> cypress-extracker-webapp@1.0.0 scripts-regression-record-vm > cypress run --config-file cypress.config_staging_regression.ts --browser chrome --record --key f075f6c3-9e86-42b3-885a-0b6e5a07380b --spec "./cypress/e2e/regression/**" Warning: We failed to remove old browser profiles from previous runs. This error will not affect or change the exit code. Error: EBUSY: resource busy or locked, unlink 'C:\Users\qateam\AppData\Roaming\Cypress\cy\production\browsers\chrome-stable\run-292\lockfile' ==================================================================================================== (Run Starting) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Cypress: 12.17.4 │ │ Browser: Chrome 116 (headless) │ │ Node Version: v18.14.1 (C:\Program Files\nodejs\node.exe) │ │ Specs: 114 found (01_LoginPage/ex-3313-invalid-credentials.spec.ts, 01_LoginPage/ex-3 │ │ 316-email-input-validation.spec.ts, 01_LoginPage/ex-5751-create-new-account-wi │ │ th-already-used-email.spec.ts, 06_Draft_COR_Log/ex-11248-to-verify-that-draft- │ │ cor-can-be-created-and-i...) │ │ Searched: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\e2e\regression\** │ │ Params: Tag: false, Group: false, Parallel: false │ │ Run URL: https://cloud.cypress.io/projects/1e8aku/runs/19 │ │ Experiments: experimentalMemoryManagement=true,experimentalStudio=true │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 01_LoginPage/ex-3313-invalid-credentials.spec.ts (1 of 114) Estimated: 13 seconds EX-3313 - EX-3313 - √ Login with invalid credentials.Sun Aug 27 2023 01:55:58 GMT+0000 (Greenwich Mean Time) (18245ms) √ Login with invalid credentials.Sun Aug 27 2023 01:55:58 GMT+0000 (Greenwich Mean Time) (18245ms) 1 passing (18s) 1 passing (18s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 18 seconds │ │ Estimated: 13 seconds │ │ Spec Ran: 01_LoginPage/ex-3313-invalid-credentials.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\01_LoginPage\ex-3313-invalid-credentials.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 01_LoginPage/ex-3316-email-input-validation.spec.ts (2 of 114) Estimated: 9 seconds 3316 - 3316 - √ Verify data input validation for emailSun Aug 27 2023 01:56:26 GMT+0000 (Greenwich Mean Time) (10566ms) √ Verify data input validation for emailSun Aug 27 2023 01:56:26 GMT+0000 (Greenwich Mean Time) (10566ms) 1 passing (11s) 1 passing (11s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_001.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 10 seconds │ │ Estimated: 9 seconds │ │ Spec Ran: 01_LoginPage/ex-3316-email-input-validation.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\01_LoginPage\ex-3316-email-input-validation.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 01_LoginPage/ex-5751-create-new-account-with-already-used-email.spec (3 of 114) .ts Estimated: 14 seconds EX-5751 - EX-5751 - √ Create account with email that is already associated with existing Extracker account.Sun Aug 27 2023 01:56:44 GMT+0000 (Greenwich Mean Time) (15621ms) √ Create account with email that is already associated with existing Extracker account.Sun Aug 27 2023 01:56:44 GMT+0000 (Greenwich Mean Time) (15621ms) 1 passing (16s) 1 passing (16s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_002.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 15 seconds │ │ Estimated: 14 seconds │ │ Spec Ran: 01_LoginPage/ex-5751-create-new-account-with-already-used-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\01_LoginPage\ex-5751-create-new-account-with-already-used-email.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Add_users_to_Project/EX-9394-GC-creates-project- (4 of 114) adds-new-customer-user.spec.ts Estimated: 2 minutes, 48 seconds EX-9394 - EX-9394 - √ Part 1: Create a project. : Sun Aug 27 2023 01:57:07 GMT+0000 (Greenwich Mean Time) (55301ms) √ Part 1: Create a project. : Sun Aug 27 2023 01:57:07 GMT+0000 (Greenwich Mean Time) (55301ms) 1) Part 2: Add new Customer to the project.Sun Aug 27 2023 01:57:07 GMT+0000 (Greenwich Mean Time) 1) Part 2: Add new Customer to the project.Sun Aug 27 2023 01:57:07 GMT+0000 (Greenwich Mean Time) √ Part 3: Cleanup GC... Sun Aug 27 2023 01:57:07 GMT+0000 (Greenwich Mean Time) (43499ms) √ Part 3: Cleanup GC... Sun Aug 27 2023 01:57:07 GMT+0000 (Greenwich Mean Time) (43499ms) 2 passing (3m) 1 failing 1) EX-9394 - Part 2: Add new Customer to the project.Sun Aug 27 2023 01:57:07 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test User' within the selector: 'td' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34) 2 passing (3m) 1 failing 1) EX-9394 - Part 2: Add new Customer to the project.Sun Aug 27 2023 01:57:07 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test User' within the selector: 'td' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_003.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 3 │ │ Passing: 2 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: true │ │ Duration: 2 minutes, 44 seconds │ │ Estimated: 2 minutes, 48 seconds │ │ Spec Ran: 02_PermissionLevels/Add_users_to_Project/EX-9394-GC-creates-project-adds-new-cus │ │ tomer-user.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\Add_users_to_Project\EX-9394-GC-creates-project-adds-new-customer-u ser.spec.ts\EX-9394 - -- Part 2 Add new Customer to the project.Sun Aug 27 2023 015707 GMT+0000 (Greenwich Mean Time) (failed).png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 44% Compression progress: 88% - Finished compressing: 30 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Add_users_to_Project\EX-9394-GC-creates-project-adds-new-customer-user.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\Add_users_to_Project\EX-9394-GC-creates-project-adds-new-customer-user.spec.ts\EX-9394 - -- Part 2 Add new Customer to the project.Sun Aug 27 2023 015707 GMT+0000 (Greenwich Mean Time) (failed).png - Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Add_users_to_Project\EX-9394-GC-creates-project-adds-new-customer-user.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3323-create-new-project-as-own (5 of 114) er-in-owner-company.spec.ts Estimated: 1 minute, 31 seconds EX-3323 - EX-3323 - √ Create a project in Owner Company as Account Owner with only mandatory data. Sun Aug 27 2023 02:00:29 GMT+0000 (Greenwich Mean Time) (57726ms) √ Create a project in Owner Company as Account Owner with only mandatory data. Sun Aug 27 2023 02:00:29 GMT+0000 (Greenwich Mean Time) (57726ms) 1 passing (58s) 1 passing (58s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_004.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 57 seconds │ │ Estimated: 1 minute, 31 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3323-create-new-project-as-owner-in-owner- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3323-create-new-project-as-owner-in-owner-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3328-create-new-project-as-own (6 of 114) er-in-sc-company.spec.ts Estimated: 1 minute, 34 seconds EX-3328 - EX-3328 - √ Create a project in SC Company as Account Owner with only mandatory data.Sun Aug 27 2023 02:01:33 GMT+0000 (Greenwich Mean Time) (93208ms) √ Create a project in SC Company as Account Owner with only mandatory data.Sun Aug 27 2023 02:01:33 GMT+0000 (Greenwich Mean Time) (93208ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_005.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 33 seconds │ │ Estimated: 1 minute, 34 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3328-create-new-project-as-owner-in-sc-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3328-create-new-project-as-owner-in-sc-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3329-create-new-project-as-own (7 of 114) er-in-other-company.spec.ts Estimated: 1 minute, 23 seconds EX-3329 - EX-3329 - √ Create a project in Other Company as Account Owner.Sun Aug 27 2023 02:03:12 GMT+0000 (Greenwich Mean Time) (99989ms) √ Create a project in Other Company as Account Owner.Sun Aug 27 2023 02:03:12 GMT+0000 (Greenwich Mean Time) (99989ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_006.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 40 seconds │ │ Estimated: 1 minute, 23 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3329-create-new-project-as-owner-in-other- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3329-create-new-project-as-owner-in-other-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3330-create-new-project-as-adm (8 of 114) in-in-owner-company.spec.ts Estimated: 1 minute, 32 seconds EX-3330 - EX-3330 - √ Create a project in Owner Company as Admin.Sun Aug 27 2023 02:05:00 GMT+0000 (Greenwich Mean Time) (56088ms) √ Create a project in Owner Company as Admin.Sun Aug 27 2023 02:05:00 GMT+0000 (Greenwich Mean Time) (56088ms) 1 passing (57s) 1 passing (57s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_007.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 56 seconds │ │ Estimated: 1 minute, 32 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3330-create-new-project-as-admin-in-owner- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3330-create-new-project-as-admin-in-owner-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3331-create-new-project-as-adm (9 of 114) in-in-gc-company.spec.ts Estimated: 1 minute, 35 seconds EX-3331 - EX-3331 - √ Create New Project in General Contractor Company as Admin, using only mandatory data.Sun Aug 27 2023 02:06:03 GMT+0000 (Greenwich Mean Time) (94159ms) √ Create New Project in General Contractor Company as Admin, using only mandatory data.Sun Aug 27 2023 02:06:03 GMT+0000 (Greenwich Mean Time) (94159ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_008.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 34 seconds │ │ Estimated: 1 minute, 35 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3331-create-new-project-as-admin-in-gc-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3331-create-new-project-as-admin-in-gc-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3332-create-new-project-as-pm- (10 of 114) in-gc-company.spec.ts Estimated: 1 minute, 45 seconds EX-3332 - EX-3332 - √ Create a projct in General Contractor Company as Project Manageer.Sun Aug 27 2023 02:07:44 GMT+0000 (Greenwich Mean Time) (97095ms) √ Create a projct in General Contractor Company as Project Manageer.Sun Aug 27 2023 02:07:44 GMT+0000 (Greenwich Mean Time) (97095ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_009.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 37 seconds │ │ Estimated: 1 minute, 45 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3332-create-new-project-as-pm-in-gc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3332-create-new-project-as-pm-in-gc-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3333-create-new-project-as-fu- (11 of 114) in-gc-company.spec.ts Estimated: 1 minute, 30 seconds EX-3333 - EX-3333 - 1) Create a project in General Contractor Company as Field UserSun Aug 27 2023 02:09:27 GMT+0000 (Greenwich Mean Time) 1) Create a project in General Contractor Company as Field UserSun Aug 27 2023 02:09:27 GMT+0000 (Greenwich Mean Time) 0 passing (1m) 1 failing 1) EX-3333 - Create a project in General Contractor Company as Field UserSun Aug 27 2023 02:09:27 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Log In' within the selector: 'h1' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34) 0 passing (1m) 1 failing 1) EX-3333 - Create a project in General Contractor Company as Field UserSun Aug 27 2023 02:09:27 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Log In' within the selector: 'h1' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_010.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 0 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: true │ │ Duration: 1 minute, 22 seconds │ │ Estimated: 1 minute, 30 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3333-create-new-project-as-fu-in-gc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\Create_Project\ex-3333-create-new-project-as-fu-in-gc-company.spec. ts\EX-3333 - -- Create a project in General Contractor Company as Field UserSun Aug 27 2023 020927 GMT+0000 (Greenwich Mean Time) (failed).png (Video) - Started compressing: Compressing to 32 CRF - Finished compressing: 15 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3333-create-new-project-as-fu-in-gc-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\Create_Project\ex-3333-create-new-project-as-fu-in-gc-company.spec.ts\EX-3333 - -- Create a project in General Contractor Company as Field UserSun Aug 27 2023 020927 GMT+0000 (Greenwich Mean Time) (failed).png - Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3333-create-new-project-as-fu-in-gc-company.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3334-create-new-project-as-pm- (12 of 114) in-owner-company.spec.ts Estimated: 1 minute, 28 seconds EX-3334 - EX-3334 - √ Creaet a project in Owner Company as Project Manager. Sun Aug 27 2023 02:11:13 GMT+0000 (Greenwich Mean Time) (57231ms) √ Creaet a project in Owner Company as Project Manager. Sun Aug 27 2023 02:11:13 GMT+0000 (Greenwich Mean Time) (57231ms) 1 passing (58s) 1 passing (58s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_011.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 57 seconds │ │ Estimated: 1 minute, 28 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3334-create-new-project-as-pm-in-owner-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3334-create-new-project-as-pm-in-owner-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3335-create-new-project-as-fu- (13 of 114) in-owner-company.spec.ts Estimated: 1 minute, 26 seconds EX-3335 - EX-3335 - √ Create a project in Owner Company as Field User.Sun Aug 27 2023 02:12:16 GMT+0000 (Greenwich Mean Time) (54544ms) √ Create a project in Owner Company as Field User.Sun Aug 27 2023 02:12:16 GMT+0000 (Greenwich Mean Time) (54544ms) 1 passing (55s) 1 passing (55s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_012.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 54 seconds │ │ Estimated: 1 minute, 26 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3335-create-new-project-as-fu-in-owner-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3335-create-new-project-as-fu-in-owner-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3336-create-new-project-as-adm (14 of 114) in-in-sc-company.spec.ts Estimated: 1 minute, 40 seconds EX-3336 - EX-3336 - 1) Create project in SC Company as Admin.Sun Aug 27 2023 02:13:18 GMT+0000 (Greenwich Mean Time) 1) Create project in SC Company as Admin.Sun Aug 27 2023 02:13:18 GMT+0000 (Greenwich Mean Time) 0 passing (2m) 1 failing 1) EX-3336 - Create project in SC Company as Admin.Sun Aug 27 2023 02:13:18 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Log In' within the selector: 'h1' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34) 0 passing (2m) 1 failing 1) EX-3336 - Create project in SC Company as Admin.Sun Aug 27 2023 02:13:18 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Log In' within the selector: 'h1' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_013.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 0 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: true │ │ Duration: 1 minute, 30 seconds │ │ Estimated: 1 minute, 40 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3336-create-new-project-as-admin-in-sc-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\Create_Project\ex-3336-create-new-project-as-admin-in-sc-company.sp ec.ts\EX-3336 - -- Create project in SC Company as Admin.Sun Aug 27 2023 021318 GMT+0000 (Greenwich Mean Time) (failed).png (Video) - Started compressing: Compressing to 32 CRF - Finished compressing: 16 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3336-create-new-project-as-admin-in-sc-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\Create_Project\ex-3336-create-new-project-as-admin-in-sc-company.spec.ts\EX-3336 - -- Create project in SC Company as Admin.Sun Aug 27 2023 021318 GMT+0000 (Greenwich Mean Time) (failed).png - Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3336-create-new-project-as-admin-in-sc-company.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3337-create-new-project-as-pm- (15 of 114) in-sc-company.spec.ts Estimated: 1 minute, 40 seconds EX-3337 - EX-3337 - √ Create New Project in SC Company as Project Manager, using only mandatory data.Sun Aug 27 2023 02:15:12 GMT+0000 (Greenwich Mean Time) (98439ms) √ Create New Project in SC Company as Project Manager, using only mandatory data.Sun Aug 27 2023 02:15:12 GMT+0000 (Greenwich Mean Time) (98439ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_014.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 38 seconds │ │ Estimated: 1 minute, 40 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3337-create-new-project-as-pm-in-sc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3337-create-new-project-as-pm-in-sc-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3338-create-new-project-as-fu- (16 of 114) in-sc-company.spec.ts Estimated: 1 minute, 31 seconds EX-3338 - EX-3338 - √ Create a project in SC Company as Field User. Sun Aug 27 2023 02:16:57 GMT+0000 (Greenwich Mean Time) (84042ms) √ Create a project in SC Company as Field User. Sun Aug 27 2023 02:16:57 GMT+0000 (Greenwich Mean Time) (84042ms) 1 passing (1m) 1 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_015.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 24 seconds │ │ Estimated: 1 minute, 31 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3338-create-new-project-as-fu-in-sc-compan │ │ y.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3338-create-new-project-as-fu-in-sc-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3342-create-new-project-as-adm (17 of 114) in-in-other-company.spec.ts Estimated: 1 minute, 25 seconds EX-3342 - EX-3342 - √ Create a project in Other Company as Admin. Sun Aug 27 2023 02:18:27 GMT+0000 (Greenwich Mean Time) (96312ms) √ Create a project in Other Company as Admin. Sun Aug 27 2023 02:18:27 GMT+0000 (Greenwich Mean Time) (96312ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_016.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 36 seconds │ │ Estimated: 1 minute, 25 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3342-create-new-project-as-admin-in-other- │ │ company.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3342-create-new-project-as-admin-in-other-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3343-create-new-project-as-pm- (18 of 114) in-other-company.spec.ts Estimated: 1 minute, 26 seconds EX-3343 - EX-3343 - √ Create a project in Other Company as Project Manager.Sun Aug 27 2023 02:20:11 GMT+0000 (Greenwich Mean Time) (101503ms) √ Create a project in Other Company as Project Manager.Sun Aug 27 2023 02:20:11 GMT+0000 (Greenwich Mean Time) (101503ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_017.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 41 seconds │ │ Estimated: 1 minute, 26 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3343-create-new-project-as-pm-in-other-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3343-create-new-project-as-pm-in-other-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Create_Project/ex-3344-create-new-project-as-fu- (19 of 114) in-other-company.spec.ts Estimated: 1 minute, 23 seconds EX-3344 - EX-3344 - √ Create a project in Other Company as Field User. Sun Aug 27 2023 02:21:59 GMT+0000 (Greenwich Mean Time) (96425ms) √ Create a project in Other Company as Field User. Sun Aug 27 2023 02:21:59 GMT+0000 (Greenwich Mean Time) (96425ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_018.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 36 seconds │ │ Estimated: 1 minute, 23 seconds │ │ Spec Ran: 02_PermissionLevels/Create_Project/ex-3344-create-new-project-as-fu-in-other-com │ │ pany.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Create_Project\ex-3344-create-new-project-as-fu-in-other-company.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Project_level/ex-10783-project-level-sent-logs-e (20 of 114) mail-for-GC-SC.spec.ts Estimated: 4 minutes, 29 seconds EX-10783 - Sun Aug 27 2023 02:23:42 GMT+0000 (Greenwich Mean Time) EX-10783 - Sun Aug 27 2023 02:23:42 GMT+0000 (Greenwich Mean Time) √ Part 1: Create a project, add company users and change the default setting on new contracts to false Sun Aug 27 2023 02:23:42 GMT+0000 (Greenwich Mean Time) (287538ms) √ Part 1: Create a project, add company users and change the default setting on new contracts to false Sun Aug 27 2023 02:23:42 GMT+0000 (Greenwich Mean Time) (287538ms) √ Part 5: Cleanup GC... Sun Aug 27 2023 02:23:42 GMT+0000 (Greenwich Mean Time) √ Part 5: Cleanup GC... Sun Aug 27 2023 02:23:42 GMT+0000 (Greenwich Mean Time) 2 passing (5m) 2 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_019.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 52 seconds │ │ Estimated: 4 minutes, 29 seconds │ │ Spec Ran: 02_PermissionLevels/Project_level/ex-10783-project-level-sent-logs-email-for-GC- │ │ SC.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Project_level\ex-10783-project-level-sent-logs-email-for-GC-SC.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/Project_level/ex-10797-project-level-sent-logs-e (21 of 114) mail-for-GC-SC.spec.ts Estimated: 4 minutes, 6 seconds Permissions | Project Level | Sent Logs & Emails | Verify proper permissions are set in My Company Users per user role for both Customer and Contractor. Sun Aug 27 2023 02:28:41 GMT+0000 (Greenwich Mean Time) Permissions | Project Level | Sent Logs & Emails | Verify proper permissions are set in My Company Users per user role for both Customer and Contractor. Sun Aug 27 2023 02:28:41 GMT+0000 (Greenwich Mean Time) √ EX-10797 - Part 1: Create a project. Add company users and verify the defaiult permissions for the user Sun Aug 27 2023 02:28:41 GMT+0000 (Greenwich Mean Time) (45144ms) √ EX-10797 - Part 1: Create a project. Add company users and verify the defaiult permissions for the user Sun Aug 27 2023 02:28:41 GMT+0000 (Greenwich Mean Time) (45144ms) √ EX-10797 - Part 2: Login as SC Owner and accept the contract (26356ms) √ EX-10797 - Part 2: Login as SC Owner and accept the contract (26356ms) √ EX-10797 - Part 3: Login as SC Admin and accept the contract (21582ms) √ EX-10797 - Part 3: Login as SC Admin and accept the contract (21582ms) √ EX-10797 - Part 4: Login as SC PM user and accept the contract (24677ms) √ EX-10797 - Part 4: Login as SC PM user and accept the contract (24677ms) √ EX-10797 - Part 5: Login as SC Field user and accept the contract (24991ms) √ EX-10797 - Part 5: Login as SC Field user and accept the contract (24991ms) √ EX-10797 - Part 6: Login as SC Owner and verify sc users default permissions (50570ms) √ EX-10797 - Part 6: Login as SC Owner and verify sc users default permissions (50570ms) √ EX-10797 - Part 7: Cleanup GC... Sun Aug 27 2023 02:28:41 GMT+0000 (Greenwich Mean Time) √ EX-10797 - Part 7: Cleanup GC... Sun Aug 27 2023 02:28:41 GMT+0000 (Greenwich Mean Time) 7 passing (3m) 7 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_020.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 18 seconds │ │ Estimated: 4 minutes, 6 seconds │ │ Spec Ran: 02_PermissionLevels/Project_level/ex-10797-project-level-sent-logs-email-for-GC- │ │ SC.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\Project_level\ex-10797-project-level-sent-logs-email-for-GC-SC.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9792-GC-account-owner-user-previll (22 of 114) eges.spec.ts Estimated: 3 minutes, 2 seconds User Role permissions| GC Account Owner | Login and verify users access privileges. Sun Aug 27 2023 02:32:06 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Account Owner | Login and verify users access privileges. Sun Aug 27 2023 02:32:06 GMT+0000 (Greenwich Mean Time) √ EX-9792 - Part 1: SignUp. Sun Aug 27 2023 02:32:06 GMT+0000 (Greenwich Mean Time) (17750ms) √ EX-9792 - Part 1: SignUp. Sun Aug 27 2023 02:32:06 GMT+0000 (Greenwich Mean Time) (17750ms) √ EX-9792 - Part 2: Verify the confirmation email. Sun Aug 27 2023 02:32:30 GMT+0000 (Greenwich Mean Time) √ EX-9792 - Part 2: Verify the confirmation email. Sun Aug 27 2023 02:32:30 GMT+0000 (Greenwich Mean Time) √ EX-9792 - Part 3: Create your account | Select, This is my company. Sun Aug 27 2023 02:32:36 GMT+0000 (Greenwich Mean Time) (20500ms) √ EX-9792 - Part 3: Create your account | Select, This is my company. Sun Aug 27 2023 02:32:36 GMT+0000 (Greenwich Mean Time) (20500ms) √ EX-9792 - Part 4: Change the role to Account owner Sun Aug 27 2023 02:33:02 GMT+0000 (Greenwich Mean Time) (22106ms) √ EX-9792 - Part 4: Change the role to Account owner Sun Aug 27 2023 02:33:02 GMT+0000 (Greenwich Mean Time) (22106ms) √ EX-9792 - Part 5: Login as GC Account Owner and verify user privilegesSun Aug 27 2023 02:33:02 GMT+0000 (Greenwich Mean Time) (51155ms) √ EX-9792 - Part 5: Login as GC Account Owner and verify user privilegesSun Aug 27 2023 02:33:02 GMT+0000 (Greenwich Mean Time) (51155ms) √ EX-9792 - Part 6: Delete the account from the company. Sun Aug 27 2023 02:33:02 GMT+0000 (Greenwich Mean Time) (16135ms) √ EX-9792 - Part 6: Delete the account from the company. Sun Aug 27 2023 02:33:02 GMT+0000 (Greenwich Mean Time) (16135ms) 6 passing (2m) 6 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_021.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 25 seconds │ │ Estimated: 3 minutes, 2 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9792-GC-account-owner-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9792-GC-account-owner-user-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9793-GC-Owner-project-previlleges. (23 of 114) spec.ts Estimated: 9 minutes, 15 seconds User Role permissions| GC Account owner | Login as GC Account owner and create project and verify user privilegesSun Aug 27 2023 02:34:39 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Account owner | Login as GC Account owner and create project and verify user privilegesSun Aug 27 2023 02:34:39 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 1: Create a project Sun Aug 27 2023 02:34:39 GMT+0000 (Greenwich Mean Time) (43899ms) √ EX-9793 - Part 1: Create a project Sun Aug 27 2023 02:34:39 GMT+0000 (Greenwich Mean Time) (43899ms) √ EX-9793 - Part 2: Edit the project details and change the nameSun Aug 27 2023 02:34:39 GMT+0000 (Greenwich Mean Time) (31586ms) √ EX-9793 - Part 2: Edit the project details and change the nameSun Aug 27 2023 02:34:39 GMT+0000 (Greenwich Mean Time) (31586ms) √ EX-9793 - Part 3: Add customer to the Project. Sun Aug 27 2023 02:34:39 GMT+0000 (Greenwich Mean Time) (34629ms) √ EX-9793 - Part 3: Add customer to the Project. Sun Aug 27 2023 02:34:39 GMT+0000 (Greenwich Mean Time) (34629ms) √ EX-9793 - Part 4: Verify the invitation email for customerSun Aug 27 2023 02:36:36 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 4: Verify the invitation email for customerSun Aug 27 2023 02:36:36 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 5: Add company user to the Project. Sun Aug 27 2023 02:36:42 GMT+0000 (Greenwich Mean Time) (44035ms) √ EX-9793 - Part 5: Add company user to the Project. Sun Aug 27 2023 02:36:42 GMT+0000 (Greenwich Mean Time) (44035ms) √ EX-9793 - Part 6: Verify company user can access project. Sun Aug 27 2023 02:36:42 GMT+0000 (Greenwich Mean Time) (27363ms) √ EX-9793 - Part 6: Verify company user can access project. Sun Aug 27 2023 02:36:42 GMT+0000 (Greenwich Mean Time) (27363ms) √ EX-9793 - Part 7: Add Contract with a user to the project. Sun Aug 27 2023 02:36:42 GMT+0000 (Greenwich Mean Time) (35801ms) √ EX-9793 - Part 7: Add Contract with a user to the project. Sun Aug 27 2023 02:36:42 GMT+0000 (Greenwich Mean Time) (35801ms) √ EX-9793 - Part 8: Verify email invitation for contractor user Sun Aug 27 2023 02:38:35 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 8: Verify email invitation for contractor user Sun Aug 27 2023 02:38:35 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 9: Add additional user to existing contract of the project. Sun Aug 27 2023 02:38:42 GMT+0000 (Greenwich Mean Time) (43205ms) √ EX-9793 - Part 9: Add additional user to existing contract of the project. Sun Aug 27 2023 02:38:42 GMT+0000 (Greenwich Mean Time) (43205ms) √ EX-9793 - Part 10: Verify email invitation for additional contract user Sun Aug 27 2023 02:39:29 GMT+0000 (Greenwich Mean Time) √ EX-9793 - Part 10: Verify email invitation for additional contract user Sun Aug 27 2023 02:39:29 GMT+0000 (Greenwich Mean Time) √ Ex-9793 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 02:39:34 GMT+0000 (Greenwich Mean Time) (41033ms) √ Ex-9793 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 02:39:34 GMT+0000 (Greenwich Mean Time) (41033ms) √ EX-9793 - Part 12: Clean up Project Sun Aug 27 2023 02:39:34 GMT+0000 (Greenwich Mean Time) (34499ms) √ EX-9793 - Part 12: Clean up Project Sun Aug 27 2023 02:39:34 GMT+0000 (Greenwich Mean Time) (34499ms) 12 passing (6m) 12 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_022.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 10 seconds │ │ Estimated: 9 minutes, 15 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9793-GC-Owner-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9793-GC-Owner-project-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9828-GC-admin-user-previlleges.spe (24 of 114) c.ts Estimated: 2 minutes, 56 seconds User Role permissions| GC Admin | Login and verify users access privilegesSun Aug 27 2023 02:40:57 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Admin | Login and verify users access privilegesSun Aug 27 2023 02:40:57 GMT+0000 (Greenwich Mean Time) √ EX-9828 - Part 1: SignUp. Sun Aug 27 2023 02:40:57 GMT+0000 (Greenwich Mean Time) (17208ms) √ EX-9828 - Part 1: SignUp. Sun Aug 27 2023 02:40:57 GMT+0000 (Greenwich Mean Time) (17208ms) √ EX-9828 - Part 2: Verify the confirmation email. Sun Aug 27 2023 02:41:20 GMT+0000 (Greenwich Mean Time) √ EX-9828 - Part 2: Verify the confirmation email. Sun Aug 27 2023 02:41:20 GMT+0000 (Greenwich Mean Time) √ EX-9828 - Part 3: Create your account | Select, This is my company. Sun Aug 27 2023 02:41:26 GMT+0000 (Greenwich Mean Time) (20805ms) √ EX-9828 - Part 3: Create your account | Select, This is my company. Sun Aug 27 2023 02:41:26 GMT+0000 (Greenwich Mean Time) (20805ms) √ EX-9828 - Part 4: Change the role to Account Admin Sun Aug 27 2023 02:41:52 GMT+0000 (Greenwich Mean Time) (21306ms) √ EX-9828 - Part 4: Change the role to Account Admin Sun Aug 27 2023 02:41:52 GMT+0000 (Greenwich Mean Time) (21306ms) √ EX-9828 - Part 5: Login as GC Account Admin and verify user privilegesSun Aug 27 2023 02:41:52 GMT+0000 (Greenwich Mean Time) (52348ms) √ EX-9828 - Part 5: Login as GC Account Admin and verify user privilegesSun Aug 27 2023 02:41:52 GMT+0000 (Greenwich Mean Time) (52348ms) √ EX-9828 - Part 6: Delete the account from the company. Sun Aug 27 2023 02:41:52 GMT+0000 (Greenwich Mean Time) (13183ms) √ EX-9828 - Part 6: Delete the account from the company. Sun Aug 27 2023 02:41:52 GMT+0000 (Greenwich Mean Time) (13183ms) 6 passing (2m) 6 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_023.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 23 seconds │ │ Estimated: 2 minutes, 56 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9828-GC-admin-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9828-GC-admin-user-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9829-GC-PM-user-previlleges.spec.t (25 of 114) s Estimated: 2 minutes, 53 seconds User Role permissions| GC PM | Login and verify users access privilegesSun Aug 27 2023 02:43:28 GMT+0000 (Greenwich Mean Time) User Role permissions| GC PM | Login and verify users access privilegesSun Aug 27 2023 02:43:28 GMT+0000 (Greenwich Mean Time) √ EX-9829 - Part 1: SignUp. Sun Aug 27 2023 02:43:28 GMT+0000 (Greenwich Mean Time) (17439ms) √ EX-9829 - Part 1: SignUp. Sun Aug 27 2023 02:43:28 GMT+0000 (Greenwich Mean Time) (17439ms) √ EX-9829 - Part 2: Verify the confirmation email. Sun Aug 27 2023 02:43:51 GMT+0000 (Greenwich Mean Time) √ EX-9829 - Part 2: Verify the confirmation email. Sun Aug 27 2023 02:43:51 GMT+0000 (Greenwich Mean Time) √ EX-9829 - Part 3: Create your account | Select, This is my company. Sun Aug 27 2023 02:43:57 GMT+0000 (Greenwich Mean Time) (21035ms) √ EX-9829 - Part 3: Create your account | Select, This is my company. Sun Aug 27 2023 02:43:57 GMT+0000 (Greenwich Mean Time) (21035ms) √ EX-9829 - Part 4: Change the role to Project Manager Sun Aug 27 2023 02:44:23 GMT+0000 (Greenwich Mean Time) (21970ms) √ EX-9829 - Part 4: Change the role to Project Manager Sun Aug 27 2023 02:44:23 GMT+0000 (Greenwich Mean Time) (21970ms) √ EX-9829 - Part 5: Login as GC PM and verify user privilegesSun Aug 27 2023 02:44:23 GMT+0000 (Greenwich Mean Time) (48453ms) √ EX-9829 - Part 5: Login as GC PM and verify user privilegesSun Aug 27 2023 02:44:23 GMT+0000 (Greenwich Mean Time) (48453ms) √ EX-9829 - Part 6: Delete the account from the company. Sun Aug 27 2023 02:44:23 GMT+0000 (Greenwich Mean Time) (18936ms) √ EX-9829 - Part 6: Delete the account from the company. Sun Aug 27 2023 02:44:23 GMT+0000 (Greenwich Mean Time) (18936ms) 6 passing (2m) 6 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_024.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 25 seconds │ │ Estimated: 2 minutes, 53 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9829-GC-PM-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9829-GC-PM-user-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9830-GC-Field-user-previlleges.spe (26 of 114) c.ts Estimated: 2 minutes, 7 seconds User Role permissions| GC FieldUser | Login and verify users access privilegesSun Aug 27 2023 02:46:01 GMT+0000 (Greenwich Mean Time) User Role permissions| GC FieldUser | Login and verify users access privilegesSun Aug 27 2023 02:46:01 GMT+0000 (Greenwich Mean Time) √ EX-9830 - Part 1: SignUp. Sun Aug 27 2023 02:46:01 GMT+0000 (Greenwich Mean Time) (19928ms) √ EX-9830 - Part 1: SignUp. Sun Aug 27 2023 02:46:01 GMT+0000 (Greenwich Mean Time) (19928ms) √ EX-9830 - Part 2: Verify the confirmation email. Sun Aug 27 2023 02:46:27 GMT+0000 (Greenwich Mean Time) √ EX-9830 - Part 2: Verify the confirmation email. Sun Aug 27 2023 02:46:27 GMT+0000 (Greenwich Mean Time) √ EX-9830 - Part 3: Create your account | Select, This is my company. Sun Aug 27 2023 02:46:34 GMT+0000 (Greenwich Mean Time) (23076ms) √ EX-9830 - Part 3: Create your account | Select, This is my company. Sun Aug 27 2023 02:46:34 GMT+0000 (Greenwich Mean Time) (23076ms) √ EX-9830 - Part 4: Login as GC FU and verify user privilegesSun Aug 27 2023 02:47:03 GMT+0000 (Greenwich Mean Time) (30128ms) √ EX-9830 - Part 4: Login as GC FU and verify user privilegesSun Aug 27 2023 02:47:03 GMT+0000 (Greenwich Mean Time) (30128ms) √ EX-9830 - Part 5: Delete the account from the company. Sun Aug 27 2023 02:47:03 GMT+0000 (Greenwich Mean Time) (15575ms) √ EX-9830 - Part 5: Delete the account from the company. Sun Aug 27 2023 02:47:03 GMT+0000 (Greenwich Mean Time) (15575ms) 5 passing (2m) 5 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_025.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 48 seconds │ │ Estimated: 2 minutes, 7 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9830-GC-Field-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9830-GC-Field-user-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9832-SC-Field-users-user-previlleg (27 of 114) es.spec.ts Estimated: 4 minutes, 1 second User Role permissions| SC FU | Login and verify users access privilegesSun Aug 27 2023 02:47:57 GMT+0000 (Greenwich Mean Time) User Role permissions| SC FU | Login and verify users access privilegesSun Aug 27 2023 02:47:57 GMT+0000 (Greenwich Mean Time) √ EX-9832 - Part 1: Add Contractor with SC Field User to existing project. Sun Aug 27 2023 02:47:57 GMT+0000 (Greenwich Mean Time) (44997ms) √ EX-9832 - Part 1: Add Contractor with SC Field User to existing project. Sun Aug 27 2023 02:47:57 GMT+0000 (Greenwich Mean Time) (44997ms) √ EX-9832 - Part 2: SignUp. Sun Aug 27 2023 02:47:57 GMT+0000 (Greenwich Mean Time) (12822ms) √ EX-9832 - Part 2: SignUp. Sun Aug 27 2023 02:47:57 GMT+0000 (Greenwich Mean Time) (12822ms) √ EX-9832 - Part 3: Verify the confirmation email. Sun Aug 27 2023 02:49:02 GMT+0000 (Greenwich Mean Time) √ EX-9832 - Part 3: Verify the confirmation email. Sun Aug 27 2023 02:49:02 GMT+0000 (Greenwich Mean Time) √ EX-9832 - Part 4: Create your account | Select, This is my company. Sun Aug 27 2023 02:49:08 GMT+0000 (Greenwich Mean Time) (21059ms) √ EX-9832 - Part 4: Create your account | Select, This is my company. Sun Aug 27 2023 02:49:08 GMT+0000 (Greenwich Mean Time) (21059ms) √ EX-9832 - Part 5: Change the role to Field User Sun Aug 27 2023 02:49:34 GMT+0000 (Greenwich Mean Time) (21923ms) √ EX-9832 - Part 5: Change the role to Field User Sun Aug 27 2023 02:49:34 GMT+0000 (Greenwich Mean Time) (21923ms) √ EX-9832 - Part 6: Login as SC FU and verify user privilegesSun Aug 27 2023 02:49:34 GMT+0000 (Greenwich Mean Time) (25788ms) √ EX-9832 - Part 6: Login as SC FU and verify user privilegesSun Aug 27 2023 02:49:34 GMT+0000 (Greenwich Mean Time) (25788ms) √ EX-9832 - Part 7: Delete the account from the company. Sun Aug 27 2023 02:49:34 GMT+0000 (Greenwich Mean Time) (15527ms) √ EX-9832 - Part 7: Delete the account from the company. Sun Aug 27 2023 02:49:34 GMT+0000 (Greenwich Mean Time) (15527ms) √ EX-9832 - Part 8: Delete the contracts of existing Project Sun Aug 27 2023 02:49:34 GMT+0000 (Greenwich Mean Time) (34708ms) √ EX-9832 - Part 8: Delete the contracts of existing Project Sun Aug 27 2023 02:49:34 GMT+0000 (Greenwich Mean Time) (34708ms) 8 passing (3m) 8 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_026.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 15 seconds │ │ Estimated: 4 minutes, 1 second │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9832-SC-Field-users-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9832-SC-Field-users-user-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9833-SC-PM-user-previlleges.spec.t (28 of 114) s Estimated: 4 minutes, 15 seconds User Role permissions| SC PM | Login and verify users access privilegesSun Aug 27 2023 02:51:21 GMT+0000 (Greenwich Mean Time) User Role permissions| SC PM | Login and verify users access privilegesSun Aug 27 2023 02:51:21 GMT+0000 (Greenwich Mean Time) √ EX-9833 - Part 1: Add Contractor with SC PM to existing project. Sun Aug 27 2023 02:51:21 GMT+0000 (Greenwich Mean Time) (43603ms) √ EX-9833 - Part 1: Add Contractor with SC PM to existing project. Sun Aug 27 2023 02:51:21 GMT+0000 (Greenwich Mean Time) (43603ms) √ EX-9833 - Part 2: SignUp. Sun Aug 27 2023 02:51:21 GMT+0000 (Greenwich Mean Time) (13265ms) √ EX-9833 - Part 2: SignUp. Sun Aug 27 2023 02:51:21 GMT+0000 (Greenwich Mean Time) (13265ms) √ EX-9833 - Part 3: Verify the confirmation email. Sun Aug 27 2023 02:52:24 GMT+0000 (Greenwich Mean Time) √ EX-9833 - Part 3: Verify the confirmation email. Sun Aug 27 2023 02:52:24 GMT+0000 (Greenwich Mean Time) √ EX-9833 - Part 4: Create your account | Select, This is my company. Sun Aug 27 2023 02:52:30 GMT+0000 (Greenwich Mean Time) (21551ms) √ EX-9833 - Part 4: Create your account | Select, This is my company. Sun Aug 27 2023 02:52:30 GMT+0000 (Greenwich Mean Time) (21551ms) √ EX-9833 - Part 5: Change the role to PM Sun Aug 27 2023 02:52:57 GMT+0000 (Greenwich Mean Time) (23203ms) √ EX-9833 - Part 5: Change the role to PM Sun Aug 27 2023 02:52:57 GMT+0000 (Greenwich Mean Time) (23203ms) √ EX-9833 - Part 6: Login as SC PM and verify user privilegesSun Aug 27 2023 02:52:57 GMT+0000 (Greenwich Mean Time) (44652ms) √ EX-9833 - Part 6: Login as SC PM and verify user privilegesSun Aug 27 2023 02:52:57 GMT+0000 (Greenwich Mean Time) (44652ms) √ EX-9833 - Part 7: Delete the account from the company. Sun Aug 27 2023 02:52:57 GMT+0000 (Greenwich Mean Time) (15145ms) √ EX-9833 - Part 7: Delete the account from the company. Sun Aug 27 2023 02:52:57 GMT+0000 (Greenwich Mean Time) (15145ms) √ EX-9833 - Part 8: Delete the contracts of existing Project Sun Aug 27 2023 02:52:57 GMT+0000 (Greenwich Mean Time) (36272ms) √ EX-9833 - Part 8: Delete the contracts of existing Project Sun Aug 27 2023 02:52:57 GMT+0000 (Greenwich Mean Time) (36272ms) 8 passing (4m) 8 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_027.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 36 seconds │ │ Estimated: 4 minutes, 15 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9833-SC-PM-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9833-SC-PM-user-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9834-SC-Admin-user-previlleges.spe (29 of 114) c.ts Estimated: 4 minutes, 6 seconds User Role permissions| SC Admin | Login and verify users access privilegesSun Aug 27 2023 02:55:05 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Admin | Login and verify users access privilegesSun Aug 27 2023 02:55:05 GMT+0000 (Greenwich Mean Time) √ EX-9834 - Part 1: Add Contractor with SC Admin to existing project. Sun Aug 27 2023 02:55:05 GMT+0000 (Greenwich Mean Time) (43205ms) √ EX-9834 - Part 1: Add Contractor with SC Admin to existing project. Sun Aug 27 2023 02:55:05 GMT+0000 (Greenwich Mean Time) (43205ms) √ EX-9834 - Part 2: SignUp. Sun Aug 27 2023 02:55:05 GMT+0000 (Greenwich Mean Time) (12733ms) √ EX-9834 - Part 2: SignUp. Sun Aug 27 2023 02:55:05 GMT+0000 (Greenwich Mean Time) (12733ms) √ EX-9834 - Part 3: Verify the confirmation email. Sun Aug 27 2023 02:56:07 GMT+0000 (Greenwich Mean Time) √ EX-9834 - Part 3: Verify the confirmation email. Sun Aug 27 2023 02:56:07 GMT+0000 (Greenwich Mean Time) √ EX-9834 - Part 4: Create your account | Select, This is my company. Sun Aug 27 2023 02:56:15 GMT+0000 (Greenwich Mean Time) (26758ms) √ EX-9834 - Part 4: Create your account | Select, This is my company. Sun Aug 27 2023 02:56:15 GMT+0000 (Greenwich Mean Time) (26758ms) √ EX-9834 - Part 5: Change the role to Admin Sun Aug 27 2023 02:56:49 GMT+0000 (Greenwich Mean Time) (26920ms) √ EX-9834 - Part 5: Change the role to Admin Sun Aug 27 2023 02:56:49 GMT+0000 (Greenwich Mean Time) (26920ms) √ EX-9834 - Part 6: Login as SC Admin and verify user privilegesSun Aug 27 2023 02:56:49 GMT+0000 (Greenwich Mean Time) (67109ms) √ EX-9834 - Part 6: Login as SC Admin and verify user privilegesSun Aug 27 2023 02:56:49 GMT+0000 (Greenwich Mean Time) (67109ms) √ EX-9834 - Part 7: Delete the account from the company. Sun Aug 27 2023 02:56:49 GMT+0000 (Greenwich Mean Time) (26145ms) √ EX-9834 - Part 7: Delete the account from the company. Sun Aug 27 2023 02:56:49 GMT+0000 (Greenwich Mean Time) (26145ms) √ EX-9834 - Part 8: Delete the contracts of existing Project Sun Aug 27 2023 02:56:49 GMT+0000 (Greenwich Mean Time) (39691ms) √ EX-9834 - Part 8: Delete the contracts of existing Project Sun Aug 27 2023 02:56:49 GMT+0000 (Greenwich Mean Time) (39691ms) 8 passing (4m) 8 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_028.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 24 seconds │ │ Estimated: 4 minutes, 6 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9834-SC-Admin-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9834-SC-Admin-user-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9835-SC-account-owner-user-previll (30 of 114) eges.spec.ts Estimated: 4 minutes, 20 seconds User Role permissions| SC Account Owner | Login and verify users access privilegesSun Aug 27 2023 02:59:39 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Account Owner | Login and verify users access privilegesSun Aug 27 2023 02:59:39 GMT+0000 (Greenwich Mean Time) √ EX-9835 - Part 1: Add Contractor with SC Account owner to existing project. Sun Aug 27 2023 02:59:39 GMT+0000 (Greenwich Mean Time) (52231ms) √ EX-9835 - Part 1: Add Contractor with SC Account owner to existing project. Sun Aug 27 2023 02:59:39 GMT+0000 (Greenwich Mean Time) (52231ms) √ EX-9835 - Part 2: SignUp. Sun Aug 27 2023 02:59:39 GMT+0000 (Greenwich Mean Time) (15588ms) √ EX-9835 - Part 2: SignUp. Sun Aug 27 2023 02:59:39 GMT+0000 (Greenwich Mean Time) (15588ms) √ EX-9835 - Part 3: Verify the confirmation email. Sun Aug 27 2023 03:00:54 GMT+0000 (Greenwich Mean Time) √ EX-9835 - Part 3: Verify the confirmation email. Sun Aug 27 2023 03:00:54 GMT+0000 (Greenwich Mean Time) √ EX-9835 - Part 4: Create your account | Select, This is my company. Sun Aug 27 2023 03:01:01 GMT+0000 (Greenwich Mean Time) (24219ms) √ EX-9835 - Part 4: Create your account | Select, This is my company. Sun Aug 27 2023 03:01:01 GMT+0000 (Greenwich Mean Time) (24219ms) √ EX-9835 - Part 5: Change the role to Account owner Sun Aug 27 2023 03:01:32 GMT+0000 (Greenwich Mean Time) (27668ms) √ EX-9835 - Part 5: Change the role to Account owner Sun Aug 27 2023 03:01:32 GMT+0000 (Greenwich Mean Time) (27668ms) √ EX-9835 - Part 6: Login as SC Account Owner and verify user privilegesSun Aug 27 2023 03:01:32 GMT+0000 (Greenwich Mean Time) (70012ms) √ EX-9835 - Part 6: Login as SC Account Owner and verify user privilegesSun Aug 27 2023 03:01:32 GMT+0000 (Greenwich Mean Time) (70012ms) √ EX-9835 - Part 7: Delete the account from the company. Sun Aug 27 2023 03:01:32 GMT+0000 (Greenwich Mean Time) (15596ms) √ EX-9835 - Part 7: Delete the account from the company. Sun Aug 27 2023 03:01:32 GMT+0000 (Greenwich Mean Time) (15596ms) √ EX-9835 - Part 8: Delete the contracts of existing Project Sun Aug 27 2023 03:01:32 GMT+0000 (Greenwich Mean Time) (35705ms) √ EX-9835 - Part 8: Delete the contracts of existing Project Sun Aug 27 2023 03:01:32 GMT+0000 (Greenwich Mean Time) (35705ms) 8 passing (4m) 8 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_029.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 23 seconds │ │ Estimated: 4 minutes, 20 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9835-SC-account-owner-user-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9835-SC-account-owner-user-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges. (31 of 114) spec.ts Estimated: 9 minutes, 59 seconds User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:04:08 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:04:08 GMT+0000 (Greenwich Mean Time) 1) EX-9885 - Part 1: Create a project Sun Aug 27 2023 03:04:08 GMT+0000 (Greenwich Mean Time) 1) EX-9885 - Part 1: Create a project Sun Aug 27 2023 03:04:08 GMT+0000 (Greenwich Mean Time) 2) EX-9885 - Part 2: Edit the project details and change the nameSun Aug 27 2023 03:04:08 GMT+0000 (Greenwich Mean Time) 2) EX-9885 - Part 2: Edit the project details and change the nameSun Aug 27 2023 03:04:08 GMT+0000 (Greenwich Mean Time) 3) EX-9885 - Part 3: Add customer to the Project. Sun Aug 27 2023 03:04:08 GMT+0000 (Greenwich Mean Time) 3) EX-9885 - Part 3: Add customer to the Project. Sun Aug 27 2023 03:04:08 GMT+0000 (Greenwich Mean Time) 4) EX-9885 - Part 4: Verify the invitation email for customerSun Aug 27 2023 03:07:06 GMT+0000 (Greenwich Mean Time) 4) EX-9885 - Part 4: Verify the invitation email for customerSun Aug 27 2023 03:07:06 GMT+0000 (Greenwich Mean Time) 5) EX-9885 - Part 5: Add company user to the Project. Sun Aug 27 2023 03:07:43 GMT+0000 (Greenwich Mean Time) 5) EX-9885 - Part 5: Add company user to the Project. Sun Aug 27 2023 03:07:43 GMT+0000 (Greenwich Mean Time) 6) EX-9885 - Part 6: Verify company user can access project. Sun Aug 27 2023 03:07:43 GMT+0000 (Greenwich Mean Time) 6) EX-9885 - Part 6: Verify company user can access project. Sun Aug 27 2023 03:07:43 GMT+0000 (Greenwich Mean Time) 7) EX-9885 - Part 7: Add Contract with a user to the project. Sun Aug 27 2023 03:07:43 GMT+0000 (Greenwich Mean Time) 7) EX-9885 - Part 7: Add Contract with a user to the project. Sun Aug 27 2023 03:07:43 GMT+0000 (Greenwich Mean Time) 8) EX-9885 - Part 8: Verify email invitation for contractor user Sun Aug 27 2023 03:10:37 GMT+0000 (Greenwich Mean Time) 8) EX-9885 - Part 8: Verify email invitation for contractor user Sun Aug 27 2023 03:10:37 GMT+0000 (Greenwich Mean Time) 9) EX-9885 - Part 9: Add additiona user to existing contract of the project. Sun Aug 27 2023 03:11:13 GMT+0000 (Greenwich Mean Time) 9) EX-9885 - Part 9: Add additiona user to existing contract of the project. Sun Aug 27 2023 03:11:13 GMT+0000 (Greenwich Mean Time) 10) EX-9885 - Part 10: Verify email invitation for additional contract user Sun Aug 27 2023 03:12:17 GMT+0000 (Greenwich Mean Time) 10) EX-9885 - Part 10: Verify email invitation for additional contract user Sun Aug 27 2023 03:12:17 GMT+0000 (Greenwich Mean Time) 11) Ex-9885 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) 11) Ex-9885 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) 12) EX-9885 - Part12: Clean up Project Sun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) 12) EX-9885 - Part12: Clean up Project Sun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) 0 passing (11m) 12 failing 1) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 1: Create a project Sun Aug 27 2023 03:04:08 GMT+0000 (Greenwich Mean Time): CypressError: Timed out retrying after 30000ms: `cy.contains()` failed because it requires a DOM element, window or document. No elements in the current DOM matched your query: > cy.get(div[role='alert']) at isElement (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144409:62) at validateType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144267:14) at Object.isType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144298:7) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:131592:22) at Object.subjectFn (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143314:16) at $Cy.verifyUpcomingAssertions (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:142658:31) at onRetry (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143305:15) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4315:29) at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143192:68) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143133:14) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18) at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1645:18) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:5450:46) From Your Spec Code: at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:276:36) 2) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 2: Edit the project details and change the nameSun Aug 27 2023 03:04:08 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Old Test Project TC9885 1693105448804' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 3) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 3: Add customer to the Project. Sun Aug 27 2023 03:04:08 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 4) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 4: Verify the invitation email for customerSun Aug 27 2023 03:07:06 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts:71:28) 5) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 5: Add company user to the Project. Sun Aug 27 2023 03:07:43 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 6) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 6: Verify company user can access project. Sun Aug 27 2023 03:07:43 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 7) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 7: Add Contract with a user to the project. Sun Aug 27 2023 03:07:43 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 8) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 8: Verify email invitation for contractor user Sun Aug 27 2023 03:10:37 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts:126:28) 9) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 9: Add additiona user to existing contract of the project. Sun Aug 27 2023 03:11:13 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 10) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 10: Verify email invitation for additional contract user Sun Aug 27 2023 03:12:17 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts:154:28) 11) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) Ex-9885 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 12) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part12: Clean up Project Sun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 0 passing (11m) 12 failing 1) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 1: Create a project Sun Aug 27 2023 03:04:08 GMT+0000 (Greenwich Mean Time): CypressError: Timed out retrying after 30000ms: `cy.contains()` failed because it requires a DOM element, window or document. No elements in the current DOM matched your query: > cy.get(div[role='alert']) at isElement (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144409:62) at validateType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144267:14) at Object.isType (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:144298:7) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:131592:22) at Object.subjectFn (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143314:16) at $Cy.verifyUpcomingAssertions (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:142658:31) at onRetry (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143305:15) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4315:29) at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143192:68) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143133:14) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18) at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1645:18) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:5450:46) From Your Spec Code: at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:276:36) 2) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 2: Edit the project details and change the nameSun Aug 27 2023 03:04:08 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Old Test Project TC9885 1693105448804' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 3) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 3: Add customer to the Project. Sun Aug 27 2023 03:04:08 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 4) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 4: Verify the invitation email for customerSun Aug 27 2023 03:07:06 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts:71:28) 5) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 5: Add company user to the Project. Sun Aug 27 2023 03:07:43 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 6) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 6: Verify company user can access project. Sun Aug 27 2023 03:07:43 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 7) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 7: Add Contract with a user to the project. Sun Aug 27 2023 03:07:43 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 8) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 8: Verify email invitation for contractor user Sun Aug 27 2023 03:10:37 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts:126:28) 9) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 9: Add additiona user to existing contract of the project. Sun Aug 27 2023 03:11:13 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 10) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part 10: Verify email invitation for additional contract user Sun Aug 27 2023 03:12:17 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts:154:28) 11) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) Ex-9885 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) 12) User Role permissions| GC Admin | Login as GC admin and create project and verify user privilegesSun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time) EX-9885 - Part12: Clean up Project Sun Aug 27 2023 03:12:52 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9885 1692983677372' within the element: but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:337:34) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_030.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 0 │ │ Failing: 12 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 12 │ │ Video: true │ │ Duration: 10 minutes, 32 seconds │ │ Estimated: 9 minutes, 59 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9885-GC-Admin-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesSun Aug 27 2023 030408 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 1 Cr eate a project Sun Aug 27 2023 030408 GMT+0000 (Greenwich Mean Time) (failed).pn g - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesSun Aug 27 2023 030408 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 2 Ed it the project details and change the nameSun Aug 27 2023 030408 GMT+0000 (Gree. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesSun Aug 27 2023 030408 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 3 Ad d customer to the Project. Sun Aug 27 2023 030408 GMT+0000 (Greenwich Mean Time. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesSun Aug 27 2023 030706 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 4 Ve rify the invitation email for customerSun Aug 27 2023 030706 GMT+0000 (Greenwic. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesSun Aug 27 2023 030743 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 5 Ad d company user to the Project. Sun Aug 27 2023 030743 GMT+0000 (Greenwich Mean . png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesSun Aug 27 2023 030743 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 6 Ve rify company user can access project. Sun Aug 27 2023 030743 GMT+0000 (Greenwic. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesSun Aug 27 2023 030743 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 7 Ad d Contract with a user to the project. Sun Aug 27 2023 030743 GMT+0000 (Greenwi. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesSun Aug 27 2023 031037 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 8 Ve rify email invitation for contractor user Sun Aug 27 2023 031037 GMT+0000 (Gree. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesSun Aug 27 2023 031113 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 9 Ad d additiona user to existing contract of the project. Sun Aug 27 2023 031113 GM. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesSun Aug 27 2023 031217 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 10 V erify email invitation for additional contract user Sun Aug 27 2023 031217 GMT+. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesSun Aug 27 2023 031252 GMT+0000 (Greenwich Mean Time) -- Ex-9885 - Part 11 N avigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 20. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role p ermissions GC Admin Login as GC admin and create project and verify user privil egesSun Aug 27 2023 031252 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part12 Cl ean up Project Sun Aug 27 2023 031252 GMT+0000 (Greenwich Mean Time) (failed).pn g (Video) - Started compressing: Compressing to 32 CRF Compression progress: 10% Compression progress: 20% Compression progress: 31% Compression progress: 41% Compression progress: 51% Compression progress: 61% Compression progress: 71% Compression progress: 81% Compression progress: 91% - Finished compressing: 1 minute, 47 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/13) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesSun Aug 27 2023 031037 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 8 Verify email invitation for contractor user Sun Aug 27 2023 031037 GMT+0000 (Gree.png - Done Uploading (2/13) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesSun Aug 27 2023 030408 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 1 Create a project Sun Aug 27 2023 030408 GMT+0000 (Greenwich Mean Time) (failed).png - Done Uploading (3/13) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesSun Aug 27 2023 031113 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 9 Add additiona user to existing contract of the project. Sun Aug 27 2023 031113 GM.png - Done Uploading (4/13) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesSun Aug 27 2023 030408 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 2 Edit the project details and change the nameSun Aug 27 2023 030408 GMT+0000 (Gree.png - Done Uploading (5/13) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesSun Aug 27 2023 031252 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part12 Clean up Project Sun Aug 27 2023 031252 GMT+0000 (Greenwich Mean Time) (failed).png - Done Uploading (6/13) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesSun Aug 27 2023 030743 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 5 Add company user to the Project. Sun Aug 27 2023 030743 GMT+0000 (Greenwich Mean .png - Done Uploading (7/13) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesSun Aug 27 2023 030408 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 3 Add customer to the Project. Sun Aug 27 2023 030408 GMT+0000 (Greenwich Mean Time.png - Done Uploading (8/13) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesSun Aug 27 2023 031252 GMT+0000 (Greenwich Mean Time) -- Ex-9885 - Part 11 Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 20.png - Done Uploading (9/13) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesSun Aug 27 2023 030743 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 6 Verify company user can access project. Sun Aug 27 2023 030743 GMT+0000 (Greenwic.png - Done Uploading (10/13) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesSun Aug 27 2023 031217 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 10 Verify email invitation for additional contract user Sun Aug 27 2023 031217 GMT+.png - Done Uploading (11/13) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesSun Aug 27 2023 030706 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 4 Verify the invitation email for customerSun Aug 27 2023 030706 GMT+0000 (Greenwic.png - Done Uploading (12/13) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts\User Role permissions GC Admin Login as GC admin and create project and verify user privilegesSun Aug 27 2023 030743 GMT+0000 (Greenwich Mean Time) -- EX-9885 - Part 7 Add Contract with a user to the project. Sun Aug 27 2023 030743 GMT+0000 (Greenwi.png - Done Uploading (13/13) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9885-GC-Admin-project-previlleges.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9886-GC-PM-project-previlleges.spe (32 of 114) c.ts Estimated: 9 minutes, 4 seconds We encountered an unexpected error communicating with our servers. StatusCodeError: 520 - undefined We will retry 3 more times in 30 seconds... User Role permissions| GC PM | Login as GC PM and create project and verify user privilegesSun Aug 27 2023 03:16:37 GMT+0000 (Greenwich Mean Time) User Role permissions| GC PM | Login as GC PM and create project and verify user privilegesSun Aug 27 2023 03:16:37 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 1: Create a project Sun Aug 27 2023 03:16:37 GMT+0000 (Greenwich Mean Time) (49335ms) √ EX-9886 - Part 1: Create a project Sun Aug 27 2023 03:16:37 GMT+0000 (Greenwich Mean Time) (49335ms) √ EX-9886 - Part 2: Edit the project details and change the nameSun Aug 27 2023 03:16:37 GMT+0000 (Greenwich Mean Time) (38050ms) √ EX-9886 - Part 2: Edit the project details and change the nameSun Aug 27 2023 03:16:37 GMT+0000 (Greenwich Mean Time) (38050ms) √ EX-9886 - Part 3: Add customer to the Project. Sun Aug 27 2023 03:16:37 GMT+0000 (Greenwich Mean Time) (40020ms) √ EX-9886 - Part 3: Add customer to the Project. Sun Aug 27 2023 03:16:37 GMT+0000 (Greenwich Mean Time) (40020ms) √ EX-9886 - Part 4: Verify the invitation email for customerSun Aug 27 2023 03:19:27 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 4: Verify the invitation email for customerSun Aug 27 2023 03:19:27 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 5: Add company user to the Project. Sun Aug 27 2023 03:19:32 GMT+0000 (Greenwich Mean Time) (48214ms) √ EX-9886 - Part 5: Add company user to the Project. Sun Aug 27 2023 03:19:32 GMT+0000 (Greenwich Mean Time) (48214ms) √ EX-9886 - Part 6: Verify company user can access project. Sun Aug 27 2023 03:19:32 GMT+0000 (Greenwich Mean Time) (25855ms) √ EX-9886 - Part 6: Verify company user can access project. Sun Aug 27 2023 03:19:32 GMT+0000 (Greenwich Mean Time) (25855ms) √ EX-9886 - Part 7: Add Contract with a user to the project. Sun Aug 27 2023 03:19:32 GMT+0000 (Greenwich Mean Time) (41015ms) √ EX-9886 - Part 7: Add Contract with a user to the project. Sun Aug 27 2023 03:19:32 GMT+0000 (Greenwich Mean Time) (41015ms) √ EX-9886 - Part 8: Verify email invitation for contractor user Sun Aug 27 2023 03:21:33 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 8: Verify email invitation for contractor user Sun Aug 27 2023 03:21:33 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 9: Add additional user to existing contract of the project. Sun Aug 27 2023 03:21:39 GMT+0000 (Greenwich Mean Time) (46503ms) √ EX-9886 - Part 9: Add additional user to existing contract of the project. Sun Aug 27 2023 03:21:39 GMT+0000 (Greenwich Mean Time) (46503ms) √ EX-9886 - Part 10: Verify email invitation for additional contract user Sun Aug 27 2023 03:22:30 GMT+0000 (Greenwich Mean Time) √ EX-9886 - Part 10: Verify email invitation for additional contract user Sun Aug 27 2023 03:22:30 GMT+0000 (Greenwich Mean Time) √ Ex-9886 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 03:22:34 GMT+0000 (Greenwich Mean Time) (42634ms) √ Ex-9886 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 03:22:34 GMT+0000 (Greenwich Mean Time) (42634ms) √ EX-9886 - Part 12: Clean up Project Sun Aug 27 2023 03:22:34 GMT+0000 (Greenwich Mean Time) (35148ms) √ EX-9886 - Part 12: Clean up Project Sun Aug 27 2023 03:22:34 GMT+0000 (Greenwich Mean Time) (35148ms) 12 passing (7m) 12 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_031.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 39 seconds │ │ Estimated: 9 minutes, 4 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9886-GC-PM-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9886-GC-PM-project-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges. (33 of 114) spec.ts Estimated: 10 minutes, 39 seconds User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesSun Aug 27 2023 03:23:59 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesSun Aug 27 2023 03:23:59 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 1: Create a project Sun Aug 27 2023 03:23:59 GMT+0000 (Greenwich Mean Time) (10652ms) √ EX-9887 - Part 1: Create a project Sun Aug 27 2023 03:23:59 GMT+0000 (Greenwich Mean Time) (10652ms) √ EX-9887 - Part 2: Edit the project details and change the nameSun Aug 27 2023 03:23:59 GMT+0000 (Greenwich Mean Time) (40214ms) √ EX-9887 - Part 2: Edit the project details and change the nameSun Aug 27 2023 03:23:59 GMT+0000 (Greenwich Mean Time) (40214ms) √ EX-9887 - Part 3: Add customer to the Project. Sun Aug 27 2023 03:23:59 GMT+0000 (Greenwich Mean Time) (38309ms) √ EX-9887 - Part 3: Add customer to the Project. Sun Aug 27 2023 03:23:59 GMT+0000 (Greenwich Mean Time) (38309ms) √ EX-9887 - Part 4: Verify the invitation email for customerSun Aug 27 2023 03:25:34 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 4: Verify the invitation email for customerSun Aug 27 2023 03:25:34 GMT+0000 (Greenwich Mean Time) √ EX-9887 - Part 5: Add company user to the Project. Sun Aug 27 2023 03:25:40 GMT+0000 (Greenwich Mean Time) (52706ms) √ EX-9887 - Part 5: Add company user to the Project. Sun Aug 27 2023 03:25:40 GMT+0000 (Greenwich Mean Time) (52706ms) √ EX-9887 - Part 6: Verify company user can access project. Sun Aug 27 2023 03:25:40 GMT+0000 (Greenwich Mean Time) (30028ms) √ EX-9887 - Part 6: Verify company user can access project. Sun Aug 27 2023 03:25:40 GMT+0000 (Greenwich Mean Time) (30028ms) 1) EX-9887 - Part 7: Add Contract with a user to the project. Sun Aug 27 2023 03:25:40 GMT+0000 (Greenwich Mean Time) 1) EX-9887 - Part 7: Add Contract with a user to the project. Sun Aug 27 2023 03:25:40 GMT+0000 (Greenwich Mean Time) 2) EX-9887 - Part 8: Verify email invitation for contractor user Sun Aug 27 2023 03:28:21 GMT+0000 (Greenwich Mean Time) 2) EX-9887 - Part 8: Verify email invitation for contractor user Sun Aug 27 2023 03:28:21 GMT+0000 (Greenwich Mean Time) 3) EX-9887 - Part 9: Add additiona user to existing contract of the project. Sun Aug 27 2023 03:28:57 GMT+0000 (Greenwich Mean Time) 3) EX-9887 - Part 9: Add additiona user to existing contract of the project. Sun Aug 27 2023 03:28:57 GMT+0000 (Greenwich Mean Time) 4) EX-9887 - Part 10: Verify email invitation for additional contract user Sun Aug 27 2023 03:30:03 GMT+0000 (Greenwich Mean Time) 4) EX-9887 - Part 10: Verify email invitation for additional contract user Sun Aug 27 2023 03:30:03 GMT+0000 (Greenwich Mean Time) √ Ex-9887 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 03:30:39 GMT+0000 (Greenwich Mean Time) (42724ms) √ Ex-9887 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 03:30:39 GMT+0000 (Greenwich Mean Time) (42724ms) √ EX-9887 - Part 12: Clean up Project Sun Aug 27 2023 03:30:39 GMT+0000 (Greenwich Mean Time) (34970ms) √ EX-9887 - Part 12: Clean up Project Sun Aug 27 2023 03:30:39 GMT+0000 (Greenwich Mean Time) (34970ms) 8 passing (8m) 4 failing 1) User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesSun Aug 27 2023 03:30:39 GMT+0000 (Greenwich Mean Time) EX-9887 - Part 7: Add Contract with a user to the project. Sun Aug 27 2023 03:25:40 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Contract' within the selector: 'tbody tr td' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34) 2) User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesSun Aug 27 2023 03:30:39 GMT+0000 (Greenwich Mean Time) EX-9887 - Part 8: Verify email invitation for contractor user Sun Aug 27 2023 03:28:21 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1693106639546' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges.spec.ts:127:28) 3) User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesSun Aug 27 2023 03:30:39 GMT+0000 (Greenwich Mean Time) EX-9887 - Part 9: Add additiona user to existing contract of the project. Sun Aug 27 2023 03:28:57 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `[data-cy="stickyTable"] tbody tr[data-cy]`, but never found it. at projectsOpenProjectAddContractors.verifyContractsCount (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Projects_OpenProject_AddContractors.ts:137:35) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges.spec.ts:141:23) 4) User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesSun Aug 27 2023 03:30:39 GMT+0000 (Greenwich Mean Time) EX-9887 - Part 10: Verify email invitation for additional contract user Sun Aug 27 2023 03:30:03 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1693106639546' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges.spec.ts:155:28) 8 passing (8m) 4 failing 1) User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesSun Aug 27 2023 03:30:39 GMT+0000 (Greenwich Mean Time) EX-9887 - Part 7: Add Contract with a user to the project. Sun Aug 27 2023 03:25:40 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Contract' within the selector: 'tbody tr td' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34) 2) User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesSun Aug 27 2023 03:30:39 GMT+0000 (Greenwich Mean Time) EX-9887 - Part 8: Verify email invitation for contractor user Sun Aug 27 2023 03:28:21 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1693106639546' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges.spec.ts:127:28) 3) User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesSun Aug 27 2023 03:30:39 GMT+0000 (Greenwich Mean Time) EX-9887 - Part 9: Add additiona user to existing contract of the project. Sun Aug 27 2023 03:28:57 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `[data-cy="stickyTable"] tbody tr[data-cy]`, but never found it. at projectsOpenProjectAddContractors.verifyContractsCount (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Projects_OpenProject_AddContractors.ts:137:35) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges.spec.ts:141:23) 4) User Role permissions| SC Admin | Login as SC admin and create project and verify user privilegesSun Aug 27 2023 03:30:39 GMT+0000 (Greenwich Mean Time) EX-9887 - Part 10: Verify email invitation for additional contract user Sun Aug 27 2023 03:30:03 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC9887 1693106639546' within the element: but never did. at emailInviteMyCustomerToProject.verifyInviteSubjectContent (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Email_InviteMyCustomerToProject.ts:23:24) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges.spec.ts:155:28) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_032.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 8 │ │ Failing: 4 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 4 │ │ Video: true │ │ Duration: 7 minutes, 57 seconds │ │ Estimated: 10 minutes, 39 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9887-SC-Admin-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9887-SC-Admin-project-previlleges.spec.ts\User Role p ermissions SC Admin Login as SC admin and create project and verify user privil egesSun Aug 27 2023 032540 GMT+0000 (Greenwich Mean Time) -- EX-9887 - Part 7 Ad d Contract with a user to the project. Sun Aug 27 2023 032540 GMT+0000 (Greenwi. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9887-SC-Admin-project-previlleges.spec.ts\User Role p ermissions SC Admin Login as SC admin and create project and verify user privil egesSun Aug 27 2023 032821 GMT+0000 (Greenwich Mean Time) -- EX-9887 - Part 8 Ve rify email invitation for contractor user Sun Aug 27 2023 032821 GMT+0000 (Gree. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9887-SC-Admin-project-previlleges.spec.ts\User Role p ermissions SC Admin Login as SC admin and create project and verify user privil egesSun Aug 27 2023 032857 GMT+0000 (Greenwich Mean Time) -- EX-9887 - Part 9 Ad d additiona user to existing contract of the project. Sun Aug 27 2023 032857 GM. png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_Perm (1272x587) issionLevels\User_roles\ex-9887-SC-Admin-project-previlleges.spec.ts\User Role p ermissions SC Admin Login as SC admin and create project and verify user privil egesSun Aug 27 2023 033003 GMT+0000 (Greenwich Mean Time) -- EX-9887 - Part 10 V erify email invitation for additional contract user Sun Aug 27 2023 033003 GMT+. png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 13% Compression progress: 27% Compression progress: 40% Compression progress: 52% Compression progress: 66% Compression progress: 79% Compression progress: 93% - Finished compressing: 1 minute, 22 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9887-SC-Admin-project-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9887-SC-Admin-project-previlleges.spec.ts\User Role permissions SC Admin Login as SC admin and create project and verify user privilegesSun Aug 27 2023 032540 GMT+0000 (Greenwich Mean Time) -- EX-9887 - Part 7 Add Contract with a user to the project. Sun Aug 27 2023 032540 GMT+0000 (Greenwi.png - Done Uploading (2/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9887-SC-Admin-project-previlleges.spec.ts\User Role permissions SC Admin Login as SC admin and create project and verify user privilegesSun Aug 27 2023 033003 GMT+0000 (Greenwich Mean Time) -- EX-9887 - Part 10 Verify email invitation for additional contract user Sun Aug 27 2023 033003 GMT+.png - Done Uploading (3/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9887-SC-Admin-project-previlleges.spec.ts\User Role permissions SC Admin Login as SC admin and create project and verify user privilegesSun Aug 27 2023 032821 GMT+0000 (Greenwich Mean Time) -- EX-9887 - Part 8 Verify email invitation for contractor user Sun Aug 27 2023 032821 GMT+0000 (Gree.png - Done Uploading (4/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\02_PermissionLevels\User_roles\ex-9887-SC-Admin-project-previlleges.spec.ts\User Role permissions SC Admin Login as SC admin and create project and verify user privilegesSun Aug 27 2023 032857 GMT+0000 (Greenwich Mean Time) -- EX-9887 - Part 9 Add additiona user to existing contract of the project. Sun Aug 27 2023 032857 GM.png - Done Uploading (5/5) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9887-SC-Admin-project-previlleges.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9888-GC-FU-project-previlleges.spe (34 of 114) c.ts Estimated: 6 minutes, 7 seconds User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesSun Aug 27 2023 03:33:27 GMT+0000 (Greenwich Mean Time) User Role permissions| GC Field User | Login as GC Field User and create project and verify user privilegesSun Aug 27 2023 03:33:27 GMT+0000 (Greenwich Mean Time) √ EX-9888 - Part 1: Create a project Sun Aug 27 2023 03:33:27 GMT+0000 (Greenwich Mean Time) (45888ms) √ EX-9888 - Part 1: Create a project Sun Aug 27 2023 03:33:27 GMT+0000 (Greenwich Mean Time) (45888ms) √ EX-9888 - Part 2: Edit the project details and change the nameSun Aug 27 2023 03:33:27 GMT+0000 (Greenwich Mean Time) (35832ms) √ EX-9888 - Part 2: Edit the project details and change the nameSun Aug 27 2023 03:33:27 GMT+0000 (Greenwich Mean Time) (35832ms) √ EX-9888 - Part 3: Add customer to the Project. Sun Aug 27 2023 03:33:27 GMT+0000 (Greenwich Mean Time) (39820ms) √ EX-9888 - Part 3: Add customer to the Project. Sun Aug 27 2023 03:33:27 GMT+0000 (Greenwich Mean Time) (39820ms) √ EX-9888 - Part 4: Verify the invitation email for customerSun Aug 27 2023 03:35:36 GMT+0000 (Greenwich Mean Time) √ EX-9888 - Part 4: Verify the invitation email for customerSun Aug 27 2023 03:35:36 GMT+0000 (Greenwich Mean Time) √ EX-9888 - Part 5: Add company user to the Project. Sun Aug 27 2023 03:35:41 GMT+0000 (Greenwich Mean Time) (47079ms) √ EX-9888 - Part 5: Add company user to the Project. Sun Aug 27 2023 03:35:41 GMT+0000 (Greenwich Mean Time) (47079ms) √ EX-9888 - Part 6: Verify company user can access project. Sun Aug 27 2023 03:35:41 GMT+0000 (Greenwich Mean Time) (24841ms) √ EX-9888 - Part 6: Verify company user can access project. Sun Aug 27 2023 03:35:41 GMT+0000 (Greenwich Mean Time) (24841ms) √ EX-9888 - Part 7: Add Contract should be in disabled state Sun Aug 27 2023 03:35:41 GMT+0000 (Greenwich Mean Time) (29429ms) √ EX-9888 - Part 7: Add Contract should be in disabled state Sun Aug 27 2023 03:35:41 GMT+0000 (Greenwich Mean Time) (29429ms) √ Ex-9888 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 03:35:41 GMT+0000 (Greenwich Mean Time) (24598ms) √ Ex-9888 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 03:35:41 GMT+0000 (Greenwich Mean Time) (24598ms) √ EX-9888 - Part 9: Clean up Project Sun Aug 27 2023 03:35:41 GMT+0000 (Greenwich Mean Time) (33214ms) √ EX-9888 - Part 9: Clean up Project Sun Aug 27 2023 03:35:41 GMT+0000 (Greenwich Mean Time) (33214ms) 9 passing (5m) 9 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_033.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 9 │ │ Passing: 9 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 54 seconds │ │ Estimated: 6 minutes, 7 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9888-GC-FU-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9888-GC-FU-project-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9889-SC-Owner-project-previlleges. (35 of 114) spec.ts Estimated: 11 minutes, 7 seconds User Role permissions| SC Account Owner | Login as SC account owner and create project and verify user privilegesSun Aug 27 2023 03:38:28 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Account Owner | Login as SC account owner and create project and verify user privilegesSun Aug 27 2023 03:38:28 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 1: Create a project Sun Aug 27 2023 03:38:28 GMT+0000 (Greenwich Mean Time) (49554ms) √ EX-9889 - Part 1: Create a project Sun Aug 27 2023 03:38:28 GMT+0000 (Greenwich Mean Time) (49554ms) √ EX-9889 - Part 2: Edit the project details and change the nameSun Aug 27 2023 03:38:28 GMT+0000 (Greenwich Mean Time) (39485ms) √ EX-9889 - Part 2: Edit the project details and change the nameSun Aug 27 2023 03:38:28 GMT+0000 (Greenwich Mean Time) (39485ms) √ EX-9889 - Part 3: Add customer to the Project. Sun Aug 27 2023 03:38:28 GMT+0000 (Greenwich Mean Time) (47972ms) √ EX-9889 - Part 3: Add customer to the Project. Sun Aug 27 2023 03:38:28 GMT+0000 (Greenwich Mean Time) (47972ms) √ EX-9889 - Part 4: Verify the invitation email for customerSun Aug 27 2023 03:40:52 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 4: Verify the invitation email for customerSun Aug 27 2023 03:40:52 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 5: Add company user to the Project. Sun Aug 27 2023 03:40:59 GMT+0000 (Greenwich Mean Time) (53281ms) √ EX-9889 - Part 5: Add company user to the Project. Sun Aug 27 2023 03:40:59 GMT+0000 (Greenwich Mean Time) (53281ms) √ EX-9889 - Part 6: Verify company user can access project. Sun Aug 27 2023 03:40:59 GMT+0000 (Greenwich Mean Time) (27133ms) √ EX-9889 - Part 6: Verify company user can access project. Sun Aug 27 2023 03:40:59 GMT+0000 (Greenwich Mean Time) (27133ms) √ EX-9889 - Part 7: Add Contract with a user to the project. Sun Aug 27 2023 03:40:59 GMT+0000 (Greenwich Mean Time) (42220ms) √ EX-9889 - Part 7: Add Contract with a user to the project. Sun Aug 27 2023 03:40:59 GMT+0000 (Greenwich Mean Time) (42220ms) √ EX-9889 - Part 8: Verify email invitation for contractor user Sun Aug 27 2023 03:43:07 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 8: Verify email invitation for contractor user Sun Aug 27 2023 03:43:07 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 9: Add additional user to existing contract of the project. Sun Aug 27 2023 03:43:13 GMT+0000 (Greenwich Mean Time) (41420ms) √ EX-9889 - Part 9: Add additional user to existing contract of the project. Sun Aug 27 2023 03:43:13 GMT+0000 (Greenwich Mean Time) (41420ms) √ EX-9889 - Part 10: Verify email invitation for additional contract user Sun Aug 27 2023 03:43:58 GMT+0000 (Greenwich Mean Time) √ EX-9889 - Part 10: Verify email invitation for additional contract user Sun Aug 27 2023 03:43:58 GMT+0000 (Greenwich Mean Time) √ Ex-9889 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 03:44:03 GMT+0000 (Greenwich Mean Time) (42345ms) √ Ex-9889 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 03:44:03 GMT+0000 (Greenwich Mean Time) (42345ms) √ EX-9889 - Part 12: Clean up Project Sun Aug 27 2023 03:44:03 GMT+0000 (Greenwich Mean Time) (34047ms) √ EX-9889 - Part 12: Clean up Project Sun Aug 27 2023 03:44:03 GMT+0000 (Greenwich Mean Time) (34047ms) 12 passing (7m) 12 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_034.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 51 seconds │ │ Estimated: 11 minutes, 7 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9889-SC-Owner-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9889-SC-Owner-project-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9890-SC-PM-project-previlleges.spe (36 of 114) c.ts Estimated: 9 minutes, 28 seconds User Role permissions| SC PM | Login as SC PM and create project and verify user privilegesSun Aug 27 2023 03:45:26 GMT+0000 (Greenwich Mean Time) User Role permissions| SC PM | Login as SC PM and create project and verify user privilegesSun Aug 27 2023 03:45:26 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 1: Create a project Sun Aug 27 2023 03:45:26 GMT+0000 (Greenwich Mean Time) (48860ms) √ EX-9890 - Part 1: Create a project Sun Aug 27 2023 03:45:26 GMT+0000 (Greenwich Mean Time) (48860ms) √ EX-9890 - Part 2: Edit the project details and change the nameSun Aug 27 2023 03:45:26 GMT+0000 (Greenwich Mean Time) (37405ms) √ EX-9890 - Part 2: Edit the project details and change the nameSun Aug 27 2023 03:45:26 GMT+0000 (Greenwich Mean Time) (37405ms) √ EX-9890 - Part 3: Add customer to the Project. Sun Aug 27 2023 03:45:26 GMT+0000 (Greenwich Mean Time) (45191ms) √ EX-9890 - Part 3: Add customer to the Project. Sun Aug 27 2023 03:45:26 GMT+0000 (Greenwich Mean Time) (45191ms) √ EX-9890 - Part 4: Verify the invitation email for customerSun Aug 27 2023 03:47:44 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 4: Verify the invitation email for customerSun Aug 27 2023 03:47:44 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 5: Add company user to the Project. Sun Aug 27 2023 03:47:51 GMT+0000 (Greenwich Mean Time) (47359ms) √ EX-9890 - Part 5: Add company user to the Project. Sun Aug 27 2023 03:47:51 GMT+0000 (Greenwich Mean Time) (47359ms) √ EX-9890 - Part 6: Verify company user can access project. Sun Aug 27 2023 03:47:51 GMT+0000 (Greenwich Mean Time) (27669ms) √ EX-9890 - Part 6: Verify company user can access project. Sun Aug 27 2023 03:47:51 GMT+0000 (Greenwich Mean Time) (27669ms) √ EX-9890 - Part 7: Add Contract with a user to the project. Sun Aug 27 2023 03:47:51 GMT+0000 (Greenwich Mean Time) (42523ms) √ EX-9890 - Part 7: Add Contract with a user to the project. Sun Aug 27 2023 03:47:51 GMT+0000 (Greenwich Mean Time) (42523ms) √ EX-9890 - Part 8: Verify email invitation for contractor user Sun Aug 27 2023 03:49:55 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 8: Verify email invitation for contractor user Sun Aug 27 2023 03:49:55 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 9: Add additiona user to existing contract of the project. Sun Aug 27 2023 03:50:00 GMT+0000 (Greenwich Mean Time) (46261ms) √ EX-9890 - Part 9: Add additiona user to existing contract of the project. Sun Aug 27 2023 03:50:00 GMT+0000 (Greenwich Mean Time) (46261ms) √ EX-9890 - Part 10: Verify email invitation for additional contract user Sun Aug 27 2023 03:50:50 GMT+0000 (Greenwich Mean Time) √ EX-9890 - Part 10: Verify email invitation for additional contract user Sun Aug 27 2023 03:50:50 GMT+0000 (Greenwich Mean Time) √ Ex-9890 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 03:50:55 GMT+0000 (Greenwich Mean Time) (40420ms) √ Ex-9890 - Part 11: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 03:50:55 GMT+0000 (Greenwich Mean Time) (40420ms) √ EX-9890 - Part 12: Clean up Project Sun Aug 27 2023 03:50:55 GMT+0000 (Greenwich Mean Time) (33845ms) √ EX-9890 - Part 12: Clean up Project Sun Aug 27 2023 03:50:55 GMT+0000 (Greenwich Mean Time) (33845ms) 12 passing (7m) 12 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_035.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 44 seconds │ │ Estimated: 9 minutes, 28 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9890-SC-PM-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9890-SC-PM-project-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 02_PermissionLevels/User_roles/ex-9891-SC-FU-project-previlleges.spe (37 of 114) c.ts Estimated: 6 minutes, 28 seconds User Role permissions| SC Field User | Login as SC Field User and create project and verify user privilegesSun Aug 27 2023 03:52:16 GMT+0000 (Greenwich Mean Time) User Role permissions| SC Field User | Login as SC Field User and create project and verify user privilegesSun Aug 27 2023 03:52:16 GMT+0000 (Greenwich Mean Time) √ EX-9891 - Part 1: Create a project Sun Aug 27 2023 03:52:16 GMT+0000 (Greenwich Mean Time) (47610ms) √ EX-9891 - Part 1: Create a project Sun Aug 27 2023 03:52:16 GMT+0000 (Greenwich Mean Time) (47610ms) √ EX-9891 - Part 2: Edit the project details and change the nameSun Aug 27 2023 03:52:16 GMT+0000 (Greenwich Mean Time) (36899ms) √ EX-9891 - Part 2: Edit the project details and change the nameSun Aug 27 2023 03:52:16 GMT+0000 (Greenwich Mean Time) (36899ms) √ EX-9891 - Part 3: Add customer to the Project. Sun Aug 27 2023 03:52:16 GMT+0000 (Greenwich Mean Time) (39985ms) √ EX-9891 - Part 3: Add customer to the Project. Sun Aug 27 2023 03:52:16 GMT+0000 (Greenwich Mean Time) (39985ms) √ EX-9891 - Part 4: Verify the invitation email for customerSun Aug 27 2023 03:54:28 GMT+0000 (Greenwich Mean Time) √ EX-9891 - Part 4: Verify the invitation email for customerSun Aug 27 2023 03:54:28 GMT+0000 (Greenwich Mean Time) √ EX-9891 - Part 5: Add company user to the Project. Sun Aug 27 2023 03:54:36 GMT+0000 (Greenwich Mean Time) (45094ms) √ EX-9891 - Part 5: Add company user to the Project. Sun Aug 27 2023 03:54:36 GMT+0000 (Greenwich Mean Time) (45094ms) √ EX-9891 - Part 6: Verify company user can access project. Sun Aug 27 2023 03:54:36 GMT+0000 (Greenwich Mean Time) (27062ms) √ EX-9891 - Part 6: Verify company user can access project. Sun Aug 27 2023 03:54:36 GMT+0000 (Greenwich Mean Time) (27062ms) √ EX-9891 - Part 7: Add Contract should be in disabled state Sun Aug 27 2023 03:54:36 GMT+0000 (Greenwich Mean Time) (29423ms) √ EX-9891 - Part 7: Add Contract should be in disabled state Sun Aug 27 2023 03:54:36 GMT+0000 (Greenwich Mean Time) (29423ms) √ Ex-9891 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 03:54:36 GMT+0000 (Greenwich Mean Time) (25899ms) √ Ex-9891 - Part 8: Navigate to project rates, divisons and additiona t&M signers pagesSun Aug 27 2023 03:54:36 GMT+0000 (Greenwich Mean Time) (25899ms) √ EX-9891 - Part 9: Clean up Project Sun Aug 27 2023 03:54:36 GMT+0000 (Greenwich Mean Time) (33465ms) √ EX-9891 - Part 9: Clean up Project Sun Aug 27 2023 03:54:36 GMT+0000 (Greenwich Mean Time) (33465ms) 9 passing (5m) 9 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_036.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 9 │ │ Passing: 9 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 1 second │ │ Estimated: 6 minutes, 28 seconds │ │ Spec Ran: 02_PermissionLevels/User_roles/ex-9891-SC-FU-project-previlleges.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\02_PermissionLevels\User_roles\ex-9891-SC-FU-project-previlleges.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Received/ex-3684-verify-user-can-see-only-cors-that-he-ha (38 of 114) s-access-to.spec.ts Estimated: 2 minutes, 0 seconds COR access | To verify that a logged in User can only see those project's COR, to which they have access toSun Aug 27 2023 03:57:24 GMT+0000 (Greenwich Mean Time) COR access | To verify that a logged in User can only see those project's COR, to which they have access toSun Aug 27 2023 03:57:24 GMT+0000 (Greenwich Mean Time) 1) EX-3684 - Verify COR / Sent. Sun Aug 27 2023 03:57:24 GMT+0000 (Greenwich Mean Time) 1) EX-3684 - Verify COR / Sent. Sun Aug 27 2023 03:57:24 GMT+0000 (Greenwich Mean Time) 2) EX-3684 - Verify COR / Received. Sun Aug 27 2023 03:57:24 GMT+0000 (Greenwich Mean Time) 2) EX-3684 - Verify COR / Received. Sun Aug 27 2023 03:57:24 GMT+0000 (Greenwich Mean Time) 0 passing (2m) 2 failing 1) COR access | To verify that a logged in User can only see those project's COR, to which they have access toSun Aug 27 2023 03:57:24 GMT+0000 (Greenwich Mean Time) EX-3684 - Verify COR / Sent. Sun Aug 27 2023 03:57:24 GMT+0000 (Greenwich Mean Time): CypressError: Timed out retrying after 30000ms: `cy.wait()` timed out waiting `30000ms` for the 1st response to the route: `toApplyProjectFilter`. No response ever occurred. https://on.cypress.io/wait at cypressErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75187:18) at Object.errByPath (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75242:10) at checkForXhr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134821:84) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134844:28) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4315:29) at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143192:68) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143133:14) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18) at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1645:18) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:5450:46) From Your Spec Code: at corLogPage.filterByProject (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/COR_Log_.ts:181:11) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Received/ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts:15:13) 2) COR access | To verify that a logged in User can only see those project's COR, to which they have access toSun Aug 27 2023 03:57:24 GMT+0000 (Greenwich Mean Time) EX-3684 - Verify COR / Received. Sun Aug 27 2023 03:57:24 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Received' within the selector: 'span' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands.ts:634:34) 0 passing (2m) 2 failing 1) COR access | To verify that a logged in User can only see those project's COR, to which they have access toSun Aug 27 2023 03:57:24 GMT+0000 (Greenwich Mean Time) EX-3684 - Verify COR / Sent. Sun Aug 27 2023 03:57:24 GMT+0000 (Greenwich Mean Time): CypressError: Timed out retrying after 30000ms: `cy.wait()` timed out waiting `30000ms` for the 1st response to the route: `toApplyProjectFilter`. No response ever occurred. https://on.cypress.io/wait at cypressErr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75187:18) at Object.errByPath (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:75242:10) at checkForXhr (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134821:84) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:134844:28) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise.attempt.Promise.try (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4315:29) at whenStable (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143192:68) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:143133:14) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1701:18) at Promise._fulfill (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1645:18) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:5450:46) From Your Spec Code: at corLogPage.filterByProject (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/COR_Log_.ts:181:11) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Received/ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts:15:13) 2) COR access | To verify that a logged in User can only see those project's COR, to which they have access toSun Aug 27 2023 03:57:24 GMT+0000 (Greenwich Mean Time) EX-3684 - Verify COR / Received. Sun Aug 27 2023 03:57:24 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Received' within the selector: 'span' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands.ts:634:34) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_037.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 0 │ │ Failing: 2 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 2 │ │ Video: true │ │ Duration: 1 minute, 56 seconds │ │ Estimated: 2 minutes, 0 seconds │ │ Spec Ran: 04_COR_Log/Received/ex-3684-verify-user-can-see-only-cors-that-he-has-access-to. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587) Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts \COR access To verify that a logged in User can only see those project's COR, t o which they have access toSun Aug 27 2023 035724 GMT+0000 (Greenwich Mean Time) -- EX-3684 - Verify COR Sent. Sun Aug 27 2023 035724 GMT+0000 (Greenwich Mean Time) (fail.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587) Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts \COR access To verify that a logged in User can only see those project's COR, t o which they have access toSun Aug 27 2023 035724 GMT+0000 (Greenwich Mean Time) -- EX-3684 - Verify COR Received. Sun Aug 27 2023 035724 GMT+0000 (Greenwich M ean Time) (.png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 79% - Finished compressing: 20 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts\COR access To verify that a logged in User can only see those project's COR, to which they have access toSun Aug 27 2023 035724 GMT+0000 (Greenwich Mean Time) -- EX-3684 - Verify COR Received. Sun Aug 27 2023 035724 GMT+0000 (Greenwich Mean Time) (.png - Done Uploading (2/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts\COR access To verify that a logged in User can only see those project's COR, to which they have access toSun Aug 27 2023 035724 GMT+0000 (Greenwich Mean Time) -- EX-3684 - Verify COR Sent. Sun Aug 27 2023 035724 GMT+0000 (Greenwich Mean Time) (fail.png - Done Uploading (3/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Received\ex-3684-verify-user-can-see-only-cors-that-he-has-access-to.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Received/ex-9912-add-bc-to-existing-cor-with-all-role-con (39 of 114) tractors.spec.ts Estimated: 1 minute, 44 seconds Backcharges | Bell Notifications | Verify that the contractor with roles AO, Admin and PM is able to receive a bell notification when the customer creates a BC for the received COR.Sun Aug 27 2023 03:59:48 GMT+0000 (Greenwich Mean Time) Backcharges | Bell Notifications | Verify that the contractor with roles AO, Admin and PM is able to receive a bell notification when the customer creates a BC for the received COR.Sun Aug 27 2023 03:59:48 GMT+0000 (Greenwich Mean Time) 1) EX-9912 | Backcharges | Bell Notifications | Verify the contractor is able to receive a bell notification when the customer creates a BC for the received COR.Sun Aug 27 2023 03:59:48 GMT+0000 (Greenwich Mean Time) 1) EX-9912 | Backcharges | Bell Notifications | Verify the contractor is able to receive a bell notification when the customer creates a BC for the received COR.Sun Aug 27 2023 03:59:48 GMT+0000 (Greenwich Mean Time) 0 passing (31s) 1 failing 1) Backcharges | Bell Notifications | Verify that the contractor with roles AO, Admin and PM is able to receive a bell notification when the customer creates a BC for the received COR.Sun Aug 27 2023 03:59:48 GMT+0000 (Greenwich Mean Time) EX-9912 | Backcharges | Bell Notifications | Verify the contractor is able to receive a bell notification when the customer creates a BC for the received COR.Sun Aug 27 2023 03:59:48 GMT+0000 (Greenwich Mean Time): CypressError: `cy.request()` timed out waiting `30000ms` for a response from your server. The request we sent was: Method: POST URL: https://api.staging.clearstory.dev/users/authenticate No response was received within the timeout. https://on.cypress.io/request at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:132377:70) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4186:41) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1697:18) at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2407:12) at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2400:9) at Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2416:5) at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2286:14) From Your Spec Code: at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-be-apis.ts:47:7) 0 passing (31s) 1 failing 1) Backcharges | Bell Notifications | Verify that the contractor with roles AO, Admin and PM is able to receive a bell notification when the customer creates a BC for the received COR.Sun Aug 27 2023 03:59:48 GMT+0000 (Greenwich Mean Time) EX-9912 | Backcharges | Bell Notifications | Verify the contractor is able to receive a bell notification when the customer creates a BC for the received COR.Sun Aug 27 2023 03:59:48 GMT+0000 (Greenwich Mean Time): CypressError: `cy.request()` timed out waiting `30000ms` for a response from your server. The request we sent was: Method: POST URL: https://api.staging.clearstory.dev/users/authenticate No response was received within the timeout. https://on.cypress.io/request at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:132377:70) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:4186:41) at tryCatcher (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1807:23) at Promise._settlePromiseFromHandler (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1519:31) at Promise._settlePromise (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1576:18) at Promise._settlePromise0 (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1621:10) at Promise._settlePromises (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:1697:18) at _drainQueueStep (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2407:12) at _drainQueue (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2400:9) at Async._drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2416:5) at Async.drainQueues (https://staging.clearstory.dev/__cypress/runner/cypress_runner.js:2286:14) From Your Spec Code: at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-be-apis.ts:47:7) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_038.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 0 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: true │ │ Duration: 31 seconds │ │ Estimated: 1 minute, 44 seconds │ │ Spec Ran: 04_COR_Log/Received/ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spe │ │ c.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587) Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Ba ckcharges Bell Notifications Verify that the contractor with roles AO, Admin a nd PM is able to receive a bell notification when the customer creates a BC for the received COR.Sun Aug 27 2023 035948 GMT+0000 (Greenwich Mean Time) -- EX-991 2 Backc.png (Video) - Started compressing: Compressing to 32 CRF - Finished compressing: 5 seconds - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts\Backcharges Bell Notifications Verify that the contractor with roles AO, Admin and PM is able to receive a bell notification when the customer creates a BC for the received COR.Sun Aug 27 2023 035948 GMT+0000 (Greenwich Mean Time) -- EX-9912 Backc.png - Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Received\ex-9912-add-bc-to-existing-cor-with-all-role-contractors.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-4366-SC-creates-project-adds-gc-customer-sc-creat (40 of 114) es-cor.spec.ts Estimated: 9 minutes, 50 seconds Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestSun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestSun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) √ EX-4366 - Create a projcet and add customers : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (50913ms) √ EX-4366 - Create a projcet and add customers : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (50913ms) √ EX-4366 - Add My Company users to the project.Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (68377ms) √ EX-4366 - Add My Company users to the project.Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (68377ms) √ EX-4366 - Add Customer to the project.Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (63472ms) √ EX-4366 - Add Customer to the project.Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (63472ms) 1) EX-4366 - PM Customer accept the project Invites : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) 1) EX-4366 - PM Customer accept the project Invites : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) √ EX-4366 - Owner Customer accept the project Invites : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (19365ms) √ EX-4366 - Owner Customer accept the project Invites : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (19365ms) 2) EX-4366 - Admin Customer accept the project Invites : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) 2) EX-4366 - Admin Customer accept the project Invites : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) √ EX-4366 - Field User Customer accept the project Invites : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (18889ms) √ EX-4366 - Field User Customer accept the project Invites : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (18889ms) √ EX-4366 - Create COR : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (72200ms) √ EX-4366 - Create COR : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (72200ms) √ EX-4366 - Verify COR is created : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (64644ms) √ EX-4366 - Verify COR is created : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (64644ms) √ EX-4366 - Cleanup GC... Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (41731ms) √ EX-4366 - Cleanup GC... Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (41731ms) √ EX-4366 - Cleanup SC... Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (37912ms) √ EX-4366 - Cleanup SC... Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) (37912ms) 9 passing (9m) 2 failing 1) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestSun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) EX-4366 - PM Customer accept the project Invites : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:276:5) 2) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestSun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) EX-4366 - Admin Customer accept the project Invites : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:276:5) 9 passing (9m) 2 failing 1) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestSun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) EX-4366 - PM Customer accept the project Invites : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:276:5) 2) Create COR | SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestSun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time) EX-4366 - Admin Customer accept the project Invites : Sun Aug 27 2023 04:00:32 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `div[role='alert']`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:276:5) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_039.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 11 │ │ Passing: 9 │ │ Failing: 2 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 2 │ │ Video: true │ │ Duration: 8 minutes, 49 seconds │ │ Estimated: 9 minutes, 50 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec. │ │ ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587) Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Crea te COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestSun Aug 27 2023 040032 GMT +0000 (Greenwich Mean Time) -- EX-4366 - PM Customer accept the project Invites Sun A.png - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587) Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Crea te COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestSun Aug 27 2023 040032 GMT +0000 (Greenwich Mean Time) -- EX-4366 - Admin Customer accept the project Invit es Su.png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 12% Compression progress: 23% Compression progress: 34% Compression progress: 46% Compression progress: 59% Compression progress: 70% Compression progress: 82% Compression progress: 95% - Finished compressing: 1 minute, 31 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Create COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestSun Aug 27 2023 040032 GMT+0000 (Greenwich Mean Time) -- EX-4366 - Admin Customer accept the project Invites Su.png - Done Uploading (2/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts\Create COR SC PM creates a project. Invites GC Company for Customer. SC PM is able to create a COR by using Create a Change Order RequestSun Aug 27 2023 040032 GMT+0000 (Greenwich Mean Time) -- EX-4366 - PM Customer accept the project Invites Sun A.png - Done Uploading (3/3) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-4366-SC-creates-project-adds-gc-customer-sc-creates-cor.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft. (41 of 114) spec.ts Estimated: 6 minutes, 2 seconds Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestSun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestSun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) √ EX-4432 - Part 1: Create project Test Project TC4432 1693109462374. Sun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) (49764ms) √ EX-4432 - Part 1: Create project Test Project TC4432 1693109462374. Sun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) (49764ms) √ EX-4432 - Part 2: Add Customer.Sun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) (38135ms) √ EX-4432 - Part 2: Add Customer.Sun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) (38135ms) 1) EX-4432 - Part 3: Customer Accept invite.Sun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) 1) EX-4432 - Part 3: Customer Accept invite.Sun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) √ EX-4432 - Part 4: Contractor creates COR Draft. : Sun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) (58120ms) √ EX-4432 - Part 4: Contractor creates COR Draft. : Sun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) (58120ms) √ EX-4432 - Part 5: Verify the COR Draft Log has the new COR draft. : Sun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) (47722ms) √ EX-4432 - Part 5: Verify the COR Draft Log has the new COR draft. : Sun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) (47722ms) √ EX-4432 - Part 6: Cleanup GC... Sun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) (34820ms) √ EX-4432 - Part 6: Cleanup GC... Sun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) (34820ms) √ EX-4432 - Part 7: Cleanup SC... Sun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) (36154ms) √ EX-4432 - Part 7: Cleanup SC... Sun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) (36154ms) 6 passing (5m) 1 failing 1) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestSun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) EX-4432 - Part 3: Customer Accept invite.Sun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC4432 1693109462374' within the selector: 'td' but never did. at projectsPage.pressAcceptBtnForInvite (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Projects_.ts:131:7) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts:47:15) 6 passing (5m) 1 failing 1) Create COR | To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestSun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time) EX-4432 - Part 3: Customer Accept invite.Sun Aug 27 2023 04:11:02 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'Test Project TC4432 1693109462374' within the selector: 'td' but never did. at projectsPage.pressAcceptBtnForInvite (webpack://cypress-extracker-webapp/./cypress/support/PageObjects/Projects_.ts:131:7) at Context.eval (webpack://cypress-extracker-webapp/./cypress/e2e/regression/04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts:47:15) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_040.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 6 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: true │ │ Duration: 5 minutes, 13 seconds │ │ Estimated: 6 minutes, 2 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_ (1272x587) Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts\Create COR To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestSun Aug 27 2023 041102 GMT+0000 (Greenwich Mean Time) -- EX-4432 - Part 3 Customer Accept invite.Sun Aug 27 2023 041102 GMT+0000 (Greenwich Mean . png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 20% Compression progress: 41% Compression progress: 61% Compression progress: 82% - Finished compressing: 56 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\04_COR_Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts\Create COR To verify that the PM is able to create a COR as Draft by using Create a Change Order RequestSun Aug 27 2023 041102 GMT+0000 (Greenwich Mean Time) -- EX-4432 - Part 3 Customer Accept invite.Sun Aug 27 2023 041102 GMT+0000 (Greenwich Mean .png - Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-4432-to-verify-PM-is-able-to-create-cor-as-draft.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-5827-to-verify-multiple-cors-to-same-tag-when-cre (42 of 114) ating-cor.spec.ts Estimated: 38 seconds COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORSun Aug 27 2023 04:17:18 GMT+0000 (Greenwich Mean Time) COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORSun Aug 27 2023 04:17:18 GMT+0000 (Greenwich Mean Time) √ EX-5827 - Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORSun Aug 27 2023 04:17:18 GMT+0000 (Greenwich Mean Time) (36921ms) √ EX-5827 - Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORSun Aug 27 2023 04:17:18 GMT+0000 (Greenwich Mean Time) (36921ms) 1 passing (38s) 1 passing (38s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_041.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 37 seconds │ │ Estimated: 38 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-5827-to-verify-multiple-cors-to-same-tag-when-creating-cor.sp │ │ ec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-5827-to-verify-multiple-cors-to-same-tag-when-creating-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/EX-5894-to-verify-multiple-cors-to-same-tag-when-upl (43 of 114) oading-cor.spec.ts Estimated: 43 seconds COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORSun Aug 27 2023 04:18:02 GMT+0000 (Greenwich Mean Time) COR | Verify Multiple CORs should not be associated with the same T&M Tag when Creating a New CORSun Aug 27 2023 04:18:02 GMT+0000 (Greenwich Mean Time) √ EX-5894 - Verify Multiple CORs should not be associated with the same T&M Tag when uploading a New CORSun Aug 27 2023 04:18:02 GMT+0000 (Greenwich Mean Time) (41434ms) √ EX-5894 - Verify Multiple CORs should not be associated with the same T&M Tag when uploading a New CORSun Aug 27 2023 04:18:02 GMT+0000 (Greenwich Mean Time) (41434ms) 1 passing (42s) 1 passing (42s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_042.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 41 seconds │ │ Estimated: 43 seconds │ │ Spec Ran: 04_COR_Log/Sent/EX-5894-to-verify-multiple-cors-to-same-tag-when-uploading-cor.s │ │ pec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\EX-5894-to-verify-multiple-cors-to-same-tag-when-uploading-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-3673-verify-contractor-is-able-to-upload-cor-with (44 of 114) -only-mandatory-data.spec.ts Estimated: 5 minutes, 31 seconds Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Sun Aug 27 2023 04:18:50 GMT+0000 (Greenwich Mean Time) Upload COR | To verify that the contractor is able to Upload a Change Order Request with only mandatory data. Sun Aug 27 2023 04:18:50 GMT+0000 (Greenwich Mean Time) √ EX-3673 - Part 0: Clean existing COR's : Sun Aug 27 2023 04:18:50 GMT+0000 (Greenwich Mean Time) (59880ms) √ EX-3673 - Part 0: Clean existing COR's : Sun Aug 27 2023 04:18:50 GMT+0000 (Greenwich Mean Time) (59880ms) √ EX-3673 - Part 1: Upload COR with only mandatory data.Sun Aug 27 2023 04:18:50 GMT+0000 (Greenwich Mean Time) (55719ms) √ EX-3673 - Part 1: Upload COR with only mandatory data.Sun Aug 27 2023 04:18:50 GMT+0000 (Greenwich Mean Time) (55719ms) √ EX-3673 - Part 2: Verify the COR data in the COR Log.Sun Aug 27 2023 04:18:50 GMT+0000 (Greenwich Mean Time) (68604ms) √ EX-3673 - Part 2: Verify the COR data in the COR Log.Sun Aug 27 2023 04:18:50 GMT+0000 (Greenwich Mean Time) (68604ms) √ EX-3673 - Part 0: Cleanup - Delete COR.Sun Aug 27 2023 04:18:50 GMT+0000 (Greenwich Mean Time) (74887ms) √ EX-3673 - Part 0: Cleanup - Delete COR.Sun Aug 27 2023 04:18:50 GMT+0000 (Greenwich Mean Time) (74887ms) 4 passing (4m) 4 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_043.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 4 │ │ Passing: 4 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 20 seconds │ │ Estimated: 5 minutes, 31 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandat │ │ ory-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-3673-verify-contractor-is-able-to-upload-cor-with-only-mandatory-data.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-3683-GC-creates-project-adds-contract-SC-creates- (45 of 114) cor.spec.ts Estimated: 5 minutes, 37 seconds COR Log | GC PM creats a project. Adds Contract with SC Company. SC PM is able to create a COR by using Create a Change Order RequestSun Aug 27 2023 04:23:18 GMT+0000 (Greenwich Mean Time) COR Log | GC PM creats a project. Adds Contract with SC Company. SC PM is able to create a COR by using Create a Change Order RequestSun Aug 27 2023 04:23:18 GMT+0000 (Greenwich Mean Time) √ EX-3683 - Part 1: Create a project. Sun Aug 27 2023 04:23:18 GMT+0000 (Greenwich Mean Time) (285254ms) √ EX-3683 - Part 1: Create a project. Sun Aug 27 2023 04:23:18 GMT+0000 (Greenwich Mean Time) (285254ms) 1 passing (5m) 1 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_044.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 45 seconds │ │ Estimated: 5 minutes, 37 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-3683-GC-creates-project-adds-contract-SC-creates-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-3683-GC-creates-project-adds-contract-SC-creates-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-3686-verify-there-are-two-tabs-on-cor-log-page-se (46 of 114) nt-received.spec.ts Estimated: 39 seconds COR Log | To verify that on COR Log page there are separate tabs for Sent and Received CORsSun Aug 27 2023 04:28:11 GMT+0000 (Greenwich Mean Time) COR Log | To verify that on COR Log page there are separate tabs for Sent and Received CORsSun Aug 27 2023 04:28:11 GMT+0000 (Greenwich Mean Time) √ EX-3686: Verify there are separate tabs for Sent and Received CORsSun Aug 27 2023 04:28:11 GMT+0000 (Greenwich Mean Time) (33867ms) √ EX-3686: Verify there are separate tabs for Sent and Received CORsSun Aug 27 2023 04:28:11 GMT+0000 (Greenwich Mean Time) (33867ms) 1 passing (36s) 1 passing (36s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_045.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 34 seconds │ │ Estimated: 39 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-3686-verify-there-are-two-tabs-on-cor-log-page-sent-received. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-3686-verify-there-are-two-tabs-on-cor-log-page-sent-received.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5244-verify-shareable-link-contains-just-the-sele (47 of 114) cted-project.spec.ts Estimated: 1 minute, 40 seconds COR | Verify sharable link contains CORs from just the selected project.Sun Aug 27 2023 04:28:53 GMT+0000 (Greenwich Mean Time) COR | Verify sharable link contains CORs from just the selected project.Sun Aug 27 2023 04:28:53 GMT+0000 (Greenwich Mean Time) √ EX-5244 Sun Aug 27 2023 04:28:53 GMT+0000 (Greenwich Mean Time) (82907ms) √ EX-5244 Sun Aug 27 2023 04:28:53 GMT+0000 (Greenwich Mean Time) (82907ms) 1 passing (1m) 1 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_046.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 23 seconds │ │ Estimated: 1 minute, 40 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5244-verify-shareable-link-contains-just-the-selected-project │ │ .spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-5244-verify-shareable-link-contains-just-the-selected-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5333-SC-creates-cor-with-full-data.spec.ts (48 of 114) Estimated: 3 minutes, 34 seconds Sun Aug 27 2023 04:30:24 GMT+0000 (Greenwich Mean Time) Sun Aug 27 2023 04:30:24 GMT+0000 (Greenwich Mean Time) √ EX-5333 - Part 1: Create COR with full set of data: Sun Aug 27 2023 04:30:24 GMT+0000 (Greenwich Mean Time) (179534ms) √ EX-5333 - Part 1: Create COR with full set of data: Sun Aug 27 2023 04:30:24 GMT+0000 (Greenwich Mean Time) (179534ms) 1 passing (3m) 1 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_047.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 59 seconds │ │ Estimated: 3 minutes, 34 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5333-SC-creates-cor-with-full-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-5333-SC-creates-cor-with-full-data.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5396-verify-contractor-is-able-to-upload-cor-with (49 of 114) -mandatory-and-optional-data.spec.ts Estimated: 9 minutes, 2 seconds Upload COR | To verify that the contractor is able to Upload a Change Order Request with full set of data. Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) Upload COR | To verify that the contractor is able to Upload a Change Order Request with full set of data. Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) √ EX-5396 - Create new project. Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (52010ms) √ EX-5396 - Create new project. Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (52010ms) √ EX-5396 - Add My Company users to the project.Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (70663ms) √ EX-5396 - Add My Company users to the project.Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (70663ms) √ EX-5396 - Add Contract to the project.Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (38246ms) √ EX-5396 - Add Contract to the project.Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (38246ms) √ EX-5396 - PM Customer accept the project Invites : Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (25775ms) √ EX-5396 - PM Customer accept the project Invites : Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (25775ms) √ EX-5396 - Owner Customer accept the project Invites : Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (23643ms) √ EX-5396 - Owner Customer accept the project Invites : Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (23643ms) √ EX-5396 - Admin Customer accept the project Invites : Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (24597ms) √ EX-5396 - Admin Customer accept the project Invites : Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (24597ms) √ EX-5396 - Field User Customer accept the project Invites : Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (24946ms) √ EX-5396 - Field User Customer accept the project Invites : Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (24946ms) √ EX-5396 - Upload COR with full data set, mandatory and optional data.Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (76269ms) √ EX-5396 - Upload COR with full data set, mandatory and optional data.Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (76269ms) √ EX-5396 - Verify the COR data in the COR Log.Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (80692ms) √ EX-5396 - Verify the COR data in the COR Log.Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (80692ms) √ EX-5396 - Cleanup GC... Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (34225ms) √ EX-5396 - Cleanup GC... Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (34225ms) √ EX-5396 - Cleanup SC... Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (34985ms) √ EX-5396 - Cleanup SC... Sun Aug 27 2023 04:33:31 GMT+0000 (Greenwich Mean Time) (34985ms) 11 passing (8m) 11 passing (8m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_048.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 11 │ │ Passing: 11 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 8 minutes, 7 seconds │ │ Estimated: 9 minutes, 2 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5396-verify-contractor-is-able-to-upload-cor-with-mandatory-a │ │ nd-optional-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-5396-verify-contractor-is-able-to-upload-cor-with-mandatory-and-optional-data.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-5435-create-new-project-add-contrac-verify-origin (50 of 114) al-contract-value.spec.ts Estimated: 4 minutes, 31 seconds Create New Project with full set of data, as GC PM add contractor and verify the Original Contract Value.Sun Aug 27 2023 04:41:45 GMT+0000 (Greenwich Mean Time) Create New Project with full set of data, as GC PM add contractor and verify the Original Contract Value.Sun Aug 27 2023 04:41:45 GMT+0000 (Greenwich Mean Time) √ EX-5435 - Create a project.Sun Aug 27 2023 04:41:45 GMT+0000 (Greenwich Mean Time) (50718ms) √ EX-5435 - Create a project.Sun Aug 27 2023 04:41:45 GMT+0000 (Greenwich Mean Time) (50718ms) √ EX-5435 - Add contract.Sun Aug 27 2023 04:41:45 GMT+0000 (Greenwich Mean Time) (46981ms) √ EX-5435 - Add contract.Sun Aug 27 2023 04:41:45 GMT+0000 (Greenwich Mean Time) (46981ms) √ EX-5435 - Sub Contractor accepts the project/contract invite.Sun Aug 27 2023 04:41:45 GMT+0000 (Greenwich Mean Time) (24694ms) √ EX-5435 - Sub Contractor accepts the project/contract invite.Sun Aug 27 2023 04:41:45 GMT+0000 (Greenwich Mean Time) (24694ms) √ EX-5435 - Verify Original Contract Value.Sun Aug 27 2023 04:41:45 GMT+0000 (Greenwich Mean Time) (59113ms) √ EX-5435 - Verify Original Contract Value.Sun Aug 27 2023 04:41:45 GMT+0000 (Greenwich Mean Time) (59113ms) √ EX-5435 - Cleanup GC... Sun Aug 27 2023 04:41:45 GMT+0000 (Greenwich Mean Time) (34487ms) √ EX-5435 - Cleanup GC... Sun Aug 27 2023 04:41:45 GMT+0000 (Greenwich Mean Time) (34487ms) √ EX-5435 - Cleanup SC... Sun Aug 27 2023 04:41:45 GMT+0000 (Greenwich Mean Time) (33873ms) √ EX-5435 - Cleanup SC... Sun Aug 27 2023 04:41:45 GMT+0000 (Greenwich Mean Time) (33873ms) 6 passing (4m) 6 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_049.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 10 seconds │ │ Estimated: 4 minutes, 31 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-5435-create-new-project-add-contrac-verify-original-contract- │ │ value.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-5435-create-new-project-add-contrac-verify-original-contract-value.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 04_COR_Log/Sent/ex-6681-verify-sent-summary-data-after-filtering-by- (51 of 114) project.spec.ts Estimated: 3 minutes, 45 seconds As Sub Contractor go to COR Log / Sent and verify the Summary data when fitered for one and multiple projects.Sun Aug 27 2023 04:46:02 GMT+0000 (Greenwich Mean Time) As Sub Contractor go to COR Log / Sent and verify the Summary data when fitered for one and multiple projects.Sun Aug 27 2023 04:46:02 GMT+0000 (Greenwich Mean Time) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by single Project.Sun Aug 27 2023 04:46:02 GMT+0000 (Greenwich Mean Time) (76010ms) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by single Project.Sun Aug 27 2023 04:46:02 GMT+0000 (Greenwich Mean Time) (76010ms) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by multiple Projects.Sun Aug 27 2023 04:46:02 GMT+0000 (Greenwich Mean Time) (100621ms) √ EX-6681 - COR | Verify the SENT Contract Summary, Status Summary and COR Log Overview shows correct values when filtered by multiple Projects.Sun Aug 27 2023 04:46:02 GMT+0000 (Greenwich Mean Time) (100621ms) 2 passing (3m) 2 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_050.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 58 seconds │ │ Estimated: 3 minutes, 45 seconds │ │ Spec Ran: 04_COR_Log/Sent/ex-6681-verify-sent-summary-data-after-filtering-by-project.spec │ │ .ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\04_COR_Log\Sent\ex-6681-verify-sent-summary-data-after-filtering-by-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5425-verify-received-summary-data-after-filte (52 of 114) ring-by-project.spec.ts Estimated: 2 minutes, 50 seconds T&M | Verify the RECEIVED Labor Hours Summary and T&M Log Summary shows correct values before and after filtering.Sun Aug 27 2023 04:49:06 GMT+0000 (Greenwich Mean Time) T&M | Verify the RECEIVED Labor Hours Summary and T&M Log Summary shows correct values before and after filtering.Sun Aug 27 2023 04:49:06 GMT+0000 (Greenwich Mean Time) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by single project.Sun Aug 27 2023 04:49:06 GMT+0000 (Greenwich Mean Time) (88283ms) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by single project.Sun Aug 27 2023 04:49:06 GMT+0000 (Greenwich Mean Time) (88283ms) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by multiple projects.Sun Aug 27 2023 04:49:06 GMT+0000 (Greenwich Mean Time) (57459ms) √ EX-5425 - Verify the RECEIVED Labor Hours Summary and T&M Log Summary values when filtered by multiple projects.Sun Aug 27 2023 04:49:06 GMT+0000 (Greenwich Mean Time) (57459ms) 2 passing (2m) 2 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_051.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 28 seconds │ │ Estimated: 2 minutes, 50 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5425-verify-received-summary-data-after-filtering-by-proj │ │ ect.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Received\ex-5425-verify-received-summary-data-after-filtering-by-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5429-verify-received-export-csv-after-filteri (53 of 114) ng-by-project.spec.ts Estimated: 1 minute, 18 seconds T&M | Verify the T&M Log / RECEIVED CSV exports.Sun Aug 27 2023 04:51:41 GMT+0000 (Greenwich Mean Time) T&M | Verify the T&M Log / RECEIVED CSV exports.Sun Aug 27 2023 04:51:41 GMT+0000 (Greenwich Mean Time) √ EX-5429 - Verify the T&M Log / RECEIVED CSV export.Sun Aug 27 2023 04:51:41 GMT+0000 (Greenwich Mean Time) (85139ms) √ EX-5429 - Verify the T&M Log / RECEIVED CSV export.Sun Aug 27 2023 04:51:41 GMT+0000 (Greenwich Mean Time) (85139ms) 1 passing (1m) 1 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_052.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 25 seconds │ │ Estimated: 1 minute, 18 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5429-verify-received-export-csv-after-filtering-by-projec │ │ t.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Received\ex-5429-verify-received-export-csv-after-filtering-by-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5431-verify-received-export-sharelog-after-fi (54 of 114) ltering-by-project.spec.ts Estimated: 1 minute, 47 seconds T&M | Verify the T&M Log / RECEIVED ShareLog exports.Sun Aug 27 2023 04:53:14 GMT+0000 (Greenwich Mean Time) T&M | Verify the T&M Log / RECEIVED ShareLog exports.Sun Aug 27 2023 04:53:14 GMT+0000 (Greenwich Mean Time) √ EX-5431 - Verify the T&M Log / RECEIVED ShareLog export.Sun Aug 27 2023 04:53:14 GMT+0000 (Greenwich Mean Time) (88800ms) √ EX-5431 - Verify the T&M Log / RECEIVED ShareLog export.Sun Aug 27 2023 04:53:14 GMT+0000 (Greenwich Mean Time) (88800ms) 1 passing (1m) 1 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_053.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 28 seconds │ │ Estimated: 1 minute, 47 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5431-verify-received-export-sharelog-after-filtering-by-p │ │ roject.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Received\ex-5431-verify-received-export-sharelog-after-filtering-by-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Received/ex-5641-verify-tnm-log-received-summary-data-aft (55 of 114) er-filtering-by-tag-status.spec.ts Estimated: 7 minutes, 47 seconds T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Sun Aug 27 2023 04:54:50 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Sun Aug 27 2023 04:54:50 GMT+0000 (Greenwich Mean Time) √ EX-5641 - Filter by status Awaiting Signature and verify the Summary data for the test project.Sun Aug 27 2023 04:54:50 GMT+0000 (Greenwich Mean Time) (82210ms) √ EX-5641 - Filter by status Awaiting Signature and verify the Summary data for the test project.Sun Aug 27 2023 04:54:50 GMT+0000 (Greenwich Mean Time) (82210ms) √ EX-5641 - Filter by status Open and verify the Summary data for the test project.Sun Aug 27 2023 04:54:50 GMT+0000 (Greenwich Mean Time) (76722ms) √ EX-5641 - Filter by status Open and verify the Summary data for the test project.Sun Aug 27 2023 04:54:50 GMT+0000 (Greenwich Mean Time) (76722ms) √ EX-5641 - Filter by status Rejected and verify the Summary data for the test project.Sun Aug 27 2023 04:54:50 GMT+0000 (Greenwich Mean Time) (78455ms) √ EX-5641 - Filter by status Rejected and verify the Summary data for the test project.Sun Aug 27 2023 04:54:50 GMT+0000 (Greenwich Mean Time) (78455ms) √ EX-5641 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Sun Aug 27 2023 04:54:50 GMT+0000 (Greenwich Mean Time) (66836ms) √ EX-5641 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Sun Aug 27 2023 04:54:50 GMT+0000 (Greenwich Mean Time) (66836ms) √ EX-5641 - Filter by status Signed and verify the Summary data for the test project.Sun Aug 27 2023 04:54:50 GMT+0000 (Greenwich Mean Time) (72995ms) √ EX-5641 - Filter by status Signed and verify the Summary data for the test project.Sun Aug 27 2023 04:54:50 GMT+0000 (Greenwich Mean Time) (72995ms) 5 passing (6m) 5 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_054.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 23 seconds │ │ Estimated: 7 minutes, 47 seconds │ │ Spec Ran: 05_T&M_Log/Received/ex-5641-verify-tnm-log-received-summary-data-after-filtering │ │ -by-tag-status.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Received\ex-5641-verify-tnm-log-received-summary-data-after-filtering-by-tag-status.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-1-gc-creates-project-and-contract-sc-creates (56 of 114) -tag-optional-signer.spec.ts Estimated: 4 minutes, 56 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 05:01:21 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 05:01:21 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 1: GC PM creates a projectSun Aug 27 2023 05:01:21 GMT+0000 (Greenwich Mean Time) (49219ms) √ EX-4415 - Part 1: GC PM creates a projectSun Aug 27 2023 05:01:21 GMT+0000 (Greenwich Mean Time) (49219ms) √ EX-4415 - Part 2: GC PM adds a contract with SC PM.Sun Aug 27 2023 05:01:21 GMT+0000 (Greenwich Mean Time) (46266ms) √ EX-4415 - Part 2: GC PM adds a contract with SC PM.Sun Aug 27 2023 05:01:21 GMT+0000 (Greenwich Mean Time) (46266ms) √ EX-4415 - Part 3.1: Sub Contractor accepts invite from the bell notification.Sun Aug 27 2023 05:01:21 GMT+0000 (Greenwich Mean Time) (30218ms) √ EX-4415 - Part 3.1: Sub Contractor accepts invite from the bell notification.Sun Aug 27 2023 05:01:21 GMT+0000 (Greenwich Mean Time) (30218ms) √ EX-4415 - Part 3.2: Sub Contractor adds users to the project.Sun Aug 27 2023 05:01:21 GMT+0000 (Greenwich Mean Time) (78440ms) √ EX-4415 - Part 3.2: Sub Contractor adds users to the project.Sun Aug 27 2023 05:01:21 GMT+0000 (Greenwich Mean Time) (78440ms) √ EX-4415 - Part 4: Sub Contractor creates a Tag and sends signature request.Sun Aug 27 2023 05:01:21 GMT+0000 (Greenwich Mean Time) (92099ms) √ EX-4415 - Part 4: Sub Contractor creates a Tag and sends signature request.Sun Aug 27 2023 05:01:21 GMT+0000 (Greenwich Mean Time) (92099ms) 5 passing (5m) 5 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_055.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 56 seconds │ │ Estimated: 4 minutes, 56 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-1-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-1-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-2-gc-creates-project-and-contract-sc-creates (57 of 114) -tag-optional-signer.spec.ts Estimated: 3 minutes, 29 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 05:06:25 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 05:06:25 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 5: Sub Contractor ADD Labor valuesSun Aug 27 2023 05:06:25 GMT+0000 (Greenwich Mean Time) (236120ms) √ EX-4415 - Part 5: Sub Contractor ADD Labor valuesSun Aug 27 2023 05:06:25 GMT+0000 (Greenwich Mean Time) (236120ms) √ EX-4415 - Part 6: Sub Contractor Add Material valuesSun Aug 27 2023 05:06:25 GMT+0000 (Greenwich Mean Time) (180013ms) √ EX-4415 - Part 6: Sub Contractor Add Material valuesSun Aug 27 2023 05:06:25 GMT+0000 (Greenwich Mean Time) (180013ms) 2 passing (7m) 2 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_056.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 58 seconds │ │ Estimated: 3 minutes, 29 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-2-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-2-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-3-gc-creates-project-and-contract-sc-creates (58 of 114) -tag-optional-signer.spec.ts Estimated: 1 minute, 46 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 05:13:30 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 05:13:30 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 7: Sub Contractor Adds Equipment. Sun Aug 27 2023 05:13:30 GMT+0000 (Greenwich Mean Time) (211515ms) √ EX-4415 - Part 7: Sub Contractor Adds Equipment. Sun Aug 27 2023 05:13:30 GMT+0000 (Greenwich Mean Time) (211515ms) 1 passing (4m) 1 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_057.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 32 seconds │ │ Estimated: 1 minute, 46 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-3-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-3-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-4-gc-creates-project-and-contract-sc-creates (59 of 114) -tag-optional-signer.spec.ts Estimated: 1 minute, 48 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 05:17:10 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 05:17:10 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 8: Sub Contractor Adds Other. Sun Aug 27 2023 05:17:10 GMT+0000 (Greenwich Mean Time) (242508ms) √ EX-4415 - Part 8: Sub Contractor Adds Other. Sun Aug 27 2023 05:17:10 GMT+0000 (Greenwich Mean Time) (242508ms) 1 passing (4m) 1 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_058.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 3 seconds │ │ Estimated: 1 minute, 48 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-4-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-4-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-5-gc-creates-project-and-contract-sc-creates (60 of 114) -tag-optional-signer.spec.ts Estimated: 2 minutes, 52 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 05:21:21 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 05:21:21 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 9 : Sub Contractor uploads files.Sun Aug 27 2023 05:21:21 GMT+0000 (Greenwich Mean Time) (126478ms) √ EX-4415 - Part 9 : Sub Contractor uploads files.Sun Aug 27 2023 05:21:21 GMT+0000 (Greenwich Mean Time) (126478ms) √ EX-4415 - Part 10 : Sub Contractor signs the Tag.Sun Aug 27 2023 05:21:21 GMT+0000 (Greenwich Mean Time) (82325ms) √ EX-4415 - Part 10 : Sub Contractor signs the Tag.Sun Aug 27 2023 05:21:21 GMT+0000 (Greenwich Mean Time) (82325ms) 2 passing (3m) 2 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_059.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 29 seconds │ │ Estimated: 2 minutes, 52 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-5-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates (61 of 114) -tag-optional-signer.spec.ts Estimated: 8 minutes, 34 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 05:24:59 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 05:24:59 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 11 : Sub Contractor sends signature request.Sun Aug 27 2023 05:24:59 GMT+0000 (Greenwich Mean Time) (124191ms) √ EX-4415 - Part 11 : Sub Contractor sends signature request.Sun Aug 27 2023 05:24:59 GMT+0000 (Greenwich Mean Time) (124191ms) √ EX-4415 - Part 12: Verify the tag was created.Sun Aug 27 2023 05:24:59 GMT+0000 (Greenwich Mean Time) (44610ms) √ EX-4415 - Part 12: Verify the tag was created.Sun Aug 27 2023 05:24:59 GMT+0000 (Greenwich Mean Time) (44610ms) √ EX-4415 - Part 13: Verify the GC sees the tag.Sun Aug 27 2023 05:24:59 GMT+0000 (Greenwich Mean Time) (43815ms) √ EX-4415 - Part 13: Verify the GC sees the tag.Sun Aug 27 2023 05:24:59 GMT+0000 (Greenwich Mean Time) (43815ms) √ EX-4415 - Part 14: Verify GC PM User recived emailsSun Aug 27 2023 05:28:40 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 14: Verify GC PM User recived emailsSun Aug 27 2023 05:28:40 GMT+0000 (Greenwich Mean Time) √ EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Sun Aug 27 2023 05:28:46 GMT+0000 (Greenwich Mean Time) (35864ms) √ EX-4415 - Part 15: Verify the GC received Bell Notification and use it to sign the tag.Sun Aug 27 2023 05:28:46 GMT+0000 (Greenwich Mean Time) (35864ms) √ EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Sun Aug 27 2023 05:28:46 GMT+0000 (Greenwich Mean Time) (44223ms) √ EX-4415 - Part 16: Verify the tag status in the GC T&M Log.Sun Aug 27 2023 05:28:46 GMT+0000 (Greenwich Mean Time) (44223ms) √ EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Sun Aug 27 2023 05:28:46 GMT+0000 (Greenwich Mean Time) (43025ms) √ EX-4415 - Part 17: Verify the tag status in the SC T&MM Log.Sun Aug 27 2023 05:28:46 GMT+0000 (Greenwich Mean Time) (43025ms) √ EX-4415 - Part 18: Cleanup...Sun Aug 27 2023 05:28:46 GMT+0000 (Greenwich Mean Time) (39245ms) √ EX-4415 - Part 18: Cleanup...Sun Aug 27 2023 05:28:46 GMT+0000 (Greenwich Mean Time) (39245ms) 8 passing (6m) 8 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_060.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 29 seconds │ │ Estimated: 8 minutes, 34 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optiona │ │ l-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-4415-6-gc-creates-project-and-contract-sc-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5424-verify-sent-summary-data-after-filtering-by- (62 of 114) project.spec.ts Estimated: 3 minutes, 43 seconds As Sub Contractor go to T&M Log / Sent and verify the Summary data for the test project.Sun Aug 27 2023 05:31:35 GMT+0000 (Greenwich Mean Time) As Sub Contractor go to T&M Log / Sent and verify the Summary data for the test project.Sun Aug 27 2023 05:31:35 GMT+0000 (Greenwich Mean Time) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log Overview Summary shows correct values when filtered by single Project.Sun Aug 27 2023 05:31:35 GMT+0000 (Greenwich Mean Time) (70368ms) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log Overview Summary shows correct values when filtered by single Project.Sun Aug 27 2023 05:31:35 GMT+0000 (Greenwich Mean Time) (70368ms) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log OVerview Summary shows correct values when filtered by multiple Projects.Sun Aug 27 2023 05:31:35 GMT+0000 (Greenwich Mean Time) (132468ms) √ EX-5424 - T&M | Verify the SENT/Labor Hours and T&M Log OVerview Summary shows correct values when filtered by multiple Projects.Sun Aug 27 2023 05:31:35 GMT+0000 (Greenwich Mean Time) (132468ms) 2 passing (3m) 2 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_061.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 26 seconds │ │ Estimated: 3 minutes, 43 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5424-verify-sent-summary-data-after-filtering-by-project.spec │ │ .ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5424-verify-sent-summary-data-after-filtering-by-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5430-verify-sent-export-csv-after-filtering-by-pr (63 of 114) oject.spec.ts Estimated: 1 minute, 6 seconds T&M | Verify the T&M Log / Sent CSV export.Sun Aug 27 2023 05:35:08 GMT+0000 (Greenwich Mean Time) T&M | Verify the T&M Log / Sent CSV export.Sun Aug 27 2023 05:35:08 GMT+0000 (Greenwich Mean Time) √ EX-5430 - Verify the T&M Log / Sent CSV export.Sun Aug 27 2023 05:35:08 GMT+0000 (Greenwich Mean Time) (59798ms) √ EX-5430 - Verify the T&M Log / Sent CSV export.Sun Aug 27 2023 05:35:08 GMT+0000 (Greenwich Mean Time) (59798ms) 1 passing (1m) 1 passing (1m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_062.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 59 seconds │ │ Estimated: 1 minute, 6 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5430-verify-sent-export-csv-after-filtering-by-project.spec.t │ │ s │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5430-verify-sent-export-csv-after-filtering-by-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5505-verify-tnm-log-sent-summary-data-after-filte (64 of 114) ring-by-customer.spec.ts Estimated: 2 minutes, 22 seconds T&M | Verify filtering the T&M Log / SENT, by Customer, returns correct values for Labor Hours Summary.Sun Aug 27 2023 05:36:14 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Customer, returns correct values for Labor Hours Summary.Sun Aug 27 2023 05:36:14 GMT+0000 (Greenwich Mean Time) √ EX-5505 - Filter by Customer and verify the Summary Labour Hours and T&M Log Overview Summary data for the test project.Sun Aug 27 2023 05:36:14 GMT+0000 (Greenwich Mean Time) (131537ms) √ EX-5505 - Filter by Customer and verify the Summary Labour Hours and T&M Log Overview Summary data for the test project.Sun Aug 27 2023 05:36:14 GMT+0000 (Greenwich Mean Time) (131537ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_063.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 13 seconds │ │ Estimated: 2 minutes, 22 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5505-verify-tnm-log-sent-summary-data-after-filtering-by-cust │ │ omer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5505-verify-tnm-log-sent-summary-data-after-filtering-by-customer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5506-verify-tnm-log-sent-summary-data-after-filte (65 of 114) ring-by-job-number.spec.ts Estimated: 2 minutes, 27 seconds T&M | Verify filtering the T&M Log / SENT, by Job Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Sun Aug 27 2023 05:38:34 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Job Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Sun Aug 27 2023 05:38:34 GMT+0000 (Greenwich Mean Time) √ EX-5506 - Filter by JobNumber and verify the Summary data for the test project.Sun Aug 27 2023 05:38:34 GMT+0000 (Greenwich Mean Time) (133521ms) √ EX-5506 - Filter by JobNumber and verify the Summary data for the test project.Sun Aug 27 2023 05:38:34 GMT+0000 (Greenwich Mean Time) (133521ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_064.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 13 seconds │ │ Estimated: 2 minutes, 27 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5506-verify-tnm-log-sent-summary-data-after-filtering-by-job- │ │ number.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5506-verify-tnm-log-sent-summary-data-after-filtering-by-job-number.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5507-verify-tnm-log-sent-summary-data-after-filte (66 of 114) ring-by-cust-ref-num.spec.ts Estimated: 2 minutes, 21 seconds T&M | Verify filtering the T&M Log / SENT, by Custmer Reference Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Sun Aug 27 2023 05:40:55 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Custmer Reference Number, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Sun Aug 27 2023 05:40:55 GMT+0000 (Greenwich Mean Time) √ EX-5507 - Filter by CustRefNum and verify the Summary data for the test project.Sun Aug 27 2023 05:40:55 GMT+0000 (Greenwich Mean Time) (138073ms) √ EX-5507 - Filter by CustRefNum and verify the Summary data for the test project.Sun Aug 27 2023 05:40:55 GMT+0000 (Greenwich Mean Time) (138073ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_065.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 18 seconds │ │ Estimated: 2 minutes, 21 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5507-verify-tnm-log-sent-summary-data-after-filtering-by-cust │ │ -ref-num.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5507-verify-tnm-log-sent-summary-data-after-filtering-by-cust-ref-num.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5508-verify-tnm-log-sent-summary-data-after-filte (67 of 114) ring-by-tag-status.spec.ts Estimated: 16 minutes, 42 seconds T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Sun Aug 27 2023 05:43:20 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log / SENT, by Tag Status, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Sun Aug 27 2023 05:43:20 GMT+0000 (Greenwich Mean Time) √ EX-5508 - Filter by status Awaiting Signature and verify the Summary data for the test project.Sun Aug 27 2023 05:43:20 GMT+0000 (Greenwich Mean Time) (130795ms) √ EX-5508 - Filter by status Awaiting Signature and verify the Summary data for the test project.Sun Aug 27 2023 05:43:20 GMT+0000 (Greenwich Mean Time) (130795ms) √ EX-5508 - Filter by status Draft and verify the Summary data for the test project.Sun Aug 27 2023 05:43:20 GMT+0000 (Greenwich Mean Time) (121926ms) √ EX-5508 - Filter by status Draft and verify the Summary data for the test project.Sun Aug 27 2023 05:43:20 GMT+0000 (Greenwich Mean Time) (121926ms) √ EX-5508 - Filter by status Open and verify the Summary data for the test project.Sun Aug 27 2023 05:43:20 GMT+0000 (Greenwich Mean Time) (122058ms) √ EX-5508 - Filter by status Open and verify the Summary data for the test project.Sun Aug 27 2023 05:43:20 GMT+0000 (Greenwich Mean Time) (122058ms) √ EX-5508 - Filter by status Rejected and verify the Summary data for the test project.Sun Aug 27 2023 05:43:20 GMT+0000 (Greenwich Mean Time) (121304ms) √ EX-5508 - Filter by status Rejected and verify the Summary data for the test project.Sun Aug 27 2023 05:43:20 GMT+0000 (Greenwich Mean Time) (121304ms) √ EX-5508 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Sun Aug 27 2023 05:43:20 GMT+0000 (Greenwich Mean Time) (122663ms) √ EX-5508 - Filter by status Revise And Resubmit and verify the Summary data for the test project.Sun Aug 27 2023 05:43:20 GMT+0000 (Greenwich Mean Time) (122663ms) √ EX-5508 - Filter by status Signed and verify the Summary data for the test project.Sun Aug 27 2023 05:43:20 GMT+0000 (Greenwich Mean Time) (120093ms) √ EX-5508 - Filter by status Signed and verify the Summary data for the test project.Sun Aug 27 2023 05:43:20 GMT+0000 (Greenwich Mean Time) (120093ms) √ EX-5508 - Filter by status Signed Not Sent and verify the Summary data for the test project.Sun Aug 27 2023 05:43:20 GMT+0000 (Greenwich Mean Time) (124658ms) √ EX-5508 - Filter by status Signed Not Sent and verify the Summary data for the test project.Sun Aug 27 2023 05:43:20 GMT+0000 (Greenwich Mean Time) (124658ms) 7 passing (15m) 7 passing (15m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_066.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 14 minutes, 32 seconds │ │ Estimated: 16 minutes, 42 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5508-verify-tnm-log-sent-summary-data-after-filtering-by-tag- │ │ status.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5508-verify-tnm-log-sent-summary-data-after-filtering-by-tag-status.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5509-verify-tnm-log-sent-summary-data-after-filte (68 of 114) ring-by-cust-label.spec.ts Estimated: 2 minutes, 23 seconds T&M | Verify filtering the T&M Log/SENT, by Label, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Sun Aug 27 2023 05:57:59 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log/SENT, by Label, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Sun Aug 27 2023 05:57:59 GMT+0000 (Greenwich Mean Time) √ EX-5509 - Filter by Label and verify the Summary data for the test project.Sun Aug 27 2023 05:57:59 GMT+0000 (Greenwich Mean Time) (124854ms) √ EX-5509 - Filter by Label and verify the Summary data for the test project.Sun Aug 27 2023 05:57:59 GMT+0000 (Greenwich Mean Time) (124854ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_067.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 6 seconds │ │ Estimated: 2 minutes, 23 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5509-verify-tnm-log-sent-summary-data-after-filtering-by-cust │ │ -label.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5509-verify-tnm-log-sent-summary-data-after-filtering-by-cust-label.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-5510-verify-tnm-log-sent-summary-data-after-filte (69 of 114) ring-by-cor-availability.spec.ts Estimated: 4 minutes, 29 seconds T&M | Verify filtering the T&M Log/SENT, by COR availability, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Sun Aug 27 2023 06:00:12 GMT+0000 (Greenwich Mean Time) T&M | Verify filtering the T&M Log/SENT, by COR availability, returns correct values for Labor Hours Summary and T&M Log Overview Summary.Sun Aug 27 2023 06:00:12 GMT+0000 (Greenwich Mean Time) √ EX-5510 - Filter by 'Display Pending CORs only' and verify the Summary data for the test project.Sun Aug 27 2023 06:00:12 GMT+0000 (Greenwich Mean Time) (129290ms) √ EX-5510 - Filter by 'Display Pending CORs only' and verify the Summary data for the test project.Sun Aug 27 2023 06:00:12 GMT+0000 (Greenwich Mean Time) (129290ms) √ EX-5510 - Filter by 'Display Tags with CORs only' and verify the Summary data for the test project.Sun Aug 27 2023 06:00:12 GMT+0000 (Greenwich Mean Time) (110396ms) √ EX-5510 - Filter by 'Display Tags with CORs only' and verify the Summary data for the test project.Sun Aug 27 2023 06:00:12 GMT+0000 (Greenwich Mean Time) (110396ms) 2 passing (4m) 2 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_068.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 2 │ │ Passing: 2 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 2 seconds │ │ Estimated: 4 minutes, 29 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-5510-verify-tnm-log-sent-summary-data-after-filtering-by-cor- │ │ availability.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-5510-verify-tnm-log-sent-summary-data-after-filtering-by-cor-availability.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6191-sc-creates-tag-required-signer-gc-signs-tag. (70 of 114) spec.ts Estimated: 17 minutes, 10 seconds T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Sun Aug 27 2023 06:04:22 GMT+0000 (Greenwich Mean Time) T&M | Workflow | Existing project and contract, SC Admin send a tag. GC Admin signs the tag as single Required Signer. Save As Draft On Each Step.Sun Aug 27 2023 06:04:22 GMT+0000 (Greenwich Mean Time) √ EX-6191 - Part 0: Clean the tags (49496ms) √ EX-6191 - Part 0: Clean the tags (49496ms) √ EX-6191 - Part 1: Sub Contractor Admin creates tag and save it as draft.Sun Aug 27 2023 06:04:22 GMT+0000 (Greenwich Mean Time) (90577ms) √ EX-6191 - Part 1: Sub Contractor Admin creates tag and save it as draft.Sun Aug 27 2023 06:04:22 GMT+0000 (Greenwich Mean Time) (90577ms) √ EX-6191 - Part 2: Sub Contractor Admin adds LMEO to the draft. Sun Aug 27 2023 06:04:22 GMT+0000 (Greenwich Mean Time) (154295ms) √ EX-6191 - Part 2: Sub Contractor Admin adds LMEO to the draft. Sun Aug 27 2023 06:04:22 GMT+0000 (Greenwich Mean Time) (154295ms) √ EX-6191 - Part 3: Sub Contractor admin adds files. Sun Aug 27 2023 06:04:22 GMT+0000 (Greenwich Mean Time) (95979ms) √ EX-6191 - Part 3: Sub Contractor admin adds files. Sun Aug 27 2023 06:04:22 GMT+0000 (Greenwich Mean Time) (95979ms) √ EX-6191 - Part 4: Sub Contractor admin signs the tag.Sun Aug 27 2023 06:04:22 GMT+0000 (Greenwich Mean Time) (86753ms) √ EX-6191 - Part 4: Sub Contractor admin signs the tag.Sun Aug 27 2023 06:04:22 GMT+0000 (Greenwich Mean Time) (86753ms) √ EX-6191 - Part 5: Sub Contractor admin sends tag for signature.Sun Aug 27 2023 06:04:22 GMT+0000 (Greenwich Mean Time) (91800ms) √ EX-6191 - Part 5: Sub Contractor admin sends tag for signature.Sun Aug 27 2023 06:04:22 GMT+0000 (Greenwich Mean Time) (91800ms) √ EX-6191 - Part 6: Verify the tag was created.Sun Aug 27 2023 06:04:22 GMT+0000 (Greenwich Mean Time) (47730ms) √ EX-6191 - Part 6: Verify the tag was created.Sun Aug 27 2023 06:04:22 GMT+0000 (Greenwich Mean Time) (47730ms) √ EX-6191 - Part 7: Verify the GC Admin sees the tag.Sun Aug 27 2023 06:04:22 GMT+0000 (Greenwich Mean Time) (49927ms) √ EX-6191 - Part 7: Verify the GC Admin sees the tag.Sun Aug 27 2023 06:04:22 GMT+0000 (Greenwich Mean Time) (49927ms) √ EX-6191 - Part 8: Verify GC Admin recived emailsSun Aug 27 2023 06:15:45 GMT+0000 (Greenwich Mean Time) √ EX-6191 - Part 8: Verify GC Admin recived emailsSun Aug 27 2023 06:15:45 GMT+0000 (Greenwich Mean Time) √ EX-6191 - Part 9: Verify the GC Admin received Bell Notification and use it to sign the tag.Sun Aug 27 2023 06:15:51 GMT+0000 (Greenwich Mean Time) (36872ms) √ EX-6191 - Part 9: Verify the GC Admin received Bell Notification and use it to sign the tag.Sun Aug 27 2023 06:15:51 GMT+0000 (Greenwich Mean Time) (36872ms) √ EX-6191 - Part 10: Verify the tag status in the GC Admin T&M Log.Sun Aug 27 2023 06:15:51 GMT+0000 (Greenwich Mean Time) (55895ms) √ EX-6191 - Part 10: Verify the tag status in the GC Admin T&M Log.Sun Aug 27 2023 06:15:51 GMT+0000 (Greenwich Mean Time) (55895ms) √ EX-6191 - Part 11: Verify the tag status in the SC Admin T&M Log.Sun Aug 27 2023 06:15:51 GMT+0000 (Greenwich Mean Time) (52474ms) √ EX-6191 - Part 11: Verify the tag status in the SC Admin T&M Log.Sun Aug 27 2023 06:15:51 GMT+0000 (Greenwich Mean Time) (52474ms) √ EX-6191 - Part 12: Cleanup SC Tag ... Sun Aug 27 2023 06:15:51 GMT+0000 (Greenwich Mean Time) (51235ms) √ EX-6191 - Part 12: Cleanup SC Tag ... Sun Aug 27 2023 06:15:51 GMT+0000 (Greenwich Mean Time) (51235ms) 13 passing (15m) 13 passing (15m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_069.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 13 │ │ Passing: 13 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 14 minutes, 45 seconds │ │ Estimated: 17 minutes, 10 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6191-sc-creates-tag-required-signer-gc-signs-tag.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-6191-sc-creates-tag-required-signer-gc-signs-tag.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6193-sc-fu-creates-tag-required-signer-gc-fu-sign (71 of 114) s-tag.spec.ts Estimated: 10 minutes, 6 seconds T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Sun Aug 27 2023 06:19:15 GMT+0000 (Greenwich Mean Time) T&M | Workflow | Existing project and contract, SC Field User send a tag. GC Field User signs the tag as single Required Signer.Sun Aug 27 2023 06:19:15 GMT+0000 (Greenwich Mean Time) √ EX-6193 - Part 1: Sub Contractor FU creates a Tag and sends signature request.Sun Aug 27 2023 06:19:15 GMT+0000 (Greenwich Mean Time) (220725ms) √ EX-6193 - Part 1: Sub Contractor FU creates a Tag and sends signature request.Sun Aug 27 2023 06:19:15 GMT+0000 (Greenwich Mean Time) (220725ms) √ EX-6193 - Part 2: Verify the tag was created.Sun Aug 27 2023 06:19:15 GMT+0000 (Greenwich Mean Time) (36073ms) √ EX-6193 - Part 2: Verify the tag was created.Sun Aug 27 2023 06:19:15 GMT+0000 (Greenwich Mean Time) (36073ms) √ EX-6193 - Part 3: Verify the GC FU sees the tag.Sun Aug 27 2023 06:19:15 GMT+0000 (Greenwich Mean Time) (28209ms) √ EX-6193 - Part 3: Verify the GC FU sees the tag.Sun Aug 27 2023 06:19:15 GMT+0000 (Greenwich Mean Time) (28209ms) √ EX-6193 - Part 4: Verify GC FU recived emailsSun Aug 27 2023 06:24:08 GMT+0000 (Greenwich Mean Time) √ EX-6193 - Part 4: Verify GC FU recived emailsSun Aug 27 2023 06:24:08 GMT+0000 (Greenwich Mean Time) √ EX-6193 - Part 5: Verify the GC FU received Bell Notification and use it to sign the tag.Sun Aug 27 2023 06:24:13 GMT+0000 (Greenwich Mean Time) (28891ms) √ EX-6193 - Part 5: Verify the GC FU received Bell Notification and use it to sign the tag.Sun Aug 27 2023 06:24:13 GMT+0000 (Greenwich Mean Time) (28891ms) √ EX-6193 - Part 6: Verify the tag status in the GC FU T&M Log.Sun Aug 27 2023 06:24:13 GMT+0000 (Greenwich Mean Time) (30736ms) √ EX-6193 - Part 6: Verify the tag status in the GC FU T&M Log.Sun Aug 27 2023 06:24:13 GMT+0000 (Greenwich Mean Time) (30736ms) √ EX-6193 - Part 7: Verify the tag status in the SC FU T&MM Log.Sun Aug 27 2023 06:24:13 GMT+0000 (Greenwich Mean Time) (32182ms) √ EX-6193 - Part 7: Verify the tag status in the SC FU T&MM Log.Sun Aug 27 2023 06:24:13 GMT+0000 (Greenwich Mean Time) (32182ms) √ EX-6193 - Part 8: Cleanup SC Tag ... Sun Aug 27 2023 06:24:13 GMT+0000 (Greenwich Mean Time) (45798ms) √ EX-6193 - Part 8: Cleanup SC Tag ... Sun Aug 27 2023 06:24:13 GMT+0000 (Greenwich Mean Time) (45798ms) 8 passing (7m) 8 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_070.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 16 seconds │ │ Estimated: 10 minutes, 6 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6193-sc-fu-creates-tag-required-signer-gc-fu-signs-tag.spec.t │ │ s │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-6193-sc-fu-creates-tag-required-signer-gc-fu-signs-tag.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-1-sc-pm-creates-project-and-contract-gc-pm-c (72 of 114) reates-tag-optional-signer.spec.ts Estimated: 14 minutes, 31 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 06:26:38 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 06:26:38 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 0: Clean existing tags. Sun Aug 27 2023 06:26:38 GMT+0000 (Greenwich Mean Time) (48290ms) √ EX-6324 - Part 0: Clean existing tags. Sun Aug 27 2023 06:26:38 GMT+0000 (Greenwich Mean Time) (48290ms) √ EX-6324 - Part 1: Sub Contractor creates a Tag and saves it as draft.Sun Aug 27 2023 06:26:38 GMT+0000 (Greenwich Mean Time) (89691ms) √ EX-6324 - Part 1: Sub Contractor creates a Tag and saves it as draft.Sun Aug 27 2023 06:26:38 GMT+0000 (Greenwich Mean Time) (89691ms) √ EX-6324 - Part 2: Sub Contractor ADD Labor values to the draft.Sun Aug 27 2023 06:26:38 GMT+0000 (Greenwich Mean Time) (233238ms) √ EX-6324 - Part 2: Sub Contractor ADD Labor values to the draft.Sun Aug 27 2023 06:26:38 GMT+0000 (Greenwich Mean Time) (233238ms) √ EX-6324 - Part 3: Sub Contractor Add Material values to the draft.Sun Aug 27 2023 06:26:38 GMT+0000 (Greenwich Mean Time) (183031ms) √ EX-6324 - Part 3: Sub Contractor Add Material values to the draft.Sun Aug 27 2023 06:26:38 GMT+0000 (Greenwich Mean Time) (183031ms) √ EX-6324 - Part 4: Sub Contractor Adds Equipment to the draft. Sun Aug 27 2023 06:26:38 GMT+0000 (Greenwich Mean Time) (213953ms) √ EX-6324 - Part 4: Sub Contractor Adds Equipment to the draft. Sun Aug 27 2023 06:26:38 GMT+0000 (Greenwich Mean Time) (213953ms) 5 passing (13m) 5 passing (13m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_071.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 12 minutes, 50 seconds │ │ Estimated: 14 minutes, 31 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-1-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-6324-1-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-2-sc-pm-creates-project-and-contract-gc-pm-c (73 of 114) reates-tag-optional-signer.spec.ts Estimated: 11 minutes, 17 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 06:39:36 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 06:39:36 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 5: Sub Contractor Adds Other to the draft. Sun Aug 27 2023 06:39:36 GMT+0000 (Greenwich Mean Time) (232706ms) √ EX-6324 - Part 5: Sub Contractor Adds Other to the draft. Sun Aug 27 2023 06:39:36 GMT+0000 (Greenwich Mean Time) (232706ms) √ EX-6324 - Part 6 : Sub Contractor upload files to the draft.Sun Aug 27 2023 06:39:36 GMT+0000 (Greenwich Mean Time) (118684ms) √ EX-6324 - Part 6 : Sub Contractor upload files to the draft.Sun Aug 27 2023 06:39:36 GMT+0000 (Greenwich Mean Time) (118684ms) √ EX-6324 - Part 7 : Sub Contractor removes one file from the draft.Sun Aug 27 2023 06:39:36 GMT+0000 (Greenwich Mean Time) (107506ms) √ EX-6324 - Part 7 : Sub Contractor removes one file from the draft.Sun Aug 27 2023 06:39:36 GMT+0000 (Greenwich Mean Time) (107506ms) √ EX-6324 - Part 8 : Sub Contractor signs the tag.Sun Aug 27 2023 06:39:36 GMT+0000 (Greenwich Mean Time) (115341ms) √ EX-6324 - Part 8 : Sub Contractor signs the tag.Sun Aug 27 2023 06:39:36 GMT+0000 (Greenwich Mean Time) (115341ms) 4 passing (10m) 4 passing (10m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_072.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 4 │ │ Passing: 4 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 9 minutes, 36 seconds │ │ Estimated: 11 minutes, 17 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-2-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-6324-2-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-c (74 of 114) reates-tag-optional-signer.spec.ts Estimated: 8 minutes, 25 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 06:49:20 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 06:49:20 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 9 : Sub Contractor removes his signature and re-adds it.Sun Aug 27 2023 06:49:20 GMT+0000 (Greenwich Mean Time) (134362ms) √ EX-6324 - Part 9 : Sub Contractor removes his signature and re-adds it.Sun Aug 27 2023 06:49:20 GMT+0000 (Greenwich Mean Time) (134362ms) √ EX-6324 - Part 10 : Sub Contractor removes a user from the TO list and adds another signerSun Aug 27 2023 06:49:20 GMT+0000 (Greenwich Mean Time) (134952ms) √ EX-6324 - Part 10 : Sub Contractor removes a user from the TO list and adds another signerSun Aug 27 2023 06:49:20 GMT+0000 (Greenwich Mean Time) (134952ms) √ EX-6324 - Part 11 : Sub Contractor sends signature request.Sun Aug 27 2023 06:49:20 GMT+0000 (Greenwich Mean Time) (117393ms) √ EX-6324 - Part 11 : Sub Contractor sends signature request.Sun Aug 27 2023 06:49:20 GMT+0000 (Greenwich Mean Time) (117393ms) √ EX-6324 - Part 12: Verify the tag status is Awaiting Signatures.Sun Aug 27 2023 06:49:20 GMT+0000 (Greenwich Mean Time) (46677ms) √ EX-6324 - Part 12: Verify the tag status is Awaiting Signatures.Sun Aug 27 2023 06:49:20 GMT+0000 (Greenwich Mean Time) (46677ms) 4 passing (7m) 4 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_073.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 4 │ │ Passing: 4 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 14 seconds │ │ Estimated: 8 minutes, 25 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-6324-3-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-c (75 of 114) reates-tag-optional-signer.spec.ts Estimated: 1 minute, 51 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 06:56:42 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 06:56:42 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 13: Verify the GC sees the tag.Sun Aug 27 2023 06:56:42 GMT+0000 (Greenwich Mean Time) (46549ms) √ EX-6324 - Part 13: Verify the GC sees the tag.Sun Aug 27 2023 06:56:42 GMT+0000 (Greenwich Mean Time) (46549ms) 1) EX-6324 - Part 14: Verify GC PM User recived emailsSun Aug 27 2023 06:57:35 GMT+0000 (Greenwich Mean Time) 1) EX-6324 - Part 14: Verify GC PM User recived emailsSun Aug 27 2023 06:57:35 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 15: Verify GC Owner User recived emails and sign the tagSun Aug 27 2023 06:57:35 GMT+0000 (Greenwich Mean Time) (11369ms) √ EX-6324 - Part 15: Verify GC Owner User recived emails and sign the tagSun Aug 27 2023 06:57:35 GMT+0000 (Greenwich Mean Time) (11369ms) 2 passing (2m) 1 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 06:57:34 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 14: Verify GC PM User recived emailsSun Aug 27 2023 06:57:35 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'DO NOT DELETE - Project for EX6324' within the selector: 'td' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34) 2 passing (2m) 1 failing 1) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 06:57:34 GMT+0000 (Greenwich Mean Time) EX-6324 - Part 14: Verify GC PM User recived emailsSun Aug 27 2023 06:57:35 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find content: 'DO NOT DELETE - Project for EX6324' within the selector: 'td' but never did. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:31:34) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_074.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 3 │ │ Passing: 2 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: true │ │ Duration: 1 minute, 35 seconds │ │ Estimated: 1 minute, 51 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_ (1272x533) Log\Sent\ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional -signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 065734 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 14 Verify GC PM User recived e mailsSun Aug 27 2023 06573.png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 74% - Finished compressing: 15 seconds - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\05_T&M_Log\Sent\ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts\T&M GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 065734 GMT+0000 (Greenwich Mean Time) -- EX-6324 - Part 14 Verify GC PM User recived emailsSun Aug 27 2023 06573.png - Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-6324-4-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-c (76 of 114) reates-tag-optional-signer.spec.ts Estimated: 5 minutes, 58 seconds T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 06:58:40 GMT+0000 (Greenwich Mean Time) T&M | GC PM creates a project, creates a contract with SC PM. SC PM send a tag, GC signs the tag as single Optional Signer.Sun Aug 27 2023 06:58:40 GMT+0000 (Greenwich Mean Time) √ EX-6324 - Part 16: Verify the tag status in the GC T&M Log.Sun Aug 27 2023 06:58:40 GMT+0000 (Greenwich Mean Time) (48901ms) √ EX-6324 - Part 16: Verify the tag status in the GC T&M Log.Sun Aug 27 2023 06:58:40 GMT+0000 (Greenwich Mean Time) (48901ms) √ EX-6324 - Part 17: Verify the tag status in the SC PM T&MM Log.Sun Aug 27 2023 06:58:40 GMT+0000 (Greenwich Mean Time) (38824ms) √ EX-6324 - Part 17: Verify the tag status in the SC PM T&MM Log.Sun Aug 27 2023 06:58:40 GMT+0000 (Greenwich Mean Time) (38824ms) √ EX-6324 - Part 18: Verify the tag status in the SC Owner T&MM Log.Sun Aug 27 2023 06:58:40 GMT+0000 (Greenwich Mean Time) (39496ms) √ EX-6324 - Part 18: Verify the tag status in the SC Owner T&MM Log.Sun Aug 27 2023 06:58:40 GMT+0000 (Greenwich Mean Time) (39496ms) √ EX-6324 - Part 19: Verify the tag status in the SC Admin T&MM Log.Sun Aug 27 2023 06:58:40 GMT+0000 (Greenwich Mean Time) (44381ms) √ EX-6324 - Part 19: Verify the tag status in the SC Admin T&MM Log.Sun Aug 27 2023 06:58:40 GMT+0000 (Greenwich Mean Time) (44381ms) √ EX-6324 - Part 20: Verify the tag status in the SC PM T&MM Log.Sun Aug 27 2023 06:58:40 GMT+0000 (Greenwich Mean Time) (34270ms) √ EX-6324 - Part 20: Verify the tag status in the SC PM T&MM Log.Sun Aug 27 2023 06:58:40 GMT+0000 (Greenwich Mean Time) (34270ms) √ EX-6324 - Part 21: Cleanup...Sun Aug 27 2023 06:58:40 GMT+0000 (Greenwich Mean Time) (51853ms) √ EX-6324 - Part 21: Cleanup...Sun Aug 27 2023 06:58:40 GMT+0000 (Greenwich Mean Time) (51853ms) 6 passing (4m) 6 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_075.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 18 seconds │ │ Estimated: 5 minutes, 58 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-o │ │ ptional-signer.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-6324-5-sc-pm-creates-project-and-contract-gc-pm-creates-tag-optional-signer.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-6335-sc-sends-tag-gc-signs-tag-as-optional-not-sa (77 of 114) ved-drafts.spec.ts Estimated: 10 minutes, 56 seconds EX-6335 | T&M | Workflow | Existing project and contract, SC PM send a tag. GC Owner signs the tag as one of four Optional Signers. Do not save as draft.Sun Aug 27 2023 07:03:05 GMT+0000 (Greenwich Mean Time) EX-6335 | T&M | Workflow | Existing project and contract, SC PM send a tag. GC Owner signs the tag as one of four Optional Signers. Do not save as draft.Sun Aug 27 2023 07:03:05 GMT+0000 (Greenwich Mean Time) √ EX-6335 - Part 1: Sub Contractor creates a Tag and sends signature request. Sun Aug 27 2023 07:03:05 GMT+0000 (Greenwich Mean Time) (238407ms) √ EX-6335 - Part 1: Sub Contractor creates a Tag and sends signature request. Sun Aug 27 2023 07:03:05 GMT+0000 (Greenwich Mean Time) (238407ms) √ EX-6335 - Part 2: Verify the tag was created. Sun Aug 27 2023 07:03:05 GMT+0000 (Greenwich Mean Time) (49946ms) √ EX-6335 - Part 2: Verify the tag was created. Sun Aug 27 2023 07:03:05 GMT+0000 (Greenwich Mean Time) (49946ms) √ EX-6335 - Part 3: Verify GC User and GC Feild user recived emails. Sun Aug 27 2023 07:08:02 GMT+0000 (Greenwich Mean Time) √ EX-6335 - Part 3: Verify GC User and GC Feild user recived emails. Sun Aug 27 2023 07:08:02 GMT+0000 (Greenwich Mean Time) √ EX-6335 - Part 4: Sign the Tag from Email. Sun Aug 27 2023 07:08:02 GMT+0000 (Greenwich Mean Time) (10816ms) √ EX-6335 - Part 4: Sign the Tag from Email. Sun Aug 27 2023 07:08:02 GMT+0000 (Greenwich Mean Time) (10816ms) √ EX-6335 - Part 5: Verify the tag status in the GC T&M Log. Sun Aug 27 2023 07:08:20 GMT+0000 (Greenwich Mean Time) (49978ms) √ EX-6335 - Part 5: Verify the tag status in the GC T&M Log. Sun Aug 27 2023 07:08:20 GMT+0000 (Greenwich Mean Time) (49978ms) √ EX-6335 - Part 6: Verify the tag status in the SC Admin T&M Log. Sun Aug 27 2023 07:08:20 GMT+0000 (Greenwich Mean Time) (61380ms) √ EX-6335 - Part 6: Verify the tag status in the SC Admin T&M Log. Sun Aug 27 2023 07:08:20 GMT+0000 (Greenwich Mean Time) (61380ms) √ EX-6335 - Part 7: Verify the tag status in the SC PM T&M Log. Sun Aug 27 2023 07:08:20 GMT+0000 (Greenwich Mean Time) (48077ms) √ EX-6335 - Part 7: Verify the tag status in the SC PM T&M Log. Sun Aug 27 2023 07:08:20 GMT+0000 (Greenwich Mean Time) (48077ms) √ EX-6335 - Part 8: Verify the tag status in the SC Owner T&MM Log. Sun Aug 27 2023 07:08:20 GMT+0000 (Greenwich Mean Time) (48997ms) √ EX-6335 - Part 8: Verify the tag status in the SC Owner T&MM Log. Sun Aug 27 2023 07:08:20 GMT+0000 (Greenwich Mean Time) (48997ms) √ EX-6335 - Part 9: Verify the tag status in the SC FieldUser T&MM Log. Sun Aug 27 2023 07:08:20 GMT+0000 (Greenwich Mean Time) (38967ms) √ EX-6335 - Part 9: Verify the tag status in the SC FieldUser T&MM Log. Sun Aug 27 2023 07:08:20 GMT+0000 (Greenwich Mean Time) (38967ms) √ EX-6335 - Part 10: Cleanup SC Tag ... Sun Aug 27 2023 07:08:20 GMT+0000 (Greenwich Mean Time) (55725ms) √ EX-6335 - Part 10: Cleanup SC Tag ... Sun Aug 27 2023 07:08:20 GMT+0000 (Greenwich Mean Time) (55725ms) 10 passing (10m) 10 passing (10m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_076.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 10 │ │ Passing: 10 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 10 minutes, 19 seconds │ │ Estimated: 10 minutes, 56 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-6335-sc-sends-tag-gc-signs-tag-as-optional-not-saved-drafts.s │ │ pec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-6335-sc-sends-tag-gc-signs-tag-as-optional-not-saved-drafts.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 05_T&M_Log/Sent/ex-7224-switch-project-workflow.spec.ts (78 of 114) Estimated: 7 minutes, 13 seconds T&M | SC PM creates a project, creates a tag for it, creates another project, moves the tag to the new project.Sun Aug 27 2023 07:13:33 GMT+0000 (Greenwich Mean Time) T&M | SC PM creates a project, creates a tag for it, creates another project, moves the tag to the new project.Sun Aug 27 2023 07:13:33 GMT+0000 (Greenwich Mean Time) √ EX-7224 - Part 1: SC PM creates a Project A.Sun Aug 27 2023 07:13:33 GMT+0000 (Greenwich Mean Time) (51375ms) √ EX-7224 - Part 1: SC PM creates a Project A.Sun Aug 27 2023 07:13:33 GMT+0000 (Greenwich Mean Time) (51375ms) √ EX-7224 - Part 2: SC adds customer to Project A.Sun Aug 27 2023 07:13:33 GMT+0000 (Greenwich Mean Time) (42193ms) √ EX-7224 - Part 2: SC adds customer to Project A.Sun Aug 27 2023 07:13:33 GMT+0000 (Greenwich Mean Time) (42193ms) √ EX-7224 - Part 3: Sub Contractor creates a tag.Sun Aug 27 2023 07:13:33 GMT+0000 (Greenwich Mean Time) (91745ms) √ EX-7224 - Part 3: Sub Contractor creates a tag.Sun Aug 27 2023 07:13:33 GMT+0000 (Greenwich Mean Time) (91745ms) √ EX-7224 - Part 4: Sub Contractor creates Project B.Sun Aug 27 2023 07:13:33 GMT+0000 (Greenwich Mean Time) (44353ms) √ EX-7224 - Part 4: Sub Contractor creates Project B.Sun Aug 27 2023 07:13:33 GMT+0000 (Greenwich Mean Time) (44353ms) √ EX-7224 - Part 5: Sub Contractor switches the tag to Project B.Sun Aug 27 2023 07:13:33 GMT+0000 (Greenwich Mean Time) (84131ms) √ EX-7224 - Part 5: Sub Contractor switches the tag to Project B.Sun Aug 27 2023 07:13:33 GMT+0000 (Greenwich Mean Time) (84131ms) √ EX-7224 - Part 7: Clean up Project A.Sun Aug 27 2023 07:13:33 GMT+0000 (Greenwich Mean Time) (35235ms) √ EX-7224 - Part 7: Clean up Project A.Sun Aug 27 2023 07:13:33 GMT+0000 (Greenwich Mean Time) (35235ms) √ EX-7224 - Part 8: Cleanup Proejct B.Sun Aug 27 2023 07:13:33 GMT+0000 (Greenwich Mean Time) (33866ms) √ EX-7224 - Part 8: Cleanup Proejct B.Sun Aug 27 2023 07:13:33 GMT+0000 (Greenwich Mean Time) (33866ms) 7 passing (6m) 7 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_077.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 24 seconds │ │ Estimated: 7 minutes, 13 seconds │ │ Spec Ran: 05_T&M_Log/Sent/ex-7224-switch-project-workflow.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\05_T&M_Log\Sent\ex-7224-switch-project-workflow.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 06_Draft_COR_Log/ex-11248-to-verify-that-draft-cor-can-be-created-an (79 of 114) d-is-in-CorDraftLog.spec.ts Estimated: 2 minutes, 50 seconds Draft COR Log | Create a Draft COR, verify its email distr. lists, verify it is not available in the COR Log and Delete it. Sun Aug 27 2023 07:20:04 GMT+0000 (Greenwich Mean Time) Draft COR Log | Create a Draft COR, verify its email distr. lists, verify it is not available in the COR Log and Delete it. Sun Aug 27 2023 07:20:04 GMT+0000 (Greenwich Mean Time) √ EX-11248 | Draft COR Log | Create a Draft COR and Delete it. Sun Aug 27 2023 07:20:04 GMT+0000 (Greenwich Mean Time) (162654ms) √ EX-11248 | Draft COR Log | Create a Draft COR and Delete it. Sun Aug 27 2023 07:20:04 GMT+0000 (Greenwich Mean Time) (162654ms) 1 passing (3m) 1 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_078.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 43 seconds │ │ Estimated: 2 minutes, 50 seconds │ │ Spec Ran: 06_Draft_COR_Log/ex-11248-to-verify-that-draft-cor-can-be-created-and-is-in-CorD │ │ raftLog.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\06_Draft_COR_Log\ex-11248-to-verify-that-draft-cor-can-be-created-and-is-in-CorDraftLog.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-6030-create-cn-respond-with-upload- (80 of 114) cor-verify-all-data.spec.ts Estimated: 6 minutes, 6 seconds Change Notifications | Create CN, respond to it with Upload COR and verify the data in the CN Log. Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) Change Notifications | Create CN, respond to it with Upload COR and verify the data in the CN Log. Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) √ EX-6030 Part 1: Create a project and send invite.Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) (50860ms) √ EX-6030 Part 1: Create a project and send invite.Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) (50860ms) √ EX-6030 Part 2: Add contractor.Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) (48301ms) √ EX-6030 Part 2: Add contractor.Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) (48301ms) √ EX-6030 Part 3: Sub Contractor accepts the invite.Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) (25242ms) √ EX-6030 Part 3: Sub Contractor accepts the invite.Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) (25242ms) √ EX-6030 Part 4: Gen Contractor creates a Pricing Request Change Notification.Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) (52943ms) √ EX-6030 Part 4: Gen Contractor creates a Pricing Request Change Notification.Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) (52943ms) √ EX-6030 Part 5: Sub Contractor responds to the Change Notification with Upload COR.Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) (94794ms) √ EX-6030 Part 5: Sub Contractor responds to the Change Notification with Upload COR.Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) (94794ms) √ EX-6030 Part 6: GC verifies CN data and status.Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) (46933ms) √ EX-6030 Part 6: GC verifies CN data and status.Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) (46933ms) √ EX-6030 Part 7: Cleanup GC...Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) (37650ms) √ EX-6030 Part 7: Cleanup GC...Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) (37650ms) √ EX-6030 Part 7: Cleanup SC...Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) (34808ms) √ EX-6030 Part 7: Cleanup SC...Sun Aug 27 2023 07:22:54 GMT+0000 (Greenwich Mean Time) (34808ms) 8 passing (7m) 8 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_079.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 33 seconds │ │ Estimated: 6 minutes, 6 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-6030-create-cn-respond-with-upload-cor-verify-a │ │ ll-data.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-6030-create-cn-respond-with-upload-cor-verify-all-data.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8597-respond-to-cn-as-SC-and-GC-cle (81 of 114) ar-response.spec.ts Estimated: 15 minutes, 20 seconds Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseSun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) Change Notifications | Clear Response | Respond to CN as GC and SC with all options and clear the responseSun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) √ EX-8597 Part 1: Delete existing CORs. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (101935ms) √ EX-8597 Part 1: Delete existing CORs. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (101935ms) √ EX-8597 Part 2: Delete existing CNs. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (43865ms) √ EX-8597 Part 2: Delete existing CNs. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (43865ms) √ EX-8597 Part 3: Create a CN with type as Authorize T&M Work and send it to Contractor. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (47090ms) √ EX-8597 Part 3: Create a CN with type as Authorize T&M Work and send it to Contractor. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (47090ms) √ EX-8597 Part 4: Respond to CN with No Cost Impact as SC PM. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (60931ms) √ EX-8597 Part 4: Respond to CN with No Cost Impact as SC PM. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (60931ms) √ EX-8597 Part 5: Verify the reponse and clear the response. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (63998ms) √ EX-8597 Part 5: Verify the reponse and clear the response. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (63998ms) √ EX-8597 Part 6: Respond to CN by creating a COR. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (88345ms) √ EX-8597 Part 6: Respond to CN by creating a COR. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (88345ms) √ EX-8597 Part 7: Verify the reponse and clear the response. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (72941ms) √ EX-8597 Part 7: Verify the reponse and clear the response. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (72941ms) √ EX-8597 Part 8: Respond to CN as SC PM by uploading a COR. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (95089ms) √ EX-8597 Part 8: Respond to CN as SC PM by uploading a COR. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (95089ms) √ EX-8597 Part 9: Verify the reponse and clear the response. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (73018ms) √ EX-8597 Part 9: Verify the reponse and clear the response. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (73018ms) √ EX-8597 Part 10: Respond to CN with No Cost Impact as GC PM and verify the reponse and clear the response. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (81994ms) √ EX-8597 Part 10: Respond to CN with No Cost Impact as GC PM and verify the reponse and clear the response. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (81994ms) √ EX-8597 Part 11: Respond to CN by linking received COR as GC PM and verify the reponse and clear the response. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (85082ms) √ EX-8597 Part 11: Respond to CN by linking received COR as GC PM and verify the reponse and clear the response. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (85082ms) √ EX-8597 Part 12: Clean the CORs. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (103079ms) √ EX-8597 Part 12: Clean the CORs. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (103079ms) √ EX-8597 Part 13: Clean the CNs. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (71422ms) √ EX-8597 Part 13: Clean the CNs. Sun Aug 27 2023 07:29:35 GMT+0000 (Greenwich Mean Time) (71422ms) 13 passing (17m) 13 passing (17m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_080.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 13 │ │ Passing: 13 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 16 minutes, 31 seconds │ │ Estimated: 15 minutes, 20 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8597-respond-to-cn-as-SC-and-GC-clear-response. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8597-respond-to-cn-as-SC-and-GC-clear-response.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8599-create-cn-authorize-t&mwork-re (82 of 114) spond-as-SC-PM-with-no-cost-impact.spec.ts Estimated: 4 minutes, 0 seconds Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor. ) Sun Aug 27 2023 07:46:17 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor. ) Sun Aug 27 2023 07:46:17 GMT+0000 (Greenwich Mean Time) √ EX-8599 Part 1: Delete existing CN (46206ms) √ EX-8599 Part 1: Delete existing CN (46206ms) √ EX-8599 Part 2: Create a CN with type as Authorize T&M Work and send it to Contractor. Sun Aug 27 2023 07:46:17 GMT+0000 (Greenwich Mean Time) (53683ms) √ EX-8599 Part 2: Create a CN with type as Authorize T&M Work and send it to Contractor. Sun Aug 27 2023 07:46:17 GMT+0000 (Greenwich Mean Time) (53683ms) √ EX-8599 Part 3: Respond to CN with No Cost Impact. Sun Aug 27 2023 07:46:17 GMT+0000 (Greenwich Mean Time) (82313ms) √ EX-8599 Part 3: Respond to CN with No Cost Impact. Sun Aug 27 2023 07:46:17 GMT+0000 (Greenwich Mean Time) (82313ms) √ EX-8599 Part 4: Verify the data as Gc. Sun Aug 27 2023 07:46:17 GMT+0000 (Greenwich Mean Time) (49919ms) √ EX-8599 Part 4: Verify the data as Gc. Sun Aug 27 2023 07:46:17 GMT+0000 (Greenwich Mean Time) (49919ms) √ EX-8599 Part 5: Delete the CN. Sun Aug 27 2023 07:46:17 GMT+0000 (Greenwich Mean Time) (45714ms) √ EX-8599 Part 5: Delete the CN. Sun Aug 27 2023 07:46:17 GMT+0000 (Greenwich Mean Time) (45714ms) 5 passing (5m) 5 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_081.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 39 seconds │ │ Estimated: 4 minutes, 0 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8599-create-cn-authorize-t&mwork-respond-as-SC- │ │ PM-with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8599-create-cn-authorize-t&mwork-respond-as-SC-PM-with-no-cost-impact.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8942-create-cn-pricing-request-resp (83 of 114) ond-as-SC-PM-with-no-cost-impact.spec.ts Estimated: 4 minutes, 4 seconds Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 07:51:03 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 07:51:03 GMT+0000 (Greenwich Mean Time) √ EX-8942 Part 1: Delete existing CN (45518ms) √ EX-8942 Part 1: Delete existing CN (45518ms) √ EX-8942 Part 2: Create a CN with type as Pricing Request and send it to ContractorSun Aug 27 2023 07:51:03 GMT+0000 (Greenwich Mean Time) (46720ms) √ EX-8942 Part 2: Create a CN with type as Pricing Request and send it to ContractorSun Aug 27 2023 07:51:03 GMT+0000 (Greenwich Mean Time) (46720ms) √ EX-8942 Part 3: Respond to CN with No Cost ImpactSun Aug 27 2023 07:51:03 GMT+0000 (Greenwich Mean Time) (80411ms) √ EX-8942 Part 3: Respond to CN with No Cost ImpactSun Aug 27 2023 07:51:03 GMT+0000 (Greenwich Mean Time) (80411ms) √ EX-8942 Part 4: Verify the data as GcSun Aug 27 2023 07:51:03 GMT+0000 (Greenwich Mean Time) (51172ms) √ EX-8942 Part 4: Verify the data as GcSun Aug 27 2023 07:51:03 GMT+0000 (Greenwich Mean Time) (51172ms) √ EX-8942 Part 5: Delete the CNSun Aug 27 2023 07:51:03 GMT+0000 (Greenwich Mean Time) (41200ms) √ EX-8942 Part 5: Delete the CNSun Aug 27 2023 07:51:03 GMT+0000 (Greenwich Mean Time) (41200ms) 5 passing (4m) 5 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_082.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 26 seconds │ │ Estimated: 4 minutes, 4 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8942-create-cn-pricing-request-respond-as-SC-PM │ │ -with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8942-create-cn-pricing-request-respond-as-SC-PM-with-no-cost-impact.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8943-create-cn-pricing-request-resp (84 of 114) ond-as-SC-PM-with-create-cor.spec.ts Estimated: 6 minutes, 42 seconds Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 07:55:36 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 07:55:36 GMT+0000 (Greenwich Mean Time) √ EX-8943 Part 1: Delete existing CN. (40237ms) √ EX-8943 Part 1: Delete existing CN. (40237ms) √ EX-8943 Part 2: Delete existing CORs. Sun Aug 27 2023 07:55:36 GMT+0000 (Greenwich Mean Time) (57578ms) √ EX-8943 Part 2: Delete existing CORs. Sun Aug 27 2023 07:55:36 GMT+0000 (Greenwich Mean Time) (57578ms) √ EX-8943 Part 3: Create a CN with type as Pricing Request and send it to Contractor. Sun Aug 27 2023 07:55:36 GMT+0000 (Greenwich Mean Time) (49357ms) √ EX-8943 Part 3: Create a CN with type as Pricing Request and send it to Contractor. Sun Aug 27 2023 07:55:36 GMT+0000 (Greenwich Mean Time) (49357ms) √ EX-8943 Part 4: Respond to CN with create COR. Sun Aug 27 2023 07:55:36 GMT+0000 (Greenwich Mean Time) (92448ms) √ EX-8943 Part 4: Respond to CN with create COR. Sun Aug 27 2023 07:55:36 GMT+0000 (Greenwich Mean Time) (92448ms) √ EX-8943 Part 5: Verify the data as GC. Sun Aug 27 2023 07:55:36 GMT+0000 (Greenwich Mean Time) (54663ms) √ EX-8943 Part 5: Verify the data as GC. Sun Aug 27 2023 07:55:36 GMT+0000 (Greenwich Mean Time) (54663ms) √ EX-8943 Part 6: Delete all CORs. Sun Aug 27 2023 07:55:36 GMT+0000 (Greenwich Mean Time) (81006ms) √ EX-8943 Part 6: Delete all CORs. Sun Aug 27 2023 07:55:36 GMT+0000 (Greenwich Mean Time) (81006ms) √ EX-8943 Part 7: Delete the CN. Sun Aug 27 2023 07:55:36 GMT+0000 (Greenwich Mean Time) (55858ms) √ EX-8943 Part 7: Delete the CN. Sun Aug 27 2023 07:55:36 GMT+0000 (Greenwich Mean Time) (55858ms) 7 passing (7m) 7 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_083.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 13 seconds │ │ Estimated: 6 minutes, 42 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8943-create-cn-pricing-request-respond-as-SC-PM │ │ -with-create-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8943-create-cn-pricing-request-respond-as-SC-PM-with-create-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8944-create-cn-pricing-request-resp (85 of 114) ond-as-SC-PM-with-upload-cor.spec.ts Estimated: 6 minutes, 42 seconds Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 08:02:57 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 08:02:57 GMT+0000 (Greenwich Mean Time) √ EX-8944 Part 1: Delete existing CN (47863ms) √ EX-8944 Part 1: Delete existing CN (47863ms) √ EX-8944 Part 2: Delete existing CORsSun Aug 27 2023 08:02:57 GMT+0000 (Greenwich Mean Time) (55006ms) √ EX-8944 Part 2: Delete existing CORsSun Aug 27 2023 08:02:57 GMT+0000 (Greenwich Mean Time) (55006ms) √ EX-8944 Part 3: Create a CN with type as Pricing Request and send it to ContractorSun Aug 27 2023 08:02:57 GMT+0000 (Greenwich Mean Time) (51355ms) √ EX-8944 Part 3: Create a CN with type as Pricing Request and send it to ContractorSun Aug 27 2023 08:02:57 GMT+0000 (Greenwich Mean Time) (51355ms) √ EX-8944 Part 4: Respond to CN with upload corSun Aug 27 2023 08:02:57 GMT+0000 (Greenwich Mean Time) (110106ms) √ EX-8944 Part 4: Respond to CN with upload corSun Aug 27 2023 08:02:57 GMT+0000 (Greenwich Mean Time) (110106ms) √ EX-8944 Part 5: Verify the data as GcSun Aug 27 2023 08:02:57 GMT+0000 (Greenwich Mean Time) (51023ms) √ EX-8944 Part 5: Verify the data as GcSun Aug 27 2023 08:02:57 GMT+0000 (Greenwich Mean Time) (51023ms) √ EX-8944 Part 6: Delete all CORsSun Aug 27 2023 08:02:57 GMT+0000 (Greenwich Mean Time) (79132ms) √ EX-8944 Part 6: Delete all CORsSun Aug 27 2023 08:02:57 GMT+0000 (Greenwich Mean Time) (79132ms) √ EX-8944 Part 7: Delete the CNSun Aug 27 2023 08:02:57 GMT+0000 (Greenwich Mean Time) (49117ms) √ EX-8944 Part 7: Delete the CNSun Aug 27 2023 08:02:57 GMT+0000 (Greenwich Mean Time) (49117ms) 7 passing (7m) 7 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_084.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 25 seconds │ │ Estimated: 6 minutes, 42 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8944-create-cn-pricing-request-respond-as-SC-PM │ │ -with-upload-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8944-create-cn-pricing-request-respond-as-SC-PM-with-upload-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8945-create-cn-pricing-request-resp (86 of 114) ond-as-GC-PM-with-no-cost-impact.spec.ts Estimated: 4 minutes, 7 seconds Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 08:10:29 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 08:10:29 GMT+0000 (Greenwich Mean Time) √ EX-8945 Part 1: Delete existing CN (44279ms) √ EX-8945 Part 1: Delete existing CN (44279ms) √ EX-8945 Part 2: Create a CN with type as Pricing Request and send it to ContractorSun Aug 27 2023 08:10:29 GMT+0000 (Greenwich Mean Time) (47645ms) √ EX-8945 Part 2: Create a CN with type as Pricing Request and send it to ContractorSun Aug 27 2023 08:10:29 GMT+0000 (Greenwich Mean Time) (47645ms) √ EX-8945 Part 3: Respond to CN with No Cost Impact as GC PMSun Aug 27 2023 08:10:29 GMT+0000 (Greenwich Mean Time) (77942ms) √ EX-8945 Part 3: Respond to CN with No Cost Impact as GC PMSun Aug 27 2023 08:10:29 GMT+0000 (Greenwich Mean Time) (77942ms) √ EX-8945 Part 4: Verify the data as ScSun Aug 27 2023 08:10:29 GMT+0000 (Greenwich Mean Time) (59337ms) √ EX-8945 Part 4: Verify the data as ScSun Aug 27 2023 08:10:29 GMT+0000 (Greenwich Mean Time) (59337ms) √ EX-8945 Part 5: Delete the CNSun Aug 27 2023 08:10:29 GMT+0000 (Greenwich Mean Time) (47006ms) √ EX-8945 Part 5: Delete the CNSun Aug 27 2023 08:10:29 GMT+0000 (Greenwich Mean Time) (47006ms) 5 passing (5m) 5 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_085.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 37 seconds │ │ Estimated: 4 minutes, 7 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8945-create-cn-pricing-request-respond-as-GC-PM │ │ -with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8945-create-cn-pricing-request-respond-as-GC-PM-with-no-cost-impact.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8946-create-cn-pricing-request-resp (87 of 114) ond-as-GC-PM-by-linking-existing-cor.spec.ts Estimated: 3 minutes, 59 seconds Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 08:15:13 GMT+0000 (Greenwich Mean Time) Change Notifications | Pricing Request | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 08:15:13 GMT+0000 (Greenwich Mean Time) √ EX-8946 Part 1: Delete existing CN (47702ms) √ EX-8946 Part 1: Delete existing CN (47702ms) √ EX-8946 Part 2: Create a CN with type as Pricing Request and send it to ContractorSun Aug 27 2023 08:15:13 GMT+0000 (Greenwich Mean Time) (49735ms) √ EX-8946 Part 2: Create a CN with type as Pricing Request and send it to ContractorSun Aug 27 2023 08:15:13 GMT+0000 (Greenwich Mean Time) (49735ms) √ EX-8946 Part 3: Respond to CN by linking received COR as GC PMSun Aug 27 2023 08:15:13 GMT+0000 (Greenwich Mean Time) (76193ms) √ EX-8946 Part 3: Respond to CN by linking received COR as GC PMSun Aug 27 2023 08:15:13 GMT+0000 (Greenwich Mean Time) (76193ms) √ EX-8946 Part 4: Verify the data as ScSun Aug 27 2023 08:15:13 GMT+0000 (Greenwich Mean Time) (61176ms) √ EX-8946 Part 4: Verify the data as ScSun Aug 27 2023 08:15:13 GMT+0000 (Greenwich Mean Time) (61176ms) √ EX-8946 Part 5: Delete the CNSun Aug 27 2023 08:15:13 GMT+0000 (Greenwich Mean Time) (40016ms) √ EX-8946 Part 5: Delete the CNSun Aug 27 2023 08:15:13 GMT+0000 (Greenwich Mean Time) (40016ms) 5 passing (5m) 5 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_086.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 36 seconds │ │ Estimated: 3 minutes, 59 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8946-create-cn-pricing-request-respond-as-GC-PM │ │ -by-linking-existing-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8946-create-cn-pricing-request-respond-as-GC-PM-by-linking-existing-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8947-create-cn-authorize-t&mwork-re (88 of 114) spond-as-SC-PM-with-create-cor.spec.ts Estimated: 7 minutes, 3 seconds Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 08:19:57 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 08:19:57 GMT+0000 (Greenwich Mean Time) √ EX-8947 Part 1: Delete existing CN (46139ms) √ EX-8947 Part 1: Delete existing CN (46139ms) √ EX-8947 Part 2: Delete existing CORsSun Aug 27 2023 08:19:57 GMT+0000 (Greenwich Mean Time) (60589ms) √ EX-8947 Part 2: Delete existing CORsSun Aug 27 2023 08:19:57 GMT+0000 (Greenwich Mean Time) (60589ms) √ EX-8947 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorSun Aug 27 2023 08:19:57 GMT+0000 (Greenwich Mean Time) (53810ms) √ EX-8947 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorSun Aug 27 2023 08:19:57 GMT+0000 (Greenwich Mean Time) (53810ms) √ EX-8947 Part 4: Respond to CN with create corSun Aug 27 2023 08:19:57 GMT+0000 (Greenwich Mean Time) (101938ms) √ EX-8947 Part 4: Respond to CN with create corSun Aug 27 2023 08:19:57 GMT+0000 (Greenwich Mean Time) (101938ms) √ EX-8947 Part 5: Verify the data as GcSun Aug 27 2023 08:19:57 GMT+0000 (Greenwich Mean Time) (50111ms) √ EX-8947 Part 5: Verify the data as GcSun Aug 27 2023 08:19:57 GMT+0000 (Greenwich Mean Time) (50111ms) √ EX-8947 Part 6: Delete all CORsSun Aug 27 2023 08:19:57 GMT+0000 (Greenwich Mean Time) (94156ms) √ EX-8947 Part 6: Delete all CORsSun Aug 27 2023 08:19:57 GMT+0000 (Greenwich Mean Time) (94156ms) √ EX-8947 Part 7: Delete the CNSun Aug 27 2023 08:19:57 GMT+0000 (Greenwich Mean Time) (51996ms) √ EX-8947 Part 7: Delete the CNSun Aug 27 2023 08:19:57 GMT+0000 (Greenwich Mean Time) (51996ms) 7 passing (8m) 7 passing (8m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_087.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 39 seconds │ │ Estimated: 7 minutes, 3 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8947-create-cn-authorize-t&mwork-respond-as-SC- │ │ PM-with-create-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8947-create-cn-authorize-t&mwork-respond-as-SC-PM-with-create-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8948-create-cn-authorize-t&mwork-re (89 of 114) spond-as-SC-PM-with-upload-cor.spec.ts Estimated: 7 minutes, 1 second Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 08:27:44 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 08:27:44 GMT+0000 (Greenwich Mean Time) √ EX-8948 Part 1: Delete existing CN (49705ms) √ EX-8948 Part 1: Delete existing CN (49705ms) √ EX-8948 Part 2: Delete existing CORsSun Aug 27 2023 08:27:44 GMT+0000 (Greenwich Mean Time) (59855ms) √ EX-8948 Part 2: Delete existing CORsSun Aug 27 2023 08:27:44 GMT+0000 (Greenwich Mean Time) (59855ms) √ EX-8948 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorSun Aug 27 2023 08:27:44 GMT+0000 (Greenwich Mean Time) (56062ms) √ EX-8948 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorSun Aug 27 2023 08:27:44 GMT+0000 (Greenwich Mean Time) (56062ms) √ EX-8948 Part 4: Respond to CN with upload corSun Aug 27 2023 08:27:44 GMT+0000 (Greenwich Mean Time) (105054ms) √ EX-8948 Part 4: Respond to CN with upload corSun Aug 27 2023 08:27:44 GMT+0000 (Greenwich Mean Time) (105054ms) √ EX-8948 Part 5: Verify the data as Gc. Sun Aug 27 2023 08:27:44 GMT+0000 (Greenwich Mean Time) (52379ms) √ EX-8948 Part 5: Verify the data as Gc. Sun Aug 27 2023 08:27:44 GMT+0000 (Greenwich Mean Time) (52379ms) √ EX-8948 Part 6: Delete all CORs. Sun Aug 27 2023 08:27:44 GMT+0000 (Greenwich Mean Time) (80860ms) √ EX-8948 Part 6: Delete all CORs. Sun Aug 27 2023 08:27:44 GMT+0000 (Greenwich Mean Time) (80860ms) √ EX-8948 Part 7: Delete the CN. Sun Aug 27 2023 08:27:44 GMT+0000 (Greenwich Mean Time) (53583ms) √ EX-8948 Part 7: Delete the CN. Sun Aug 27 2023 08:27:44 GMT+0000 (Greenwich Mean Time) (53583ms) 7 passing (8m) 7 passing (8m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_088.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 39 seconds │ │ Estimated: 7 minutes, 1 second │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8948-create-cn-authorize-t&mwork-respond-as-SC- │ │ PM-with-upload-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8948-create-cn-authorize-t&mwork-respond-as-SC-PM-with-upload-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8949-create-cn-authorize-t&mwork-re (90 of 114) spond-as-GC-PM-with-no-cost-impact.spec.ts Estimated: 5 minutes, 19 seconds Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 08:35:30 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 08:35:30 GMT+0000 (Greenwich Mean Time) √ EX-8949 Part 1: Delete existing CN (49856ms) √ EX-8949 Part 1: Delete existing CN (49856ms) √ EX-8949 Part 2: Create a CN with type as Authorize T&M Work and send it to ContractorSun Aug 27 2023 08:35:30 GMT+0000 (Greenwich Mean Time) (57391ms) √ EX-8949 Part 2: Create a CN with type as Authorize T&M Work and send it to ContractorSun Aug 27 2023 08:35:30 GMT+0000 (Greenwich Mean Time) (57391ms) √ EX-8949 Part 3: Respond to CN with No Cost Impact as GC PMSun Aug 27 2023 08:35:30 GMT+0000 (Greenwich Mean Time) (70834ms) √ EX-8949 Part 3: Respond to CN with No Cost Impact as GC PMSun Aug 27 2023 08:35:30 GMT+0000 (Greenwich Mean Time) (70834ms) √ EX-8949 Part 4: Verify the data as ScSun Aug 27 2023 08:35:30 GMT+0000 (Greenwich Mean Time) (58156ms) √ EX-8949 Part 4: Verify the data as ScSun Aug 27 2023 08:35:30 GMT+0000 (Greenwich Mean Time) (58156ms) √ EX-8949 Part 5: Delete the CNSun Aug 27 2023 08:35:30 GMT+0000 (Greenwich Mean Time) (48594ms) √ EX-8949 Part 5: Delete the CNSun Aug 27 2023 08:35:30 GMT+0000 (Greenwich Mean Time) (48594ms) 5 passing (5m) 5 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_089.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 46 seconds │ │ Estimated: 5 minutes, 19 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8949-create-cn-authorize-t&mwork-respond-as-GC- │ │ PM-with-no-cost-impact.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8949-create-cn-authorize-t&mwork-respond-as-GC-PM-with-no-cost-impact.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 07_ChangeNotificationLog/Sent/ex-8950-create-cn-authorize-t&mwork-re (91 of 114) spond-as-GC-PM-by-linking-existing-cor.spec.ts Estimated: 4 minutes, 31 seconds Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 08:40:24 GMT+0000 (Greenwich Mean Time) Change Notifications | Authorize T&M Work | Create CN as GC PM and respond to CN with No const impact as SC PM(contractor) Sun Aug 27 2023 08:40:24 GMT+0000 (Greenwich Mean Time) √ EX-8950 Part 1: Delete existing CN (37326ms) √ EX-8950 Part 1: Delete existing CN (37326ms) √ EX-8950 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorSun Aug 27 2023 08:40:24 GMT+0000 (Greenwich Mean Time) (56991ms) √ EX-8950 Part 3: Create a CN with type as Authorize T&M Work and send it to ContractorSun Aug 27 2023 08:40:24 GMT+0000 (Greenwich Mean Time) (56991ms) √ EX-8950 Part 4: Respond to CN by linking received COR as GC PMSun Aug 27 2023 08:40:24 GMT+0000 (Greenwich Mean Time) (69293ms) √ EX-8950 Part 4: Respond to CN by linking received COR as GC PMSun Aug 27 2023 08:40:24 GMT+0000 (Greenwich Mean Time) (69293ms) √ EX-8950 Part 5: Verify the data as ScSun Aug 27 2023 08:40:24 GMT+0000 (Greenwich Mean Time) (44833ms) √ EX-8950 Part 5: Verify the data as ScSun Aug 27 2023 08:40:24 GMT+0000 (Greenwich Mean Time) (44833ms) √ EX-8950 Part 6: Delete the CNSun Aug 27 2023 08:40:24 GMT+0000 (Greenwich Mean Time) (48779ms) √ EX-8950 Part 6: Delete the CNSun Aug 27 2023 08:40:24 GMT+0000 (Greenwich Mean Time) (48779ms) 5 passing (4m) 5 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_090.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 18 seconds │ │ Estimated: 4 minutes, 31 seconds │ │ Spec Ran: 07_ChangeNotificationLog/Sent/ex-8950-create-cn-authorize-t&mwork-respond-as-GC- │ │ PM-by-linking-existing-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\07_ChangeNotificationLog\Sent\ex-8950-create-cn-authorize-t&mwork-respond-as-GC-PM-by-linking-existing-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 08_Projects/Active Projects/ex-5467-verify-job-number-propagation-be (92 of 114) tween-project.spec.ts Estimated: 7 minutes, 22 seconds Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) √ EX-5467 - Create project as GC.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (42381ms) √ EX-5467 - Create project as GC.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (42381ms) √ EX-5467 - Add contract.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (46975ms) √ EX-5467 - Add contract.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (46975ms) √ EX-5467 - Verify the contract is added.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (30275ms) √ EX-5467 - Verify the contract is added.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (30275ms) √ EX-5467 - Add Customer.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (39159ms) √ EX-5467 - Add Customer.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (39159ms) √ EX-5467 - Verify Project Details at GC side.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (36030ms) √ EX-5467 - Verify Project Details at GC side.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (36030ms) √ EX-5467 - Accept the project invite at the SC side.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (47414ms) √ EX-5467 - Accept the project invite at the SC side.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (47414ms) √ EX-5467 - Verify Project Details at SC side.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (32875ms) √ EX-5467 - Verify Project Details at SC side.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (32875ms) √ EX-5467 - Accept project invite at the Customer side.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (24358ms) √ EX-5467 - Accept project invite at the Customer side.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (24358ms) √ EX-5467 - Verify Project Details at the Customer side.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (26997ms) √ EX-5467 - Verify Project Details at the Customer side.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (26997ms) √ EX-5467 - Cleanup GC... Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (34621ms) √ EX-5467 - Cleanup GC... Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (34621ms) √ EX-5467 - Cleanup SC... Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (33796ms) √ EX-5467 - Cleanup SC... Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) (33796ms) √ EX-5467 - Cleanup for Owner.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) √ EX-5467 - Cleanup for Owner.Sun Aug 27 2023 08:44:49 GMT+0000 (Greenwich Mean Time) 12 passing (7m) 12 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_091.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 12 │ │ Passing: 12 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 41 seconds │ │ Estimated: 7 minutes, 22 seconds │ │ Spec Ran: 08_Projects/Active Projects/ex-5467-verify-job-number-propagation-between-projec │ │ t.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\08_Projects\Active Projects\ex-5467-verify-job-number-propagation-between-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 08_Projects/Active Projects/ex-7362-verify-job-number-propagation-to (93 of 114) -draft-cors.spec.ts Estimated: 5 minutes, 1 second Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sun Aug 27 2023 08:51:37 GMT+0000 (Greenwich Mean Time) Projects | Verify Customer Job Number and My Job Number propagate properly between customers and contractors.Sun Aug 27 2023 08:51:37 GMT+0000 (Greenwich Mean Time) √ EX-7362 - Part 1: Create project as SC.Sun Aug 27 2023 08:51:37 GMT+0000 (Greenwich Mean Time) (40603ms) √ EX-7362 - Part 1: Create project as SC.Sun Aug 27 2023 08:51:37 GMT+0000 (Greenwich Mean Time) (40603ms) √ EX-7362 - Part 2: Add Customer.Sun Aug 27 2023 08:51:37 GMT+0000 (Greenwich Mean Time) (41366ms) √ EX-7362 - Part 2: Add Customer.Sun Aug 27 2023 08:51:37 GMT+0000 (Greenwich Mean Time) (41366ms) √ EX-7362 - Part 3: Accept the project invite at the GC side.Sun Aug 27 2023 08:51:37 GMT+0000 (Greenwich Mean Time) (33359ms) √ EX-7362 - Part 3: Accept the project invite at the GC side.Sun Aug 27 2023 08:51:37 GMT+0000 (Greenwich Mean Time) (33359ms) √ EX-7362 - Part 4: Create COR and Save it as Draft.Sun Aug 27 2023 08:51:37 GMT+0000 (Greenwich Mean Time) (55701ms) √ EX-7362 - Part 4: Create COR and Save it as Draft.Sun Aug 27 2023 08:51:37 GMT+0000 (Greenwich Mean Time) (55701ms) √ EX-7362 - Part 5: Verify Draft COR data in the Draft COR Log.Sun Aug 27 2023 08:51:37 GMT+0000 (Greenwich Mean Time) (33749ms) √ EX-7362 - Part 5: Verify Draft COR data in the Draft COR Log.Sun Aug 27 2023 08:51:37 GMT+0000 (Greenwich Mean Time) (33749ms) √ EX-7362 - Cleanup GC... Sun Aug 27 2023 08:51:37 GMT+0000 (Greenwich Mean Time) (43817ms) √ EX-7362 - Cleanup GC... Sun Aug 27 2023 08:51:37 GMT+0000 (Greenwich Mean Time) (43817ms) √ EX-7362 - Cleanup SC... Sun Aug 27 2023 08:51:37 GMT+0000 (Greenwich Mean Time) (33168ms) √ EX-7362 - Cleanup SC... Sun Aug 27 2023 08:51:37 GMT+0000 (Greenwich Mean Time) (33168ms) 7 passing (5m) 7 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_092.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 43 seconds │ │ Estimated: 5 minutes, 1 second │ │ Spec Ran: 08_Projects/Active Projects/ex-7362-verify-job-number-propagation-to-draft-cors. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\08_Projects\Active Projects\ex-7362-verify-job-number-propagation-to-draft-cors.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 09_Analytics/ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx (94 of 114) -after-filtering-by-project.spec.ts Estimated: 44 seconds Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Sun Aug 27 2023 08:56:27 GMT+0000 (Greenwich Mean Time) Analytics | Verify the SENT, Detailed TM Tags Report (Excel)Sun Aug 27 2023 08:56:27 GMT+0000 (Greenwich Mean Time) √ EX-5428 - Verify the SENT, Detailed TM Tags Report (Excel).Sun Aug 27 2023 08:56:27 GMT+0000 (Greenwich Mean Time) (42460ms) √ EX-5428 - Verify the SENT, Detailed TM Tags Report (Excel).Sun Aug 27 2023 08:56:27 GMT+0000 (Greenwich Mean Time) (42460ms) 1 passing (44s) 1 passing (44s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_093.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 42 seconds │ │ Estimated: 44 seconds │ │ Spec Ran: 09_Analytics/ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx-after-filte │ │ ring-by-project.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\09_Analytics\ex-5428-verify-sent-export--tm-tag-detailed-report-xlsx-after-filtering-by-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 09_Analytics/ex-8799-verify-received-export--tm-tag-detailed-report- (95 of 114) xlsx-after-filtering-by-project.spec.ts Estimated: 46 seconds Analytics | Verify the Received, Detailed TM Tags Report (Excel)Sun Aug 27 2023 08:57:16 GMT+0000 (Greenwich Mean Time) Analytics | Verify the Received, Detailed TM Tags Report (Excel)Sun Aug 27 2023 08:57:16 GMT+0000 (Greenwich Mean Time) √ EX-8799 - Verify the Received, Detailed TM Tags Report (Excel).Sun Aug 27 2023 08:57:16 GMT+0000 (Greenwich Mean Time) (48310ms) √ EX-8799 - Verify the Received, Detailed TM Tags Report (Excel).Sun Aug 27 2023 08:57:16 GMT+0000 (Greenwich Mean Time) (48310ms) 1 passing (49s) 1 passing (49s) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_094.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 48 seconds │ │ Estimated: 46 seconds │ │ Spec Ran: 09_Analytics/ex-8799-verify-received-export--tm-tag-detailed-report-xlsx-after-f │ │ iltering-by-project.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\09_Analytics\ex-8799-verify-received-export--tm-tag-detailed-report-xlsx-after-filtering-by-project.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/CORs/ex-3720-verify-all-links-in-cor-recieved-email.spec.t (96 of 114) s Estimated: 6 minutes, 12 seconds Email Hyperlinks | To verify that all links on COR received email works fineSun Aug 27 2023 08:58:11 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on COR received email works fineSun Aug 27 2023 08:58:11 GMT+0000 (Greenwich Mean Time) √ EX-3720 Part 1: Create a project. Sun Aug 27 2023 08:58:11 GMT+0000 (Greenwich Mean Time) (47575ms) √ EX-3720 Part 1: Create a project. Sun Aug 27 2023 08:58:11 GMT+0000 (Greenwich Mean Time) (47575ms) √ EX-3720 Part 2: Add contract. Sun Aug 27 2023 08:58:11 GMT+0000 (Greenwich Mean Time) (43720ms) √ EX-3720 Part 2: Add contract. Sun Aug 27 2023 08:58:11 GMT+0000 (Greenwich Mean Time) (43720ms) √ EX-3720 Part 3: Sub Contractor accepts the project invite.Sun Aug 27 2023 08:58:11 GMT+0000 (Greenwich Mean Time) (26664ms) √ EX-3720 Part 3: Sub Contractor accepts the project invite.Sun Aug 27 2023 08:58:11 GMT+0000 (Greenwich Mean Time) (26664ms) √ EX-3720 Part 4: Sub Contractor creates COR.Sun Aug 27 2023 08:58:11 GMT+0000 (Greenwich Mean Time) (114848ms) √ EX-3720 Part 4: Sub Contractor creates COR.Sun Aug 27 2023 08:58:11 GMT+0000 (Greenwich Mean Time) (114848ms) √ EX-3720 Part 5: Verify the new COR email links to clearstory.build.Sun Aug 27 2023 09:02:11 GMT+0000 (Greenwich Mean Time) (15523ms) √ EX-3720 Part 5: Verify the new COR email links to clearstory.build.Sun Aug 27 2023 09:02:11 GMT+0000 (Greenwich Mean Time) (15523ms) √ EX-3720 Part 6: Verify the VIEW/COMMENT/DOWNLOAD button link.Sun Aug 27 2023 09:02:32 GMT+0000 (Greenwich Mean Time) (14181ms) √ EX-3720 Part 6: Verify the VIEW/COMMENT/DOWNLOAD button link.Sun Aug 27 2023 09:02:32 GMT+0000 (Greenwich Mean Time) (14181ms) √ EX-3720 Part 7: Cleanup GC...Sun Aug 27 2023 09:02:32 GMT+0000 (Greenwich Mean Time) (36809ms) √ EX-3720 Part 7: Cleanup GC...Sun Aug 27 2023 09:02:32 GMT+0000 (Greenwich Mean Time) (36809ms) √ EX-3720 Part 8: Cleanup SC...Sun Aug 27 2023 09:02:32 GMT+0000 (Greenwich Mean Time) (35794ms) √ EX-3720 Part 8: Cleanup SC...Sun Aug 27 2023 09:02:32 GMT+0000 (Greenwich Mean Time) (35794ms) 8 passing (6m) 8 passing (6m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_095.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 47 seconds │ │ Estimated: 6 minutes, 12 seconds │ │ Spec Ran: 11_Emails/CORs/ex-3720-verify-all-links-in-cor-recieved-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\11_Emails\CORs\ex-3720-verify-all-links-in-cor-recieved-email.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/ChangeNotifications/ex-3723-verify-all-links-in-pricing-re (97 of 114) quest-cn-response-needed-email.spec.ts Estimated: 4 minutes, 47 seconds Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sun Aug 27 2023 09:04:05 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Pricing Request CN.Sun Aug 27 2023 09:04:05 GMT+0000 (Greenwich Mean Time) √ EX-3723 Part 1: Create a project and send invite.Sun Aug 27 2023 09:04:05 GMT+0000 (Greenwich Mean Time) (48899ms) √ EX-3723 Part 1: Create a project and send invite.Sun Aug 27 2023 09:04:05 GMT+0000 (Greenwich Mean Time) (48899ms) √ EX-3723 Part 2: Add Sub-Contractor.Sun Aug 27 2023 09:04:05 GMT+0000 (Greenwich Mean Time) (47267ms) √ EX-3723 Part 2: Add Sub-Contractor.Sun Aug 27 2023 09:04:05 GMT+0000 (Greenwich Mean Time) (47267ms) √ EX-3723 Part 3: Login to the Sub Contractor account and Accept the invite.Sun Aug 27 2023 09:04:05 GMT+0000 (Greenwich Mean Time) (24622ms) √ EX-3723 Part 3: Login to the Sub Contractor account and Accept the invite.Sun Aug 27 2023 09:04:05 GMT+0000 (Greenwich Mean Time) (24622ms) √ EX-3723 Part 4: Log in back to the Gen Contractor account and create a Pricing Request Change Notification.Sun Aug 27 2023 09:04:05 GMT+0000 (Greenwich Mean Time) (46964ms) √ EX-3723 Part 4: Log in back to the Gen Contractor account and create a Pricing Request Change Notification.Sun Aug 27 2023 09:04:05 GMT+0000 (Greenwich Mean Time) (46964ms) √ EX-3723 Part 5: Verify the Response Needed CN email.Sun Aug 27 2023 09:07:00 GMT+0000 (Greenwich Mean Time) (9115ms) √ EX-3723 Part 5: Verify the Response Needed CN email.Sun Aug 27 2023 09:07:00 GMT+0000 (Greenwich Mean Time) (9115ms) √ EX-3723 Part 6: Verify LinksSun Aug 27 2023 09:07:15 GMT+0000 (Greenwich Mean Time) (17874ms) √ EX-3723 Part 6: Verify LinksSun Aug 27 2023 09:07:15 GMT+0000 (Greenwich Mean Time) (17874ms) √ EX-3723 Part 7: Cleanup GC...Sun Aug 27 2023 09:07:15 GMT+0000 (Greenwich Mean Time) (34107ms) √ EX-3723 Part 7: Cleanup GC...Sun Aug 27 2023 09:07:15 GMT+0000 (Greenwich Mean Time) (34107ms) √ EX-3723 Part 7: Cleanup SC...Sun Aug 27 2023 09:07:15 GMT+0000 (Greenwich Mean Time) (38175ms) √ EX-3723 Part 7: Cleanup SC...Sun Aug 27 2023 09:07:15 GMT+0000 (Greenwich Mean Time) (38175ms) 8 passing (5m) 8 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_096.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 39 seconds │ │ Estimated: 4 minutes, 47 seconds │ │ Spec Ran: 11_Emails/ChangeNotifications/ex-3723-verify-all-links-in-pricing-request-cn-res │ │ ponse-needed-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\11_Emails\ChangeNotifications\ex-3723-verify-all-links-in-pricing-request-cn-response-needed-email.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/ChangeNotifications/ex-5287-verify-all-links-in-authorize- (98 of 114) work-cn-response-needed-email.spec.ts Estimated: 4 minutes, 10 seconds Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Authorize Work CN.Sun Aug 27 2023 09:08:51 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Change Notification Response needed email works fine for Authorize Work CN.Sun Aug 27 2023 09:08:51 GMT+0000 (Greenwich Mean Time) √ EX-5287 Part 1: Create a project.Sun Aug 27 2023 09:08:51 GMT+0000 (Greenwich Mean Time) (50292ms) √ EX-5287 Part 1: Create a project.Sun Aug 27 2023 09:08:51 GMT+0000 (Greenwich Mean Time) (50292ms) √ EX-5287 Part 2: Send invite.Sun Aug 27 2023 09:08:51 GMT+0000 (Greenwich Mean Time) (45953ms) √ EX-5287 Part 2: Send invite.Sun Aug 27 2023 09:08:51 GMT+0000 (Greenwich Mean Time) (45953ms) √ EX-5287 Part 3: Login to the Sub Contractor account and Accept the invite.Sun Aug 27 2023 09:08:51 GMT+0000 (Greenwich Mean Time) (26139ms) √ EX-5287 Part 3: Login to the Sub Contractor account and Accept the invite.Sun Aug 27 2023 09:08:51 GMT+0000 (Greenwich Mean Time) (26139ms) √ EX-5287 Part 4: Log in back to the Gen Contractor account and create a Authorize T&M Work Change Notification.Sun Aug 27 2023 09:08:51 GMT+0000 (Greenwich Mean Time) (47093ms) √ EX-5287 Part 4: Log in back to the Gen Contractor account and create a Authorize T&M Work Change Notification.Sun Aug 27 2023 09:08:51 GMT+0000 (Greenwich Mean Time) (47093ms) √ EX-5287 Part 5: Verify the Response Needed CN email.Sun Aug 27 2023 09:11:47 GMT+0000 (Greenwich Mean Time) (8601ms) √ EX-5287 Part 5: Verify the Response Needed CN email.Sun Aug 27 2023 09:11:47 GMT+0000 (Greenwich Mean Time) (8601ms) √ EX-5287 Part 6: Verify LinksSun Aug 27 2023 09:12:01 GMT+0000 (Greenwich Mean Time) (19838ms) √ EX-5287 Part 6: Verify LinksSun Aug 27 2023 09:12:01 GMT+0000 (Greenwich Mean Time) (19838ms) √ EX-5287 Part 7: Cleanup GC...Sun Aug 27 2023 09:12:01 GMT+0000 (Greenwich Mean Time) (37277ms) √ EX-5287 Part 7: Cleanup GC...Sun Aug 27 2023 09:12:01 GMT+0000 (Greenwich Mean Time) (37277ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_097.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 6 seconds │ │ Estimated: 4 minutes, 10 seconds │ │ Spec Ran: 11_Emails/ChangeNotifications/ex-5287-verify-all-links-in-authorize-work-cn-resp │ │ onse-needed-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\11_Emails\ChangeNotifications\ex-5287-verify-all-links-in-authorize-work-cn-response-needed-email.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/Projects/ex-3717-verify-all-links-in-add-my-company-email. (99 of 114) spec.ts Estimated: 3 minutes, 15 seconds Email Hyperlinks | To verify that all links on Add My Company email work fineSun Aug 27 2023 09:13:04 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Add My Company email work fineSun Aug 27 2023 09:13:04 GMT+0000 (Greenwich Mean Time) √ EX-3717 Part 1: Create project and send invite.Sun Aug 27 2023 09:13:04 GMT+0000 (Greenwich Mean Time) (46572ms) √ EX-3717 Part 1: Create project and send invite.Sun Aug 27 2023 09:13:04 GMT+0000 (Greenwich Mean Time) (46572ms) √ EX-3717 Part 2: Add My Comapny Users. Sun Aug 27 2023 09:13:04 GMT+0000 (Greenwich Mean Time) (42854ms) √ EX-3717 Part 2: Add My Comapny Users. Sun Aug 27 2023 09:13:04 GMT+0000 (Greenwich Mean Time) (42854ms) √ EX-3717 Part 3: Verify the email links to clearstory.build.Sun Aug 27 2023 09:14:40 GMT+0000 (Greenwich Mean Time) (11019ms) √ EX-3717 Part 3: Verify the email links to clearstory.build.Sun Aug 27 2023 09:14:40 GMT+0000 (Greenwich Mean Time) (11019ms) √ EX-3717 Part 4: Verify the JOIN PROJECT button link.Sun Aug 27 2023 09:14:58 GMT+0000 (Greenwich Mean Time) (16402ms) √ EX-3717 Part 4: Verify the JOIN PROJECT button link.Sun Aug 27 2023 09:14:58 GMT+0000 (Greenwich Mean Time) (16402ms) √ EX-3717 Part 5: Cleanup...Sun Aug 27 2023 09:14:58 GMT+0000 (Greenwich Mean Time) (34156ms) √ EX-3717 Part 5: Cleanup...Sun Aug 27 2023 09:14:58 GMT+0000 (Greenwich Mean Time) (34156ms) 5 passing (3m) 5 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_098.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 5 │ │ Passing: 5 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 44 seconds │ │ Estimated: 3 minutes, 15 seconds │ │ Spec Ran: 11_Emails/Projects/ex-3717-verify-all-links-in-add-my-company-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\11_Emails\Projects\ex-3717-verify-all-links-in-add-my-company-email.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/Projects/ex-3718-verify-all-links-in-add-my-customer-email (100 of 114) .spec.ts Estimated: 3 minutes, 53 seconds Email Hyperlinks | To verify that all the links on Add My Customer worksSun Aug 27 2023 09:15:55 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all the links on Add My Customer worksSun Aug 27 2023 09:15:55 GMT+0000 (Greenwich Mean Time) √ EX-3718 Part 1: Create project and send invite.Sun Aug 27 2023 09:15:55 GMT+0000 (Greenwich Mean Time) (48730ms) √ EX-3718 Part 1: Create project and send invite.Sun Aug 27 2023 09:15:55 GMT+0000 (Greenwich Mean Time) (48730ms) √ EX-3718 Part 2: Add Customers.Sun Aug 27 2023 09:15:55 GMT+0000 (Greenwich Mean Time) (40161ms) √ EX-3718 Part 2: Add Customers.Sun Aug 27 2023 09:15:55 GMT+0000 (Greenwich Mean Time) (40161ms) √ EX-3718 Part 3: Login to the Owner PM account and Accept the invite.Sun Aug 27 2023 09:15:55 GMT+0000 (Greenwich Mean Time) (23617ms) √ EX-3718 Part 3: Login to the Owner PM account and Accept the invite.Sun Aug 27 2023 09:15:55 GMT+0000 (Greenwich Mean Time) (23617ms) √ EX-3718 Part 4: Verify the email links to clearstory.build.Sun Aug 27 2023 09:17:54 GMT+0000 (Greenwich Mean Time) (21874ms) √ EX-3718 Part 4: Verify the email links to clearstory.build.Sun Aug 27 2023 09:17:54 GMT+0000 (Greenwich Mean Time) (21874ms) √ EX-3718 Part 5: Verify the JOIN PROJECT button link.Sun Aug 27 2023 09:18:23 GMT+0000 (Greenwich Mean Time) (16017ms) √ EX-3718 Part 5: Verify the JOIN PROJECT button link.Sun Aug 27 2023 09:18:23 GMT+0000 (Greenwich Mean Time) (16017ms) √ EX-3718 Part 6: Cleanup Ow...Sun Aug 27 2023 09:18:23 GMT+0000 (Greenwich Mean Time) √ EX-3718 Part 6: Cleanup Ow...Sun Aug 27 2023 09:18:23 GMT+0000 (Greenwich Mean Time) √ EX-3718 Part 7: Cleanup GC...Sun Aug 27 2023 09:18:23 GMT+0000 (Greenwich Mean Time) (40598ms) √ EX-3718 Part 7: Cleanup GC...Sun Aug 27 2023 09:18:23 GMT+0000 (Greenwich Mean Time) (40598ms) 7 passing (3m) 7 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_099.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 29 seconds │ │ Estimated: 3 minutes, 53 seconds │ │ Spec Ran: 11_Emails/Projects/ex-3718-verify-all-links-in-add-my-customer-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\11_Emails\Projects\ex-3718-verify-all-links-in-add-my-customer-email.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/Projects/ex-3719-verify-all-links-in-add-contrctor-email.s (101 of 114) pec.ts Estimated: 4 minutes, 3 seconds Email Hyperlinks | To verify that all the links on Add Contractors email workSun Aug 27 2023 09:19:31 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all the links on Add Contractors email workSun Aug 27 2023 09:19:31 GMT+0000 (Greenwich Mean Time) √ EX-3719 Part 1: Create a project Sun Aug 27 2023 09:19:31 GMT+0000 (Greenwich Mean Time) (50753ms) √ EX-3719 Part 1: Create a project Sun Aug 27 2023 09:19:31 GMT+0000 (Greenwich Mean Time) (50753ms) √ EX-3719 Part 2: Send invite.Sun Aug 27 2023 09:19:31 GMT+0000 (Greenwich Mean Time) (44382ms) √ EX-3719 Part 2: Send invite.Sun Aug 27 2023 09:19:31 GMT+0000 (Greenwich Mean Time) (44382ms) √ EX-3719 Part 3: Accept invite. Sun Aug 27 2023 09:19:31 GMT+0000 (Greenwich Mean Time) (25104ms) √ EX-3719 Part 3: Accept invite. Sun Aug 27 2023 09:19:31 GMT+0000 (Greenwich Mean Time) (25104ms) √ EX-3719 Part 4: Verify the email links to Eclearstory.build.Sun Aug 27 2023 09:21:38 GMT+0000 (Greenwich Mean Time) (15828ms) √ EX-3719 Part 4: Verify the email links to Eclearstory.build.Sun Aug 27 2023 09:21:38 GMT+0000 (Greenwich Mean Time) (15828ms) √ EX-3719 Part 5: Verify JOIN PROJECT button link.Sun Aug 27 2023 09:22:00 GMT+0000 (Greenwich Mean Time) (14247ms) √ EX-3719 Part 5: Verify JOIN PROJECT button link.Sun Aug 27 2023 09:22:00 GMT+0000 (Greenwich Mean Time) (14247ms) √ EX-3719 Part 6: Cleanup GC...Sun Aug 27 2023 09:22:00 GMT+0000 (Greenwich Mean Time) (35137ms) √ EX-3719 Part 6: Cleanup GC...Sun Aug 27 2023 09:22:00 GMT+0000 (Greenwich Mean Time) (35137ms) √ EX-3719 Part 7: Cleanup SC...Sun Aug 27 2023 09:22:00 GMT+0000 (Greenwich Mean Time) (35279ms) √ EX-3719 Part 7: Cleanup SC...Sun Aug 27 2023 09:22:00 GMT+0000 (Greenwich Mean Time) (35279ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_100.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 53 seconds │ │ Estimated: 4 minutes, 3 seconds │ │ Spec Ran: 11_Emails/Projects/ex-3719-verify-all-links-in-add-contrctor-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\11_Emails\Projects\ex-3719-verify-all-links-in-add-contrctor-email.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 11_Emails/T&M_Tags/ex-3721-verify-all-links-in-please-sign-tm-tag-em (102 of 114) ail.spec.ts Estimated: 5 minutes, 26 seconds Email Hyperlinks | To verify that all links on Please sign T&M tag email works fineSun Aug 27 2023 09:23:31 GMT+0000 (Greenwich Mean Time) Email Hyperlinks | To verify that all links on Please sign T&M tag email works fineSun Aug 27 2023 09:23:31 GMT+0000 (Greenwich Mean Time) √ EX-3721 Part 1: Create a project and send invite.Sun Aug 27 2023 09:23:31 GMT+0000 (Greenwich Mean Time) (48268ms) √ EX-3721 Part 1: Create a project and send invite.Sun Aug 27 2023 09:23:31 GMT+0000 (Greenwich Mean Time) (48268ms) √ EX-3721 Part 2: Send invite.Sun Aug 27 2023 09:23:31 GMT+0000 (Greenwich Mean Time) (45846ms) √ EX-3721 Part 2: Send invite.Sun Aug 27 2023 09:23:31 GMT+0000 (Greenwich Mean Time) (45846ms) √ EX-3721 Part 3: Sub Contractor Accepts the invite.Sun Aug 27 2023 09:23:31 GMT+0000 (Greenwich Mean Time) (25803ms) √ EX-3721 Part 3: Sub Contractor Accepts the invite.Sun Aug 27 2023 09:23:31 GMT+0000 (Greenwich Mean Time) (25803ms) √ EX-3721 Part 4: Sub Contractor creates a Tag.Sun Aug 27 2023 09:23:31 GMT+0000 (Greenwich Mean Time) (55692ms) √ EX-3721 Part 4: Sub Contractor creates a Tag.Sun Aug 27 2023 09:23:31 GMT+0000 (Greenwich Mean Time) (55692ms) √ EX-3721 Part 5: Verify the tag was created.Sun Aug 27 2023 09:23:31 GMT+0000 (Greenwich Mean Time) (43575ms) √ EX-3721 Part 5: Verify the tag was created.Sun Aug 27 2023 09:23:31 GMT+0000 (Greenwich Mean Time) (43575ms) √ EX-3721 Part 6: Verify the please sign T&M email.Sun Aug 27 2023 09:27:18 GMT+0000 (Greenwich Mean Time) (15057ms) √ EX-3721 Part 6: Verify the please sign T&M email.Sun Aug 27 2023 09:27:18 GMT+0000 (Greenwich Mean Time) (15057ms) √ EX-3721 Part 7: Cleanup GC...Sun Aug 27 2023 09:27:39 GMT+0000 (Greenwich Mean Time) (37022ms) √ EX-3721 Part 7: Cleanup GC...Sun Aug 27 2023 09:27:39 GMT+0000 (Greenwich Mean Time) (37022ms) √ EX-3721 Part 7: Cleanup SC...Sun Aug 27 2023 09:27:39 GMT+0000 (Greenwich Mean Time) (34896ms) √ EX-3721 Part 7: Cleanup SC...Sun Aug 27 2023 09:27:39 GMT+0000 (Greenwich Mean Time) (34896ms) 8 passing (5m) 8 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_101.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 8 │ │ Passing: 8 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 5 minutes, 19 seconds │ │ Estimated: 5 minutes, 26 seconds │ │ Spec Ran: 11_Emails/T&M_Tags/ex-3721-verify-all-links-in-please-sign-tm-tag-email.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\11_Emails\T&M_Tags\ex-3721-verify-all-links-in-please-sign-tm-tag-email.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 12_Tag_Activity/ex-10763-verify-activity-feed-is-preserved..spec.ts (103 of 114) Estimated: 1 minute, 17 seconds Activity Feed | T&M | Verify Activity Feed is preserved. Sun Aug 27 2023 09:28:58 GMT+0000 (Greenwich Mean Time) Activity Feed | T&M | Verify Activity Feed is preserved. Sun Aug 27 2023 09:28:58 GMT+0000 (Greenwich Mean Time) √ EX-10763 - Part 1: Verify the Activity feed in 'DO NOT DELETE - Tag for EX-10763' (93612ms) √ EX-10763 - Part 1: Verify the Activity feed in 'DO NOT DELETE - Tag for EX-10763' (93612ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_102.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 33 seconds │ │ Estimated: 1 minute, 17 seconds │ │ Spec Ran: 12_Tag_Activity/ex-10763-verify-activity-feed-is-preserved..spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\12_Tag_Activity\ex-10763-verify-activity-feed-is-preserved..spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 12_Tag_Activity/ex-7214-tag-activity-create-sign-send-reject-from-we (104 of 114) b.spec.ts Estimated: 10 minutes, 14 seconds Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification). Sun Aug 27 2023 09:30:39 GMT+0000 (Greenwich Mean Time) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Reject the tag from the web(Bell notification). Sun Aug 27 2023 09:30:39 GMT+0000 (Greenwich Mean Time) √ EX-7214 - Part 1: Clean the tags (54642ms) √ EX-7214 - Part 1: Clean the tags (54642ms) √ EX-7214 - Part 2: Sub Contractor admin creates a Tag and sends signature request. Sun Aug 27 2023 09:30:39 GMT+0000 (Greenwich Mean Time) (88881ms) √ EX-7214 - Part 2: Sub Contractor admin creates a Tag and sends signature request. Sun Aug 27 2023 09:30:39 GMT+0000 (Greenwich Mean Time) (88881ms) √ EX-7214 - Part 3: Verify activity feed. Sun Aug 27 2023 09:30:39 GMT+0000 (Greenwich Mean Time) (58535ms) √ EX-7214 - Part 3: Verify activity feed. Sun Aug 27 2023 09:30:39 GMT+0000 (Greenwich Mean Time) (58535ms) √ EX-7214 - Part 4: Verify the GC Admin received Bell Notification and use it to reject the tag. Sun Aug 27 2023 09:30:39 GMT+0000 (Greenwich Mean Time) (29173ms) √ EX-7214 - Part 4: Verify the GC Admin received Bell Notification and use it to reject the tag. Sun Aug 27 2023 09:30:39 GMT+0000 (Greenwich Mean Time) (29173ms) √ EX-7214 - Part 5: Verify the tag activity in the SC Admin T&M Log page. Sun Aug 27 2023 09:30:39 GMT+0000 (Greenwich Mean Time) (55567ms) √ EX-7214 - Part 5: Verify the tag activity in the SC Admin T&M Log page. Sun Aug 27 2023 09:30:39 GMT+0000 (Greenwich Mean Time) (55567ms) √ EX-7214 - Part 6: Verify the tag activity in the GC Admin T&M Log page in Receiver tab. Sun Aug 27 2023 09:30:39 GMT+0000 (Greenwich Mean Time) (59248ms) √ EX-7214 - Part 6: Verify the tag activity in the GC Admin T&M Log page in Receiver tab. Sun Aug 27 2023 09:30:39 GMT+0000 (Greenwich Mean Time) (59248ms) √ EX-7214 - Part 7: Cleanup SC Tag ... Sun Aug 27 2023 09:30:39 GMT+0000 (Greenwich Mean Time) (50227ms) √ EX-7214 - Part 7: Cleanup SC Tag ... Sun Aug 27 2023 09:30:39 GMT+0000 (Greenwich Mean Time) (50227ms) 7 passing (7m) 7 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_103.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 36 seconds │ │ Estimated: 10 minutes, 14 seconds │ │ Spec Ran: 12_Tag_Activity/ex-7214-tag-activity-create-sign-send-reject-from-web.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\12_Tag_Activity\ex-7214-tag-activity-create-sign-send-reject-from-web.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 12_Tag_Activity/ex-7215-tag-activity-create-sign-send-revise-resubmi (105 of 114) t-from-web.spec.ts Estimated: 7 minutes, 6 seconds Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Revise and Resubmit the tag from the web(Bell notification)Sun Aug 27 2023 09:37:23 GMT+0000 (Greenwich Mean Time) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Revise and Resubmit the tag from the web(Bell notification)Sun Aug 27 2023 09:37:23 GMT+0000 (Greenwich Mean Time) √ EX-7215 - Part 1: Clean the tags (52616ms) √ EX-7215 - Part 1: Clean the tags (52616ms) √ EX-7215 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagSun Aug 27 2023 09:37:23 GMT+0000 (Greenwich Mean Time) (109416ms) √ EX-7215 - Part 2: Sub Contractor admin creates a Tag and sends signature request. - Create tagSun Aug 27 2023 09:37:23 GMT+0000 (Greenwich Mean Time) (109416ms) √ EX-7215 - Part 3: Verify the GC Admin received Bell Notification and use it to revise and resubmit the tag.Sun Aug 27 2023 09:37:23 GMT+0000 (Greenwich Mean Time) (28664ms) √ EX-7215 - Part 3: Verify the GC Admin received Bell Notification and use it to revise and resubmit the tag.Sun Aug 27 2023 09:37:23 GMT+0000 (Greenwich Mean Time) (28664ms) 1) EX-7215 - Part 4: Verify the tag activity in the SC Admin T&M Log pageSun Aug 27 2023 09:37:23 GMT+0000 (Greenwich Mean Time) 1) EX-7215 - Part 4: Verify the tag activity in the SC Admin T&M Log pageSun Aug 27 2023 09:37:23 GMT+0000 (Greenwich Mean Time) √ EX-7215 - Part 5: Verify the tag activity in the GC Admin T&M Log page in Receiver tabSun Aug 27 2023 09:37:23 GMT+0000 (Greenwich Mean Time) (58103ms) √ EX-7215 - Part 5: Verify the tag activity in the GC Admin T&M Log page in Receiver tabSun Aug 27 2023 09:37:23 GMT+0000 (Greenwich Mean Time) (58103ms) √ EX-7215 - Part 6: Cleanup SC Tag ... Sun Aug 27 2023 09:37:23 GMT+0000 (Greenwich Mean Time) (55123ms) √ EX-7215 - Part 6: Cleanup SC Tag ... Sun Aug 27 2023 09:37:23 GMT+0000 (Greenwich Mean Time) (55123ms) 5 passing (6m) 1 failing 1) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Revise and Resubmit the tag from the web(Bell notification)Sun Aug 27 2023 09:37:23 GMT+0000 (Greenwich Mean Time) EX-7215 - Part 4: Verify the tag activity in the SC Admin T&M Log pageSun Aug 27 2023 09:37:23 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `li[data-option-index='1']`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:342:19) 5 passing (6m) 1 failing 1) Activity Log | T&M Tag | Create the tag, Send the tag, View the tag, Revise and Resubmit the tag from the web(Bell notification)Sun Aug 27 2023 09:37:23 GMT+0000 (Greenwich Mean Time) EX-7215 - Part 4: Verify the tag activity in the SC Admin T&M Log pageSun Aug 27 2023 09:37:23 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `li[data-option-index='1']`, but never found it. at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:342:19) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_104.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 5 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: true │ │ Duration: 5 minutes, 58 seconds │ │ Estimated: 7 minutes, 6 seconds │ │ Spec Ran: 12_Tag_Activity/ex-7215-tag-activity-create-sign-send-revise-resubmit-from-web.s │ │ pec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\12_Tag_ (1272x533) Activity\ex-7215-tag-activity-create-sign-send-revise-resubmit-from-web.spec.ts\ Activity Log T&M Tag Create the tag, Send the tag, View the tag, Revise and Re submit the tag from the web(Bell notification)Sun Aug 27 2023 093723 GMT+0000 (G reenwich Mean Time) -- EX-7215 - Part 4 Verify the tag activity in the SC Admin T&M Log pa.png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 22% Compression progress: 44% Compression progress: 64% Compression progress: 86% - Finished compressing: 54 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\12_Tag_Activity\ex-7215-tag-activity-create-sign-send-revise-resubmit-from-web.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\12_Tag_Activity\ex-7215-tag-activity-create-sign-send-revise-resubmit-from-web.spec.ts\Activity Log T&M Tag Create the tag, Send the tag, View the tag, Revise and Resubmit the tag from the web(Bell notification)Sun Aug 27 2023 093723 GMT+0000 (Greenwich Mean Time) -- EX-7215 - Part 4 Verify the tag activity in the SC Admin T&M Log pa.png - Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\12_Tag_Activity\ex-7215-tag-activity-create-sign-send-revise-resubmit-from-web.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 12_Tag_Activity/ex-7353-tag-activity-create-tag-opened-status.spec.t (106 of 114) s Estimated: 4 minutes, 55 seconds Activity Log | T&M Tag | Create a Tag with status Open and verify its Activity Feed messages. Sun Aug 27 2023 09:44:24 GMT+0000 (Greenwich Mean Time) Activity Log | T&M Tag | Create a Tag with status Open and verify its Activity Feed messages. Sun Aug 27 2023 09:44:24 GMT+0000 (Greenwich Mean Time) √ EX-7353 - Part 1: GC PM creates a projectSun Aug 27 2023 09:44:24 GMT+0000 (Greenwich Mean Time) (47009ms) √ EX-7353 - Part 1: GC PM creates a projectSun Aug 27 2023 09:44:24 GMT+0000 (Greenwich Mean Time) (47009ms) √ EX-7353 - Part 2: GC PM adds a contract with SC PM.Sun Aug 27 2023 09:44:24 GMT+0000 (Greenwich Mean Time) (47393ms) √ EX-7353 - Part 2: GC PM adds a contract with SC PM.Sun Aug 27 2023 09:44:24 GMT+0000 (Greenwich Mean Time) (47393ms) √ EX-7353 - Part 3: Sub Contractor accepts invite from the bell notification.Sun Aug 27 2023 09:44:24 GMT+0000 (Greenwich Mean Time) (29043ms) √ EX-7353 - Part 3: Sub Contractor accepts invite from the bell notification.Sun Aug 27 2023 09:44:24 GMT+0000 (Greenwich Mean Time) (29043ms) √ EX-7353 - Part 4: Gen Contractor creates a Authorize T&M Work Change Notification.Sun Aug 27 2023 09:44:24 GMT+0000 (Greenwich Mean Time) (47274ms) √ EX-7353 - Part 4: Gen Contractor creates a Authorize T&M Work Change Notification.Sun Aug 27 2023 09:44:24 GMT+0000 (Greenwich Mean Time) (47274ms) √ EX-7353 - Part 5: Verify the tag activity in the GC Admin T&M Log page at the receiver tabSun Aug 27 2023 09:44:24 GMT+0000 (Greenwich Mean Time) (45073ms) √ EX-7353 - Part 5: Verify the tag activity in the GC Admin T&M Log page at the receiver tabSun Aug 27 2023 09:44:24 GMT+0000 (Greenwich Mean Time) (45073ms) √ EX-7353 - Part 6: Cleanup SC. Sun Aug 27 2023 09:44:24 GMT+0000 (Greenwich Mean Time) (34413ms) √ EX-7353 - Part 6: Cleanup SC. Sun Aug 27 2023 09:44:24 GMT+0000 (Greenwich Mean Time) (34413ms) √ EX-7353 - Part 6: Cleanup GC. Sun Aug 27 2023 09:44:24 GMT+0000 (Greenwich Mean Time) (31361ms) √ EX-7353 - Part 6: Cleanup GC. Sun Aug 27 2023 09:44:24 GMT+0000 (Greenwich Mean Time) (31361ms) 7 passing (5m) 7 passing (5m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_105.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 42 seconds │ │ Estimated: 4 minutes, 55 seconds │ │ Spec Ran: 12_Tag_Activity/ex-7353-tag-activity-create-tag-opened-status.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\12_Tag_Activity\ex-7353-tag-activity-create-tag-opened-status.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-10247-cor-activity-upload-bc-without-email-sendin (107 of 114) g.spec.ts Estimated: 2 minutes, 15 seconds Activity Log | COR | Create a Backcharge and send out for distributionSun Aug 27 2023 09:49:12 GMT+0000 (Greenwich Mean Time) Activity Log | COR | Create a Backcharge and send out for distributionSun Aug 27 2023 09:49:12 GMT+0000 (Greenwich Mean Time) √ EX-10247 - Part 1: Create a project with contract Sun Aug 27 2023 09:49:12 GMT+0000 (Greenwich Mean Time) (17023ms) √ EX-10247 - Part 1: Create a project with contract Sun Aug 27 2023 09:49:12 GMT+0000 (Greenwich Mean Time) (17023ms) √ Ex-10247 - Part 2: Login as SC Owner and accept the contract (9704ms) √ Ex-10247 - Part 2: Login as SC Owner and accept the contract (9704ms) √ EX-10247 - Part 3: Upload backcharge COR without sending the emails and verify the activity logSun Aug 27 2023 09:49:12 GMT+0000 (Greenwich Mean Time) (81965ms) √ EX-10247 - Part 3: Upload backcharge COR without sending the emails and verify the activity logSun Aug 27 2023 09:49:12 GMT+0000 (Greenwich Mean Time) (81965ms) √ EX-10247 - Part 4: Cleanup GC... Sun Aug 27 2023 09:49:12 GMT+0000 (Greenwich Mean Time) (6486ms) √ EX-10247 - Part 4: Cleanup GC... Sun Aug 27 2023 09:49:12 GMT+0000 (Greenwich Mean Time) (6486ms) 4 passing (2m) 4 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_106.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 4 │ │ Passing: 4 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 1 minute, 55 seconds │ │ Estimated: 2 minutes, 15 seconds │ │ Spec Ran: 13_Cor_Activity/ex-10247-cor-activity-upload-bc-without-email-sending.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-10247-cor-activity-upload-bc-without-email-sending.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-10248-cor-activity-upload-bc-with-email-sending.s (108 of 114) pec.ts Estimated: 2 minutes, 23 seconds EX-10248 - Sun Aug 27 2023 09:51:13 GMT+0000 (Greenwich Mean Time) EX-10248 - Sun Aug 27 2023 09:51:13 GMT+0000 (Greenwich Mean Time) √ Create a Backcharge and send out for distribution Sun Aug 27 2023 09:51:13 GMT+0000 (Greenwich Mean Time) (120757ms) √ Create a Backcharge and send out for distribution Sun Aug 27 2023 09:51:13 GMT+0000 (Greenwich Mean Time) (120757ms) 1 passing (2m) 1 passing (2m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_107.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 2 minutes, 0 seconds │ │ Estimated: 2 minutes, 23 seconds │ │ Spec Ran: 13_Cor_Activity/ex-10248-cor-activity-upload-bc-with-email-sending.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-10248-cor-activity-upload-bc-with-email-sending.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7673-cor-activity-create-cor-draft-view-cor.spec. (109 of 114) ts Estimated: 2 minutes, 4 seconds Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiver. Sun Aug 27 2023 09:53:20 GMT+0000 (Greenwich Mean Time) Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiver. Sun Aug 27 2023 09:53:20 GMT+0000 (Greenwich Mean Time) √ EX-7673 | Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiver. Sun Aug 27 2023 09:53:20 GMT+0000 (Greenwich Mean Time) (264818ms) √ EX-7673 | Activity Log | COR | Create a COR as Draft and send out for distribution and view the COR at the receiver. Sun Aug 27 2023 09:53:20 GMT+0000 (Greenwich Mean Time) (264818ms) 1 passing (4m) 1 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_108.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 1 │ │ Passing: 1 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 4 minutes, 25 seconds │ │ Estimated: 2 minutes, 4 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7673-cor-activity-create-cor-draft-view-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-7673-cor-activity-create-cor-draft-view-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7674-cor-activity-create-cor-resend-cor-resend-co (110 of 114) r-with-email-message-view-cor.spec.ts Estimated: 8 minutes, 13 seconds COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageSun Aug 27 2023 09:57:53 GMT+0000 (Greenwich Mean Time) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageSun Aug 27 2023 09:57:53 GMT+0000 (Greenwich Mean Time) √ EX-7674 - Part 0: Clean existing COR's : Sun Aug 27 2023 09:57:53 GMT+0000 (Greenwich Mean Time) (61539ms) √ EX-7674 - Part 0: Clean existing COR's : Sun Aug 27 2023 09:57:53 GMT+0000 (Greenwich Mean Time) (61539ms) √ EX-7674 - Part 1: Create COR. Sun Aug 27 2023 09:57:53 GMT+0000 (Greenwich Mean Time) (70356ms) √ EX-7674 - Part 1: Create COR. Sun Aug 27 2023 09:57:53 GMT+0000 (Greenwich Mean Time) (70356ms) √ EX-7674 - Part 2: Verify the COR is in the Sent Log : Sun Aug 27 2023 09:57:53 GMT+0000 (Greenwich Mean Time) (61253ms) √ EX-7674 - Part 2: Verify the COR is in the Sent Log : Sun Aug 27 2023 09:57:53 GMT+0000 (Greenwich Mean Time) (61253ms) √ EX-7674 - Part 3: Resend the COR with email message and verify activity in sent log : Sun Aug 27 2023 09:57:53 GMT+0000 (Greenwich Mean Time) (74277ms) √ EX-7674 - Part 3: Resend the COR with email message and verify activity in sent log : Sun Aug 27 2023 09:57:53 GMT+0000 (Greenwich Mean Time) (74277ms) √ EX-7674 - Part 4: Verify the activity at the reciver side : Sun Aug 27 2023 09:57:53 GMT+0000 (Greenwich Mean Time) (60250ms) √ EX-7674 - Part 4: Verify the activity at the reciver side : Sun Aug 27 2023 09:57:53 GMT+0000 (Greenwich Mean Time) (60250ms) √ EX-7674 - Part 5: Clean the COR: Sun Aug 27 2023 09:57:53 GMT+0000 (Greenwich Mean Time) (69802ms) √ EX-7674 - Part 5: Clean the COR: Sun Aug 27 2023 09:57:53 GMT+0000 (Greenwich Mean Time) (69802ms) 6 passing (7m) 6 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_109.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 6 minutes, 39 seconds │ │ Estimated: 8 minutes, 13 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7674-cor-activity-create-cor-resend-cor-resend-cor-with-email │ │ -message-view-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-7674-cor-activity-create-cor-resend-cor-resend-cor-with-email-message-view-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7678-cor-activity-create-cor-change-status-state- (111 of 114) at-receiver.spec.ts Estimated: 7 minutes, 59 seconds Create a COR and send the COR and change the status and stage with email message at the receiver sideSun Aug 27 2023 10:04:39 GMT+0000 (Greenwich Mean Time) Create a COR and send the COR and change the status and stage with email message at the receiver sideSun Aug 27 2023 10:04:39 GMT+0000 (Greenwich Mean Time) √ EX-7678 - Part 1: Clean existing COR's : Sun Aug 27 2023 10:04:39 GMT+0000 (Greenwich Mean Time) (62144ms) √ EX-7678 - Part 1: Clean existing COR's : Sun Aug 27 2023 10:04:39 GMT+0000 (Greenwich Mean Time) (62144ms) √ EX-7678 - Part 2: Create COR : Sun Aug 27 2023 10:04:39 GMT+0000 (Greenwich Mean Time) (66968ms) √ EX-7678 - Part 2: Create COR : Sun Aug 27 2023 10:04:39 GMT+0000 (Greenwich Mean Time) (66968ms) √ EX-7678 - Part 3: Verify the COR is in the Sent Log : Sun Aug 27 2023 10:04:39 GMT+0000 (Greenwich Mean Time) (64401ms) √ EX-7678 - Part 3: Verify the COR is in the Sent Log : Sun Aug 27 2023 10:04:39 GMT+0000 (Greenwich Mean Time) (64401ms) √ EX-7678 - Part 4: Change status and state at sent side verify activity in received log : Sun Aug 27 2023 10:04:39 GMT+0000 (Greenwich Mean Time) (84584ms) √ EX-7678 - Part 4: Change status and state at sent side verify activity in received log : Sun Aug 27 2023 10:04:39 GMT+0000 (Greenwich Mean Time) (84584ms) √ EX-7678 - Part 5: Verify the activity at the sent side : Sun Aug 27 2023 10:04:39 GMT+0000 (Greenwich Mean Time) (69746ms) √ EX-7678 - Part 5: Verify the activity at the sent side : Sun Aug 27 2023 10:04:39 GMT+0000 (Greenwich Mean Time) (69746ms) √ EX-7678 - Part 6: Clean the COR:Sun Aug 27 2023 10:04:39 GMT+0000 (Greenwich Mean Time) (72449ms) √ EX-7678 - Part 6: Clean the COR:Sun Aug 27 2023 10:04:39 GMT+0000 (Greenwich Mean Time) (72449ms) 6 passing (7m) 6 passing (7m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_110.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 6 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 7 minutes, 1 second │ │ Estimated: 7 minutes, 59 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7678-cor-activity-create-cor-change-status-state-at-receiver. │ │ spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-7678-cor-activity-create-cor-change-status-state-at-receiver.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts (112 of 114) Estimated: 7 minutes, 55 seconds COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageSun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageSun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time) √ EX-7798 - Part 1: Clean existing COR's : Sun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time) (59527ms) √ EX-7798 - Part 1: Clean existing COR's : Sun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time) (59527ms) √ EX-7798 - Part 2: Upload COR : Sun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time) (71211ms) √ EX-7798 - Part 2: Upload COR : Sun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time) (71211ms) 1) EX-7798 - Part 3: View the COR at receiver side : Sun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time) 1) EX-7798 - Part 3: View the COR at receiver side : Sun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time) √ EX-7798 - Part 4: Verify the COR is in the Sent Log : Sun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time) (81407ms) √ EX-7798 - Part 4: Verify the COR is in the Sent Log : Sun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time) (81407ms) √ EX-7798 - Part 5: Verify the activity at the reciver side : Sun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time) (68401ms) √ EX-7798 - Part 5: Verify the activity at the reciver side : Sun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time) (68401ms) √ EX-7798 - Part 6: Clean the COR:Sun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time) (99410ms) √ EX-7798 - Part 6: Clean the COR:Sun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time) (99410ms) 5 passing (8m) 1 failing 1) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageSun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time) EX-7798 - Part 3: View the COR at receiver side : Sun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `:visible`, but never found it. Queried from: > cy.get([data-cy="viewActivityLink"]) at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:167:21) 5 passing (8m) 1 failing 1) COR Log | Create a COR and send out for distribution and resend the cor and resend again with email messageSun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time) EX-7798 - Part 3: View the COR at receiver side : Sun Aug 27 2023 10:11:48 GMT+0000 (Greenwich Mean Time): AssertionError: Timed out retrying after 30000ms: Expected to find element: `:visible`, but never found it. Queried from: > cy.get([data-cy="viewActivityLink"]) at Context.eval (webpack://cypress-extracker-webapp/./cypress/support/commands-object-actions.ts:167:21) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_111.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 6 │ │ Passing: 5 │ │ Failing: 1 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 1 │ │ Video: true │ │ Duration: 8 minutes, 9 seconds │ │ Estimated: 7 minutes, 55 seconds │ │ Spec Ran: 13_Cor_Activity/ex-7798-cor-activity-upload-cor-view-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Screenshots) - C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_ (1272x533) Activity\ex-7798-cor-activity-upload-cor-view-cor.spec.ts\COR Log Create a COR and send out for distribution and resend the cor and resend again with email mes sageSun Aug 27 2023 101148 GMT+0000 (Greenwich Mean Time) -- EX-7798 - Part 3 Vi ew the COR at receiver side Sun Aug 27 2023 101148 GMT+0000 (Greenw.png (Video) - Started compressing: Compressing to 32 CRF Compression progress: 15% Compression progress: 30% Compression progress: 45% Compression progress: 60% Compression progress: 76% Compression progress: 91% - Finished compressing: 1 minute, 22 seconds Compression progress: 100% - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-7798-cor-activity-upload-cor-view-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Done Uploading (1/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\screenshots\13_Cor_Activity\ex-7798-cor-activity-upload-cor-view-cor.spec.ts\COR Log Create a COR and send out for distribution and resend the cor and resend again with email messageSun Aug 27 2023 101148 GMT+0000 (Greenwich Mean Time) -- EX-7798 - Part 3 View the COR at receiver side Sun Aug 27 2023 101148 GMT+0000 (Greenw.png - Done Uploading (2/2) C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-7798-cor-activity-upload-cor-view-cor.spec.ts.mp4 ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-9781-cor-activity-create-bc-to-existing-cor.spec. (113 of 114) ts Estimated: 3 minutes, 44 seconds Backcharges | Activity Feed | Verify a proper activity feed is logged when a Backcharge is created without the option to send emailSun Aug 27 2023 10:21:29 GMT+0000 (Greenwich Mean Time) Backcharges | Activity Feed | Verify a proper activity feed is logged when a Backcharge is created without the option to send emailSun Aug 27 2023 10:21:29 GMT+0000 (Greenwich Mean Time) √ EX-9781 - Part 1: Create project add a contract with owner company user Sun Aug 27 2023 10:21:29 GMT+0000 (Greenwich Mean Time) (20430ms) √ EX-9781 - Part 1: Create project add a contract with owner company user Sun Aug 27 2023 10:21:29 GMT+0000 (Greenwich Mean Time) (20430ms) √ EX-9781 Part 2: Login as Owner and accept the contract. Sun Aug 27 2023 10:21:29 GMT+0000 (Greenwich Mean Time) (6750ms) √ EX-9781 Part 2: Login as Owner and accept the contract. Sun Aug 27 2023 10:21:29 GMT+0000 (Greenwich Mean Time) (6750ms) √ EX-9781 - Part 3: Add second contract with all sc users Sun Aug 27 2023 10:21:29 GMT+0000 (Greenwich Mean Time) (15619ms) √ EX-9781 - Part 3: Add second contract with all sc users Sun Aug 27 2023 10:21:29 GMT+0000 (Greenwich Mean Time) (15619ms) √ EX-9781 Part 4: Login as SC Owner and accept the contract. Sun Aug 27 2023 10:21:29 GMT+0000 (Greenwich Mean Time) (7804ms) √ EX-9781 Part 4: Login as SC Owner and accept the contract. Sun Aug 27 2023 10:21:29 GMT+0000 (Greenwich Mean Time) (7804ms) √ EX-9781 - Part 5: Create COR : Sun Aug 27 2023 10:21:29 GMT+0000 (Greenwich Mean Time) (61358ms) √ EX-9781 - Part 5: Create COR : Sun Aug 27 2023 10:21:29 GMT+0000 (Greenwich Mean Time) (61358ms) √ EX-9781 - Part 6: Create backcharge from the received COR and verify the activity Sun Aug 27 2023 10:21:29 GMT+0000 (Greenwich Mean Time) (111716ms) √ EX-9781 - Part 6: Create backcharge from the received COR and verify the activity Sun Aug 27 2023 10:21:29 GMT+0000 (Greenwich Mean Time) (111716ms) √ EX-9781 - Part 7: Cleanup GC... Sun Aug 27 2023 10:21:29 GMT+0000 (Greenwich Mean Time) (5573ms) √ EX-9781 - Part 7: Cleanup GC... Sun Aug 27 2023 10:21:29 GMT+0000 (Greenwich Mean Time) (5573ms) 7 passing (4m) 7 passing (4m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_112.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 49 seconds │ │ Estimated: 3 minutes, 44 seconds │ │ Spec Ran: 13_Cor_Activity/ex-9781-cor-activity-create-bc-to-existing-cor.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-9781-cor-activity-create-bc-to-existing-cor.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ──────────────────────────────────────────────────────────────────────────────────────────────────── Running: 13_Cor_Activity/ex-9782-cor-activity-create-bc-to-existing-cor-with- (114 of 114) email-sending.spec.ts Estimated: 3 minutes, 31 seconds Backcharges | Activity Feed | Verify a proper activity feed is logged when a Backcharge is created with the option to send emailSun Aug 27 2023 10:25:26 GMT+0000 (Greenwich Mean Time) Backcharges | Activity Feed | Verify a proper activity feed is logged when a Backcharge is created with the option to send emailSun Aug 27 2023 10:25:26 GMT+0000 (Greenwich Mean Time) √ EX-9782 - Part 1: Create project add a contract with owner company user Sun Aug 27 2023 10:25:26 GMT+0000 (Greenwich Mean Time) (17964ms) √ EX-9782 - Part 1: Create project add a contract with owner company user Sun Aug 27 2023 10:25:26 GMT+0000 (Greenwich Mean Time) (17964ms) √ EX-9782 Part 2: Login as Owner and accept the contract. Sun Aug 27 2023 10:25:26 GMT+0000 (Greenwich Mean Time) (7024ms) √ EX-9782 Part 2: Login as Owner and accept the contract. Sun Aug 27 2023 10:25:26 GMT+0000 (Greenwich Mean Time) (7024ms) √ EX-9782 - Part 3: Add second contract with all sc users Sun Aug 27 2023 10:25:26 GMT+0000 (Greenwich Mean Time) (11057ms) √ EX-9782 - Part 3: Add second contract with all sc users Sun Aug 27 2023 10:25:26 GMT+0000 (Greenwich Mean Time) (11057ms) √ EX-9782 Part 4: Login as SC Owner and accept the contract. Sun Aug 27 2023 10:25:26 GMT+0000 (Greenwich Mean Time) (6818ms) √ EX-9782 Part 4: Login as SC Owner and accept the contract. Sun Aug 27 2023 10:25:26 GMT+0000 (Greenwich Mean Time) (6818ms) √ EX-9782 - Part 5: Create COR : Sun Aug 27 2023 10:25:26 GMT+0000 (Greenwich Mean Time) (49938ms) √ EX-9782 - Part 5: Create COR : Sun Aug 27 2023 10:25:26 GMT+0000 (Greenwich Mean Time) (49938ms) √ EX-9782 - Part 6: Create backcharge from the received COR and verify the activity Sun Aug 27 2023 10:25:26 GMT+0000 (Greenwich Mean Time) (105667ms) √ EX-9782 - Part 6: Create backcharge from the received COR and verify the activity Sun Aug 27 2023 10:25:26 GMT+0000 (Greenwich Mean Time) (105667ms) √ EX-9782 - Part 7: Cleanup GC... Sun Aug 27 2023 10:25:26 GMT+0000 (Greenwich Mean Time) (5445ms) √ EX-9782 - Part 7: Cleanup GC... Sun Aug 27 2023 10:25:26 GMT+0000 (Greenwich Mean Time) (5445ms) 7 passing (3m) 7 passing (3m) [mochawesome] Report JSON saved to C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\reports\mocha\mochawesome_113.json (Results) ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ Tests: 7 │ │ Passing: 7 │ │ Failing: 0 │ │ Pending: 0 │ │ Skipped: 0 │ │ Screenshots: 0 │ │ Video: false │ │ Duration: 3 minutes, 24 seconds │ │ Estimated: 3 minutes, 31 seconds │ │ Spec Ran: 13_Cor_Activity/ex-9782-cor-activity-create-bc-to-existing-cor-with-email-sendin │ │ g.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ (Video) - Video output: C:\GitRepo\end-to-end-tests\cypress-extracker-webapp\cypress\videos\13_Cor_Activity\ex-9782-cor-activity-create-bc-to-existing-cor-with-email-sending.spec.ts.mp4 (Uploading Screenshots & Videos) - Nothing to Upload ==================================================================================================== (Run Finished) Spec Tests Passing Failing Pending Skipped ┌────────────────────────────────────────────────────────────────────────────────────────────────┐ │ √ 01_LoginPage/ex-3313-invalid-creden 00:18 1 1 - - - │ │ tials.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 01_LoginPage/ex-3316-email-input-va 00:10 1 1 - - - │ │ lidation.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 01_LoginPage/ex-5751-create-new-acc 00:15 1 1 - - - │ │ ount-with-already-used-email.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 02_PermissionLevels/Add_users_to_Pr 02:44 3 2 1 - - │ │ oject/EX-9394-GC-creates-project-ad │ │ ds-new-customer-user.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 00:57 1 1 - - - │ │ ex-3323-create-new-project-as-owner │ │ -in-owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:33 1 1 - - - │ │ ex-3328-create-new-project-as-owner │ │ -in-sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:40 1 1 - - - │ │ ex-3329-create-new-project-as-owner │ │ -in-other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 00:56 1 1 - - - │ │ ex-3330-create-new-project-as-admin │ │ -in-owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:34 1 1 - - - │ │ ex-3331-create-new-project-as-admin │ │ -in-gc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:37 1 1 - - - │ │ ex-3332-create-new-project-as-pm-in │ │ -gc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 02_PermissionLevels/Create_Project/ 01:22 1 - 1 - - │ │ ex-3333-create-new-project-as-fu-in │ │ -gc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 00:57 1 1 - - - │ │ ex-3334-create-new-project-as-pm-in │ │ -owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 00:54 1 1 - - - │ │ ex-3335-create-new-project-as-fu-in │ │ -owner-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 02_PermissionLevels/Create_Project/ 01:30 1 - 1 - - │ │ ex-3336-create-new-project-as-admin │ │ -in-sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:38 1 1 - - - │ │ ex-3337-create-new-project-as-pm-in │ │ -sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:24 1 1 - - - │ │ ex-3338-create-new-project-as-fu-in │ │ -sc-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:36 1 1 - - - │ │ ex-3342-create-new-project-as-admin │ │ -in-other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:41 1 1 - - - │ │ ex-3343-create-new-project-as-pm-in │ │ -other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Create_Project/ 01:36 1 1 - - - │ │ ex-3344-create-new-project-as-fu-in │ │ -other-company.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Project_level/e 04:52 2 2 - - - │ │ x-10783-project-level-sent-logs-ema │ │ il-for-GC-SC.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/Project_level/e 03:18 7 7 - - - │ │ x-10797-project-level-sent-logs-ema │ │ il-for-GC-SC.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 02:25 6 6 - - - │ │ 792-GC-account-owner-user-previlleg │ │ es.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 06:10 12 12 - - - │ │ 793-GC-Owner-project-previlleges.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 02:23 6 6 - - - │ │ 828-GC-admin-user-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 02:25 6 6 - - - │ │ 829-GC-PM-user-previlleges.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 01:48 5 5 - - - │ │ 830-GC-Field-user-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 03:15 8 8 - - - │ │ 832-SC-Field-users-user-previlleges │ │ .spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 03:36 8 8 - - - │ │ 833-SC-PM-user-previlleges.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 04:24 8 8 - - - │ │ 834-SC-Admin-user-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 04:23 8 8 - - - │ │ 835-SC-account-owner-user-previlleg │ │ es.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 02_PermissionLevels/User_roles/ex-9 10:32 12 - 12 - - │ │ 885-GC-Admin-project-previlleges.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 06:39 12 12 - - - │ │ 886-GC-PM-project-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 02_PermissionLevels/User_roles/ex-9 07:57 12 8 4 - - │ │ 887-SC-Admin-project-previlleges.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 04:54 9 9 - - - │ │ 888-GC-FU-project-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 06:51 12 12 - - - │ │ 889-SC-Owner-project-previlleges.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 06:44 12 12 - - - │ │ 890-SC-PM-project-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 02_PermissionLevels/User_roles/ex-9 05:01 9 9 - - - │ │ 891-SC-FU-project-previlleges.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 04_COR_Log/Received/ex-3684-verify- 01:56 2 - 2 - - │ │ user-can-see-only-cors-that-he-has- │ │ access-to.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 04_COR_Log/Received/ex-9912-add-bc- 00:31 1 - 1 - - │ │ to-existing-cor-with-all-role-contr │ │ actors.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 04_COR_Log/Sent/EX-4366-SC-creates- 08:49 11 9 2 - - │ │ project-adds-gc-customer-sc-creates │ │ -cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 04_COR_Log/Sent/EX-4432-to-verify-P 05:13 7 6 1 - - │ │ M-is-able-to-create-cor-as-draft.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/EX-5827-to-verify-m 00:37 1 1 - - - │ │ ultiple-cors-to-same-tag-when-creat │ │ ing-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/EX-5894-to-verify-m 00:41 1 1 - - - │ │ ultiple-cors-to-same-tag-when-uploa │ │ ding-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-3673-verify-cont 04:20 4 4 - - - │ │ ractor-is-able-to-upload-cor-with-o │ │ nly-mandatory-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-3683-GC-creates- 04:45 1 1 - - - │ │ project-adds-contract-SC-creates-co │ │ r.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-3686-verify-ther 00:34 1 1 - - - │ │ e-are-two-tabs-on-cor-log-page-sent │ │ -received.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5244-verify-shar 01:23 1 1 - - - │ │ eable-link-contains-just-the-select │ │ ed-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5333-SC-creates- 02:59 1 1 - - - │ │ cor-with-full-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5396-verify-cont 08:07 11 11 - - - │ │ ractor-is-able-to-upload-cor-with-m │ │ andatory-and-optional-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-5435-create-new- 04:10 6 6 - - - │ │ project-add-contrac-verify-original │ │ -contract-value.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 04_COR_Log/Sent/ex-6681-verify-sent 02:58 2 2 - - - │ │ -summary-data-after-filtering-by-pr │ │ oject.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5425-verify- 02:28 2 2 - - - │ │ received-summary-data-after-filteri │ │ ng-by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5429-verify- 01:25 1 1 - - - │ │ received-export-csv-after-filtering │ │ -by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5431-verify- 01:28 1 1 - - - │ │ received-export-sharelog-after-filt │ │ ering-by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Received/ex-5641-verify- 06:23 5 5 - - - │ │ tnm-log-received-summary-data-after │ │ -filtering-by-tag-status.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-1-gc-create 04:56 5 5 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-2-gc-create 06:58 2 2 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-3-gc-create 03:32 1 1 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-4-gc-create 04:03 1 1 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-5-gc-create 03:29 2 2 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-4415-6-gc-create 06:29 8 8 - - - │ │ s-project-and-contract-sc-creates-t │ │ ag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5424-verify-sent 03:26 2 2 - - - │ │ -summary-data-after-filtering-by-pr │ │ oject.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5430-verify-sent 00:59 1 1 - - - │ │ -export-csv-after-filtering-by-proj │ │ ect.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5505-verify-tnm- 02:13 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-customer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5506-verify-tnm- 02:13 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-job-number.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5507-verify-tnm- 02:18 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-cust-ref-num.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5508-verify-tnm- 14:32 7 7 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-tag-status.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5509-verify-tnm- 02:06 1 1 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-cust-label.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-5510-verify-tnm- 04:02 2 2 - - - │ │ log-sent-summary-data-after-filteri │ │ ng-by-cor-availability.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6191-sc-creates- 14:45 13 13 - - - │ │ tag-required-signer-gc-signs-tag.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6193-sc-fu-creat 07:16 8 8 - - - │ │ es-tag-required-signer-gc-fu-signs- │ │ tag.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-1-sc-pm-cre 12:50 5 5 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-2-sc-pm-cre 09:36 4 4 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-3-sc-pm-cre 07:14 4 4 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 05_T&M_Log/Sent/ex-6324-4-sc-pm-cre 01:35 3 2 1 - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6324-5-sc-pm-cre 04:18 6 6 - - - │ │ ates-project-and-contract-gc-pm-cre │ │ ates-tag-optional-signer.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-6335-sc-sends-ta 10:19 10 10 - - - │ │ g-gc-signs-tag-as-optional-not-save │ │ d-drafts.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 05_T&M_Log/Sent/ex-7224-switch-proj 06:24 7 7 - - - │ │ ect-workflow.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 06_Draft_COR_Log/ex-11248-to-verify 02:43 1 1 - - - │ │ -that-draft-cor-can-be-created-and- │ │ is-in-CorDraftLog.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-60 06:33 8 8 - - - │ │ 30-create-cn-respond-with-upload-co │ │ r-verify-all-data.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-85 16:31 13 13 - - - │ │ 97-respond-to-cn-as-SC-and-GC-clear │ │ -response.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-85 04:39 5 5 - - - │ │ 99-create-cn-authorize-t&mwork-resp │ │ ond-as-SC-PM-with-no-cost-impact.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 04:26 5 5 - - - │ │ 42-create-cn-pricing-request-respon │ │ d-as-SC-PM-with-no-cost-impact.spec │ │ .ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 07:13 7 7 - - - │ │ 43-create-cn-pricing-request-respon │ │ d-as-SC-PM-with-create-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 07:25 7 7 - - - │ │ 44-create-cn-pricing-request-respon │ │ d-as-SC-PM-with-upload-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 04:37 5 5 - - - │ │ 45-create-cn-pricing-request-respon │ │ d-as-GC-PM-with-no-cost-impact.spec │ │ .ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 04:36 5 5 - - - │ │ 46-create-cn-pricing-request-respon │ │ d-as-GC-PM-by-linking-existing-cor. │ │ spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 07:39 7 7 - - - │ │ 47-create-cn-authorize-t&mwork-resp │ │ ond-as-SC-PM-with-create-cor.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 07:39 7 7 - - - │ │ 48-create-cn-authorize-t&mwork-resp │ │ ond-as-SC-PM-with-upload-cor.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 04:46 5 5 - - - │ │ 49-create-cn-authorize-t&mwork-resp │ │ ond-as-GC-PM-with-no-cost-impact.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 07_ChangeNotificationLog/Sent/ex-89 04:18 5 5 - - - │ │ 50-create-cn-authorize-t&mwork-resp │ │ ond-as-GC-PM-by-linking-existing-co │ │ r.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 08_Projects/Active Projects/ex-5467 06:41 12 12 - - - │ │ -verify-job-number-propagation-betw │ │ een-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 08_Projects/Active Projects/ex-7362 04:43 7 7 - - - │ │ -verify-job-number-propagation-to-d │ │ raft-cors.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 09_Analytics/ex-5428-verify-sent-ex 00:42 1 1 - - - │ │ port--tm-tag-detailed-report-xlsx-a │ │ fter-filtering-by-project.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 09_Analytics/ex-8799-verify-receive 00:48 1 1 - - - │ │ d-export--tm-tag-detailed-report-xl │ │ sx-after-filtering-by-project.spec. │ │ ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/CORs/ex-3720-verify-all-l 05:47 8 8 - - - │ │ inks-in-cor-recieved-email.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/ChangeNotifications/ex-37 04:39 8 8 - - - │ │ 23-verify-all-links-in-pricing-requ │ │ est-cn-response-needed-email.spec.t │ │ s │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/ChangeNotifications/ex-52 04:06 7 7 - - - │ │ 87-verify-all-links-in-authorize-wo │ │ rk-cn-response-needed-email.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/Projects/ex-3717-verify-a 02:44 5 5 - - - │ │ ll-links-in-add-my-company-email.sp │ │ ec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/Projects/ex-3718-verify-a 03:29 7 7 - - - │ │ ll-links-in-add-my-customer-email.s │ │ pec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/Projects/ex-3719-verify-a 03:53 7 7 - - - │ │ ll-links-in-add-contrctor-email.spe │ │ c.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 11_Emails/T&M_Tags/ex-3721-verify-a 05:19 8 8 - - - │ │ ll-links-in-please-sign-tm-tag-emai │ │ l.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 12_Tag_Activity/ex-10763-verify-act 01:33 1 1 - - - │ │ ivity-feed-is-preserved..spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 12_Tag_Activity/ex-7214-tag-activit 06:36 7 7 - - - │ │ y-create-sign-send-reject-from-web. │ │ spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 12_Tag_Activity/ex-7215-tag-activit 05:58 6 5 1 - - │ │ y-create-sign-send-revise-resubmit- │ │ from-web.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 12_Tag_Activity/ex-7353-tag-activit 04:42 7 7 - - - │ │ y-create-tag-opened-status.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-10247-cor-activi 01:55 4 4 - - - │ │ ty-upload-bc-without-email-sending. │ │ spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-10248-cor-activi 02:00 1 1 - - - │ │ ty-upload-bc-with-email-sending.spe │ │ c.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-7673-cor-activit 04:25 1 1 - - - │ │ y-create-cor-draft-view-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-7674-cor-activit 06:39 6 6 - - - │ │ y-create-cor-resend-cor-resend-cor- │ │ with-email-message-view-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-7678-cor-activit 07:01 6 6 - - - │ │ y-create-cor-change-status-state-at │ │ -receiver.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ × 13_Cor_Activity/ex-7798-cor-activit 08:09 6 5 1 - - │ │ y-upload-cor-view-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-9781-cor-activit 03:49 7 7 - - - │ │ y-create-bc-to-existing-cor.spec.ts │ ├────────────────────────────────────────────────────────────────────────────────────────────────┤ │ √ 13_Cor_Activity/ex-9782-cor-activit 03:24 7 7 - - - │ │ y-create-bc-to-existing-cor-with-em │ │ ail-sending.spec.ts │ └────────────────────────────────────────────────────────────────────────────────────────────────┘ × 12 of 114 failed (11%) 8:09:26 539 511 28 - - ─────────────────────────────────────────────────────────────────────────────────────────────────────── Recorded Run: https://cloud.cypress.io/projects/1e8aku/runs/19