (96054ms) √ EX-6030 Part 6: GC verifies CN data and status.Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) (43046ms) √ EX-6030 Part 6: GC verifies CN data and status.Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) (43046ms) √ EX-6030 Part 7: Cleanup GC...Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) (38345ms) √ EX-6030 Part 7: Cleanup GC...Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) (38345ms) √ EX-6030 Part 7: Cleanup SC...Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) (36418ms) √ EX-6030 Part 7: Cleanup SC...Thu Aug 24 2023 12:45:02 GMT+0000 (Greenwich Mean Time) (36418ms) 8 passing (7m) 8 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_079.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 31 seconds │ │ Estimated: 7 minutes, 32 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-6030-create-cn-respond-with-upload-cor-verify-a │ │ ll-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-6030-create-cn-respond-with-upload-cor-verify-all-data.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8597-respond-to-cn-as-SC-and-GC-cle (81 of 114) ar-response.spec.ts Estimated: 17 minutes, 37 seconds Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseThu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseThu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) √ EX-8597 Part 1: Delete existing CORs. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (142102ms) √ EX-8597 Part 1: Delete existing CORs. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (142102ms) √ EX-8597 Part 2: Delete existing CNs. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (41408ms) √ EX-8597 Part 2: Delete existing CNs. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (41408ms) √ EX-8597 Part 3: Create a CN with type as Authorize T&M Work and send it to Contractor. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (53424ms) √ EX-8597 Part 3: Create a CN with type as Authorize T&M Work and send it to Contractor. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (53424ms) √ EX-8597 Part 4: Respond to CN with No Cost Impact as SC PM. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (74585ms) √ EX-8597 Part 4: Respond to CN with No Cost Impact as SC PM. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (74585ms) √ EX-8597 Part 5: Verify the reponse and clear the response. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (61865ms) √ EX-8597 Part 5: Verify the reponse and clear the response. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (61865ms) √ EX-8597 Part 6: Respond to CN by creating a COR. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (81210ms) √ EX-8597 Part 6: Respond to CN by creating a COR. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (81210ms) √ EX-8597 Part 7: Verify the reponse and clear the response. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (69097ms) √ EX-8597 Part 7: Verify the reponse and clear the response. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (69097ms) √ EX-8597 Part 8: Respond to CN as SC PM by uploading a COR. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (74900ms) √ EX-8597 Part 8: Respond to CN as SC PM by uploading a COR. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (74900ms) √ EX-8597 Part 9: Verify the reponse and clear the response. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (71707ms) √ EX-8597 Part 9: Verify the reponse and clear the response. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (71707ms) √ EX-8597 Part 10: Respond to CN with No Cost Impact as GC PM and verify the reponse and clear the response. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (92752ms) √ EX-8597 Part 10: Respond to CN with No Cost Impact as GC PM and verify the reponse and clear the response. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (92752ms) √ EX-8597 Part 11: Respond to CN by linking received COR as GC PM and verify the reponse and clear the response. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (77098ms) √ EX-8597 Part 11: Respond to CN by linking received COR as GC PM and verify the reponse and clear the response. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (77098ms) √ EX-8597 Part 12: Clean the CORs. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (142753ms) √ EX-8597 Part 12: Clean the CORs. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (142753ms) √ EX-8597 Part 13: Clean the CNs. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (51793ms) √ EX-8597 Part 13: Clean the CNs. Thu Aug 24 2023 12:51:40 GMT+0000 (Greenwich Mean Time) (51793ms) 13 passing (17m) 13 passing (17m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_080.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 13 │ │ Passing: 13 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 17 minutes, 17 seconds │ │ Estimated: 17 minutes, 37 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8597-respond-to-cn-as-SC-and-GC-clear-response. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8597-respond-to-cn-as-SC-and-GC-clear-response.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8599-create-cn-authorize-t&mwork-re (82 of 114) spond-as-SC-PM-with-no-cost-impact.spec.ts Estimated: 4 minutes, 41 seconds Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor. ) Thu Aug 24 2023 13:09:04 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor. ) Thu Aug 24 2023 13:09:04 GMT+0000 (Greenwich Mean Time) √ EX-8599 Part 1: Delete existing CN (46855ms) √ EX-8599 Part 1: Delete existing CN (46855ms) √ EX-8599 Part 2: Create a CN with type as Authorize T&M Work and send it to Contractor. Thu Aug 24 2023 13:09:04 GMT+0000 (Greenwich Mean Time) (55307ms) √ EX-8599 Part 2: Create a CN with type as Authorize T&M Work and send it to Contractor. Thu Aug 24 2023 13:09:04 GMT+0000 (Greenwich Mean Time) (55307ms) √ EX-8599 Part 3: Respond to CN with No Cost Impact. Thu Aug 24 2023 13:09:04 GMT+0000 (Greenwich Mean Time) (78529ms) √ EX-8599 Part 3: Respond to CN with No Cost Impact. Thu Aug 24 2023 13:09:04 GMT+0000 (Greenwich Mean Time) (78529ms) √ EX-8599 Part 4: Verify the data as Gc. Thu Aug 24 2023 13:09:04 GMT+0000 (Greenwich Mean Time) (52440ms) √ EX-8599 Part 4: Verify the data as Gc. Thu Aug 24 2023 13:09:04 GMT+0000 (Greenwich Mean Time) (52440ms) √ EX-8599 Part 5: Delete the CN. Thu Aug 24 2023 13:09:04 GMT+0000 (Greenwich Mean Time) (41626ms) √ EX-8599 Part 5: Delete the CN. Thu Aug 24 2023 13:09:04 GMT+0000 (Greenwich Mean Time) (41626ms) 5 passing (5m) 5 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_081.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 35 seconds │ │ Estimated: 4 minutes, 41 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8599-create-cn-authorize-t&mwork-respond-as-SC- │ │ PM-with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8599-create-cn-authorize-t&mwork-respond-as-SC-PM-with-no-cost-impact.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8942-create-cn-pricing-request-resp (83 of 114) ond-as-SC-PM-with-no-cost-impact.spec.ts Estimated: 4 minutes, 16 seconds Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 13:13:47 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 13:13:47 GMT+0000 (Greenwich Mean Time) √ EX-8942 Part 1: Delete existing CN (45194ms) √ EX-8942 Part 1: Delete existing CN (45194ms) √ EX-8942 Part 2: Create a CN with type as Pricing Request and send it to ContractorThu Aug 24 2023 13:13:47 GMT+0000 (Greenwich Mean Time) (47019ms) √ EX-8942 Part 2: Create a CN with type as Pricing Request and send it to ContractorThu Aug 24 2023 13:13:47 GMT+0000 (Greenwich Mean Time) (47019ms) √ EX-8942 Part 3: Respond to CN with No Cost ImpactThu Aug 24 2023 13:13:47 GMT+0000 (Greenwich Mean Time) (73253ms) √ EX-8942 Part 3: Respond to CN with No Cost ImpactThu Aug 24 2023 13:13:47 GMT+0000 (Greenwich Mean Time) (73253ms) √ EX-8942 Part 4: Verify the data as GcThu Aug 24 2023 13:13:47 GMT+0000 (Greenwich Mean Time) (46415ms) √ EX-8942 Part 4: Verify the data as GcThu Aug 24 2023 13:13:47 GMT+0000 (Greenwich Mean Time) (46415ms) √ EX-8942 Part 5: Delete the CNThu Aug 24 2023 13:13:47 GMT+0000 (Greenwich Mean Time) (38602ms) √ EX-8942 Part 5: Delete the CNThu Aug 24 2023 13:13:47 GMT+0000 (Greenwich Mean Time) (38602ms) 5 passing (4m) 5 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_082.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 12 seconds │ │ Estimated: 4 minutes, 16 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8942-create-cn-pricing-request-respond-as-SC-PM │ │ -with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8942-create-cn-pricing-request-respond-as-SC-PM-with-no-cost-impact.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8943-create-cn-pricing-request-resp (84 of 114) ond-as-SC-PM-with-create-cor.spec.ts Estimated: 8 minutes, 51 seconds Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 13:18:07 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 13:18:07 GMT+0000 (Greenwich Mean Time) √ EX-8943 Part 1: Delete existing CN. (48920ms) √ EX-8943 Part 1: Delete existing CN. (48920ms) √ EX-8943 Part 2: Delete existing CORs. Thu Aug 24 2023 13:18:07 GMT+0000 (Greenwich Mean Time) (122562ms) √ EX-8943 Part 2: Delete existing CORs. Thu Aug 24 2023 13:18:07 GMT+0000 (Greenwich Mean Time) (122562ms) √ EX-8943 Part 3: Create a CN with type as Pricing Request and send it to Contractor. Thu Aug 24 2023 13:18:07 GMT+0000 (Greenwich Mean Time) (60196ms) √ EX-8943 Part 3: Create a CN with type as Pricing Request and send it to Contractor. Thu Aug 24 2023 13:18:07 GMT+0000 (Greenwich Mean Time) (60196ms) √ EX-8943 Part 4: Respond to CN with create COR. Thu Aug 24 2023 13:18:07 GMT+0000 (Greenwich Mean Time) (102385ms) √ EX-8943 Part 4: Respond to CN with create COR. Thu Aug 24 2023 13:18:07 GMT+0000 (Greenwich Mean Time) (102385ms) √ EX-8943 Part 5: Verify the data as GC. Thu Aug 24 2023 13:18:07 GMT+0000 (Greenwich Mean Time) (45699ms) √ EX-8943 Part 5: Verify the data as GC. Thu Aug 24 2023 13:18:07 GMT+0000 (Greenwich Mean Time) (45699ms) √ EX-8943 Part 6: Delete all CORs. Thu Aug 24 2023 13:18:07 GMT+0000 (Greenwich Mean Time) (122310ms) √ EX-8943 Part 6: Delete all CORs. Thu Aug 24 2023 13:18:07 GMT+0000 (Greenwich Mean Time) (122310ms) √ EX-8943 Part 7: Delete the CN. Thu Aug 24 2023 13:18:07 GMT+0000 (Greenwich Mean Time) (55115ms) √ EX-8943 Part 7: Delete the CN. Thu Aug 24 2023 13:18:07 GMT+0000 (Greenwich Mean Time) (55115ms) 7 passing (9m) 7 passing (9m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_083.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 9 minutes, 19 seconds │ │ Estimated: 8 minutes, 51 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8943-create-cn-pricing-request-respond-as-SC-PM │ │ -with-create-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8943-create-cn-pricing-request-respond-as-SC-PM-with-create-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8944-create-cn-pricing-request-resp (85 of 114) ond-as-SC-PM-with-upload-cor.spec.ts Estimated: 7 minutes, 32 seconds Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 13:27:37 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 13:27:37 GMT+0000 (Greenwich Mean Time) √ EX-8944 Part 1: Delete existing CN (41567ms) √ EX-8944 Part 1: Delete existing CN (41567ms) √ EX-8944 Part 2: Delete existing CORsThu Aug 24 2023 13:27:37 GMT+0000 (Greenwich Mean Time) (94041ms) √ EX-8944 Part 2: Delete existing CORsThu Aug 24 2023 13:27:37 GMT+0000 (Greenwich Mean Time) (94041ms) √ EX-8944 Part 3: Create a CN with type as Pricing Request and send it to ContractorThu Aug 24 2023 13:27:37 GMT+0000 (Greenwich Mean Time) (51507ms) √ EX-8944 Part 3: Create a CN with type as Pricing Request and send it to ContractorThu Aug 24 2023 13:27:37 GMT+0000 (Greenwich Mean Time) (51507ms) √ EX-8944 Part 4: Respond to CN with upload corThu Aug 24 2023 13:27:37 GMT+0000 (Greenwich Mean Time) (107375ms) √ EX-8944 Part 4: Respond to CN with upload corThu Aug 24 2023 13:27:37 GMT+0000 (Greenwich Mean Time) (107375ms) √ EX-8944 Part 5: Verify the data as GcThu Aug 24 2023 13:27:37 GMT+0000 (Greenwich Mean Time) (47194ms) √ EX-8944 Part 5: Verify the data as GcThu Aug 24 2023 13:27:37 GMT+0000 (Greenwich Mean Time) (47194ms) √ EX-8944 Part 6: Delete all CORsThu Aug 24 2023 13:27:37 GMT+0000 (Greenwich Mean Time) (99107ms) √ EX-8944 Part 6: Delete all CORsThu Aug 24 2023 13:27:37 GMT+0000 (Greenwich Mean Time) (99107ms) √ EX-8944 Part 7: Delete the CNThu Aug 24 2023 13:27:37 GMT+0000 (Greenwich Mean Time) (47536ms) √ EX-8944 Part 7: Delete the CNThu Aug 24 2023 13:27:37 GMT+0000 (Greenwich Mean Time) (47536ms) 7 passing (8m) 7 passing (8m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_084.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 8 minutes, 10 seconds │ │ Estimated: 7 minutes, 32 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8944-create-cn-pricing-request-respond-as-SC-PM │ │ -with-upload-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8944-create-cn-pricing-request-respond-as-SC-PM-with-upload-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8945-create-cn-pricing-request-resp (86 of 114) ond-as-GC-PM-with-no-cost-impact.spec.ts Estimated: 4 minutes, 24 seconds Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 13:35:54 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 13:35:54 GMT+0000 (Greenwich Mean Time) √ EX-8945 Part 1: Delete existing CN (43808ms) √ EX-8945 Part 1: Delete existing CN (43808ms) √ EX-8945 Part 2: Create a CN with type as Pricing Request and send it to ContractorThu Aug 24 2023 13:35:54 GMT+0000 (Greenwich Mean Time) (47862ms) √ EX-8945 Part 2: Create a CN with type as Pricing Request and send it to ContractorThu Aug 24 2023 13:35:54 GMT+0000 (Greenwich Mean Time) (47862ms) √ EX-8945 Part 3: Respond to CN with No Cost Impact as GC PMThu Aug 24 2023 13:35:54 GMT+0000 (Greenwich Mean Time) (71180ms) √ EX-8945 Part 3: Respond to CN with No Cost Impact as GC PMThu Aug 24 2023 13:35:54 GMT+0000 (Greenwich Mean Time) (71180ms) √ EX-8945 Part 4: Verify the data as ScThu Aug 24 2023 13:35:54 GMT+0000 (Greenwich Mean Time) (58395ms) √ EX-8945 Part 4: Verify the data as ScThu Aug 24 2023 13:35:54 GMT+0000 (Greenwich Mean Time) (58395ms) √ EX-8945 Part 5: Delete the CNThu Aug 24 2023 13:35:54 GMT+0000 (Greenwich Mean Time) (44965ms) √ EX-8945 Part 5: Delete the CNThu Aug 24 2023 13:35:54 GMT+0000 (Greenwich Mean Time) (44965ms) 5 passing (4m) 5 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_085.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 28 seconds │ │ Estimated: 4 minutes, 24 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8945-create-cn-pricing-request-respond-as-GC-PM │ │ -with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8945-create-cn-pricing-request-respond-as-GC-PM-with-no-cost-impact.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8946-create-cn-pricing-request-resp (87 of 114) ond-as-GC-PM-by-linking-existing-cor.spec.ts Estimated: 4 minutes, 24 seconds Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 13:40:28 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 13:40:28 GMT+0000 (Greenwich Mean Time) √ EX-8946 Part 1: Delete existing CN (46859ms) √ EX-8946 Part 1: Delete existing CN (46859ms) √ EX-8946 Part 2: Create a CN with type as Pricing Request and send it to ContractorThu Aug 24 2023 13:40:28 GMT+0000 (Greenwich Mean Time) (49007ms) √ EX-8946 Part 2: Create a CN with type as Pricing Request and send it to ContractorThu Aug 24 2023 13:40:28 GMT+0000 (Greenwich Mean Time) (49007ms) √ EX-8946 Part 3: Respond to CN by linking received COR as GC PMThu Aug 24 2023 13:40:28 GMT+0000 (Greenwich Mean Time) (72310ms) √ EX-8946 Part 3: Respond to CN by linking received COR as GC PMThu Aug 24 2023 13:40:28 GMT+0000 (Greenwich Mean Time) (72310ms) √ EX-8946 Part 4: Verify the data as ScThu Aug 24 2023 13:40:28 GMT+0000 (Greenwich Mean Time) (56987ms) √ EX-8946 Part 4: Verify the data as ScThu Aug 24 2023 13:40:28 GMT+0000 (Greenwich Mean Time) (56987ms) √ EX-8946 Part 5: Delete the CNThu Aug 24 2023 13:40:28 GMT+0000 (Greenwich Mean Time) (46801ms) √ EX-8946 Part 5: Delete the CNThu Aug 24 2023 13:40:28 GMT+0000 (Greenwich Mean Time) (46801ms) 5 passing (5m) 5 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_086.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 33 seconds │ │ Estimated: 4 minutes, 24 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8946-create-cn-pricing-request-respond-as-GC-PM │ │ -by-linking-existing-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8946-create-cn-pricing-request-respond-as-GC-PM-by-linking-existing-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8947-create-cn-authorize-t&mwork-re (88 of 114) spond-as-SC-PM-with-create-cor.spec.ts Estimated: 7 minutes, 6 seconds Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 13:45:08 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 13:45:08 GMT+0000 (Greenwich Mean Time) √ EX-8947 Part 1: Delete existing CN (37085ms) √ EX-8947 Part 1: Delete existing CN (37085ms) √ EX-8947 Part 2: Delete existing CORsThu Aug 24 2023 13:45:09 GMT+0000 (Greenwich Mean Time) (100204ms) √ EX-8947 Part 2: Delete existing CORsThu Aug 24 2023 13:45:09 GMT+0000 (Greenwich Mean Time) (100204ms) √ EX-8947 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorThu Aug 24 2023 13:45:09 GMT+0000 (Greenwich Mean Time) (54881ms) √ EX-8947 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorThu Aug 24 2023 13:45:09 GMT+0000 (Greenwich Mean Time) (54881ms) √ EX-8947 Part 4: Respond to CN with create corThu Aug 24 2023 13:45:09 GMT+0000 (Greenwich Mean Time) (94921ms) √ EX-8947 Part 4: Respond to CN with create corThu Aug 24 2023 13:45:09 GMT+0000 (Greenwich Mean Time) (94921ms) √ EX-8947 Part 5: Verify the data as GcThu Aug 24 2023 13:45:09 GMT+0000 (Greenwich Mean Time) (42842ms) √ EX-8947 Part 5: Verify the data as GcThu Aug 24 2023 13:45:09 GMT+0000 (Greenwich Mean Time) (42842ms) √ EX-8947 Part 6: Delete all CORsThu Aug 24 2023 13:45:09 GMT+0000 (Greenwich Mean Time) (103303ms) √ EX-8947 Part 6: Delete all CORsThu Aug 24 2023 13:45:09 GMT+0000 (Greenwich Mean Time) (103303ms) √ EX-8947 Part 7: Delete the CNThu Aug 24 2023 13:45:09 GMT+0000 (Greenwich Mean Time) (47078ms) √ EX-8947 Part 7: Delete the CNThu Aug 24 2023 13:45:09 GMT+0000 (Greenwich Mean Time) (47078ms) 7 passing (8m) 7 passing (8m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_087.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 8 minutes, 1 second │ │ Estimated: 7 minutes, 6 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8947-create-cn-authorize-t&mwork-respond-as-SC- │ │ PM-with-create-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8947-create-cn-authorize-t&mwork-respond-as-SC-PM-with-create-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8948-create-cn-authorize-t&mwork-re (89 of 114) spond-as-SC-PM-with-upload-cor.spec.ts Estimated: 8 minutes, 16 seconds Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 13:53:17 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 13:53:17 GMT+0000 (Greenwich Mean Time) √ EX-8948 Part 1: Delete existing CN (45471ms) √ EX-8948 Part 1: Delete existing CN (45471ms) √ EX-8948 Part 2: Delete existing CORsThu Aug 24 2023 13:53:17 GMT+0000 (Greenwich Mean Time) (104222ms) √ EX-8948 Part 2: Delete existing CORsThu Aug 24 2023 13:53:17 GMT+0000 (Greenwich Mean Time) (104222ms) √ EX-8948 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorThu Aug 24 2023 13:53:17 GMT+0000 (Greenwich Mean Time) (55830ms) √ EX-8948 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorThu Aug 24 2023 13:53:17 GMT+0000 (Greenwich Mean Time) (55830ms) √ EX-8948 Part 4: Respond to CN with upload corThu Aug 24 2023 13:53:17 GMT+0000 (Greenwich Mean Time) (103473ms) √ EX-8948 Part 4: Respond to CN with upload corThu Aug 24 2023 13:53:17 GMT+0000 (Greenwich Mean Time) (103473ms) √ EX-8948 Part 5: Verify the data as Gc. Thu Aug 24 2023 13:53:17 GMT+0000 (Greenwich Mean Time) (51423ms) √ EX-8948 Part 5: Verify the data as Gc. Thu Aug 24 2023 13:53:17 GMT+0000 (Greenwich Mean Time) (51423ms) √ EX-8948 Part 6: Delete all CORs. Thu Aug 24 2023 13:53:17 GMT+0000 (Greenwich Mean Time) (98120ms) √ EX-8948 Part 6: Delete all CORs. Thu Aug 24 2023 13:53:17 GMT+0000 (Greenwich Mean Time) (98120ms) √ EX-8948 Part 7: Delete the CN. Thu Aug 24 2023 13:53:17 GMT+0000 (Greenwich Mean Time) (48316ms) √ EX-8948 Part 7: Delete the CN. Thu Aug 24 2023 13:53:17 GMT+0000 (Greenwich Mean Time) (48316ms) 7 passing (8m) 7 passing (8m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_088.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 8 minutes, 27 seconds │ │ Estimated: 8 minutes, 16 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8948-create-cn-authorize-t&mwork-respond-as-SC- │ │ PM-with-upload-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8948-create-cn-authorize-t&mwork-respond-as-SC-PM-with-upload-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8949-create-cn-authorize-t&mwork-re (90 of 114) spond-as-GC-PM-with-no-cost-impact.spec.ts Estimated: 4 minutes, 22 seconds Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 14:01:51 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 14:01:51 GMT+0000 (Greenwich Mean Time) √ EX-8949 Part 1: Delete existing CN (44322ms) √ EX-8949 Part 1: Delete existing CN (44322ms) √ EX-8949 Part 2: Create a CN with type as Authorize T&M Work and send it to ContractorThu Aug 24 2023 14:01:51 GMT+0000 (Greenwich Mean Time) (51614ms) √ EX-8949 Part 2: Create a CN with type as Authorize T&M Work and send it to ContractorThu Aug 24 2023 14:01:51 GMT+0000 (Greenwich Mean Time) (51614ms) √ EX-8949 Part 3: Respond to CN with No Cost Impact as GC PMThu Aug 24 2023 14:01:51 GMT+0000 (Greenwich Mean Time) (83783ms) √ EX-8949 Part 3: Respond to CN with No Cost Impact as GC PMThu Aug 24 2023 14:01:51 GMT+0000 (Greenwich Mean Time) (83783ms) √ EX-8949 Part 4: Verify the data as ScThu Aug 24 2023 14:01:51 GMT+0000 (Greenwich Mean Time) (47415ms) √ EX-8949 Part 4: Verify the data as ScThu Aug 24 2023 14:01:51 GMT+0000 (Greenwich Mean Time) (47415ms) √ EX-8949 Part 5: Delete the CNThu Aug 24 2023 14:01:51 GMT+0000 (Greenwich Mean Time) (45728ms) √ EX-8949 Part 5: Delete the CNThu Aug 24 2023 14:01:51 GMT+0000 (Greenwich Mean Time) (45728ms) 5 passing (5m) 5 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_089.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 33 seconds │ │ Estimated: 4 minutes, 22 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8949-create-cn-authorize-t&mwork-respond-as-GC- │ │ PM-with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8949-create-cn-authorize-t&mwork-respond-as-GC-PM-with-no-cost-impact.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8950-create-cn-authorize-t&mwork-re (91 of 114) spond-as-GC-PM-by-linking-existing-cor.spec.ts Estimated: 4 minutes, 41 seconds Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 14:06:32 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Thu Aug 24 2023 14:06:32 GMT+0000 (Greenwich Mean Time) √ EX-8950 Part 1: Delete existing CN (48256ms) √ EX-8950 Part 1: Delete existing CN (48256ms) √ EX-8950 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorThu Aug 24 2023 14:06:32 GMT+0000 (Greenwich Mean Time) (55133ms) √ EX-8950 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorThu Aug 24 2023 14:06:32 GMT+0000 (Greenwich Mean Time) (55133ms) √ EX-8950 Part 4: Respond to CN by linking received COR as GC PMThu Aug 24 2023 14:06:32 GMT+0000 (Greenwich Mean Time) (69235ms) √ EX-8950 Part 4: Respond to CN by linking received COR as GC PMThu Aug 24 2023 14:06:32 GMT+0000 (Greenwich Mean Time) (69235ms) √ EX-8950 Part 5: Verify the data as ScThu Aug 24 2023 14:06:32 GMT+0000 (Greenwich Mean Time) (48688ms) √ EX-8950 Part 5: Verify the data as ScThu Aug 24 2023 14:06:32 GMT+0000 (Greenwich Mean Time) (48688ms) √ EX-8950 Part 6: Delete the CNThu Aug 24 2023 14:06:32 GMT+0000 (Greenwich Mean Time) (45492ms) √ EX-8950 Part 6: Delete the CNThu Aug 24 2023 14:06:32 GMT+0000 (Greenwich Mean Time) (45492ms) 5 passing (4m) 5 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_090.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 28 seconds │ │ Estimated: 4 minutes, 41 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8950-create-cn-authorize-t&mwork-respond-as-GC- │ │ PM-by-linking-existing-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8950-create-cn-authorize-t&mwork-respond-as-GC-PM-by-linking-existing-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 08_Projects/Active Projects/ex-5467-verify-job-number-propagation-be (92 of 114) tween-project.spec.ts Estimated: 10 minutes, 46 seconds Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) √ EX-5467 - Create project as GC.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (51523ms) √ EX-5467 - Create project as GC.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (51523ms) √ EX-5467 - Add contract.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (49950ms) √ EX-5467 - Add contract.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (49950ms) √ EX-5467 - Verify the contract is added.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (31815ms) √ EX-5467 - Verify the contract is added.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (31815ms) √ EX-5467 - Add Customer.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (39093ms) √ EX-5467 - Add Customer.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (39093ms) √ EX-5467 - Verify Project Details at GC side.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (43985ms) √ EX-5467 - Verify Project Details at GC side.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (43985ms) √ EX-5467 - Accept the project invite at the SC side.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (42920ms) √ EX-5467 - Accept the project invite at the SC side.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (42920ms) √ EX-5467 - Verify Project Details at SC side.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (42525ms) √ EX-5467 - Verify Project Details at SC side.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (42525ms) √ EX-5467 - Accept project invite at the Customer side.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (21868ms) √ EX-5467 - Accept project invite at the Customer side.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (21868ms) √ EX-5467 - Verify Project Details at the Customer side.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (29727ms) √ EX-5467 - Verify Project Details at the Customer side.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (29727ms) √ EX-5467 - Cleanup GC... Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (38366ms) √ EX-5467 - Cleanup GC... Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (38366ms) √ EX-5467 - Cleanup SC... Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (42558ms) √ EX-5467 - Cleanup SC... Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (42558ms) √ EX-5467 - Cleanup for Owner.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (44082ms) √ EX-5467 - Cleanup for Owner.Thu Aug 24 2023 14:11:08 GMT+0000 (Greenwich Mean Time) (44082ms) 12 passing (8m) 12 passing (8m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_091.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 8 minutes, 1 second │ │ Estimated: 10 minutes, 46 seconds │ │ Spec Ran: 08_Projects/Active Projects/ex-5467-verify-job-number-propagation-between-projec │ │ t.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\08_Projects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 08_Projects/Active Projects/ex-7362-verify-job-number-propagation-to (93 of 114) -draft-cors.spec.ts Estimated: 7 minutes, 19 seconds Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) √ EX-7362 - Part 1: Create project as SC.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) (56449ms) √ EX-7362 - Part 1: Create project as SC.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) (56449ms) √ EX-7362 - Part 2: Add Customer.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) (46286ms) √ EX-7362 - Part 2: Add Customer.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) (46286ms) √ EX-7362 - Part 3: Accept the project invite at the GC side.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) (44517ms) √ EX-7362 - Part 3: Accept the project invite at the GC side.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) (44517ms) √ EX-7362 - Part 4: Create COR and Save it as Draft.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) (59728ms) √ EX-7362 - Part 4: Create COR and Save it as Draft.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) (59728ms) 1) EX-7362 - Part 5: Verify Draft COR data in the Draft COR Log.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) 1) EX-7362 - Part 5: Verify Draft COR data in the Draft COR Log.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) 2) EX-7362 - Cleanup GC... Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) 2) EX-7362 - Cleanup GC... Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) √ EX-7362 - Cleanup SC... Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) (34293ms) √ EX-7362 - Cleanup SC... Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) (34293ms) 5 passing (5m) 2 failing 1) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) EX-7362 - Part 5: Verify Draft COR data in the Draft COR Log.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:261:21) 2) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) EX-7362 - Cleanup GC... Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time): AssertionError: expected 'undefined' to equal undefined at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-be-apis.ts:68:41) 5 passing (5m) 2 failing 1) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) EX-7362 - Part 5: Verify Draft COR data in the Draft COR Log.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:261:21) 2) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time) EX-7362 - Cleanup GC... Thu Aug 24 2023 14:19:16 GMT+0000 (Greenwich Mean Time): AssertionError: expected 'undefined' to equal undefined at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-be-apis.ts:68:41) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_092.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 5 │ │ Failing: 2 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 2 │ │ Video: true │ │ Duration: 5 minutes, 3 seconds │ │ Estimated: 7 minutes, 19 seconds │ │ Spec Ran: 08_Projects/Active Projects/ex-7362-verify-job-number-propagation-to-draft-cors. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533) ects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts \Projects Verify Customer Job Number and My Job Number propagate properly betwe en customers and contractors.Thu Aug 24 2023 141916 GMT+0000 (Greenwich Mean Tim e) -- EX-7362 - Part 5 Verify Draft COR data in the Draft COR Log.Thu Aug 24 202 3 141916 GM.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Proj (1272x533) ects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts \Projects Verify Customer Job Number and My Job Number propagate properly betwe en customers and contractors.Thu Aug 24 2023 141916 GMT+0000 (Greenwich Mean Tim e) -- EX-7362 - Cleanup GC... Thu Aug 24 2023 141916 GMT+0000 (Greenwich Mean Ti me) (failed.png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 25% Compression progress: 51% Compression progress: 73% Compression progress: 92% - Finished compressing: 51 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\08_Projects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Thu Aug 24 2023 141916 GMT+0000 (Greenwich Mean Time) -- EX-7362 - Part 5 Verify Draft COR data in the Draft COR Log.Thu Aug 24 2023 141916 GM.png - Done Uploading (2/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\08_Projects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts\Projects Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Thu Aug 24 2023 141916 GMT+0000 (Greenwich Mean Time) -- EX-7362 - Cleanup GC... Thu Aug 24 2023 141916 GMT+0000 (Greenwich Mean Time) (failed.png - Done Uploading (3/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\08_Projects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 09_Analytics/ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx (94 of 114) -after-filtering-by-project.spec.ts Estimated: 49 seconds Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Thu Aug 24 2023 14:25:19 GMT+0000 (Greenwich Mean Time) Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Thu Aug 24 2023 14:25:19 GMT+0000 (Greenwich Mean Time) √ EX-5428 - Verify the SENT, Detailed TM Tags Report (Excel).Thu Aug 24 2023 14:25:19 GMT+0000 (Greenwich Mean Time) (43760ms) √ EX-5428 - Verify the SENT, Detailed TM Tags Report (Excel).Thu Aug 24 2023 14:25:19 GMT+0000 (Greenwich Mean Time) (43760ms) 1 passing (45s) 1 passing (45s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_093.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 44 seconds │ │ Estimated: 49 seconds │ │ Spec Ran: 09_Analytics/ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx-after-filte │ │ ring-by-project.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\09_Analytics\ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx-after-filtering-by-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 09_Analytics/ex-8799-verify-received-export--tm-tag-detailed-report- (95 of 114) xlsx-after-filtering-by-project.spec.ts Estimated: 42 seconds Analytics | Verify the Received, Detailed TM Tags Report (Excel)Thu Aug 24 2023 14:26:10 GMT+0000 (Greenwich Mean Time) Analytics | Verify the Received, Detailed TM Tags Report (Excel)Thu Aug 24 2023 14:26:10 GMT+0000 (Greenwich Mean Time) √ EX-8799 - Verify the Received, Detailed TM Tags Report (Excel).Thu Aug 24 2023 14:26:10 GMT+0000 (Greenwich Mean Time) (47875ms) √ EX-8799 - Verify the Received, Detailed TM Tags Report (Excel).Thu Aug 24 2023 14:26:10 GMT+0000 (Greenwich Mean Time) (47875ms) 1 passing (48s) 1 passing (48s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_094.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 47 seconds │ │ Estimated: 42 seconds │ │ Spec Ran: 09_Analytics/ex-8799-verify-received-export--tm-tag-detailed-report-xlsx-after-f │ │ iltering-by-project.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\09_Analytics\ex-8799-verify-received-export--tm-tag-detailed-report-xlsx-after-filtering-by-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/CORs/ex-3720-verify-all-links-in-cor-recieved-email.spec.t (96 of 114) s Estimated: 5 minutes, 50 seconds Email Hyperlinks | To verify that all links on COR received email works fineThu Aug 24 2023 14:27:04 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on COR received email works fineThu Aug 24 2023 14:27:04 GMT+0000 (Greenwich Mean Time) √ EX-3720 Part 1: Create a project. Thu Aug 24 2023 14:27:04 GMT+0000 (Greenwich Mean Time) (49200ms) √ EX-3720 Part 1: Create a project. Thu Aug 24 2023 14:27:04 GMT+0000 (Greenwich Mean Time) (49200ms) √ EX-3720 Part 2: Add contract. Thu Aug 24 2023 14:27:04 GMT+0000 (Greenwich Mean Time) (42122ms) √ EX-3720 Part 2: Add contract. Thu Aug 24 2023 14:27:04 GMT+0000 (Greenwich Mean Time) (42122ms) √ EX-3720 Part 3: Sub Contractor accepts the project invite.Thu Aug 24 2023 14:27:04 GMT+0000 (Greenwich Mean Time) (23740ms) √ EX-3720 Part 3: Sub Contractor accepts the project invite.Thu Aug 24 2023 14:27:04 GMT+0000 (Greenwich Mean Time) (23740ms) √ EX-3720 Part 4: Sub Contractor creates COR.Thu Aug 24 2023 14:27:04 GMT+0000 (Greenwich Mean Time) (110144ms) √ EX-3720 Part 4: Sub Contractor creates COR.Thu Aug 24 2023 14:27:04 GMT+0000 (Greenwich Mean Time) (110144ms) √ EX-3720 Part 5: Verify the new COR email links to clearstory.build.Thu Aug 24 2023 14:30:56 GMT+0000 (Greenwich Mean Time) (15160ms) √ EX-3720 Part 5: Verify the new COR email links to clearstory.build.Thu Aug 24 2023 14:30:56 GMT+0000 (Greenwich Mean Time) (15160ms) √ EX-3720 Part 6: Verify the VIEW/COMMENT/DOWNLOAD button link.Thu Aug 24 2023 14:31:16 GMT+0000 (Greenwich Mean Time) (29567ms) √ EX-3720 Part 6: Verify the VIEW/COMMENT/DOWNLOAD button link.Thu Aug 24 2023 14:31:16 GMT+0000 (Greenwich Mean Time) (29567ms) √ EX-3720 Part 7: Cleanup GC...Thu Aug 24 2023 14:31:16 GMT+0000 (Greenwich Mean Time) (38735ms) √ EX-3720 Part 7: Cleanup GC...Thu Aug 24 2023 14:31:16 GMT+0000 (Greenwich Mean Time) (38735ms) √ EX-3720 Part 8: Cleanup SC...Thu Aug 24 2023 14:31:16 GMT+0000 (Greenwich Mean Time) (32649ms) √ EX-3720 Part 8: Cleanup SC...Thu Aug 24 2023 14:31:16 GMT+0000 (Greenwich Mean Time) (32649ms) 8 passing (6m) 8 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_095.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 53 seconds │ │ Estimated: 5 minutes, 50 seconds │ │ Spec Ran: 11_Emails/CORs/ex-3720-verify-all-links-in-cor-recieved-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\11_Emails\CORs\ex-3720-verify-all-links-in-cor-recieved-email.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/ChangeNotifications/ex-3723-verify-all-links-in-pricing-re (97 of 114) quest-cn-response-needed-email.spec.ts Estimated: 5 minutes, 29 seconds Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Thu Aug 24 2023 14:33:03 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Thu Aug 24 2023 14:33:03 GMT+0000 (Greenwich Mean Time) √ EX-3723 Part 1: Create a project and send invite.Thu Aug 24 2023 14:33:03 GMT+0000 (Greenwich Mean Time) (54933ms) √ EX-3723 Part 1: Create a project and send invite.Thu Aug 24 2023 14:33:03 GMT+0000 (Greenwich Mean Time) (54933ms) √ EX-3723 Part 2: Add Sub-Contractor.Thu Aug 24 2023 14:33:03 GMT+0000 (Greenwich Mean Time) (42929ms) √ EX-3723 Part 2: Add Sub-Contractor.Thu Aug 24 2023 14:33:03 GMT+0000 (Greenwich Mean Time) (42929ms) √ EX-3723 Part 3: Login to the Sub Contractor account and Accept the invite.Thu Aug 24 2023 14:33:03 GMT+0000 (Greenwich Mean Time) (22273ms) √ EX-3723 Part 3: Login to the Sub Contractor account and Accept the invite.Thu Aug 24 2023 14:33:03 GMT+0000 (Greenwich Mean Time) (22273ms) √ EX-3723 Part 4: Log in back to the Gen Contractor account and create a Pricing Request Change Notification.Thu Aug 24 2023 14:33:03 GMT+0000 (Greenwich Mean Time) (45144ms) √ EX-3723 Part 4: Log in back to the Gen Contractor account and create a Pricing Request Change Notification.Thu Aug 24 2023 14:33:03 GMT+0000 (Greenwich Mean Time) (45144ms) √ EX-3723 Part 5: Verify the Response Needed CN email.Thu Aug 24 2023 14:35:55 GMT+0000 (Greenwich Mean Time) (8899ms) √ EX-3723 Part 5: Verify the Response Needed CN email.Thu Aug 24 2023 14:35:55 GMT+0000 (Greenwich Mean Time) (8899ms) √ EX-3723 Part 6: Verify LinksThu Aug 24 2023 14:36:08 GMT+0000 (Greenwich Mean Time) (18042ms) √ EX-3723 Part 6: Verify LinksThu Aug 24 2023 14:36:08 GMT+0000 (Greenwich Mean Time) (18042ms) √ EX-3723 Part 7: Cleanup GC...Thu Aug 24 2023 14:36:08 GMT+0000 (Greenwich Mean Time) (31667ms) √ EX-3723 Part 7: Cleanup GC...Thu Aug 24 2023 14:36:08 GMT+0000 (Greenwich Mean Time) (31667ms) √ EX-3723 Part 7: Cleanup SC...Thu Aug 24 2023 14:36:08 GMT+0000 (Greenwich Mean Time) (35287ms) √ EX-3723 Part 7: Cleanup SC...Thu Aug 24 2023 14:36:08 GMT+0000 (Greenwich Mean Time) (35287ms) 8 passing (5m) 8 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_096.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 30 seconds │ │ Estimated: 5 minutes, 29 seconds │ │ Spec Ran: 11_Emails/ChangeNotifications/ex-3723-verify-all-links-in-pricing-request-cn-res │ │ ponse-needed-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\11_Emails\ChangeNotifications\ex-3723-verify-all-links-in-pricing-request-cn-response-needed-email.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/ChangeNotifications/ex-5287-verify-all-links-in-authorize- (98 of 114) work-cn-response-needed-email.spec.ts Estimated: 4 minutes, 27 seconds Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Authorize Work CN.Thu Aug 24 2023 14:37:39 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Authorize Work CN.Thu Aug 24 2023 14:37:39 GMT+0000 (Greenwich Mean Time) √ EX-5287 Part 1: Create a project.Thu Aug 24 2023 14:37:39 GMT+0000 (Greenwich Mean Time) (55691ms) √ EX-5287 Part 1: Create a project.Thu Aug 24 2023 14:37:39 GMT+0000 (Greenwich Mean Time) (55691ms) √ EX-5287 Part 2: Send invite.Thu Aug 24 2023 14:37:39 GMT+0000 (Greenwich Mean Time) (42760ms) √ EX-5287 Part 2: Send invite.Thu Aug 24 2023 14:37:39 GMT+0000 (Greenwich Mean Time) (42760ms) √ EX-5287 Part 3: Login to the Sub Contractor account and Accept the invite.Thu Aug 24 2023 14:37:39 GMT+0000 (Greenwich Mean Time) (23205ms) √ EX-5287 Part 3: Login to the Sub Contractor account and Accept the invite.Thu Aug 24 2023 14:37:39 GMT+0000 (Greenwich Mean Time) (23205ms) √ EX-5287 Part 4: Log in back to the Gen Contractor account and create a Authorize T&M Work Change Notification.Thu Aug 24 2023 14:37:39 GMT+0000 (Greenwich Mean Time) (40585ms) √ EX-5287 Part 4: Log in back to the Gen Contractor account and create a Authorize T&M Work Change Notification.Thu Aug 24 2023 14:37:39 GMT+0000 (Greenwich Mean Time) (40585ms) √ EX-5287 Part 5: Verify the Response Needed CN email.Thu Aug 24 2023 14:40:28 GMT+0000 (Greenwich Mean Time) (7995ms) √ EX-5287 Part 5: Verify the Response Needed CN email.Thu Aug 24 2023 14:40:28 GMT+0000 (Greenwich Mean Time) (7995ms) √ EX-5287 Part 6: Verify LinksThu Aug 24 2023 14:40:40 GMT+0000 (Greenwich Mean Time) (13866ms) √ EX-5287 Part 6: Verify LinksThu Aug 24 2023 14:40:40 GMT+0000 (Greenwich Mean Time) (13866ms) √ EX-5287 Part 7: Cleanup GC...Thu Aug 24 2023 14:40:40 GMT+0000 (Greenwich Mean Time) (30644ms) √ EX-5287 Part 7: Cleanup GC...Thu Aug 24 2023 14:40:40 GMT+0000 (Greenwich Mean Time) (30644ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_097.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 45 seconds │ │ Estimated: 4 minutes, 27 seconds │ │ Spec Ran: 11_Emails/ChangeNotifications/ex-5287-verify-all-links-in-authorize-work-cn-resp │ │ onse-needed-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\11_Emails\ChangeNotifications\ex-5287-verify-all-links-in-authorize-work-cn-response-needed-email.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/Projects/ex-3717-verify-all-links-in-add-my-company-email. (99 of 114) spec.ts Estimated: 3 minutes, 11 seconds Email Hyperlinks | To verify that all links on Add My Company email work fineThu Aug 24 2023 14:41:30 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Add My Company email work fineThu Aug 24 2023 14:41:30 GMT+0000 (Greenwich Mean Time) √ EX-3717 Part 1: Create project and send invite.Thu Aug 24 2023 14:41:30 GMT+0000 (Greenwich Mean Time) (58933ms) √ EX-3717 Part 1: Create project and send invite.Thu Aug 24 2023 14:41:30 GMT+0000 (Greenwich Mean Time) (58933ms) √ EX-3717 Part 2: Add My Comapny Users. Thu Aug 24 2023 14:41:30 GMT+0000 (Greenwich Mean Time) (41264ms) √ EX-3717 Part 2: Add My Comapny Users. Thu Aug 24 2023 14:41:30 GMT+0000 (Greenwich Mean Time) (41264ms) √ EX-3717 Part 3: Verify the email links to clearstory.build.Thu Aug 24 2023 14:43:16 GMT+0000 (Greenwich Mean Time) (9933ms) √ EX-3717 Part 3: Verify the email links to clearstory.build.Thu Aug 24 2023 14:43:16 GMT+0000 (Greenwich Mean Time) (9933ms) √ EX-3717 Part 4: Verify the JOIN PROJECT button link.Thu Aug 24 2023 14:43:32 GMT+0000 (Greenwich Mean Time) (15738ms) √ EX-3717 Part 4: Verify the JOIN PROJECT button link.Thu Aug 24 2023 14:43:32 GMT+0000 (Greenwich Mean Time) (15738ms) √ EX-3717 Part 5: Cleanup...Thu Aug 24 2023 14:43:32 GMT+0000 (Greenwich Mean Time) (38713ms) √ EX-3717 Part 5: Cleanup...Thu Aug 24 2023 14:43:32 GMT+0000 (Greenwich Mean Time) (38713ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_098.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 56 seconds │ │ Estimated: 3 minutes, 11 seconds │ │ Spec Ran: 11_Emails/Projects/ex-3717-verify-all-links-in-add-my-company-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\11_Emails\Projects\ex-3717-verify-all-links-in-add-my-company-email.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/Projects/ex-3718-verify-all-links-in-add-my-customer-email (100 of 114) .spec.ts Estimated: 4 minutes, 12 seconds Email Hyperlinks | To verify that all the links on Add My Customer worksThu Aug 24 2023 14:44:33 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all the links on Add My Customer worksThu Aug 24 2023 14:44:33 GMT+0000 (Greenwich Mean Time) √ EX-3718 Part 1: Create project and send invite.Thu Aug 24 2023 14:44:33 GMT+0000 (Greenwich Mean Time) (54448ms) √ EX-3718 Part 1: Create project and send invite.Thu Aug 24 2023 14:44:33 GMT+0000 (Greenwich Mean Time) (54448ms) √ EX-3718 Part 2: Add Customers.Thu Aug 24 2023 14:44:33 GMT+0000 (Greenwich Mean Time) (37453ms) √ EX-3718 Part 2: Add Customers.Thu Aug 24 2023 14:44:33 GMT+0000 (Greenwich Mean Time) (37453ms) √ EX-3718 Part 3: Login to the Owner PM account and Accept the invite.Thu Aug 24 2023 14:44:33 GMT+0000 (Greenwich Mean Time) (14724ms) √ EX-3718 Part 3: Login to the Owner PM account and Accept the invite.Thu Aug 24 2023 14:44:33 GMT+0000 (Greenwich Mean Time) (14724ms) √ EX-3718 Part 4: Verify the email links to clearstory.build.Thu Aug 24 2023 14:46:25 GMT+0000 (Greenwich Mean Time) (19643ms) √ EX-3718 Part 4: Verify the email links to clearstory.build.Thu Aug 24 2023 14:46:25 GMT+0000 (Greenwich Mean Time) (19643ms) √ EX-3718 Part 5: Verify the JOIN PROJECT button link.Thu Aug 24 2023 14:46:52 GMT+0000 (Greenwich Mean Time) (9397ms) √ EX-3718 Part 5: Verify the JOIN PROJECT button link.Thu Aug 24 2023 14:46:52 GMT+0000 (Greenwich Mean Time) (9397ms) √ EX-3718 Part 6: Cleanup Ow...Thu Aug 24 2023 14:46:52 GMT+0000 (Greenwich Mean Time) (34220ms) √ EX-3718 Part 6: Cleanup Ow...Thu Aug 24 2023 14:46:52 GMT+0000 (Greenwich Mean Time) (34220ms) √ EX-3718 Part 7: Cleanup GC...Thu Aug 24 2023 14:46:52 GMT+0000 (Greenwich Mean Time) (32029ms) √ EX-3718 Part 7: Cleanup GC...Thu Aug 24 2023 14:46:52 GMT+0000 (Greenwich Mean Time) (32029ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_099.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 35 seconds │ │ Estimated: 4 minutes, 12 seconds │ │ Spec Ran: 11_Emails/Projects/ex-3718-verify-all-links-in-add-my-customer-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\11_Emails\Projects\ex-3718-verify-all-links-in-add-my-customer-email.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/Projects/ex-3719-verify-all-links-in-add-contrctor-email.s (101 of 114) pec.ts Estimated: 4 minutes, 15 seconds Email Hyperlinks | To verify that all the links on Add Contractors email workThu Aug 24 2023 14:48:14 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all the links on Add Contractors email workThu Aug 24 2023 14:48:14 GMT+0000 (Greenwich Mean Time) √ EX-3719 Part 1: Create a project Thu Aug 24 2023 14:48:14 GMT+0000 (Greenwich Mean Time) (52282ms) √ EX-3719 Part 1: Create a project Thu Aug 24 2023 14:48:14 GMT+0000 (Greenwich Mean Time) (52282ms) √ EX-3719 Part 2: Send invite.Thu Aug 24 2023 14:48:14 GMT+0000 (Greenwich Mean Time) (46422ms) √ EX-3719 Part 2: Send invite.Thu Aug 24 2023 14:48:14 GMT+0000 (Greenwich Mean Time) (46422ms) √ EX-3719 Part 3: Accept invite. Thu Aug 24 2023 14:48:14 GMT+0000 (Greenwich Mean Time) (28880ms) √ EX-3719 Part 3: Accept invite. Thu Aug 24 2023 14:48:14 GMT+0000 (Greenwich Mean Time) (28880ms) √ EX-3719 Part 4: Verify the email links to Eclearstory.build.Thu Aug 24 2023 14:50:28 GMT+0000 (Greenwich Mean Time) (14555ms) √ EX-3719 Part 4: Verify the email links to Eclearstory.build.Thu Aug 24 2023 14:50:28 GMT+0000 (Greenwich Mean Time) (14555ms) √ EX-3719 Part 5: Verify JOIN PROJECT button link.Thu Aug 24 2023 14:50:50 GMT+0000 (Greenwich Mean Time) (11087ms) √ EX-3719 Part 5: Verify JOIN PROJECT button link.Thu Aug 24 2023 14:50:50 GMT+0000 (Greenwich Mean Time) (11087ms) √ EX-3719 Part 6: Cleanup GC...Thu Aug 24 2023 14:50:50 GMT+0000 (Greenwich Mean Time) (33912ms) √ EX-3719 Part 6: Cleanup GC...Thu Aug 24 2023 14:50:50 GMT+0000 (Greenwich Mean Time) (33912ms) √ EX-3719 Part 7: Cleanup SC...Thu Aug 24 2023 14:50:50 GMT+0000 (Greenwich Mean Time) (34858ms) √ EX-3719 Part 7: Cleanup SC...Thu Aug 24 2023 14:50:50 GMT+0000 (Greenwich Mean Time) (34858ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_100.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 55 seconds │ │ Estimated: 4 minutes, 15 seconds │ │ Spec Ran: 11_Emails/Projects/ex-3719-verify-all-links-in-add-contrctor-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\11_Emails\Projects\ex-3719-verify-all-links-in-add-contrctor-email.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/T&M_Tags/ex-3721-verify-all-links-in-please-sign-tm-tag-em (102 of 114) ail.spec.ts Estimated: 5 minutes, 53 seconds Email Hyperlinks | To verify that all links on Please sign T&M tag email works fineThu Aug 24 2023 14:52:17 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Please sign T&M tag email works fineThu Aug 24 2023 14:52:17 GMT+0000 (Greenwich Mean Time) √ EX-3721 Part 1: Create a project and send invite.Thu Aug 24 2023 14:52:17 GMT+0000 (Greenwich Mean Time) (58080ms) √ EX-3721 Part 1: Create a project and send invite.Thu Aug 24 2023 14:52:17 GMT+0000 (Greenwich Mean Time) (58080ms) √ EX-3721 Part 2: Send invite.Thu Aug 24 2023 14:52:17 GMT+0000 (Greenwich Mean Time) (47337ms) √ EX-3721 Part 2: Send invite.Thu Aug 24 2023 14:52:17 GMT+0000 (Greenwich Mean Time) (47337ms) √ EX-3721 Part 3: Sub Contractor Accepts the invite.Thu Aug 24 2023 14:52:17 GMT+0000 (Greenwich Mean Time) (24313ms) √ EX-3721 Part 3: Sub Contractor Accepts the invite.Thu Aug 24 2023 14:52:17 GMT+0000 (Greenwich Mean Time) (24313ms) √ EX-3721 Part 4: Sub Contractor creates a Tag.Thu Aug 24 2023 14:52:17 GMT+0000 (Greenwich Mean Time) (55598ms) √ EX-3721 Part 4: Sub Contractor creates a Tag.Thu Aug 24 2023 14:52:17 GMT+0000 (Greenwich Mean Time) (55598ms) √ EX-3721 Part 5: Verify the tag was created.Thu Aug 24 2023 14:52:17 GMT+0000 (Greenwich Mean Time) (42442ms) √ EX-3721 Part 5: Verify the tag was created.Thu Aug 24 2023 14:52:17 GMT+0000 (Greenwich Mean Time) (42442ms) √ EX-3721 Part 6: Verify the please sign T&M email.Thu Aug 24 2023 14:56:12 GMT+0000 (Greenwich Mean Time) (16197ms) √ EX-3721 Part 6: Verify the please sign T&M email.Thu Aug 24 2023 14:56:12 GMT+0000 (Greenwich Mean Time) (16197ms) √ EX-3721 Part 7: Cleanup GC...Thu Aug 24 2023 14:56:34 GMT+0000 (Greenwich Mean Time) (34108ms) √ EX-3721 Part 7: Cleanup GC...Thu Aug 24 2023 14:56:34 GMT+0000 (Greenwich Mean Time) (34108ms) √ EX-3721 Part 7: Cleanup SC...Thu Aug 24 2023 14:56:34 GMT+0000 (Greenwich Mean Time) (36074ms) √ EX-3721 Part 7: Cleanup SC...Thu Aug 24 2023 14:56:34 GMT+0000 (Greenwich Mean Time) (36074ms) 8 passing (5m) 8 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_101.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 27 seconds │ │ Estimated: 5 minutes, 53 seconds │ │ Spec Ran: 11_Emails/T&M_Tags/ex-3721-verify-all-links-in-please-sign-tm-tag-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\11_Emails\T&M_Tags\ex-3721-verify-all-links-in-please-sign-tm-tag-email.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 12_Tag_Activity/ex-10763-verify-activity-feed-is-preserved..spec.ts (103 of 114) Estimated: 1 minute, 13 seconds Activity Feed | T&M | Verify Activity Feed is preserved. Thu Aug 24 2023 14:57:51 GMT+0000 (Greenwich Mean Time) Activity Feed | T&M | Verify Activity Feed is preserved. Thu Aug 24 2023 14:57:51 GMT+0000 (Greenwich Mean Time) 1) EX-10763 - Part 1: Verify the Activity feed in 'DO NOT DELETE - Tag for EX-10763' 1) EX-10763 - Part 1: Verify the Activity feed in 'DO NOT DELETE - Tag for EX-10763' 0 passing (1m) 1 failing 1) Activity Feed | T&M | Verify Activity Feed is preserved. Thu Aug 24 2023 14:57:51 GMT+0000 (Greenwich Mean Time) EX-10763 - Part 1: Verify the Activity feed in 'DO NOT DELETE - Tag for EX-10763': AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:251:21) 0 passing (1m) 1 failing 1) Activity Feed | T&M | Verify Activity Feed is preserved. Thu Aug 24 2023 14:57:51 GMT+0000 (Greenwich Mean Time) EX-10763 - Part 1: Verify the Activity feed in 'DO NOT DELETE - Tag for EX-10763': AssertionError: Timed out retrying after 30000ms: Expected to find element: `.MuiCircularProgress-svg`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:251:21) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_102.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 0 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: true │ │ Duration: 1 minute, 12 seconds │ │ Estimated: 1 minute, 13 seconds │ │ Spec Ran: 12_Tag_Activity/ex-10763-verify-activity-feed-is-preserved..spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\12_Tag_ (1272x533) Activity\ex-10763-verify-activity-feed-is-preserved..spec.ts\Activity Feed T&M Verify Activity Feed is preserved. Thu Aug 24 2023 145751 GMT+0000 (Greenwich M ean Time) -- EX-10763 - Part 1 Verify the Activity feed in 'DO NOT DELETE - Tag for EX-10763' (failed).png (Video) - Started compressing: Compressing to 32 CRF - Finished compressing: 12 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\12_Tag_Activity\ex-10763-verify-activity-feed-is-preserved..spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\12_Tag_Activity\ex-10763-verify-activity-feed-is-preserved..spec.ts\Activity Feed T&M Verify Activity Feed is preserved. Thu Aug 24 2023 145751 GMT+0000 (Greenwich Mean Time) -- EX-10763 - Part 1 Verify the Activity feed in 'DO NOT DELETE - Tag for EX-10763' (failed).png - Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\12_Tag_Activity\ex-10763-verify-activity-feed-is-preserved..spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 12_Tag_Activity/ex-7214-tag-activity-create-sign-send-reject-from-we (104 of 114) b.spec.ts Estimated: 7 minutes, 43 seconds Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification). Thu Aug 24 2023 14:59:23 GMT+0000 (Greenwich Mean Time) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification). Thu Aug 24 2023 14:59:23 GMT+0000 (Greenwich Mean Time) √ EX-7214 - Part 1: Clean the tags (53832ms) √ EX-7214 - Part 1: Clean the tags (53832ms) √ EX-7214 - Part 2: Sub Contractor admin creates a Tag and sends signature request. Thu Aug 24 2023 14:59:23 GMT+0000 (Greenwich Mean Time) (109379ms) √ EX-7214 - Part 2: Sub Contractor admin creates a Tag and sends signature request. Thu Aug 24 2023 14:59:23 GMT+0000 (Greenwich Mean Time) (109379ms) √ EX-7214 - Part 3: Verify activity feed. Thu Aug 24 2023 14:59:23 GMT+0000 (Greenwich Mean Time) (64033ms) √ EX-7214 - Part 3: Verify activity feed. Thu Aug 24 2023 14:59:23 GMT+0000 (Greenwich Mean Time) (64033ms) √ EX-7214 - Part 4: Verify the GC Admin received Bell Notification and use it to reject the tag. Thu Aug 24 2023 14:59:23 GMT+0000 (Greenwich Mean Time) (28914ms) √ EX-7214 - Part 4: Verify the GC Admin received Bell Notification and use it to reject the tag. Thu Aug 24 2023 14:59:23 GMT+0000 (Greenwich Mean Time) (28914ms) √ EX-7214 - Part 5: Verify the tag activity in the SC Admin T&M Log page. Thu Aug 24 2023 14:59:23 GMT+0000 (Greenwich Mean Time) (56124ms) √ EX-7214 - Part 5: Verify the tag activity in the SC Admin T&M Log page. Thu Aug 24 2023 14:59:23 GMT+0000 (Greenwich Mean Time) (56124ms) √ EX-7214 - Part 6: Verify the tag activity in the GC Admin T&M Log page in Receiver tab. Thu Aug 24 2023 14:59:23 GMT+0000 (Greenwich Mean Time) (65898ms) √ EX-7214 - Part 6: Verify the tag activity in the GC Admin T&M Log page in Receiver tab. Thu Aug 24 2023 14:59:23 GMT+0000 (Greenwich Mean Time) (65898ms) √ EX-7214 - Part 7: Cleanup SC Tag ... Thu Aug 24 2023 14:59:23 GMT+0000 (Greenwich Mean Time) (58250ms) √ EX-7214 - Part 7: Cleanup SC Tag ... Thu Aug 24 2023 14:59:23 GMT+0000 (Greenwich Mean Time) (58250ms) 7 passing (7m) 7 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_103.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 17 seconds │ │ Estimated: 7 minutes, 43 seconds │ │ Spec Ran: 12_Tag_Activity/ex-7214-tag-activity-create-sign-send-reject-from-web.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\12_Tag_Activity\ex-7214-tag-activity-create-sign-send-reject-from-web.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 12_Tag_Activity/ex-7215-tag-activity-create-sign-send-revise-resubmi (105 of 114) t-from-web.spec.ts Estimated: 7 minutes, 6 seconds Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Revise and Resubmit the tag from the web(Bell notification)Thu Aug 24 2023 15:06:48 GMT+0000 (Greenwich Mean Time) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Revise and Resubmit the tag from the web(Bell notification)Thu Aug 24 2023 15:06:48 GMT+0000 (Greenwich Mean Time) √ EX-7215 - Part 1: Clean the tags (60243ms) √ EX-7215 - Part 1: Clean the tags (60243ms) √ EX-7215 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagThu Aug 24 2023 15:06:48 GMT+0000 (Greenwich Mean Time) (105570ms) √ EX-7215 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagThu Aug 24 2023 15:06:48 GMT+0000 (Greenwich Mean Time) (105570ms) √ EX-7215 - Part 3: Verify the GC Admin received Bell Notification and use it to revise and resubmit the tag.Thu Aug 24 2023 15:06:48 GMT+0000 (Greenwich Mean Time) (31735ms) √ EX-7215 - Part 3: Verify the GC Admin received Bell Notification and use it to revise and resubmit the tag.Thu Aug 24 2023 15:06:48 GMT+0000 (Greenwich Mean Time) (31735ms) √ EX-7215 - Part 4: Verify the tag activity in the SC Admin T&M Log pageThu Aug 24 2023 15:06:48 GMT+0000 (Greenwich Mean Time) (59134ms) √ EX-7215 - Part 4: Verify the tag activity in the SC Admin T&M Log pageThu Aug 24 2023 15:06:48 GMT+0000 (Greenwich Mean Time) (59134ms) √ EX-7215 - Part 5: Verify the tag activity in the GC Admin T&M Log page in Receiver tabThu Aug 24 2023 15:06:48 GMT+0000 (Greenwich Mean Time) (64633ms) √ EX-7215 - Part 5: Verify the tag activity in the GC Admin T&M Log page in Receiver tabThu Aug 24 2023 15:06:48 GMT+0000 (Greenwich Mean Time) (64633ms) √ EX-7215 - Part 6: Cleanup SC Tag ... Thu Aug 24 2023 15:06:48 GMT+0000 (Greenwich Mean Time) (52360ms) √ EX-7215 - Part 6: Cleanup SC Tag ... Thu Aug 24 2023 15:06:48 GMT+0000 (Greenwich Mean Time) (52360ms) 6 passing (6m) 6 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_104.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 14 seconds │ │ Estimated: 7 minutes, 6 seconds │ │ Spec Ran: 12_Tag_Activity/ex-7215-tag-activity-create-sign-send-revise-resubmit-from-web.s │ │ pec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\12_Tag_Activity\ex-7215-tag-activity-create-sign-send-revise-resubmit-from-web.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 12_Tag_Activity/ex-7353-tag-activity-create-tag-opened-status.spec.t (106 of 114) s Estimated: 4 minutes, 57 seconds Activity Log | T&M Tag | Create a Tag with status Open and verify its Activity Feed messages. Thu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) Activity Log | T&M Tag | Create a Tag with status Open and verify its Activity Feed messages. Thu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) √ EX-7353 - Part 1: GC PM creates a projectThu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) (54214ms) √ EX-7353 - Part 1: GC PM creates a projectThu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) (54214ms) √ EX-7353 - Part 2: GC PM adds a contract with SC PM.Thu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) (45184ms) √ EX-7353 - Part 2: GC PM adds a contract with SC PM.Thu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) (45184ms) √ EX-7353 - Part 3: Sub Contractor accepts invite from the bell notification.Thu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) (28176ms) √ EX-7353 - Part 3: Sub Contractor accepts invite from the bell notification.Thu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) (28176ms) √ EX-7353 - Part 4: Gen Contractor creates a Authorize T&M Work Change Notification.Thu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) (50482ms) √ EX-7353 - Part 4: Gen Contractor creates a Authorize T&M Work Change Notification.Thu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) (50482ms) √ EX-7353 - Part 5: Verify the tag activity in the GC Admin T&M Log page at the receiver tabThu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) (48785ms) √ EX-7353 - Part 5: Verify the tag activity in the GC Admin T&M Log page at the receiver tabThu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) (48785ms) 1) EX-7353 - Part 6: Cleanup SC. Thu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) 1) EX-7353 - Part 6: Cleanup SC. Thu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) √ EX-7353 - Part 6: Cleanup GC. Thu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) (44565ms) √ EX-7353 - Part 6: Cleanup GC. Thu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) (44565ms) 6 passing (5m) 1 failing 1) Activity Log | T&M Tag | Create a Tag with status Open and verify its Activity Feed messages. Thu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) EX-7353 - Part 6: Cleanup SC. Thu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `button[data-cy='logoButton'] img`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:342:19) 6 passing (5m) 1 failing 1) Activity Log | T&M Tag | Create a Tag with status Open and verify its Activity Feed messages. Thu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time) EX-7353 - Part 6: Cleanup SC. Thu Aug 24 2023 15:13:09 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `button[data-cy='logoButton'] img`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:342:19) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_105.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 6 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: true │ │ Duration: 5 minutes, 9 seconds │ │ Estimated: 4 minutes, 57 seconds │ │ Spec Ran: 12_Tag_Activity/ex-7353-tag-activity-create-tag-opened-status.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\12_Tag_ (1272x533) Activity\ex-7353-tag-activity-create-tag-opened-status.spec.ts\Activity Log T&M Tag Create a Tag with status Open and verify its Activity Feed messages. Thu A ug 24 2023 151309 GMT+0000 (Greenwich Mean Time) -- EX-7353 - Part 6 Cleanup SC. Thu Aug 24 2023 151309 GMT+0000 (Greenwich Mean Time) (failed).png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 20% Compression progress: 41% Compression progress: 60% Compression progress: 81% - Finished compressing: 56 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\12_Tag_Activity\ex-7353-tag-activity-create-tag-opened-status.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\12_Tag_Activity\ex-7353-tag-activity-create-tag-opened-status.spec.ts\Activity Log T&M Tag Create a Tag with status Open and verify its Activity Feed messages. Thu Aug 24 2023 151309 GMT+0000 (Greenwich Mean Time) -- EX-7353 - Part 6 Cleanup SC. Thu Aug 24 2023 151309 GMT+0000 (Greenwich Mean Time) (failed).png - Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\12_Tag_Activity\ex-7353-tag-activity-create-tag-opened-status.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-10247-cor-activity-upload-bc-without-email-sendin (107 of 114) g.spec.ts Estimated: 2 minutes, 19 seconds Activity Log | COR | Create a Backcharge and send out for distributionThu Aug 24 2023 15:19:24 GMT+0000 (Greenwich Mean Time) Activity Log | COR | Create a Backcharge and send out for distributionThu Aug 24 2023 15:19:24 GMT+0000 (Greenwich Mean Time) √ EX-10247 - Part 1: Create a project with contract Thu Aug 24 2023 15:19:24 GMT+0000 (Greenwich Mean Time) (22590ms) √ EX-10247 - Part 1: Create a project with contract Thu Aug 24 2023 15:19:24 GMT+0000 (Greenwich Mean Time) (22590ms) √ Ex-10247 - Part 2: Login as SC Owner and accept the contract (8956ms) √ Ex-10247 - Part 2: Login as SC Owner and accept the contract (8956ms) √ EX-10247 - Part 3: Upload backcharge COR without sending the emails and verify the activity logThu Aug 24 2023 15:19:24 GMT+0000 (Greenwich Mean Time) (86071ms) √ EX-10247 - Part 3: Upload backcharge COR without sending the emails and verify the activity logThu Aug 24 2023 15:19:24 GMT+0000 (Greenwich Mean Time) (86071ms) √ EX-10247 - Part 4: Cleanup GC... Thu Aug 24 2023 15:19:24 GMT+0000 (Greenwich Mean Time) (6634ms) √ EX-10247 - Part 4: Cleanup GC... Thu Aug 24 2023 15:19:24 GMT+0000 (Greenwich Mean Time) (6634ms) 4 passing (2m) 4 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_106.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 4 │ │ Passing: 4 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 4 seconds │ │ Estimated: 2 minutes, 19 seconds │ │ Spec Ran: 13_Cor_Activity/ex-10247-cor-activity-upload-bc-without-email-sending.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-10247-cor-activity-upload-bc-without-email-sending.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-10248-cor-activity-upload-bc-with-email-sending.s (108 of 114) pec.ts Estimated: 2 minutes, 3 seconds Activity Log | COR | Create a Backcharge and send out for distributionThu Aug 24 2023 15:21:35 GMT+0000 (Greenwich Mean Time) Activity Log | COR | Create a Backcharge and send out for distributionThu Aug 24 2023 15:21:35 GMT+0000 (Greenwich Mean Time) √ EX-10248 - Part 1: Create a project with contract Thu Aug 24 2023 15:21:35 GMT+0000 (Greenwich Mean Time) (131875ms) √ EX-10248 - Part 1: Create a project with contract Thu Aug 24 2023 15:21:35 GMT+0000 (Greenwich Mean Time) (131875ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_107.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 12 seconds │ │ Estimated: 2 minutes, 3 seconds │ │ Spec Ran: 13_Cor_Activity/ex-10248-cor-activity-upload-bc-with-email-sending.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-10248-cor-activity-upload-bc-with-email-sending.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7673-cor-activity-create-cor-draft-view-cor.spec. (109 of 114) ts Estimated: 2 minutes, 10 seconds Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiver. Thu Aug 24 2023 15:23:55 GMT+0000 (Greenwich Mean Time) Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiver. Thu Aug 24 2023 15:23:55 GMT+0000 (Greenwich Mean Time) 1) EX-7673 | Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiver. Thu Aug 24 2023 15:23:55 GMT+0000 (Greenwich Mean Time) 1) EX-7673 | Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiver. Thu Aug 24 2023 15:23:55 GMT+0000 (Greenwich Mean Time) 0 passing (2m) 1 failing 1) Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiver. Thu Aug 24 2023 15:23:55 GMT+0000 (Greenwich Mean Time) EX-7673 | Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiver. Thu Aug 24 2023 15:23:55 GMT+0000 (Greenwich Mean Time): CypressError: Timed out retrying after 30000ms: `cy.wait()` timed out waiting `30000ms` for the 1st request to the route: `loadFilteredByProjectDraftCorList`. No request ever occurred. https://on.cypress.io/wait at cypressErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75187:18) at Object.errByPath (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75242:10) at checkForXhr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134821:84) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134844:28) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4315:29) at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143192:68) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143133:14) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18) at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1645:18) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:5450:46) From Your Spec Code: at draftCorLogPage.deleteAllDraftCORsForProject (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Draft_COR_Log.ts:149:11) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/13_Cor_Activity/ex-7673-cor-activity-create-cor-draft-view-cor.spec.ts:35:18) 0 passing (2m) 1 failing 1) Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiver. Thu Aug 24 2023 15:23:55 GMT+0000 (Greenwich Mean Time) EX-7673 | Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiver. Thu Aug 24 2023 15:23:55 GMT+0000 (Greenwich Mean Time): CypressError: Timed out retrying after 30000ms: `cy.wait()` timed out waiting `30000ms` for the 1st request to the route: `loadFilteredByProjectDraftCorList`. No request ever occurred. https://on.cypress.io/wait at cypressErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75187:18) at Object.errByPath (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75242:10) at checkForXhr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134821:84) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134844:28) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4315:29) at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143192:68) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143133:14) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18) at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1645:18) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:5450:46) From Your Spec Code: at draftCorLogPage.deleteAllDraftCORsForProject (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Draft_COR_Log.ts:149:11) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/13_Cor_Activity/ex-7673-cor-activity-create-cor-draft-view-cor.spec.ts:35:18) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_108.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 0 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: true │ │ Duration: 2 minutes, 3 seconds │ │ Estimated: 2 minutes, 10 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7673-cor-activity-create-cor-draft-view-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_ (1272x533) Activity\ex-7673-cor-activity-create-cor-draft-view-cor.spec.ts\Activity Log CO R Create a COR as Draft and send out for distribution and view the COR at the r eceiver. Thu Aug 24 2023 152355 GMT+0000 (Greenwich Mean Time) -- EX-7673 Activ ity Log COR Create a COR as Draft and send out for distribution and view.png (Video) - Started compressing: Compressing to 32 CRF - Finished compressing: 20 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-7673-cor-activity-create-cor-draft-view-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_Activity\ex-7673-cor-activity-create-cor-draft-view-cor.spec.ts\Activity Log COR Create a COR as Draft and send out for distribution and view the COR at the receiver. Thu Aug 24 2023 152355 GMT+0000 (Greenwich Mean Time) -- EX-7673 Activity Log COR Create a COR as Draft and send out for distribution and view.png - Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-7673-cor-activity-create-cor-draft-view-cor.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7674-cor-activity-create-cor-resend-cor-resend-co (110 of 114) r-with-email-message-view-cor.spec.ts Estimated: 8 minutes, 31 seconds COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageThu Aug 24 2023 15:26:26 GMT+0000 (Greenwich Mean Time) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageThu Aug 24 2023 15:26:26 GMT+0000 (Greenwich Mean Time) √ EX-7674 - Part 0: Clean existing COR's : Thu Aug 24 2023 15:26:26 GMT+0000 (Greenwich Mean Time) (69804ms) √ EX-7674 - Part 0: Clean existing COR's : Thu Aug 24 2023 15:26:26 GMT+0000 (Greenwich Mean Time) (69804ms) √ EX-7674 - Part 1: Create COR. Thu Aug 24 2023 15:26:26 GMT+0000 (Greenwich Mean Time) (74991ms) √ EX-7674 - Part 1: Create COR. Thu Aug 24 2023 15:26:26 GMT+0000 (Greenwich Mean Time) (74991ms) √ EX-7674 - Part 2: Verify the COR is in the Sent Log : Thu Aug 24 2023 15:26:26 GMT+0000 (Greenwich Mean Time) (61963ms) √ EX-7674 - Part 2: Verify the COR is in the Sent Log : Thu Aug 24 2023 15:26:26 GMT+0000 (Greenwich Mean Time) (61963ms) √ EX-7674 - Part 3: Resend the COR and resend the cor with email message and verify activity in sent log : Thu Aug 24 2023 15:26:26 GMT+0000 (Greenwich Mean Time) (91641ms) √ EX-7674 - Part 3: Resend the COR and resend the cor with email message and verify activity in sent log : Thu Aug 24 2023 15:26:26 GMT+0000 (Greenwich Mean Time) (91641ms) √ EX-7674 - Part 4: Verify the activity at the reciver side : Thu Aug 24 2023 15:26:26 GMT+0000 (Greenwich Mean Time) (56703ms) √ EX-7674 - Part 4: Verify the activity at the reciver side : Thu Aug 24 2023 15:26:26 GMT+0000 (Greenwich Mean Time) (56703ms) √ EX-7674 - Part 5: Clean the COR: Thu Aug 24 2023 15:26:26 GMT+0000 (Greenwich Mean Time) (88688ms) √ EX-7674 - Part 5: Clean the COR: Thu Aug 24 2023 15:26:26 GMT+0000 (Greenwich Mean Time) (88688ms) 6 passing (7m) 6 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_109.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 24 seconds │ │ Estimated: 8 minutes, 31 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7674-cor-activity-create-cor-resend-cor-resend-cor-with-email │ │ -message-view-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-7674-cor-activity-create-cor-resend-cor-resend-cor-with-email-message-view-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7678-cor-activity-create-cor-change-status-state- (111 of 114) at-receiver.spec.ts Estimated: 8 minutes, 20 seconds Create a COR and send the COR and change the status and stage with email message at the receiver sideThu Aug 24 2023 15:33:57 GMT+0000 (Greenwich Mean Time) Create a COR and send the COR and change the status and stage with email message at the receiver sideThu Aug 24 2023 15:33:57 GMT+0000 (Greenwich Mean Time) √ EX-7678 - Part 1: Clean existing COR's : Thu Aug 24 2023 15:33:57 GMT+0000 (Greenwich Mean Time) (66454ms) √ EX-7678 - Part 1: Clean existing COR's : Thu Aug 24 2023 15:33:57 GMT+0000 (Greenwich Mean Time) (66454ms) √ EX-7678 - Part 2: Create COR : Thu Aug 24 2023 15:33:57 GMT+0000 (Greenwich Mean Time) (66424ms) √ EX-7678 - Part 2: Create COR : Thu Aug 24 2023 15:33:57 GMT+0000 (Greenwich Mean Time) (66424ms) √ EX-7678 - Part 3: Verify the COR is in the Sent Log : Thu Aug 24 2023 15:33:57 GMT+0000 (Greenwich Mean Time) (61242ms) √ EX-7678 - Part 3: Verify the COR is in the Sent Log : Thu Aug 24 2023 15:33:57 GMT+0000 (Greenwich Mean Time) (61242ms) √ EX-7678 - Part 4: Change status and state at sent side verify activity in received log : Thu Aug 24 2023 15:33:57 GMT+0000 (Greenwich Mean Time) (92565ms) √ EX-7678 - Part 4: Change status and state at sent side verify activity in received log : Thu Aug 24 2023 15:33:57 GMT+0000 (Greenwich Mean Time) (92565ms) √ EX-7678 - Part 5: Verify the activity at the sent side : Thu Aug 24 2023 15:33:57 GMT+0000 (Greenwich Mean Time) (61447ms) √ EX-7678 - Part 5: Verify the activity at the sent side : Thu Aug 24 2023 15:33:57 GMT+0000 (Greenwich Mean Time) (61447ms) √ EX-7678 - Part 6: Clean the COR:Thu Aug 24 2023 15:33:57 GMT+0000 (Greenwich Mean Time) (92866ms) √ EX-7678 - Part 6: Clean the COR:Thu Aug 24 2023 15:33:57 GMT+0000 (Greenwich Mean Time) (92866ms) 6 passing (7m) 6 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_110.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 22 seconds │ │ Estimated: 8 minutes, 20 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7678-cor-activity-create-cor-change-status-state-at-receiver. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-7678-cor-activity-create-cor-change-status-state-at-receiver.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts (112 of 114) Estimated: 9 minutes, 2 seconds COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageThu Aug 24 2023 15:41:27 GMT+0000 (Greenwich Mean Time) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageThu Aug 24 2023 15:41:27 GMT+0000 (Greenwich Mean Time) √ EX-7798 - Part 1: Clean existing COR's : Thu Aug 24 2023 15:41:27 GMT+0000 (Greenwich Mean Time) (70249ms) √ EX-7798 - Part 1: Clean existing COR's : Thu Aug 24 2023 15:41:27 GMT+0000 (Greenwich Mean Time) (70249ms) √ EX-7798 - Part 2: Upload COR : Thu Aug 24 2023 15:41:27 GMT+0000 (Greenwich Mean Time) (78031ms) √ EX-7798 - Part 2: Upload COR : Thu Aug 24 2023 15:41:27 GMT+0000 (Greenwich Mean Time) (78031ms) √ EX-7798 - Part 3: View the COR at receiver side : Thu Aug 24 2023 15:41:27 GMT+0000 (Greenwich Mean Time) (77989ms) √ EX-7798 - Part 3: View the COR at receiver side : Thu Aug 24 2023 15:41:27 GMT+0000 (Greenwich Mean Time) (77989ms) √ EX-7798 - Part 4: Verify the COR is in the Sent Log : Thu Aug 24 2023 15:41:27 GMT+0000 (Greenwich Mean Time) (66366ms) √ EX-7798 - Part 4: Verify the COR is in the Sent Log : Thu Aug 24 2023 15:41:27 GMT+0000 (Greenwich Mean Time) (66366ms) √ EX-7798 - Part 5: Verify the activity at the reciver side : Thu Aug 24 2023 15:41:27 GMT+0000 (Greenwich Mean Time) (68550ms) √ EX-7798 - Part 5: Verify the activity at the reciver side : Thu Aug 24 2023 15:41:27 GMT+0000 (Greenwich Mean Time) (68550ms) √ EX-7798 - Part 6: Clean the COR:Thu Aug 24 2023 15:41:27 GMT+0000 (Greenwich Mean Time) (85316ms) √ EX-7798 - Part 6: Clean the COR:Thu Aug 24 2023 15:41:27 GMT+0000 (Greenwich Mean Time) (85316ms) 6 passing (7m) 6 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_111.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 27 seconds │ │ Estimated: 9 minutes, 2 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-7798-cor-activity-upload-cor-view-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-9781-cor-activity-create-bc-to-existing-cor.spec. (113 of 114) ts Estimated: 3 minutes, 48 seconds Backcharges | Activity Feed | Verify a proper activity feed is logged when a Backcharge is created without the option to send emailThu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) Backcharges | Activity Feed | Verify a proper activity feed is logged when a Backcharge is created without the option to send emailThu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) √ EX-9781 - Part 1: Create project add a contract with owner company user Thu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) (21206ms) √ EX-9781 - Part 1: Create project add a contract with owner company user Thu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) (21206ms) √ EX-9781 Part 2: Login as Owner and accept the contract. Thu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) (5715ms) √ EX-9781 Part 2: Login as Owner and accept the contract. Thu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) (5715ms) √ EX-9781 - Part 3: Add second contract with all sc users Thu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) (15315ms) √ EX-9781 - Part 3: Add second contract with all sc users Thu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) (15315ms) √ EX-9781 Part 4: Login as SC Owner and accept the contract. Thu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) (6641ms) √ EX-9781 Part 4: Login as SC Owner and accept the contract. Thu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) (6641ms) √ EX-9781 - Part 5: Create COR : Thu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) (44682ms) √ EX-9781 - Part 5: Create COR : Thu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) (44682ms) 1) EX-9781 - Part 6: Create backcharge from the received COR and verify the activity Thu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) 1) EX-9781 - Part 6: Create backcharge from the received COR and verify the activity Thu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) √ EX-9781 - Part 7: Cleanup GC... Thu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) (7012ms) √ EX-9781 - Part 7: Cleanup GC... Thu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) (7012ms) 6 passing (3m) 1 failing 1) Backcharges | Activity Feed | Verify a proper activity feed is logged when a Backcharge is created without the option to send emailThu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) EX-9781 - Part 6: Create backcharge from the received COR and verify the activity Thu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected not to exist in the DOM, but it was continuously found. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:253:21) 6 passing (3m) 1 failing 1) Backcharges | Activity Feed | Verify a proper activity feed is logged when a Backcharge is created without the option to send emailThu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time) EX-9781 - Part 6: Create backcharge from the received COR and verify the activity Thu Aug 24 2023 15:49:01 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected not to exist in the DOM, but it was continuously found. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:253:21) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_112.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 6 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: true │ │ Duration: 3 minutes, 4 seconds │ │ Estimated: 3 minutes, 48 seconds │ │ Spec Ran: 13_Cor_Activity/ex-9781-cor-activity-create-bc-to-existing-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_ (1272x533) Activity\ex-9781-cor-activity-create-bc-to-existing-cor.spec.ts\Backcharges Act ivity Feed Verify a proper activity feed is logged when a Backcharge is created without the option to send emailThu Aug 24 2023 154901 GMT+0000 (Greenwich Mean Time) -- EX-9781 - Part 6 Create backcharge from the received COR and ver.png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 34% Compression progress: 68% - Finished compressing: 30 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-9781-cor-activity-create-bc-to-existing-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_Activity\ex-9781-cor-activity-create-bc-to-existing-cor.spec.ts\Backcharges Activity Feed Verify a proper activity feed is logged when a Backcharge is created without the option to send emailThu Aug 24 2023 154901 GMT+0000 (Greenwich Mean Time) -- EX-9781 - Part 6 Create backcharge from the received COR and ver.png - Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-9781-cor-activity-create-bc-to-existing-cor.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-9782-cor-activity-create-bc-to-existing-cor-with- (114 of 114) email-sending.spec.ts Estimated: 4 minutes, 9 seconds Backcharges | Activity Feed | Verify a proper activity feed is logged when a Backcharge is created with the option to send emailThu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) Backcharges | Activity Feed | Verify a proper activity feed is logged when a Backcharge is created with the option to send emailThu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) √ EX-9782 - Part 1: Create project add a contract with owner company user Thu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) (21625ms) √ EX-9782 - Part 1: Create project add a contract with owner company user Thu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) (21625ms) √ EX-9782 Part 2: Login as Owner and accept the contract. Thu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) (5806ms) √ EX-9782 Part 2: Login as Owner and accept the contract. Thu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) (5806ms) √ EX-9782 - Part 3: Add second contract with all sc users Thu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) (9451ms) √ EX-9782 - Part 3: Add second contract with all sc users Thu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) (9451ms) √ EX-9782 Part 4: Login as SC Owner and accept the contract. Thu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) (6671ms) √ EX-9782 Part 4: Login as SC Owner and accept the contract. Thu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) (6671ms) √ EX-9782 - Part 5: Create COR : Thu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) (49130ms) √ EX-9782 - Part 5: Create COR : Thu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) (49130ms) 1) EX-9782 - Part 6: Create backcharge from the received COR and verify the activity Thu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) 1) EX-9782 - Part 6: Create backcharge from the received COR and verify the activity Thu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) √ EX-9782 - Part 7: Cleanup GC... Thu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) (7320ms) √ EX-9782 - Part 7: Cleanup GC... Thu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) (7320ms) 6 passing (3m) 1 failing 1) Backcharges | Activity Feed | Verify a proper activity feed is logged when a Backcharge is created with the option to send emailThu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) EX-9782 - Part 6: Create backcharge from the received COR and verify the activity Thu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected not to exist in the DOM, but it was continuously found. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:253:21) 6 passing (3m) 1 failing 1) Backcharges | Activity Feed | Verify a proper activity feed is logged when a Backcharge is created with the option to send emailThu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time) EX-9782 - Part 6: Create backcharge from the received COR and verify the activity Thu Aug 24 2023 15:52:44 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected not to exist in the DOM, but it was continuously found. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:253:21) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_113.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 6 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: true │ │ Duration: 3 minutes, 0 seconds │ │ Estimated: 4 minutes, 9 seconds │ │ Spec Ran: 13_Cor_Activity/ex-9782-cor-activity-create-bc-to-existing-cor-with-email-sendin │ │ g.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_ (1272x533) Activity\ex-9782-cor-activity-create-bc-to-existing-cor-with-email-sending.spec. ts\Backcharges Activity Feed Verify a proper activity feed is logged when a Ba ckcharge is created with the option to send emailThu Aug 24 2023 155244 GMT+0000 (Greenwich Mean Time) -- EX-9782 - Part 6 Create backcharge from the received C OR and verify.png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 34% Compression progress: 72% - Finished compressing: 28 seconds - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-9782-cor-activity-create-bc-to-existing-cor-with-email-sending.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_Activity\ex-9782-cor-activity-create-bc-to-existing-cor-with-email-sending.spec.ts\Backcharges Activity Feed Verify a proper activity feed is logged when a Backcharge is created with the option to send emailThu Aug 24 2023 155244 GMT+0000 (Greenwich Mean Time) -- EX-9782 - Part 6 Create backcharge from the received COR and verify.png - Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-9782-cor-activity-create-bc-to-existing-cor-with-email-sending.spec.ts.mp4 ==================================================================================================== (Run Finished) Spec Tests Passing Failing Pending Skipped ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ √ 01_LoginPage/ex-3313-invalid-creden 00:16 1 1 - - - │ │ tials.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 01_LoginPage/ex-3316-email-input-va 00:11 1 1 - - - │ │ lidation.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 01_LoginPage/ex-5751-create-new-acc 00:17 1 1 - - - │ │ ount-with-already-used-email.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 02_PermissionLevels/Add_users_to_Pr 02:59 3 2 1 - - │ │ oject/EX-9394-GC-creates-project-ad │ │ ds-new-customer-user.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:36 2 2 - - - │ │ ex-3323-create-new-project-as-owner │ │ -in-owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:32 2 2 - - - │ │ ex-3328-create-new-project-as-owner │ │ -in-sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:31 2 2 - - - │ │ ex-3329-create-new-project-as-owner │ │ -in-other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:38 2 2 - - - │ │ ex-3330-create-new-project-as-admin │ │ -in-owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:28 2 2 - - - │ │ ex-3331-create-new-project-as-admin │ │ -in-gc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:28 2 2 - - - │ │ ex-3332-create-new-project-as-pm-in │ │ -gc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:27 2 2 - - - │ │ ex-3333-create-new-project-as-fu-in │ │ -gc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:28 2 2 - - - │ │ ex-3334-create-new-project-as-pm-in │ │ -owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:49 2 2 - - - │ │ ex-3335-create-new-project-as-fu-in │ │ -owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:34 2 2 - - - │ │ ex-3336-create-new-project-as-admin │ │ -in-sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:42 2 2 - - - │ │ ex-3337-create-new-project-as-pm-in │ │ -sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:27 2 2 - - - │ │ ex-3338-create-new-project-as-fu-in │ │ -sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:25 2 2 - - - │ │ ex-3342-create-new-project-as-admin │ │ -in-other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:34 2 2 - - - │ │ ex-3343-create-new-project-as-pm-in │ │ -other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:25 2 2 - - - │ │ ex-3344-create-new-project-as-fu-in │ │ -other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Project_level/e 04:44 5 5 - - - │ │ x-10783-project-level-sent-logs-ema │ │ il-for-GC-SC.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Project_level/e 03:47 7 7 - - - │ │ x-10797-project-level-sent-logs-ema │ │ il-for-GC-SC.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 03:11 6 6 - - - │ │ 792-GC-account-owner-user-previlleg │ │ es.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 06:59 12 12 - - - │ │ 793-GC-Owner-project-previlleges.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 03:10 6 6 - - - │ │ 828-GC-admin-user-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 03:14 6 6 - - - │ │ 829-GC-PM-user-previlleges.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 02:06 5 5 - - - │ │ 830-GC-Field-user-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 03:35 8 8 - - - │ │ 832-SC-Field-users-user-previlleges │ │ .spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 02_PermissionLevels/User_roles/ex-9 05:41 8 4 4 - - │ │ 833-SC-PM-user-previlleges.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 04:19 8 8 - - - │ │ 834-SC-Admin-user-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 04:09 8 8 - - - │ │ 835-SC-account-owner-user-previlleg │ │ es.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 07:31 12 12 - - - │ │ 885-GC-Admin-project-previlleges.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 02_PermissionLevels/User_roles/ex-9 07:33 12 10 2 - - │ │ 886-GC-PM-project-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 06:13 12 12 - - - │ │ 887-SC-Admin-project-previlleges.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 02_PermissionLevels/User_roles/ex-9 08:58 9 - 9 - - │ │ 888-GC-FU-project-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 08:11 12 12 - - - │ │ 889-SC-Owner-project-previlleges.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 07:45 12 12 - - - │ │ 890-SC-PM-project-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 06:01 9 9 - - - │ │ 891-SC-FU-project-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 04_COR_Log/Received/ex-3684-verify- 01:52 2 - 2 - - │ │ user-can-see-only-cors-that-he-has- │ │ access-to.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 04_COR_Log/Received/ex-9912-add-bc- 00:30 1 - 1 - - │ │ to-existing-cor-with-all-role-contr │ │ actors.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 04_COR_Log/Sent/EX-4366-SC-creates- 09:32 11 9 2 - - │ │ project-adds-gc-customer-sc-creates │ │ -cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 04_COR_Log/Sent/EX-4432-to-verify-P 06:03 7 6 1 - - │ │ M-is-able-to-create-cor-as-draft.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/EX-5827-to-verify-m 00:39 1 1 - - - │ │ ultiple-cors-to-same-tag-when-creat │ │ ing-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/EX-5894-to-verify-m 00:45 1 1 - - - │ │ ultiple-cors-to-same-tag-when-uploa │ │ ding-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 04_COR_Log/Sent/ex-3673-verify-cont 05:56 4 3 1 - - │ │ ractor-is-able-to-upload-cor-with-o │ │ nly-mandatory-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-3683-GC-creates- 05:30 1 1 - - - │ │ project-adds-contract-SC-creates-co │ │ r.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-3686-verify-ther 01:02 1 1 - - - │ │ e-are-two-tabs-on-cor-log-page-sent │ │ -received.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5244-verify-shar 01:32 1 1 - - - │ │ eable-link-contains-just-the-select │ │ ed-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5333-SC-creates- 04:09 1 1 - - - │ │ cor-with-full-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5396-verify-cont 09:41 11 11 - - - │ │ ractor-is-able-to-upload-cor-with-m │ │ andatory-and-optional-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5435-create-new- 04:17 6 6 - - - │ │ project-add-contrac-verify-original │ │ -contract-value.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-6681-verify-sent 03:25 2 2 - - - │ │ -summary-data-after-filtering-by-pr │ │ oject.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5425-verify- 02:33 2 2 - - - │ │ received-summary-data-after-filteri │ │ ng-by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5429-verify- 01:20 1 1 - - - │ │ received-export-csv-after-filtering │ │ -by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5431-verify- 01:26 1 1 - - - │ │ received-export-sharelog-after-filt │ │ ering-by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5641-verify- 06:46 5 5 - - - │ │ tnm-log-received-summary-data-after │ │ -filtering-by-tag-status.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-1-gc-create 05:36 5 5 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-2-gc-create 07:19 2 2 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-3-gc-create 03:45 1 1 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-4-gc-create 04:54 1 1 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 05_T&M_Log/Sent/ex-4415-5-gc-create 04:17 2 - 2 - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 05_T&M_Log/Sent/ex-4415-6-gc-create 11:13 8 1 7 - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5424-verify-sent 03:42 2 2 - - - │ │ -summary-data-after-filtering-by-pr │ │ oject.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5430-verify-sent 01:02 1 1 - - - │ │ -export-csv-after-filtering-by-proj │ │ ect.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5505-verify-tnm- 02:18 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-customer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5506-verify-tnm- 02:18 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-job-number.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5507-verify-tnm- 02:16 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-cust-ref-num.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5508-verify-tnm- 15:29 7 7 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-tag-status.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5509-verify-tnm- 02:15 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-cust-label.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5510-verify-tnm- 04:20 2 2 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-cor-availability.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6191-sc-creates- 18:59 13 13 - - - │ │ tag-required-signer-gc-signs-tag.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6193-sc-fu-creat 08:44 8 8 - - - │ │ es-tag-required-signer-gc-fu-signs- │ │ tag.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-1-sc-pm-cre 14:18 5 5 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-2-sc-pm-cre 11:02 4 4 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-3-sc-pm-cre 07:54 4 4 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-4-sc-pm-cre 01:09 3 3 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-5-sc-pm-cre 05:16 6 6 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6335-sc-sends-ta 11:43 10 10 - - - │ │ g-gc-signs-tag-as-optional-not-save │ │ d-drafts.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-7224-switch-proj 07:01 7 7 - - - │ │ ect-workflow.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 06_Draft_COR_Log/ex-11248-to-verify 03:03 1 1 - - - │ │ -that-draft-cor-can-be-created-and- │ │ is-in-CorDraftLog.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-60 06:31 8 8 - - - │ │ 30-create-cn-respond-with-upload-co │ │ r-verify-all-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-85 17:17 13 13 - - - │ │ 97-respond-to-cn-as-SC-and-GC-clear │ │ -response.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-85 04:35 5 5 - - - │ │ 99-create-cn-authorize-t&mwork-resp │ │ ond-as-SC-PM-with-no-cost-impact.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 04:12 5 5 - - - │ │ 42-create-cn-pricing-request-respon │ │ d-as-SC-PM-with-no-cost-impact.spec │ │ .ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 09:19 7 7 - - - │ │ 43-create-cn-pricing-request-respon │ │ d-as-SC-PM-with-create-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 08:10 7 7 - - - │ │ 44-create-cn-pricing-request-respon │ │ d-as-SC-PM-with-upload-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 04:28 5 5 - - - │ │ 45-create-cn-pricing-request-respon │ │ d-as-GC-PM-with-no-cost-impact.spec │ │ .ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 04:33 5 5 - - - │ │ 46-create-cn-pricing-request-respon │ │ d-as-GC-PM-by-linking-existing-cor. │ │ spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 08:01 7 7 - - - │ │ 47-create-cn-authorize-t&mwork-resp │ │ ond-as-SC-PM-with-create-cor.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 08:27 7 7 - - - │ │ 48-create-cn-authorize-t&mwork-resp │ │ ond-as-SC-PM-with-upload-cor.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 04:33 5 5 - - - │ │ 49-create-cn-authorize-t&mwork-resp │ │ ond-as-GC-PM-with-no-cost-impact.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 04:28 5 5 - - - │ │ 50-create-cn-authorize-t&mwork-resp │ │ ond-as-GC-PM-by-linking-existing-co │ │ r.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 08_Projects/Active Projects/ex-5467 08:01 12 12 - - - │ │ -verify-job-number-propagation-betw │ │ een-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 08_Projects/Active Projects/ex-7362 05:03 7 5 2 - - │ │ -verify-job-number-propagation-to-d │ │ raft-cors.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 09_Analytics/ex-5428-verify-sent-ex 00:44 1 1 - - - │ │ port--tm-tag-detailed-report-xlsx-a │ │ fter-filtering-by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 09_Analytics/ex-8799-verify-receive 00:47 1 1 - - - │ │ d-export--tm-tag-detailed-report-xl │ │ sx-after-filtering-by-project.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/CORs/ex-3720-verify-all-l 05:53 8 8 - - - │ │ inks-in-cor-recieved-email.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/ChangeNotifications/ex-37 04:30 8 8 - - - │ │ 23-verify-all-links-in-pricing-requ │ │ est-cn-response-needed-email.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/ChangeNotifications/ex-52 03:45 7 7 - - - │ │ 87-verify-all-links-in-authorize-wo │ │ rk-cn-response-needed-email.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/Projects/ex-3717-verify-a 02:56 5 5 - - - │ │ ll-links-in-add-my-company-email.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/Projects/ex-3718-verify-a 03:35 7 7 - - - │ │ ll-links-in-add-my-customer-email.s │ │ pec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/Projects/ex-3719-verify-a 03:55 7 7 - - - │ │ ll-links-in-add-contrctor-email.spe │ │ c.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/T&M_Tags/ex-3721-verify-a 05:27 8 8 - - - │ │ ll-links-in-please-sign-tm-tag-emai │ │ l.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 12_Tag_Activity/ex-10763-verify-act 01:12 1 - 1 - - │ │ ivity-feed-is-preserved..spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 12_Tag_Activity/ex-7214-tag-activit 07:17 7 7 - - - │ │ y-create-sign-send-reject-from-web. │ │ spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 12_Tag_Activity/ex-7215-tag-activit 06:14 6 6 - - - │ │ y-create-sign-send-revise-resubmit- │ │ from-web.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 12_Tag_Activity/ex-7353-tag-activit 05:09 7 6 1 - - │ │ y-create-tag-opened-status.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-10247-cor-activi 02:04 4 4 - - - │ │ ty-upload-bc-without-email-sending. │ │ spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-10248-cor-activi 02:12 1 1 - - - │ │ ty-upload-bc-with-email-sending.spe │ │ c.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 13_Cor_Activity/ex-7673-cor-activit 02:03 1 - 1 - - │ │ y-create-cor-draft-view-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-7674-cor-activit 07:24 6 6 - - - │ │ y-create-cor-resend-cor-resend-cor- │ │ with-email-message-view-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-7678-cor-activit 07:22 6 6 - - - │ │ y-create-cor-change-status-state-at │ │ -receiver.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-7798-cor-activit 07:27 6 6 - - - │ │ y-upload-cor-view-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 13_Cor_Activity/ex-9781-cor-activit 03:04 7 6 1 - - │ │ y-create-bc-to-existing-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 13_Cor_Activity/ex-9782-cor-activit 03:00 7 6 1 - - │ │ y-create-bc-to-existing-cor-with-em │ │ ail-sending.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ × 17 of 114 failed (15%) 8:55:18 557 518 39 - - ─────────────────────────────────────────────────────────────────────────────────────────────────────── Recorded Run: https://cloud.cypress.io/projects/1e8aku/runs/16